SERIES II No. 41
PUBLISHED BY AUTHORITY
RNI No. GOAENG/2002/6410
Reg. No. RNP/GOA/32/2024-2026
Panaji, 11th January, 2024 (Pausa 21, 1945)
GOVERNMENT OF GOA
Department of Co-operation
Office of the Asstt. Registrar of Co-operative Societies
–––
No. ARCS/CZ/HSG/147/ADM/50/2471
Read: 1. Letter dated 23-11-2023 from the Members
of Satchitanad Co-operative Housing
Society Ltd., Mardol-Goa.
2. Letter dated 14-12-2022 from Ex-Secretary
of Satchitanad Co-operative Housing
Society Ltd., Mardol-Goa.
3. Letter dated 7-02-2000 from the Chairman
of Satchitanand Co-operative Housing
Society Ltd., Mardol-Goa.
4. Certificate of Registration bearing
registration No. ARCS/CZ/HSG (b)-147/
/ADM/90 dated 17-01-1991.
Whereas, vide letter dated 23-11-2023 referred
at Sr. No. 1 above, the members of Satchitanand
Co-operative Housing Society Ltd., Mardol-Goa, has
submitted the resolution of the Special General
Body meeting held on 5-11-2023 resolving therein
to de-register Satchitanad Co-operative Housing
Society Ltd., Mardol-Goa.
And whereas, vide letter dated 14-12-2022
referred at Sr. No. 2 received from the ex-secretary,
Note:- There is one Extraordinary issue to the Official
Gazette, Series II No. 40 dated 04-1-2024 namely,
Extraordinary dated 08-01-2024 from pages 995
to 1000 regarding Orders and Notifications from
Goa State Election Commission.
it has informed that the society was registered in
the year 1991 to avail the plot under Co-op. Housing
Society and since the said plot was sold to the other
party, they were unable to avail the facility of plot
under the said society and as per their decision they
have decided to close the said society under
intimation to the Asstt. Registrar, Panaji in the year
1991.
And whereas, vide letter dated 7-02-2000 referred
at Sr. No. 3, the Chairman of the society has informed
that, they have not purchased any plot nor they
have constructed any houses for their society
members. They have also not audited account of the
society as there is no any transactions in their
account.
I am therefore inclined to pass the following order.
ORDER
In exercise of the powers vested in me under
Section 19 of the Goa Co-operative Societies Act,
2001, I, Shri Pankaj V. Marathe, Asstt. Registrar of
Co-operative Societies, Ponda Zone, Ponda-Goa is
satisfied that the purpose for which society was
registered was not served and also no useful purpose
will be served by merely continuing the existence of
Satchitanad Co-operative Housing Society Ltd.,
Mardol-Goa and hence the registration of the society
stands cancelled with immediate effect.
Given under my hand and seal of this office on
this day of
Pankaj V. Marathe, Asstt. Registrar of Co-op.
Societies, Ponda Zone.
Ponda, 13th December, 2023.
1001
Suggestions are welcomed on e-mail: [email protected]
1002
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, “Omkar Residency Row Houses Co-operative
Housing Maintenance Society Ltd., Omkar
Residency Pontemol”-Goa is registered under code
symbol No. RCSQZ2023240015.
Santosh P. Naik, Asst. Registrar (Co-operative
Societies), Quepem Zone.
Quepem, 30th October, 2023.
Certificate of Registration
“Omkar Residency Row Houses Co-operative
Housing Maintenance Society, Ltd., Omkar
Residency Pontemol”-Goa has been registered on
30-10-2023 and its bears registration code symbol
No. RCSQZ2023240015 and its classified as
“Co-operative Housing Society” under sub-
-classification “No. 7-(d)-Co-operative Housing
Maintenance Society” in terms of Rule 8 of the Goa
Co-operative Societies Rules, 2003.
Santosh P. Naik, Asst. Registrar (Co-operative
Societies), Quepem Zone.
Quepem, 30th October, 2023.
————
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, “The Profit Centre Co-op. Housing
Maintenance Society Ltd.”, Opp. Kadamba Bus
Stand, Margao-Goa is registered under code symbol
No. RCSSZ2022230020.
Sonu R. Gaunekar, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 22nd April, 2022.
Certificate of Registration
“The Profit Centre Co-op. Housing Maintenance
Society, Ltd.”, Opp. Kadamba Bus Stand, Margao-
-Goa, has been registered on 22-04-2022 and its
bears registration code symbol No. RCSSZ2022230020
and its classified as “Co-operative Housing Society”
under sub-classification No. 7-(d)-”Co-operative
Housing Maintenance Society” in terms of Rule 8 of
the Goa Co-operative Rules, 2003.
Sonu R. Gaunekar, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 22nd April, 2022.
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, “The Dipraj Residency Co-operative Housing
Maintenance Society Ltd.”, Curtorim Road, Raia,
Salcete-Goa is registered under code symbol No.
RCSSZ2022230021.
Sonu R. Gaunekar, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 28th April, 2022.
Certificate of Registration
“The Dipraj Residency Co-operative Housing
Maintenance Society Ltd.”, Curtorim Road, Raia,
Salcete Goa-Goa has been registered on 28-04-2022
and its bears registration code symbol No.
RCSSZ2022230021 and its classified as “Co-operative
Housing Society” under sub-classification No. 7-(d)-
-Co-operative Housing Maintenance Society in
terms of Rule 8 of the Goa Co-operative Rules, 2003.
Sonu R. Gaunekar, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 28th April, 2022.
————
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, The Sumit Bells-II Co-operative Housing
Society Limited, Near Nuvem Chapel, Nuvem,
Salcete, is registered under code symbol No.
RCSSZ2022230022.
Sonu R. Gaunekar, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 2nd May, 2022.
Certificate of Registration
“The Sumit Bells-II Co-operative Housing Society
Limited”, Near Nuvem Chapel, Nuvem, Salcete-
-Goa has been registered on 02-05-2022 and its
bears
registration
code
symbol
No.
RCSSZ2022230022
and
its
classified
as
“Co-operative Housing Society under sub-
-classification No. 7-(b)-Co-partnership Housing
Society in terms of Rule 8 of the Goa Co-operative
Rules, 2003.
Sonu R. Gaunekar, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 2nd May, 2022.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
1003
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, “The Diva Co-operative Housing Maintenance
Society Limited”, Near Westside, Gogol, Margao, is
registered under code symbol No. RCSSZ2022230023.
Sonu R. Gaunekar, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 05th May, 2022.
Certificate of Registration
“The Diva Co-operative Housing Maintenance
Society Limited”, Near Westside, Gogol, Margao-
-Goa has been registered on 05-05-2022 and its
bears registration code symbol No. RCSSZ2022230023
and its classified as “Co-operative Housing Society
under sub-classification No. 7-(d)-Co-operative
Housing Maintenance Society in terms of Rule 8 of
the Goa Co-operative Rules, 2003.
Sonu R. Gaunekar, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 05th May, 2022.
————
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, “The Royal Symphony Co-operative Housing
Maintenance Society Ltd.”, Beloy, Rumbre Nuvem,
Salcete-Goa is registered under code symbol No.
RCSSZ2022230024.
Sonu R. Gaunekar, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 12th May, 2022.
Certificate of Registration
“The Royal Symphony Co-operative Housing
Maintenance Society Ltd.”, Beloy, Rumbre Nuvem,
Salcete-Goa has been registered on 12-05-2022 and
its bears registration code symbol No. RCSSZ2022230024
and its classified as “Co-operative Housing Society”
under sub-classification No. 7-(d)-Co-operative
Housing Maintenance Society in terms of Rule 8 of
the Goa Co-operative Rules, 2003.
Sonu R. Gaunekar, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 12th May, 2022.
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, “The Essen Tulip Co-operative Housing
Maintenance Society Ltd.”, Opp. KTC Bus Stand,
Mundvel, Vasco-da-Gama, Goa is registered under
code symbol No. RCSSZ2022230025.
Sonu R. Gaunekar, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 12th May, 2022.
Certificate of Registration
“The Essen Tulip Co-operative Housing
Maintenance Society Ltd.”, Opposite KTC Bus Stand,
Mundvel, Vasco-da-Gama, Goa has been registered
on 12-05-2022 and its bears registration code symbol
No. RCSSZ2022230025 and its classified as
“Co-operative Housing Society” under sub-
-classification No. 7-(d)-Co-operative Housing
Society in terms of Rule 8 of the Goa Co-operative
Rules, 2003.
Sonu R. Gaunekar, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 12th May, 2022.
————
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, The Anvi Residency Co-operative Housing
Society Ltd., Ambaji, Chandrawado, Fatorda,
Margao-Goa is registered under code symbol No.
RCSSZ2021220009.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 25th November, 2021.
Certificate of Registration
“The Anvi Residency Co-operative Housing
Society Ltd.”, Ambaji, Chandrawado, Fatorda,
Margao Goa-Goa has been registered on
25-11-2021 and its bears registration code symbol
No. RCSSZ2021220009 and its classified as
“Co-operative Housing Society” under sub-
-classification No. 7-(b)-Co-partnership Housing
Society in terms of Rule 8 of the Goa Co-operative
Rules, 2003.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 25th November, 2021.
1004
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, “The Maravilhas Block “B” Co-operative
Housing Society Ltd.”, Opp. St. Joaquim Church,
Borda, Margao-Goa is registered under code symbol
No. RCSSZ2021220010.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 13th December, 2021.
Certificate of Registration
“The Maravilhas Block “B” Co-operative Housing
Maintenance Society Ltd.”, Opp. St. Joaquim
Church, Borda, Margao-Goa has been registered on
13-12-2021 and its bears registration code symbol
No. RCSSZ2021220010 and its classified as
“Co-operative Housing Society under sub-
-classification No. 7-(d)-Co-operative Housing
Maintenance Society in terms of Rule 8 of the Goa
Co-operative Rules, 2003.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 13th December, 2021.
—–––––—
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, The Prime Majestic Co-operative Housing
Society Ltd., Opposite Cosal Building, Merces,
Vaddem, Vasco-da-Gama, Goa is registered under
code symbol No. RCSSZ2021-220011.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 31st January, 2022.
Certificate of Registration
“The Prime Majestic Co-operative Housing
Society Ltd.”, Opposite Cosal Building, Merces,
Vaddem, Vasco-da-Gama, Goa has been registered
on 31-01-2022 and its bears registration code symbol
No. RCSSZ2021-220011 and its classified as
“Co-operative Housing Society under sub-
-classification No. 7-(b)-Co-partnership Housing
Society in terms of Rule 8 of the Goa Co-operative
Rules, 2003.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 31st January, 2022.
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, Aman’s R. K. Towers Co-operative Housing
Maintenance Society Ltd., Near Pednekar Society,
Baina, Vasco-da-Gama, Goa is registered under code
symbol No. RCSSZ2021-220012.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 31st January, 2022.
Certificate of Registration
“Aman’s R. K. Towers Co-operative Housing
Maintenance Society Ltd.”, Near Pednekar Society,
Baina, Vasco-da-Gama, Goa has been registered on
31-01-2022 and its bears registration code symbol
No. RCSSZ2021-220012 and it is classified as
“Co-operative Housing Society” under sub-
-classification No. 7-(d)-Co-operative Housing
Maintenance Society in terms of Rule 8 of the Goa
Co-operative Rules, 2003.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 31st January, 2022.
—–––––—
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, “Arabian Sea Residency (Phase 1) Co-operative
Housing Society Ltd.”, Sasmollem, Baina, Vasco-da-
-Gama, Goa is registered under code symbol No.
RCSSZ2021-220013.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 31st January, 2022.
Certificate of Registration
“Arabian Sea Residency (Phase 1) Co-operative
Housing Society Ltd.”, Sasmollem, Baina, Vasco-da-
-Gama, Goa has been registered on 31-01-2022 and
its
bears
registration
code
symbol
No. RCSSZ2021-220013 and it is classified as
“Co-operative Housing Society under sub-
classification No. 7-(b)-Co-partnership Housing
Society in terms of Rule 8 of the Goa Co-operative
Rules, 2003.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 31st January, 2022.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
1005
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, The Palm View Residency Co-operative
Housing Maintenance Society Ltd., Chandrawado,
Fatorda, Margao-Goa is registered under code
symbol No. RCSSZ2021-220014.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 02nd February, 2022.
Certificate of Registration
“The Palm View Residency Co-operative Housing
Maintenance Society Ltd.”, Chandrawado, Fatorda,
Margao-Goa has been registered on 02-02-2022 and
its bears registration code symbol No. RCSSZ2021-
-220014 and it is classified as “Co-operative Housing
Society” under sub-classification No. 7-(d)-
-Co-operative Housing Maintenance Society in
terms of Rule 8 of the Goa Co-operative Rules, 2003.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 02nd February, 2022.
—–––––—
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, “The Vikramaditya Apartments Co-operative
Housing Maintenance Society Ltd.”, Agalli, Fatorda,
Margao-Goa is registered under code symbol No.
RCSSZ2021-220015.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 28th February, 2022.
Certificate of Registration
“The Vikramaditya Apartments Co-operative
Housing Maintenance Society Ltd.”, Agalli, Fatorda,
Margao Goa-Goa has been registered on 28-02-2022
and its bears registration code symbol
No. RCSSZ2021-220015 and its classified as
“Co-operative Housing Society under sub-
-classification No. 7-(d)-Co-operative Housing
Maintenance Society in terms of Rule 8 of the Goa
Co-operative Rules, 2003.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 28th February, 2022.
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, The Pantagon Towers Co-operative Housing
Maintenance Society Ltd., Opposite Classic
Hospital, Malbhat, Margao-Goa is registered under
code symbol No. RCSSZ2021-220017.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 28th February, 2022.
Certificate of Registration
“The Pantagon Towers Co-operative Housing
Maintenance Society Ltd.”, Opposite Classic
Hospital, Malbhat, Margao Goa-Goa has been
registered on 28-02-2022 and its bears registration
code symbol No. RCSSZ2021-220017 and its
classified as “Co-operative Housing Society under
sub-classification No. 7-(d)-Co-operative Housing
Maintenance Society in terms of Rule 8 of the Goa
Co-operative Rules, 2003.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 28th February, 2022.
—–––––—
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, The Royal Arcade Co-operative Housing
Maintenance Society Ltd., Murda O Grande,
Nuvem, Salcete-Goa is registered under code symbol
No. RCSSZ2021-220016.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 28th February, 2022.
Certificate of Registration
“The Royal Arcade Co-operative Housing
Maintenance Society Ltd.”, Murda O Grande,
Nuvem, Salcete Goa-Goa has been registered on
28-02-2022 and its bears registration code symbol
No. RCSSZ2021-220016 and its classified as
“Co-operative Housing Society under sub-
-classification No. 7-(d)-Co-operative Housing
Maintenance Society in terms of Rule 8 of the Goa
Co-operative Rules, 2003.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 28th February, 2022.
1006
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, The Neelkant Enclave Co-operative Housing
Maintenance Society Ltd., Cupangale, Gogol,
Margao-Goa is registered under code symbol No.
RCSSZ2021-220018.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 28th February, 2022.
Certificate of Registration
“The Neelkant Enclave Co-operative Housing
Maintenance Society Ltd.”, Cupangale, Gogol,
Margao Goa-Goa has been registered on 28-02-2022
and its bears registration code symbol No.
RCSSZ2021-220018 and
its classified as
“Co-operative Housing Society under sub-
-classification No. 7-(d)-Co-operative Housing
Maintenance Society in terms of Rule 8 of the Goa
Co-operative Rules, 2003.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 28th February, 2022.
—–––––—
Notification
In exercise of the powers vested in me under
Section 8 of the Goa Co-operative Societies Act,
2001, “The Vina Classic Co-operative Housing
Maintenance Society Ltd., Comba, Paricotto,
Cuncolim, Salcete-Goa is registered under code
symbol No. RCSSZ2021-220019.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 17th March, 2022.
Certificate of Registration
“The Vina Classic Co-operative Housing
Maintenance Society Ltd.”, Comba, Paricotto,
Cuncolim, Salcete-Goa has been registered on
17-03-2022 and its bears registration code symbol
No. RCSSZ2021-220019 and its classified as
“Co-operative Housing Society under sub-
-classification No. 7-(d)-Co-operative Housing
Maintenance Society in terms of Rule 8 of the Goa
Co-operative Rules, 2003.
Suraj S. Ghaisas, Asst. Registrar (Co-operative
Societies), South Zone.
Margao, 17th March, 2022.
Department of Education
Directorate of Higher Education
–––
Order
No. ACAD III/GC/Tranfer & Posting/55/2019/11168
Read: DHE/Admn/149/ChargeADD-WA/2022/19413
dated 04-10-2022.
Government is pleased to transfer the following
official under the Directorate of Higher Education
with immediate effect in public interest.
Sr.
Name
Posted
No.
& Designation
as
1.
Dr. Keshav Dhuri, College
Goa College of
Librarian, Sant Sohirobanath
Home Science,
Ambiye Government College
Campal,
of Arts and Commerce,
Panaji-Goa.
Pernem-Goa
Dr. Keshav Dhuri to continue to hold charge as
Assistant Director (Development) of Higher
Education on working arrangement basis as a
temporary measure until further orders.
He shall draw his salary against the post created
vide Order No. 1/5/2017-DHE/1024 dated 07-06-2018.
By order and in the name of the Governor of
Goa.
Ms. Sanjana Dipak Bandekar, Under Secretary
(Higher Education).
Porvorim, 02nd January, 2024.
—–––––—
Order
No. ACAD III/GC/FILLING-ASST.PROF./115/2018/Part III/
/11379
Read: Memorandum No. ACAD III/GC/FILLING-
-ASST. PROF./115/2018/PartIII/7895 dated
06-09-2023.
On the recommendation of the Goa Public Service
Commission as conveyed vide their letter No. COM/
/I/5/53(1)/2021/196 dated 17-07-2023, Government
is pleased to appoint Harsha Suhas Naik to the post
of Librarian (Group “A” Gazetted) at the Sant
Sohirobanath Ambiye Government College of Arts
& Commerce, Virnoda, Pernem-Goa under
Directorate of Higher Education on temporary basis
in the UGC Pay Scale Matrix Level 10 with
immediate effect, and as per the terms and
conditions contained in the Memorandum cited
above. She shall be on probation for a period of two
years.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
1007
Harsha Suhas Naik has been declared medically
fit by the Medical Board. The appointment has been
made subject to verification of her character and
antecedents. In the event of any adverse remarks
noticed by the Government on verification of her
character and antecedents, her services shall be
terminated.
She shall draw her salary against the newly
created post vide Order No. 1/5/2017-DHE/1024
dated 07-06-2018.
By order and in the name of the Governor of
Goa.
Sanjana Dipak Bandekar, Under Secretary (Higher
Education).
Porvorim, 08th January, 2024.
——————
Department of Labour
––
Notification
No. 28/02/2023-LAB/Part-I/03
The following Award passed by the Industrial
Tribunal and Labour Court, at Panaji-Goa on
12-12-2023 in Appln. No. 5/2021 is hereby published
as required under Section 17 of the Industrial
Disputes Act, 1947 (Central Act 14 of 1947).
By order and in the name of the Governor of
Goa.
Asha Harmalkar, Under Secretary (Labour).
Porvorim, 2nd January, 2024.
––––
IN THE INDUSTRIAL TRIBUNAL
AND LABOUR COURT
GOVERNMENT OF GOA
AT PANAJI
(Before Mr. Anil Scaria, Hon’ble Presiding Officer)
No. Appln. 05/2021
Shri Amol Matal,
House No. EE-99,
Mapusa Housing Board,
Ekta Nagar, Nr. Saibaba Temple,
Mapusa, Bardez-Goa.
…… Applicant/Party I
V/s
M/s. Enigma Tech. UK Limited,
3rd floor, Shanta Bldg.,
18th June Road, St. Inez,
Panaji-Goa.
…… Opponent/Party II
Applicant/Party I represented by Learned Advocate
Shri A. Kundaikar.
Opponent/Party II represented by Learned Advocate
Shri P. Agrawal.
AWARD
(Delivered on this the 12th day of the month of
December of the year 2023)
This is an application under Section 2A(2) of the
Industrial Disputes Act, 1947. The opponent has filed
its reply. The Applicant has filed his rejoinder.
2. The Applicant’s case is that the Opponent
appointed the Applicant as a Customer Service
Representative by letter dated 24-05-2021. That the
Applicant was drawing a monthly salary of
Rs. 22,000/-. That the Applicant had a honest and
unblemished record. That the Applicant was
terminated with immediate effect by letter dated
25-08-2021. That the Applicant was terminated for
“ill reported” behavior with female employees
outside office premises. That no charge-sheet was
issued and no enquiry was held before the
Applicant was terminated from service.
3. That the Opponent has used a private
celebration in Calangute to get rid of the Applicant
from service. That the letter of termination casts a
stigma on the Applicant. That the Applicant is
unable to get employment. That the Applicant is
unemployed ever since his termination from service.
That the Applicant raised a dispute before the Asst.
Labour Commissioner, Panaji for conciliation on
15-09-2021.That this Application has been filed after
45 days from the date of application before the
Conciliation Officer (Asst. Labour Commissioner).
Therefore, it is prayed that the “retrenchment”
(Termination) dated 25-08-2021 be set aside and the
workman be reinstated with full back wages.
4. The case of the Opponent is that the Opponent
appointed the Applicant as a Customer Service
Representative by letter dated 24-05-2021. That, he
was appointed on probation for a period of 3 months.
That, during the probation period, an employee
made a Complaint against the Applicant. That the
Complaint was given by e-mail dated 24-08-2021.
That the Complaint stated that the Applicant has
misbehaved with 3 female employees on
21-08-2021. That the Opponent asked the Applicant
to give his explanation. That the Applicant admitted
the occurrence by e-mail dated 25-08-2021. That, on
the same day (25-08-2021), the Opponent refused to
confirm the Applicant and discontinued his service.
That the termination was communicated by way of
an e-mail dated 25-08-2021. That the Applicant filed
a Complaint in the Office of the Commissioner,
1008
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
Labour and Employment on 20-09-2021. That,
pending the discussions before the Asst. Labour
Commissioner, the Applicant filed the present
application before this Tribunal on 02-11-2022. That,
this Application, is therefore, not maintainable. That
the Applicant was a probationer and there was no
need to issue him a charge-sheet and conduct an
enquiry before removing him from service.
5. That the Applicant is gainfully employed. That
the Applicant is not a ‘workman’ and the Opponent
is not an ‘industry’. That, there is no ‘industrial
dispute’ between the Applicant and the Opponent.
Therefore, it is prayed that the application be
rejected.
6. In his Rejoinder to the Written Statement, the
Applicant has denied that he misbehaved with 3
female employees of the Opponent on 21-08-2021. It
is denied that the Applicant admitted the incident.
It is denied that the Applicant is gainfully
employed. That the Opponent is an ‘industry’ and
the Applicant is a ‘workman’. That the dispute
between the Applicant and the Opponent is an
‘industrial dispute’. That the present application is
made after the expiry of 45 days from the date of
application to the Labour Commissioner. That the
application is maintainable.
7. The following issues were framed by this
Tribunal and my findings thereon are as follows:
Issue No.
Issues
Findings
1
2
3
1.
Does the Opponent/Party II
In the
prove that termination of
affirmative.
services of the Applicant/
/Party I is legal?
2.
Does the Applicant/
In the
/Party I prove that the
affirmative.
application is maintainable?
3.
Whether the Applicant/Party I
In the
prove that he is entitled to
negative.
reinstatement with full
back wages
REASONS
8. Issue No. 1:- The case of the Opponent/Party
II is that the termination of the services of the
Applicant/Party I is legal for two reasons. Firstly, it
is contented that the Applicant/Party I was a
probationer and as such his services could be
terminated. Secondly, it is contended that the
Applicant had misbehaved with 3 female employees
of the Opponent/Party II. That the Applicant/Party
I had admitted his misbehavior. That it was therefore
legal to dismiss him.
9. Let us consider each one of these reasons
separately.
10. The first reason given by the Opponent/Party II
is that the Applicant/Party I was a probationer and
that the Opponent/Party II had a right to terminate
his services.
11. The termination from service was made by an
e-mail dated 25-08-2021 (Exh. 20 Colly). It is stated
therein that the Applicant/Party I was being
terminated because of “ill reported behavior” in
dealing with female employees outside office
premises.
12. No stigma should be cast on a probationer
while discontinuing his services. If a stigma is cast,
it should be proved by evidence. In this case, a
stigma has been cast on the Applicant/Party I.
Therefore, the Opponent/Party II did not have the
right to terminate the services of the Applicant/
/Party I without proving the allegations made
against him.
13. The second reason given for the termination
of the services of the Applicant/Party I is that he
misbehaved with three female employees of the
Opponent/Party II.
14. The Opponent/Party II did not conduct a
departmental enquiry before terminating the
services of the Applicant/Party I.
15. As departmental enquiry was not conducted,
the Opponent had filed an application to lead
evidence on this issue and prove the same. The Ld.
Advocate for the Applicant had given his “no
objection” to the Opponent’s application and the
same was granted.
16. The Opponent/Party II has examined 2
witnesses. Atul Tanaji Utturkar is witness No. 1 for
the Opponent. He is the Director of the Opponent.
Ms. Shraddha Chawdekar is Witness No. 2 for the
Opponent. She was the Senior Manager-Human
Resources of the Opponent.
17. The Applicant has not adduced any evidence.
18. Atul Tanaji Utturkar (Witness No. 1 for the
Opponent) deposes that the Opponent had received
e-mail Complaint dated 24-08-2021 from an
employee stating that the Applicant had
misbehaved with 3 female employees on 21-08-2021.
He deposes that the Applicant was asked to give
his explanation. He deposes that the Applicant had
admitted the incident. He deposes that by e-mail
dated 25-08-2021, the Opponent terminated the
services of the Applicant for disorderly behavior.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
1009
19. In cross-examination Shri Atul Tanaji Utturkar
(Witness No. 1 for the Opponent) deposes that the
incident had happened before he became the
Director of the Opponent and that he does not have
any personal knowledge of the same.
20. Ms. Shraddha Chawdekar (Witness No. 2 for
the Opponent) deposes that she received a
complaint by way of e-mail dated 24-08-2021 stating
that the Applicant had misbehaved with 3 female
employees of the Opponent on 21-08-2021. She
deposes that the Opponent had asked the Applicant
to give his explanation. She deposes that the
Applicant replied by e-mail dated 25-08-2021 and
admitted the occurrence of the incident. She
deposes that the Applicant was terminated by
e-mail dated 25-08-2021.
21. There were 3 ladies with whom the Applicant
had allegedly misbehaved. They were Nikhat,
Cidelle and Valerie. Ms. Shraddha Chawdekar
(Witness No. 2 for the Opponent) deposes in cross-
-examination that the Applicant and Cidelle were
working for the Opponent. She deposes that the
Applicant and Cidelle were allotted by the
Opponent to do the work of their Client, Symbio
Energy. She deposes that Nikhat and Valerie were
working for the Clients of the Opponent.
22. Cidelle D’Mello had sent an email complaint
dated 24-08-2021 (Exh. 24) to Shraddha (Witness No. 2
for the Opponent). It is stated therein that a few
colleagues had organized an overnight get-together
on 21-08-2021. It is stated therein that the Applicant
crossed the limits and touched the upper belly of
Cidelle near the bra line. It is also stated that the
Applicant told Nikhat that “don’t mind, but I really
like your jaw line. It is sexy’’. It is stated that he
pulled her hand and grabbed her waist. It is also
stated therein that when Valarie was sleeping, the
Applicant pulled up her top and touched her upper
belly near her bra line.
23. Exhibit 19 is explanation dated 25-08-2021
given by the Applicant. In the said explanation he
admits having put his hand around the shoulder of
Nikhat on the relevant night.
24. The Learned Advocate for the Applicant,
Shri Anand Kundaikar states that the incident took
place outside the premises of the Opponent and
was a private affair. Therefore, it is argued that
action could not have been taken against the
Applicant.
25. What happens outside the office has an
impact on the healthy relationship between workers
in the office and it spoils the atmosphere in the
office. Hence, there is no merit in this argument.
26. Learned Advocate, Shri Anand Kundaikar
argues that two of the ladies involved were not
working for the Opponent. That they were working
for the Opponent’s client.
27. Misbehaving with a staff of the Opponent
clients will spoil the business of the Opponent and
cannot be tolerated.
28. Learned Advocate Shri Anand Kundaikar
argues that the ladies involved in the incident were
not examined as witnesses.
29. In an industrial dispute direct evidence is not
always necessary. Hear-say evidence is admissable.
30. There is sufficient evidence to show that the
Applicant has misbehaved with women who are
either working for the Opponent or the Opponent’
clients. It is also found that the Applicant has not
adduced any evidence. Therefore the Opponent/
/Party II has proved that the termination of the
services of the Applicant/Party I is legal. Hence, I
hold issue No. 1 in the affirmative.
31. Issue No. 2: The case of the Applicant/Party I
is that the application is maintainable.
32. The Applicant’s case is that he raised a
dispute with the Assistant Labour Commissioner at
Panaji for conciliation on 15-09-2021. That this
application was filed on 02-11-2021, i. e. after 45
days from the date of application for conciliation.
That, it is maintainable under Section 2-A of the
Industrial Disputes Act, 1947.
33. The Opponent states that the dispute was
raised for conciliation on 20-09-2021 and that this
application was filed before this Tribunal before the
expiry of 45 days from the date of raising the dispute.
Therefore, the application before this Tribunal is
not maintainable.
34. The Opponent has produced the application
for conciliation (Exhibit 21 Colly). It shows that it
was registered on 20-09-2021.
35. The Applicant has produced a copy of his
application for conciliation. There is an
endorsement on it showing that it was received on
15-09-2021. This application has not been tendered
in evidence.
36. Nevertheless, Ms. Shraddha Chawdekar
(Witness No. 2 for the Opponent) has stated in her
cross-examination, that the application for
conciliation proceeding was filed on 15-09-2023 and
not 20-09-2023. In view of this admission, it should
be held that the said application was filed on
15-09-2021 and the application under Section 2-A
was filed before this Tribunal after 45 days of filing
1010
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
of the application for conciliation. Therefore, the
Applicant has proved that the application under
Section 2-A of the Industrial Disputes Act, 1947 is
maintainable. Hence, I hold issue No. 2 in the
affirmative.
37. Issue No. 3:- The case of the Applicant/Party I
is that he is entitled to reinstatement with full back
wages.
38. The Opponent has proved that the Applicant
has misbehaved with a lady working for the
Opponent and two other ladies working for the
clients of the Opponent. Consequently, the
Opponent has proved that the dismissed of the
Applicant is legal and justified. Therefore, the
Applicant/Party I has failed to prove that he is
entitled to reinstatement with full back wages.
Hence, I hold issue No. 3 in the negative.
39. The Learned Advocate for the Applicant has
relied on Deepali G. Surwase V/s Kranti JR. A. M.
(D.Ed.) and Others (2014 II CLR 813) to show that
once the workman pleads that he was unemployed
from the date of termination of service, the onus
shifts onto the Employer to show that he was
employed. The Ld. Advocate for the Applicant
argues that the Employer (Opponent) has not
discharged the onus of proof cast on him.
40. It is found that the Applicant was lawfully
dismissed. It does not matter if he was employed or
unemployed thereafter.
41. Before concluding, it is necessary to state
that this Tribunal is not bound by strict rules of
pleading and evidence. Therefore, minor disparities
in pleadings and evidence are ignored.
Hence, I pass the following:-
ORDER
(i)
The Application is dismissed.
(ii)
No orders as to cost.
(iii)
Inform the Government accordingly.
Sd/-
(Anil Scaria)
Presiding Officer,
Industrial Tribunal and
Labour Court.
Department of Law & Judiciary
Law (Establishment) Division
–––
Order
No. 2-6-2020-LD(Estt.)/32
The notice of voluntary retirement tendered by
Smt. Maria Aquila Filomena Araujo, Civil Registrar-
-cum-Sub Registrar, vide her letter dated 31-10-2023
is hereby accepted by the Appointing Authority
with effect from 31-01-2024 (a.n.) in terms of Rule 43
of Central Civil Service (Pension) Rules, 2021 and
regulated in terms of Rule 44 of Central Civil Service
(Pension) Rules, 2021.
Smt. Maria Aquila Filomena Araujo, Civil
Registrar-cum-Sub Registrar shall stand relieved
from Government service with effect from
31-01-2024 (a.n.).
Outstanding dues (if any) shall be adjusted/
/recovered from her gratuity.
By order and in the name of the Governor of
Goa.
Amir Y. Parab, Under Secretary (Law-Estt.).
Porvorim, 03rd January, 2024.
————
Order
No. LS/1077/93-Part II/24
Government of Goa is pleased to accept the
resignation tendered by Adv. Ravindra Ashok
Lokhande, as Standing Counsel, before the Hon’ble
Supreme Court of India, New Delhi, National Green
Tribunal, New Delhi and all other Courts and
Tribunals in the matters for defending the interest
of Government of Goa with immediate effect.
Adv. Ravindra A. Lokhande shall return all the
briefs pending with him if any, to the Resident
Commissioner, Goa Sadan, New Delhi under
intimation to this Department.
By order and in the name of the Governor of
Goa.
Amir Y. Parab, Under Secretary (Law-Estt.).
Porvorim, 02nd January, 2024.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
1011
Department of Legal Metrology
Office of the Secretary (Legal Metrology)
–––
Order
No. 20/S(LM)Petroleum Stakeholders Comm./Order/
/2024/36
In continuation of Order No. Secy (LM)/comm./
/2023/702/1723 dated 24-07-2023, the following
addition is hereby made to the Goa Petroleum
Stakeholders Committee:
President, Goa Petroleum
—
Member.
Dealers Association
Rest of the contents of the Order remains
unchanged.
Sanjit Rodrigues, IAS, Secretary (Legal
Metrology).
Porvorim, 4th January, 2024.
——————
Department of Official Language
Directorate of Official Language
–––
Notification
No. 5/12/2011/DOL/GKA/Gen-Coun/Part File/1154
Read:
No. 5/12/2011/DOL/GKA/Gen-Coun/1133
dated 15-01-2020.
The Government hereby accepts the resignation
tendered by Shri Arun Sakhardande, President of
Goa Konkani Akademi and stands relieved from this
post with immediate effect.
By order and in the name of the Governor of
Goa.
Raju V. Gawas, Director (Official Language) &
ex officio Joint Secretary.
Panaji, 3rd January, 2024.
——————
Department of Personnel
–––
Order
No. 13/27/2023-PER/5166
The Governor of Goa is pleased to grant extension
in service to Shri Datta G. Naik, Assistant Engineer,
Public Works Department, for a period of one year
w.e.f. 01-01-2024 to 31-12-2024, in public interest.
This order is subject to vigilance clearance from
Vigilance Department, concurrence of Finance
Department and approval of Council of Ministers.
The extension is further subject to termination
without assigning any reasons during the period of
extension.
By order and in the name of the Governor of
Goa.
Avit S. Naik, Under Secretary (Personnel-II).
Porvorim, 29th December, 2023.
————
Order
No. 13/26/2023-PER/5167
The Governor of Goa is pleased to grant extension
in service to Mrs. Jayanti M. Dhargalkar, Junior
Stenographer, Directorate of Mines & Geology
beyond the date of her superannuation for a period
of one year w.e.f. 01-01-2024 to 31-12-2024, in public
interest. This order is subject to vigilance clearance
from Vigilance Department, concurrence of Finance
Department and approval of Council of Ministers.
The extension is further subject to termination
without assigning any reasons during the period of
extension.
By order and in the name of the Governor of
Goa.
Avit S. Naik, Under Secretary (Personnel-II).
Porvorim, 29th December, 2023.
————
Order
No. 13/28/2023-PER/5168
The Governor of Goa is pleased to grant extension
in service to Shri Euclides F. E. de Souza, Executive
Engineer, Public Works Department, for a period of
one year w.e.f. 01-01-2024 to 31-12-2024, in public
interest. This order is subject to vigilance clearance
from Vigilance Department, concurrence of Finance
Department and approval of Council of Ministers.
The extension is further subject to termination
without assigning any reasons during the period of
extension.
By order and in the name of the Governor of
Goa.
Avit S. Naik, Under Secretary (Personnel-II).
Porvorim, 30th December, 2023.
1012
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
Order
No. 7/3/2022-PER/69
Read: Order No. 32012-4-2019-IFS-I(AGMUT) dated
05-01-2024.
The Governor of Goa is pleased to relieve Shri R.
K. Gupta, IFS, Principal Chief Conservator of Forests,
from the State Administration w.e.f. 05-01-2024
(a.n.), to join the post of Principal Chief Conservator
of Forests (HoFF), Arunachal Pradesh.
The charge of the post of Principal Chief
Conservator of Forests shall be held by Shri Umakant,
IFS, Additional Principal Chief Conservator of
Forests & Chief Wildlife Warden, until further
orders.
By order and in the name of the Governor of
Goa.
Eshant V. Sawant, Under Secretary (Personnel-I).
Porvorim, 05th January, 2024.
Order
No. 6/8/2022-PER/90
Read: 1)
Order No. 6/8/2022-PER/151 dated
17-01-2023.
2)
Order No. 6/8/2022-PER/170 dated
18-01-2023.
Shri Gourish Kurtikar, Director (Administration),
Water Resources Department, shall also function as
Special Officer (Mhadei Disputes) in addition his
own duties with immediate effect.
This issues on the recommendation of the Goa
Services Board.
By order and in the name of the Governor of
Goa.
Eshant V. Sawant, Under Secretary (Personnel-I).
Porvorim, 08th January, 2024.
————
————
Order
No. 5/12/2017-PER/95
Smt. Anita Bhosle, Under Secretary, Goa Human
Rights Commission shall hold the charge of Deputy
Director (Admn.), O/o. Principal Chief Conservator
of Forest in addition to her own duties with
immediate effect.
This issues on the recommendation of the Goa
Services Board.
By order and in the name of the Governor of
Goa.
Eshant V. Sawant, Under Secretary (Personnel-I).
Porvorim, 08th January, 2024.
Order
No. 15/2/2020-PER/96
On the recommendation of the Goa Services
Board, the Governor of Goa is pleased to transfer
and post Shri Rajaram Y. Parab in the Office of the
Hon’ble Chief Minister on working arrangement
with immediate effect.
Shri Abhijit G. Gaonkar, Joint Mamlatdar-I,
Bicholim shall hold the charge of Mamlatdar,
Bicholim in addition to his own duties until further
orders.
The officers shall complete handing over and
taking over process with immediate effect and
submit compliance.
By order and in the name of the Governor of
Goa.
Eshant V. Sawant, Under Secretary (Personnel-I).
Porvorim, 08th January, 2024.
————
Order
No. 3/23/93-PER(Part-I)/13
Read: Order (V) & (VII) No. 46011-1-2019-IFS-I(AGMUT)(Part-I) dated 04-12-2023.
The Governor of Goa is pleased to relieve the following officers from this Administration to join their new
assignment in pursuance to Ministry of Environment, Forest and Climate Change order read in the preamble.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
1013
Sr.
Name and
Designation
Transferred
Date of
No.
Batch of the Officer
to
relieving from Goa
(Shri/Smt./Ms.)
1.
Shri Saurabh Kumar, IFS
Chief Conservator of Forests,
Chandigarh
15-01-2024
(AGMUT:2003)
(Administration and Wildlife
& Eco-Tourism)
2.
Shri Jabestin A., IFS
Dy. Conservator of Forests
Delhi
31-01-2024
(AGMUT:2011)
(Headquarters)
By order and in the name of the Governor of Goa.
Eshant V. Sawant, Under Secretary (Personnel-I).
Porvorim, 2nd January, 2024.
————
Order
No. 15/22/96-PER/Part-II/98
Read: 1) Notification No. 15/22/96-PER/Part-I dated 04-10-1999 published in the Official Gazette,
Series I No. 30 dated 21-10-1999.
2)
Notification No. 15/22/96-PER/Part-I dated 27-07-2011 published in the Official Gazette,
Series I No. 21 dated 25-08-2011.
3)
Notification No. 1/25/87-PER (Pt.II) dated 06-02-2013 published in the Official Gazette,
Series I No. 46 dated 14-02-2013.
4)
Notification No. 15/22/96-PER/Part-II/2588 dated 14-10-2021 published in the Official
Gazette, Series I No. 31 dated 28-10-2021.
5)
Letter No. COM/I/5/42(1)/2022/1718 dated 12-12-2023 of the Secretary, Goa Public Service
Commission, Panaji-Goa.
The result of the Departmental Examination of the following Officers in the cadre of Block Development
Officers conducted by the Goa Public Service Commission in pursuance to the Notifications at Sr. Nos. (1),
(2), (3) & (4) read in preamble held from 16-10-2023 to 20-10-2023, is declared, as indicated against their
name:
Sr. No.
Name of the Officer
Results
Remarks
1.
Shri Suryajirao V. Rane
Fail
Failed in Paper IV, VIII & IX.
2.
Shri Anil L. Dhumaskar
Fail
Absent in Paper II, IV, V, VI, VII, VIII
& IX.
3.
Shri Gurudatta P. Naik
Pass
——
4.
Shri M. B. Parwar
Fail
Failed in Paper II, IV, V, VIII, IX & X.
This is issued based on the result of the above candidates communicated by the Goa Public Service
Commission vide letter read in the preamble at Sr. No. (5).
By order and in the name of the Governor of Goa.
Eshant V. Sawant, Under Secretary (Personnel-I).
Porvorim, 8th January, 2024.
————
Notification
No. 7/27/2022-PER/21
Read: 1. Notification No. 7/17/2022-PER/4036 dated 05-12-2022.
2. Notification No. 7/17/2022-PER/1100 dated 18-04-2023.
1014
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
3. Notification No. 7/17/2022-PER/3388 dated 14-08-2023.
4. Notification No. 7/17/2022-PER/3687 dated 15-09-2023.
5. Notification No. 7/17/2022-PER/3821 dated 05-10-2023.
6. Notification No. 7/17/2022-PER/3912 dated 13-10-2023.
7. Corrigendum No. 7/17/2022-PER/4027 dated 23-10-2023.
8. Notification No. 7/17/2022-PER/4953 dated 06-12-2023.
In partial modification to the Notifications read in preamble, the Governor of Goa is pleased to order
allocation of work/Departments to the following Secretary to the Government, with immediate erffect:-
Sr. No.
Name & Designation
Departments
1.
Shri Sanjeev Ahuja, IAS (2008)
1.
Resident Commissioner, Goa Sadan.
Resident Commissioner
2.
Information Technology.
3.
Tourism.
By order and in the name of the Governor of Goa.
Eshant V. Sawant, Under Secretary (Personnel-I).
Porvorim, 3rd January, 2024.
——————
Department of Town & Country Planning
–––
Notification
No. 36/18/185/17(2)/Ella/104/1-A/TCP/2023/563
Whereas, the Department is in receipt of an
application dated 17-08-2023 (hereinafter referred
to as the “said Application”) under sub-section (2)
of Section 17 of the Goa Town and Country Planning
Act, 1974 (Act 21 of 1975) (hereinafter referred to as
the “said Act”) for correction of inconsistent/
/incoherent zoning provisions in the Regional Plan
for Goa-2021 (RPG-2021) in respect of plot of land
admeasuring an area of 63993 m2, surveyed under
Survey No. 104, sub-division No. 1-A, of Village Ella,
Tiswadi Taluka, District North Goa, State of Goa
(hereinafter referred to as the “said plot of land”);
And whereas, the correction/rectification as
requested by the applicant has been scrutinized
and a Report of the Department alongwith the
report from a registered professional was submitted
to the Government for decision (hereinafter referred
to as the “said Reports”);
And whereas, the Government has considered
the said Reports and it is of the opinion that
alteration/modification is necessary to be carried
out to the RPG-2021 for the purpose of rectifying
inadvertent/inconsistent/incoherent error zoning
that has occurred in the RPG-2021 and it has
directed the Chief Town Planner (Planning) to carry
out alteration/modification to the RPG-2021 for the
purpose of correcting/rectifying the zone of part of
the plot of land surveyed under Survey No. 104,
sub-division No. 1-A, of Village Ella, Tiswadi Taluka
admeasuring an area of 57253 m2 only which is
earmarked as Orchard as per RPG-2021, to
Settlement Zone by issuing Notification under
sub-section (2) of Section 17 of the said Act;
Now, therefore, as directed by the Government
and in pursuance of sub-section (2) of Section 17 of
the Goa Town and Country Planning Act, 1974 (Act 21
of 1975), the following alteration/modification to the
RPG-2021 is hereby carried out, namely:-
In the RPG-2021, the zone of part of the plot of
land admeasuring an area of 57253 m2, surveyed
under Survey No. 104, sub-division No. 1-A, of
Village Ella, Tiswadi Taluka, District North Goa,
State of Goa which is earmarked as Orchard as per
RPG-2021 is hereby corrected as Settlement Zone.
Rajesh J. Naik, Chief Town Planner (Administration/
/Planning).
Panaji, 8th January, 2024.
————
Notification
No. 36/18/169/17(2)/Colvale/285/7/TCP/2023/564
Whereas, the Department is in receipt of an
application dated 17-07-2023 (hereinafter referred
to as the “said Application”) under sub-section (2)
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
1015
of Section 17 of the Goa Town and Country Planning
Act, 1974 (Act 21 of 1975) (hereinafter referred to as
the “said Act”) for correction of inconsistent/
/incoherent zoning provisions in the Regional Plan
for Goa-2021 (RPG-2021) in respect of plot of land
admeasuring an area of 11250 m2, surveyed under
Survey No. 285, sub-division No. 7, of Village
Colvale, Bardez Taluka, District North Goa, State of
Goa (hereinafter referred to as the “said plot of
land”);
And whereas, the correction/rectification as
requested by the applicant has been scrutinized
and a Report of the Department alongwith the
report from a registered professional was submitted
to the Government for decision (hereinafter referred
to as the “said Reports”);
And whereas, the Government has considered
the said Reports and it is of the opinion that
alteration/modification is necessary to be carried
out to the RPG-2021 for the purpose of rectifying
inadvertent/inconsistent/incoherent error zoning
that has occurred in the RPG-2021 and it has
directed the Chief Town Planner (Planning) to carry
out alteration/modification to the RPG-2021 for the
purpose of correcting/rectifying the Zone of part of
the plot of land surveyed under Survey No. 285,
sub-division No. 7, of Village Colvale, Bardez Taluka
admeasuring an area of 8870 m2, only which is
earmarked as Orchard as per RPG-2021, to
Settlement Zone by issuing Notification under
sub-section (2) of Section 17 of the said Act;
Now, therefore, as directed by the Government
and in pursuance of sub-section (2) of Section 17 of
the Goa Town and Country Planning Act, 1974 (Act 21
of 1975), the following alteration/modification to the
RPG-2021 is hereby carried out, namely:-
In the RPG-2021, the zone of part of the plot of
land admeasuring an area of 8870 m2, surveyed
under Survey No. 285, sub-division No. 7, of Village
Colvale, Bardez Taluka, District North Goa, State of
Goa which is earmarked as Orchard as per
RPG-2021 is hereby corrected as Settlement Zone.
Rajesh J. Naik, Chief Town Planner (Administration/
/Planning).
Panaji, 9th January, 2024.
————
Notification
No. 36/18/144/17(2)/Raia/360/1/TCP/2023/567
Whereas, the Department is in receipt of an
application dated 02-05-2023 (hereinafter referred
to as the “said Application”) under sub-section (2)
of Section 17 of the Goa Town and Country Planning
Act, 1974 (Act 21 of 1975) (hereinafter referred to as
the “said Act”) for correction of inconsistent/
/incoherent zoning provisions in the Regional Plan
for Goa-2021 (RPG-2021) in respect of plot of land
admeasuring an area of 130575 m2, surveyed under
Survey No. 360, sub-division No. 1, of Village Raia,
Salcete Taluka, District South Goa, State of Goa
(hereinafter referred to as the “said plot of land”);
And whereas, the correction/rectification as
requested by the applicant has been scrutinized
and a Report of the Department alongwith the
report from a registered professional was submitted
to the Government for decision (hereinafter referred
to as the “said Reports”);
And whereas, the Government has considered
the said Reports and it is of the opinion that
alteration/modification is necessary to be carried
out to the RPG-2021 for the purpose of rectifying
inadvertent/inconsistent/incoherent error zoning
that has occurred in the RPG-2021 and it has
directed the Chief Town Planner (Planning) to carry
out alteration/modification to the RPG-2021 for the
purpose of correcting/rectifying the zone of part of
the plot of land surveyed under Survey No. 360,
sub-division No. 1, of Village Raia, Salcete Taluka
admeasuring an area of 22800 m2 only which is
earmarked as Orchard as per RPG-2021, to
Institutional Zone by issuing Notification under
sub-section (2) of Section 17 of the said Act;
Now, therefore, as directed by the Government
and in pursuance of sub-section (2) of Section 17 of
the Goa Town and Country Planning Act, 1974 (Act 21
of 1975), the following alteration/modification to the
RPG-2021 is hereby carried out, namely:-
In the RPG-2021, the zone of part of the plot of
land admeasuring an area of 22800 m2, surveyed
under Survey No. 360, sub-division No. 1, of Village
Raia, Salcete Taluka, District South Goa, State of
Goa which is earmarked as Orchard as per
RPG-2021 is hereby corrected as Institutional Zone.
Rajesh J. Naik, Chief Town Planner (Administration/
/Planning).
Panaji, 9th January, 2024.
————
Notification
No. 36/18/208/17(2)/Nuvem/253/4/TCP/2023/568
Whereas, the Department is in receipt of an
application dated 29-08-2023 (hereinafter referred
to as the “said Application”) under sub-section (2)
of Section 17 of the Goa Town and Country Planning
Act, 1974 (Act 21 of 1975) (hereinafter referred to as
the “said Act”) for correction of inconsistent/
/incoherent zoning provisions in the Regional Plan
1016
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
for Goa-2021 (RPG-2021) in respect of plot of land
admeasuring an area of 22163 m2, surveyed under
Survey No. 253, sub-division No. 4, of Village Nuvem,
Salcete Taluka, District South Goa, State of Goa
(hereinafter referred to as the “said plot of land”);
And whereas, the correction/rectification as
requested by the applicant has been scrutinized
and a Report of the Department alongwith the
report from a registered professional was submitted
to the Government for decision (hereinafter referred
to as the “said Reports”);
And whereas, the Government has considered
the said Reports and it is of the opinion that
alteration/modification is necessary to be carried
out to the RPG-2021 for the purpose of rectifying
inadvertent/inconsistent/incoherent error zoning
that has occurred in the RPG-2021 and it has
directed the Chief Town Planner (Planning) to carry
out alteration/modification to the RPG-2021 for the
purpose of correcting/rectifying the zone of part of
the plot of land surveyed under Survey No. 253,
sub-division No. 4, of Village Nuvem, Salcete Taluka
admeasuring an area of 2919 m2 only which is
earmarked as Orchard Zone with No Development
Slope as per RPG-2021, to Settlement Zone by
issuing Notification under sub-section (2) of Section
17 of the said Act;
Now, therefore, as directed by the Government
and in pursuance of sub-section (2) of Section 17 of
the Goa Town and Country Planning Act, 1974 (Act 21
of 1975), the following alteration/modification to the
RPG-2021 is hereby carried out, namely:-
In the RPG-2021, the zone of part of the plot of
land admeasuring an area of 2919 m2, surveyed
under Survey No. 253, sub-division No. 4, of Village
Nuvem, Salcete Taluka, District South Goa, State of
Goa which is earmarked as Orchard Zone with No
Development Slope as per RPG-2021 is hereby
corrected as Settlement Zone.
Rajesh J. Naik, Chief Town Planner (Administration/
Planning).
Panaji, 10th January, 2024.
——————
Department of Urban Development
(Municipal Administration)
–––
Order
No. 1/03/DMA/ADMN/RTI/2871
Read Order: 1. No. 1/03/DMA/ADMN/RTI/255 dated 30-4-2015.
2. No. 1/03/DMA/ADMN/RTI/3356 dated 6-2-2019.
3. No. 1/03/DMA/ADMN/RTI/3475 dated 18-11-2022.
In partial modification to the above referred Orders, approval is hereby granted for the appointment of
the following Officials of the Mormugao Municipal Council to act as Officials under sub-section 2 of Section 5 of
the Right to Information Act, 2005:-
Sr. No.
Designation of PIO
Name of Section
Designation of APIO
1.
ACAO
All matters pertaining to
Accountant.
1. Accounts Section
2. Administrative Section
3. Registration of Births and Deaths Section
2.
ATO
All matters pertaining to
Accountant.
1. Taxation Section
2. Trade and Establishment
3. Signboard
4. House Tax
5. Rent
6. Markets
7. Recovery Section
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 41
11TH JANUARY, 2024
1017
www.goaprintingpress.gov.in
Published and Printed by the Director, Printing & Stationery,
Government Printing Press,
Mahatma Gandhi Road, Panaji-Goa 403 001.
PRICE–Rs. 17.00
PRINTED AT THE GOVERNMENT PRINTING PRESS, PANAJI-GOA—360/80—01/2024.
1
2
3
4
3.
Municipal Engineer
All matters pertaining to
Wardwise Municipal
Grade-II
Technical Section
Engineer Grade-III.
The Public Information Officers and Assistant Public Information Officers are responsible for maintaining
and updating all required information and also receiving and disposing off applications under the Right
to Information Act, 2005.
Gurudas P. Pilarnekar, Director (Urban Development).
Panaji, 26th December, 2023.
——————
Wagle High School Staff Credit Co-operative Society Ltd.
FORM-24
(See Rule 111A)
Form for Declaration of Result
In pursuance of powers conferred by sub-section 6 of Section 66 of the Goa Co-op. Societies Act, 2001,
I, declare the result of Office Bearers as follows.
Election of Office Bearer of: Wagle High School Staff Co-operative Credit Society Ltd., Mangeshi, Mardol-Goa.
1) Chairman
2) Vice-Chairman
3) Secretary
4) Treasurer
Sr.
Name of the candidate/
Designation
Address, contact number
No.
/elected Office Bearer
& e-mail ID of the candidate
1.
Aigal Mithasha Manjunath
Chairman
H. No. 32/3, Chaitanya Ganganagar,
Curti, Ponda-Goa
9423881966
2.
Naik Manoj Dattaram
Vice-Chairman
H. No. 335, Near Mahalaxmi
Temple, Holibhat, Talaulim,
Ponda-Goa
9158346526
3.
Gawade Bhagwan Baburao
Secretary
Flat No. 82, Block ‘C’, Goa Housing
Board Complex, Alto Porvorim-Goa
7875235700
4.
Shet Kurtarkar Preeti Rajendra
Treasurer
H. No. 3/1-A, Kalyanmastu,
Shantadurga Society, Shapur,
Ponda-Goa
9420685889
Somnath M. Gaude, Sr. Auditor/Sr. Inspector/SRO (Co-operative Societies), Ponda Zone.
Mangeshi-Mardol, 6th December, 2023.
V. No. AP-1103/2024.