Panaji, 19th August, 2021 (Sravana 28, 1943)

SERIES II No. 21

PUBLISHED BY AUTHORITY

GOVERNMENT OF GOA

Department of Co-operation

Office of the Registrar of Co-operative Societies

__

Order

No. 50/3/(259)/Elec/BOD/CVCH/RCS/CZ/19/Suppl/

/1224

Read: Letter No. 1/346/Elec/CVCH/ARCS/19/976

dated 29-09-2020 received from the Asst.

Registrar of Co-op. Societies, Central Zone,

Panaji-Goa to grant exemption of Section

59(4) in terms of Section 126A of the Goa

Co-operative Societies Act, 2001 to Campo

Varde Co-operative Housing Society Ltd.,

Campo Varde, Caranzalem-Goa.

In pursuance of the powers vested under Section

126A of the Goa Co-operative Societies Act, 2001

the Government of Goa hereby exempts Campo

Varde Co-operative Housing Society Ltd., Campo

Varde, Caranzalem-Goa from the provisions of

Section 59 (4) of the Goa Co-operative Societies Act,

2001 so as to enable Campo Varde Co-operative

Housing Society Ltd., Campo Varde, Caranzalem-

Goa to constitute its full fledged Board of Directors.

The exemption so granted shall be valid for a

period of three months or until the all vacant posts

of the Board of Directors are duly filled in whichever

is earlier.

By order and in the name of the Governor of

Goa.

Arvind B. Khutkar, Registrar & ex officio

Jt. Secretary (Co-operative Societies).

Panaji, 06th August, 2021.

RNI No. GOAENG/2002/6410

Reg. No. RNP/GOA/32/2021-23

423

Suggestions are welcomed on e-mail: [email protected]

Note:- There is one Extraordinary issue to the Official

Gazette, Series II No. 20 dated 12-08-2021

namely, Extraordinary dated 12-08-2021 from

pages 421 to 422 regarding Notification from

Goa Legislature Secretariat.

Order

No. 1/5/2003/TS/RCS/Part File/Liq/MUCB/1246

Reserve Bank of India (RBI) vide letter dated

27-7-2021

has

submitted

a

requisition

No. DOR.MON/S476/12.22.158/2021-22 of Deputy

General Manager, RBI. Requisition has been

submitted to this authority under Section 92A of

the Goa Co-operative Societies Act, 2001 read with

Section 2(gg) and 13D of the Deposit Insurance and

Credit Guarantee Corporation Act, 1961. This

requisition is for winding up of The Madgaum Urban

Co-op. Bank Ltd., Margao, Goa and to appoint a

Liquidator.

2. The RBI has passed a speaking order for

cancellation of license to carry on banking business

in India under Section 22(4) read with Section 56 of

the Banking Regulation Act, 1949 regarding

Madgaum Urban Co-op. Bank Ltd., Margao, Goa. RBI

has come to a conclusion that the financial position

of the bank leaves no scope for its revival, though

the bank has been given ample time and

opportunity for turn around. The RBI has also

observed that the bank is not satisfying the

requirement of minimum capital and reserves as

prescribed under Section 11 (1) read with Section

56 of the said Act and capital adequacy and earning

prospects as stipulated under Section 22(3) (d) of

the said Act and also the stipulated minimum

regulatory capital requirement. It is further,

concluded that no useful purpose would be served

by allowing the Bank to continue as envisaged in

Section 22 (3) (e) of the Act. Rather, public interest

would be adversely affected if the bank is allowed

to carry on its banking business any further.

3. Therefore, by virtue of powers vested in me

under the provision of sub-section (1) of Section 93

of the Goa Co-operative Societies Act, 2001. I, Arvind

B. Khutkar, Registrar of Co-op. Societies, Govt. of

Goa, Panaji-Goa hereby appoint Shri S.V. Naik,

Retired Goa Civil Service Officer, as the liquidator of

the Madgaum Urban Co-op. Bank Ltd., Margao-Goa.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

424

The liquidator shall have all the powers as

prescribed under Section 95 of the Goa Co-operative

Societies Act, 2001 read with Rule 129 of the Goa

Co-operative Societies Rules, 2003 and shall be

entitled for payment of remuneration of Rs. 80,000/-

per month which shall be paid out of the funds of

the aforesaid Bank.

Arvind B. Khutkar, Registrar (Co-operative

Societies).

Panaji, 10th August, 2021.

———u———

Office of the Asst.Registrar of Co-operative

Societies

__

No. 3/10/00-TS/904

Read: Letter dated 18-12-2020 from the Chairman.

Requested to appoint the Liquidator on

the Society Philcorp & its Associated

Companies Employees Multipurpose Co-op.

Society Ltd., Karaswada, Mapusa-Goa.

Philcorp & its Associated Companies Employees

Multipurpose Co-op. Society Ltd., Karaswada,

Mapusa-Goa, has been registered under Code

Symbol No. RES- ©1/NZ/Goa dated 14-11-1984, and

further classified as “Resource Society” under

sub-classification No. 8 (a) “Credit Resource

Society” in terms of Rule 9 of the Maharashtra

Co-operative Societies Act, 1962 as applied to the

State of Goa is hereby now repealed under Section

128(1) of the Goa Co-operative Societies Act, 2001

and Rule, 2003.

The main object of the Society are to encourage

and foster a sense of mutual help and thrift among

the members, to enable its members, to obtain loans

on reasonable terms, to enable members to save

part of their income in a safe and convenient way.

However, since last many years the Society has

failed to achieve its objectives and its working has

come to stand still due to closure of the parent

Company.

The Society has convened its Annual General

Body Meeting on 29-11-2020 for the year 2019-2020

which was attended by 8 members only. However,

the audit report submitted to this office for the

year 2019-2020 stated that membership strength

as on 31-03-2020 stands at 12. Election of the office

bearer for the term 2015- 2020 has been held and

has assured charged on 07-10-2015 and will end its

tenure on 06-10-2020.

The Society has paid the audit fees for the year

2019-2020 Amt. Rs. 3000/- filing fees Rs. 200/- for

the year 2019-2020.

The General Body Meeting held on 29-11-2020

decided to liquidate the affairs of the Society on

account of closure of its parent Company and insist

on appointment of the Government Liquidator to

handle the proceeding of the Society.

Taking into consideration the stagnant position

of the Society and further vide letter dated

18-12-2021, from the Chairman of the Society

requested to this office as mentioned above for

closure of the Society and appoint Liquidator

for the same. Accordingly, this office issued

Show Cause Notice No. 3/10/00-TS/837 dated

5th February, 2021 to the office bearers for their

final say.

The office bearer has filed reply to the Show

Cause Notice dated 5th February, 2021 to this office

is not found to be satisfactory.

And whereas, the financial position of the

Society as on 31-03-2020 being assessed found to

be not healthy enough and economically viable to

continue its existence. Therefore the entire Board

of Directors and the General Body insist for closure

of its activities.

Further, the Society has submitted the position

as on 31-12-2020 where in the share capital of

Rs. 800/- funds Rs. 263960.22 and other liabilities

Amt. Rs. 4088.01. Whereas cash at Bank

Rs. 36500/93 FD Rs. 200000/- doubtful debt

Rs. 1300/- and Loss estimated at Rs. 31047.30.

From the above, I am satisfied that no useful

purpose will be served by its mere continuance as

the objectives for which it was registered has

remained unachieved, due to disinterest of the

members in General and Board of Directors

members in particular.

Therefore, I pass the following order:-

ORDER

In exercise of the power vested in me under

Section 92 of the Goa Co-op. Societies Act, 2001

and Rules, 2003, I Shri M. N. Kalangutkar, Asstt.

Registrar of Co-op. Societies, North Zone,

Mapusa-Goa, hereby order and direct that the affairs

of the Philcorp & its Associated Companies

Employees Multipurpose Co-op. Society Ltd.,

Karaswada, Mapusa-Goa, be wound up.

Further, in exercise of the power vested in me

under Section 93 and Rule 129 of the Goa Co-op.

Societies Act, 2001 and Rules, 2003. I hereby

appoint Shri Nilesh M. Gawde, Jr. Auditor, O/o the

Asstt. Registrar of Co-op. Societies, North Zone,

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

425

Mapusa as a Liquidator of Philcorp & its Associated

Companies Employees Multipurpose Co-op. Society

Ltd., Karaswada, Mapusa-Goa.

M. N. Kalangutkar, Asstt. Registrar of Co-op.

Societies, North Zone.

Mapusa, 28th July, 2021.

———uuu———

Department of Industries

__

Notification

No. 3/23/2021-IND/277

In exercise of the powers conferred by sub-

-section (1) of Section 3 and Section 4 of the Goa

Investment Promotion and Facilitation of Single

Window Clearance Ordinance, 2021 (Ordinance

No. 3 of 2021) and in supersession of the Government

Notification No. 3/26/2014-IND/428 dated

02-08-2019, the Government of Goa hereby

establishes the Goa Investment Promotion and

Facilitation Board consisting of the following,

namely:-

(i)

Chief Minister

—

Chairperson

of Goa

ex-officio.

(ii) Minister for Industries

—

Vice-Chair-

person,

ex-officio.

(iii) Minister for Finance

—

ex-officio

member.

(iv) Chairman, Goa Industrial —

ex-officio

Development Corporation

member.

(v) Chief Secretary

—

ex-officio

member.

(vi) Secretary (Industries)

—

ex-officio

member.

(vii) Secretary (Environment)

—

ex-officio

member.

(viii) Secretary (Town &

—

ex-officio

Country Planning)

member.

(ix) Secretary (Tourism)

—

ex-officio

member.

(x)

Secretary (Revenue)

—

ex-officio

member.

(xi) Secretary (Power)

—

ex-officio

member.

(xii) Shri Ralph De Sousa,

—

Member.

nominee from Goa

Chamber of Commerce

and Industry (GCCI)

(xiii) Shri Vishwanath Kochkar, —

Member.

nominee from Goa State

Industries Association

(GSIA)

(xiv) Ms. Swati Salgaocar,

—

Member.

nominee from Confederation

of Indian Industry

(CII) Goa

(xv) Shri Nilesh Shah, nominee —

Member.

from Travel and Tourism

Association of Goa (TTAG)

(xvi) Shri Milind Anvekar,

—

Member.

nominee from Goa

Technology

Association (GTA)

(xvii) Shri Rajkumar Kamat

—

Member.

(xviii) Chief Executive Officer,

—

Member

Goa Investment

Secretary.

Promotion and

Facilitation Board

This Notification shall come into force with

immediate efffect.

By order and in the name of the Governor of

Goa.

Amalia O. F. Pinto, Under Secretary (Industries).

Porvorim, 11th August, 2021.

———uuu———

Department of Labour

—

Order

No. 24/17/2020-LAB/393

On the recommendation of the Goa Public Service

Commission vide their letter No. COM/II/12/28(4)/

/2021/125 dated 16-07-2021, Government is pleased

to declare satisfactory completion of probation

period as well as confirmation of Shri Satish S.

Vaghonkar, in the post of Deputy Labour

Commissioner (Group ‘A’ Gazetted post) in the office

of the Commissioner, Labour and Employment,

Panaji-Goa with effect from 15-03-2018.

By order and in the name of the Governor of

Goa.

Amalia O. F. Pinto, Under Secretary (Labour).

Porvorim,10th August, 2021.

________

Order

No. 28/32/2021-LAB/385

Whereas, the Government of Goa is of the opinion

that an industrial dispute exists between the

management of M/s. Syngenta India Limited and

M/s. Deccan Fine Chemicals (India) Private Limited,

Santa Monica Works, Corlim Ilhas, Goa and it’s

workman, Shri Noubhat Vaidya, in respect of the

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

426

matter specified in the Schedule hereto (hereinafter

referred to as the “said dispute”);

And whereas, the Government of Goa considers

it expedient to refer the said dispute for

adjudication.

Now therefore, in exercise of the powers

conferred by Clause (c) of sub-section (1) of Section

10 of the Industrial Disputes Act, 1947 (Central Act

14 of 1947) (hereinafter referred to as the “said

Act”), the Government of Goa hereby refers the said

dispute for adjudication to the Labour Court-II of

Goa at Panaji-Goa, constituted under Section 7(1)

of the said Act.

SCHEDULE

“(1) Whether the action of the management of

M/s. Syngenta India Limited in terminating

the services of Shri Noubhat Vaidya, with effect

from 31-01-2011 is legal and justified?

(2) Whether M/s. Deccan Fine Chemicals (India)

Private Limited, Santa Monica Works, Corlim,

Ilhas, Goa, is liable for any claim of Shri

Noubhat

Vaidya,

after

taking

over

manufacturing site of M/s. Syngenta India

Limited, Corlim on 01-06-2016 vide business

transfer agreement dated 21-12-2015?

(3) As per the findings of (1) and (2) above, to what

relief the workman is entitled?”.

By order and in the name of the Governor of

Goa.

Amalia O. F. Pinto, Under Secretary (Labour).

Porvorim, 10th August, 2021.

________

Order

No. 28/34/2021-LAB/386

Whereas, the Government of Goa is of the opinion

that an industrial dispute exists between the

management of M/s. GKB Opthalmics Limited, 16A,

Tivim Industrial Estate, Karaswada, Mapusa, Goa,

and it’s workman, Mrs. Manda Madkar represented

by the Goa Trade and Commercial Workers’ Union,

in respect of the matter specified in the Schedule

hereto (hereinafter referred to as the “said dispute”);

And whereas, the Government of Goa considers

it expedient to refer the said dispute for

adjudication.

Now therefore, in exercise of the powers

conferred by Clause (c) of sub-section (1) of Section

10 of the Industrial Disputes Act, 1947 (Central Act

14 of 1947) (hereinafter referred to as the “said

Act”), the Government of Goa hereby refers the said

dispute for adjudication to the Labour Court-II of

Goa at Panaji-Goa, constituted under Section 7(1) of

the said Act.

SCHEDULE

“(1) Whether the action of the management of

M/s. GKB Opthalmics Limited, 16A, Tivim

Industrial Estate, Karaswada, Mapusa, Goa in

dismissing the services of Mrs. Manda Madkar,

Housekeeping Attendant, with effect from

28-01-2015, is legal and justified?

(2) If not, to what relief the workman is entitled?”.

By order and in the name of the Governor of

Goa.

Amalia O. F. Pinto, Under Secretary (Labour).

Porvorim, 10th August, 2021.

________

Order

No. 28/35/2021-LAB/387

Whereas, the Government of Goa is of the opinion

that an industrial dispute exists between the

management of M/s. GKB Opthalmics Limited, 16A,

Tivim Industrial Estate, Karaswada, Mapusa, Goa

and it’s workman, Mrs. Bindu Dhume, represented

by the Goa Trade and Commercial Workers’ Union,

in respect of the matter specified in the Schedule

hereto (hereinafter referred to as the “said dispute”);

And whereas, the Government of Goa considers

it expedient to refer the said dispute for

adjudication.

Now, therefore, in exercise of the powers

conferred by Clause (c) of sub-section (1) of Section

10 of the Industrial Disputes Act, 1947 (Central Act

14 of 1947) (hereinafter referred to as the “said

Act”), the Government of Goa hereby refers the said

dispute for adjudication to the Labour Court-II of

Goa at Panaji-Goa, constituted under Section 7(1) of

the said Act.

SCHEDULE

“(1) Whether the action of the management of

M/s. GKB Opthalmics Limited, 16A, Tivim

Industrial Estate, Karaswada, Mapusa, Goa in

dismissing the services of Mrs. Bindu Dhume,

QC Packer, with effect from 14-11-2015, is legal

and justified?

(2) If not, to what relief the workman is entitled?”.

By order and in the name of the Governor of

Goa.

Amalia O. F. Pinto, Under Secretary (Labour).

Porvorim, 10th August, 2021.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

427

Order

No. 28/5/2021-LAB/389

Whereas, the Government of Goa is of the opinion

that an industrial dispute exists between

management of M/s. The International Centre Goa,

Dr. E. Borges Road, Dona Paula, Goa and it’s

workperson Ms. Maria Silvia Mergulhao Desouza,

Senior Executive - House Keeping, in respect of the

matter specified in the Schedule hereto (hereinafter

referred to as the “said dispute”);

And whereas, the Government of Goa considers

it expedient to refer the said dispute for

adjudication.

Now therefore, in exercise of the powers

conferred by Clause (c) of sub-section (1) of

Section 10 of the Industrial Disputes Act, 1947

(Central Act 14 of 1947) (hereinafter referred to as

the “said Act”), the Government of Goa hereby

refers the said dispute for adjudication to the Labour

Court-II of Goa at Panaji-Goa, constituted under

Section 7(1) of the said Act.

SCHEDULE

“(1) Whether Ms. Maria Silvia Mergulhao Desouza,

Senior Executive Housekeeping could be

construed as “Workman” as defined under

Section 2(s) of the Industrial Disputes Act, 1947

(Central Act 14 of 1947)?

(2) If answer to the above is in affirmative, then,

whether the action of the management of

M/s. The International Centre Goa, Dona Paula,

Goa, in refusing employment to Ms. Maria

Silvia Mergulhao Desouza, with effet from

02-01-2020, is legal and justified?

(3) If answer to issue No. (2) above is in negative

then, what relief the workperson is entitled

to?”.

By order and in the name of the Governor

of Goa.

Amalia O. F. Pinto, Under Secretary (Labour).

Porvorim, 10th August, 2021.

________

Notification

No. 28/2/2021-LAB/341

The following Award passed by the Industrial

Tribunal and Labour Court, at Panaji-Goa on

22-06-2021 in Ref. No. IT/03/21 is hereby published

as required under Section 17 of the Industrial

Disputes Act, 1947 (Central Act 14 of 1947).

By order and in the name of the Governor

of Goa.

Amalia O. F. Pinto, Under Secretary (Labour).

Porvorim, 19th July, 2021.

IN THE INDUSTRIAL TRIBUNAL AND

LABOUR COURT

GOVERNMENT OF GOA

AT PANAJI

(Before Ms. Bela N. Naik, Hon’ble Presiding

Officer)

Ref. No. IT/03/21

The General Manager,

M/s Sanofi India Limited,

L-121, Phase III,

Verna Industrial Estate,

Verna, Goa- 403722.

.... Employer/Party I

V/s

Workmen,

Rep. by the President,

Bhartiya Kamgar Sena,

C/o Shankar Murari Pandit,

H. No. 86/1(85, Mahalaxmi Residency,

Behind Kala Bhavan,

Sancoale, Goa- 403726.

..... Workman/Party II

Employer/Party I represented by Ld. Adv. Shri M. S.

Bandodkar.

Workmen/Party II represented by Ld. Adv. Shri P. J.

Kamat.

AWARD

(Delivered on this the 22nd day of the month

of June of the Year 2021)

By Order dated 21-12-2020, bearing No. 28/22/

/2020-LAB/1118, the Government of Goa in exercise

of powers conferred by Section 10 (1)(d) of the

Industrial Disputes Act, 1947 (for short The Act),

has referred the following dispute to this Tribunal

for adjudication.

“(1) Whether the action of the Bhartiya Kamgar

Sena, c/o Shankar Pandit, H. No. 86/1 (85),

Mahalaxmi Residency, Behind Kala Bhavan,

Upasnagar, Sancoale, Goa, in refusing to

concede the following demands raised by

management of M/s Sanofi India Limited,

Plot No. L-21, Phase III, Verna Industrial

Estate, Verna-Goa, is legal and justified?

CHARTER OF DEMANDS

(1) Demand No. 1: Period of settlement:

The period of settlement will be for a period of

4 years from the date of signing the settlement. No

retrospective settlement to be signed by the

management.

(2) Demand No. 2: Applicability:

Settlement arrived strictly to be extended only

to the workmen who are on the rolls of the company

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

428

and members of the union on the date of submission

of the charter and subsequently remains on the

rolls of the Company on signing of the settlement.

Further the workmen entitled for the same will be

those for whom the union membership proof has

been submitted by the union on the date of raising

charter of demand.

(3) Demand No. 3: Same scale of pay:

The management will not revise any scale

further and will continue to pay the same.

(4) Demand No. 4: No separate dearness allowance

to be paid:

The Management is already revising salary on

yearly basis and increment as per existing scale is

given. No separate dearness allowance component

to be started.

(5) Demand No. 5: HRA:

The Management will continue to pay same HRA

as the component paid is already of higher

standards.

(6) Demand No. 6: LTA:

The Management will continue to pay same LTA

as the component paid is already of higher

standards. The most costliest train journey in Indian

Railways, apart from Tourist Trains, is travelling

from Trivandrum to New Delhi and the current

amount of LTA given covers more than the same.

(7) Demand No. 7: Lunch Allowance:

The Lunch allowance @ 575/- to be paid only to

those employees who don’t avail canteen facility.

(8) Demand No. 8: Subsidized snacks:

The snacks at the start of the shift and midnight

meal to be provided at 50% subsidy cost to the

employees concerned.

(9) Demand No. 9: Education allowance:

The Management will continue to pay existing

Education Allowance but only to be paid to those

workmen who are taking up higher studies and

proof of such to be submitted by the workman.

(10) Demand No. 10: Conveyance allowance:

The Management will continue to pay existing

Conveyance Allowance only to those workmen who

are not availing transport facility provided to the

workman.

(11) Demand No. 11: Transport facility:

The Transport facility to be provided by the

management where only fixed cost will be borne

by the management and fuel cost to be borne by

the workman.

(12) Demand No. 12: Hospitalization policy:

The Management provides hospitalization policy

to those workmen who are outside the purview of

ESIC scheme. Management will continue the

scheme and consider increasing the amount of the

same than covered in last settlement. No separate

medical assistance or any other allowance related

to medical to be paid.

(13) Demand No. 13: Shift Allowance:

The Company works in shift as per provision of

the law. The third shift was initiated with an

understanding of third shift allowance. There is no

change in shifts after that and thus no change in

shift allowance to be given.

(14) Demand No. 14: Special allowance:

The Management will continue to give special

allowance to employees who perform more duties

or special jobs and avails performance based

increment system. Based on performance

evaluation such increment is given every year. In

case any workman wishes to avail such facility the

company may look forward to offer/revise special

allowance to such employees.

(15) Demand No. 15: No separate maintenance

allowance:

No maintenance allowance to be paid to

engineering technicians. In case of non availability

of technical jobs, engineering technicians are

required to perform machine operations on daily

basis.

(16) Demand No. 16: Staggered weekly off for

maintenance dept.:

The engineering technicians are required to

perform preventive maintenance on Sunday or on

a Holiday when the plant is not in operation. The

technicians concerned will not get any overtime

in such case and to get staggered weekly off.

(17) Demand No. 17: Overtime:

Overtime to be paid as per provisions of the law.

(18) Demand No. 18: Leave facilities:

All the workmen to get leaves as per Factories

Act and provisions made therein. Additional leaves

currently granted will be given only in case of

chronic illness certified by the Factory Medical

Officer or under exceptional circumstance

explained in writing by the workman to the

satisfaction of the management. No additional

leave whatsoever than mentioned above to be

provided.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

429

(19) Demand No. 19: Loan:

The Company shall pay reimburse 50% of the

interest charged by the bank to the workman for

a loan upto Rs. 1,20,000/-. Not exceeding Rs. 360/-

per month. This facility will not be extended to

workman who have remained habitually absent

from duties for the previous year.

(20) Demand No. 20: Incentives:

The increment as per the scale yearly to be paid

only if the workman has performed his duties at

least average for the year and has contributed to

the targets. In case of low performance or below

average performance only 50% of the yearly

increment scale to be given. No profit whatsoever

can be shared with workman as the profit needs to

be shared with investors.

(21) Demand No. 21: Punching card:

The provision of biometric punching card would

be made near each machine/cubical. This will help

to track the attendance more accurately and will

and increase productivity. Employees are required

to punch during start and end of the lunch/dinner/

mid-night break timings. In case of violations of

more than 3 times in a month, the management to

deduct the half day salary for such instances in

that particular month.

(22) Demand No. 22: Shift timings:

Current shift timings to be continued. First shift,

Second shift, Third shift and General shift. (8.00 to

16, 16.00 to 00.00, 00.00 to 8.00), shift timings as

agreed upon in the last consent award to be

implemented. Break to be given as per Factories

Act.

(23) Demand No. 23: Transport facility:

The Company currently provides transport

facility to Shiroda, Marcel, Mapusa, Margao, Ponda,

Vasco and Usgao in all three shifts. Company

maintains that this facility has been extended to

all workers without being it a demand in any of

the settlement. Thus, this is a management

prerogative and is not a service condition. However,

company demands that the fixed cost to be borne

by the company of all buses and fuel cost to be

borne by the workmen. Buses to continue to start

at the same timing as on date and will change the

timings as and when it is necessary by giving all

workmen 7 days’ notice.

(24) Demand No. 24: Bonus:

Bonus to be paid by the company as per

provisions of the Bonus Act, 1965 and rules made

therein.

(25) Demand No. 25: Service award:

The company on its own has started rewarding

employees on completion of every 5 years, 10 years,

15 years, 20 years and 25 years in the company.

The reward consists of a merit certificate, trophy

and monetary benefits based on completion of the

number of years in the company. These facilities

are revised as and when deemed necessary. It will

remain same as of now. Company wishes to

introduce that this reward will not be given to any

employee who have faced Disciplinary action and

found guilty in the tenure of last 5 years.

(26) Demand No. 26: Medical Scheme/Medical

Allowance:

The Company already have Medical Scheme

(Medical Hospitalisation Reimbursement Policy)

insurance policy on 24 hr. basis upto an amount of

Rs. 1,00,000/- per financial year for self, spouse and

up to 2 dependent children up to 21 years of age.

It is one of the few companies in the region to offer

such a facility to its workmen in the region-cum-

industry. Company also pays medical allowance @

500/- per month to all such workers who are outside

the purview of ESIC. Company demands that this

amount is to be paid to only those workers who are

outside the purview of ESIC and incurs this medical

expense. They will be required to submit the

medical bills along with certified doctor’s

prescriptions to claim this amount.

Sanofi India Pvt. Ltd. Goa employs contractors

and no casual workers are employed under Sanofi

India Ltd.

(27) Demand No. 27: Local committee of the union/

Meetings:

The Company wants the union to participate

and co-operate in works committee which is

requirement under law. Union should counsel its

workers on following discipline and help company

to increase its productivity. Company already

provides casual leave and in any emergency case

half day casual leave will be considered.

(28) Demand No. 28: Wage ceiling:

The workers have to pay ceiling @ 38,000 INR

CTC per month in the workman grade.

(29) Demand No. 29: Work on special projects as a

part of job rotation:

Current practice of job rotation to continue

which is on need basis to increase productivity.

The company proposed workers depending on their

experience and skill level, may be placed in process

development/projects/any other projects, in house

or external for which they should provide total

participation.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

430

(30) Demand No. 30:

A gift is and also understood to be a donation

or offering. As a welfare measure and for motivating

its workmen, the company on its own has started

marriage gift. The gift which is currently given

cannot be matter of right. These policies of the

company are revised as and when deemed

necessary and at the discretion of the management.

(31) Demand No. 31: CTC basis:

Any increase or demand agreed upon or for

discussion will be on CTC basis. The settlement

amounts to the additional cost to be incurred by

the company and the cost needs to be budgeted

for the settlement period.

(32) Demand No. 32: Insurance Policy:

Workers are covered under ESI Act, which takes

care of all medical needs of the workmen and their

family members for which company contributes a

substantial amount in respect of each workmen.

The company provides its employees a very high

level hygienic, safe and health work environment.

Every employee is medically checked annually and

the company also maintains a full fledged First

Aid centre managed by a full time medical

practitioner and a full time Nurse. Even though

the medical facility is free of cost in State of Goa,

the company on its own have covered its employees

under Employees Compensation Act, Group Life

Insurance Policy, Group Accident Policy. The

amount is decided by the company on timely basis.

(33) Demand No. 33: Lumpsum Payment Incentive:

No lumpsum incentive will be paid for signing

the agreement/wage settlement.

(34) Demand No. 34: Festival Advance:

Current practice of festival advance to continue.

No change in the current practice.

(35) Demand No. 35: CTC increase:

The company offers 5% increase over and above

current CTCC including yearly increment year on

year. CTC will include all emoluments which can

be decided or named by the workers, PF & ESI

(contribution by the company, Bonus, LTA or any

other amount to be paid or any other additional

amount incurred due to change in current clauses

of the consent award.

(36) Demand No. 36: Interim Relief:

ZERO Unauthorized Absenteeism. There is huge

unauthorized absenteeism and it is not acceptable.

The Management propose that the union should

ensure zero unauthorized absenteeism for its

members. ZERO Data integrity violation - Data

integrity violation is against the fundamental

principle of pharmaceutical industry and business.

The union will co-operate and ensure that no such

case will occur and in case if occurs, management

will take strict action against such employee.

ZERO Rework/Rejections due to operator

attributable reasons.

ZERO Markets complaints.

ZERO defects to quality.

(2)

If the answer to issue No. (1) is in the

negative, then, to what relief the

Management is entitled?”

2. Upon receipt of the reference, it was registered

as IT/03/21 and registered A/D notices were issued

to both the parties.

3. During the course of proceedings, Party I filed

an application at Exhibit 4 for taking up the matter

on 09-06-2021 and filed an application at Exhibit-

5 colly along with the Memorandum of Settlement

dated 08-06-2021 at Exhibit 5 colly stating that

they have arrived at a settlement under Section

2(p) read with Section 18(1) of the Industrial

Disputes Act, 1947 in respect of Charter of demands

dated 02-05-2018 the Union and the Management

Charter of Demands dated 12-07-2019 that they do

not wish to continue with the reference and prayed

that an award be passed in terms of said settlement

dated 09-06-2021. The above application has been

signed by representative of Party I, Mr. Arvind

Sawant, President, Dr. Raghunath Kuchik, General

Secretary and other Committee Members, so also

the representative of Party II, Shri Magno

Fernandes, Site Director, Goa Site and Mr.

Shailendra Bidye - Site HR Head, Goa Site and the

other Officials on behalf of Party II and agreed

upon the terms mentioned below:

1.0 Objectives, intent and purpose of this settlement:

1.1 The purpose of this settlement is to provide

orderly, effective and harmonious industrial

relations through collective bargaining, to maintain

cordial and meaningful relations between the

Company and the workmen, to maintain fair wage

and service conditions, to ensure prompt and fair

redressal of grievances, to foster positive discipline

and total observance of all rules and regulations

everywhere in the organization, to sustain and

improve efficiency, smooth and uninterrupted

operations in the factory and to increase individual

and overall productivity all round and ensuring

also the welfare of the workmen.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

431

1.2 Recognising the rights and responsibilities

of the Company and appreciating that the

Company must improve and sustain its competitive

status and earning capacity through concerted

efforts aimed at improving efficiency and

productivity, the workmen agree to render

complete, wholehearted and unstinted co-

operation in improving productivity, to improve

continuously the quality of the Company’s products

and to ensure on time delivery.

1.3 To re-dedicate and re-affirm our mutual faith

to work together for the continuous stability,

growth and profitability so that our organization

becomes WORLD CLASS, serve customers to

international standards, develop technologies

related to both process and products, hold our own

against competition and to become global in our

thinking and approach.

1.4 The parties will co-operate in securing

improvements in overall productivity and avoiding

all forms of waste including waste of time and

materials and all wasteful practices. For achieving

the above objectives and to sustain and improve

the competitive status of the Company, effectively

respond to and satisfy customer needs and to

improve its production and earning capacity, and

pledge to foster and encourage the highest degree

of co-operation between the Company and their

workmen at all levels.

1.5 It is the intent and purpose of the parties

hereto that under the existing highly competitive

conditions in the industry, all efforts will be directed

at maximising production/productivity, quality,

containing the manufacturing costs at appropriate

levels and eliminating all wasteful practices. In

order to achieve this, there shall be appreciation of

obligations on either side.

1.6 It is clearly understood and agreed by the

Parties hereto that the objectives of the Settlement

are not only to ensure harmonious industrial

relations resulting in improved productivity and

higher earnings to workmen, but also to review,

streamline and rationalise various procedures,

practices, systems, etc. and to ensure optimum

utilisation of all resources, maintain optimum

inventory levels, elimination of all wasteful

practices and due enforcement of discipline for

the sustained stability and growth for achieving

the targeted turnover of the company.

2.0 Management Role:

In discharging their responsibilities, the

Management shall be the providers of direction

and long term perspective for the organization. All

such necessary performance such as adequate long

term and short term planning, required capital

expenditure and investments in plant, equipment

etc. development and sufficient provision of vital

infrastructure facilities such as space and power,

development and management of sources of raw

material/supplies of input to the Production Unit,

adequate manpower planning and stationing and

governance of the Employee population shall be

considered as Management responsibilities.

3.0 Employee Role:

While discharging their responsibilities through

their sufficient and effective performance, the

Workmen shall co-operate in all initiatives Lean,

Supply Chain Management, Modernisation, change

in technology and manufacturing processes,

contemporary management techniques and

practices and optimising the use of men, material

and machinery. Implementation of safety measures

and using safety appliances, personal protection

equipment’s (PPE) etc. workmen agree jointly and

severally to extend their full co-operation to the

company in improving effective working time,

enforcing discipline, improving the efficiency,

maintaining punctuality and regularity in

attendance, improving quality and safety at

workplace consistently and eliminating wastage

and unproductive practices which will hamper

production/productivity.

4.0 Collaborative Efforts:

Harmonious Industrial Relations, healthy

practices and commitment on either side to resort

only to constitutional means to resolve differences,

if any, are accepted as prerequisites for successfully

steering the Company to establish growth and

attain an enviable position in the industry. Both

parties firmly believe that joint efforts on the lines

referred to above, will enabie them to attain their

cherished goals.

5.0 Applicability:

The provisions of this settlement shall be

applicable only to all permanent workmen who are

members of the union and were on the rolls of the

company on the date of submission of the charter

of demands dated 2nd May, 2018 (as per the list

attached in Annexure A) and no other workmen or

employee shall be covered under this settlement.

Any confirmed employee who was part of the

charter of demand dated 2nd May, 2018 and has

resigned from the services of the company or ceased

to be in employment for any reason during the

term of the settlement will be entitled for an amount

proportionate to the period of service rendered

during the term of the settlement. They would be

paid actual arrears in full and final settlement of

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

432

all their dues arising out of this settlement. In order

to identify such workman an application will be

obtained from them. As on the date of singing of

this settlement, since the period/tenure of the

settlement is already over the benefit would be

given only to members as per the list attached in

Annexure A.

It is further agreed between the parties that the

provisions of this settlement, however, shall not be

applicable to, workmen employed by any of the

contractors or those who are employed as retainer/

consultant or casual/temporary/part-time workmen

for whatsoever job work in whatsoever capacity,

they are engaged.

6.0 Emoluments & costing of this settlement:

The total cost of the settlement was arrived at

and then after agreement between the parties in

mutual interest it was decided to distribute it in

the following manner.

6.1 Basic Pay and Fitment:

It is agreed that the following pay scale shall

apply to all the eligible workmen during the tenure

of this settlement.

3000-550-5750-575-8625-600-11625-625-14750-

650-18000-675-21375-700-24875-725-28500.

Each permanent workman on the rolls of the

company and who are part of this settlement shall

be given an ad hoc rise in their existing basic pay

w.e.f. 1st July, 2017 as follows:

Group

w.e.f. 1st

w.e.f. 1st

w.e.f. 1st July,

July, 17

July, 2018

2019

I

Rs. 3045/-

Rs. 652.50/-

Rs. 652.50/-

p.m.

p.m.+yearly

p.m.+ yearly

increment

increment.

II

Rs. 2695/-

Rs. 577.50/-

Rs. 577.50/-

p.m.

p.m.+yearly

p.m.+ yearly

increment

increment.

III

Rs. 2380/-

Rs. 510/-

Rs. 510/-

p.m.

p.m.+yearly

p.m.+ yearly

increment

increment.

IV

Rs. 1645/-

Rs. 352.50/-

Rs. 352.50/-

p.m.

p.m.+yearly

p.m.+ yearly

increment

increment.

On adding above amount into the existing Basic

Pay & Personal Pay (drawn in July, 2017), the basic

salary so arrived will be then fitted in the Pay

Scale at appropriate level. If there is no

corresponding step in the salary scale the residue

amount, if any, due to this fitment will be

considered as Personal Pay. It is agreed between

the parties that the Personal Pay of the first year

i.e. 1st July, 2017 shall be added to the fitment

money of the second year i.e. 1st July, 2018 and

fitted at the respective step in the Scale of Pay and

residue amount in the second year shall be taken

as personal pay. Similarly the personal pay of

second year shall be added to the fitment amount

of the third year i.e. 1st July, 2019 and fitted at the

respective step in the scale of pay and the residue

amount in the third year shall be taken as Personal

Pay. This personal pay shall be considered for

calculating all benefits such as overtime wages,

provident fund, bonus, LTA, Gratuity. Basic scales

for new employees taken on Probation/

Confirmation will be fitted into Basic scale in

respective Grades depending on his qualifications

and experience and is paid all allowances in the

Grade at the discretion of the management.

It is agreed between the parties that if the

management associate joins the union of workmen

at any time, they shall be given the scale of pay as

agreed above in clause 2 and fitted at appropriate

step prospectively from the date they join the union.

It has been agreed between the Union and the

Management that the amount of Rs. 200 shall be

added into Basic Wage w.e.f. 1st July, 2017.

6.2 House Rent Allowance:

Each permanent workman on the rolls of the

company and who are part of this settlement shall

be given a rise in their existing House Rent

Allowance w.e.f. 1st July, 2017 as follows:

Group

w.e.f. 1st

w.e.f. 1st

w.e.f. 1st July,

July, 2017

July, 2018

2019

I

Rs. 1995/-

Rs. 427.50/-

Rs. 427.50/-

p.m.

p.m.

p.m.

II

Rs. 1645/-

Rs. 352.50/-

Rs. 352.50/-

p.m.

p.m.

p.m.

III

Rs. 1330/-

Rs. 285/-

Rs. 285/-

p.m.

p.m.

p.m.

IV

Rs. 595/-

Rs. 127.50/-

Rs. 127.50/-

p.m.

p.m.

p.m.

House Rent Allowance will attract only

contributions towards ESI and overtime benefit in

accordance with the prevailing statute. It shall not

be consider for the purpose of PF, Bonus, Gratuity

and Leave encashment and shall be proportionately

deducted in case of unpaid leave/unauthorized

absence.

6.3 Lunch Allowance:

Each permanent workman on the rolls of the

company and who are part of this settlement shall

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

433

be given a rise in their existing Lunch Allowance

w.e.f. 1st July, 2017 as follows:

Group

w.e.f. 1st

w.e.f. 1st

w.e.f. 1st July,

July, 2017

July, 2018

2019

I

Rs. 350/- p.m. Rs. 75/- p.m.

Rs. 75/- p.m.

II

Rs. 350/- p.m. Rs. 75/- p.m.

Rs. 75/- p.m.

III

Rs. 350/- p.m. Rs. 75/- p.m.

Rs. 75/- p.m.

IV

Rs. 350/- p.m. Rs. 75/- p.m.

Rs. 75/- p.m.

This allowance shall not be considered for

purpose of PF, Bonus, Gratuity, overtime and Leave

encashment and shall be proportionately deducted

in case of unpaid leave/unauthorized absence.

The present system of providing a subsidy of

Rs. 14/- per meal will continue, however any further

increase in the meal prices will be shared in the

proportion of 75: 25 between the Management and

the employees respectively.

6.4 Education Allowance:

Each permanent workman on the rolls of the

company and who are part of this settlement shall

be given a rise in their existing Education

Allowance w.e.f. 1st July, 2017 as follows:

Group

w.e.f. 1st

w.e.f. 1st

w.e.f. 1st July,

July, 2017

July, 2018

2019

I

Rs. 350/- p.m. Rs. 75/- p.m.

Rs. 75/- p.m.

II

Rs. 350/- p.m. Rs. 75/- p.m.

Rs. 75/- p.m.

III

Rs. 350/- p.m. Rs. 75/- p.m.

Rs. 75/- p.m.

IV

Rs. 350/- p.m. Rs. 75/- p.m.

Rs. 75/- p.m.

This allowance shall not be considered for

purpose of PF, Bonus, Gratuity, overtime and Leave

encashment and shall be proportionately deducted

in case of unpaid leave/unauthorized absence.

6.5 Conveyance Allowance/Transport Allowance:

Each permanent workman on the rolls of the

company and who are part of this settlement shall

be given a rise in their existing Conveyance

Allowance/Transport Allowance w.e.f. 1st July,

2017 as follows:

Group

w.e.f. 1st

w.e.f. 1st

w.e.f. 1st July,

July, 2017

July, 2018

2019

I

Rs. 350/- p.m. Rs. 75/- p.m.

Rs. 75/- p.m.

II

Rs. 350/- p.m. Rs. 75/- p.m.

Rs. 75/- p.m.

III

Rs. 350/- p.m. Rs. 75/- p.m.

Rs. 75/- p.m.

IV

Rs. 350/- p.m. Rs. 75/- p.m.

Rs. 75/- p.m.

Conveyance Allowance/Transport Allowance

shall not be considered for purpose of PF, Bonus,

Gratuity, overtime and Leave encashment and shall

be proportionately deducted in case of unpaid

leave/unauthorized absence.

6.6 Medical Allowance:

It is agreed between the parties that the

prevailing practice shall continue in respect of this

demand.

7.0 Medical Scheme:

All such workmen who are exempted from ESIC

scheme (as in Clause 7) will be covered under a

suitable

insurance

policy

for

Medical

Hospitalization Reimbursement Policy upto an

amount of Rs. 5,00,000/- per financial year for self,

spouse and upto 2 dependent children upto 21

years of age. The hospitalization claim shall be

directly settled with insurance company and all

the terms and conditions as prevalent with the

Insurance company will be applicable.

As and when the existing employee is again

covered under ESIC scheme in future, whether

prospectively or retrospectively, due to amendment

in the ESI Act, the hospitalization benefit scheme

will cease to be in operation.

8.0 Leave Travel Allowance:

All permanent employee on the rolls of the

company will be paid an amount equivalent of one

month Basic Pay and Personal Pay as Leave Travel

Allowance. All other conditions for availing LTA

will be as per the LTA policy of the company and

will remain the same.

9.0 Shift Timings:

It is agreed that the shift timings will be as

follows (in case of three shift working):

Shift

Timing

Lunch/Dinner

I

08.00 hrs. - 16.00 hrs.

30 mins.

II

16.00 hrs. - 00.00 hrs.

30 mins.

III

00.00 hrs. - 08.00 hrs.

30 mins.

General 09.00 hrs. - 17.30 hrs.

30 mins.

a. It is also agreed that, as per the prevailing

practice and business needs, the company will

decide to work in One/Two/Three shifts/

Extended shift as and when the need arise as

per business requirement or due to exigencies

of work.

b. Availability of operators at work place (place

of work) at start of shift indicated above i.e.

sharp 08.00 hrs. for first shift, 16.00 hrs. in

second shift and 00.00 hrs. in third shift.

c. During two shift operation

I. Machines to start within 10 minutes (i.e. 8:10

a.m. in first shift) latest at beginning of shift.

II. No stoppage during first and second shift

transition/handover.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

434

III. Stoppage of machines 15 minutes before end

or shift for cleaning purposes (at 11:45 p.m.

in second shift).

IV. If there is no cleaning of machine in each

shift that the machines in the first and

second shift shall run without stoppage.

d. Subject to clause 10 (C) above, the Operators

to follow running handover strictly.

I. Operator shall ensure that the machine is

not stopped during the shift change and

handover the machine in running condition

to the next operator/assigned employee.

II. The operator shall ensure that he/she takes

the handover prior or sharp at respective

shift timings mentioned and notified from

time to time.

III. Operator to remain at respective post till

other operator/assigned employee is able to

take over charge during shift change.

IV. Operators to ensure that at no circumstances

machine shall be stopped during the shift

change. Similarly staggering shall be strictly

followed during lunch/dinner break.

e. Maximum number of late comings 3 (three) in

a calendar month and max. Late time allowed

in such case is upto 10 minutes, after which

the employee has to apply for half day

alternatively salary for half day will be

deducted. No intimation in this regards, may

be given to the concerned operator. The same

rule and calculation will hold good for

employees leaving the workplace earlier than

the designated time.

f. Any operator punching his attendance card or

reporting at place of work after 15 minutes

from the start of the shift, the employee has to

apply for half day alternatively salary for half

day will be deducted. No intimation in this

regards, may be given to the concerned

operator. The same rule and calculation will

hold good for employees leaving the workplace

earlier than the designated time.

g. Lunch break and dinner break timing of 30

mins. to be strictly followed and necessary

staggering should be done.

h. Shift operating personnel will remain at their

posts until he is relieved by his successor or

their supervisor is able to make other

arrangements for their relieving.

I. Operators should remain at the work place

and may leave workplace for IPC checks or

only work related issues with permission of

their supervisors.

II. Subject to Clause 10 (c) above, there will be

no stoppage of machines during first, second

shift and third shift transition and handover.

III. Immediate communication in case machine

stoppage to be given by the operator to the

supervisor or maintenance engineer, to

ensure maximum machine utilization and

minimize the wastage.

9.0 Shift Allowance Payments:

All confirmed employee working in second shift

will be paid a shift allowance of Rs. 40/- per second

shift worked and Rs. 80/- in case of third shift

effective July, 2017. This will not be applicable for

extended hours. Rules and regulations for claiming

this allowance will be made in accordance with

the provisions of the law relating to shift working.

This amount will not attract any other benefit such

as Provident Fund, Gratuity, Bonus and Overtime

Payments.

10.0 Leave and Paid Holidays:

All such workmen who are exempted from ESIC

Scheme (as in Clause 7) will be given an additional

2 days of sick leave per calendar year (on pro-rata

basis). These leaves will be withdrawn, as and

when the employee is again covered under ESIC

scheme in future, whether prospectively or

retrospectively, due to amendment in the ESI Act.

All other terms and conditions with respect to

leave and paid holidays as per the prevailing

practice and as detailed in the Certified Standing

Orders will be applicable.

11.0 Overtime:

Overtime shall be paid as per the provisions of

the Factories Act, 1948 and other relevant statutes.

This amount shall not be taken into account for PF,

Gratuity, Bonus and Leave encashment. The

overtime shall not be refused when asked due to

exigencies of work.

12.0 Loan:

The permanent workman shall be entitled, from

the date of signing of this agreement for a 50%

interest subsidy on personal loan of upto Rs.

1,80,000/-. The workman shall satisfy all the terms

and conditions attached to the loan. The Company

shall reimburse 50% of the interest charged by the

bank to the workman in his/her monthly salary.

Any rules and regulations made under the loan

scheme in future shall be binding on all workmen.

Till the loan amount is fully repaid, workmen will

not be entitled to any other company loan.

Prevalent rules as applicable under Income Tax

will be applicable.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

435

13.0 Festival Advance:

The permanent workmen shall be entitled to

avail festival advance of Rs. 5,000/- per year. The

advance will be paid once a year, either for Ganesh

Chaturthi, Diwali, Id or Christmas as per request

made by the workmen in writing. The advance

shall be deducted in 10 equal monthly instalments

from the salary of the workmen from the month

when the advance is availed.

14.0 Monsoon Allowance:

It is agreed between the parties that the

prevailing practice shall continue in respect of this

demand. An Amount of Rs. 750/- will be paid

w.e.f. 2018 along with the salary in the month of

May/June.

15.0 Bonus:

The Payment of Bonus shall be as per the

provisions of the Payment of Bonus Act, 1965, and

rules made thereunder.

16.0 Insurance Policy:

All workmen would be covered under the Group

Personal Accident Insurance Policy. The accident

coverage for each workman will be for an amount

of Rs. 1,00,000/- (Rupees one lakh only). The

coverage will be on a 24-hours basis. The terms

and conditions prevailing as per the policy shall

be binding.

17.0 Lumpsum Payment:

It is agreed that the company shall pay a one-

time lumpsum amount of Rs. 5,000/- as ex-gratia as

settlement signing incentive.

In appreciation of the Co-operation shown by

the Union and as demanded by the Union and the

Workmen the company has agreed that each

workman/member of union who are on the rolls of

the company on the date of signing of this

settlement shall be paid lumpsum amount of Rs.

11,500/- totalling to Rs. 8,05,000/- as ex gratia to be

paid as a part of the arrears arising out of the

settlement.

It is also agreed between the Union/Workmen/

Management/Company that both the Parties shall

file a joint application before the appropriate

authorities for an award/order in terms of the

settlement in Ref. IT/10/20 and IT/3/21 as also

following disputes pending before various

authorities for finally disposing the matters.

Sl.

Brief

Filed by

Filed against

Case No.

No.

1. Special

Union

Sanofi India IT/53/16

Allowance

Ltd.

2. Withdra-

Union

Sanofi India IT/13/18

wal of

Ltd.

Special

Allowance

3. Protected

Union

Sanofi India All

Workmen

Ltd.

pending

cases.

4. Deduction

Pravin

Sanofi India CLE/

of Special

Kande &

Ltd.

(PWA-

Allowance

Others

2)/2018.

5. Refusal of

Union

Sanofi India IT/06/

work

Ltd.

2020

6. Works

Union

Sanofi India CLE/TA/

Committee

Ltd.

(383)/

2016 and

other

related

matters

on the

subject.

The works committee will be constituted as per

law laid down and committee shall be constituted

within 90 days after the Award passed in terms of

settlement by the Industrial Tribunal.

All pending enquiries against the workmen who

are members of the Union will be mutually closed.

18.0 General Provisions:

a) The Union and the workmen have specifically

agreed to implementation of various

requirements/procedures under ISO, FDA

regulations, GMP, EHS, Factories Act, I.D. Act,

1947 and gowning procedures and other

Global/International authorities etc.

b) This settlement is in full and final settlement

of all demands raised by the Union in their

charter of demands dated 20th June, 2020

mentioned in the recital of this case above and

other demands, which are not specifically dealt

with or not pressed in this settlement, shall be

treated as settled.

c) The Union and the workmen individually,

jointly or through any other union or agency,

agree not to raise or pursue any dispute in

respect of any demands in respect of the

workmen covered under this settlement,

whether specifically covered or not pressed or

withdrawn in this settlement and further agree

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

436

not to raise any demand on behalf of these

workmen involving any financial burden or

otherwise on the company, directly or

indirectly, during the currency of this

settlement. The Company agrees not to raise

or pursue any dispute specifically covered or

withdrawn during the currency of this

settlement.

d) In case of a legislation or otherwise, any

identical or similar higher benefits as accruing

to the workmen under this settlement, are

introduced in future by the Government, the

Union and the workman, the company shall

make good the difference to fall in line with

such legislation. The workmen will be entitled

to opt for benefits either under this settlement

or the legislation in its totality, whichever is

more beneficial to them but not both.

e) Both parties also agree that in case of any

individual/group grievances, every effort will

be made to resolve it in the first place by mutual

discussions between the parties in accordance

with the existing grievance procedure, and

without either party resorting to any unilateral

action. It is also agreed between the parties

that in event that they do not arrive at a

mutually acceptable solution, both parties will

follow constitutional and legally established

machinery/methods for the settlement of

disputes and shall not resort to any direct and/

or agitational methods.

f) It is in interest of the Company and its workmen

that the company must sustain and improve

its competitive status and earning capacity.

For this the union and its workmen agree to

co-operate with the Management in all

necessary efforts to continue to improve

efficiency, productivity, various continuous

improvement prograrnmes and elimination of

wastage. As a measure of the same it is agreed

that workmen or employee shall co-operate and

participate in the Lean management/GMP and

different initiatives like +QDCI, VSM (Value

Stream Mapping), works committee, or any

other taken in this regards.

g) It is expressly understood by the Union and it

workmen that all the prevalent service

conditions shall continue to remain unaltered

and the union and the workmen agree to abide

and follow these conditions for the overall

efficiency of the Plant and the Company.

h) It is understood by the Union and the workmen

that any rules and regulations, existing

practices, privileges, terms and conditions

currently prevailing in the company as a matter

of policy or statute which have not been

expressly altered as a result of this settlement

shall continue to remain in force and the union

and its workmen shall abide by the same. Any

alteration in the existing policy, rules and

regulations, existing practices and privileges

or introduction of any new policy, rules and

regulations, practices and privileges by the

Company during the tenure of this settlement

in accordance with the existing law at the

time of such alteration/introduction, and which

does not prejudice the terms and conditions of

this settlement shall be followed by the union

and its workmen. Similarly any statute modified

or introduced by the Government during the

tenure of this settlement shall be complied

with by the company as well as the union and

its workmen.

i) It is understood and agreed upon by the Union

and its workmen that usage of Mobile phones

in the Production area (Manufacturing and

Packaging) and other restricted areas is not

permitted. The workmen and all other

employees of the company shall strictly abide

by the Mobile Policy of the Company.

j) The Union and the workmen appreciate that it

is essential to improve and maintain the

competitive status and profitability of the

company and reduce the costs as an ongoing

exercise. The Union and the Workmen shall

continue to adhere to all measures adopted by

the company from time to time towards this

goal, including the following.

I. Introduction of new and/or improved

methods and machinery, re-structuring, re-

allocation or re-organization, flexibility of

manpower

allocation

and

method

simplification

or

modification

or

improvements in Various Inputs.

II. Both parties agree to carry out modifications,

abolition of wasteful practices, introduction

of appropriate procedure for effective and

maximum utilization of the operating time,

and such other methods as may be

considered appropriate jointly which will

result into work simplification or overall

improvement in the efficiency.

III. It is agreed that workman shall work in any

section/department as per the requirement

of the company. The Company may also

depute workmen in other department/on any

other job than currently handled by him for

up-gradation of his skill or due to exigencies

of work or company requirements.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

437

IV. It is agreed that workman shall adhere to

working in shifts as notified from time to

time and accepting overtime work as and

when it is required. Workmen from the prior

shift shall co-operate and continue to work

on overtime after his regular duty hours in

case of absenteeism or work requirement.

V. It is also agreed that safety of the plant,

machinery/equipments and personnel is of

paramount importance and both the parties

shall protect it under all circumstances. The

workmen shall ensure at all times wearing

of personal protective equipment wherever

required as per safety norms required for

personal safety.

VI. The concerned workmen shall handover

proper charge at work-place during the

change over from one shift to another. It is

also agreed that all workmen will adhere to

the shift timings by starting the work on

time and not leaving the place of work until

and unless he is relieved by the next shift

operator.

VII. It is agreed that the workmen will adhere to

all the rules of the cafeteria/canteen

including of lifting of self-soiled plates and

depositing the same in the bin provided in

the canteen.

VIII. It is also agreed that all workmen will attend

the training programs they are nominated

for as per the Company’s training and

development plans.

19.0 Tenure of Settlement:

The settlement shall remain effective from 1st

July, 2017 to 30th September, 2020 and shall

continue to remain in force thereafter until such

time it is validly terminated by either of the parties

as per the provisions of the Industrial Disputes

Act, 1947.

It is further agreed that the arrears arising out

of this settlement shall be paid to all the workmen

as per list at Annexure A. The said payment shall

be subject to any deductions under the prevailing

laws and will be paid within 3 succeeding months

from signing of the settlement. Any tax liability

arising from any payment or other benefits

introduced or revised under the settlement will be

as per the Income Tax Act, 1961.

That this settlement shall be presented before

the Industrial Tribunal, Panaji in References

No. IT 10/20 IT 03/2021, IT 53/16, IT 13/18 & IT 06/20

and before the Office of the Commissioner of Labour

and Employment in cases of Protected Workmen,

Pravin Kande and Others bearing No. CLE/(PWA-

2)/2018 & Works Committee with a prayer to make

an Order in Terms of this settlement.

It is agreed that with the signing of the

settlement all the differences or disputes pending

cases/reference related to the Charter of Demands

in Reference No. IT 10/20 and IT 03/2021 between

the management and the workmen in the tribunal

or with conciliation authority is deemed to have

been settled. It is agreed that no fresh dispute on

any issue which is settled under this settlement

shall be raised with the management or with any

authority under industrial/labour law during the

subsistence of this settlement. In view of the above

settlement it is specifically agreed between the

parties for the disposal of all the matters mentioned

hereinbelow that Union will withdraw all the

following case or file and shall make applications

before the appropriate authority to pass no dispute

award for the disputes mentioned hereinbelow.

Sl.

Brief

Filed by

Filed against

Case No.

No.

1. Special

Union

Sanofi India IT/53/16

Allowance

Ltd.

2. Withdra-

Union

Sanofi India IT/13/18

wal of

Ltd.

Special

Allowance

3. Protected

Union

Sanofi India All

Workmen

Ltd.

pending

cases.

4. Deduction

Pravin

Sanofi India CLE/

of Special

Kande &

Ltd.

(PWA-

Allowance

Others

2)/2018.

5. Refusal of

Union

Sanofi India IT/06/

work

Ltd.

2020.

6. Works

Union

Sanofi India CLE/TA/

Committee

Ltd.

(383)/

2016 and

other

related

matters

on the

subject.

20.0 That in consideration of the management

having agreed to their demands as specified in this

settlement, during the period of its operation the

workers who are beneficiaries of the settlement and

the Union agree that they will not, either jointly or

severally, raise/support any demand involving any

additional financial burden upon the management,

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

438

or support any move likely to disrupt any of the

operations of the Management, which may directly

or indirectly cast a financial burden on the

company.

For following three workmen who were

confirmed in between the tenure of the settlement,

their payment mode will be as follows:

E Code

Name

DOJ

130042

Surat Gaonkar

14-09-2017.

99227

Kumar Kamble

14-09-2017.

99070

Jitendra Usapkar

13-05-2017.

The above three workmen would be only eligible

for settlement benefit from July, 2018. Further, they

would be paid annual basic increment of April,

2018. If the said employees had taken MA

increments for the year April, 2018, then the same

stands to be relinquished by them and would be

recovered from the arrears paid arising out of this

settlement.

Further, employees joined the union on

17-07-2017 would be eligible for Settlement benefit

from July, 2017. Further, employees joined the union

on 28-06-2018 would be eligible for Settlement

benefit from July, 2017. Further they will be paid

annual basic increment of April, 2018 as per the

settlement. Further, if these set of workmen had

taken MA increments for the year April, 2018 than

the same stands to be relinquished by them and

would be recovered from the arrears paid arising

out of this settlement.

21.0 Other conditions of service:

That all other terms and conditions of service,

more particularly including all those specified in

the letter of appointment of probation/confirmation,

Certified Standing Orders and existing rules and

regulations as the case may be, in the employment

of the management not modified in this settlement,

will continue unaltered.

It is hereby agreed by and between the parties

that any technical, legal, arithmetical and

typographical error that may have inadvertently

crept up in the settlement, will be resolved and

rectified mutually and neither party will take

undue advantage if any.

4. I have gone through the application dated

09-06-2021 along with the Memorandum of

Settlement at Exh. 5 colly filed by both the Parties,

which in my view, are just and fair and in the

interest of both the Workmen/Party I as well as

Employer/Party II and hence, the same are

accepted.

5. In view of above, I pass the following:

ORDER

(i) The reference at the instance of both the

Parties stands disposed off in view of the

application dated 09-06-2021 at Exhibit 5

colly.

(ii) Consequently, the benefits of the

Settlement shall be extended to the

workmen of Party I.

(iii) No order as to costs.

(iv) Inform the Government accordingly.

Sd/-

(Bela N. Naik),

Presiding Officer,

Industrial Tribunal and

Labour Court.

———uuu———

Department of Law & Judiciary

Law (Establishment) Division

__

Order

No. 14/09/2016-LD(Estt.)(PF-I)/1687

Sanction of the Government is hereby conveyed

to provide medical and conveyance/L’I’C facilities

to the Hon’ble Judges of the High Court of Bombay

at Goa, on par with the Hon’ble Judges of the High

Court of Bombay at Mumbai, Maharashtra, as

detailed below:-

1. Reimbursement of actual medical expenditure

incurred for the treatment taken in private

hospital/clinics.

2. Taxi/car fare at the rate of Rs. 24/per km. towards

journey performed in own car/taxi, as per

O. M. No. 19030/1/2017-E.IV dated 13-07-2017 of

Government of India, Ministry of Finance,

Department of Expenditure, New Delhi.

This issues with the concurrence of the Finance

(R&C) Department vide U.O. No. 1400072796 dated

02-07-2021.

By order and in the name of the Governor of

Goa.

Amalia O. F. Pinto, Under Secretary (Law-Estt.)

(Link).

Porvorim, 6th August, 2021.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

439

Order

No. 2/65/2016-LD(Estt.)/1673

Read: (1) Order No. 8/33/2005-LD(Estt)/Part-I/704 dated 07-05-2013;

(2) Order No. 2/65/2016-LD(Estt.)/1178 dated 17-06-2021; and

(3) Order No. 2/65/2016-LD(Estt.)/979 dated 10-06-2020.

The Government of Goa is hereby pleased to assign charge/additional charge and posting of the

following Civil Registrar-cum-Sub Registrar, Group ‘B’, Gazetted Officers of Registration Department:-

Sr

Name of Officials

Present place of

To hold charge as

No.

posting

mentioned below

1. Shri Hanumant G. Dessai

Civil Registrar-cum-Sub

He shall hold charge of C.R.S.R., Bardez

Registrar, Ponda

and Jt. Civil Registrar cum-Sub-Registrar,

Bardez-I, during the period of Child Care

Leave (CCL) of Smt. Soniya Halarnkar,

from 09-08-2021, till she joins her duties.

2. Smt. Freeda Gomes

Civil Registrar-cum-Sub

To hold additional charge of C.R.S.R., Ponda,

Registrar, Dharbandora

in addition to her own duties, till Smt. Soniya

Halarnkar resumes her duties i.e. C.R.S.R.,

Bardez and Shri Hanumant G. Dessai, reports

to his original place of posting i.e. C.R.S.R.,

`

Ponda.

By order and in the name of the Governor of Goa.

Amalia O. F. Pinto, Under Secretary (Law-Estt.).

Porvorim, 6th August, 2021.

_______

Addendum

No. 2/59/2015-LD(Estt.)/1594

Read: (i) Order No. 2/59/2015-LD(Estt.)/827 dated 25-04-2016.

(ii) Addendum No. 2/59/2015-LD(Estt.)/987 dated 24-05-2016.

In the above read Order, the following para shall be added as 5th Para:-

“The Officers promoted to the post of Civil Registrar-cum-Sub Registrar, are entitled to pay and

allowances, from the date of accepting the promotion in relaxation to F.R. 17(1)”.

The Officers mentioned in the above cited order shall draw their salary against the vacant position from

the date of accepting the promotion as mentioned below:

Sr.

Name

Designation

Period

Salary to be

No

drawn to the post

1

2

3

4

5

1. Smt. Freeda B. J. Gomes

Civil Registrar-cum-

27-04-2016 to

Jt. CRSR, Ponda.

-Sub Registrar

31-07-2016

2. Shri Domingos Martins

Civil Registrar-cum-

27-04-2016 to

Jt. CRSR, Tiswadi-II.

-Sub Registrar

09-05-2016

3. Smt. Sunanda T. Gauns

Civil Registrar-cum-

27-04-2016 to

Jt. CRSR, Bardez-I.

-Sub Registrar

31-07-2016

All the remaining contents in the above read Order shall remain unchanged.

This issues in supersession to earlier Addendum No. 2/59/2015-LD(Estt.)/1099 dated 04-06-2021.

By order and in the name of the Governor of Goa.

Amalia O. F. Pinto, Under Secretary (Law-Estt.).

Porvorim, 27th July, 2021.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

440

Department of Personnel

__

Order

No. 6/10/2020-PER/PF/1924

Read:1.Order No. 6/10/2020-PER/5259 dated

01-12-2020.

2. Memorandum No. 6/4/2020-PER/1389 dated

09-06-2021.

In continuation to the order read in the preamble

and in exercise of the powers conferred under Rule 43

of the Goa Civil Service Rules, 2016 (hereinafter to

be called as said rules); the Government, in

consultation with the Goa Public Service

Commission, hereby relaxes Rule 38 of the said

Rules, to consider the crucial date of eligibility for

appointment of Smt. Meena Naik Goltekar, Junior

Administrative Grade Officer of Goa Civil Service to

the Selection Grade, from the date of completion of

the requisite service i.e. 12-09-2020 instead of 1st

April for considering her for DPC held on

16-12-2020.

This issues with the approval of the Goa Public

Service Commission conveyed vide letter No. COM/

/II/11/42(3)/2020/491 dated 22-07-2021.

By order and in the name of the Governor of

Goa.

Maya Pednekar, Under Secretary (Personnel-I).

Porvorim, 06th August, 2021.

_________

Order

No. 6/13/2011-PER/1932

On the recommendation of the Goa Service Board

and with the approval of the Government, the

transfer and posting of the following Junior Scale

Officers of Goa Civil Service is ordered in public

interest:-

Sr.

Name and present

Posted as

No.

posting of the officer

1

2

3

1. Shri Pravin Hire Parab,

Deputy Collector

Deputy Director (Admn.),

& SDM, Sattari

Goa Medical College

with additional

charge of Forest

Settlement Officer,

North.

2. Smt. Snehal Shivram Prabhu, Deputy Director

Deputy Collector (LA),

(Admn.), Goa

South holding additional

Medical College

charge of Deputy Collector

with additional

(Revenue), South

charge of Deputy

Director-II, GMC.

3. Shri Ramesh N. Gaonkar,

Deputy Collector

Deputy Collector, South-1

(Revenue), South

with additional

charge of Deputy

Collector, South-1.

4.Smt. Seema Salkar @

Deputy Director

Veera Nayak, Deputy

(Admn.), Tribal

Collector (Elections),

Welfare with

North

additional charge

of Administrator of

Communidade,

Central Zone.

5.Shri Pundalik Khorjuekar,

Deputy Registrar

Deputy Director (Admn.),

of Co-op Societies

Tribal Welfare holding

(Tech.).

additional charge of

Deputy registrar of Co-op.

Societies (Tech.)

6.Shri Deepesh Narayan

Under Secretary in

Priolkar, Deputy Director,

the Office of

Urban Development

Minister (Town &

holding additional charge

Country Planning)

of Under Secretary

with additional

in the Office of Minister

charge of

(Town & Country

Deputy Director

Planning)

(Admn.), Town &

Country Planning.

7. Smt. Gautami Sachin

Deputy Collector

Parmekar, Under Secretary

(DRO), North with

(Health-II)

additional charge

of Deputy Collector

(Elections), North.

8. Smt. Sapna Bandodkar,

Under Secretary to

Awaiting posting

Chief Minister.

9. Shri Pandurang T. Talgaonkar,Deputy Director

Deputy Director (Admn.),

(Admn.), Urban

Agriculture

Development with

additional charge

of GM (GIDC).

10. Shri Alexio F. Vaz

Under Secretary,

Deputy Director (Admn.),

Health-II.

Fire & Emergency Services,

holding additional charge of

Deputy Director (Admn.),

Town & Country Planning

Department

11. Shri Sohan Ashok Uskaikar, Deputy Director

Deputy Director (Admn.), (Admn.), Agriculture.

DFDA holding additional

charge of General Manager,

GIDC

1

2

3

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

441

12 Shri Kedar Ashok Naik,

Deputy Director

Deputy Collector &

(Admn.), IPHB with

SDM, Dharbandora

additional charge

of Deputy Director

(Admn.), Goa

Dental College.

13. Shri Ramesh P. Naik,

Deputy Collector

Joint Director, Information

& SDM,

and Publicity holding

Dharbandora.

additional charge of

Deputy Director (Admn.),

Art & Culture

14. Shri Manuel P. Barreto,

Project Officer,

Deputy Director of Mines-I

DRDA, South with

additional charge

of Deputy

Collector (LA),

South.

15. Shri Kuldeep Arolkar,

Deputy Director of

Deputy Director (Admn.),

Mines-I.

Electricity

16. Shri Joao B. Fernandes,

Chief Officer,

Deputy Collector & SDO-II,

Cuncolim Municipal

Salcete holding additional

Council.

charge of SLAO, KRC &

Administrator of Communidade,

South Zone

17. Smt. Violet Gomes,

Administrator of

Chief Officer, Cuncolim

Communidade,

Municipal Council holding

South Zone with

additional charge of Forest additional charge

Settlement Officer, South

of SLAO (KRC).

18. Dr. Pooja Madkaikar,

Under Secretary,

Deputy Director (Admn.),

GA-I with

IPHB holding additional

additional charge

charge of Deputy Director

of Under Secretary,

(Admn.), Goa Dental

GA-II.

College

19. Smt. Maya Pednekar,

Deputy Director,

Under Secretary (Personnel-II) Vigilance.

holding additional charge

of Under Secretary, ARD

20. Shri Shripad Arlekar,

Deputy Director

Under Secretary, GA-I

(Admn.), Electricity.

21. Smt. Nathine Stevea Araujo, Under Secretary

Deputy Director, Vigilance

(Personnel-II), with

additional charge

of Under Secretary,

GA-III.

22. Dr. Geeta Nagvenkar,

Joint Director,

Administrator of

Information and

Communidade,

Publicity with

Central Zone

additional charge

of Deputy Director

(Admn.), Art &

Culture.

23. Smt. Pratima J. Braganza,

Deputy Director

Assistant Commissioner of

(Admn.), Fire &

Commercial Taxes

Emergency Services.

Shri Bala Korgaonkar, Assistant Director (HT&C),

shall hold the charge of Deputy Director (Adrnn.),

DFDA in addition to his own duties.

Shri Tulsidas S. Karanzalkar, Under Secretary,

(HT&C), shall hold the charge of Under Secretary,

Forest in addition to his own duties.

Smt. Asha Harmalkar, Deputy Director (Admn.),

Printing & Stationery, shall hold the charge of

Deputy Director (Child Welfare), Women & Child

Development in addition to her own duties.

Shri Eshant Sawant, Under Secretary, Home-II

shall hold the charge of Under Secretary, ARD in

addition to his own duties.

Shri Sachin Desai, OSD in Imagine Panaji Smart

City Development Ltd., shall hold the charge of

Deputy Commissioner of Sales Taxes in addition to

his own duties.

Shri Madhu Narvekar, Chief Officer, Quepem

Municipal Council shall hold the charge of Forest

Settlement Officer, South in addition to his own

duties.

The above officers shall complete their handing

over and taking over process within 05 working days

and submit compliance. The transfer & posting of

Officers at Sr. Nos. 1 to 3, 9, 11, 13, 19, 21 & 22 shall be

effected upon resuming of duties by concerned

officers from ongoing departmental training.

By order and in the name of the Governor of

Goa.

Meghana Shetgaonkar, Joint Secretary (Personnel).

Porvorim, 09th August, 2021.

———uuu———

Department of Public Health

__

Certificate

No. 4/10/2002-II/PHD/Vol.II/1487

Read: Government Order No. 4/10/2002-II/PHD/

/Vol.II/305 dated 11-02-2021.

1

2

3

1

2

3

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

442

Certified that the character and antecedents of

Dr. Charan Jayaram Phayade, Lecturer, Department

of Orthopaedic Surgery in Goa Medical College and

Hospital, Bambolim mentioned in the above referred

Order have been verified by the District Magistrate,

South Goa District, Margao and nothing adverse

has come to the notice of the Government.

Gautami S. Parmekar, Under Secretary (Health)/

Link.

Porvorim, 06th August, 2021.

_________

Certificate

No. 4/13/2002-II/PHD/1486

Read: Government Order No. 4/13/2002-II/PHD/

/617 dated 24-03-2021.

Certified that the character and antecedents of

Dr. Swamini Digambar Panandikar, Lecturer,

Department of Radiology in Goa Medical College

and Hospital, Bambolim mentioned in the above

referred Order have been verified by the District

Magistrate, South Goa District, Margao and nothing

adverse has come to the notice of the Government.

Gautami S. Parmekar, Under Secretary (Health)/

Link.

Porvorim, 06th August, 2021.

———uuu———

Department of Science and Technology

and Waste Management

__

Order

No. 363-10-2019/S&T-DIR/133

Sanction of the Government is hereby conveyed

to the Pattern of Assistance to incur an expenditure

of Rs. 15.00 lakhs, per annum, as Grant-in-aid,

subject to provision in the budget, to Goa State

Council for Science & Technology (GSCST),

functioning under the administrative control of

Department of Science and Technology and

Waste Management (DST & WM), Government of

Goa.

i) The grants shall be utilised exclusively

towards following item:

Sr.

Description

Amount

No.

(i) Support against deficit for

Rs. 15.00 lakhs

the salary by Central Ministry

Total

Rs. 15.00 lakhs

(ii) The grants shall be disbursed/sanctioned in

single installment to GSCST Saligao, Bardez-

Goa, after receipt of proposal for particular

financial year.

(iii) The entire amount of the grant-in-aid should

be utilized within a period of one year from

the date of sanction and only for the purpose

for which it is sanctioned. Any portion of

the grant which is not ultimately required

will be refunded to the Government

Treasury. After utilizing/refunding the above

sanctioned amount an utilization certificate

should be furnished to the sanctioning

authority as required under Form GFR-12A.

(iv) The account of the Grantee in respect of

this grant should be audited by the

Government approved Auditor/Chartered

Accountant concerned immediately on

completion of one year from the date of

sanctioned. The accounts of the grants shall

be maintained separately and properly from

its normal activities and submitted as and

when required. They shall be open to a test

check by the Comptroller and Auditor

General of India at his discretion.

(v) The Audited statement of accounts showing

the expenditure incurred by the Grantee

from the grants should be furnished to the

Government as soon as possible on

completion of one year from the date of

sanction together with a certificate from the

Auditor to the effect that the grant was

utilised for the purpose for which it was

sanctioned.

(vi) A performance-cum-achievement report

specifying in detail the achievements made

by the Grantee with the Government grants/

/amount sanctioned should be furnished to

concerned Department as soon as possible.

(vii) No grants shall be allowed to be paid to any

other institutions/voluntary organisations

out of this grant, sanctioned by the

Government.

(viii) The Grantee Institution must exercise

reasonable economy, observe all financial

rules as issued by the Government from time

to time while incurring the expenditure.

(ix) In case of misutilisation of grants, the

amount so misutilised shall be recovered

from the Grantee Institution.

(x) The amount remaining unspent out of this

grant shall be refunded back to the

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

19TH AUGUST, 2021

443

Government Treasury by Challan imme-

diately on completion of one year from the

date of sanction.

(xi) The amount shall be drawn from the

Directorate of Accounts on presentation of

the bill on FORM GAR-32 duly counter-

signed by the Drawing and Disbursing

Officer of the Department.

(xii) The Pattern of Assistance to release the

grant-in-aid has been approved by the

Finance Department under U.O. No.

1400072081 dated 10-03-2021.

By order and in the name of the Governor of

Goa.

Levinson J. Martins, Director & ex officio Joint

Secretary (S&T).

Porvorim, 24th May, 2021.

www.goaprintingpress.gov.in

Published and Printed by the Director, Printing & Stationery,

Government Printing Press,

Mahatma Gandhi Road, Panaji-Goa 403 001.

PRICE–Rs. 21.00

PRINTED AT THE GOVERNMENT PRINTING PRESS, PANAJI-GOA—154/150–8/2021.

———uuu———

Department of Water Resources

Office of the Chief Engineer

__

Order

No. 3/25-15/90/CE-WR/Adm.I/449

On the recommendation of the Goa Public Service Commission as conveyed vide confidential letter

No. COM/II/11/27(3)/2013/976 dated 08-03-2021, Government is pleased to order the promotion of Surveyor

of Works/Executive Engineer, Water Resources Department, Government of Goa to the post of Superintending

Engineer (Civil), Group-A Gazetted in Water Resources Department on regular basis in the Pay Matrix Level

No. 12 with immediate effect and posted against existing vacancy indicated below:-

Sr

Name of Officers

Present designation

Designation & place of posting

No.

and place of posting

on promotion

1. Shri Dnyaneshwar Y. Salelkar

Executive Engineer, Works Division-I, Superintending Engineer,

(ST)

WRD, Porvorim

O/o Superintending Engineer,

CO II, WRD, Karaswada.

2. Shri Ankush G. Gaonkar

Executive Engineer, Works Division-II, Superintending Engineer,

(ST)

WRD, Margao

O/o Superintending

Engineer, CO IV, WRD, Gogal,

Margao-Goa.

This is issued vide Government approval No. 4760/F dated 05-08-2021.

By order and in the name of the Governor of Goa.

P. B. Badami, Chief Engineer & ex officio Addl. Secretary (WR).

Porvorim, 09th August, 2021.