1159

Panaji, 1st December, 2022 (Agrahayana 10, 1944)

SERIES I No. 35

Reg. No. RNP/GOA/32/2021-2023

RNI No. GOAENG/2002/6410

PUBLISHED BY AUTHORITY

Suggestions are welcomed on e-mail: dir–[email protected]

NOTE

There are two Extraordinary issues to the Official Gazette, Series I No. 34 dated 24-11-2022, namely:—

(1) Extraordinary dated 25-11-2022 from pages 1153 to 1154, Notification No. 5-1-2022-Fin(DMU) regarding Market

Borrowing Programme from Department of Finance.

(2) Extraordinary (No. 2) dated 30-11-2022 from pages 1155 to 1158, Notifications regarding framing of monthly

lottery scheme from Department of Finance.

INDEX

Department

Notification/Add/Corrigendum.

Subject

Pages

1

2

3

4

1.

Agriculture

Not.- 3/1/Agri.Mech/AD(AE)/

Modified Scheme for Custom

1160

/2022-23/D.Agri/263

Hiring Service in Agriculture.

2.

Co-operation

Not.- 1-33-2014-15/PLG/RCS/

Amendment of Government Share

1160

/275/3088

Capital Contribution Scheme.

3.

Finance

Not.- 1/5/2022-Fin(R&C)/1025

Levy of excise duty on beer as

1161

specified.

4.

Fisheries

Not.- DF/PLG/BUD/2022-23

Financial Assistance to Brackish

1161

Water Aquaculture Farms—

Amended.

5.

Personnel

Not.- 1/14/2017-PER

RRs.—Water Resources Department.

1162

6.

Revenue

Not.- 22/1/2016-RD/1424

Modification of Policy on

1164

Procurement of Land.

7.

Tourism

Corri.- N5/3(840)/2022-DT/203

Correction of words.

1164

8.a. Water Resources

Not.- 4/4/EO-WRD/2022-23/320

Establishment of SWIC.

1164

b. —do—

Not.- 4/4/EO-WRD/2022-23/325

Policy on Rainwater Harvesting

1166

(Amendment)—2022.

9.

Mormugao Port

—

Revision of Estate Rentals of

1168

Authority

Mormugao Port Authority.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES I No. 35

1ST DECEMBER, 2022

1160

GOVERNMENT OF GOA

Department of Agriculture

Directorate of Agriculture

–––

Notification

3/1/Agri.Mech/AD(AE)/2022-23/D.Agri/263

Read Notification: (1) No. 3/1/AD(AE)/2017-18/

D.Agri/119 dated 07-09-2017,

Series I No. 23.

(2)No. 3/1/AD(AE)/2018-19/

/D.Agri/275 dated 21-02-2019.

Short title and commencement.— The

scheme shall be called “Modified Scheme for

Custom Hiring Service in Agriculture”.

Amendment

The standard hire charges of following

Agriculture machineries shown under the

Pattern of Assistance at clause 3 (iv) in the

above read notifications are revised and

amended as shown below:

Sr.

Type of machinery

Hire charge

No.

(Rs.)

1

2

3

1.

Tractor (30 hp & above)

800/- per hour

with implements excluding

Rotovator

2.

Tractor (30 hp & above)

1000/- per hour

with Rotovator

3.

Mini Tractor

600/- per hour

4.

Power tiller

500/- per hour

5.

Paddy Transplanter

35000/- per

hectare

The revised rate of hire charges will be

effective with immediate effect from the date

of publication on Official Gazette.

Other contents of the notification remain

the same.

This issues with the approval of the

Government and concurrence of the Finance

(Expenditure) Department, Government of

Goa vide U. O. No. 1400038300 dated 18-10-2022.

By order and in the name of the Governor

of Goa.

Nevil Alphonso, Director & ex officio Joint

Secretary (Agriculture).

Tonca-Caranzalem, 21st November, 2022.

Department of Co-operation

Office of the Registrar of Co-operative Societies

–––

Notification

1-33-2014-15/PLG/RCS/275/3088

Read: 1. Notification No. 1-27-2011/PLG/

/RCS dated 20-06-2012 published

in the Official Gazette, Series I No.

13 dated 28-06-2012;

2. Notification No. 1-33-2014-15/PLG/

/RCS dated 25-04-2017 published

in the Official Gazette, Series I No.

5 dated 04-05-2017.

Whereas the Government has notified vide

Notification read at No. 1 above a scheme

named “the existing revised scheme to

provide financial assistance in the form of

Government share capital contribution, loan,

subsidy, managerial subsidy, grant in aid, etc.

to the “Apex Co-operative Bank (Goa State

Co-op. Bank Ltd.), Goa State Co-operative Milk

Producer’s Union, Goa State Co-operative

Housing Finance & Federation Ltd., Goa State

Co-operative Union Ltd., Goa Co-operative

Marketing and Supply Federation Ltd. and

Industrial Co-operatives.” Said scheme was

amended vide Notification read at No. 2

above.

And whereas the Government considers it

necessary to carry out further amendments

to the said scheme for ensuring growth and

development/smooth functioning of business

and other allied activities of the Institutions.

Now, therefore, Government is pleased to

further amend the scheme and pattern of

financial assistance as shown under.

In the said scheme, under Clause 3. Pattern

of Financial Assistance-In the table, for entry

against Sr. No. 1, the following entry shall be

substituted.

Sr.

Type of

Name of

Pattern of

No.

Society

the Scheme Financial Assis-

tance

1

2

3

4

1. Apex Co-opera-

Government

The total limit

tive Bank (Goa

Share Capital of Government

State Co-operative Contribution investment in

Bank Ltd.)

the Share Capi-

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES I No. 35

1ST DECEMBER, 2022

1161

1

2

3

4

tal of the Apex

Co-operative

Bank i.e. Goa

State Co-opera-

tive Bank Ltd.,

Panaji shall be

to the extent

of Rs. 3000.00

lakh inclusive

of the Govern-

ment Share

contribution

already

released to the

said Bank.

This issues with the concurrence of Finance

(Expenditure) Department conveyed vide their

U. O. No. 2968/F dated 19-11-2022.

By order and in the name of the Governor

of Goa.

Vishant S. N. Gaunekar, Registrar of

Co-operative Societies & ex officio Joint

Secretary (Co-operation).

Panaji, 25th November, 2022.

———uuu———

Department of Finance

Revenue & Control Division

–––

Notification

1/5/2022-Fin(R&C)/1025

In exercise of the powers conferred by

sub-section (1) of section 42 of the Goa Excise

Duty Act, 1964 (Act No. 5 of 1964), the

Government of Goa being of the opinion that

reasonable grounds exist for doing so, hereby

allows to levy excise duty on beer

manufactured and sold in the State of Goa

and Fee for beer imported from outside India

or transported from Custom Station or

imported from the rest of India and sold in

the State of Goa on the stock in the bonded

warehouse of the wholesaler or manufactured

as on 06-10-2022 or on the stock for which

import permits were issued on or before

06-10-2022 shall be at the rates specified in

the Government Notification No. 1/2/2020-Fin

(R&C)/556 dated 11th May, 2020.

By order and in the name of the Governor

of Goa.

Pranab G. Bhat, Under Secretary, Finance

(R&C).

Porvorim, 25th November, 2022.

———uuu———

Department of Fisheries

Directorate of Fisheries

–––

Notification

DF/PLG/BUD/2022-23

Ref: Notification No. DF/PLG/Bud/2012-13

published in Official Gazette, Series I

No. 31 dated 01-11-2012.

In partial modification of the notification

referred above the introduction shall be

revised and amended as follows:

The Government of Goa hereby introduces

the scheme namely, “Financial Assistance to

Brackish Water Aquaculture Farms” to

increase fish production through aquaculture.

Further, in clause (vi) sub-clause (a) shall

be revised and amended as follows:

(a) “Financial Assistance for Construc-

tion and renovation of farms”. Financial

Assistance will be provided as subsidy i.e.

25% subsidy of the cost of construction or

renovation of farms/bandhs etc., limited to

Rs. 2.00 lakh per ha. Aquaculture farmers

will be eligible for renovation of farm after

5 years of its construction”.

And in clause (xi)) sub-clause (a) shall be

revised and amended as follows:

(xi) Quantum of subsidy and eligibility.—

(a) Subsidy will be 25% of cost of

construction or renovation of farms/bandhs

limited to Rs. 2.00 lakh per ha.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES I No. 35

1ST DECEMBER, 2022

1162

This issues with the approval of

Government vide entry No. 2180/F dated

25-10-2022.

By order and in the name of the Governor

of Goa.

Dr. Shamila Monteiro, Directror & ex officio

Joint Secretary (Fisheries).

Panaji.

———uuu———

Department of Personnel

–––

Notification

1/14/2017-PER

In exercise of the powers conferred by the

proviso to Article 309 of the Constitution of

India, the Governor of Goa hereby makes the

following rules to regulate the recruitment to

Group ‘C’, Non-Gazetted, Non-Ministerial

posts, in the Water Resources Department,

Government of Goa, namely:—

1. Short title, application and commence-

ment.— (1) These rules may be called the

Government of Goa, Water Resources

Department, Group ‘C’, Non-Gazetted, Non-

-Ministerial Post, Recruitment Rules, 2022.

(2) They shall apply to the post specified in

column (1) of the Schedule to these rules

(hereinafter called as the “said Schedule”).

(3) They shall come into force on the date

of their publication in the Official Gazette.

2. Number, classification and level in the

pay matrix.— The number of posts,

classification of the said posts and level in

the pay matrix attached thereto shall be as

specified in columns (2) to (4) of the said

Schedule:

Provided that the Government may vary

the number of posts as specified in column

(2) of the said Schedule from time to time

subject to exigencies of work.

3. Method of recruitment, age limit and

other qualifications.— The method of

recruitment to the said post, age limit,

qualifications and other matters connected

therewith shall be as specified in columns

(5) to (13) of the said Schedule.

4. Disqualification.— No person who has

entered into or contracted a marriage with a

person having a spouse living or who, having

a spouse living, has entered into or contracted

a marriage with any person, shall be eligible

for appointment to the service:

Provided that the Government may, if

satisfied that such marriage is permissible

under the personal law applicable to such

person and the other party to the marriage

and that there are other grounds for so doing,

exempt any person from the operation of this

rule.

5. Power to relax.— Where, the Government

is of the opinion that it is necessary or

expedient so to do, it may, by order, for

reasons to be recorded in writing, relax any

of the provisions of these rules with respect

to any class or category of persons.

6. Saving.— Nothing in these rules shall

affect reservations, relaxation of age limit and

other concessions required to be provided

for Scheduled Castes, Scheduled Tribes, Other

Backward Classes, Ex-servicemen and other

special categories of persons in accordance

with the orders issued by the Government

from time to time in that regard.

By order and in the name of the Governor

of Goa.

Eshant V. Sawant, Under Secretary

(Personnel-I).

Porvorim, 24th November, 2022.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES I No. 35

1ST DECEMBER, 2022

1163

N.A.

Name

/desig-

nation of

post

Age

limit

for

direct

recruits

Period

of

proba-

tion, if

any

Method of

recruitment,

whether by direct

recruitment or

by promotion

or by deputation/

/absorption and

percentage

of the vacancies

to be filled by

various methods

In case of recruit-

ment by promo-

tion/deputation/

/absorption, grades

from which

promotion/

deputation/

/absorption is to be

made

to be made

Educational

and other

qualifications

required for

direct recruits

Classifi-

cation

Whether age & educational qualifications

prescribed for the direct recruits will

apply in the case of promotees

Number

of

posts

Level

in the

pay

matrix

If a

D.P.C.

exists,

what is

its

compo-

sition

Whether

selection

post or

non-

-selection

post

135

(2022)

(Subject to

variation

depen-

dent on

workload).

N.A.

Group

‘C’, Non-

Gazetted,

Non-

Ministe-

rial.

L-5.

By direct

recruitment.

Junior

Engineer:

(i) Civil (122

posts)

(ii) Mechanical

(07 posts)

(iii) Electrical

(06 posts).

1

2

3

4

5

6

7

8

9

10

11

12

13

SCHEDULE

Group ‘C’,

D.S.C.

Circum-

stances in

which Goa

Public

Service

Commission

is to be

consulted in

making

recruitment

Not

exceeding

45 years

(Relaxable

for

Govern-

ment

servants

upto five

years in

accor-

dance with

the

instruc-

tions or

orders

issued by

the

Govern-

ment from

time to

time).

Essential:

(i) Degree from

a recognized

University or

Diploma from a

recognized

Institution in the

concerned

branch of

Engineering i.e.

Civil/

/Mechanical/

/Electrical.

(ii) Knowledge

of Konkani.

Desirable:

Knowledge of

Marathi.

N.A.

Two

years.

N.A.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES I No. 35

1ST DECEMBER, 2022

1164

Department of Revenue

–––

Notification

22/1/2016-RD/1424

Read: Notification No. 22/01/2016-RD dated

30-05-2016.

In order to simplify the procedure involved

in the Land Acquisition process for

Government Departments, the Government

is pleased to modify and replace the clauses

2.1, 2.6 and 2.7 of the Policy on Procurement

of Land under Right to Fair Compensation

and Transparency in Land Acquisition,

Rehabilita-tion and Resettlement Act, 2013 for

Direct Procurement of land, read at preamble,

as follows:-

Clause 2.1:- Any Government Department

(hereinafter referred to as requiring

Department) requiring land for public

purposes may request the Collector for the

same. The Requiring Department may submit

the request in prescribed Form-I, as annexed

to the Collector which will include the

purpose for requirement of land, number of

beneficiaries of the project, whether the

project will generate revenue, employment

or any other benefits to the State, extent of

area required, preferable locations i.e. Taluka

in which the project is proposed, financial

arrangement etc., after obtaining Administra-

tive Approval

Clause 2.6:- The Collector on receipt of

report shall examine the same and submit

with due comments and recommendations

to the Revenue Department for obtaining

approval of the Government. Thereafter,

Expenditure Sanction shall be taken by

Revenue Department only in those cases

where prior Expenditure Sanction was not

obtained by the acquiring department.

Provided that the proposals which fall

under the purview of the Schedule appended

to the Rules of Business of the Government of

Goa, 1991 shall be placed before the Council

of Ministers.

Clause 2.7:- Simultaneous to Clause 2.6,

Revenue Department shall get the draft sale

deed vetted from the panel of Advocates as

per the empanelled list maintained by Law

Department.

This issues with the approval of the Council

of Ministers as resolved in the XIIth Cabinet

Meeting on 23-11-2022.

By order and in the name of the Governor

of Goa.

Shubham Naik, Under Secretary (Revenue-I).

Porvorim, 23rd November, 2022.

———uuu———

Department of Tourism

–––

Corrigendum

N5/3(840)/2022-DT/203

Ref. Official Gazette of Government of Goa

Series I No. 32 dated 10th November,

2022.

1) The Notification No. N5/3(840)2022-DT

pertaining to the words in bracket (Goa Act

10 of 2022) may be read as (Goa Act 11 of

2022).

Other details remain unchanged.

Nikhil U. Desai, Director of Tourism & ex

officio Addl. Secretary.

Panaji, 17th November, 2022.

———uuu———

Department of Water Resources

Office of the Chief Engineer

–––

Notification

4/4/EO-WRD/2022-23/320

Sub.:

Establishment of State Water

Informatics Center (SWIC)

1.0 General.— The Government has decided

to create and establish the State Water

Informatics Center (SWIC) in the Data Center

Building of the Water Resources Department

located at Sinchai Bhavan, Porvorim with the

Water Resources Department as the lead

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES I No. 35

1ST DECEMBER, 2022

1165

Department in manning and maintaining the

said SWIC. The Chief Engineer will head the

organization, with Superintending Engineer

(CPO) as officer in charge along with support

staff to establish and develop the State Water

Informatics Center (SWIC). The SWIC will be

responsible for collation of all the information

pertaining to floods, river level monitoring,

water quality, rainfall etc. in the State.

2.0 Background.— Water is a dynamic

Resource, it needs to be monitored, historical

data bank created, scientific interpretation of

data done and algorithms need to be evolved

to understand its behavior. The said data so

created, needs to be exchanged/shared with

the GOI for better forecasting of floods,

draughts, water budgeting, planning etc. in

a scientific and integrated manner. The

Government of India has requested the State

of Goa to create such an organization within

the State for which NWIC is encouraging and

supporting States to establish State Water

Informatics Centres (SWIC) with the goal of

optimizing the use of water data within States

and adding value to existing data through

standardization, increased interoperability,

improved data validation and integration of

latest technologies and GIS framework.

3.0 Objective.— 3.1 The establishment of

SWIC will help the State in:

Ø Policy formulation for scientific manage-

ment of water resources and related

aspects of the State.

Ø Strategic Decision making.

Ø Modeling activities and development of

analytical tools.

Ø Development of decision support systems

and other knowledge products related to

water.

Ø Overall water resources management and

planning in the respective States.

3.2 Major roles of NWIC in establishing

SWIC will be:

Ø Standardization of data and GIS layers.

Ø Sharing & Integration of data with States.

Ø Common validation tools.

Ø Production

Environment

Hosting

platforms (servers/cloud requirement).

Ø Development

of

generic

reports,

visualization and dashboards.

Ø Common licenses, software for GIS and

databases.

Ø Development of generic applications and

DSS.

NWIC will handhold the States during all

the stages of establishment of SWIC and the

development of State-Water Resources

Information System (State-WRIS) by providing

technical guidance and support during SWIC.

4.0 Need of SWIC.—

Ø The State collects enormous micro level

data and the data is collected by various

departments.

Ø Need of a dedicated body to:

l act as a single data repository.

l formulate policy towards uniform

data acquisition, standardization,

validation, analysis and dissemina-

tion.

l establish a mechanism for

coordination

among

data

generating organizations, users,

planners, academicians and all

other stakeholders.

l To achieve real improvement in

water resources management.

l Data will be available to all the

stakeholders at a single platform.

5.0 Scope of SWIC.—

Ø Collection of water data (Micro level).

Ø Consolidation of the existing data.

Ø Setting up regular mechanism.

Ø Data validation.

Ø Additional Database & Geo-Spatial data.

Ø Creation as per state specific needs.

Ø State-specific reports, visualization &

Ø Dashboards.

Ø State-specific Application & DSS.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES I No. 35

1ST DECEMBER, 2022

1166

6.0 Stakeholder Departments.— Represen-

tatives from the following departments will

be stakeholders of the SWIC:

Ø Water Resources Department.

Ø Agriculture Department.

Ø Rural Development Department.

Ø Public Works Department (PHE).

Ø Directorate of Planning, Statistics &

Evaluation.

Ø Goa University.

Ø Goa Engineering College (Civil

Engineering Dept.).

Ø National Institute of Oceanography.

Ø Center for Environment Education

(CEE).

By order and in the name of the Governor

of Goa.

P. B. Badami, Chief Engineer (WRD) & ex

officio Addl. Secretary.

Porvorim, 23rd November, 2022.

———

Notification

4/4/EO-WRD/2022-23/325

Sub.:- Policy on Rainwater Harvesting

(Amendment) 2022.

1.0 General.— The Government had notified

a policy on rain water harvesting on

16-10-2008 (Published in the Official Gazette

Series I No. 3 dated 23-10-2008). Now it has

been expedient to partially amend certain

provisions in the said policy to enhance the

public response at large by incorporating new

ideologies as per changing scenario in the

state. Accordingly, this notification is issued

superseding the existing policy for the

information of the public & for guidance of all

concerned departments. This policy will be

effective from the date of its publication in

the Official Gazette.

2.0 Definition and Scope.— For the purpose

of the policy, rain water harvesting shall be

defined as the water management technique

and practice of collecting rain water and

recharging of ground water by following

methods:

a) Roof top Rainwater Harvesting:-

Collection of Rainwater falling on the

roof of house/building or groups of houses/

/buildings located on a single plot of land

and storing the collected water in

underground or over ground storage

container/tanks/cisterns for continuous

use/consumption by the user/occupants of

the houses/buildings from whose roofs the

water has been so collected.

b) Ground Water Recharge:-

(i) Construction

of

Rain

water

harvesting pits of size 1.0 m x 1.0

m x 0.60 m (LxBxD) in agricultural/

/orchard/open lands.

(ii) Ground Water Recharge through

Bore wells/Tube wells/Open wells,

to be implemented with the prior

approval, and under supervision

and technical guidance of Water

Resources Department.

The Policy shall apply to the whole State.

3.0 Mandatory Provisions of the Policy.—

Rain water harvesting shall be mandatory

for the following groups of users:

(i)Residential complexes including

apartments on a plot area of 2000 sq. mts.

and above.

(ii) Commercial complexes on a plot area

of 1500 sq. mts. and above.

(iii) Industrial units on a plot area of 10000

sq. mts. and above.

(iv) All the Government buildings and

Government schools and colleges.

However, all the users of these groups who

incorporate Sewage Treatment Plants (STP)

or Waste Water Recycling processes where

the gray water is reused, shall be exempted

from the mandatory inclusion of rainwater

harvesting structures in their buildings.

4.0 Incentives for adopting rainwater

harvesting.—

4.1 Subsidies:- Subsidies on reimburse-

ment basis shall be provided to the different

user groups at the rates mentioned below:-

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES I No. 35

1ST DECEMBER, 2022

1167

(i)

Individual

households/Residential

houses: Upto 50% of the cost incurred

for incorporation of the rainwater

harvesting system or Rs. 1,00,000

(Rupees one lakh only) whichever is

less.

(ii)

Residential complexes/apartments/

/buildings/privates housing societies/

/private schools/colleges: Upto 50% of

the cost incurred for incorporation of

the rainwater harvesting system or

Rs. 5,00,000.00 (Rupees five lakhs only)

whichever is less.

(iii)

For Commercial complexes, Industries

and hospitality businesses: Upto 50%

of the cost incurred for incorporation

of the rainwater harvesting structures

or Rs. 5,00,000/- (Rupees five lakhs

only) whichever is less.

(iv)

For registered group of farmers/youth

clubs/NGOs

under

community

participatory programme: Upto 80% of

the cost incurred towards implemen-

tation of the rainwater harvesting

structure such as construction of

traditional kutcha bunds, development

of lakes etc. or Rs. 5,00,000/- (Rupees

five lakhs only) whichever is less.

(v)

For construction of Rain water

harvesting pits: For construction of

rainwater harvesting pits of size 1.00

mts. x 1.00 mts. x 0.60 mts. in the

agricultural/open/orchard land holding

which is over 1000 sq. mts. in cluster

of minimum 20 pits/1000 m2, subsidy

at a flat rate of Rs. 50/- per pit, subject

to financial ceiling of Rs. 1,00,000/-

(Rupees one lakh only) per applicant.

(vi)

For ground water recharge through

borwells/tubewells/open wells: Upto

50% of the cost incurred or Rs. 1,00,000/-

(Rupees one lakh only) whichever is

less.

All these subsidies as mentioned above

shall be granted on reimbursement basis.

4.2 Annual award for the best rainwater

harvesting practices:- The Water Resources

Department will institute an annual award

carrying a citation and a cash prize of

Rs. 25,000/- for the best rainwater harvesting

practices per taluka and a State level prize

of Rs. 50,000/- in the following categories:

(i) Primary and secondary schools.

(ii) High schools and Pre-university

education institutes.

(iii) Colleges.

(iv) Group housing/societies/apartments.

(v) Individual households.

(vi) Municipalities

and

Panchayat

buildings.

(vii) NGO/registered organizations/youth

clubs/registered farmers group.

(viii) Industries and Industrial estates.

The best performer will be selected by a

team of four expert members as appointed

by the Government and headed by the Chief

Engineer (WRD). The last date for submission

of application every year etc. will be

published subsequently.

5.0 Amendment of Bye-laws.— All the

authorities/departments/agencies in the State

issuing licenses/permissions for building

construction shall take immediate action to

amend the building bye-laws presently in

force to bring them into conformity with this

policy. Similarly all other authorities issuing

licenses/clearances etc. shall also take action

to bring their rules/regulations/procedures/

/guidelines etc. for issuing licenses etc. into

conformity with this policy.

6.0 Nodal Officers.— For the purpose of

releasing subsidy, the Executive Engineer,

Work Division - I, WRD, Porvorim and the

Executive Engineer, Works Division - II, WRD,

Rawanfond, Margao, shall be the Nodal

Officers for North Goa and South Goa districts

respectively.

7.0 Procedure for application, sanction,

implementation and release of subsidy.—

Subsidies under the policy shall be released

only on reimbursement basis.

a. Application:

1. Application in the prescribed form,

along with requisite documents to

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES I No. 35

1ST DECEMBER, 2022

1168

be submitted online or offline

mode to the office of the concerned

Nodal officer.

** The applicant may make use/refer

the typical drawings for roof top

and

groundwater

recharge

structure, from the Rain Water

Harvesting and Conservation

Manual, State of Goa.

b. Sanction:

(i)

The Nodal officer will scrutinize

and process the application and

place before the sanctioning

committee.

(ii)

The

Sanctioning

Committee

headed by the Chief Engineer,

Superintending Engineer (CPO),

Superintending Engineer (Circle-I),

Sr. Hydrogeologist and Enginee-

ring officer as members shall

examine the design, technical

feasibility, other relevant aspects

like location, type of soil strata,

ground water, pollution etc., and

accordingly decision will be taken.

(iii)

The Nodal Officer/Chief Engineer,

will communicate the sanction to

the applicant.

c. Implementation:

(i) Upon receiving the letter of

sanction, the applicant shall

implement the work.

(ii) On completion, the applicant shall

submit the bill of quantities of the

work done prepared as per current

Goa Scheduled of rates (for the

items not available in the Goa

Schedule of rates, the rates shall

be fair market rates supported

with appropriate quotations) and

certified by the registered Civil

Engineer.

(iii) The applicant can also engage the

services of Empanelled Agencies

by the Water Resources Department

for implementation of Rain Water

harvesting structure, who shall

handhold the applicant from

application phase till completion of

the scheme.

d. Mode of release of subsidy:

(i)

Upon Implementation of the

scheme, the bill shall be submitted

to the Nodal Officer by individual/

/empanelled agency duly certified

by the registered civil engineer.

(ii)

The completed work will be

inspected,

geo

tagged

and

photograph of the competed work

will be uploaded on the portal.

(iii)

On satisfactory completion of the

work, Nodal Officer shall release

the subsidy amount to the

applicant as per the eligibility.

By order and in the name of the Governor

of Goa.

P. B. Badami, Chief Engineer (WRD) & ex

officio Addl. Secretary.

Porvorim, 25th November, 2022.

———uuu———

MORMUGAO PORT AUTHORITY

Mormugao Port Authority-

Scale of Rates (SOR) for Estates

Goa

Dated: 7th September, 2022

Notification

In exercise of the powers conferred under

section 27(1)-D. Imposition of Rates, clause 1

of the Major Port Authorities Act, 2021, the

Board of the Mormugao Port Authority hereby

disposes of the proposal for Revision of Estate

Rentals of Port Land (Sr. I, II & III) and

Premises-Two Structures (Sr. IV). The revised

Scale of Rates (SoR) for Estates of Mormugao

Port Authority has been set out in the

Schedule annexed to this Notification.

Sd/-

Chairperson of the Board of

Mormugao Port Authority

———

SCHEDULE

Scale of Rates (SOR) for Estates of

Mormugao Port Authority

General Note:

All the conditions/notes prescribed in the

existing Scale of Rates/Schedule of License

Fees, Lease Rentals and Way Leave Charges

shall apply to the extent they are not

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES I No. 35

1ST DECEMBER, 2022

1169

inconsistent with the conditions prescribed

in the amended Land Policy Guidelines of

2014 issued by the Ministry of Shipping, and

as may be amended from time to time. In

case of disagreement, the conditions

prescribed by the Government in the amended

Land Policy for Major Ports 2014 shall prevail.

I. LICENCE FEE ON PORT LAND FOR BUILDING

AND OTHER STRUCTURES:

Sr.

Zone/Location

Rate per 10 sq. mtr. or

No.

part thereof per calendar

month or part thereof (in `)

1.

Mormugao Harbour

665.00

& Vasco Bay

2.

Baina

750.00

3.

Vasco

3266.00

4.

Dabolim

788.00

5.

Headland Sada

750.00

6.

Bogda

575.00

II. CHARGES FOR OCCUPATION OF FORESHORE

LAND:

Sr.

Zone/Location

Rate per 10 sq. mtr. or part

No.

thereof per calendar month

or part thereof (in `)

1.

Foreshore Area at

148.00

Vasco

2.

Foreshore Area Beyond

148.00

Vasco and at Betul

III. WAY LEAVE CHARGES:

Sr.

Zone/Location

Rate per 10 sq. mtr. or part

No.

thereof per calendar month

or part thereof (in `)

1. Mormugao & Vasco Bay

665.00

2. Head Land Sada &

750.00

Bogda

3. Baina

750.00

4. Beyond Vasco Bay upto

148.00

Port limit, Dabolim/

/Chicalim/Sancoale/

/North of Zuari River/

/Betul Foreshore

IV. LEASE RENT FOR PREMISES-COMMERCIAL

BUILDING NEAR VASCO RAILWAY STATION AND

CRUISE TERMINAL BUILDING:

Sr.

Zone/Location

Rate per sq. mtr. per

No.

month (in `)

1

2

3

1.

Commercial building,

near Vasco Railway

Station,Vasco, Goa

1

2

3

(a) Ground Floor

593.00

(b) Other than Ground

465.00

Floor

2.

Cruise Terminal

475.00

Building at Harbour,

Mormugao Port

Authority (MPA) at

Vasco, Goa

Note:

(i) The rates prescribed in Schedule I, II, III &

IV above shall be applicable with effect

from 17 June, 2022.

(ii) The rates prescribed in Schedule I, II, III

& IV above shall remain valid for five years

i.e. till 16 June, 2027.

(iii) The rates provided in the Scale of Rates

shall get automatically escalated by 2%

per annum for Land, Foreshore Area and

Way Leave Charges. The rates for premises

i.e. Commercial Building at Vasco Railway

Station and Cruise Terminal Building at

Harbour prescribed above shall get

automatically escalated by 5% per annum

after expiry of each year from the effective

date of implementation of the Scale of

Rates.

(iv) For the purpose of way leave charges, the

area occupied by single pipelines should

be calculated based on the diameter and

length of those pipelines. In case of multi-

layer pipeline stacks, the physical area

occupied by the multilayer pipeline

stacks should be considered and the

respective users should be billed for pro-

rata area on the basis of the diameter and

length of their pipelines passing through

that area. With respect to the area shared

with road, rails, jetties, etc., the respective

users should be billed pro-rata for 50% of

the concerned area assuming that they

do not have exclusive possession of land

and what they have is only ‘Right of Way’.

As far as underground pipes are

concerned if the users establish that the

possession of surface area above the

underground cross-country pipelines is

not physically with them, the area

occupied by such pipelines should be

counted 50% of the product of diameter

and length, for the purpose of levy of way

leave charges.

(v) The Licence Fees for water area shall be

charged 50% of the licence fee of abutting

land.

Sd/-

Chairperson of the Board of

Mormugao Port Authority

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES I No. 35

1ST DECEMBER, 2022

1170

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES I No. 35

1ST DECEMBER, 2022

1171

www.goaprintingpress.gov.in

Printed and Published by the Director, Printing & Stationery,

Government Printing Press,

Mahatma Gandhi Road, Panaji-Goa 403 001.

PRICE – Rs. 13.00

PRINTED AT THE GOVERNMENT PRINTING PRESS, PANAJI-GOA—314/120—12/2022.

V. No.AP-907/2022

V. No. AP-907/2022.