GOVERNMENT OF GOA

Department of Animal Husbandry & Veterinary Services

Directorate of Animal Husbandry & Veterinary Services

–––

Order

No. 14-9-AH/DSPCA/2023-24/2619

The Government of Goa had notified the District SPCA North Goa and South Goa under the Prevention

of Cruelty to Animals Act, 1960 (Establishment and Regulation of SPCA Rules, 2001). Subsequently, the

Managing Committee of the District SPCA North Goa and South Goa were notified vide Notification No.

14-9-AH/AWB/2020-21 dated 17-09-2020 and the same were duly registered under the Registration of

Societies Act, 1980.

Government of Goa is pleased to appoint the following Officers as Member Secretaries with their Link

Officers on District Society for Prevention of Cruelty to Animals (DSPCA), for North Goa District and

South Goa District respectively in addition to their own duties:-

Sr. No.

Name of the Officer

Name of the District SPCA

Link Officers

1

2

3

4

1.

Dr. Harsh Bathini, Assistant

Member Secretary, DSPCA,

Senior most Veterinary

Director, Veterinary Hospital,

North Goa District

Officer of Veterinary Hospital,

Tonca, Caranzalem, Goa

Tonca, Caranzalem, Goa.

2.

Dr. Atanazia Fernandes,

Member Secretary, DSPCA,

Senior most Veterinary

Assistant Director, Veterinary

South Goa District

Officer of Veterinary Hospital,

Hospital, Sonsodo, Margao-Goa

Sonsodo, Margao, Goa.

Dr. Harsh Bathini, Assistant Director, Veterinary Hospital, Tonca, Caranzalem, Goa shall take over complete

charge of post of Member Secretary, DSPCA North Goa District thus relieving Dr. Prakash Korgaonkar,

Assistant Director, Directorate of Animal Husbandry & Veterinary Services, Patto, Panaji, Goa and

Dr. Atanazia Fernandes, Assistant Director, Veterinary Hospital, Sonsodo, Margao, Goa shall take over

complete charge of post of Member Secretary, DSPCA South Goa District thus relieving Dr. Nitin Naik,

Assistant Director, Directorate of Animal Husbandry & Veterinary Services, Patto, Panaji, Goa with immediate

effect.

This Order supersedes the earlier Order in this regards.

By order and in the name of the Governor of Goa.

Dr. Agostinho Misquita, Director & ex officio Jt. Secretary (AH).

Panaji, 16th August, 2023.

Note:- There is one Extraordinary issue to the Official Gazette, Series II No. 20 dated 17-08-2023 namely, Extraordinary

dated 21-08-2023 from pages 495 to 496 regarding Notification from Goa Legislature Secretariat.

497

Suggestions are welcomed on e-mail: [email protected]

SERIES II No. 21

PUBLISHED BY AUTHORITY

RNI No. GOAENG/2002/6410

Reg. No. RNP/GOA/32/2021-2023

Panaji, 24th August, 2023 (Bhadra 2, 1945)

498

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

Order

No. 8-2(47)/AM/Revival/2023-2024/2641

Sanction of the Government is hereby accorded for the revival of 2 (Two) lapsed posts of Storekeeper

under Group “C” on regular basis in the Directorate of Animal Husbandry and Veterinary Services, Panaji.

The details are as shown below:

Sr.

Designation/Category

No. of

Name of the Employee

Pay

Budget Head

No.

of the post

posts

with Creation Order

Scale

1.

Storekeeper

01

Shri Vassu R. Sawant,

Pay Matrix

2403—Animal

G. O. No. FYP/3/

Level-04

Husbandry;

/AHVS/64/14911

PB-5200-20200+

00—;

dated 30-04-1993

GP Rs. 2400/- 102—Cattle &

Buffalo

Development;

01—Government

Livestock

Farm;

01— Salaries.

01

Shri Bhalchandra

Pay Matrix

2403—Animal

V. Gaonkar,

Level-04

Husbandry;

G. O. No. FYP/12/

PB-5200-20200+

00—;

/AHVS/64/15673

GP Rs. 2400/-

103—Poultry

dated 15-06-1964

Development;

01—Government

Poultry Farm;

01— Salaries.

This issues with the concurrence of Finance Department vide their U. O. No. 4268/F dated 10-08-2023 &

Secretary, Finance vide their U. O. No. 227 dated 10-08-2023.

By order and in the name of the Governor of Goa.

Dr. Agostinho Misquita, Director & ex officio Jt. Secretary (AH).

Panaji, 17th August, 2023.

——————

Department of Co-operation

Officer of the Registrar of Co-operative Societies

–––

Order

No. 3/1/Urban Credit/TS-II/BZ/2018/RCS/1910

Read: 1. Order No. 48-8-2001-TS-RCS/III/311 dated

21-04-2017.

2. Circular No. 6-13-81/EST/RCS/Part V dated

06-03-2020.

3. Order No. 3/6/Urban Credit/TS II/BZ/2018/

/RCS/3122 dated 14-12-2020.

4. Letter No. ARCS/BZ/ADT/CIRCULAR/64

dated 11-04-2023.

5. Letter No. 3/1/Urban Credit/TS II/BZ/

/2018/RCS/3122 dated 08-05-2020.

6. Letter No. BMUCCSL/HO/243/23-24 dated

09-06-2023 received from the Bicholim

Merchant Urban Co-operative Credit

Society Ltd., Bicholim, Goa.

Whereas, vide Order read at Sr. No. 1 above, Adv.

Yeshwant V. Gauns, having office at Flat No. 7, First

Floor, Apa Residential Complex, Valpoi, Sattari-Goa

was appointed as Registrar’s Nominee under

Section 86(1) of the Goa Co-operative Societies Act,

2001 (Goa Act No. 36 of 2001) (hereafter referred as

“Act”) read with Rule 116(1) of the Goa

Co-operative Societies Rules, 2003 and his name is

reflecting at Sr. No. 09 of the said Order.

And whereas, vide this office Order read at

Sr. No. 3 above, Adv. Yeshwant V. Gauns was

authorized as dedicated Nominee of the Registrar

of Co-operative Societies for the Bicholim Merchant

Urban Co-operative Credit Society Ltd. (Reg. No.

RES-(A)-5/NZ/Goa), Near “Sahayog”, Odli, New

Market, Bicholim, Goa (hereafter referred as “said

Society”) to entertain all the disputes referred to

him in matters of recovery of outstanding loans of

the said Society, without routing through this

Department.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

499

And whereas, the said authorization was

initially for a period of one year w.e.f. 14-12-2020 to

13-12-2021. And whereas, vide letter dated

11-04-2023 read at Sr. No. 4 above, the Asstt.

Registrar of Co-operative Societies, Bicholim Zone,

Sanquelim, Goa has forwarded the request of the

said Society for extending the said authorization

for a further period of one year.

And whereas, it was observed that there was an

inordinate delay in submitting the proposal to this

office for extending the term of Adv. Yeshwant V.

Gauns as the dedicated R’s Nominee of the said

Society and therefore this office vide letter dated

08-05-2023 referred at Sr. No. 4 above, instructed

the Assistant Registrar of Co-operative Societies,

Bicholim Zone, Sanquelim to seek clarification from

the said Society for not submitting the proposal for

such extension within the stipulated time.

And whereas, the Society vide letter dated

09-06-2023 referred at Sr. No. 5 above, clarified that

the delay was due to inadvertency and hence

requested for extension for a further period w.e.f.

13-02-2021.

Now therefore, in exercise of the powers

conferred under Section 123(B) of the Goa

Co-operative Societies Act, 2001 read with Rule

116 of the Goa Co-operative Societies Rules, 2003,

I, the undersigned Registrar of Co-operative

Societies do hereby extend the authorization of

Adv. Yeshwant V. Gauns, having office at Flat No.

7, First Floor, Apa Residential Complex, Valpoi,

Sattari-Goa, as dedicated RCS Nominee for a period

of two years with retrospective effect from

13-12-2021 to 12-12-2023 for the Bicholim Merchant

Urban Co-operative Credit Society Ltd. (Reg. No.

RES-(A)-5/NZ/Goa), Near “Sahayog”, Odli, New

Market, Bicholim-Goa.

Further, when a purported dispute is referred

by the said Society, the above named dedicated

Nominee is authorized to first decide under

sub-section (1) of Section 86 of the Goa

Co-operative Societies Act, 2001 whether the matter

referred by the Society involves a dispute and pass

appropriate Orders under sub-section (1) of Section

86 of the Act.

Further, only upon the Nominee satisfying that

there exists a dispute, he shall proceed to

adjudicate the same and give Award accordingly.

The Nominee shall abide by the terms and

conditions on which he was originally appointed

as Registrar’s Nominee vide Order read at Sr. No. 1 above.

This extension of authorization as dedicated

Nominee is liable to be withdrawn at any time

without assigning an reason thereof at the discretion

of the undersigned.

Given under the seal of this office.

Manuel Barreto, Registrar (Co-operative Societies)

& ex officio Joint Secretary (Co-operation).

Panaji, 16th August, 2023.

————

Order

No. 60/188/MOC/SCDC-DCDC/W-II/HO/RCS/263/1953

Read: 1. Letter No. R-11016/52/2022-CTP dated

17-03-2023 and Letter No. R-11016/28/

/2022-CTP dated 21-06-2023 from Joint

Secretary, Ministry of Co-operation, CTP

Division, New Delhi.

2. Order No. 60/188/M.O.C/W-II/RCS/358

dated 02-05-2023 issued by Registrar of

Co-operative Societies, Panaji, Goa.

Vide above read letter dated 17-03-2023, it is

informed that the Union Cabinet in its meetings held

on 15-02-2023 has approved the plan for

“Strengthening Co-operative movement in the

Country and Deepening its reach up to the

Grassroots” by setting up new multipurpose PACS

or dairy/fishery primary co-operative societies in

each uncovered Panchayat/village in the country as

the case may be and strengthening existing

PACS and dairy fishery co-operatives through

convergence of various identified Schemes of

Government of India.

In order to ensure smooth and effective

implementation of the plan, an Inter-Ministerial

Committee (IMC) under the Chairmanship of Hon’ble

Union Minister for Co-operation and a National Level

Co-ordination Committee (NLCC) under the

Chairmanship of Secretary (Co-operation),

Government of India has been constituted.

The implementation plan required all the States/

/UT’s to constitute State Co-operative Development

Committee (SCDC) at the State level and District

Co-operative Development Committee (DCDC) in

each District in order to ensure implementation of

the Plan.

Hence, in accordance with the implementation

plan, Government had constituted 2 District

Co-operative Development Committees (DCDC) for

the North Goa and South Goa District of Goa.

Now, vide above read letter dated 21-06-2023, it is

informed that the Union Cabinet in its meeting held

500

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

on 31-05-2023, has approved the “World’s Largest

Grain Storage Plan in Co-operative Sector” for

creation of various agri infrastructure at PACS level,

including warehouses, custom hiring center,

processing units, fair price shops, etc. by leveraging

the ‘whole-of-Government’ approach and has further

requested to expand the membership of SCDC and

DCDC so that the same Committee is able to

undertake implementation and monitoring of both

the plans, i.e., ‘World’s Largest Grain Storage Plan

in Co-operative Sector’ and ‘Strengthening

Co-operative Movement in the Country and

Deepening its reach up to the Grassroots.

Accordingly, Government is pleased to amend

the District Co-operative Development Committee

(DCDC) constituted vide Order No. 60/188/M.O.C/

/W-II/RCS/358 dated 02-05-2023 for the North Goa

and South Goa Districts as under:

A. District Co-operative Development Committee

(DCDC) for North Goa District

1. District Collector (North)

—

Chairperson.

2. CEO, Zilla Panchayat

—

Member.

(North)

3. Additional Collector-I

—

Member.

(North)

4. Deputy Registrar of

—

Convener.

Co-operative Societies

(Tech.)/District Level

Incharge (North)

5. Deputy Director of

—

Member.

Animal Husbandry &

Veterinary Services

6. Deputy Director of Fisheries —

Member.

7. Deputy Director of Agriculture —

Member.

8. Deputy Director of Civil

—

Member.

Supplies and Consumer Affairs

9. Representative not below

—

Member.

the rank of General Manager

of the Goa State

Co-operative Bank Ltd.

10. District Development

—

Member.

Manager (DDM)/Representative

for Goa Regional Office

of NABARD

11. Representative of NDDB

—

Member.

12. Representative of NFDB

—

Member.

13. Representative of FCI

—

Member.

14. Representative of CWC

—

Member.

15. Representative of WDRA

—

Member.

16. Managing Director of

—

Member.

the Goa State Co-operative

Milk Producers Union Ltd.,

Curti, Ponda, Goa

B. District Co-operative Development Committee

(DCDC) for South Goa District

1. District Collector (South)

—

Chairperson.

2. CEO, Zilla Panchayat

—

Member.

(South)

3. Additional Collector-I

—

Member.

(South)

4. Deputy Registrar of

—

Convener.

Co-operative Societies

(Admn.)/District

Level Incharge (South)

5.Deputy Director of

—

Member.

Animal Husbandry &

Veterinary Services

6. Deputy Director of Fisheries —

Member.

7. Deputy Director of Agriculture —

Member.

8. Deputy Director of Civil

—

Member.

Supplies and Consumer Affairs

9. Representative not below

—

Member.

the rank of General Manager

of the Goa State

Co-operative Bank Ltd.

10. District Development

—

Member.

Manager (DDM)/Representative

for Goa Regional Office

of NABARD

11. Representative of NDDB

—

Member.

12. Representative of NFDB

—

Member.

13. Representative of FCI

—

Member.

14. Representative of CWC

—

Member.

15. Representative of WDRA

—

Member.

16. Managing Director of

—

Member.

the Goa State Co-operative

Milk Producers Union Ltd.,

Curti, Ponda, Goa

The roles and responsibilities of the District

Co-operative Development Committee (DCDC) are

as under:

1. To ensure the regular and timely updation of

National Co-operative Database.

2. To prepare the District Plan for setting up of

new multipurpose PACS or primary dairy/

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

501

/fishery Co-operative Societies on the basis of

the gap analysis from National Co-operative

Database.

3. To ensure that all the Panchayats/Villages in

the district are covered by multipurpose

PACS or primary dairy/fishery co-operative

societies, as the case may be.

4. To establish linkages of existing and new

primary Co-operative Societies with State

Co-operative Bank and/or their respective

District/Block Level Federations, if any, with

the support of State Government and other

stakeholders concerned. If District/Block

Level Federations are not existent, then

linkages may be established with the

Federations present in nearby District/Block.

5. To facilitate setting up of District Level

Federations, if not presently existent, as per

requirement and viability assessment, in

co-ordination with State Government and

stakeholders concerned.

6. To facilitate registration of new primary

Co-operative Societies with the support of

Registrar of Co-operative Societies.

7. To ensure dovetailing of various schemes of

Government of India at the level of PACS or

Primary Dairy/Fishery Co-operative Societies

to improve their viability and make them

vibrant economic entities.

8. To provide all necessary infrastructure and

logistical support to primary co-operative

societies at the Panchayat/Village level,

including allotment of Government/Gram

Sabha land to PACS.

9. To examine and assess the availability of

existing storage facilities, their capacity

utilization, storage gap, capacity of proposed

godowns, viability of the applicant PACS,

location of the proposed project, connectivity,

logistics, etc.

10. To provide necessary Government/Gram Sahha

land to PACS/LAMPS/FSS/For creation of

grain storage facilities and their other agri-

infrastructure.

11. To notify such PACS/LAMPS/FSS as

procurement centre for procurement of food

grains at Minimum Support Price (MSP).

12. To grant Fair Price Shop (FPS) license to such

PACS/LAMPS/FSS.

13. To facilitate in preparation of Detailed Project

Reports (DPRs) for the PACS/LAMPS/FSS with

the support of NAB CONS or any other agency

for availing subsidy/interest subvention

under various GOI schemes.

14. To recommend the proposal of applicant PACS/

/LAMPS/FSS for creation, refurbishment,

modernization and up gradation of agri

infrastructure.

15. To provide all necessary logistical and

infrastructural support, including utilities,

road connectivity, etc. to the PACS/LAMPS/

/FSS.

16. To co-ordinate with all the line Departments

for granting requisite approvals/clearances/

permissions to the PACS/LAMPS/FSS.

17. To assist in establishing linkages of agri

infrastructure to be created at PACS/LAMPS/

/FSS with Central/State/Private agencies in

co-ordination with all the stakeholders

concerned, to ensure fmancial viability for

PACS/LAMPS/FSS.

18. To co-ordinate with all stakeholders

concerned and provide all necessary support

for ensuring implementation of the plan.

19. Any other related matters.

The DCDC shall abide by the guidelines for the

implementation of the plan.

The Department of Co-operation shall be the

convener of the DCDC.

By order and in the name of the Governor of

Goa.

Manuel Barreto, Registrar (Co-operative Societies)

& ex officio Joint Secretary (Co-operation).

Panaji, 18th August, 2023.

————

Order

No. 60/188/MOC/SCDC-DCDC/W-II/HO/RCS/264/1954

Read: 1. Letter No. R-11016/52/2022-CTP dated

17-03-2023 and Letter No. R-11016/28/

/2022-CTP dated 21-06-2023 from Joint

Secretary, Ministry of Co-operation, CTP

Division, New Delhi.

2. Order No. 60/188/M.O.C/W-II/RCS/359

dated 02-05-2023 issued by Registrar of

Co-operative Societies, Panaji, Goa.

Vide above read letter dated 17-03-2023, it is

informed that the Union Cabinet in its meetings

held on 15-02-2023 has approved the plan for

“Strengthening Co-operative movement in the

502

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

Country and Deepening its reach up to the

Grassroots” by setting up new multipurpose PACS

or dairy/fishery primary co-operative societies in

each uncovered Panchayat/village in the country

as the case may be and strengthening existing

PACS and dairy fishery co-operatives through

convergence of various identified Schemes of

Government of India.

In order to ensure smooth and effective

implementation of the plan, an Inter-Ministerial

Committee (IMC) under the Chairmanship of

Hon’ble Union Minister for Co-operation and a

National Level Co-ordination Committee (NLCC)

under the Chairmanship of Secretary (Co-operation),

Government of India has been constituted.

The implementation plan required all the States/

/UTs to constitute State Co-operative Development

Committee (SCDC) at the State level and District

Co-operative Development Committee (DCDC) in

each District in order to ensure implementation of

the plan.

Hence, in accordance with the implementation

plan, Government had constituted the State

Co-operative Development Committee (SCDC) for

the State of Goa.

Now, vide above read letter dated 21-06-2023, it

is informed that the Union Cabinet in its meeting

held on 31-05-2023, has approved the “World’s

Largest Grain Storage Plan in Co-operative Sector”

for creation of various agri infrastructure at PACS

level, including warehouses, custom hiring center,

processing units, fair price shops, etc. by leveraging

the ‘whole-of-Government’ approach and has further

requested to expand the membership of SCDC and

DCDC so that the same Committee is able to

undertake implementation and monitoring of both

the plans, i.e., ‘World’s Largest Grain Storage Plan

in Co-operative Sector’ and ‘Strengthening

Co-operative Movement in the Country and

Deepening its reach up to the Grassroots.

Accordingly, Government is pleased to amend

the State Co-operative Development Committee

(SCDC) constituted vide order No. 60/188/M.O.C./

/W-II/RCS/359 dated 02-05-2023 for the State of Goa

as under:

State Co-operative Development Committee (SCDC)

1. Chief Secretary,

—

Chairperson.

Government of Goa

2. Secretary (Co-operation),

—

Convener.

Government of Goa

3. Director of Agriculture,

—

Member.

Government of Goa

4. Secretary (Civil Supplies

—

Member.

& Consumer Affairs),

Government of Goa

5. Secretary (Animal Husbandry —

Member.

& Veterinary Services),

Government of Goa

6. Secretary (Fisheries),

—

Member.

Government of Goa

7. Secretary (Rural Development), —

Member.

Government of Goa

8. Additional Secretary (Finance), —

Member.

Government of Goa

9. Joint Secretary (Revenue),

—

Member.

Government of Goa

10. Registrar of Co-operative

—

Member.

Societies, Government of Goa

11. Representative from National —

Member.

Bank for Agriculture & Rural

Development (NABARD),

Goa Regional Office

12. A Representative from

—

Member.

Regional Office of National

Co-operative Development

Corporation (NCDC)

13. A Representative from

—

Member.

National Dairy Development

Board (NDDB)

14. A Representative from National —

Member.

Fisheries Development

Board (NFDB)

15. Chairman, The Goa State

—

Member.

Co-operative Bank Ltd., Panaji

16. Chairman, The Goa

—

Member.

State Co-operative Milk

Producers Union Ltd.,

Curti, Ponda-Goa

17. Representative of

—

Member.

Warehousing Development

& Regulatory Authority (WDRA)

18. Representative of Food

—

Member.

Corporation of India (FCI),

Porvorim-Goa

19. Representative of Central

—

Member.

Warehousing Corporation

(CWC), Verna-Goa

The roles and responsibilities of the State

Co-operative Development Committee (SCDC) are

as under:

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

503

1. To ensure that all the Panchayats/Villages in

the State are covered by multipurpose PACS

or primary dairy/fishery co-operative societies,

as the case may be;

2. To review the district-wise action plan for

setting up new multipurpose PACS or primary

dairy/fishery co-operative societies with a

total target of establishing two lakh such

societies in the next five years across the

country;

3. To extend all necessary support in preparation

and updation of National Co-operative

Database;

4. To prepare an action plan in co-ordination

with NABARD, NDDB, NFDB, NAFSCOB,

NCDFI & FISHCOPED to set up State/District

Level Federations if not presently existent, as

per requirement and viability assessment;

5. To assist in establishing linkages of existing

and new primary co-operative societies with

State Co-operative Bank and/or their

respective District and State Level

Federations;

6. To ensure convergence of various Schemes of

Government of India at the level of PACS or

dairy/fishery primary co-operative societies to

make them vibrant economic entities;

7. To provide all necessary policy support for

creation of infrastructure at the level of

Co-operative Societies, including allotment of

Government/Gram Sabha land to PACS;

8. To facilitate PACS/LAMPS/FSS in adoption of

Model Bye-laws for diversification of their

activities;

9. To assess food grain storage gap, marketable

surplus, existing storage facilities, their

capacity utilization, etc. in the State up to

Block/Panchayat level;

10.

To provide necessary Government/Gram

Sabha land to PACS/LAMPS/FSS for creation

of storage facilities and other agri-infrastructure;

11.

To notify such PACS/LAMPS/FSS as

procurement centre for procurement of food

grains at Minimum Support Price (MSP);

12.

To grant Fair Price Shop (FPS) license to such

PACS/LAMPS/FSS;

13.

To assist in establishing linkages of agri

infrastructure to be created at PACS/LAMPS/

/FSS with Central/State/Private agencies in

co-ordination with all the stakeholders

concerned, to ensure financial viability for

PACS/LAMPS/FSS;

14.

To regularly monitor and review the progress

of the district-wise plans for facilitating the

World’s Largest Grain Storage Plan in

Co-operative Sector, including the Pilot Project;

15.

To provide all necessary policy support for

creation of infrastructure at the level of PACS/

/LAMPS/FSS;

16.

To extend all necessary support and issue

requisite directions to District Co-operative

Development Committee (DCDC) and review

their outcomes for successful implementation

of the plan at the grassroots level in a time

bound manner;

17.

To monitor the progress of implementation of

the action plan at the State Level;

18.

Any other related matters.

The SCDC shall abide by the guidelines for the

implementation of the plan.

The Department of Co-operation shall be the

convener of the SCDC.

By order and in the name of the Governor of

Goa.

Manuel Barreto, Registrar (Co-operative Societies)

& ex officio Joint Secretary (Co-operation).

Panaji, 18th August, 2023.

——————

Omkar Co-operative Housing Society Ltd.

–––

FORM-24

(See Rule 111A)

Form of Declaration of Result

Election of Office Bearers of Omkar Co-op.

Housing Society Ltd., Vasco-da-Gama.

In pursuance of powers conferred by sub-section

6 of Section 66 of the Goa Co-op. Societies Act,

2001, I, declare the result of office bearers as

follows:

Sr.

Name of the candidate

Address, contact

No.

designation

numbers & e-mail ID

of the candidate

1

2

3

1.

Vinayak Umesh

B-4, Omkar Co-op. Hsg.

Bandekar, Chairman

Society, New Vaddem,

Vasco-da-Gama

Mob.: 9860322752

e-mail: vinayak020357

@gmail.com

504

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

1

2

3

2. Dattatraya Kusha

A-4, Omkar Co-op. Hsg.

Savant, Secretary

Society, New Vaddem,

Vasco-da-Gama,

Mob.: 9423057093

e-mail:mail2dks07

@gmail.com

Ashok V. Ghag, Presiding Officer, Election of

Office Bearers, Omkar Co-op. Hsg. Society Ltd.

New Vaddem, Vasco, 18th August, 2023.

V. No. AP-556/2023.

——————

Department of Education, Art & Culture

Directorate of Art and Culture

–––

Order

No. DAC/5/Admn/376/Prom-Lib/2023/2665

On the recommendation of the Departmental

Promotion Committee as conveyed by the Goa

Public Service Commission vide Minutes of DPC

meeting No. 54/23 (PROMOTION) held on 27-07-2023,

Government is pleased to promote Ms. Bernadetta

Alzira Desouza to the post of Librarian, Group ‘B’

Non Gazetted on regular basis in the Pay Matrix

Level-6 with Grade Pay Rs. 4,200/- plus usual

allowance as admissible under the rules.

The above promotion shall be effective from the

date of joining to the post. The officer shall send

joining report to the Administration Section of this

Directorate. She shall be on probation for a period

of 2 years.

Ms. Desouza may exercise an option in terms of

Provision of FR 22(I)(a)(1) if she so desired within

one month from the date of the issue of this order

for fixing her pay in the respective promotional

grade.

The expenditure towards pay & allowances shall

be debited to the Budget Head 2205—Art & Culture,

00, 105—Public Libraries, 12—District Libraries

(Plan), 01—Salaries under Demand No. 43”.

By order and in the name of the Governor of

Goa.

Sagun R. Velip, Director (Art & Culture) & ex officio

Joint Secretary.

Panaji, 14th August, 2023.

——————

Directorate of Higher Education

–––

Order

No. ACAD III/GC/CAS/27/2023/4227

Read:

No. 8/1/2016-DHE/2765 dated 28-12-2016

On the recommendation of the Screening Committee, Government is pleased to grant Senior Scale (pre-

revised Rs. 10,000-325-15200) (revised Rs. 15,600-39,100+AGP Rs. 7,000) and Selection Grade (pre-revised

Rs. 12000-420-18300) (Revised Rs. 15,600-39,100+AGP Rs. 8,000) under Career Advancement Scheme of Goa

University Statute SA-19 in terms of Goa University Notification No. 2/155/13-Legal/Amend-Stat(New)/

/2013/VolVI/1947 dated 30-06-2010, to the following teaching faculty of the Sant Sohirobanath Ambiye

Government College of Arts and Commerce, Pernem-Goa, with effect from the date indicated against his

name as under:-

Sr.

Name of the

Date of eligibility for

Date of eligibility for

No.

Faculty

Senior Scale Pre-revised

Selection Grade

Rs. 10,000-325-15,200

Pre-revised

Rs. 12,000-420-18,300

1.

Dr. Balappa K. Haravi, Assistant

23-12-2010 (i.e. date of

23-12-2010 (i.e. date

Professor in Geography

obtaining Ph.D)

of obtaining Ph.D).

His pay scale shall be fixed as per the rules in force accordingly.

This supersedes earlier Order No. 8/1/2016-DHE/2765 dated 28-12-2016.

By order and in the name of the Governor of Goa.

Smt. Avelina D’sa E Pereira, Under Secretary (Higher Education).

Porvorim, 17th August, 2023.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

505

Order

No. ACAD III/GC/CAS/27/2023/4228

Read: No. 5/29/AC/98/-DHE/1844/VOI.11/663

dated 01-06-2017.

On recommendation of the Selection Committee,

Government is pleased to revise dates of grant of

Associate Professor Scale to Dr. B. K. Haravi,

Associate Professor in Geography, Sant Sohirobanath

Ambiye Government College of Arts and Commerce,

Pernem.

Dr. B. K. Haravi, Associate Professor in Geography,

Sant Sohirobanath Ambiye Government College of

Art and Commerce, Pernem shall be placed in

Associate Professor’s Scale (Stage IV) with effect

from 23-12-2010 under Career Advancement Scheme

of Goa University Statute SA-19 in terms of Goa

University Notification No. 2/155/13-Legal/Amend-

Stat(New)/2013/volVI/1947 dated 30-06-2010.

His pay shall be fixed as per the existing rules in

force. He may exercise an option, if applicable, if he

so desires within one month from the date of issue

of the order for fixing the pay in the Career

Advancement Scheme.

This supersedes earlier order No. 5/29/AC/98/-

DHE/1844/VOI.11/663 dated 01-06-2017.

By order and in the name of the Governor of

Goa.

Smt. Avelina D’sa E Pereira, Under Secretary

(Higher Education).

Porvorim, 17th August, 2023.

—–––––—

Pattern of Assistance

No. ACAD III/SHEC/Pattern of Assistance/05/

/2022/4229

Sanction of the Government is hereby accorded

to the following Pattern of Assistance governing

the recurring Grant-in-Aid to ‘Goa State Higher

Education Council’.

1. The main objective of the Goa State Higher

Education Council includes planned and

co-ordinated development of Higher Education in

the State, promoting Academic excellence and

Social Justice by obtaining academic input for

policy formulation and prospective planning,

ensuring

autonomy,

accountability

and

co-ordination of all institutions of Higher Education

in the State and guiding the growth of Higher

Education in accordance with the Socio-economic

requirements of the State.

2. The grants shall be utilised exclusively for

establishment and smooth functioning of ‘Goa State

Higher Education Council’ enacted as per the Goa

State Higher Education Council Act of 2018.

3. The grants shall be disbursed as per the

Budget provision in the State Budget for the

concerned Financial Year or Rs. 5.00 crores for the

financial year 2023-2024, Rs. 6.00 crores for 2024-

2025 and Rs. 7.00 crores for 2025-2026.

4. Initially the grants for the first year shall be

released in one instalment. However from the

subsequent year the release of grants shall be in

two instalments on 70:30 basis.

The first instalment of 70% of the Budget

allocation shall be released in month of April of the

Financial Year and the second instalment of 30%

shall be released subject to submission of 50% of

utilization of funds disbursed in the first instalment.

5. The grants shall be utilised for achieving the

responsibilities and functions of the Council, for

payment of salaries and allowances, wages,

honorarium, administrative and office expenses,

expenditure on various workshops, training, Faculty

Development Programmes, implementation of New

Education Policy, implementation of various

schemes of the Council, software development,

maintenance expenditure on building and

equipment and other asset and other expenditure

as may be required from time to time to fulfil the

aims and objectives of the ‘Goa State Higher

Education Council’. The grants shall also be utilised

for procurement of vehicle and expenditure on

construction expansion an upgradation of the

building with the approval of the Government.

6. The entire amount of the grant should be

utilised only for the purpose for which it is

sanctioned.

7. The assets acquired wholly or substantially

out of the Government grants shall be the property

of the Government. The Grantee shall maintain a

register of the permanent and semi-permanent

assets created out of the grants. The register shall

be maintained seperately in respect of the grants

sanctioned and an extract from the register shall be

furnished to the Government annually with the

audited accounts after the close of the financial

year. Register shall be maintained in terms of Form

GFR-22 and Form GFR-23. Such assets acquired

wholly or substantially shall not be disposed of,

encumbered or utilised for purpose other than those

for which the grant was given, without prior

approval of the Government. Should the Grantee

Institution cease to exist at any time, such assets

properties shall revert to the Government.

506

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

8. The account of the Grantee Institution in

respect of this grant shall be audited by the

Government

approved

Auditor/Chartered

Accountant concerned immediately after the end of

the financial year on completion of six months for

which the grant is sanctioned. The accounts of the

grants shall be maintained separately and in such

a form and manner as prescribed from time to time.

The records shall be open to the Sanctioning

Authority and the Comptroller and Auditor General

of India at any point of time.

9. The Audited statement of accounts showing

the expenditure incurred by the Grantee Institution

from the grants released, duly authenticated by the

Competent Authority of the Council and Chartered

Accountant, shall be furnished to the Government

as soon as possible after the close of the financial

year or on completion of six months of the financial

year for which the grant is sanctioned.

10. The Grantee Institution shall submit their

requirement of funds with supporting details by

the end of September in the year preceding the

year for which the Grant-in-Aid is sought.

11. A performance-cum-achievement report

specifying in detail the achievements made by the

Grantee Institution with the Government grants

shall be furnished to the Directorate of Higher

Education not later than six months after the close

of financial year.

12. The Grantee Institution must exercise

reasonable economy, observe all financial rules and

regulations as issued by the Government from time

to time while incurring the expenditure.

13. In case of misutilization of grants, the amount

so misutilized shall be recovered from the Grantee

Institution.

14. The Grantee institution shall not increase the

man power without the approval of the Government

which increase its liability on establishment

charges. The pay scales of the staff of the Council

shall be subject to the approval from time to time.

15. The amount shall be drawn from the

Directorate of Accounts on presentation of the bill

in Form GAR-32 duly countersigned by the Drawing

and Disbursing Officer, Directorate of Higher

Education.

16. The grant-in-aid shall be debited to the

Budget Head of Account.

Demand No. 35

2202—General Education;

03—University and Higher Education;

103—Government Colleges and Institution;

02—State Council for Hr. Educ./State Awards

for meritorious College Teachers;

31—Grant-in-Aid.

17. The Pattern of Assistance shall be valid for

the period of 3 years.

18. The Pattern of Assistance to release the grant-

in-aid has been approved by the Finance (Exp.)

Department under U. O. No. 3986/F dated

06-08-2023.

By order and in the name of the Governor of

Goa.

Avelina D’sa E Pereira, Under Secretary (Higher

Education).

Porvorim, 17th August, 2023.

——————

Department of Home

Home—General Division

–––

Order

No. 24/31/2014-HD(G)/Part II/2189

Read: Memorandum No. 24/31/2014-HD(G)/Part II/

1477 dated 31-05-2023.

On the recommendation of the Goa Public

Service Commission as conveyed vide their letter

No. COM/I/5/58(1)/2021/66 dated 28-04-2023, the

Governor of Goa is pleased to appoint Shri Amey

Pundalik Barad to the post of Assistant Public

Prosecutors (Group ‘A’ Gazetted) on temporary

basis in the Directorate of Prosecution in Level-10

of the pay matrix with immediate effect.

The pay of the above candidate will be fixed in

accordance with CCS (Revised Pay) Rules, 2016.

The appointment will be further subject to the

following conditions:-

a) The above candidate has been declared

medically fit by the Medical Board and his

character and antecedents has been

verified.

b) The above candidate shall be on probation

for a period of two years with effect from

his date of joining.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

507

c) The pay and allowances of the above

candidate shall be debited to the Budget

Head controlled by the Directorate of

Prosecution wherever he is posted from

time to time.

d) The above candidate shall join his duties

in the Directorate of Prosecution with

immediate effect.

By order and in the name of the Governor of

Goa.

Diksha N. Tari, Under Secretary (Home-II).

Porvorim, 14th August, 2023.

——————

Department of Industries

–––

Order

No. 5/4/2020-IND/Part/186

The Government is pleased to constitute a

Committee of the following members for

implementation of “One Taluka One Product” an

initiative of State Government to strengthen the

domestic industries in line with the vision of

“Atmanirbhar Bharat” and “Swayampurna Goa”.

1. Director of Industries,

—

Chairperson.

Trade & Commerce of the

Committee

2. Collector (North Goa)

—

Member.

3. Collector (South Goa)

—

Member.

4. Director of Agriculture

—

Member.

5. Director, Handicrafts,

—

Member.

Textile & Coir

6. Member Secretary, Goa

—

Member.

State Biodiversity Board

7. Director of Science &

—

Member.

Technology

8. Deputy Director (Industries) —

Member

Secretary.

The terms of reference of the Committee are as

follows:-

The Committee shall identify agricultural/

/handicrafts/textile products/products of

cultural significance from each taluka of the

State.

The Committee will work on the constraints

faced by the producers/artisans of the product.

The Committee shall help and provide support

to promote the product as identified.

By order and in the name of the Governor of

Goa.

Vivek Naik, Under Secretary (Industries).

Porvorim, 17th August, 2023.

——————

Department of Law & Judiciary

Law (Establishment) Division

–––

Order

No. 2/65/2016-LD(Estt)/1388

The Government of Goa is pleased to order the transfer and posting of the Civil Registrar-cum-Sub

Registrars, Group ‘B’ Gazetted Officer of Registration Department, in public interest, with immediate effect:-

Sr. No.

Name of the Official

Present place of posting

Place of posting on transfer

1.

Smt. Malini P. Sawant

Holding charge of Civil-Registrar-

Civil Registrar-cum-Sub

-cum-Sub Registrar, Sattari

Registrar, Sattari.

The above Officer shall draw her pay and allowances against the above place of posting from the date

of acceptance of post i.e. 23-06-2023 b.n.

By order and in the name of the Governor of Goa.

Amir Y. Parab, Under Secretary (Law-Estt.).

Porvorim, 17th August, 2023.

508

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

509

510

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

511

512

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

513

514

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

515

516

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

517

518

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

519

520

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

521

522

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

523

524

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

525

526

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

527

Mormugao Port Authority

–––

Notification

Goa, on the 31st day of the Month of May, 2023

No. PPP/1/2023/Berth No. 7— In exercise of the powers conferred by Section 27 of the Major Port Authorities

Act, 2021, the Mormugao Port Authority, Goa (MPA) hereby disposes of the representation dated 20-07-2021

received from the Adani Murmugao Port Terminal Private Limited (AMPTPL) as in the Order appended

hereto;

and

an

In exercise of the powers conferred by Section 27 of the Major Port Authorities Act, 2021 and in pursuance

of Ministry of Shipping Letter No. PD-13/1/2018-PPP Cell dated 11 July, 2018 on Stressed PPP Projects, the

Mormugao Port Authority, Goa hereby disposes of the proposal dated 21-10-2022 and

16-04-2023 for rationalization of storage charge at Berth No. 7 operated by Adani Murmugao Port Terminal

Private Limited as in the Order appended hereto.

MORMUGAO PORT AUTHORITY

Case No. PPP/1/2023/Berth No. 7

Adani Murmugao Port Terminal Private Limited (AMPTPL)… Applicant

Order

(Passed on this 31st day of May, 2023)

SCALE OF RATE (SoR) FOR COAL TERMINAL AT MORMUGAO PORT AUTHORITY

1.1. This Authority received a representation dated 21-10-2022 from the Adani Murmugao Port Terminal

Private Limited to increase free period from present 15 days to 25 days and correct the storage charges

approved in the tariff Order No. TAMP/23/2008-MOPT dated 07 August, 2008 notified in the erstwhile name

of Mormugao Port Trust (MOPT) followed by AMPTPL proposal dated 16-04-2023 on the same subject of its

representation dated 20-07-2021. Their presentation dated 20-07-2021 of AMPTPL also claimed that the

AMPTPL’s Berth No. 7 at MOPT qualified as a Stressed PPP Project in terms of the criteria established by the

Stressed PPP Guidelines issued by the Ministry of Shipping (MOS) in the Government of India, entitling it to

a rationalization of storage charges as prescribed procedures given below.

1.2. Ministry of Shipping (MoS) vide letter dtd. 11-07-2018 has directed to all Major Ports to adopt the

prescribed procedures for classification of a PPP project as “Stressed Project” including review of the situation

periodically for optimum utilization of the facility created. The Committee constituted by MoS had

recommended the following three criteria for classification of PPP Project as “Stressed Project”.

(i) The project is sub-optimally utilized as evidenced by the actual cargo handled by

the operator during two preceding financial years being less than 70% of the projection

as per DPR/Feasibility report forming part of the bid document; and

(ii) Project SPV incurring cash loss continuously for two preceding financial years; and

(iii) The losses incurred by Concessionaire has caused at least 50% erosion of its peak Net

Worth during the operation period.

The Committee (MoS) suggested the following options for the post classification as a stressed project.

a) Further it stated that, if the PPP Project falls under the category of “Stressed Project” and an issue of

abnormal storage charges arise, in such projects, then the Ports may approach TAMP under the provisions of

Article 21.9 “Amendments, Modifications or alterations” of the CA with the proposal for rationalization of

storage charges in consultation with the Concessionaire so as to achieve the Annual Revenue Requirement

(ARR) as per TAMP Guidelines/Notifications.

b) MoS also directed to make the DBFOT terminals competitive by proposing rationalization of storage

charges levied by extending the free period depending on the local conditions with a view to optimize the

capacity utilization of the berth with periodical review duly ensuring the following.

528

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

(i) No storage charges and hence no Royalty if cargo is cleared within the free period as per

executed Concession Agreement.

(ii) If the cargo is cleared after the expiry of free period as per executed CA but within the

extended free period, no storage charges will be payable, but the Concessionaire shall pay

Royalty equal to 1% of the ARR; and

(iii) If the cargo is cleared after the extended free period, then the Concessionaire shall pay

Royalty equal to quoted percentage on actual storage charges recovered or 1% of

ARR whichever is higher, for the period beyond the extended period.

c) The Ministry also directed the Major Ports to periodically review the situation of Stressed Projects for

optimum utilization of the facility created.

1.3. This Authority also received a proposal dated 21-10-2022 from AMPTPL for rationalization of storage

charges at Berth No. 7 for the year 2021-22 in pursuance of MOS Letter No. PD-13/1/2018-PPP Cell dated

11th July, 2018 on Stressed PPP Projects. Since the representation dated 21-10-2022 and the proposal dated

16-04-2023 received from AMPTPL towards rationalization of storage charges at Berth No. 7 operated by

AMPTPL, a common Order is passed as in hereunder.

2.1 The Tariff Authority for Major Ports(TAMP) had notified upfront tariff for Development of Coal handling

terminal at berth No.7 at MPA on DBFOT basis vide Order No. TAMP/23/2008-MOPT dated

07 August, 2008 which was notified in the Gazette of India on 20 August, 2008 vide Gazette No. 141. The MPT

awarded the project to Adani Murmugao Port Terminal Private Limited (AMPTPL). Based on the proposal of

AMPTPL, TAMP notified the Scale of Rates after indexation in the name of AMPTPL vide Order No. TAMP/13/

2014-MOPT dated 04th July, 2014. The said Order was notified in the Gazette of India on 25th July, 2014 vide

Gazette No. 224.

2.2 The relevant extracts of storage charges schedule and relevant Note (i) prescribed in the upfront

tariff Order dated 7 August, 2008 and in the tariff Order dated 4 July, 2014 notifying SOR in the name of

AMPTPL are given below:

(i). Order No. TAMP/23/2008-MOPT dated 7 August, 2008:

“4. Storage Charges:

The Storage charges for the cargo stored in the stack yard beyond the free period shall be as below:

(Rate in Rs. per tonne per day or part thereof)

Sr.

Commodity

Rate for five days for

Rate for sixth day to

Rate for the Eleventh

No.

the balance cargo

tenth day for the

day onwards for the

remaining after the

balance cargo

balance cargo

free period

1

2

3

4

5

1.

Coal (all types)

12

24

48

Note: (i). Fifteen free Days shall be allowed, after complete discharge of vessel’s cargo. For the purpose of

calculation of free period, customs notified holidays and Terminal’s non- working days shall be

excluded.

(ii). Order No.TAMP/13/2014-MOPT dated 4 July 2014 [After Indexation]:

“4.

Storage Charges:

The Storage charges for the cargo stored in the stack yard beyond the free period shall be as below:

(Rate in Rs. per tonne per day or part thereof)

Sr.

Commodity

Rate for five days for

Rate for sixth day to

Rate for the Eleventh

No.

the balance cargo

tenth day for the

day onwards for the

remaining after the

balance cargo

balance cargo

free period

1

2

3

4

5

1.

Coal (all types)

15.79

31.58

63.16

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

529

Note: (i). Fifteen free Days shall be allowed, after complete discharge of vessel’s cargo. For the purpose

of calculation of free period, customs notified holidays and Terminal’s non working days shall

be excluded.

3.1 The submissions made by AMPTPL in its representation dated 20-07-2021 to this Committee for

rationalization of storage charge approved by this Authority vide Order dated 07 August, 2008 notifying

the Scale of Rates in the name of MOPT are summarized below:

1. AMPTPL could not handle cargo up to its designed capacity due to various reasons such as

a.

Punitive charges by way of storage rent are prohibiting in attracting customers.

b.

Dispatches of cargo through road are restricted by various authorities by time to time by frequent

restrictions from GSPCB & MMC.

c.

Competing Ports are offering free storage period ranging from 45 to 60 days with

nominal storage charges.

The details of the cargo handled during the preceding two Financial Year are as below.

Financial

Projected Cargo

Cargo Handled

Year

as per DPR

in MMT

1

2

3

2019-20

7.5

4.00

2020-21

7.5

3.74

2. AMPTPL is running with huge losses since commencement of commercial operation. Cash Loss

incurred by AMPTPL during the preceding two financial years i.e. FY 2019-20 and 2020-21 duly certified

by statutory auditor.

3. Year wise net loss incurred by AMPTPL during the preceding two financial years i.e. FY

2019-20 & 2020-21 duly certified by our statutory auditor.

4. Proposed 4 Lane Port connectivity highway which was planned in FY 2010 to facilitate faster

evacuation of cargo are still not been operational. This has compelled vehicle to move through city roads

causing in serious impact on truck turn around time and thereby evacuation.

4.1. M/s. AMPTPL has referred MOS letter dated 11 July, 2018 issued to all Major Port Trusts on Stressed

PPP Projects and it has discussed about consideration of AMPTPL project as Stressed PPP Project in

pursuance of the said MOS letter, and claimed that AMPTPL’s berth No. 7 at MOPT qualifies as a stressed

PPP project, entitling it to a rationalization of storage charges as per the criteria set by stressed PPP

Guidelines as brought out in an earlier paragraph.

4.2. MOS vide letter No. PD-13/1/2018-PPP Cell dated 11 July, 2018 addressed to all Major Port Trusts

including MOPT has evolved a mechanism to rationalize storage charge for stressed PPP project. Para 6

of the said letter states that whenever issue of abnormal storage charges emerges in stressed projects as

defined in the said MOS letter, the Ports may approach TAMP under the provisions of “Amendments,

modification or alternations” to the terms and conditions of the concession agreement with an appropriate

proposal for rationalization of storage charges in consultation with concessionaires so as to achieve the ARR

as per the TAMP guidelines/notification. TAMP has to consider such proposals on merit. The Committee also

recommended review of the situation by the Concessioning Authority periodically for optimum utilization

of the facility created.

4.3. As per Major Port Authorities Act, 2021, Mormugao Port Authority (MPA) will dispose the said

application through approval of the Board of Mormugao Port Authority. Accordingly, the said proposal of

AMPTPL was circulated vide letter No. CME/PROJ/34/2023/00556 dated 09-05-2023 for consultation process,

to all the concerned users/user organizations.

5.1. The subject project was awarded to M/s. Adani Murmugao Port Terminal Pvt. Ltd., (AMPTPL) the

Concessionaire, at Port of Mormugao, Goa. The project is operational w.e.f. 06-06-2014. The Upfront tariff and

indexed SOR for the project has been notified by TAMP Vide Order No. TAMP/13/2014-MOPT dtd.

04-07-2014 for berth hire charges, cargo handling charges, storage charges and miscellaneous charges.

530

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

5.2 AMPTPL had made an application dated 20-07-2021 to Mormugao Port Authority, Goa, that their project

is being operated in stressed condition due to various reasons including storage charges.

5.3 Ministry of Shipping vide Letter No. PD-13/1/2018-PPP Cell dtd. 11-07-2018 has directed all Major Ports

and TAMP to adopt the procedure contained therein including the review of the situation periodically for

optimum utilisation of the facility created. In response to MoS letter dtd. 11-07-2018, AMPTPL submitted

above request vide letter dated 20-07-2021 to consider project as Stressed by giving the below mentioned

reasons for project being stressed.

i. The dispatches of cargo through road are restricted by various authorities by time to time like frequent

restriction from GSPCB and MMC and in time MPA citing various reasons.

ii. Proposed 4-Lane Port connectivity highway which was planned in FY 2010 to facilitate faster evacuation

of cargo are still not been operational. This has compelled vehicles to move through city roads causing

in serious impact on truck turn around time and thereby evacuation.

iii. Competing Ports are offering free storage period ranging from 45 to 60 days with nominal storage

charges.

5.4 AMPTPL has given the details of cargo handled during the preceding 2 years and financial audited

report for FY 2019-20 & 2020-21 certified by their statutory auditor. AMPTPL has proposed the free days for

storage of cargo as 25 days at their terminal.

6.1 A Committee was constituted by the Mormugao Port Authority (MPA), headed by the

Dy. Chairman and comprising of TM, FA & CAO, CME & CE.

6.2 The Committee met on 13-06-2022, and observed that, the actual cargo handled in the two preceding

years i.e. 2019-20 and 2020-21, is sub-optimally utilized with 59% and 54% respectively as against 70% of the

Criteria ‘a’. The same has been certified by Traffic Department. AMPTPL vide letter dtd. 20-07-2021, has

enclosed the report of M/s. Deloitte Haskins & Sells LLP, the statutory auditor wherein they have certified the

cash loss (Criteria ‘b’) and net worth (Criteria ‘c’) for the financial year 2019-20 and 2020-21 as given below.

FY

Cash (Loss)

Net worth

1

2

3

2019-20

Rs. (63.72) Crores

Rs. (219.99) Crores.

2020-21

Rs. (7.81) Crores

Rs. (259.85) Crores.

6.3 The Port had appointed M/s. D.K. Chhajer & Co. Chartered Accountants as an Independent Auditor for

conducting the Special Audit on AMPTPL Accounts for FY 2020-21. The Committee observed that the project

meets all the criteria for qualification as a stressed project for the FY 2021-22 as per the guidelines of the

Ministry of Shipping based on data pertaining to FY 2019-20 and 2020-21, as evidenced in the Special Audit

Report of M/s. D.K. Chhajer & Co. Chartered Accountants dated 28-01-2022.

The details for classification of a PPP Project as ‘Stressed Project’ as per MoS are given below as ready

reference.

Sr.

Criteria for classification of a PPP

FY 2019-20

FY 2020-21

No.

Project as ‘Stressed Project”

1

2

3

4

1.

Criteria-’a’

Project is sub-optimally utilized as evidenced

59%

54%

by the actual cargo handled by operator

during the two preceding financial years

being less than 70% of the projection as per

the DPR/Feasibility Report forming part of

the bid document

2.

Criteria-’b’

Project SPV incurring Cash loss continously

Rs. (-) 5.06 Cr.

Rs. (-) 7.85 Cr.

for two preceding financial years

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

531

1

2

3

4

3.

Criteria-’c’

The losses incurred by Concessionaire has caused

353%

399%

atleast 50% Erosion of its Peak Net worth during

the Operation Period

6.4 The request of the Concessionaire were put up to the Board of Mormugao Port Authority in its meeting

held on 07-09-2022 for review and deliberations. The Board vide resolution No. 68 of 07-09-2022 resolved that

i. To consider PPP project at Berth No. 7 as stressed, for the Financial Year 2021-22.

ii. To submit a detailed proposal by the Concessionaire to the Board of Mormugao Port Authority in this

regard, duly justifying the reasonableness of increasing the storage period from the existing 15 days,

as per the TAMP guidelines for a Coal Handling Terminal.

iii. To place the proposal regarding increasing the free time for storage of cargo from the existing 15 days

as stipulated in the Concession Agreement before the Board for discussions and approval based on

the assessment of actual dwell time of the terminal.

iv. The said proposal shall be valid for a period of one year and may be reviewed after a period of one year.

6.5 The Board Resolution was communicated to AMPTPL. In response, M/s. AMPTPL submitted a detailed

proposal vide their letter No. AMPTPL/2022/888 dtd. 21-10-2022, for rationalisation of storage charges duly

enhancing the free period from 15 days to 25 days and to amend the storage charges as notified by MPA for

the FY 2020-21 as communicated vide Section 4 of MoS letter dtd. 11-07-2018.

6.6 The Committee met again on 02-03-2023 to discuss issue of free days for storage of cargo. As per TAMP

notified SOR dated 04-07-2014, the free days for storage cargo is stipulated as 15 days. The Committee found

that AMPTPL request for increase in free days for storage of cargo as 25 days, is in line with the TAMP

guidelines communicated vide letter No. PR-14019/25/2007-PG dt. 12-02-2008, for upfront tariff setting for

PPP Projects at Major Port Trusts, for a Coal handling terminal.

6.7 The Committee also observed that, as per data provided by AMPTPL regarding details of the storage

period of the vessels handled at Berth No.7, during the FY 2020-21, 18 vessels out of 67 vessels have exceeded

storage period more than 25 days. It may be noted that 49 vessels out of 67 vessels have been cleared within

25 days.

6.8 The Committee requested to consider the proposal submitted by AMPTPL for rationalisation of storage

charges as envisaged and notify the same, to avoid diversion of cargo to the neighbouring private port and to

attract additional volumes so that the capacity utilization of the facility can be improved. The Committee

further stated that Mormugao Port Authority shall review the proposed rationalisationof storage charges

after one year of notification.

6.9 The request of the Concessionaire were put up to the Board of Mormugao Port Authority, in its meeting

held on 23-03-2023 for review and deliberations. The Board vide resolution No. 132 of 23-03-2023 resolved and

considered the request of M/s. AMPTPL to increase the free period for storage of cargo, from the existing 15

days to 25 days, for Coal Handling Terminal at Berth No. 7 of Port of Mormugao, Goa, for the F.Y. 2021-22 and to

obtain the proposal from M/s. AMPTPL, duly justifying the reasonableness of increasing the storage period, for

rationalisation of storage charges.

6.10 Port vide letter dated 12-04-2023 informed decision of the Board to increase the free period for storage

of cargo, from the existing 15 days to 25 days, for Coal Handling Terminal at Berth No.7 of Port of Mormugao,

Goa, for the F.Y. 2021-22. Port requested M/s. AMPTPL to submit the proposal for rationalization of storage

charges to the Port’s Scale of Rates Committee for further consideration. M/s. AMPTPL vide letter dated

16-04-2023 submitted the proposed storage charges after applying the applicable indexation factor for the

FY 2021-22. Port vide letter dated 09-05-2023 has circulated the proposal of M/s. AMPTPL to the concerned

users/user organizations, who are stakeholders to be consulted for this proposal.

6.11

The comparative position of the existing tariff, proposed tariff and the royalty in respect of storage

charges by M/s. AMPTPL is presented below for amendment w.e.f. 01-04-2021 for the FY 2021-22:

532

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

(Rate in Rs. per tonne per day or part thereof)

Storage

Existing Storage

Proposed Storage

Royalty payable as

Days

Charges applicable

Charges from

per MOS letter

for the year

01-04-2021 to 31-03-2022

No. PD-13/1/2018-PPP

2021-22 after applicable

by AMPTPL

Cell dated 11 July, 2018

indexation

1

2

3

4

Storage Charges

Nil

No charges

Nil.

(0-15 days)

Storage Charges

17.22

No charges

1% of ARR from Storage

(16-20 days)

charges at Rs. 85.28 lakhs

estimated in August 2008

Order and after applicable

indexation.

Storage Charges

34.44

No charges

1% of ARR from Storage

(21-25 days)

charges i.e. Rs. 85.28 lakhs

estimated in August 2008

Order and after applicable

indexation.

Storage Charges

68.87

2.95

20% of actual storage charges

(26 to 30 days)

recovered or 1% of ARR

from Storage charges i.e.

Storage Charges

4.42

Rs. 85.28 lakhs estimated

(31 to 35 days)

in August 2008, after

indexation, whichever is

Storage Charges

5.91

higher.

(36th day onwards)

7.1. AMPTPL vide letter No. AMPTPL/2022/888 dated 21-10-2022 has submitted amended proposal as

given below, for considering AMPTPL as stressed project for FY 2021-22.

1. “We refer to the captioned Concession Agreement dated 22 September, 2009 (“the CA”) between

Mormugao Port Authority and Adani Mormugao Port Terminal Pvt. Ltd., (“AMPTPL”) for Coal Handling Terminal

at Berth No. 7 in the Port of Mormugao (“MPA”) on Design, Build, Finance, Operate and Transfer Basis (“the

Project”).

2. We further refer to the Upfront Tariff notified for the Project by the Tariff Authority for Major Ports

(“TAMP”) vide Order dated 07 August, 2008 in Case No. TAMP/23/2008 (notified in Gazette No. 141 dated 20

August, 2008) (“Upfront Tariff”) and to the Scale of Rates notified by TAMP for the facility designed and built

by AMPTPL vide Order dated 04 July, 2014 in Case No. TAMP/13/2014 (notified in Gazette No. 224 dated 25

July, 2014) (“SOR”).

3. We refer to the Stressed PPP Projects Guidelines notified by the Ministry of Shipping, Government of

India vide Letter No. PD-13/1/2018-PPP Cell dated 11 July, 2018 (“Stressed PPP Guidelines”).

4. We refer to our letter No. AMPTPL/2021-22/659 dated 20-07-2021 (“Stressed Project Application”),

whereby we had requested that the Coal Handling Terminal at Berth No. 7 at MPA be considered to be a

Stressed PPP Project under the Stressed PPP Guidelines.

5. Lastly, in this connection, we refer to the MPA Letter No. CME/PROJ/34/2022/1021 dated 03-10-22

whereby the MPA has communicated that the Board of Trustees for the MPA has decided to favorably consider

the Stressed Project Application for the financial year 2021-22; and ordered to submit a proposal for the

rationalization of storage charges along with the justification for the reasonableness.

6. As is apparent from the facts, data and information provided in the Stressed Project Application, the

Upfront Tariff and SOR provide for a free storage period of 15 days (in contrast with 25 days in the Upfront

Tariff Guidelines, 2008 notified by TAMP) on the basis of an assumed plot turnover ratio of 20 that is inherently

dependent on the cargo evacuation infrastructure available to the terminal Operator. It is a matter of record

that the cargo evacuation infrastructure available to AMPTPL’s Coal Handling Terminal at Berth No. 7 at MPA

is woefully inadequate as the flyover and 4-lane highway connectivity which was promised by MPA to be

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

533

completed in 2010 are yet to be delivered, and there are restrictions imposed by the Goa State Pollution

Control Board (“GSPCB”) on the movement of coal cargo on trucks except during the narrow window between

10 p.m. and 6 a.m. It is thus observed that the average dwell time is around 30 days. As per TAMP guidelines

storage charges free period of 25 days is fixed, hence we propose to increase free storage period from existing

15 days to 25 days. The brief working of vessels along with dwell time for FY 21-22 is enclosed herewith as

“Annexure”.

7. As a result of the low capacity of the cargo evacuation infrastructure leading to higher dwell times, and

the low free storage period notified in the Upfront Tariff and SOR, the notional storage charges based on the

SOR work out to much higher than the envisaged 1% of Annual Revenue Requirement (ARR) as provided by

the Upfront Tariff Guidelines, 2008. In fact, the notional Storage Charges work out, in several cases, to be

much higher than the Cargo Handling Charges as per the SOR! Unsurprisingly, AMPTPL has never been able

to charge or recover any Storage Charges since inception till date, for the reason that the Storage Charges

under the Upfront Tariff and SOR are not commercially viable and if AMPTPL were to levy Storage Charges as

per the SOR, the cargo handling business would simply move away from MPA to other competing ports.

8. Faced with a severely constrained cargo volumes (which were abysmally low when compared to the

projections in the Detailed Project Report dated 12 March 2010 (“DPR”) and the facilities constructed and

built by AMPTPL) and coupled with a high cost of borrowed capital for an escalated actual Project Cost

which has not yet been compensated to AMPTPL, AMPTPL began incurring substantial operating and cash

losses in each year, such that by 31 March, 2018, more than 100% of its net worth had been wiped out.

9. It is in this background that AMPTPL had made the Stressed Project Application. It remains AMPTPL’s

position that it fully meets all objective criteria established under the Stressed PPP Guidelines, including but

not limited to the following:

i)

Sub-optimal utilization of the project facilities, as evidenced by the actual cargo handled by

AMPTPL during two preceding financial years, namely 2020-21 and 2021-22, being less than

70% of the projection as per DPR/Feasibility report forming part of the bid document;

ii)

AMPTPL incurring cash loss continuously for two preceding financial years, namely

2020-21 and 2021-22; and

iii)

The losses incurred by AMPTPL have caused at least 50% erosion of its peak Net Worth

during the operation period.

10. AMPTPL has not been able to achieve the proposed ARR through realization of tariff. The tariff cap for

different individual services is therefore, to be set appropriately by TAMP so as to enable AMPTPL to achieve

the ARR determined as per Clause 3.8.2 of the Upfront Tariff Guidelines, 2008.

11. The commercial unviability of the Upfront Tariff and SOR for the Coal Handling Terminal at Berth No. 7

is also highlighted by the fact that as against the TAMP-notified 16% Return On Capital Employed (“ROCE”),

AMPTPL has had a negative ROCE, as per AMPTPL’s audited books of accounts for the 5 years preceding

2020-21 is set out below:-

Sl.

Year

Volume of

Cargo Handling

Operating Cost

Return on

No.

Cargo Handled

Revenue

(Rs. Crores)

Capital Employed

(MT)

(Rs. Crores)

1

2

3

4

5

6

1.

2014-15

860,339

20.72

10.08

-28.18

2.

2015-16

1,812,324

44.42

22.58

-49.78

3.

2016-17

1,959,252

48.08

26.45

-7.85

4.

2017-18

1,122,377

27.72

17.83

-49.62

5.

2018-19

4,248,719

112.42

116.63

-103.38

6.

2019-20

4,000,641

107.50

112.56

-96.12

7.

2020-21

3,743,778

97.28

105.13

-39.89

8.

2021-22

4,042,998

103.33

107.40

-42.62

12.

It is indisputable that AMPTPL meets all objective criteria for being declared a Stressed PPP Project

within the meaning assigned to the said term under the Stressed PPP Guidelines, and as a corollary,

534

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

AMPTPL qualifies for rationalization of the Tariff and SOR for the Coal Handling Terminal at Berth No. 7

of MPT. This has also been confirmed by MPT vide its letter dated 03 Oct., 2022.

Guidance on Tariff Rationalization from the Upfront Tariff Guidelines, 2008 read with the Stressed

PPP Guidelines

13. As per the Annexure III of the Upfront Tariff Guidelines, 2008 the norms for apportionment of the ARR is

as follows.

Tariff Group

Percentage of Total revenue allocated

1

2

Coal Handling Charges

98

Storage Charges

1

Miscellaneous Charges

1

14. For the identified stressed assets, the Stressed PPP Guidelines recommends the extension of the free

storage period with a view to optimize the capacity utilization of the berth. In making this recommendation,

the Stressed PPP Guidelines also note the following points, all of which apply to AMPTPL’s case since

commencement of cargo operations:-

(a) The norm fixed by TAMP (in the Upfront Tariff Guidelines, 2008) anticipating 1% revenue

towards storage charges out of gross revenue from handling charges was based on certain

assumptions regarding the dwell time of cargo, which may change based on factors

such as availability of rakes, storage space at importers premises, etc.;

(b) As a result of higher and telescopic storage charges, cargo handling migrates away to

non-major ports that offer higher free time and as a result, the income generation from the

projects come down, making them unviable.

(c) The higher storage charges and resultant diversion of cargo handling business to non-mechanized

facilities defeats the very objective of the PPP projects for mechanization of cargo berths at major ports.

15. Accordingly, we had requested MPA to increase the free period (which is currently 15 days as per the

Upfront Tariff, and as adopted in the CA). The MPA got a Special Audit for AMPTPL conducted by M/s. D S

Pawooskar & Co. and D.K Chhajer for Financial Year 2019-20 & FY 2020-21 respectively and on consideration

of the Special Audit Report along with the Report made by AMPTPL’s Statutory Auditors, M/s. Deloitte

Haskins & Sells LLP, affirmatively concluded that AMPTPL qualifies as a Stressed PPP Project under the

Stressed PPP Guidelines.

AMPTPL’s Proposal for Tariff Rationalization for 2021-22

16. AMPTPL agrees and undertakes to comply with the Stressed PPP Guidelines such that:

a) No Storage charges and hence no Royalty if cargo is cleared within the free period as per

executed CA (i.e. 15 days free period).

b) If the cargo is cleared after the expiry of free period as per the executed CA but within the extended

free period, no storage charges will be applied but AMPTPL shall pay Royalty equal to 1% ARR to MPA;

and

c) If the cargo is cleared after extended free period (i.e. beyond 25 days), AMPTPL shall pay Royalty equal

to quoted % on actual storage charges recovered or 1% of ARR whichever is higher for the period

beyond the extended period.

17. It is pertinent that AMPTPL continues to meet the objective criteria under the Stressed PPP Guidelines

in Financial Year 2021-22, and the data and Auditor’s Reports in this behalf have already been provided to

MPA.

18. Now, therefore, we, the Concessionaire, AMPTPL, do hereby apply for the rationalization of SOR and a

suitable amendment to the CA w.e.f. 01 April, 2021 for the Financial Year 2021-22.

19. Accordingly, in light of our current request, the SOR may be amended and the table at Para 4 of the

Schedule to the SOR be substituted w.e.f. 01 April, 2021 for the Financial Year 2021-22 as follows which is

already notified by TAMP for the FY 2019-20 & MPA notified for the FY 2020-21:

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

535

Rate in Rs. Per Ton or Part Thereof

Sl.

Storage

Existing Storage

Proposed Storage

Royalty payable as

No.

Days

Charges applicable

Charges from

per MOS letter

for the year

01-04-2021 till 31-03-2022

No. PD-13/1/2018-PPP

2021-22 after applicable

Cell dated 11 July, 2018

indexation

and as given by MOPT

for the year 2021-22

1

2

3

4

5

1.

Storage Charges

Nil

No charge

Nil.

(0-15 days)

2.

Storage Charges

17.22

No charge

1% of APR from Storage

(16-20 days)

charges at Rs. 85.28 lakhs

estimated in August 2008

Order and after applicable

indexation.

3.

Storage Charges

34.43

No charge

1% of APR from Storage

(21-25 days)

charges i.e. Rs. 85.28 lakhs

estimated in August 2008

Order and after applicable

indexation.

4.

Storage Charges

68.87

2.95

20% of actual storage charges

(26-30 days)

recovered or 1% of ARR

from Storage charges i.e.

5.

Storage Charges

4.42

Rs. 85.28 lakhs as per

(31-35 days)

Order dated 07-08-2008

after indexation, whichever

6.

Storage Charges

5.91

is higher.

(36th day onwards)

i. Twenty five free days shall be allowed, after complete discharge of vessel’s cargo. For the purpose

of calculation of free period, customs notified holidays and Terminal’s non-working days shall be

excluded.

ii. Storage charges shall be payable for all days including Terminal’s non-working days and customs

notified holidays for stay of cargo beyond the prescribed free days.

iii. Storage charge on cargo shall not accrue for the period when the terminal operator is not in a

position to deliver/ship the cargo when requested by the user due to reasons attributable to the

terminal operator.

iv. The above storage schedule shall be valid for a period of one year of 2021-22 i.e. from 1 April, 2021

till 31 March, 2022.

20. Hence we request your good office to issue an order as issued in last year which will be effective

for a period of one year (i.e. from 01-04-2021 till 31-03-2022).

8.1. AMPTPL vide letter dated 16-04-2023 submitted amended storage charges with applying the

indexation factor of 0.33% announced by the Tariff Authority for Major Ports for the financial year 2021-22

are as given below.

Rate in Rs. Per Ton or Part Thereof

Sl.

Storage

Existing Storage

Proposed Storage

Royalty payable as

No.

Days

Charges applicable

Charges from

per MOS letter

for the year

01-04-2021 till 31-03-2022

No. PD-13/1/2018-PPP

2021-22 after applicable

Cell dated 11 July, 2018

indexation

and as given by MPA

for the year 2021-22

1

2

3

4

5

1.

Storage Charges

Nil

No charge

Nil.

(0-15 days)

536

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

1

2

3

4

5

2.

Storage Charges

17.22

No charge

1% of ARR from Storage

(16-20 days)

charges at Rs. 85.28 lakhs

estimated in August 2008

Order and after applicable

indexation.

3.

Storage Charges

34.44

No charge

1% of ARR from Storage

(21-25 days)

charges i.e. Rs. 85.28 lakhs

estimated in August 2008

Order and after applicable

indexation.

4.

Storage Charges

68.87

2.95

20% of actual storage charges

(26-30 days)

recovered or 1% of ARR

from Storage charges i.e.

5.

Storage Charges

4.42

Rs. 85.28 lakhs as per

(31-35 days)

Order dated 07-08-2008 after

indexation, whichever is

6.

Storage Charges

5.91

higher.

(36th day onwards)

9.1

The Board vide Resolution No. 20 of 10-02-2022 resolved to form the Committee of HOD’s headed by

Dy. Chairperson to deal with all Scale of Rates (SOR) and PPP issues related to Stressed Project pertaining

to MOPA as per The Major Port Authorities Act, 2021. Accordingly, the Committee of HOD’s headed by

Dy. Chairperson, evaluated the proposal of M/s. AMPTPL.

9.2

Mormugao Port Authority (MPA) will have to dispose the said application through Board of Authority

of Port of Mormugao as per Major Port Authorities Act, 2021. Accordingly, the said proposal of AMPTPL was

circulated for consultation process to all the concerned users/user organisations.

9.3

Mormugao Port Authority (MPA) vide letter dated 09-05-2023 intimated to all the concerned users/

/user organisations for consultation process held through video conferencing on 16-05-2023 at 11.00 hrs.

10.1. The prescribed consultation process with stake holders including AMPTPL was initiated to have

participative approach and to give an opportunity of hearing to the concerned parties and accordingly

all the concerned users/user organisations intimated vide our letter dated 09-05-2023.

10.2. In accordance with the consultative procedure prescribed, the proposal of MPA was forwarded vide

our letter dated 09-05-2023 to the concerned users/user organisations seeking their comments.

10.3

A joint hearing in this case was held on 16-05-2023 through video conferencing. At the joint hearing,

AMPTPL and users/user organizations have made their submissions.

M/s. Adani Murmugao Port Terminal Pvt. Ltd.

(i) M/s. Adani Murmugao Port Terminal Pvt. Ltd., Capt. Jeyaraj Thamburaj made following submission

before the Port Authority.

Sl.

Storage

Existing Storage Charges

Proposed Storage Charges

No.

Days

applicable for the year 2021-22

from 01-04-2021 to 31.03.2022

after applicable indexation

1

2

3

4

1.

Storage Charges (0-15 days)

Nil

No charge

2.

Storage Charges (16-20 days)

17.22

No charge

3.

Storage Charges (21-25 days)

34.44

No charge

4.

Storage Charges (26-30 days)

68.87

2.95

5.

Storage Charges (31-35 days)

4.42

6.

Storage Charges (36th day onwards)

5.91

(ii) AMPTPL has proposed free period of 25 days for storage of cargo.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

537

-Adani Enterprises Ltd. (AEL)

During joint hearing, AMPTPL informed that, Adani Enterprises Ltd. (AEL) would not attend the meeting

but, offer their comments through letter. Accordingly, AEL vide letter dtd. 17-05-2023, forwarded vide

AMPTPL email dated 20-05-2023, submitted their comments as given below:

AEL handles the power plants and other customers coal requirement, through AMPTPL. The following

are issues faced by them in discharging customers to utilize Berth No. 7 at MPA for coal imports.

(i) Free storage period of only 15 days we need at least 30 days free storage to facilitate the trade.

(ii) The existing Storage rent is higher than the other Ports. The Storage rate needs to be rationalized

to be competitive.

(iii) Inadequate rakes supplied by SWR/MPA to AMPTPL.

-West Coast Paper Mills Ltd.

(i) Mr. Vivek Gupta of M/s. West Coast Paper Mills Ltd., attended the meeting and informed that, the

free storage period is very less as compared to other neighbouring Ports. M/s. West Coast requested

to increase the free period to 45 days.

(ii) Storage charges are very high as compared to other neighbouring Ports and requested to make

it competitive.

-Goa Carbon Ltd.

(i) Mr. Ajay Prasad of M/s. Goa Carbon Ltd., attended the meeting and raised issue that, the storage

plot rent is very high.

(ii) Free period for storage of cargo is less and should be competitive with other Ports. He informed

that they have planned higher quantity i.e. 1,00,000 MT, this year, but due to high storage charges

and less free period, they can handle less than 50,000 MT.

(iii) M/s. Goa Carbon requested to increase free period from 15 to 30 days.

11.1. After going through the total information collected during the processing of the case, the following

position emerges:

A. The request of the AMPTPL to increase free period from present 15 days to 25 days, as prescribed in

the Upfront Tariff Guidelines 2008 for the year 2021-22 andrationalization of storage charges by

increasing the free period from 15 days to 25 days for the year 2021-22 by treating the AMPTPL

project as stressed project in pursuance of the MOS letter No. PD-13/1/2018-PPP cell dated

11 July, 2018 for stressed PPP project is in order.

B. A comparative position of storage schedule as per the upfront tariff approved by TAMP vide its

Order dated 7 August, 2008, rate applicable as per SOR notified in the name of the AMPTPL vide

Order dated 4 July, 2014 for the year 2021-22 after applicable automatic indexation announced by this

Authority (i.e. compoundable indexation factor of 35.08% upto the year 2017-18 for the base

year 1 January, 2008, annual indexation factor of 1.13% for the year 2020-21 and 0.33% for the year

2021-22) and rationalized storage charges proposed by AMPTPL by increasing the free period from

existing 15 days to 25 days is tabulated below:

(Rate in Rs. per tonne per day or part thereof)

Sl.

Particulars

Storage Charges

Storage Charges

Storage Charges

Storage Charges

No.

approved by

in the SoR

applicable for

proposed by AMPTPL

Authority vide

notified in the

the year 2021-22

vide its letter dated

Order dated

name of AMPTPL

after applicable

16th April, 2023

07 August, 2008

vide Order dated

indexation

based on existing

04 July, 2014 after

factor

rate recommended

applicable

for approval after

indexation factor

updating it with

applicable annual

indexation factor

for the year 2021-22

applicable from

1st April, 2021 till

31-03-2022

1

2

3

4

5

6

1.

Storage Charges

Nil

Nil

No charges

No Charges.

(0-15 days)

538

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

1

2

3

4

5

6

2.

Storage Charges

12

15.79

17.22

No Charges.

(16-20 days)

3.

Storage Charges

24

31.58

34.43

No Charges.

(21-25 days)

4.

Storage Charges

48

63.16

68.87

2.95

(26-30 days)

Storage Charges

4.42

(31-35 days)

Storage Charges

5.91

(36th day onwards)

C. The AMPTPL had earlier sought from the MPA to increase free period from existing 15 days to 25

days citing the constraints of restricted dispatches of cargo due to probable traffic congestion, non-

operational 4-lane connectivity and frequent restriction by GSPCB on movement of cargo. The Port then

impressed upon the AMPTPL that, giving extra storage period would reduce the terminal turnaround time

and increase the risk of customers using the terminal as storage yard area.

D. Recognizing that the proposal filed by the AMPTPL is based on the approval of the Board of Mormugao

Port Authority and is also based on the MOS letter dated 11 July, 2018 on the Stressed Project for a period

of one year i.e. 2021-22 and is intended to improve the utilization of the facility created, Board of Mormugao

Port Authority may consider to approve the current proposal of the AMPTPL as per Para 6 of the MOS letter

dated 11 July, 2018 which states that, the Concessioning Authority is to review the situation, periodically

for optimum utilization of the facility created.

E. The Committee has proposed the rationalized storage schedule by increasing the free period from

existing 15 days to 25 days, for one year for FY 2021-22 and has opined, that it will review the proposed

rationalization after one year and shall approach Mormugao Port Authority.

F.

The current proposal is for a period of one year i.e. FY 2021-22. Recognizing that the storage charge

and the free period prescribed in the SOR notified in the name of the AMPTPL is for the entire project

period of 30 years subject to annual escalation. Further, a note is prescribed that the rationalized storage

schedule is applicable for period of one year i.e. year 2021-22 from 1 April, 2021 till 31 March, 2022 and that

from 1 April, 2021 onwards, the original storage schedule as approved in the Order dated 4 July, 2014 with

appropriate indexation rates shall apply.

G. This will tantamount to prescribing the rate with retrospective effect from 1 April, 2021 to

31 March, 2022. Since the proposal is an agreed proposal between the Port and the AMPTPL and is in

pursuance of the MOS letter dated 11 July, 2018 for stressed PPP project, the Committee recommends

Mormugao Port Authority to accord approval to the same with retrospective effect for the said one year

period of 2021-22.

11.2 As brought out earlier, Para 6 of the MOS letter dated 11 July, 2018 on stressed PPP project which

states, that whenever issue of abnormal storage charges emerges in stressed projects as defined in the said

MOS letter, the Ports may approach TAMP under the provisions of “Amendments, modification or alternations”

to the terms and conditions of the concession agreement with an appropriate proposal for rationalization of

storage charges in consultation with concessionaires so as to achieve the ARR as per the relevant TAMP

original tariff Order. The AMPTPL has filed the proposal increasing the free period from existing

15 days to 25 days and proposed that the rationalized storage charge for the third slab i.e. 26th to 30th day

shall be at Rs. 2.95 per tonne per day, 31st to 35th day shall be Rs. 4.42 per tonne per day and from 36th day

onwards Rs. 5.91 per tonne per day for the year 2021-22 under the stressed PPP project. The AMPTPL has

stated that, though they have agreed to increase the free period from existing 15 days to 25 days, the rate of

Rs. 68.87 per tonne per day beyond 25 days is very high, they have never been able to collect storage charges

or recover any storage charges since inception till date, for the reason that the Storage Charges under the

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

539

Upfront Tariff and SOR are not commercially viable and if AMPTPL were to levy Storage Charges as per the

SOR, the cargo handling business would simply move away from MPA to other competing ports. During the

consultation process of this case, apart from AMPTPL, stakeholders/users also attended M/s. West Coast

Paper Mills and M/s. Goa Carbon have also pointed out that, the proposed storage rate are on higher side as

compared to other ports and have claimed that due to high storage charges, cargo is not coming to terminal.

The free period of storage of cargo is 15 days, which is too less as compared to other neighboring Ports where

free period for storage of cargo is more as compared to Mormugao Port. M/s. Adani Enterprises Ltd. has not

attended the joint hearing, but submitted their comments through letter.

11.3 Incidentally, the AMPTPL in their proposal dated 21-10-2022 has given calculation for storage charge

based on certain assumptions of dwell time of cargo, cargo evacuation slab wise so as to achieve the ARR of

Rs. 85.28 lakhs estimated in the original tariff Order of August 2008. None of the other users have objected to

the same. That being so, and as pointed out by the users and AMPTPL that the existing storage charges of Rs.

68.87 per tonne is high, the Committee proposes to recommend the proposed rationalized storage charge for

three slabs after 25 days free period viz. 26-30 days, 31-35 days and 36th day onwards as proposed by AMPTPL

based on the calculation of the AMPTPL for the rationalizing storage charge to address the objection raised

by the users and AMPTPL for the year 2021-22.

11.4. In the result, and for the reasons given above, and based on a collective application of mind, Mormugao

Port Authority (MPA) approves the following:

I) Storage charge applicable as per existing Schedule 4 in the Order No. TAMP/13/2014-MPA dated

4 July, 2014 passed by TAMP notifying the SOR in the name of the AMPTPL is replaced with the following

schedule for the year 2021-22 i.e. from 1 April, 2021 till 31 March, 2022:

Rate in Rs. Per Ton or Part Thereof

Sl.

Storage

Existing Storage

Proposed Storage

Royalty payable as

No.

Days

Charges applicable

Charges from

per MOS letter

for the year

01-04-2021 till 31-03-2022

No. PD-13/1/2018-PPP

2021-22 after applicable

Cell dated 11 July, 2018

indexation

and as given by MPA

for the year 2021-22

1

2

3

4

5

1.

Storage Charges

Nil

No charges

Nil.

(0-15 days)

2.

Storage Charges

17.22

No charges

1% of ARR from Storage

(16-20 days)

charges at Rs. 85.28 lakhs

estimated in August 2008

Order and after applicable

indexation.

3.

Storage Charges

34.44

No charges

1% of ARR from Storage

(21-25 days)

charges i.e. Rs. 85.28 lakhs

estimated in August 2008

Order and after applicable

indexation.

4.

Storage Charges

68.87

2.95

20% of actual storage charges

(26-30 days)

recovered or 1% of ARR

from Storage charges i.e.

5.

Storage Charges

4.42

Rs. 85.28 lakhs as per

(31-35 days)

Order dated 07-08-2008 after

indexation, whichever is

6.

Storage Charges

5.91

higher.

(36th day onwards)

(i) Twenty five free days shall be allowed, after complete discharge of vessel’s cargo. For the purpose

of calculation of free period, customs notified holidays and Terminal’s non-working days shall be

excluded.

540

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

(ii) Storage charges shall be payable for all days including Terminal’s non-working days and customs

notified holidays for stay of cargo beyond the prescribed free days.

(iii) Storage charge on cargo shall not accrue for the period when the terminal operator is not in a

position to deliver/ship the cargo when requested by the user due to reasons attributable to the

terminal operator.

(iv) The above storage schedule shall be valid for a period of one year of 2021-22 i.e. from 1 April, 2021

till 31 March, 2022. From 1 April, 2022 onwards, the original storage schedule as approved in the

Order dated 4 July, 2014 with appropriate indexation rates shall apply.

(v) The AMPTPL has full flexibility as regards extending higher free period than the prescribed level.

As regards revenue share payable by the BOT operator to the port, the MOS letter dated 11 July, 2018

on stressed PPP project prescribes the mechanism for payment of revenue share when the storage charge

is rationalised i.e. reduced or free period is increased for stressed PPP project. The principle enumerated

in the said letter is that the BOT operator shall pay revenue share at the agreed rate (i.e. 20% revenue share)

as per the Concession Agreement on the actual revenue from storage charge or revenue share calculated

on the ARR from the storage charge estimated in the original Order (i.e. Rs. 85.28 lakhs) after applying

applicable annual indexation, whichever is higher.

The proposal for rationalization of storage charge in the Order No. TAMP/13/2014-MPA dated 4 July, 2014

for a period of one year of 2021-22 is treated as disposed of. Further, the representation of Adani Murmugao

Port Terminal Pvt. Ltd. (AMPTPL) dated 20-07-2021 and proposal dated 21-10-2022 and dated 16-04-2023 on

the same matter are also treated as disposed of.

Sd/-

Chairperson of the Board of Mormugao Port Authority.

V. No. AP-542/2023.

——————

Department of Personnel

–––

Order

No. 7/29/2023-PER/3341

The Governor of Goa is pleased to appoint Shri Sanjay Goel, IAS (AGMUT:2004), as Commissioner-cum-

-Secretary to Government, with immediate effect.

Shri Sanjay Goel, IAS joined this administration on 01-08-2023 (f.n.).

By order and in the name of the Governor of Goa.

Eshant V. Sawant, Under Secretary (Personnel-I).

Porvorim, 9th August, 2023.

————

Order

No. 15/2/2020-PER/3383

On the recommendations of Goa Services Board, the Governor of Goa is pleased to transfer the following

Officers in the cadre of Mamlatdar/Joint Mamlatdar/Vigilance Officer, in public interest, with immediate

effect:

Sr. No.

Name

Present posting

Posted as

1

2

3

4

1.

Shri Ranjeet Salgaonkar

Mamlatdar, Mormugao

Jt. Mamlatdar-I, Tiswadi.

2.

Shri Dattaprasad S. Toraskar

Awaiting posting

Jt. Mamlatdar-III, Tiswadi.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

541

1

2

3

4

3.

Shri Jeetendra Bugde

Mamlatdar in Collectorate,

Jt. Mamlatdar-I, Bardez.

South-I with addl. charge of

Mamlatdar in Collectorate,

South-II

4.

Shri Shailendra Dessai

Jt. Mamlatdar-I, Tiswadi

Jt. Mamlatdar-V, Bardez.

5.

Smt. Jennifer Fernandes

Vigilance Officer-I

Jt. Mamlatdar-VI, Bardez.

6.

Shri Abhijit G. Gaonkar

Awaiting posting

Jt. Mamlatdar-I, Bicholim.

7.

Shri Vishnu M. Rane

Awaiting posting

Jt. Mamlatdar-I, Sattari.

8.

Shri Saiesh Naik

Jt. Mamlatdar-VI, Bardez

Mamlatdar, Ponda.

9.

Shri Rosario Carvalho

Jt. Mamlatdar-I, Mormugao

Jt. Mamlatdar-I, Ponda.

10.

Shri Rajesh Sakhalkar

Jt. Mamlatdar-I, Ponda

Jt. Mamlatdar-II, Ponda.

11.

Kum. Ruchika Swapnil Birje

Awaiting posting

Jt. Mamlatdar-III, Ponda.

12.

Shri Vimod Dalal

Mamlatdar, Ponda

Jt. Mamlatdar-II, Salcete.

13.

Kum. Shannon Chika De Almeida

Awaiting posting

Jt. Mamlatdar-III, Salcete.

14.

Smt. Ana Rita Maria Paes

Jt. Mamlatdar-II, Salcete

Jt. Mamlatdar-IV, Salcete.

15.

Shri Gajanan A. Halarnekar

Awaiting posting

Jt. Mamlatdar-V, Salcete.

16.

Shri Sidharth A. Prabhu

Awaiting posting

Jt. Mamlatdar-VII, Salcete.

17.

Smt. Seema Gudekar

Jt. Mamlatdar-I, Sanguem

Mamlatdar in Collectorate,

with addl. charge of

South-I.

Jt. Mamlatdar-II, Sanguem

18.

Shri Pravinjay Pandit

Jt. Mamlatdar-IV, Salcete

Mamlatdar, Mormugao.

with addl. charge of

Jt. Mamlatdar-V, Salcete

19.

Shri Nathan Afonso

Jt. Mamlatdar-I, Quepem

Jt. Mamlatdar-I, Mormugao.

with addl. charge of

Jt. Mamlatdar-II, Quepem

20.

Kum. Shruti S. Kumtekar

Awaiting posting

Jt. Mamlatdar-II, Mormugao.

21.

Shri Gajesh P. Shirodkar

Awaiting posting

Jt. Mamlatdar-III, Mormugao.

22.

Kum. Dayle Rebello

Awaiting posting

Jt. Mamlatdar-I, Quepem

with addl. charge of

Jt. Mamlatdar-II, Quepem.

23.

Smt. Janavi Kalekar

Jt. Mamlatdar-II, Ponda

Jt. Mamlatdar-I, Sanguem

with addl. charge of

with addl. charge of

Jt. Mamlatdar-III, Ponda

Jt. Mamlatdar-II, Sanguem.

24.

Smt. Akshaya Amonkar

Jt. Mamlatdar-I, Bicholim

Mamlatdar in Collectorate-

-North.

25.

Smt. Archana Chodankar

Mamlatdar in Collectorate-

Vigilance Officer-I.

North

Shri Anant Malik, Mamlatdar, Pernem shall hold the charge of Chief Officer, Pernem Municipal

Council, in addition to his own duties.

The officers shall complete handing over and taking over process with immediate effect and submit

compliance.

By order and in the name of the Governor of Goa.

Eshant V. Sawant, Under Secretary (Personnel-I)

Porvorim, 11th August, 2023.

542

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

Order

No. 7/30/2023-PER/3385

The Governor of Goa is pleased to appoint

Ms. Ankita Mishra, IAS (AGMUT:2018), as Special

Secretary to Government, with immediate effect.

Ms.

Ankita

Mishra,

IAS,

joined

this

administration on 03-08-2023 (f.n.). She is allowed

joining time from 01-08-2023 to 02-08-2023.

Ms. Ankita Mishra, IAS, shall draw pay and

allowances with effect from 01-08-2023 (f.n.)

against the post of “Central Deputation Reserve”.

By order and in the name of the Governor of

Goa.

Eshant V. Sawant, Under Secretary (Personnel-I).

Porvorim, 14th August, 2023.

————

Order

No. 15/2/2020-PER/3391

Read: Order No. 15/2/2020-PER/3383 dated

11-08-2023.

In partial modification of the Order read in the

preamble, the following officers in the cadre of

Mamlatdar/Joint Mamlatdar/Vigilance Officer are

transferred and posted as below with immediate

effect:

Sr.

Name of the

Posted

No.

Officer

as

1. Shri Rajesh Sakhalkar

Mamlatdar, Ponda.

2. Smt. Jennifer Fernandes

Joint Mamlatdar-II,

Ponda.

3. Shri Saiesh Naik

Joint Mamlatdar-VI,

Bardez.

This issues on the recommendation of the Goa

Services Board.

By order and in the name of the Governor of

Goa.

Eshant V. Sawant, Under Secretary (Personnel-I).

Porvorim, 14th August, 2023.

————

Order

No. 13/07/2023-PER/3401

Whereas, Government vide Order No. 13/07/2023-

PER/1250 dated 27-04-2023 had granted extension

in service to Shri Anil Naik, Block Development

Officer in the Directorate of Panchayats beyond the

date of his superannuation for a period of one year

w.e.f. 01-05-2023 or till the posts of Block

Development Officers are filled on regular basis,

whichever is earlier, in public interest, subject to

Vigilance clearance, concurrence of Finance

Department and approval of Council of Ministers;

And whereas, the Vigilance Department has

submitted Vigilance Clearance stating that, no

Disciplinary Proceedings/Vigilance cases are

pending or being contemplated against Shri Anil Naik;

And whereas, the Finance Department vide its

U.O. No. 1400093600 dated 14-07-2023 concurred the

proposal for grant of extension in service to

Shri Anil Naik, Block Development Officer in the

Directorate of Panchayats subject to Cabinet

approval and adherence of all Rules in force;

And whereas, the Council of Ministers in its

XXIXth meeting held on 09-08-2023 resolved to grant

ex-post facto approval for extension in service to

Shri Anil Naik, Block Development Officer in the

Directorate of Panchayats beyond the date of his

superannuation for a period of one year w.e.f.

01-05-2023 or till the posts of Block Development

Officers are filled on regular basis, whichever is

earlier, in public interest;

Now, therefore, the Government is pleased to

confirm the Order No. 13/07/2023-PER/1250 dated

27-04-2023 granting extension in service to Shri Anil

Naik, Block Development Officer in the Directorate

of Panchayats beyond the date of his superannuation

for a period of one year w.e.f. 01-05-2023 or till the

posts of Block Development Officers are filled on

regular basis, whichever is earlier, in public interest.

By order and in the name of the Governor of

Goa.

Nathine S. Araujo, Under Secretary (Personnel-II).

Porvorim, 16th August, 2023.

————

Notification

No. 7/17/2022-PER/3388

Read: 1. Notification No. 7/17/2022-PER/4036

dated 05-12-2022.

2. Notification No. 7/27/2022-PER/781

dated 21-03-2023.

3. Notification No. 7/17/2022-PER/1100

dated 18-04-2023.

In partial modification to the Notifications read

in the preamble, the Governor of Goa is pleased to

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

543

order allocation of work/Departments amongst the

following Secretaries to the Government, with

immediate effect:-

Sr.

Name &

Departments

No.

Designation

1

2

3

1.

Shri Sanjay Goel,

1. General Administration.

IAS (2004)

2.Tourism.

Secretary (General

3. Information Technology.

Administration)

4. CEO, Goa CSR Authority.

5. PPP.

2.

Shri Sanjeev Ahuja,

1. Resident Commissioner,

IAS (2008)

Goa Sadan.

Resident Commissioner

3.

Shri Sandip Jacques,

1.Revenue.

IAS (2009)

2.Law & Judiciary and

Secretary (Revenue)

Legislative Affairs.

3. Labour & Employment.

4. Co-operation.

1

2

3

4. Ms. Ankita Mishra,

1. Special Secretary

IAS (2018)

(Revenue).

Special Secretary

(Revenue)

By order and in the name of the Governor of

Goa.

Eshant V. Sawant, Under Secretary (Personnel-I).

Porvorim, 14th August, 2023.

————

Corrigendum

No. 5/2/2023-PER/3414

Read: 1) Order No. 5/2/2023-PER/3355 dated

10-08-2023.

The name of officer at Sr. No. 10 in the Order

read in preamble shall be corrected to read as

“Ratnakant Dinraj Govenker” instead of

“Ratnakant Dinraj Govenkar”.

By order and in the name of the Governor of

Goa.

Eshant V. Sawant, Under Secretary (Personnel-I).

Porvorim, 17th August, 2023.

——————

Department of Skill Development and Entrepreneurship

Directorate of Skill Development and Entrepreneurship

CMKPS Section

–––

Order

No. DSDE/CMKPS/2023/Monitoring Committee/03/1532

The Government is pleased to constitute the Monitoring Committee of Chief Minister’s Kaushalya

Path Scheme (CMKPS) under the Chairmanship of the Director of Skill Development & Entrepreneurship

and consisting of the following members:

1. Director, Skill Development & Entrepreneurship, Directorate of Skill

— Chairman.

Development & Entrepreneurship, 3rd Floor, Shramashakti

Bhavan, Panaji-Goa

2. Deputy Director (DSDE), Directorate of Skill Development

— Vice-Chairman.

& Entrepreneurship

3. Asst. Director (DSDE), Directorate of Skill Development

— Member Secretary.

& Entrepreneurship

4. Member Secretary of (HRDF), Directorate of Skill Development

— Member.

& Entrepreneurship

5. Assistant Accounts Officer (DSDE), Directorate of Skill Development

— Member.

& Entrepreneurship

6. Senior most Principal of ITI, Directorate of Skill Development

— Member.

& Entrepreneurship

7. Representative of Industrial Association (3 Nos.)

544

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

a) Shri Kiran Ballikar, Director, Goa Chamber of Commerce & Industry

— Member.

(GCCI), Narayan Rajaram Bandekar Bhavan, T.B. Cunha Road,

P. O. Box 59, Panaji, Goa, India 403001

b) Shri Narainrao Dessai, Goa State Industries Association (GSIA),

— Member.

4th Floor, Goa IDC House, Patto Plaza, Panaji-Goa, 403001

c) Shri Ryan Vaz, Business Networking International (BNI) Goa Region,

— Member.

1st Floor, B.R. Commercial Centre, Opp. Parade Ground,

above Tata Motors, Campal, Panaji-Goa 403001

The tenure of the Monitoring Committee shall be for a period of 3 years with effect from the date of

issue of this order. The role, responsibilities and functions of the Committee are as published in

Government Gazette vide Notification No. DSDE/Proj/598/CMKPS/2022-23 dated 2nd March, 2023.

This issues with the approval of the Government.

By order and in the name of the Governor of Goa.

S. S. Gaonkar, Director (Skill Development & Entrepreneurship).

Panaji, 18th August, 2023.

——————

Department of Sports and Youth Affairs

Directorate of Sports and Youth Affairs

–––

Order

No. 8/10/PROMOTION/GPSC/DSYA/1698

On recommendation of Goa Public Service Commission conveyed vide their letter No. COM/II/

/11/45(1)/2020/207 dated 31-07-2023, Government is pleased to promote the below mentioned Asstt. Physical

Education Officers in the Directorate of Sports & Youth Affairs to the post of Asstt. Director (Group ‘B’

Gazetted) as shown against their names on regular basis with immediate effect.

Sr.

Name of the

Pay Scale

Name of the post

Budget Head

No.

Officer

against which promoted

1

2

3

4

5

1.

Smt. Neelam Mayekar (ST)

Rs. 9300-34,800+GP

Asstt. Director

Demand No. 42

Rs. 5400 (Level-9 of

(Projects)

2204—Sports & Youth

the 7th CPC)

Services;

00—;

101—Physical

Education;

04—Directorate

of Sports;

01—Salaries.

2.

Shri John Fernandes

Rs. 9300-34,800+GP

Asstt. Director

Demand No. 42

Rs. 5400 (Level-9 of

(Sports)

2204—Sports & Youth

the 7th CPC)

Services;

00—;

101—Physical

Education;

05—Strengthening

of Physical

Education;

01—Salaries.

They shall draw their salaries against the above mentioned Budget Head.

They shall be on probation for a period of two years and shall be governed by existing rules in force.

By order and in the name of the Governor of Goa.

Arvind Khutkar, Director (Sports & Youth Affairs)/ex officio Joint Secretary.

Panaji, 17th August, 2023.

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

545

Department of Town & Country Planning

–––

Notification

No. 36/18/56/RPG-21/Bambolim/6/8/TCP/2023/232

Whereas, the Department is in receipt of an

application dated 11-04-2023 (hereinafter referred

to as the “said Application”) under sub-section (2)

of Section 17 of the Goa Town and Country Planning

Act, 1974 (Act 21 of 1975) (hereinafter referred to

as the “said Act”) for correction of inconsistent/

/incoherent zoning provisions in the Regional Plan

for Goa-2021 (RPG-2021) in respect of plot of land

admeasuring an area of 2775 m2, surveyed under

Survey No. 6, sub-division No. 8 of Village Bambolim,

Tiswadi Taluka, District North Goa, State of Goa

(hereinafter referred to as the “said plot of land”);

And whereas, the correction/rectification as

requested by the applicant has been scrutinized

and a Report of the Department alongwith the

report from a registered professional was submitted

to the Government for decision (hereinafter referred

to as the “said Reports”);

And whereas, the Government has considered

the said Reports and it is of the opinion that

alteration/modification is necessary to be carried

out to the RPG-2021 for the purpose of rectifying

inadvertent/inconsistent/incoherent error zoning

that has occurred in the RPG-2021 and it has

directed the Chief Town Planner (Planning) to carry

out alteration/modification to the RPG-2021 for the

purpose of correcting/rectifying the zone of part of

the plot of land surveyed under Survey No. 6,

sub-division No. 8 of Village Bambolim, Tiswadi

Taluka admeasuring an area of 485 m2, only which

is earmarked as Natural Cover as per RPG-2021, to

Settlement zone by issuing Notification under

sub-section (2) of Section 17 of the said Act;

Now, therefore, as directed by the Government

and in pursuance of sub-section (2) of Section 17 of

the Goa Town and Country Planning Act, 1974 (Act

21 of 1975), the following alteration/modification to

the RPG-2021 is hereby carried out, namely:-

In the RPG-2021, the zone of part of the plot of

land admeasuring an area of 485 m2, surveyed

under Survey No. 6, sub-division No. 8, of Village

Bambolim, Tiswadi Taluka, District North Goa, State

of Goa which is earmarked as Natural Cover as per

RPG-2021 is hereby corrected as Settlement Zone.

Vertika Dagur, Chief Town Planner (Land Use)/

(Administration/Planning).

Panaji, 23rd August, 2023.

Notification

No. 36/18/32/17(2)/RPG-21/150/15-I/TCP-2023/233

Whereas, the Department is in receipt of an

application dated 10-04-2023 (hereinafter referred

to as the “said Application”) under sub-section (2)

of Section 17 of the Goa Town and Country Planning

Act, 1974 (Act 21 of 1975) (hereinafter referred to as

the “said Act”) for correction of inconsistent/

/incoherent zoning provisions in the Regional Plan

for Goa-2021 (RPG-2021) in respect of plot of land

admeasuring an area of 253 m2, surveyed under

Survey No. 150, sub-division No. 15-I of Village Raia,

Salcete Taluka, District South Goa, State of Goa

(hereinafter referred to as the “said plot of land”);

And whereas, the correction/rectification as

requested by the applicant has been scrutinized

and a Report of the Department alongwith the

report from a registered professional was submitted

to the Government for decision (hereinafter referred

to as the “said Reports”);

And whereas, the Government has considered

the said Reports and it is of the opinion that

alteration/modification is necessary to be carried

out to the RPG-2021 for the purpose of rectifying

inadvertent/inconsistent/incoherent error zoning

that has occurred in the RPG-2021 and it has

directed the Chief Town Planner (Planning) to carry

out alteration/modification to the RPG-2021 for the

purpose of correcting/rectifying the zone of plot of

land surveyed under Survey No. 150, sub-division

No. 15-I of Village Raia, Salcete Taluka admeasuring

an area of 253 m2 only which is earmarked as Paddy

Field as per RPG-2021, to Settlement zone by issuing

Notification under sub-section (2) of Section 17 of

the said Act;

Now, therefore, as directed by the Government

and in pursuance of sub-section (2) of Section 17 of

the Goa Town and Country Planning Act, 1974 (Act

21 of 1975), the following alteration/modification to

the RPG-2021 is hereby carried out, namely:-

In the RPG-2021, the zone of the plot of land

admeasuring an area of 253 m2, surveyed under

Survey No. 150, sub-division No. 15-I, of Village Raia,

Salcete Taluka, District South Goa, State of Goa

which is earmarked as Paddy Field as per RPG-2021

is hereby corrected as Settlement Zone.

Vertika Dagur, Chief Town Planner (Land Use)/

(Administration/Planning).

Panaji, 23rd August, 2023.

546

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 21

24TH AUGUST, 2023

Notification

No. 36/18/71/Assagao/146/6/TCP/2023/234

Whereas, the Department is in receipt of an

application dated 03-05-2023 (hereinafter referred

to as the “said Application”) under sub-section (2)

of Section 17 of the Goa Town and Country Planning

Act, 1974 (Act 21 of 1975) (hereinafter referred to as

the “said Act”) for correction of inconsistent/

/incoherent zoning provisions in the Regional Plan

for Goa-2021 (RPG-2021) in respect of plot of land

admeasuring an area of 900 m2, surveyed under

Survey No. 146, sub-division No. 6 of Village Assagao,

Bardez Taluka, District North Goa, State of Goa

(hereinafter referred to as the “said plot of land”);

And whereas, the correction/rectification as

requested by the applicant has been scrutinized

and a Report of the Department alongwith the

report from a registered professional was submitted

to the Government for decision (hereinafter referred

to as the “said Reports”);

And whereas, the Government has considered

the said Reports and it is of the opinion that

alteration/modification is necessary to be carried

out to the RPG-2021 for the purpose of rectifying

inadvertent/inconsistent/incoherent error zoning

that has occurred in the RPG-2021 and it has

directed the Chief Town Planner (Planning) to carry

out alteration/modification to the RPG-2021 for the

purpose of correcting/rectifying the zone of plot of

land surveyed under Survey No. 146, sub-division

No. 6 of Village Assagao, Bardez Taluka admeasuring

an area of 900 m2 only which is earmarked as Natural

Cover as per RPG-2021, to Settlement zone by

issuing Notification under sub-section (2) of Section

17 of the said Act;

Now, therefore, as directed by the Government

and in pursuance of sub-section (2) of Section 17 of

the Goa Town and Country Planning Act, 1974 (Act

21 of 1975), the following alteration/modification to

the RPG-2021 is hereby carried out, namely:-

In the RPG-2021, the zone of part of the plot of

land admeasuring an area of 900 m2, surveyed

under Survey No. 146, sub-division No. 6, of Village

Assagao, Bardez Taluka, District North Goa, State of

Goa which is earmarked as Natural Cover as per

RPG-2021 is hereby corrected as Settlement zone.

Vertika Dagur, Chief Town Planner (Land Use)/

(Administration/Planning).

Panaji, 23rd August, 2023.

——————

Department of Transport

Directorate of Transport

–––

Order

No. D.Tpt/EST/244/Addl.D.T./Part File-I/2023/2301

On the recommendation of the Goa Public Service

Commission, Panaji conveyed vide their letter No.

COM/II/11/49(1)/2006/232 dated 10-08-2023, the

Government is pleased to promote Shri Sandeep

B. Dessai, Assistant Director of Transport to the post

of Additional Director of Transport (Group ‘A’

Gazetted) in the Pay Matrix Level 10 of the 7th Pay

Commission on regular basis with immediate effect

and post him as Additional Director of Transport,

South, Margao-Goa.

The said Officer shall be on probation for a period

of two years.

Consequently, the Assistant Director of Transport,

Dharbandora (1st Link Officer) as per Order No.

D.Tpt/EST/2645/2019/3198 dated 13-09-2019, shall

hold ‘additional charge’ as Assistant Director of

Transport, Ponda in addition to his duties until

further orders.

By order and in the name of the Governor of

Goa.

Rajan Satardekar, Director and ex officio Addl.

Secretary (Transport).

Panaji, 18th August, 2023.

www.goaprintingpress.gov.in

Published and Printed by the Director, Printing & Stationery,

Government Printing Press,

Mahatma Gandhi Road, Panaji-Goa 403 001.

PRICE–Rs. 50.00

PRINTED AT THE GOVERNMENT PRINTING PRESS, PANAJI-GOA—188/80—08/2023.