GOVERNMENT OF GOA
Department of New & Renewable Energy
–––
Notification
1/307/Comp-B (Revalidation)/
/2023-24/375
Re-validation of the scheme for
implementing of Component B of
Pradhan Mantri Kisan Urja Suraksha
evam Utthan Mahabhiyan (PM-KUSUM)
notified vide Series I No. 27 dated 30th
September, 2021 for the financial years
2022-2023 to 2025-26
The
Re-validation
of
scheme
for
Implementation of Component-B of Pradhan
Mantri Kisan Urja Suraksha evam Utthan
Mahabhiyan (PM-KUSUM) scheme for
Provision of Off-grid, Standalone Solar
Photovoltaics Water Pumping Systems
(SPWPS) to the Farmers (inherited/self-
owned/caretaker cultivator) with Subsidy
Assistance for the financial years 2022-2023
to 2025-26.
The following scheme for Implementation
of Component B of Pradhan Mantri Kisan Urja
Suraksha
evam
Utthan
Mahabhiyan
(PM-KUSUM) in the State of Goa is approved
by the Government and is hereby published
for the information of the general public.
1. Short title and commencement.— (i) This
scheme may be called as “Re-validation of
Component B of PM-KUSUM”.
(ii) It shall come into force after publishing
in the Official Gazette from the financial years
2022-23 to 2025-26.
(iii) The scheme shall be implemented
through the Goa Energy Development
Agency (GEDA).
2. Introduction to the scheme.— a) The
State of Goa notified the Scheme for
Implementation of Component B of Pradhan
Mantri Kisan Urja Suraksha evam Utthan
Mahabhiyan (PM-KUSUM) vide Series I
No. 27 dated 30th September 2021, with a
provision of off-grid, standalone solar
photovoltaic water pumping systems (SPWPS)
to the Farmers (inherited/self-owned/
/caretaker cultivator) with Subsidy Assistance
for the year 2021-2022 in the State of Goa.
b) As per the Order issued by Ministry of
New and Renewable Energy (MNRE),
Government of India vide No. 32/645/2017-
SPV Division dated August 1st, 2022, the
scheme has been extended till 31-03-2026.
c) Ministry of New and Renewable Energy
(MNRE), Government of India vide letter
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 49
(SUPPLEMENT)
7TH MARCH, 2024
2926
F. No. 32/54/2018-SPV Division-Part (I), dated
01-01-2024 has sanctioned additional 700 Nos.
of standalone solar pumps under Component-
-B to Goa and has designated Goa Energy
Development Agency (GEDA) as State
Implementing Agency under the Pradhan
Mantri Kisan Urja Suraksha evam Utthan
Mahabhiyan (PM-KUSUM).
d) The Central Financial Assistance under
this scheme shall be provided as per
operational guidelines for implementation of
PM-KUSUM Programme issued by Ministry
of New and Renewable Energy (MNRE),
Government of India and its amendment from
time to time. Presently Central Financial
Assistance (CFA) is 30%.
e) It is proposed to provide 100 Nos. of
standalone solar pumps for the year 2023-24
on first come first serve basis. Also,
sanctioning of 200 Nos. of standalone solar
pumps as per the applications received from
the farmers and sanctioning of the balance
pumps as per the requirements of the farmers
till 31st March, 2026 will be subject to
approval from the Finance Department,
Government of Goa.
3. Objectives of the scheme.— (a) To
provide standalone solar pump of capacity of
1HP upto 10HP to individual farmers where
grid connectivity is either not feasible or not
cost effective.
(b) To provide State financial assistance of
70% to the farmers eligible under this scheme.
(c) The scheme is to provide the financial
assistance for the financial years 2022-2023
to 2025-2026.
4. Operational area.— The programme will
be implemented in both the districts of Goa.
5. Category of solar pumps and irrigation
sources.— The solar pumps with capacity of
1HP-7.5 HP AC and DC pumps and 10 HP of
AC pumps are to be provided under the
programme to the farmers for bore wells, open
wells and surface storage structures.
6. Quantum of financial subsidy under the
scheme.— (a) Funding and subsidy pattern
for the scheme.
(i) MNRE, GOI, Central Financial
Assistance (CFA) is 30%.
(ii) State Government share is 70%.
Total subsidy (i) + (ii) is 100%.
The subsidy shall be disbursed on the
benchmark cost or the rate derived
whichever is lower.
(b) Government reserves the right to stop
future grants and also modify the financial
quantum, so also the conditions of the
scheme, depending upon the budgetary
provisions made.
(c) Government also reserves the right to
stop future grants and also modify the
financial quantum, so also the conditions of
the scheme, depending upon the budgetary
provisions made.
7. Pattern of Assistance of the scheme.—
a) “The GEDA shall be entitled to Government
grants based on the estimate approved by
the Government in the Budget Estimate
during that financial year” for the scheme
and will be sanctioned as per the terms and
conditions laid by the Government.
b) The entire amount of the grants should
be utilized within a period of one financial
year and only for the purpose of which it is
sanctioned. Any portion of the grant, which
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 49
(SUPPLEMENT)
7TH MARCH, 2024
2927
is not ultimately required, will be refunded
to the Government. After ‘utilizing/refunding’
the above sanctioned amount, an utilization
certificate should be furnished to the
sanctioning authority as required under Form
GFR-19A.
c) The account of the Grantee in respect of
this grant should be audited by the
Government approved Auditor/Chartered
Accountant concerned immediately after the
end of the financial year on completion of six
months for which the grant is sanctioned.
The account of the grants shall be maintained
separately and properly from its normal
activities and submitted as and when
required. They shall be open to a test check
by the Controller and Auditor General of India
at his discretion.
8. Rates approval and empanelment of
companies.— GEDA will call for e-tender for
installation of solar pumps and the rate
discovered by tendering process will be
followed for the implementation of the
programme.
9. Implementation Modalities.— 9.1
Identification of beneficiaries and eligibility:
The beneficiary for the programme shall
be a farmer having krishi card/kisan card
issued by competent authority & and owning
farm land, with reliable irrigation source viz.
bore well/open well/surface storage tank.
The irrigation source which does not have
any electricity connection alone will be
considered for provision of solar pumps under
the programme. The prospective farmer
should furnish application in format along
with relevant land documents for proof of
ownership of land and irrigation source with
relevant photo identification.
9.2 Obtaining of beneficiary application:
a) Publicity, awareness campaign for
public shall be given by the companies
besides printing brochure and other
materials.
b) The GEDA will also give wide
publicity, press news and propagate the
scheme
during
the
mass
conduct
programmes convened by the District
Collector and other farmers’ gatherings and
mobilize applications from the farmers.
c) The applications from the beneficiaries
shall be addressed to Member Secretary,
Goa Energy Development Agency (GEDA),
Goa IDC Building, Patto, Panaji-Goa.
d) The details of applications received
will be shared to all the empanelled
companies by GEDA every week.
e) The empanelled company has to
submit the beneficiary list in their favour
to GEDA on weekly basis.
9.3 Techno feasibility survey:
On getting the consent from the
beneficiaries in their favour, the empanelled
companies shall conduct site survey either
on the own or with GEDA officials to decide
the suitability of irrigation source for operation
of solar pumps of the required capacity and
model. The techno feasibility report shall be
signed by the official of GEDA, Farmer and
the representative of the company. After
ascertaining of techno feasibility survey, the
prospective farmer would be informed to
furnish the demand draft in favour of the
selected company towards their contribution.
9.4 Issuing of work orders cum Notice to
Proceed (NTP):
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 49
(SUPPLEMENT)
7TH MARCH, 2024
2928
On receipt of techno feasibility report, the
work orders will be issued by GEDA to the
concerned company, to execute the work in
the farmers field. The solar pump installations
shall be installed to the farmers as per the
technical specifications mentioned in the
contract within 30 days from the date of issue
of work orders and as per PM-KUSUM
guidelines by the empanelled company in
close supervision of the GEDA officials.
9.5 Technical specifications of solar
powered pumping systems:
a) As per the GEDA tender conditions
for the scheme, the scope of work viz., the
Design, Manufacture, Supply, Erection,
Testing and Commissioning of Off Grid,
Standalone Solar Photovoltaic Water
Pumping Systems (SPWPS) includes
complete system warranty and its repair
and maintenance for 5 years under MNRE
off-grid and decentralized solar PV
applications scheme as per MNRE
specifications and as per applicable BIS
standards.
b) It is mandatory to use indigenously
manufactured solar panels with indigenous
solar cells and modules. Further, the motor-
pump-set, controller and balance of system
should also be manufactured indigenously
and used for the Solar Photovoltaic Water
Pumping systems.
c) The various components of the system
installed shall be as per the technical
specification mentioned in the GEDA tender
for the work and as per the PM-KUSUM
guidelines and BIS specifications.
9.6 Installation and Commissioning:
a) The installation work shall be
completed within 30 days from the date of
issue of work order from GEDA. The ground
work for installation of the system shall be
commenced by the empanelled company
within 15 days from the date of issue of
work order.
b) The official of GEDA, the representative
of empanelled company and the beneficiary
farmer will jointly inspect the installed solar
pump and commission the system.
c) The empanelled company shall furnish
the Joint Commissioning Report (JCR) and
Project Completion Report (PCR).
10. Process for raising invoice bill.— a) The
invoice shall be raised in favour of the
Member Secretary, GEDA, who issued the
work order. The invoice shall indicate the
work order reference, name of the farmer,
village for whom the system is installed and
show the description of components with SPV
modules, serial No., pump serial No.,
controller serial No., quantity of each
component, unit rate and amount with all the
supporting documents as per terms of the
contract. After due verification by official of
GEDA, GEDA shall process the verified Bills/
/Invoice for the release of payment.
b) In case the company fails to submit the
Invoice/bill with all the required documents,
GEDA reserves the right to hold the payment
against such Bills/Invoices.
c) The company shall be responsible for
submitting all the requisite documents for
processing the Bills/Invoices. The company
shall submit the Bills/Invoices for the work
executed shown separately, GST and any
other statutory levies in the Bills/Invoices.
Note: GEDA has the right to seek any additional
documents/information certification it deems
fit prior to be release of any installment.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 49
(SUPPLEMENT)
7TH MARCH, 2024
2929
11. Completion time.— a) The entire
installation for individual farmer shall be
completed within 30 days from the date of
issue of work order. However, all the works
allocated shall be completed within the
contract period.
b) The implementation work on ground
should start within 15 days from the date of
Notice To Proceed (NTP) issued by GEDA.
c) Time schedule includes the time
enquired for mobilization as well as testing,
rectification if any, retesting and completion
in all aspects to the entire system.
12. Warranty.— Entire Solar powered
pumping system shall be warranted for 5
years. Whereas, for Solar PV modules, as
specified in MNRE technical specifications
issued during 2019, the PV modules must be
warranted for the output wattage which
should not be less than 90% of the rated
wattage at the end of 10 years and 80% of
the rated wattage at the end of 25 years.
13. Monitoring and maintenance.— a) The
empanelled company shall be responsible
for
design,
supply,
installation
and
commissioning of solar agricultural pumpsets.
b) The empanelled company shall provide
the Remote Monitoring mechanism as per the
conditions of the contract.
c) The empanelled company shall
mandatorily provide Annual Maintenance
Contract (AMC) for a period of 5 years from
the date of commissioning of the systems
including insurance coverage for the installed
systems against natural calamities and theft.
d) AMC will include inspection by the
company at least once in a quarter and
submission of quarterly inspection report of
the installed pumps as per prescribed format.
To ensure timely maintenance of the systems
the company shall have one authorized
service centre in both operational district and
a helpline in local language in each
operational State. Helpline number shall be
indicated on the pump/controller at suitable
location easily visible to the user.
14. Relaxation of the provisions of the
scheme.— The Government shall be
empowered to relax any or all of the clauses
or conditions of this scheme in genuine
case(s) for sanction of the grant.
15. Interpretation of the provisions of this
scheme.— If any question arises regarding
interpretation of any clause, word, expression
of the scheme, the decision about the
interpretation shall lie with the Government,
which shall be final and binding on all
concerned.
16. Redressal of grievances and dispute.—
Grievances or disputes between beneficiary
and
GEDA,
if
any,
arising
out
of
implementation of this Scheme, shall be
referred to the Secretary (NRE) to the
Government of Goa who shall hear and
decide such matters and the decision of the
Secretary (NRE) to the Government of Goa in
this regard shall be final and binding on all
concerned:
Provided no grievance or dispute regarding
the decision of the Government under clause
6 (b) above shall lie with any authority or
tribunal or court, in respect of the decision.
17. The sanction for formulation of Scheme
for Implementation of Component B of
Pradhan Mantri Kisan Urja Suraksha evam
Utthan Mahabhiyan (PM-KUSUM) in the
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 49
(SUPPLEMENT)
7TH MARCH, 2024
2930
State of Goa has been approved by Finance
(Expenditure) Division vide U. O. No 7610/F.
Financial Assistance for the scheme up for
the first 100 Nos. of standalone Solar pumps
in form of subsidy has been approved for the
Financial Year 2023-24.
Sanctioning of 200 Nos. of standalone Solar
pumps as per the applications received from
the farmers and sanctioning of the balance
pumps as per the requirements of the farmers
till 31st March, 2026 will be subject to
approval from the Finance Department,
Government of Goa.
Stephen Fernandes, Director (NRE)/ex
officio, Joint Secretary.
Panaji, 7th March, 2024.
———ttt———
Department of Town & Country Planning
–––
Notification
21/1/TCP/GTCPACT/2024/470
In exercise of the powers conferred by
sub-section (1) of section 39A read with
sub-sections (1) and (2) of section 140 of the
Goa Town and Country Planning Act, 1974
(Act 21 of 1975) and all other powers enabling
it in this behalf, the Government of Goa
hereby makes the following rules, namely:—
1. Short title and commencement.— (1)
These rules may be called the Goa Town and
Country Planning (Change of zone of land in
the Regional Plan or the Outline Development
Plan) Rules, 2024.
(2) They shall come into force on the date
of their publication in the Official Gazette.
2. Definitions.— (1) In these rules, unless
the context otherwise requires,—
(a) “Act” means the Goa Town and
Country Planning Act, 1974 (Act 21 of
1975);
(b) “Department” means the Department
of Town and Country Planning;
(c) “eco-sensitive land” means a low
lying paddy field, water body, khazan land,
flood prone area, land having slope more
than 25%, forest land including private
forest land, land falling in the buffer zone
of Wild Life Sanctuary;
(d) “Form” means a form appended to
these rules;
(e) “Government” means the Government
of Goa;
(f) “Outline Development Plan” means
the Outline Development Plan notified
under section 29 of the Act, which is in
force;
(g) “Regional Plan” means the Regional
Plan notified under section 15 of the Act,
which is in force;
(h) “Schedule” means a Schedule
appended hereto;
(2) The words and expressions used in
these rules but not defined shall have the
same meanings as are respectively assigned
to them in the Act.
3. Form of application and processing fee
for making request for change of zone of
land.— (1) A request for change of zone of
any land in the Regional Plan or Outline
Development Plan under sub-section (1) of
Section 39 shall be made in Form ‘A’ hereto to
the Chief Town Planner (Planning) alongwith
fees as specified in column (2) of the Schedule
hereto.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 49
(SUPPLEMENT)
7TH MARCH, 2024
2931
(2) Where the application submitted under
sub-section (1) of section 39 is approved by
the Goa Town and Country Planning Board
and the Government, the applicant shall pay
appropriate fee for change of zone as
specified in columns (3) to (5) of the Schedule
hereto.
4. Procedure for change of zone in Regional
Plan/Outline Development Plan.— (1) The
Chief Town Planner (Planning) upon direction
of the Government or upon receipt of
application made by any person, under
sub-section (1) of section 39, for change of
zone of any land in the Regional Plan or
Outline Development Plan, give notice of the
proposed change of zone of land by a
notification published in the Official Gazette
and in two local newspapers inviting
suggestions from the public within a period
of thirty days from the date of publication of
the notification in the Official Gazette and local
newspapers.
(2) The suggestions, if any, received in
respect of the proposed change of zone of
land shall be scrutinized by the Department
by following guidelines as specified in rule 6.
(3) After expiry of such period of thirty
days, the proposal for change of zone of land
alongwith suggestions if any received, shall
be placed before the Goa Town and Country
Planning Board for its recommendation/
/approval.
(4) The Chief Town Planner (Planning) shall
place the recommendation/decision of the
Goa Town and Country Planning Board before
the Government for decision.
(5) Upon decision of the Government under
sub-rule (4), the Chief Town Planner
(Planning) shall alter or modify the Regional
Plan or the Outline Development Plan to the
extent as specified in sub-section (2) of
section 39 for carrying out change of zone of
any land therein.
5. Scrutiny of applications.—
The
Department shall carry out scrutiny of the
applications submitted under sub-section (1)
of section 39 by following the guidelines as
specified below:-
(i) Eco-sensitive land as defined in clause
(c) of sub-rule (1) of rule 2 shall not be
considered for change of zone;
(ii) Past commitment/approvals/sanad
granted in respect of land shall be
considered provided that such land is not
an eco-sensitive land;
(iii) In case of land falling within Coastal
Regulation Zone area, the comments of the
Goa Coastal Zone Management Authority
shall be obtained.
(iv) In case of land who’s zoning has
been reverted to agricultural and non-
-developable zones in Regional Plan 2021
from Settlement zone in Regional Plan 2001
shall be considered on priority and as per
the merit of each case;
(v) Applications of individuals who
purchased plots in unauthorized layouts in
non-conforming zones shall be considered
as per the merit of each case;
(vi) Wherever required the comments
from Forest Department and/or Agriculture
Department shall be obtained by the
Department and the concerned Departments
shall be required to submit their comments
in a time bound manner;
(vii) Applications by religious, health and
educational institutions and applications for
employment generating activity and
tourism related projects shall be considered
on the merits of the case;
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 49
(SUPPLEMENT)
7TH MARCH, 2024
2932
(viii) Projects which are recommended by Goa Investment Promotion Board shall be
given due consideration;
(ix) The public utility and tourism related projects/proposals shall be considered on the
merits of the case.
6. Notification of alteration or modification to Regional Plan/Outline Development Plan.—
Every alteration/modification of the Regional Plan or the Outline Development Plan
shall be published by the Chief Town Planner (Planning) by notification in the Official Gazette.
SCHEDULE
Rate of processing fee and rate of fee for change of zone
Area of the land in
Processing fee
Fee for change of
Fee for change of Fee for change of
respect of which
in Rs.
zone to settlement
zone to Industrial
zone to Institutional
change of zone is
zone or sub-zone
zone per sq. mtr.
zone and others per
proposed
settlement (Commer-
of land
sq. mtr. of land
cial) per sq. mtr. of
land
(1)
(2)
(3)
(4)
(5)
Upto 500 sq. mtrs.
Rs. 5,000
Nil
Rs. 100
Rs. 50
501 sq. mtrs. to
Rs. 7,500
Rs. 50
Rs. 150
Rs. 50
1,000 sq. mtrs.
1,001 sq. mtrs. to
Rs. 10,000
Rs. 75
Rs. 150
Rs. 50
2,000 sq. mtrs.
2.001 sq. mtrs. to
Rs. 15,000
Rs. 100
Rs. 150
Rs. 50
5,000 sq. mtrs.
5001 sq. mtrs. to
Rs. 20,000
Rs. 125
Rs. 200
Rs. 100
10,000 sq. mtrs.
10,001 sq. mtrs. to
Rs. 30,000
Rs. 150
Rs. 300
Rs. 100
20,000 sq. mtrs.
Above 20,001 sq. mtrs.
Rs. 50,000
Rs. 200
Rs. 400
Rs. 150
Note:-
(1) The rate of fee specified in column Nos. (2), (3), (4) and (5) above are applicable for land in
V.P-2 category villages in Talukas of Pernem, Bardez, Tiswadi, Ponda, Mormugao, Salcete and
Canacona as identified in Release-3 Report of Regional Plan 2021: Provided that, the rate of fee
in respect of VP-2 category villages in the Talukas of Bicholim, Sattari, Quepem, Sanguem and
Dharbandora, as identified in Release-3 Report of Regional Plan 2021, shall be 80% of the rate
of fee specified in column Nos. (2), (3), (4) and (5) above:
(2) The rate of fee for land in VP-1 category villages and M2 class Municipal areas/coastal villages,
shall be increased by 20% and 40%, respectively, over the rate specified for VP-2 category
villages.
(3) The rate of fee for change of zone from Industrial zone to Settlement zone shall be as specified
in column No. (3) above and the rate of fee for change of zone from Settlement zone to Industrial
zone shall be as specified in column No. (4) above.
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES I No. 49
(SUPPLEMENT)
7TH MARCH, 2024
2933
Form ‘A’
(See rule 3)
From:
To,
1.
Name and address of the applicant
——
2.
Survey No., Village Panchayat and Taluka in which land is situated
——
3.
Whether free hold or lease hold
——
4.
Existing zone as per Regional Plan 2021/Outline Development Plan
——
5.
Road Accessibility/Status
——
6.
Tenancy details
——
7.
CRZ status (River/Sea)
——
8.
Past commitment (such as developments like sub-division approvals by
Competent Authorities, Conversion Sanad under Land Revenue Code, 1968,
building approvals/NOC’s etc.
——
9.
Change of Zone sought for (Specify the proposed zone)
——
10.
Area of land sought for change of zone
——
11.
Nature of land, specify whether sloping/low lying
——
12.
Purpose of change
——
13.
Details of processing fee paid
——
Date:
Place:
Signature of the Applicant
Enclosed following documents:
i)
Survey Plan.
ii) Form I & IV.
iii) Ownership documents.
iv) Zoning Certificate.
v) Contour Plan, photograph of the property, if required.
By order and in the name of the Governor of Goa.
Vertika Dagur, Chief Town Planner (Admn.) & ex officio Joint Secretary.
Panaji, 6th March, 2024.
www.goaprintingpress.gov.in
Printed and Published by the Director, Printing & Stationery,
Government Printing Press,
Mahatma Gandhi Road, Panaji-Goa 403 001.
PRICE – Rs. 9.00
PRINTED AT THE GOVERNMENT PRINTING PRESS, PANAJI-GOA—433/100—3/2024.