Note: There are two Extraordinary issues to the Official Gazette, Series II No. 29 dated 16-10-2025 as follows:-

1. Extraordinary dated 16-10-2025 from pages 999 to 1002 regarding Notifications from Department of Panchayati Raj and

Community Development.

2. Extraordinary (No. 2) dated 21-10-2025 from pages 1003 to 1004 regarding Notification from Department of Finance.

GOVERNMENT OF GOA

Department of Animal Husbandry & Veterinary Services

Directorate of Animal Husbandry and Veterinary Services

Notification

Read: Notification No. 14-9-AH/AWB/2020-21 dated 17-09-2020.

Whereas, the Government of Goa had notified the District SPCA North Goa and South Goa under the

Prevention of Cruelty to Animals (Establishment and Regulation of Societies for Prevention of Cruelty to

Animals) Rules, 2001 and subsequently, the Managing Committee of the District SPCA North Goa and South

Goa were notified vide Notification No. 14-9-AH/AWB/2020-21 dated 17-09-2020 and the same were duly

registered under the Registration of Societies Act, 1980.

And whereas, Hon’ble High Court of Bombay at Goa vide Judgment dated 08-08-2025, in MCA No. 210 of

2025 of Writ Petition No. 216 of 2024, directed to elect 2 members for the post of Management Committee of

the respective District Society for Prevention of Cruelty to Animals (DSPCAs) of North and South Goa.

And whereas, the following members were unanimously elected and appointed as members on Managing

Committee of the DSPCA North and South Goa respectively, by the respective General Body of the Societies.

Sr.

No.

Names of the DSPCAs

Names of the appointed members

1.

DSPCA North Goa

1) Mr. Vijay Mendes

2) Mr. Vijendra Gairola

2.

DSPCA South Goa

1) Mr. Louis Pereira

2) Mr. Chaitanya Malkarnekar

By order and in the name of the Governor of Goa.

Dr. Nitin Naik, Director & ex officio Jt. Secretary (AH).

Panaji.

No. 14-9-AH/DSPCA/2025-26/4497

Date : 10-Oct-2025

Suggestions are welcomed on e-mail: [email protected]

1005

Reg. No. RNP/GOA/32/2024-2026

RNI No. GOAENG/2002/6410

Panaji, 23rd October, 2025 (Kartika 1, 1947)

SERIES II No. 30

PUBLISHED BY AUTHORITY

Department of Co-operation

Office of the Asstt. Registrar of Co-operative Societies

Notification

In exercise of the powers vested in me under Section 8 of the Goa Co-operative Societies Act, 2001,

“Nagavanti Self Help Group Co-operative Society Ltd.”, H.No 1058, Gauthan, Priol, Mardol, Goa-Goa is

registered under code symbol No.- RCSPZ2025260070.

Pankaj V. Marathe, Asst. Registrar of Co-op. Societies, Ponda Zone.

Ponda.

CERTIFICATE OF REGISTRATION

“Nagavanti Self Help Group Co-operative Society Ltd.”, H.No 1058, Gauthan, Priol, Mardol, Goa-Goa has

been registered on 11-08-2025 and its bears registration code symbol No. RCSPZ2025260070 and its classified

as General Society under sub-classification No. 12-(e)-Self Help Group in terms of Rule 8 of the Goa Co-

operative Rules, 2003.

Pankaj V. Marathe, Asst. Registrar of Co-op. Societies, Ponda Zone.

Ponda.

——— ♦♦♦———

Department of Industries

Notification

Read: Government Notification No. 3/8/2025-IND/207 dated 03-09-2025, published in the Official

Gazette, Series I No. 24 dated 11-09-2025 in respect of the Project Proponent M/s. Express

Machines & Scaffolding Private Limited.

In exercise of the powers conferred by sub-section (1) of Section 43 of the Goa Investment Promotion and

Facilitation of Single Window Clearance Act, 2021 (Goa Act 19 of 2021), the Government of Goa hereby

appoints a Planning, Development and Construction Committee, consisting of the following members, for the

Investment Promotion Area declared by the Government vide Notification cited above, in respect of the Project

Proponent M/s. Express Machines & Scaffolding Private Limited to expand its operation by setting up of new

warehouse at Loutolim Village, Salcete Taluka, South Goa District:-

(i)

Chief Secretary

–

Chairperson.

(ii)

Secretary (Industries)

–

Member.

(iii)

Director, Directorate of Industries, Trade and Commerce

–

Member.

(iv)

Chief Town Planner (Planning)

–

Member

(v)

Director, Directorate of Health Services

–

Member

(vi)

Director of Fire and Emergency Service

–

Member

(vii)

Chief Inspector of Factories and Boilers

–

Member

(viii)

Chief Electrical Engineer, Electricity Department

–

Member

(ix)

Principal Chief Engineer, Public Works Department

–

Member

(x)

Principal Chief Conservator of Forests

–

Member

(xi)

Member Secretary, Goa State Pollution Control Board

–

Member

(xii)

Member Secretary, Goa Coastal Zone Management Authority

–

Member

193-10/25-26/ARCS/PZ/GEN/866

Date : 19-Aug-2025

3/8/2025-IND/240

Date : 21-Oct-2025

1006

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

(xiii)

District Collector, North Goa

–

Member

(xiv)

District Collector, South Goa

–

Member

(xv)

Chief Executive Officer of the Board

–

Member Secretary

The said Committee shall exercise all the powers, such as, control or erection of building, etc. and all other

powers conferred on it by the Goa Investment Promotion and Facilitation of Single Window Clearance Act,

2021 (Goa Act 19 of 2021).

This Notification shall come into force on the date of its publication in the Official Gazette.

By order and in the name of the Governor of Goa.

Amalia O. F. Pinto, Under Secretary (Industries).

Porvorim.

——— ♦♦♦———

Inspectorate of Factories and Boilers

Order

In exercise of the powers conferred by sub-section (2) of Section 65 of the Factories Act, 1948 (Central Act

No. 63 of 1948) as in force in the State of Goa (hereinafter called the “said Act”), I, Shri Anant S. Pangam, the

Chief Inspector, hereby exempt all of the adult workers working in the Electronics Lock Assembly Department

of the factory, namely, M/s Godrej & Boyce Mfg. Co. Limited, situated at Shed No. D2-38/39, Tivim Industrial

Estate, Tivim, Bardez-Goa, except the person who are holding positions of supervision or management and/or

employed in a confidential position within the meaning of sub-section (1) of Section 64 of the said Act, from the

provisions of Sections 51, 54 and 56 of the said Act, for a period of three years with effect from the date of

publication of this Order in the Official Gazette.

Anant S. Pangam, Chief Inspector of Factories and Boilers.

Panaji.

——— ♦♦♦———

Department of Labour

Notification

The following Award passed by the Industrial Tribunal and Labour Court, at Panaji-Goa on 04/09/2025 in

Case Ref. No. IT/94/1999 is hereby published as required under Section 17 of the Industrial Disputes Act, 1947

(Central Act 14 of 1947).

By order and in the name of the Governor of Goa.

Amalia O.F. Pinto, Under Secretary (Labour).

Porvorim.

________

IN THE INDUSTRIAL TRIBUNAL AND LABOUR COURT

GOVERNMENT OF GOA AT PANAJI

(Before Mrs. Vijayalaxmi Shivolkar, Hon’ble Presiding Officer)

Ref. No.: IT/94/1999

Mr. Jose Gomes,

Rep. by the Goa MRF Employees Union,

Saidham, Dhavalimol,

Ponda-Goa.

…

Workman/Party I

VI/FAC-3/(GOA/616)/2025-IFB/2265

Date : 21-Oct-2025

28/02/2025-LAB/Part-I/606

Date : 16-Oct-2025

1007

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

V/s

M/s. M.R.F. Limited,

Tisk, Usgao,

Ponda-Goa.

…

Employer/Party II

Workman/Party I represented by Learned Adv. Ms. S. Narvekar.

Employer/Party II represented by Adv. Shri S. B. Karpe along with Adv. Ms. S. Vaigankar.

AWARD

(Delivered on this the 22nd day of the month of September of the year 2025)

By Order dated 21st July, 1999 bearing No. IRM/CON-P(184)/98/3597, the Government of Goa in exercise

of powers conferred by Clause (d) of sub-section (1) of Section 10 of the Industrial Disputes Act, 1947 (Central

Act of 14 of 1947), has referred the following dispute to this Tribunal for adjudication.

SCHEDULE

(1)

“Whether the action of the management of M/s MRF Limited, Usgao, Ponda-Goa, in terminating the

services of Shri Jose Gomes, with effect from 17-02-1997,is legal and justified?

(2)

If not, to what relief the workman is entitled?”

2. Upon receipt of the reference, it was registered as IT/94/1999 and the notices were hand delivered to

both the Parties. Pursuant to service of notice, Party I filed his Claim Statement at Exhibit 3.

3. The Party I stated that since the formation of the Union, the Company has been attempting to disrupt the

unity of the workmen employed by the Company who are members of the Union. Of late, there has been large

scale harassment and victimization of the Union Office bearers and its other members due to their legitimate

trade union activities. The harassment, inter-alia, include illegal changes in service conditions, unjustified and

unwarranted suspensions, charge-sheets based on false and fabricated charges, refusal to negotiate in good faith,

and impositions of unfair labour practices in the guise of following management policy, etc., and further,

including the illegal termination of the Workman, Mr. Jose Gomes.

4. The Party I states that the Workman was issued a letter/charge-sheet dated 31-01-1996, which itself was

illegal and untenable at law and was based totally on concocted charges solely to victimize the Workman for his

union activities. The Party I states that the said Company issued Charge-sheet dated 31-01-1996, thereby

alleging certain acts of misconduct against the said Workman, which (the issuance of the Charge-sheet) is

illegal, invalid and untenable at law. It is alleged that the Workman along with 2 other workmen on 26-01-1996

had assaulted other Workman namely Mr. Ulhas Pednekar thereby causing grievous injuries to his face at a

meeting.

5. The charge-sheet, however, did not disclose any names of the other three workmen, nor did it disclose

the place or time of the assault. Apart from the bare allegation that Mr. Pednekar had grievous injuries caused to

his face, no other details of whatsoever nature were given in respect of the nature of the so-called injuries. The

charges mentioned in the charge-sheet did not concur with the facts mentioned therein. The misconduct alleged

therein, even if proved, would not be enough to warrant the punishment of dismissal from service.

6. Thereafter, upon the receipt of the above-mentioned charge-sheet on 08-02-1996, the said Workman, by

his Letter dated 10-02-1996, requested for seven days’ time to file his reply. It is pertinent to note that prior to

issuance of the Charge-sheet dated 31-01-1996, the said Workman was already illegally and unjustifiably

suspended, vide letter dated 29-01-1996.

7. It is further pertinent to note that the said Workman and the Union repeatedly requested the said

Company to furnish the copies of the documents, including the Complaint allegedly filed/furnished by the said

Mr. Pednekar, which the so-called complaint was (is) the sole basis for the issuance of Charge-sheet dated 31-

01-1996, but to no avail. Thereafter, the said Union became aware that Mr. Pednekar based on whose complaint

the purported charges of the assault were levelled upon the said Workman and the suspension and termination

arising there from got ensued, had withdrawn his complaint.

1008

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

8. The Party I states that the Management did not supply a copy of the complaint made by said Mr.

Pednekar despite constant request from the workman, with malafide intention, purportedly to consider the reply

as unsatisfactory, and by letter dated 04-07-1996, i.e., after a gap of nearly 6 months, issued notice of inquiry to

the charges of alleged misconduct to be commenced from 23-07-1996. This action of the Management severely

prejudiced the Workman, as the management, since, did not withdraw the suspension forthwith after the

withdrawal of the complaint by Mr. Pednekar.

9. It is pertinent to note that though Mr. Pednekar had alleged charges of assault against four persons, viz.

Mr. Rohidas Naik, Mr. Jose Gomes i.e. the Workman herein, Mr. Danny Fernandes and Mr. Kissan Dessai, the

enquiry was conducted only against Mr. Jose Gomes the Workman herein, Mr. Danny Fernandes and Mr.

Rohidas Naik, whereas no enquiry of whatsoever nature was conducted against Mr. Kissan Dessai,on some

alleged pretext that he had been terminated from his services earlier, in some other case. However, Mr. Kissan

Dessai was later exonerated of all the charges levelled against him and was allowed tore-join services at a later

stage by the said Company.

10. Party I further stated that, during the course of enquiry, many irregularities and discrepancies were

brought to the notice of the Enquiry Officer. However, he failed to consider any of such discrepancies raised

while submitting his findings to the said Company. The Enquiry Officer had deliberately ignored all the

evidence placed before him by the said Workman and, in fact, went to the extent of recording that the concerned

Workmen, including the said Workman, were deliberately trying to implicate Mr. Kissan Dessai. The Enquiry

Officer failed to consider that the said Mr. Pednekar had made a statement admitting that he was assaulted by

Mr. Kissan Dessai outside the Company’s premises, which fact, in any case, takes the scope of the enquiry to be

overreaching, making it perverse and invalid.

11. The Party I stated that the charge-sheet issued to him was ex-facie illegal and untenable at law. He

further stated that the Enquiry Officer has conducted the enquiry devoid of the principles of natural justice.

12. The Party I states that it had served a letter dated 29-08-1996 on 30-08-1996 to the Labour

Commissioner at Panaji calling for the conciliation proceedings on the Charter of Demands dated 15-02-1996 of

the workmen for wage rise and better service conditions. The Workman concerned in the present dispute is also

a Workman concerned/covered in the dispute/demand pending before the Labour Commissioner as on 29-08-

1996.

13. The Party I states that the Party II attended the conciliation proceedings on the said Charter of Demands

and even filed its reply to the justification of the Party I on the general demands on 24-10-1996. In the

meanwhile, since the management was not ready to accede to the demands of the Union, the Labour

Commissioner, Panaji was pleased to call for further meetings between the Management and Union. The last

meeting, to the best of Union’s knowledge, was held on 17-02-1996 at 3.00 p.m., for trying to conciliate and

settle the dispute. The Labour Commissioner was called for the said joint meeting on 17-02-1997 vide letter

dated 11-02-1997 bearing No. IRM/CON/PONDA/(104)/96/752.

14. The Party I states that the workman was dismissed on17-02-1997, the day when the joint meeting of the

Union and the Management was called by the Labour Commissioner, Panaji, to conciliate and settle the dispute

on the Charter of Demands, without even waiting for the Failure Report to reach the Appropriate Government.

The Government of Goa was pleased to refer the said dispute to this Hon’ble Tribunal for adjudication only on

05-06-1997 vide its Order No. ALC/PONDA/C.H.OF DEMANDS/MRF/2488.

15. Under these circumstances, it is humbly submitted that the Party II was required to seek approval of its

action for dismissal under Section 33 of the Industrial Disputes Act, 1947 which it had failed to do. Therefore,

its action of dismissing the Party I/Workman without seeking approval of the Conciliation Officer/Labour

Commissioner is contrary to the Section 33 of the Industrial Disputes Act, 1947, hence illegal and void.

16. Party I further stated that there was no evidence supporting the charges levelled against him, and that

the charges levelled did not constitute any misconduct either major, or at all and that he was prejudiced at each

stage of the enquiry. He stated that his illegal termination from services was also an act of unfair labour practice

under the Industrial Disputes Act, 1947. He stated that the penalty of illegal and unjust termination is grossly

disproportionate to the charges on which the termination is based, and moreover, the same is discriminatory.

Hence, it is prayed that the illegal termination of Party I be revoked and he be reinstated in service with full

back wages.

1009

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

17. In its Written Statement filed at Exhibit 4, the Party II stated that Mr. Jose Gomes was charge-sheeted

vide Charge-sheet dated 31-01-1996 for alleged act of misconduct as referred to in the said charge-sheet. Thus,

itis stated that these alleged acts committed by the Workman, if proved, amounts to gross misconducts under

Item VI, VII, XL, LII and LIII of Clause-21 of the Certified Standing Orders of the Company/Party II, and the

charges in the charge-sheet reads as under:

Clause 21 Item VI Clause 21 Item VI

:

Restraining or detaining or gheraoing any supervisory staff or

workman of the Company either inside or outside the premises

of the Company.

Clause-21 Item VII

:

Use of impolite or insulting or abusive language, assault or

threat of assault, intimidating or coercion within the precincts

of the Company against any supervisory staff, Workman or

any other person authorised to work in the company and any

such act Clause 21 Item VI: outside the premises of the

Company if directly affects the discipline of the company.

Clause-21 Item XL

:

Making false or malicious statement public or otherwise

against the Company or any employee of the Company.

Clause-21 Item LII

:

Any act subversive of discipline.

Clause-21 Item LIII

:

Instigation, incitement, abetment or furtherance of any of the

above acts or omissions.

and with which you are charged.”

“it is reported against you that on 26-01-1996, at a meeting called by the Union Executive Committee for

workmen of the Curing and Finishing Departments, you, along with three other workmen who were present at

the meeting, severely assaulted one of our worker, Mr. Ulhas Pednekar causing grievous injuries to his face, on

alleged grounds that he was found talking to one of our supervisors, Mr. Raghu Gaude, while they were on

duty.”

18. The Party II submits that as the charge-sheet outlines the misconduct of the Workman, the Workman has

been charged with misconduct by referring to the acts on his part in the backdrop of the Certified Standing

Orders. The Charge-sheet-cum-notice of enquiry also called upon the Workman to submit his reply/explanation

within 48 hours of receipt of the said charge-sheet. Pending enquiry, Party I was placed under suspension vide

order dated 21-09-1996 and during the suspension period, Party I was paid subsistence allowance as per the

Certified Standing Orders and in terms of the settlement.

19. The Party II submits that the enquiry was initially conducted by Mr. Claudio Fernandes and

subsequently by Shri Suhaas Naik and Mr. Prakash Mulgaonkar was appointed as Management Representative.

The Party II submits that the workman was represented by Mr. Savio Furtardo, an office bearer of the Union, at

the enquiry. The Enquiry Officer, after considering the evidence on record, submitted his findings dated 06-02-

1997, holding the Party I/Workman guilty of the charges. The Party II states that the findings of the Enquiry

Officer are based on the evidence on record and that the enquiry had been conducted in accordance with

principles of natural justice.

20. The Party II submits that the proved misconduct established at the enquiry warranted extreme

punishment of dismissal of PartyI/Workman from its service. The Party II states that the punishment of

termination was consequent to properly conducted enquiry and based on the proved acts of misconduct

committed by the Workman.

21. The Party II submits that the enquiry was fair and proper and was conducted in accordance with the

principles of natural justice. The Party I was given every opportunity to defend himself, and only after

appreciating the evidence on record, the Enquiry Officer gave are as one finding on the basis of which any

prudent person would come to the conclusion that the Party I was guilty of the charges levelled against him. The

Party II submits that the termination by way of punishment of Party I is pursuant to a charge-sheet and properly

conducted enquiry by an impartial Enquiry Officer who has considered all the evidence on record and has

1010

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

submitted a reasoned findings, and that the termination by way of punishment of Party I/Workman is legal and

justified.

22. In its Written Statement, Party II denied that there has been large scale harassment and victimization of

the union office bearers and its other members due to their legitimate trade union activities, as alleged. It is

denied that there are any illegal changes in the service conditions or unjustified or unwarranted termination or

charge-sheets are issued to the workmen on false and fabricated charges, or that there is refusal to negotiate in

good faith, as alleged. It is denied that there is commission of unfair labour practice. It is specifically denied that

Mr. Jose Gomes was an active member of the Union.

23. It is further denied that the Workman’s defence was prejudiced due to non-issuance of show-cause

notice, as in any event, area sonable opportunity was given to the Workman during the course of the enquiry to

present his defence. It is denied that the Enquiry Officererred in coming to the conclusion of guilt, as alleged, or

that the Enquiry Officer failed to appreciate the evidence of the Workman, or that he was biased. It is denied

that the Termination Order of the Workman was for collateral purposes or was solely to victimize the Workman

for his continued allegiance to the Union, as alleged. Itis denied that there has been any gross discrimination in

imposing the punishment of termination of the Party I/Workman, as alleged, and hence, it is submitted that the

Party I is not entitled to the relief sought in the Claim Statement and prays that the claim of the PartyI/Workman

may be rejected on the aforesaid grounds.

24. On completion of the pleadings, the following Issues dated 01-02-2000 were framed at Exhibit 6 by this

Tribunal which reads as under:

ISSUES

1.

Whether the Party I proves that the domestic enquiry held against the workman Shri Jose Gomes is not

fair, proper and impartial?

2.

Whether the charges of misconduct levelled against the Workman Shri Jose Gomes are proved to the

satisfaction of the Tribunal by acceptable evidence?

3.

Whether the Party I proves that the Termination of service of the Workman Shri Jose Gomes is by way

of victimization and unfairlabour practice?

4.

Whether the Party I proves that the Termination of services of the workman Shri Jose Gomes by the

Party II w. e. f. 17-02-1997 is illegal and unjustified?

Additional Issue No. 4A: Whether the Party II has followed the mandatory provisions of Section 33(2)

(a)(b) of the Industrial Disputes Act before dismissing the Workman from the services?

5.

Whether the Workman Shri Jose Gomes is entitled to any relief?

6.

What Award?

25. From the issues framed hereinabove, Issue No. 1, 2 and additional Issue No. 4A have been taken up to

be tried as preliminary issues and accordingly both the Parties to the proceeding led their evidence in respect of

these preliminary issues, and my findings to the same with reasons are as follows:

Issue No. 1 : In the Affirmative

Issue No. 2 : In the Negative

Issue No. 4A : In the Affirmative

REASONS

26. Issue No.1 & 2: It is in the evidence of Shri Ratnakar Amonkar, then Officer working for Party II as

Manager (Production), that the Party I was issued with charge-sheet dated 31-01-1996. The Party I was

appointed as a Trainee Operator with the Party II vide letter dated 01-03-1990 signed by the Sr. General

Manager Mr. E. M. Mathai who was competent to do so. The appointment of the Party I was probationary

appointment, and later on he was confirmed in the service after completion of the probation period vide

Confirmation Letter dated 01-09-1991. All the corresponding letters have been identified by Shri Amonkar

when they were produced in the domestic enquiry. In the said enquiry, the Company initially appointed Shri

1011

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

Claudio Fernandes as an Enquiry Officer and thereafter he was replaced by Mr. Suhaas Naik, who completed

the enquiry in respect of the charge-sheet issued to the Party I, which letter was signed by the General Manager,

Mr. Mathai. The Management was represented by Mr. Prakash Mulgaonkar. Pending enquiry, the Party I was

placed under suspension. The Plant Human Resource Manager, Mr. George Nainan, being competent, issued

Notice of Enquiry dated 24-12-1996. The Party I Workman was represented by hisco-worker Mr. Savio Furtado.

27. He further deposed that on completion of enquiry, the Enquiry Officer gave his Findings dated 06-02-

1997 holding the Party I guilty of the charges referred to in the charge-sheet and submitted his Findings to the

Management. The Management, during the pendency of the enquiry, paid subsistence allowance to Party I in

terms of provisions of the Certified Standing Orders. In his cross-examination, the Management witness Shri

Amonkar denied that no fair and proper enquiry was conducted or that findings given by the Enquiry Officer are

perverse. Shri Amonkar in the cross stated that the charge-sheet was sent to the Party I by registered post, so

also the Suspension Order was sent to Party I by registered post, and denied that the Suspension Order was hand

delivered to the Party I.

28. The Company’s Witness No. 1, Mr. Ratnakar Amonkar, has further admitted certain vital facts in his

cross-examination which admissions strengthens the defences taken by the Workman as regards to his

termination being illegal and as an act of unfair labour practice, which exhibits clear malafide, discrimination,

non-application of mind by the Enquiry Officer and the admissions reads as under.

‘… In the suspension order dt. 29-1-96 what misconduct committed by the party I had not mentioned…’.

‘… No document were given along with the suspension order to party I. No explanation was called on the

party I in respect of suspension order…’.

‘… Along with the charge sheet the copies of the document were not given to the party I…’.

‘… It is not true to say that prejudice was caused to the party I because the copies of the documents were

not given to him alongwith the charge sheet…’.

‘… It is true to that vide letter dt. 10/2/96 the party I had requested for time to reply to the charge sheet...’.

‘… It is true that by letter dt. 25-3-96 Goa MRF Employees Union had informed the party II that the person

who had made the complaint against the party I had withdrawn the said complain. I am not aware if the party I

had asked for the copy of the complain made by Ulhas Pednekar and that the same was not given to him. I am

not aware if the copy of the complain was not given to the party I throughout the inquiry, though he had asked

for the same…’.

‘…It is true that Mr. Pednekar had withdrawn his complaint based on which the Party I was issued a

charge sheet…’.

‘… It is true that as per the complaint four persons including Kisan Dessaiwere involved in the incident of

assaulting. I am not aware whether any enquiry was conducted against Kisan Dessai…’.

‘… It is not true to suggest that it was necessary to obtain an approval before terminating services of Party

I. I am not aware whether charter of demand dated 15/2/1996 was pending at the time of termination of services

of Party I…’.

29. Therefore, it is the contention of the Party I/Workman that, by not providing the so-called documents

based upon which the charges are levelled against him were attempted to be proved, the Enquiry Officer has

clearly violated the principles of natural justice, there by rendering the entire enquiry and the purported findings

resulting there from as ex-facie illegal, invalid and unjust to the said Workman. That, by not providing the

relevant documents underlying to the charges levelled against the said Workman, despite the fact of the whole

foundational document of the charge-sheet, being the complaint of Mr. Pednekar, was withdrawn by the

Complainant himself, the Party II therefore ought to have refrained itself from going ahead with the so-called

enquiry and should not have appointed the Enquiry Officer to conduct the enquiry in respect of the charges

alleged in the charge-sheet based on the complaint filed by Mr. Pednekar.

1012

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

30. The Party II Company, however, proceeded with the enquiry knowing fully well that the complaint on

basis of which the charges were levelled in the charge-sheet had been withdrawn by the victim himself. Such act

by and on behalf of the Company by the Enquiry Officer not considering the material before him and blindly

going ahead with the enquiry and thereafter holding Party I guilty of the charges, is nothing but a violation and

contravention of the principles of natural justice, as was exactly observed by the Hon’ble Delhi High Court

recently as on 16-12-2024 in Hotel Corporation of India Limited Versus Sudesh Kumar Julka wherein it

was held “ 9.1 After examination of the entire record, the Tribunal came to the conclusion that neither copies of

the documents forming basis of the charge-sheet were supplied to the respondent workman nor inspection there

of was granted to him; that neither the report of the audit team was supplied to the respondent workman nor

members of the raiding team were examined during the enquiry; and that it is only through the members of the

raiding team that the respondent workman could have demonstrated that the conclusions arrived at by the audit

team were based on wrong facts. The learned Tribunal also observed from record that the petitioner

management filed documents before the Enquiry Officer in piece meal across repeated adjournments, in the

sense that there spondent workman was called upon to admit or deny the charges and thereafter the petitioner

management filed some documents and exhibited the same, after which the petitioner management sought

adjournment to file more documents. Further, according to record, the Enquiry Officer directed the management

to produce Sh. Vijay Dhingra and Sh. Vikas Gambhir, members of the audit raiding team as witnesses, but on

the next date Sh. S.C. Bhalla was examined as a witness and he proved his report Ex. MW2/1, but a copy thereof

was not supplied to the respondent workman. The said Sh. S.C. Bhalla admitted that the document

Ex.MW1/5bore certain cuttings but denied that the same were done subsequent to signatures of the respondent

workman and explained that on this aspect he had verified from Sh. Vikas Gambhir and Sh. Vijay Dhingra, who

were not produced before the Enquiry Officer to explain those cuttings.

9.2 On the basis of the said infirmities, the Tribunal held that the enquiry stood vitiated and further

observed in the impugned order dated 20-12-2003 that since the petitioner management had not taken any

pleae it her in the approval application or in the rejoinder that in case the enquiry is vitiated, it be given a

chance to lead evidence on merits to prove the charges, the only issue to be examined was as to whether them

anagement was entitled to the approval sought for, for which the matter was posted for 04.02.2004…’.

‘… 10.1 There is no denial qua the findings that neither the list of witnesses sought to be examined by the

petitioner management nor even the report of the audit raiding party was supplied to the respondent workman.

Both were the fundamental documents, and non-supply of copies thereof to the respondent workman was

certainly a serious abrogation of jus naturale.

10.2 Of course, the strict rules of evidence would not operate in the domestic enquiry. But that does not

mean that a document, that too avital one would be allowed to be got proved through a third person, who had

no personal knowledge of the events recorded in that document. Admittedly, there were cuttings on the audit

raid report Ex. MW1/5, regarding which the explanation could be rendered only by the members of the audit

team, namely Sh. Vikas Gambhir and Sh. Vijay Dhingra, butneither of them were examined in the enquiry.

Claim of the witness Sh. S.C. Bhalla that he had enquired from Sh. Vikas Gambhir and Sh. Vijay Dhingra about

those cuttings cannot be a reliable piece of evidence. Rather, it shows that despite being available, those

witnesses were kept away from the witness box. Had Sh. Vikas Gambhir and/or Sh. Vijay Dhingra stepped into

the witness box, the respondent workman would have been able to better establish his innocence. Thereby, the

respondent workman was clearly deprived of a fair opportunity to defend himself against the charge sheet.

10.3 There is another aspect. Sh. Vikas Gambhir and Sh. Vijay Dhingra constituting the audit raiding team

were the only witnesses, who could prove the audit report, describing what they found during the raid.

Noneelse, including Sh. S. C. Bhalla could have done that. But neither of those two persons was examined. It is,

therefore a clear case of no legal evidence at all recorded during the domestic enquiry. In the absence of the

audit report and the statement of those two star witnesses, no reasonable person can arrive at conclusion of

guilt against the respondent workman. So, the finding of guilt recorded against the respondent workman by the

Enquiry Officer is clearly a perverse finding…’.

1013

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

‘… 10.5 Then comes the question as to whether failure on the part of the respondent workman to plead

victimisation at the hands of the petition ermanagement would be fatal to his case challenging the validity of the

domestic enquiry. In my considered view, that cannot be so. Fair and reasonable opportunity to defend himself

being a fundamental right of the every individual facing enquiry or trial, the prosecuting as well as the

adjudicating authority are under a duty to ensure strict adherence to jusnaturale whether it be a case of

victimisation or otherwise…’.”

31. In the case in hand, the management witness has clearly admitted in his cross-examination that vide

letter dated 25-03-1996 the Goa MRF Employees Union had informed to the Party II that the person who had

made the complaint against the Party I has withdrawn the said complaint. As such, it was incumbent upon the

Management to put a full stop to thesaid enquiry, however, the Management by notice dated 04-07-1996

informed Party I about the enquiry being fixed on 23-07-1996, i.e. after an unreasonable delay and gap of about

5 months, which has again caused grave prejudice to the Party I; besides, the same reflect on the conduct of the

management and the enquiry itself, same being bad for delay and latches.

32. Be that as it may, regardless of whether the enquiry was ex facieillegal and violative of the principles of

natural justice or not, the Party I Workman had served Letter dated 29-08-1996, on 30-08--1996, upon the

Labour Commissioner, Panaji, thereby calling for the conciliation proceedings on Charter of Demands dated 15-

02-1996 of the workmen, including the Party I Workman, for wage rise and better service conditions and the

said Workman was also concerned in the said dispute covered under the said Charter of Demands, the then

pending before the Labour Commissioner as on 30-08-1996. The Party II/Company had, in fact, attended the

conciliation proceedings, on 24-10-1996, in respect of the aforesaid Charter of Demands. Since, the Party II

Company was not ready to accede to the demands of the Union, the Labour Commissioner, Panaji, was pleased

to call for further meetings between the said Company and the said Union and the last meeting, to the best of the

knowledge, was held on 17-02-1997, for trying to conciliate and settle the dispute.

33. That the said Company did not even wait for the Conciliation Officer, the Labour Commissioner to

record failure and without waiting for the Appropriate Government to receive the Report to consider the same or

make reference of the dispute to this Hon’ble Tribunal, the Party II/Company dismissed the Party I/Workman on

17-021997. It is pertinent to note that the Government of Goa was pleased to refer the aforesaid dispute of

Charter of Demand to this Hon’ble Tribunal for adjudication only on 05-06-1997. That the dismissal of the said

Workman, while the aforesaid conciliation proceedings were pending before the Conciliation Officer which

dismissal of the said Workman amounts to an unfair labour practice.

34. The Letter dated 10-09-1996 at Exhibit 29 is addressed by the Assistant Labour Commissioner to the

Company. By this letter, the Assistant Labour Commissioner requested the Party II/Company to offer their

comments on the Charter of Demands raised by the said Union of which the Party I/Workman is part and parcel.

In response thereto, the representative of the Party II/Company, Mr. George Nainan, the Plant Human Resource

Manager, vide its Letter dated 19-09-1996 at Exhibit 30, requested for 3 weeks’ time to offer their comment to

which the Assistant Labour Commissioner, vide his Letter dated 07-10-1996 at Exhibit 31, intimated to both the

Parties therein that he would hold discussions and, if necessary, the conciliation proceedings under the

provisions of Section 12(3) of the Industrial Disputes Act, 1947, in respect of the dispute raised by the said

Workman, and the date of hearing was fixed on 14-10-1996 at 11.00 a.m. The Party I/Company, thereafter vide

its Letter dated 10-10-1996 at Exhibit 32, requested time to file their comments. The Assistant Labour

Commissioner, after considering the request of the Party II/Company, thereafter placed the matter for further

discussions/conciliation on 24-10-1996 at Exhibit 35. On the said day, the proceedings before the Conciliation

Officer reads thus.

‘… the Management submitted their Written Statement on the Justification Statement given by the Union on

Charter of Demands and asked for revised reasonable Charter of Demands as the Charter of Demands are

raised at an increase of average of Rs. 40,000/- per employee per month and the period of settlement is effective

for 2 years. The demands raised are unreasonable by any standards and further the Union has not given any

reply to the Charter of Demands of the Management without which itis difficult to consider any proposals. Our

1014

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

reply to both is required to continue with the discussions else we did not like to say discussion in the presence of

any other than our employees, employees who are on the rolls of the Company…’.

35. Accordingly, the Minutes of Meeting were drawn at Exhibit 35 detailing the business of the day and

before concluding the Minutes, the Conciliation Officer held that both the Parties have stuck up to their own

stand; as such, he suggested that they should both think about their stand taken by them so as to have an

amicable solution and postponed the discussions to 28-10-1996 at 11.00 a.m. The joint discussions continued on

28-10-1996 and in the Minutes of Meeting which was drawn on 28-10-1996 at Exhibit 36, the Conciliation

Officer, once again, held that both the parties had stuck to their own stand as the said Union was not ready to

amend their demands and the said Company was not ready to give any offer and, as such, the Conciliation

Officer was pleased to close the discussion and informed both the parties to await for further report.

36. The Assistant Labour Commissioner vide its Letter dated 29-10-1996 at Exhibit 37, forwarded to the

Commissioner, Labour, the Report of Failure of discussion upon the Charter of Demands sub-judice between

both the parties, along with his original file for its perusal and further necessary actions thereupon. The Office

of the Commissioner, Labour, vide his Letter dated 15-11-1996 at Exhibit 38, called upon the Union, the Party

I/Workman, for the discussions with reference to the aforesaid report submitted before him by the Assistant

Labour Commissioner.

37. The Office of the Labour Commissioner, vide his Letter dated 14-01-1997 at Exhibit 39, informed the

Union of the Party I/Workman that the Hon’ble Minister for Labour wanted to explore the possibility of an

amicable settlement on the whole dispute. The Office of the Labour Commissioner, vide his letter dated 11-02-

1997 at Exhibit 40, called upon both the parties for a joint discussion to be held on 17-02-1997 at 3.00 p.m. in

the Office of the Labour Commissioner. It is pertinent for this Hon’ble Tribunal to note that there were no

further correspondences, nor was there any report or write-up produced before this Hon’ble Tribunal about the

joint discussion which was proposed to be held on 17-02-1997in the Office of the Labour Commissioner. The

submission of the Failure Report to the Labour Commissioner, by the Conciliation Officer, is an internal

departmental affair. Even after submission of the Failure Report, the Office of the Commissioner thought it

appropriate to call upon the parties for further joint discussion. The matter did not stop at that stage and that

there was an intervention by the Hon’ble Minister for Labour who too felt it appropriate to have a joint

discussion with both the parties.

38. It is therefore the contention of the Party I/Workman that in the event, even assuming without admitting

that the joint discussion had failed, it was incumbent upon the Conciliation Officer to submit his Failure Report

to the Government but it was not done until such time the Union of the Party I/Workman preferred a Writ

Petition before the Hon’ble Bombay High Court at Goa, pursuant to which the Additional Government Pleader

produced on record Reference dated 05-06-1997. Thus, it is submitted that the Conciliation Officer did not send

the Failure Report in view of the date being fixed for further discussions even after the Failure Report was sent

by the Assistant Labour Commissioner to his Superior, i.e., the Office of the Labour Commissioner and, further,

from the Office of the Labour Commissioner, the joint discussions were proposed to be held with the

intervention of the Hon’ble Minister for Labour.

39. It is pertinent to note that the perusal of the Outward Register at Exhibit 46 Colly, would confirm that

the File ALC/Ponda/Ch. of Demand/MRF was forwarded to the Hon’ble Labour Minister. It is also important to

note that the Office of the Labour Commissioner, vide letter dated 14/01/1997at Exhibit 39 informed the Union

of the Party I/Workman that the Hon’ble Labour Minister wanted to explore the possibility of an amicable

settlement on the whole dispute; therefore, it could not be said that the Failure Report was indeed sent to the

Government, vide this Outward Number by the Office of the Labour Commissioner, the said submission of the

Party II/Company being devoid of any substance. It is abundantly clear that the Hon’ble Labour Minister

wanted to have joint discussion with both the parties and, therefore, by no stretch of imagination can it be

construed that the File containing the Minutes of the Failure sent to the Hon’ble Labour Minister is the Failure

Report being sent to the Government of Goa under the provisions of Section 12(3) of the Industrial Disputes

Act, 1947.

1015

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

40. The records speak for itself and the document to that effect shows that the Party I/Workman was

dismissed on 17-02-1997 and the Outward Register seems to suggest that the so-called Failure Report was

forwarded on 04-06/1997. Thus, it is clear from the records that the services of the Party I/Workman were

terminated when the matter was sub judice for conciliation before the Conciliation Officer; therefore, the Party

I/Workman, through oral as well as documentary evidence, was able to prove his defence of the Party

II/Company having clearly violated there quirements prescribed under the provisions of Section 33 of the

Industrial Disputes Act, 1947.

41. The Party I/Workman, in support of his amended pleading, has examined his next witness Shri Rohidas

Naik wherein he highlighted the relevant and material facts pertaining to the conciliation proceeding before the

Labour Commissioner. The said witness Shri Rohidas Naik stood by his testimony in the cross-examination to

support and substantiate the defence of the Party I/Workman as regards to the Party II/Company violating the

mandatory provisions of the Section 33 of the Act in addition to oral testimony and documentary evidence on

record, the Party I/Workmanhas placed reliance in the case of Jaipur Zila Sahadari Bhoomi Vikas Bank Ltd.,

V/s Ram Gopal Sharma and Others [(2002) 2 SCC 244].

42. Therefore the ratio laid down in the case of Jaipur Zila Sahadari Bhoomi Vikas Bank Ltd. (Supra)

has come to the rescue of this Workman. The Party I/Workman has been able to establish that his termination

was illegal as the same was done pending the Charter of Demands, in which Charter of Demands he too was a

concerned Workman. Therefore, the Party II ought to have refrained from taking any action pending such

conciliation in view of Section 33(2) (b) of the Industrial Disputes Act, 1947. Therefore the question of

violation of Section 33(1) of the Industrial Disputes Act, 1947 requires to be considered in the light of the

relevant statutory provisions. Section 33 of the Industrial Disputes Act, sub-section (1) reads as under:

“33. Conditions of service, etc., to remain unchanged under certain circumstances during pendency of

proceedings.- (1) During the pendency of any conciliation proceeding before [an arbitrator or] a conciliation

officer or a Board or of any proceeding before a Labour Court or Tribunal or National Tribunal in respect of an

industrial dispute, no employer shall,- (a) in regard to any matter connected with the dispute, alter, to the

prejudice of the workmen concerned in such dispute, the conditions of service applicable to them immediately

before the commencement of such proceeding; or (b) for any misconduct connected with the dispute, discharge

or punish, whether by dismissal or otherwise, any workman concerned in such dispute”.

43. Furthermore, as per the ratio laid down in Lokmat Newspaper Pvt. Ltd. v/s Shankar Prasad (1999) 6

SCC it is but obvious that the impugned termination of the said Workman on 17-02-1997, amounts to unfair

labour practice. The relevant portion is reproduced which read thus.

‘… (19) NOW it must be stated that the impugned termination order was passed against the respondent-

workman on 22-06-1982. Within three days thereof, the respondent raised an industrial dispute by filing

acomplaint under Section 28 of the Maharashtra Act alleging that the impugned termination order amounted to

unfair labour practice. Before the impugned termination order was passed by the management, it had already

served a notice under Section 9-A of the 1. D. Act to there spondents union to the effect that it proposed to

introduce a change in the conditions of service of the respondent and other members of the union on the ground

that it was proposing to rationalise the printing work at the appellants concern at Nagpur by setting up photo-

type machine for carrying out the work of composing, resulting in substantial reduction in the work of

composing by hand. It may be stated that the respondent was employed as a foreman in the hand-composing

department of the appellant at the relevant time. The respondents union objected to the said notice of change

and approached the Conciliation Officer under Section 12(1 of the I.D. Act which reads as under:-

12. Duties of Conciliation Officers.- (1 Where an industrial dispute exists or is apprehended, the

conciliation officer may, or where the dispute relates to a public utility service and a notice under Section 22

has been given shall, hold conciliation proceedings in the prescribed manner.&

(20) THE Conciliation Officer took the dispute in conciliation within his discretion even though as

appellants concern was not a public utility service it was not mandatory for the Conciliation Officer to start

conciliation proceedings. As the report of the Conciliation Officer submitted to the State government shows, he

1016

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

invited the management and the respondents union for preliminary discussions on 14-4-1982 in his office and

thereafter the matter was adjourned during conciliation from time to time.

(21) IT can therefore, be said that by 14-04-1982 the matter was taken up for investigation and thus the

conciliation proceedings had commenced. It is also well established on the record of the case that the parties

could not come to any settlement with the result that on 22-06-1982 the investigation was closed by the

Conciliation Officer at 4.35 p.m. at Nagpur. Immediately thereafter, the Appellant passed the impugned order of

termination against the respondent and others on the very same day i.e. on 22-6-1982 at 5.00 p.m. The said

order was placed on the notice board of the appellants office at Nagpur on the evening of that day. It is not in

dispute between the parties that thereafter the Conciliation Officer submitted his report to the government

which reached the State government on 13-8-1982.

(22) ON the aforesaid facts, the question arises whether the impugne dtermination order dated 22-6-1982

was passed during the pendency of the conciliation proceedings. It is not in dispute between the parties that

before passing such an order no express permission in writing was obtained by the appellant from the

Conciliation Office. The Labour court/the Industrial court and the learned Single Judge of the High court have

taken the view that because investigation was closed by the conciliator by 4.35 p.m. on 22-6-1982, immediately

thereafter the conciliation proceedings could be said to have ended and were not pending before him.

Consequently at 5.00 p.m. on that very day when the appellant issued the impugned order, it did not violate

Section 33 of the I. D. Act. While, on the other hand, the division bench of the High court in the impugned

judgment has taken the view that merely because the conciliator closed the investigation in the evening of 22-6-

1982 till he prepared his report as per Section 12(4) of the I. D. Act and till that report reached the government,

conciliation proceedings were deemed to have continued and had not got terminated till 13/08/1982 and as in

the meantime on 22-6-1982, the impugned termination order was passed without following the procedure of

Section 33(1 of the I.D. Act it got vitiated in law.

(23) UNDER these circumstances, a moot question arises whether the impugned retrenchment order was

passed on 22/6/1982 during the pendency of conciliation proceedings. It cannot be disputed that the impugned

order was directly connected with the matter in dispute before the Conciliation Officer wherein the question of

legality of notice under Section 9-A of the I.D. Act was under consideration for the purpose of arriving at any

settlement between the parties in this connection. The impugned order had definitely altered to the prejudice of

the responden this conditions of service. It was not a case of retrenchment simpliciter but was a consequential

retrenchment on the introduction of the scheme of rationalisation as contemplated by Section 9-A read with

Schedule IV item No. 1 of the I.D. Act.

(24) WE shall refer to these provisions in greater detail later on while considering the question of legality

of notice under Section 9-A of the I. D. Act. For the time being, it is sufficient to note that the question of

violation of Section 33(1 of the I. D. Act has a direct nexus with the further question whether on 22/6/1982 when

the impugned termination-order was passed, conciliation proceedings were pending before the authority or not.

(25) IN order to answer these questions, it is necessary to note Ss. (4) of Section 12 of the 1.D. Act which

reads as under:

(4) If no such settlement is arrived at, the conciliation officer shall, as soon as practicable after the close of

the investigation, send to the appropriate government a full report setting forth the steps taken by him for

ascertaining the facts and circumstances relating to the dispute and for bringing about a settlement there of,

together with a full statement of such facts and circumstances, and the reasons on account of which, in his

opinion, a settlement could not be arrived at. A mere look at this provision shows that if the Conciliation Officer

finds during conciliation proceedings that no settlement is arrived at between the disputing parties, then after

closing the investigation he has, as soon as practicable, to send to the appropriate government a full report

setting forth the steps taken by him for ascertaining the facts and circumstances relating to the dispute and has

also to mention all other details as required to be mentioned in the report under Section 12(4 of the I.D. Act.

(26) THE aforesaid statutory requirements leave no room for doubt that after closing the investigation and

after having arrived at the conclusion that no settlement is possible between the parties, the Conciliation

1017

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

Officer has to spend some more time before submitting his detailed written report about failure of consideration

for information and necessary action by the State government. In the very nature of things, therefore, such

requirement will take at least a couple of days, if not more, for the conciliator after closing the investigation to

enable him to send an appropriate report to the State government. It is, therefore, obvious that on 22-6-1982

when by 4.35 p.m. the Conciliation Officer declared that settlement was not possible between the parties and he

closed the investigation, neither his statutory function did not come to an end nor did he become functus officio.

His jurisdiction had to continue till he submitted his report as per Section 12(4) to the appropriate government.

Even such preparation of the report and sending of the same from his end to the appropriate government would

obviously have taken at least a few days after 22/6/1982. It must, therefore, be held that the conciliator

remained in charge of the conciliation proceedings at least for a couple of days after 22-6-1982. It is, therefore,

difficult to appreciate how within half an hour after the closing of investigation by the conciliator and before his

getting even a breathing time to prepare his detailed written report about failure of conciliation to be sent to the

government as per Section 12(4), the appellant could persuade itself to presume that conciliation proceedings

had ended and, therefore, it was not required to follow the procedure of Section 33(1) and straightaway could

pass the impugned order of retrenchment within 25 minutes of the closing of the investigation by the conciliator

on the very same day. It is difficult to appreciate the reasoning of the Labour court that after the closer of

investigation the conciliator became functus officio and the management could not have approached him for

express written permission to pass the impugned order. It is easy to visualise that even on the same day i.e. on

22/6/1982 or even on the next day, before the conciliator had time even to start writing his report, such an

express permission could have been asked for by the appellant as the conciliator by then could not be said to

have washed his hand off the conciliation proceedings. He remained very much seized of these proceedings tilt

at least the time the report left his end apart from the further question whether conciliation proceedings could

be said to have continued till the report reached the State government. Thus, on the express language of Section

12(4) the conclusion is inevitable that closer of investigation by 4.35 p.m. on 22/6/1982 did not amount to

termination of conciliation proceedings by that very time. The argument of learned counsel for the appellant

was that closer of investigation automatically amounted to termination of conciliation proceedings. This

argument proceeds on a wrong premise that closer of investigation by the conciliator is the same as closer of

conciliation proceedings. The legislature while enacting Section 12(4) has deliberately not used the words

closer of conciliation but, on the contrary, provided that after closer of investigation something more was

required to be done by the conciliator as laid down under Section 12(4 before he can be said to have done away

with conciliation proceedings earlier initiated by him. On this conclusion alone the decision rendered by the

division bench of the High Court that the impugned order of termination dated 22-6-1982 was issued by the

appellant without following the procedure of Section 33(1 of the I.D. Act has to be sustained.…’.

44. The Ld. Adv. Shri S. B. Karpe, appearing for Party II in support of their defence on the issue of alleged

violation of Section 33, placedreliance in the case of East Asiatic & Allied V/s Shelke (B.L.) (1961

ILLJ162 Bom), Ambuja Cement V/s U B Group, Gopinath Daulat Dalvi V/s State of Maharashtra,

Suresh Vithoo Nare V/s Dharamsi Morarji Chemicals 1991 Lab. I.C. 1932 Bom, and VIP Industries

Shramik Sangh V/s. VIP Industries Ltd. MANU/MH /1929/ 2024.

45. Relying on the ratios in the citations above, Ld. Adv. Shri S. B. Karpe submitted that unless the

Conciliation Officer applies his mind and decides to enter in conciliation, the conciliation cannot be said to have

commenced.

46. The above contention of Ld. Adv. Shri S. B. Karpe is contrary to the records produced on the record by

the Party I Workman, which duly supports the defence taken by him as regard to his termination being illegal

and in contraventions to the provisions of Section 33. The same is duly supported by the ratio in the case of

Lokmat Newspaper Pvt. Ltd.(Supra), as the provisions of Section 33 (2) (b) has been settled in the case of

Lokmat (Supra), the same being later in time than the ones relied upon by the Party II. Hence, it is the

contention of the Party I/Workman that the facts in question and the provisions of law involved in the case of

Lokmat (Supra) are the same as in the present reference. Therefore, it directly applies to the case in hand, giving

no room to this Tribunal to deviate from the ratio laid down in the citation above.

1018

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

47. That, except a mere submission being made “ that unless the Conciliation Officer applies his mind and

decides to enter in conciliation, the conciliation cannot be said to have been commenced” there is nothing

produced by the Management. Nor could the management discard the evidence adduced by the Party I

Workman, which clearly indicates his termination pending the conciliation proceedings sans the Failure Report

clearly showing that the termination was prior to submitting the Failure Report to the Government of Goa. Be

that as it may, there has been a clear admission on record by the Management witness Shri Ratnakar Amonkar

as regards to the Party II/Company having received the notices of hearing for conciliation, and the Party II, in

turn, having responded to those notices.

48. Thus, this is a clear case of violation of mandatory provisions of Section 33 (2) (b) of the Industrial

Disputes Act, 1947. Hence, the ratio in the case of Jaipur Zila would be squarely applicable to the present

reference, wherein it is held “Amendments to Section 33 of the Industrial Disputes Act, 1947 in the year 1956

were made at a time when no remedy under the Industrial Disputes Act, 1947 was available to the individual

workman to challenge the termination of his employment. At that time, the dismissal of an individual workman

could form the subject-matter of an industrial dispute only if it was espoused by the fellow workmen. In those

days, dismissal of workmen who actively participated in raising an industrial dispute which was not uncommon.

In order to obviate this contingency, Section 33 imposed an obligation on the employer to seek approval or

permission for the dismissal of any workman to be effected during the pendency of an industrial dispute. Apart

from imposing an obligation on the employer to file such an application, in order to protect the workman

against any termination which might be made without seeking approval or permission, Section 33-A was

enacted creating a right in favour of the aggrieved workman to file a complaint which will be dealt with like

adjudication of an industrial dispute. In other words, a right which was not available to the individual workman

to approach the Labour Court or Tribunal for adjudication of a dispute relating to his dismissal was conferred by

Section 33-A.”

49. The Supreme Court in the case under review has ruled that failure to apply for approval by the

employer would make the order of dismissal inoperative and that the workman may get wages and other

benefits. It was also held that even if the application for approval is granted by the Authority, still the aggrieved

could make a complaint under Section 33-Achallenging the approval. It is to be considered whether an

interpretation can be placed on Section 33 to the effect that even without judicial declaration about the validity

of the order of dismissal, as a result of the failure to seek approval or permission, the workman could straight

away proceed on the footing that the dismissal is invalid and inoperative and work out his rights for recovery of

wages and other benefits. The case law placed before the Supreme Court does not support the present ruling. In

order to dispel any doubt in the minds of the litigants and the lower courts, it may be clarified that no dismissed

workman can claim the relief of reinstatement without a declaration by a competent court that the order of

termination is not valid and no punitive order of termination be interfered without any technical grounds, if such

an order is otherwise justified on merits.

50. The Party I/Workman thus have successfully discharged his burden to prove that the domestic enquiry

held against him was not fair and proper, and the same was not free from bias from the Management side.

Hence, the Issue No. 1 stands answered in the affirmative in favour of the Workman/Party I.

51. Similarly, the charges levelled in the charge-sheet on the basis of the complaint, and the complaint

thereafter being withdrawn, as such there was no basis for the Enquiry Officer to proceed with the enquiry in

the absence of any allegations, the same being withdrawn. Hence, by no stretch of imagination it can be held the

Issue No. 2, the burden of which appears to be on the Management, and the Management having failed to

discharge the same, this Issue stands answered in the negative.

52. Additional Issue No.4A: While discussing the Issue Nos. 1 and 2, this Tribunal has taken into

consideration all the sequential events to show that the Employer/Party II has violated the mandatory provisions

of the Industrial Disputes Act, 1947. Thus, this is a fit case where the ratio laid down in the case of Jaipur Zilla

squarely applies, leaving no room for any further prolonged litigation but to put a full stop to the entire

reference by applying the ratio laid down in the case of Jaipur Zilla (Supra).

1019

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

53. It is pertinent to note that in the case of Jaipur Zila (Supra) while referring to the case of Strawboard

Mfg. Co. v. Govind, the Hon’ble Apex Court observed that “the application for approval was rejected by the

Tribunal”. Dealing with the consequence of such rejection, the Supreme Court held that “If the Tribunal does

not approve of the action taken by the employer, the result would be that the action taken by him would fail and

there upon the workman would be deemed never to have been dismissed or discharged and would remain in the

service of the employer. In such a case no specific provision as to reinstatement is necessary and by the very

fact of the Tribunal not approving the action of the employer, the dismissal or discharge of the workman would

be of no effect and the workman concerned would continue to be in service as if there never was any dismissal

or discharge by the employer.

54. Considering this observation, this Tribunal is of the opinion that no further purpose will be served if this

Tribunal proceeds to pass the Part Award on the preliminary issues only and keeps the reference alive for

holding an enquiry on other issues when the termination of the Party I/Workman itself is illegal, the same being

in violation of provisions of Section 33 (2) (a) (b) of the Industrial Disputes Act, 1947.

Hence, the final Order.

ORDER

i.

It is held that the action of the Management of Party II/M/s. MR.F. Limited, Usgao, Ponda-Goa in

terminating the Workman/Mr. Jose Gomes is illegal and unjustified and consequently, the Party II

is hereby directed to re-instate in service the Party I/Workman, Mr. Jose Gomes with full

backwages from 17-02-1997.

ii.

No order as to cost.

iii.

Inform the Government accordingly.

Vijayalaxmi R. Shivolkar, Presiding Officer, Industrial Tribunal & Labour Court.

Panaji.

——— ♦♦♦———

Department of Law & Judiciary

Law (Establishment) Division

Order

On the recommendation of the Goa Public Service Commission (GPSC) as conveyed vide their letter No.

COM/II/11/55(1)/2017/253 dated 08-10-2025, the Government is pleased to promote the following Civil

Registrar-cum-Sub Registrars to the post of District Registrar in Registration Department, “Group A” Gazetted

Officers, on regular basis in the Pay Level 10 and other allowances to be fixed, as per rules with immediate

effect:

1. Dr. Gouresh Gurudas Bugde; and

2. Shri Mahesh Ramesh Prabhu Parrikar.

The above Officers shall be on probation for a period of two years.

Consequent upon their promotion, they shall continue to work at the place where they are presently posted.

The expenditure towards the Salary and other allowances shall be debited under the Demand No. 10,

Budget Head­ 2030–Stamps and Registration; 03–Registration; 001–Direction and Administration; 01–

Superintendence; 00–General; 01–Salaries. The promoted Officers shall exercise their option for fixation of the

pay in the promotional grade in terms of FR 22 (I) (a) (1) within a period of one month from the date of their

promotion as District Registrar. The option once exercised shall be final.

By order and in the name of the Governor of Goa.

Amir Y. Parab, Under Secretary (Estt.), Law.

Porvorim.

2-2-2020-LD (Estt.)/Part-I/2775

Date : 17-Oct-2025

1020

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

Order

On the recommendation of the Goa Public Service Commission (GPSC) as conveyed vide their letter No.

COM/II/11/55(2)/2015/254 dated 08/10/2025, the Government is pleased to promote the following Head

Clerk/Upper Division Clerks to the post of Civil Registrar-cum-Sub Registrar on regular basis, Group ‘B’

Gazetted Officers, in the Pay Level-7 (Rs. 9,300 - 34,800 + Grade Pay Rs. 4,600/-) and other allowances to be

fixed as per rules with immediate effect:

Sr. No.

Name of the Official

1

Smt. Rama L. Malik

2

Smt. Perpetua Cruz (ST)

3

Smt. Malini P. Sawant

The above Officers shall be on probation for a period of two years, from the date of joining.

Salary shall be drawn against Budget Head­ 2030—Stamps and Registration; 03—Registration; 001—

Direction and Administration; 02—District Charges; 00—General; 01—Salary under Demand No. 10. She/He

shall exercise her/his option for fixation of the pay in the promotional grade in terms of FR 22 (I) (a) (1) within

a period of one month from the date of their promotion as Civil Registrar-cum-Sub Registrar. The option once

exercised shall be final.

By order and in the name of the Governor of Goa.

Amir Y. Parab, Under Secretary (Estt.), Law.

Porvorim.

——— ♦♦♦———

Department of Personnel

Order

Consequent upon the marriage of Smt. Meeksha N. Naik, Block Development Officer, Pernem with Shri

Omkar Naresh Manjrekar registered in the Office of the Civil Registrar, Bardez, Mapusa-Goa under Certificate

of Marriage No. MR-BAR-810-2024, her name "Meeksha Nagesh Naik" stands changed to “Meeksha Omkar

Manjrekar”.

Henceforth, her name in all official records/purpose shall be as per above changes.

By order and in the name of the Governor of Goa.

Raghuraj A. Faldesai, Under Secretary (Personnel-I).

Porvorim.

——— ♦♦♦———

Department of Town and Country Planning

Notification

Whereas, the Town and Country Planning Department of the Government of Goa received applications

under sub-section (1) of Section 39A of the Goa Town and Country Planning Act, 1974 (Act 21 of 1975) for

change of zones in the Regional Plan for Goa 2021 and Outline Development Plan of Vasco Da Gama Planning

Area 2030 in respect of the plots of land as specified in detail in column Nos. (2) to (7) of the Table below

(hereinafter referred to as “the said Proposals”);

2-3-2020-LD (Estt)/Part-I/2796

Date : 21-Oct-2025

15/18/2023-PER/3121

Date : 09-Oct-2025

36/18/39A/Notification (15F)/TCP/2025/618

Date : 22-Oct-2025

1021

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

TABLE

Sr.

No.

Name of the

Applicant

Survey No./

Sub-Division

No./P.T. Sheet

No./Chalta

No.

Name of

Village and

Taluka

Published land

use as per RPG-

2021/ODP

(Total Area) in m2

Proposed land use

Area

proposed

in sq. mts.

Decision of the

Government

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

1.

Prestige Acres

Private Limited

rep. by Mr.

Kishor Kumar

Kadrolkar

130/1

Sancoale,

Mormugao

Partly

Residential

(S-2)

(61601m2),

Partly

Transport/

warehousing &

communication

(24574m2)

Total Area

(86175)

Transport/

warehousing &

communication to

Settlement

24574

Approved for

change of zone.

2.

Prestige Acres

Private Limited

rep. by Mr.

Kishor Kumar

Kadrolkar

131/1

Sancoale,

Mormugao

Partly

Transport/

warehousing &

communication

(8864m2)

Partly S-2 Zone

(10186m2)

Total Area

(19050)

Transport/

warehousing &

communication to

Settlement

8864

Approved for

change of zone.

3.

Bhumi

Developers Pvt.

Ltd.

59/1 (Part)

Arvalem,

Bicholim

Playground

Total Area

(86517)

Settlement Zone

26610

Approved for

change of zone.

4.

Mandrem

Hotels Pvt. Ltd.

201/0

Mandrem,

Pernem

Partly Orchard

(25,630m2)

Partly Orchard

with No

Development

Slope

(2,487m2)

Total Area

(28117)

Settlement Zone

28117

Approved for

change of zone an

area of 25630m2

from orchard to

Settlement zone.

And whereas, in terms of sub-rule (1) of Rule 4 of the Goa Town and Country Planning (Change of zone of

land in the Regional Plan or the Outline Development Plan) Rules, 2024 (hereinafter referred to as the “said

Rules”), the Town and Country Planning Department after scrutinizing the said proposals placed such proposals

alongwith its scrutiny reports before the Goa Town and Country Planning Board for its

recommendations/approval/decision;

And whereas, the Goa Town and Country Planning Board approved the said proposals as specified in

column No. 8 of the above Table;

And whereas, notices as required by sub-rule (2) of Rule 4 of the said Rules were published,–

(i)

Vide Notification No. 36/18/39A/Notification(11)/TCP/2024/53 dated 26-11-2024, published in

the Official Gazette, Series III No. 35 dated 28-11-2024 (as regards proposals at Sr. No. 1);

(ii)

Vide Notification No. 36/18/39A/Notification(8)/TCP/2024/35 dated 05-11-2024, published in

the Official Gazette, Series III No. 32 dated 07-11-2024 (as regards proposals at Sr. No. 2);

(iii)

Vide Notification No. 36/18/39A/Notification(27)/TCP/2025/323 dated 16-07-2025, published

in the Official Gazette, Series III No. 16 dated 17-07-2025 (as regards proposals at Sr. No. 3);

1022

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

(iv)

Vide Notification No. 36/18/39A/Notification(14)/TCP/2024/67 dated 31-12-2024 read with

corrigendum 36/18/39A/Notification(14C)/TCP/2024/68 dated 03-01-2025, published in the

Official Gazette, Series III No. 40 dated 02-01-2025 (as regards proposals at Sr. No. 4); and

suggestions were invited from the public within a period of thirty days from the date of

publication to the said Notifications in the Official Gazette.

And whereas, suggestions received from public were placed before the Goa Town and Country Planning

Board in terms of sub-rule (3) of Rule 4 for its recommendation/approval and the Goa Town and Country

Planning Board after due consideration of the suggestions received from the public recommended the proposals

for change of zone as regards to Sr. No. 1 in its 211th meeting held on 15-01-2025 and Sr. No. 2 in its 210th

meeting held on 30-12-2024, Sr. No. 3 in its 218th meeting held on 12-09-2025 and Sr. No. 4 in its 213th meeting

held on 07-03-2025 and directed to take further action as per sub-rule (4) of Rule 4 of the said Rules;

And whereas, as required by sub-rule (4) of Rule 4 of the said Rules, the recommendation/

approval/decision of the Goa Town and Country Planning Board along with the said proposals were placed

before the Government for its decision and the Government has approved the same;

Now, therefore, in view of the recommendation of the Goa Town and Country Planning Board being

approved by the Government and in exercise of the powers conferred by Section 39A of the Goa Town and

Country Planning Act, 1974 (Act 21 of 1975) read with sub-rule (5) of Rule 4 of the Goa Town and Country

Planning (Change of zone of land in the Regional Plan or the Outline Development Plan) Rules, 2024, the

Regional Plan and the Outline Development Plan is hereby altered and modified as specified in column No. (8)

of above Table and as directed by the Government for carrying out change of zone of land in respect of the plots

of land as specified in detail in column Nos. (2) to (7) of above Table.

The alteration and modification of the Regional Plan and the Outline Development Plan as notified in this

Notification shall be subject to the outcome of the PIL Writ Petition Nos. 53 of 2024 and 54 of 2024 which are

pending final disposal before the Hon’ble High Court of Bombay at Goa.

Vertika Dagur, Chief Town Planner (Planning).

Panaji.

1023

OFFICIAL GAZETTE — GOVT. OF GOA

SERIES II No. 30

23RD OCTOBER, 2025

www.goaprintingpress.gov.in

Published by the Director, Printing & Stationary,

Government Printing Press,

Mahatma Gandhi Road, Panaji-Goa 403 001.

Price—Rs. 19.00

PRINTED AT GOVERNMENT PRINTING PRESS, PANAJI-GOA—267/80-10/2025.