1159
Panaji, 1st December, 2022 (Agrahayana 10, 1944)
SERIES I No. 35
Reg. No. RNP/GOA/32/2021-2023
RNI No. GOAENG/2002/6410
PUBLISHED BY AUTHORITY
Suggestions are welcomed on e-mail: dir–[email protected]
NOTE
There are two Extraordinary issues to the Official Gazette, Series I No. 34 dated 24-11-2022, namely:—
(1) Extraordinary dated 25-11-2022 from pages 1153 to 1154, Notification No. 5-1-2022-Fin(DMU) regarding Market
Borrowing Programme from Department of Finance.
(2) Extraordinary (No. 2) dated 30-11-2022 from pages 1155 to 1158, Notifications regarding framing of monthly
lottery scheme from Department of Finance.
INDEX
Department
Notification/Add/Corrigendum.
Subject
Pages
1
2
3
4
1.
Agriculture
Not.- 3/1/Agri.Mech/AD(AE)/
Modified Scheme for Custom
1160
/2022-23/D.Agri/263
Hiring Service in Agriculture.
2.
Co-operation
Not.- 1-33-2014-15/PLG/RCS/
Amendment of Government Share
1160
/275/3088
Capital Contribution Scheme.
3.
Finance
Not.- 1/5/2022-Fin(R&C)/1025
Levy of excise duty on beer as
1161
specified.
4.
Fisheries
Not.- DF/PLG/BUD/2022-23
Financial Assistance to Brackish
1161
Water Aquaculture Farms—
Amended.
5.
Personnel
Not.- 1/14/2017-PER
RRs.—Water Resources Department.
1162
6.
Revenue
Not.- 22/1/2016-RD/1424
Modification of Policy on
1164
Procurement of Land.
7.
Tourism
Corri.- N5/3(840)/2022-DT/203
Correction of words.
1164
8.a. Water Resources
Not.- 4/4/EO-WRD/2022-23/320
Establishment of SWIC.
1164
b. —do—
Not.- 4/4/EO-WRD/2022-23/325
Policy on Rainwater Harvesting
1166
(Amendment)—2022.
9.
Mormugao Port
—
Revision of Estate Rentals of
1168
Authority
Mormugao Port Authority.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 35
1ST DECEMBER, 2022
1160
GOVERNMENT OF GOA
Department of Agriculture
Directorate of Agriculture
–––
Notification
3/1/Agri.Mech/AD(AE)/2022-23/D.Agri/263
Read Notification: (1) No. 3/1/AD(AE)/2017-18/
D.Agri/119 dated 07-09-2017,
Series I No. 23.
(2)No. 3/1/AD(AE)/2018-19/
/D.Agri/275 dated 21-02-2019.
Short title and commencement.— The
scheme shall be called “Modified Scheme for
Custom Hiring Service in Agriculture”.
Amendment
The standard hire charges of following
Agriculture machineries shown under the
Pattern of Assistance at clause 3 (iv) in the
above read notifications are revised and
amended as shown below:
Sr.
Type of machinery
Hire charge
No.
(Rs.)
1
2
3
1.
Tractor (30 hp & above)
800/- per hour
with implements excluding
Rotovator
2.
Tractor (30 hp & above)
1000/- per hour
with Rotovator
3.
Mini Tractor
600/- per hour
4.
Power tiller
500/- per hour
5.
Paddy Transplanter
35000/- per
hectare
The revised rate of hire charges will be
effective with immediate effect from the date
of publication on Official Gazette.
Other contents of the notification remain
the same.
This issues with the approval of the
Government and concurrence of the Finance
(Expenditure) Department, Government of
Goa vide U. O. No. 1400038300 dated 18-10-2022.
By order and in the name of the Governor
of Goa.
Nevil Alphonso, Director & ex officio Joint
Secretary (Agriculture).
Tonca-Caranzalem, 21st November, 2022.
Department of Co-operation
Office of the Registrar of Co-operative Societies
–––
Notification
1-33-2014-15/PLG/RCS/275/3088
Read: 1. Notification No. 1-27-2011/PLG/
/RCS dated 20-06-2012 published
in the Official Gazette, Series I No.
13 dated 28-06-2012;
2. Notification No. 1-33-2014-15/PLG/
/RCS dated 25-04-2017 published
in the Official Gazette, Series I No.
5 dated 04-05-2017.
Whereas the Government has notified vide
Notification read at No. 1 above a scheme
named “the existing revised scheme to
provide financial assistance in the form of
Government share capital contribution, loan,
subsidy, managerial subsidy, grant in aid, etc.
to the “Apex Co-operative Bank (Goa State
Co-op. Bank Ltd.), Goa State Co-operative Milk
Producer’s Union, Goa State Co-operative
Housing Finance & Federation Ltd., Goa State
Co-operative Union Ltd., Goa Co-operative
Marketing and Supply Federation Ltd. and
Industrial Co-operatives.” Said scheme was
amended vide Notification read at No. 2
above.
And whereas the Government considers it
necessary to carry out further amendments
to the said scheme for ensuring growth and
development/smooth functioning of business
and other allied activities of the Institutions.
Now, therefore, Government is pleased to
further amend the scheme and pattern of
financial assistance as shown under.
In the said scheme, under Clause 3. Pattern
of Financial Assistance-In the table, for entry
against Sr. No. 1, the following entry shall be
substituted.
Sr.
Type of
Name of
Pattern of
No.
Society
the Scheme Financial Assis-
tance
1
2
3
4
1. Apex Co-opera-
Government
The total limit
tive Bank (Goa
Share Capital of Government
State Co-operative Contribution investment in
Bank Ltd.)
the Share Capi-
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 35
1ST DECEMBER, 2022
1161
1
2
3
4
tal of the Apex
Co-operative
Bank i.e. Goa
State Co-opera-
tive Bank Ltd.,
Panaji shall be
to the extent
of Rs. 3000.00
lakh inclusive
of the Govern-
ment Share
contribution
already
released to the
said Bank.
This issues with the concurrence of Finance
(Expenditure) Department conveyed vide their
U. O. No. 2968/F dated 19-11-2022.
By order and in the name of the Governor
of Goa.
Vishant S. N. Gaunekar, Registrar of
Co-operative Societies & ex officio Joint
Secretary (Co-operation).
Panaji, 25th November, 2022.
———uuu———
Department of Finance
Revenue & Control Division
–––
Notification
1/5/2022-Fin(R&C)/1025
In exercise of the powers conferred by
sub-section (1) of section 42 of the Goa Excise
Duty Act, 1964 (Act No. 5 of 1964), the
Government of Goa being of the opinion that
reasonable grounds exist for doing so, hereby
allows to levy excise duty on beer
manufactured and sold in the State of Goa
and Fee for beer imported from outside India
or transported from Custom Station or
imported from the rest of India and sold in
the State of Goa on the stock in the bonded
warehouse of the wholesaler or manufactured
as on 06-10-2022 or on the stock for which
import permits were issued on or before
06-10-2022 shall be at the rates specified in
the Government Notification No. 1/2/2020-Fin
(R&C)/556 dated 11th May, 2020.
By order and in the name of the Governor
of Goa.
Pranab G. Bhat, Under Secretary, Finance
(R&C).
Porvorim, 25th November, 2022.
———uuu———
Department of Fisheries
Directorate of Fisheries
–––
Notification
DF/PLG/BUD/2022-23
Ref: Notification No. DF/PLG/Bud/2012-13
published in Official Gazette, Series I
No. 31 dated 01-11-2012.
In partial modification of the notification
referred above the introduction shall be
revised and amended as follows:
The Government of Goa hereby introduces
the scheme namely, “Financial Assistance to
Brackish Water Aquaculture Farms” to
increase fish production through aquaculture.
Further, in clause (vi) sub-clause (a) shall
be revised and amended as follows:
(a) “Financial Assistance for Construc-
tion and renovation of farms”. Financial
Assistance will be provided as subsidy i.e.
25% subsidy of the cost of construction or
renovation of farms/bandhs etc., limited to
Rs. 2.00 lakh per ha. Aquaculture farmers
will be eligible for renovation of farm after
5 years of its construction”.
And in clause (xi)) sub-clause (a) shall be
revised and amended as follows:
(xi) Quantum of subsidy and eligibility.—
(a) Subsidy will be 25% of cost of
construction or renovation of farms/bandhs
limited to Rs. 2.00 lakh per ha.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 35
1ST DECEMBER, 2022
1162
This issues with the approval of
Government vide entry No. 2180/F dated
25-10-2022.
By order and in the name of the Governor
of Goa.
Dr. Shamila Monteiro, Directror & ex officio
Joint Secretary (Fisheries).
Panaji.
———uuu———
Department of Personnel
–––
Notification
1/14/2017-PER
In exercise of the powers conferred by the
proviso to Article 309 of the Constitution of
India, the Governor of Goa hereby makes the
following rules to regulate the recruitment to
Group ‘C’, Non-Gazetted, Non-Ministerial
posts, in the Water Resources Department,
Government of Goa, namely:—
1. Short title, application and commence-
ment.— (1) These rules may be called the
Government of Goa, Water Resources
Department, Group ‘C’, Non-Gazetted, Non-
-Ministerial Post, Recruitment Rules, 2022.
(2) They shall apply to the post specified in
column (1) of the Schedule to these rules
(hereinafter called as the “said Schedule”).
(3) They shall come into force on the date
of their publication in the Official Gazette.
2. Number, classification and level in the
pay matrix.— The number of posts,
classification of the said posts and level in
the pay matrix attached thereto shall be as
specified in columns (2) to (4) of the said
Schedule:
Provided that the Government may vary
the number of posts as specified in column
(2) of the said Schedule from time to time
subject to exigencies of work.
3. Method of recruitment, age limit and
other qualifications.— The method of
recruitment to the said post, age limit,
qualifications and other matters connected
therewith shall be as specified in columns
(5) to (13) of the said Schedule.
4. Disqualification.— No person who has
entered into or contracted a marriage with a
person having a spouse living or who, having
a spouse living, has entered into or contracted
a marriage with any person, shall be eligible
for appointment to the service:
Provided that the Government may, if
satisfied that such marriage is permissible
under the personal law applicable to such
person and the other party to the marriage
and that there are other grounds for so doing,
exempt any person from the operation of this
rule.
5. Power to relax.— Where, the Government
is of the opinion that it is necessary or
expedient so to do, it may, by order, for
reasons to be recorded in writing, relax any
of the provisions of these rules with respect
to any class or category of persons.
6. Saving.— Nothing in these rules shall
affect reservations, relaxation of age limit and
other concessions required to be provided
for Scheduled Castes, Scheduled Tribes, Other
Backward Classes, Ex-servicemen and other
special categories of persons in accordance
with the orders issued by the Government
from time to time in that regard.
By order and in the name of the Governor
of Goa.
Eshant V. Sawant, Under Secretary
(Personnel-I).
Porvorim, 24th November, 2022.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 35
1ST DECEMBER, 2022
1163
N.A.
Name
/desig-
nation of
post
Age
limit
for
direct
recruits
Period
of
proba-
tion, if
any
Method of
recruitment,
whether by direct
recruitment or
by promotion
or by deputation/
/absorption and
percentage
of the vacancies
to be filled by
various methods
In case of recruit-
ment by promo-
tion/deputation/
/absorption, grades
from which
promotion/
deputation/
/absorption is to be
made
to be made
Educational
and other
qualifications
required for
direct recruits
Classifi-
cation
Whether age & educational qualifications
prescribed for the direct recruits will
apply in the case of promotees
Number
of
posts
Level
in the
pay
matrix
If a
D.P.C.
exists,
what is
its
compo-
sition
Whether
selection
post or
non-
-selection
post
135
(2022)
(Subject to
variation
depen-
dent on
workload).
N.A.
Group
‘C’, Non-
Gazetted,
Non-
Ministe-
rial.
L-5.
By direct
recruitment.
Junior
Engineer:
(i) Civil (122
posts)
(ii) Mechanical
(07 posts)
(iii) Electrical
(06 posts).
1
2
3
4
5
6
7
8
9
10
11
12
13
SCHEDULE
Group ‘C’,
D.S.C.
Circum-
stances in
which Goa
Public
Service
Commission
is to be
consulted in
making
recruitment
Not
exceeding
45 years
(Relaxable
for
Govern-
ment
servants
upto five
years in
accor-
dance with
the
instruc-
tions or
orders
issued by
the
Govern-
ment from
time to
time).
Essential:
(i) Degree from
a recognized
University or
Diploma from a
recognized
Institution in the
concerned
branch of
Engineering i.e.
Civil/
/Mechanical/
/Electrical.
(ii) Knowledge
of Konkani.
Desirable:
Knowledge of
Marathi.
N.A.
Two
years.
N.A.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 35
1ST DECEMBER, 2022
1164
Department of Revenue
–––
Notification
22/1/2016-RD/1424
Read: Notification No. 22/01/2016-RD dated
30-05-2016.
In order to simplify the procedure involved
in the Land Acquisition process for
Government Departments, the Government
is pleased to modify and replace the clauses
2.1, 2.6 and 2.7 of the Policy on Procurement
of Land under Right to Fair Compensation
and Transparency in Land Acquisition,
Rehabilita-tion and Resettlement Act, 2013 for
Direct Procurement of land, read at preamble,
as follows:-
Clause 2.1:- Any Government Department
(hereinafter referred to as requiring
Department) requiring land for public
purposes may request the Collector for the
same. The Requiring Department may submit
the request in prescribed Form-I, as annexed
to the Collector which will include the
purpose for requirement of land, number of
beneficiaries of the project, whether the
project will generate revenue, employment
or any other benefits to the State, extent of
area required, preferable locations i.e. Taluka
in which the project is proposed, financial
arrangement etc., after obtaining Administra-
tive Approval
Clause 2.6:- The Collector on receipt of
report shall examine the same and submit
with due comments and recommendations
to the Revenue Department for obtaining
approval of the Government. Thereafter,
Expenditure Sanction shall be taken by
Revenue Department only in those cases
where prior Expenditure Sanction was not
obtained by the acquiring department.
Provided that the proposals which fall
under the purview of the Schedule appended
to the Rules of Business of the Government of
Goa, 1991 shall be placed before the Council
of Ministers.
Clause 2.7:- Simultaneous to Clause 2.6,
Revenue Department shall get the draft sale
deed vetted from the panel of Advocates as
per the empanelled list maintained by Law
Department.
This issues with the approval of the Council
of Ministers as resolved in the XIIth Cabinet
Meeting on 23-11-2022.
By order and in the name of the Governor
of Goa.
Shubham Naik, Under Secretary (Revenue-I).
Porvorim, 23rd November, 2022.
———uuu———
Department of Tourism
–––
Corrigendum
N5/3(840)/2022-DT/203
Ref. Official Gazette of Government of Goa
Series I No. 32 dated 10th November,
2022.
1) The Notification No. N5/3(840)2022-DT
pertaining to the words in bracket (Goa Act
10 of 2022) may be read as (Goa Act 11 of
2022).
Other details remain unchanged.
Nikhil U. Desai, Director of Tourism & ex
officio Addl. Secretary.
Panaji, 17th November, 2022.
———uuu———
Department of Water Resources
Office of the Chief Engineer
–––
Notification
4/4/EO-WRD/2022-23/320
Sub.:
Establishment of State Water
Informatics Center (SWIC)
1.0 General.— The Government has decided
to create and establish the State Water
Informatics Center (SWIC) in the Data Center
Building of the Water Resources Department
located at Sinchai Bhavan, Porvorim with the
Water Resources Department as the lead
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 35
1ST DECEMBER, 2022
1165
Department in manning and maintaining the
said SWIC. The Chief Engineer will head the
organization, with Superintending Engineer
(CPO) as officer in charge along with support
staff to establish and develop the State Water
Informatics Center (SWIC). The SWIC will be
responsible for collation of all the information
pertaining to floods, river level monitoring,
water quality, rainfall etc. in the State.
2.0 Background.— Water is a dynamic
Resource, it needs to be monitored, historical
data bank created, scientific interpretation of
data done and algorithms need to be evolved
to understand its behavior. The said data so
created, needs to be exchanged/shared with
the GOI for better forecasting of floods,
draughts, water budgeting, planning etc. in
a scientific and integrated manner. The
Government of India has requested the State
of Goa to create such an organization within
the State for which NWIC is encouraging and
supporting States to establish State Water
Informatics Centres (SWIC) with the goal of
optimizing the use of water data within States
and adding value to existing data through
standardization, increased interoperability,
improved data validation and integration of
latest technologies and GIS framework.
3.0 Objective.— 3.1 The establishment of
SWIC will help the State in:
Ø Policy formulation for scientific manage-
ment of water resources and related
aspects of the State.
Ø Strategic Decision making.
Ø Modeling activities and development of
analytical tools.
Ø Development of decision support systems
and other knowledge products related to
water.
Ø Overall water resources management and
planning in the respective States.
3.2 Major roles of NWIC in establishing
SWIC will be:
Ø Standardization of data and GIS layers.
Ø Sharing & Integration of data with States.
Ø Common validation tools.
Ø Production
Environment
Hosting
platforms (servers/cloud requirement).
Ø Development
of
generic
reports,
visualization and dashboards.
Ø Common licenses, software for GIS and
databases.
Ø Development of generic applications and
DSS.
NWIC will handhold the States during all
the stages of establishment of SWIC and the
development of State-Water Resources
Information System (State-WRIS) by providing
technical guidance and support during SWIC.
4.0 Need of SWIC.—
Ø The State collects enormous micro level
data and the data is collected by various
departments.
Ø Need of a dedicated body to:
l act as a single data repository.
l formulate policy towards uniform
data acquisition, standardization,
validation, analysis and dissemina-
tion.
l establish a mechanism for
coordination
among
data
generating organizations, users,
planners, academicians and all
other stakeholders.
l To achieve real improvement in
water resources management.
l Data will be available to all the
stakeholders at a single platform.
5.0 Scope of SWIC.—
Ø Collection of water data (Micro level).
Ø Consolidation of the existing data.
Ø Setting up regular mechanism.
Ø Data validation.
Ø Additional Database & Geo-Spatial data.
Ø Creation as per state specific needs.
Ø State-specific reports, visualization &
Ø Dashboards.
Ø State-specific Application & DSS.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 35
1ST DECEMBER, 2022
1166
6.0 Stakeholder Departments.— Represen-
tatives from the following departments will
be stakeholders of the SWIC:
Ø Water Resources Department.
Ø Agriculture Department.
Ø Rural Development Department.
Ø Public Works Department (PHE).
Ø Directorate of Planning, Statistics &
Evaluation.
Ø Goa University.
Ø Goa Engineering College (Civil
Engineering Dept.).
Ø National Institute of Oceanography.
Ø Center for Environment Education
(CEE).
By order and in the name of the Governor
of Goa.
P. B. Badami, Chief Engineer (WRD) & ex
officio Addl. Secretary.
Porvorim, 23rd November, 2022.
———
Notification
4/4/EO-WRD/2022-23/325
Sub.:- Policy on Rainwater Harvesting
(Amendment) 2022.
1.0 General.— The Government had notified
a policy on rain water harvesting on
16-10-2008 (Published in the Official Gazette
Series I No. 3 dated 23-10-2008). Now it has
been expedient to partially amend certain
provisions in the said policy to enhance the
public response at large by incorporating new
ideologies as per changing scenario in the
state. Accordingly, this notification is issued
superseding the existing policy for the
information of the public & for guidance of all
concerned departments. This policy will be
effective from the date of its publication in
the Official Gazette.
2.0 Definition and Scope.— For the purpose
of the policy, rain water harvesting shall be
defined as the water management technique
and practice of collecting rain water and
recharging of ground water by following
methods:
a) Roof top Rainwater Harvesting:-
Collection of Rainwater falling on the
roof of house/building or groups of houses/
/buildings located on a single plot of land
and storing the collected water in
underground or over ground storage
container/tanks/cisterns for continuous
use/consumption by the user/occupants of
the houses/buildings from whose roofs the
water has been so collected.
b) Ground Water Recharge:-
(i) Construction
of
Rain
water
harvesting pits of size 1.0 m x 1.0
m x 0.60 m (LxBxD) in agricultural/
/orchard/open lands.
(ii) Ground Water Recharge through
Bore wells/Tube wells/Open wells,
to be implemented with the prior
approval, and under supervision
and technical guidance of Water
Resources Department.
The Policy shall apply to the whole State.
3.0 Mandatory Provisions of the Policy.—
Rain water harvesting shall be mandatory
for the following groups of users:
(i)Residential complexes including
apartments on a plot area of 2000 sq. mts.
and above.
(ii) Commercial complexes on a plot area
of 1500 sq. mts. and above.
(iii) Industrial units on a plot area of 10000
sq. mts. and above.
(iv) All the Government buildings and
Government schools and colleges.
However, all the users of these groups who
incorporate Sewage Treatment Plants (STP)
or Waste Water Recycling processes where
the gray water is reused, shall be exempted
from the mandatory inclusion of rainwater
harvesting structures in their buildings.
4.0 Incentives for adopting rainwater
harvesting.—
4.1 Subsidies:- Subsidies on reimburse-
ment basis shall be provided to the different
user groups at the rates mentioned below:-
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 35
1ST DECEMBER, 2022
1167
(i)
Individual
households/Residential
houses: Upto 50% of the cost incurred
for incorporation of the rainwater
harvesting system or Rs. 1,00,000
(Rupees one lakh only) whichever is
less.
(ii)
Residential complexes/apartments/
/buildings/privates housing societies/
/private schools/colleges: Upto 50% of
the cost incurred for incorporation of
the rainwater harvesting system or
Rs. 5,00,000.00 (Rupees five lakhs only)
whichever is less.
(iii)
For Commercial complexes, Industries
and hospitality businesses: Upto 50%
of the cost incurred for incorporation
of the rainwater harvesting structures
or Rs. 5,00,000/- (Rupees five lakhs
only) whichever is less.
(iv)
For registered group of farmers/youth
clubs/NGOs
under
community
participatory programme: Upto 80% of
the cost incurred towards implemen-
tation of the rainwater harvesting
structure such as construction of
traditional kutcha bunds, development
of lakes etc. or Rs. 5,00,000/- (Rupees
five lakhs only) whichever is less.
(v)
For construction of Rain water
harvesting pits: For construction of
rainwater harvesting pits of size 1.00
mts. x 1.00 mts. x 0.60 mts. in the
agricultural/open/orchard land holding
which is over 1000 sq. mts. in cluster
of minimum 20 pits/1000 m2, subsidy
at a flat rate of Rs. 50/- per pit, subject
to financial ceiling of Rs. 1,00,000/-
(Rupees one lakh only) per applicant.
(vi)
For ground water recharge through
borwells/tubewells/open wells: Upto
50% of the cost incurred or Rs. 1,00,000/-
(Rupees one lakh only) whichever is
less.
All these subsidies as mentioned above
shall be granted on reimbursement basis.
4.2 Annual award for the best rainwater
harvesting practices:- The Water Resources
Department will institute an annual award
carrying a citation and a cash prize of
Rs. 25,000/- for the best rainwater harvesting
practices per taluka and a State level prize
of Rs. 50,000/- in the following categories:
(i) Primary and secondary schools.
(ii) High schools and Pre-university
education institutes.
(iii) Colleges.
(iv) Group housing/societies/apartments.
(v) Individual households.
(vi) Municipalities
and
Panchayat
buildings.
(vii) NGO/registered organizations/youth
clubs/registered farmers group.
(viii) Industries and Industrial estates.
The best performer will be selected by a
team of four expert members as appointed
by the Government and headed by the Chief
Engineer (WRD). The last date for submission
of application every year etc. will be
published subsequently.
5.0 Amendment of Bye-laws.— All the
authorities/departments/agencies in the State
issuing licenses/permissions for building
construction shall take immediate action to
amend the building bye-laws presently in
force to bring them into conformity with this
policy. Similarly all other authorities issuing
licenses/clearances etc. shall also take action
to bring their rules/regulations/procedures/
/guidelines etc. for issuing licenses etc. into
conformity with this policy.
6.0 Nodal Officers.— For the purpose of
releasing subsidy, the Executive Engineer,
Work Division - I, WRD, Porvorim and the
Executive Engineer, Works Division - II, WRD,
Rawanfond, Margao, shall be the Nodal
Officers for North Goa and South Goa districts
respectively.
7.0 Procedure for application, sanction,
implementation and release of subsidy.—
Subsidies under the policy shall be released
only on reimbursement basis.
a. Application:
1. Application in the prescribed form,
along with requisite documents to
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 35
1ST DECEMBER, 2022
1168
be submitted online or offline
mode to the office of the concerned
Nodal officer.
** The applicant may make use/refer
the typical drawings for roof top
and
groundwater
recharge
structure, from the Rain Water
Harvesting and Conservation
Manual, State of Goa.
b. Sanction:
(i)
The Nodal officer will scrutinize
and process the application and
place before the sanctioning
committee.
(ii)
The
Sanctioning
Committee
headed by the Chief Engineer,
Superintending Engineer (CPO),
Superintending Engineer (Circle-I),
Sr. Hydrogeologist and Enginee-
ring officer as members shall
examine the design, technical
feasibility, other relevant aspects
like location, type of soil strata,
ground water, pollution etc., and
accordingly decision will be taken.
(iii)
The Nodal Officer/Chief Engineer,
will communicate the sanction to
the applicant.
c. Implementation:
(i) Upon receiving the letter of
sanction, the applicant shall
implement the work.
(ii) On completion, the applicant shall
submit the bill of quantities of the
work done prepared as per current
Goa Scheduled of rates (for the
items not available in the Goa
Schedule of rates, the rates shall
be fair market rates supported
with appropriate quotations) and
certified by the registered Civil
Engineer.
(iii) The applicant can also engage the
services of Empanelled Agencies
by the Water Resources Department
for implementation of Rain Water
harvesting structure, who shall
handhold the applicant from
application phase till completion of
the scheme.
d. Mode of release of subsidy:
(i)
Upon Implementation of the
scheme, the bill shall be submitted
to the Nodal Officer by individual/
/empanelled agency duly certified
by the registered civil engineer.
(ii)
The completed work will be
inspected,
geo
tagged
and
photograph of the competed work
will be uploaded on the portal.
(iii)
On satisfactory completion of the
work, Nodal Officer shall release
the subsidy amount to the
applicant as per the eligibility.
By order and in the name of the Governor
of Goa.
P. B. Badami, Chief Engineer (WRD) & ex
officio Addl. Secretary.
Porvorim, 25th November, 2022.
———uuu———
MORMUGAO PORT AUTHORITY
Mormugao Port Authority-
Scale of Rates (SOR) for Estates
Goa
Dated: 7th September, 2022
Notification
In exercise of the powers conferred under
section 27(1)-D. Imposition of Rates, clause 1
of the Major Port Authorities Act, 2021, the
Board of the Mormugao Port Authority hereby
disposes of the proposal for Revision of Estate
Rentals of Port Land (Sr. I, II & III) and
Premises-Two Structures (Sr. IV). The revised
Scale of Rates (SoR) for Estates of Mormugao
Port Authority has been set out in the
Schedule annexed to this Notification.
Sd/-
Chairperson of the Board of
Mormugao Port Authority
———
SCHEDULE
Scale of Rates (SOR) for Estates of
Mormugao Port Authority
General Note:
All the conditions/notes prescribed in the
existing Scale of Rates/Schedule of License
Fees, Lease Rentals and Way Leave Charges
shall apply to the extent they are not
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 35
1ST DECEMBER, 2022
1169
inconsistent with the conditions prescribed
in the amended Land Policy Guidelines of
2014 issued by the Ministry of Shipping, and
as may be amended from time to time. In
case of disagreement, the conditions
prescribed by the Government in the amended
Land Policy for Major Ports 2014 shall prevail.
I. LICENCE FEE ON PORT LAND FOR BUILDING
AND OTHER STRUCTURES:
Sr.
Zone/Location
Rate per 10 sq. mtr. or
No.
part thereof per calendar
month or part thereof (in `)
1.
Mormugao Harbour
665.00
& Vasco Bay
2.
Baina
750.00
3.
Vasco
3266.00
4.
Dabolim
788.00
5.
Headland Sada
750.00
6.
Bogda
575.00
II. CHARGES FOR OCCUPATION OF FORESHORE
LAND:
Sr.
Zone/Location
Rate per 10 sq. mtr. or part
No.
thereof per calendar month
or part thereof (in `)
1.
Foreshore Area at
148.00
Vasco
2.
Foreshore Area Beyond
148.00
Vasco and at Betul
III. WAY LEAVE CHARGES:
Sr.
Zone/Location
Rate per 10 sq. mtr. or part
No.
thereof per calendar month
or part thereof (in `)
1. Mormugao & Vasco Bay
665.00
2. Head Land Sada &
750.00
Bogda
3. Baina
750.00
4. Beyond Vasco Bay upto
148.00
Port limit, Dabolim/
/Chicalim/Sancoale/
/North of Zuari River/
/Betul Foreshore
IV. LEASE RENT FOR PREMISES-COMMERCIAL
BUILDING NEAR VASCO RAILWAY STATION AND
CRUISE TERMINAL BUILDING:
Sr.
Zone/Location
Rate per sq. mtr. per
No.
month (in `)
1
2
3
1.
Commercial building,
near Vasco Railway
Station,Vasco, Goa
1
2
3
(a) Ground Floor
593.00
(b) Other than Ground
465.00
Floor
2.
Cruise Terminal
475.00
Building at Harbour,
Mormugao Port
Authority (MPA) at
Vasco, Goa
Note:
(i) The rates prescribed in Schedule I, II, III &
IV above shall be applicable with effect
from 17 June, 2022.
(ii) The rates prescribed in Schedule I, II, III
& IV above shall remain valid for five years
i.e. till 16 June, 2027.
(iii) The rates provided in the Scale of Rates
shall get automatically escalated by 2%
per annum for Land, Foreshore Area and
Way Leave Charges. The rates for premises
i.e. Commercial Building at Vasco Railway
Station and Cruise Terminal Building at
Harbour prescribed above shall get
automatically escalated by 5% per annum
after expiry of each year from the effective
date of implementation of the Scale of
Rates.
(iv) For the purpose of way leave charges, the
area occupied by single pipelines should
be calculated based on the diameter and
length of those pipelines. In case of multi-
layer pipeline stacks, the physical area
occupied by the multilayer pipeline
stacks should be considered and the
respective users should be billed for pro-
rata area on the basis of the diameter and
length of their pipelines passing through
that area. With respect to the area shared
with road, rails, jetties, etc., the respective
users should be billed pro-rata for 50% of
the concerned area assuming that they
do not have exclusive possession of land
and what they have is only ‘Right of Way’.
As far as underground pipes are
concerned if the users establish that the
possession of surface area above the
underground cross-country pipelines is
not physically with them, the area
occupied by such pipelines should be
counted 50% of the product of diameter
and length, for the purpose of levy of way
leave charges.
(v) The Licence Fees for water area shall be
charged 50% of the licence fee of abutting
land.
Sd/-
Chairperson of the Board of
Mormugao Port Authority
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 35
1ST DECEMBER, 2022
1170
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 35
1ST DECEMBER, 2022
1171
www.goaprintingpress.gov.in
Printed and Published by the Director, Printing & Stationery,
Government Printing Press,
Mahatma Gandhi Road, Panaji-Goa 403 001.
PRICE – Rs. 13.00
PRINTED AT THE GOVERNMENT PRINTING PRESS, PANAJI-GOA—314/120—12/2022.
V. No.AP-907/2022
V. No. AP-907/2022.