Note: There are three Extraordinary issues to the Official Gazette, Series II No. 38 dated 18-12-2025 as follows:-
1. Extraordinary dated 23-12-2025 from pages 1305 to 1306 regarding Notifications from Office of the Chief Electoral Officer.
2. Extraordinary (No. 2) dated 24-12-2025 from pages 1307 to 1308 regarding Order from State Election Commission, Goa.
3. Extraordinary (No. 3) dated 24-12-2025 from pages 1309 to 1312 regarding Notification from Department of Panchayati Raj &
Community Development.
GOVERNMENT OF GOA
Inspectorate of Factories & Boilers
Order
On the recommendation of the Goa Public Service Commission as conveyed vide their letter No.
COM/1/5/19(1)/2025/191 dated 22-08-2025, Government is pleased to appoint Dr. Naresh Suresh Fadte to
the post of Medical Inspector of Factories (Group “A” Gazetted) in the Inspectorate of Factories and Boilers,
Altinho, Panaji, Goa on deputation with immediate effect.
The period of deputation shall be initially for a period of 03 years and shall be regulated as per the
standard terms of deputation as contained in the O.M. No. 13/4/74-PER dated 20-11-2013 issued by the
Department of Personnel and as amended from time to time.
By order and in the name of the Governor of Goa.
Anant S. Pangam, Chief Inspector of Factories and Boilers & ex officio Joint Secretary.
Panaji.
——— ♦♦♦———
Goa Legislature Secretariat
Order
In pursuance of Rule 4(2) of the Goa Legislature Secretariat (Recruitment and Conditions of Service)
Rules, 1988, the Hon’ble Governor in consultation with the “BOARD” is pleased to promote Smt. Anjusha
G. Amonkar, Reporter (Konkani) of the Goa Legislature Secretariat to the post of Chief Reporter, Group “B”
(Gazetted) in the Pay Matrix Level–7, with effect from 23rd December, 2025 (f. n.) on regular basis.
No. 2/05(Part-IX)/ADM-IFB/25-26/2718
Date : 12-Dec-2025
No. LA-ADMN-2025-3140
Date : 23-Dec-2025
Suggestions are welcomed on e-mail: [email protected]
1313
Reg. No. RNP/GOA/32/2024-2026
RNI No. GOAENG/2002/6410
Panaji, 26th December, 2025 (Pausa 5, 1947)
SERIES II No. 39
PUBLISHED BY AUTHORITY
2.
The said promotion is made against the post of Chief Reporter caused due to promotion of Smt.
Maria Celestina Sequeira, Chief Reporter to the post of Editor of Debates.
3.
Smt. Anjusha G. Amonkar, will be on probation period for a period of 2 years from the date of her
promotion.
4.
The pay of Smt. Anjusha G. Amonkar, shall be fixed as per the rules.
5.
The expenditure on account of this be debited to the Budget Head “2011-Parliament/State/U.T.
Legislature; 02—State/U.T. Legislature; 103—Legislative Secretariat; 01—Legislature Secretariat of State;
00—General; 01—Salaries.”
By order and in the name of the Governor of Goa.
Mohan J. Gaonkar, Joint Secretary, Legislature.
Porvorim.
——— ♦♦♦———
Department of Labour
Notification
The following Award passed by the Industrial Tribunal and Labour Court, at Panaji-Goa on 16-10-2025
in Case Ref. No. IT/57/1999 is hereby published as required under Section 17 of the Industrial Disputes Act,
1947 (Central Act 14 of 1947).
By order and in the name of the Governor of Goa.
Amalia O. F. Pinto, Under Secretary (Labour).
Porvorim.
IN THE INDUSTRIAL TRIBUNAL AND LABOUR COURT
GOVERNMENT OF GOA AT PANAJI
(Before Mrs. Vijayalaxmi Shivolkar, Hon’ble Presiding Officer)
Ref. No.: IT/57/1999
Mr. Santan Costa,
Rep. by the Goa MRF Employees Union,
Saidham, Dhavalimol,
Ponda-Goa.
…
Workman/Party I
V/s
M/s. M.R.F. Limited,
Tisk, Usgao,
Ponda-Goa.
…
Employer/Party II
Workman/Party I represented by Learned Adv. Shri P. Agrawal.
Employer/Party II represented by Adv. Shri S. B. Karpe along with Adv. Ms. S. Vaigankar.
AWARD
(Delivered on this the 16th day of the month of October of the Year, 2025)
By Order dated 25th May, 1999 bearing No. IRM/CON/P/(188)/1998/2667, the Government of Goa in
exercise of powers conferred by Clause (d) of sub-section (1) of Section 10 of the Industrial Disputes Act,
1947 (Central Act of 14 of 1947), has referred the following dispute to this Tribunal for adjudication.
No. 28/02/2025-LAB/643
Date : 17-Nov-2025
1314
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 39
26TH DECEMBER, 2025
SCHEDULE
(1)
“Whether the action of the management of M/s. MRF Limited, Usgao, Ponda-Goa, in terminating
the services of Shri. Santana Costa with effect from 28-10-1996, is legal and justified?
(2)
If not, to what relief the workman is entitled?
2. Upon receipt of the reference, it was registered as IT/57/1999 and registered A/D notices were issued
to both the Parties. Pursuant to service of notice, Party I filed his Claim Statement at Exhibit 3.
3. The Party I stated that since the formation of the Union, the Company has been attempting to disrupt
the unity of the workmen employed by the Company who are members of the Union. Of late, there has been
large scale harassment and victimization of the Union Office bearers and its other members due to their
legitimate trade union activities. The harassment, inter-alia, include illegal changes in service conditions,
unjustified and unwarranted suspensions, charge-sheets based on false and fabricated charges, refusal to
negotiate in good faith, and impositions of unfair labour practices in the guise of following management
policy, etc., and further including the termination of the Workman, Mr. Santana Costa.
4. The Party I states that the Workman was issued a letter/charge-sheet dated 13-05-1996, which itself
was illegal and untenable at law and was based totally on concocted charges solely to victimize the Workman
for his union activities. The Party I states that the said Company issued Charge-sheet dated 13-05-1996,
thereby alleging certain acts of misconduct against the said Workman, which (the issuance of the Charge-
sheet) is illegal, invalid and untenable at law. It was based totally on concocted charges to victimize him for
his bonafide Union activities.
5. The Charge-sheet was based on the allegation that the said Workman, was in the habit of remaining
absent from duty without authorization on several dates more particularly mentioned in the charge-sheet. The
purported charges mentioned in the so-called Charge-sheet were not supported with any document. The said
Workman was called upon to submit his reply in writing within 48 hours. The workman stated that the
misconduct alleged therein, even if proved, would not be enough to warrant the punishment of dismissal
from service.
6. Thereafter, the management without even calling for an explanation from the workman concerned
decided to hold an enquiry into the charges and accordingly fixed an inquiry to be held on 24-05-1996 by
appointing Inquiry Officer. That on 10-08-1996 the plea of the workman was recorded and the management
presented their case by submitting document on 12-08-1996 on which date the management also produced
the several warning letters dated 15-07-1994, 22-08-1994 and 26-11-1996 in support of the charges levelled
in the charge-sheet dated 13-05-1999. It is further the case of the workman that by letter dated 28-10-1996
his services were terminated without affording to him a reasonable opportunity to show-cause to the decision
taken by the management to terminate his services.
7. Party I further stated that, during the course of enquiry, many irregularities and discrepancies were
brought to the notice of the Enquiry Officer. The Enquiry Officer had deliberately ignored all the evidence
placed before him by the said Workman. As such it is stated that the Findings of the Enquiry Officer sent to
him subsequent to the Order of Dismissal is perverse and invalid. The Party I stated that the charge-sheet
issued to him was ex-facie illegal and untenable at law. He further stated that the Enquiry Officer has
conducted the enquiry devoid of the principles of natural justice. The Party I through his amended pleading
further submitted that it had served a letter dated 29-08-1996 on 30-08-1996 to the Labour Commissioner at
Panaji calling for the conciliation proceedings on the Charter of Demands dated 15-02-1996 of the workmen
for their wage rise and better service conditions. The workman concerned in the present dispute is also a
workman concerned/covered in the dispute/demand pending before the Labour Commissioner as on 30-08-
1996.
8. The Party I states that the Party II attended the conciliation proceedings on the said Charter of
Demands and even filed its reply to the justification of the Party I on the general demands on 24-10-1996.In
the meanwhile, since the management was not ready to accede to the demands of the Union, the Labour
Commissioner of Panaji was pleased to call for further meetings between the management and Union. The
last meeting, to the best of Union’s knowledge, was held on 17-02-1996 at 3.00 p.m., for trying to conciliate
and settle the dispute. The Labour Commissioner was called for the said joint meeting on 17-02-1997 vide
letter dated 11-02-1997 bearing No. IRM/CON/PONDA/(104)/96/752.
9. The Party I states that the workman was dismissed on 28-10-1996, while the proceeding before the
Labour Commissioner, Panaji, was still pending to conciliate and settle the dispute on the Charter of
1315
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 39
26TH DECEMBER, 2025
Demands, without even waiting for the Failure Report to reach the appropriate Government. The
Government of Goa was pleased to refer the said dispute to this Hon’ble Tribunal for adjudication only on
05-06-1996 vide its Order No. ALC/PONDA/C.H.OFDEMANDS/MRF/2488.
10. Under these circumstances, it is humbly submitted that the Party II was required to seek approval of
its action for dismissal under Section 33 of the Industrial Disputes Act, which it had failed to do. Therefore,
its action of dismissing the workman without seeking approval of the Conciliation Officer/Labour
Commissioner is contrary to Section 33 of the Industrial Disputes Act, hence illegal and void.
11. Party I further stated that there was no evidence supporting the charges levelled against him, and that
the charges levelled did not constitute any misconduct either major, or at all and that he was prejudiced at
each stage of the enquiry. He stated that his illegal termination from services was also an act of unfair labor
practice under the Industrial Disputes Act, 1947. That the Dismissal Order was passed in haste and without
waiting for the Conciliation Officer to forward the report of failure of conciliation of general demands to the
appropriate Government or waiting for the Government of Goa to receive the same or to consider the same
or to make a reference of the dispute. Hence, it is stated that the penalty of illegal and unjust termination is
grossly disproportionate to the charges on which the termination is based, and moreover, the same is illegal
and void. Hence, it is prayed that the illegal termination of Party I be revoked and he be reinstated in service
with full back wages.
12. In its Written Statement filed at Exhibit 4, the Party II submitted that Mr. Santana Costa was charge-
sheeted vide Charge-sheet dated 13-05-1996 for alleged act of misconduct as referred to in the said charge-
sheet. It is submitted that the said unauthorized absenteeism by the Workman, if proved, amounts to gross
misconducts under Item Nos. XXV& LII of Clause-21 of the Certified Standing Orders of the
Company/Party II, and the charges in the charge-sheet reads as under:
Clause 21 Item XXV
:
Habitual absence without leave or Absence without leave for more than 8
Consecutive days or over staying the sanction leave without satisfactory
explanation
Clause-21 Item LII
:
Any act subversive of discipline and with which you are charged
13. As the charge-sheet outlines the misconduct of the Workman, the Workman has been charged with
misconduct of unauthorized absenteeism in the backdrop of the Certified Standing Orders. Accordingly, an
inquiry was conducted by the Enquiry Officer Mr. P. S. Nayak. In the said inquiry Mr. Prakash Mulgaonkar
represented the management. On the first date of hearing workman remained absent and when issued notice
of inquiry once again did not accept deliberately and remained absent for the second hearing as well did not
attend the hearing on subsequent dates. The Workman however remained present on 03-08-1996, on which
day the plea of the Party I/Workman was recorded in presence of his defense representative Mr. Digamber
Bhave.
14. After the closure of the evidence on both the sides, the Enquiry Officer, after considering the
evidence on record, submitted his Findings dated 10-10-1996, holding the Party I/Workman guilty of the
charges. The Party II submitted that the Findings of the Enquiry Officer are based on the evidence on record
and that the enquiry had been conducted in accordance with the principles of natural justice.
15. The Party II submits that the proved misconduct established at the enquiry warranted extreme
punishment of dismissal of Party I/Workman from its service. The Party II submitted that the punishment of
termination was consequent to properly conducted enquiry and is based on the proved acts of misconduct
committed by the workman.
16. The Party II submits that the enquiry was fair and proper and was conducted in accordance with the
principles of natural justice. The Party I was given every opportunity to defend himself and only after
appreciating the evidence on record, the Enquiry Officer gave a reasoned finding on the basis of which any
prudent person would come to the conclusion that the Party I was guilty of the charges leveled against him.
The Party II submits that the termination by way of punishment of Party I is pursuant to charge-sheet and
properly conducted enquiry by an impartial Enquiry Officer who has considered all the evidence on record
and has submitted reasoned findings, and that the termination by way of punishment of Party/Workman is
legal and justified.
1316
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 39
26TH DECEMBER, 2025
17. Party II denied that there has been large scale harassment &victimization of the union office bearers
and its other members due toothier legitimate trade union activities, as alleged. It is denied that there are any
illegal changes in the service conditions or unjustified or unwarranted termination or that the charge-sheets
are issued to the workman on false and fabricated charges, or that there is refusal to negotiate in good faith,
as alleged. It is denied that there is commission of unfair labour practice. It is specifically denied that Mr.
Santana Costa was an active member of the Union.
18. It is denied that the Enquiry Officer erred in coming to the conclusion of guilt, as alleged, or that the
Enquiry Officer failed to appreciate the evidence of the workman, or that he was biased. It is denied that the
Termination Order of the workman was for collateral purposes or that it was solely to victimize the workman
for his continued allegiance to the said Union, as alleged. It is denied that there has been any gross
discrimination in imposing the punishment of termination of the Party I/Workman, as alleged, and hence it is
submitted that the Party I is not entitled to the relief sought in the Claim Statement and prays that the claim
of the Party I/Workman may be rejected on the aforesaid grounds.
19. The Party I in its Rejoinder filed at Exhibit 5 repeats and reiterates all averments made by him in the
Statement of Claim and denies all the averments made by Party II in its Written Statement which run
contrary to the pleadings in the Statement of Claim.
20. On completion of the pleadings, the following Issues we reframed at Exhibit 6 by this Tribunal
which reads as under:
ISSUES
1.
Whether the Party I proves that the domestic enquiry held against the workman Shri Santana Costa
is not fair and proper?
2.
Whether the charges of misconduct levelled against the Workman Shri Santana Costa are proved to
the satisfaction of the Tribunal by acceptable evidence?
3.
Whether the Party I proves that the termination of service of the Workman Shri Santan Costa is by
way of victimization and unfair labour practice?
4.
Whether the Party I proves that the action of the Party II in terminating the services of the workman
Shri Santan Costa w.e. f. 28-10-1996 is illegal and unjustified?
Additional Issue No. 4A: Whether the Party II has followed the mandatory provisions of Section 33(2)
(a)(b) of the Industrial Disputes Act before dismissing the workman from the services?
5.
Whether the Workman Shri Suntan Costa is entitled to any relief?
6.
What Award?
21. From the issues framed hereinabove, Issue No. 1 and 2 and additional issue No. 4A have been taken
up to be tried as preliminary issues and accordingly both the Parties to the proceeding led their evidence in
respect of these preliminary issues, and my findings to the same with reasons are as follows:
Issue No. 1
: In the Affirmative
Issue No. 2
: In the Negative
Issue No. 4A : In the Negative
REASONS
22. Issue No. 1 and 2: It is in the evidence of Shri Francis Gonzales, the then Officer working for Party
II in the HRD Department, that the Party I was issued with charge-sheet dated 13-05-1996. The Party I was
appointed as a Trainee with the Party II vide letter dated 02-04-1990 signed by these. General Manager Shri
Mr. E. M. Mathai who was competent to do so. The appointment of the Party I was probationary
appointment, and later on he was confirmed in the service after completion of the probation period vide
Confirmation Letter dated 01-10-1991. All the corresponding letters have been identified by Shri Francis
Gonzales when the same were produced in the domestic enquiry as well produced before this Tribunal for
identification. In the said enquiry, the Company appointed Shri M. P. S. Nayak as an Enquiry Officer who
1317
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 39
26TH DECEMBER, 2025
submitted his findings to the management on the conclusion of the enquiry. The management was
represented by Mr. Prakash Mulgaonkar. The Party I/Workman was represented by his co-worker Mr.
Digamber Bhave.
23. He further deposed that on completion of the enquiry, the Enquiry Officer gave his Findings dated
10-10-1996 holding the Party I guilty of the charges referred to in the charge-sheet and submitted his
findings to the Management. In his cross-examination, the Management witness Shri Francis Gonsalves
denied that no fair and proper enquiry was conducted and that the Findings given by the Enquiry Officer are
perverse.
24. The management examined Shri P. Shankar Nayak as the witness No 2, he being the Enquiry
Officer who had conducted the enquiry into the charges of unauthorised absenteeism levelled against the
workman. According to Mr. Nayak, the Party I was represented by his co-worker Mr. Digamber Bhave and
that the Workman was given fair and proper opportunity. He further confirmed that the proceedings and
records of the enquiry are true and correct. The Enquiry Officer in the cross denied that he was biased and
favoured the management in the enquiry and that he did not give fair and proper opportunity to the Party
I/Workman to defend his case. He further denied that he having rejected the request of the workman to
examine his wife as awitness or that the enquiry was closed without giving the workman an opportunity to
wait for the evidence.
25. The Party I/Workman in his defence examined himself whereby he reiterated and maintained the
facts stated by him in his Claim Statement and deposed to say that he was not given fair opportunity to cross-
examine the MR. He further stated that Enquiry Officer did not give him an opportunity to examine his
witness though he had made such a request and that the Enquiry Officer closed the enquiry because of which
he could not give his statement properly. He further stated that the Findings given by Enquiry Officer are
perverse and are not based on the evidence on record. In the cross-examination, the Party I/workman
however admitted of he having not attended the enquiry on the first two dates of hearing and admitted he
having received the notice of inquiry. The workman also identified the proceeding sheets wherein it is
mentioned that the proceedings of the enquiry have been explained to him. He admitted that he was allowed
to be represented by the co-worker of his choice i.e. Mr. Digamabr Bhave, so, there is no direct evidence
which the Party I/Workman could rely upon to say that no fair and proper opportunity was given to him to
defend himself in the said enquiry.
26. Be that as it may, regardless of whether the enquiry was ex-facie illegal and in violation of the
principles of natural justice or not, the Party I/Workman in order to prove that the management did not
comply with the provisions of Section 33(2)(a)(b) of the Industrial Disputes Act, 1947. In support of its
subsequent amended pleading in the Claim Statement, the Party I/Workman examined Shri Rohidas Naik. It
is in the evidence of Shri Rohidas Naik who claims to be the President of the Union and that his Union had
issued Letter dated 29-08-1996 on 30-08-1996, upon the Labour Commissioner, Panaji, thereby calling for
the conciliation proceedings on Charter of Demands dated 12-02-1996 of the workmen, including the Party
I/Workman, for wage rise and better service conditions and the said Workman was also concerned in the said
dispute covered under the said Charter of Demands, which were pending before the Labour Commissioner as
on 30-08-1996. The Party II/Company had, in fact, attended the conciliation proceedings on 24-10-1996 in
respect of the aforesaid Charter of Demands. Since, the Party II Company was not ready to accede to the
demands of the Union, the Labour Commissioner, Panaji, was pleased to call for further meetings between
the said Company and the said Union and the last meeting, to the best of his knowledge, was held on 17-02-
1997, for trying to conciliate and settle the dispute.
27. That the said Company did not even wait for the Conciliation Officer, the Labour Commissioner to
record failure and, without waiting for the appropriate Government to receive the report to consider the same
or make reference of the dispute to this Hon’ble Tribunal, the Party II/Company dismissed the Party
I/Workman on 28-10-1996. It is pertinent to note that the Government of Goa was pleased to refer the
aforesaid dispute of Charter of Demand to this Hon’ble Tribunal for adjudication only on 04-06-1997. That
the dismissal of the said Workman while the aforesaid conciliation proceedings were pending before the
Conciliation Officer amounts to an unfair labour practice.
28. The Letter dated 10-09-1996 at Exhibit 31 is addressed by the Assistant Labour Commissioner to
Party II. By this letter, the Assistant Labour Commissioner requested the Party II/Company to offer their
comments on the Charter of Demands raised by the said Union of which the Party I/Workman is part and
parcel. In response thereto, the representative of the Party II/Company, Mr. George Nainan, the Plant Human
1318
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 39
26TH DECEMBER, 2025
Resource Manager, vide its Letter dated 19-09-1996 at Exhibit 32,requested for 3 weeks’ time to offer their
comment to which the Assistant Labour Commissioner, vide his Letter dated 07-10-1996 at Exhibit
33,intimated to both the Parties therein that he would hold discussions and, if necessary, the conciliation
proceedings under the provisions of Section12(3) of the Industrial Disputes Act, 1947, in respect of the
dispute raised by the Party I/Workman and the date of hearing was fixed on 14-10-1996 at11.00 a.m. The
Party II/Company thereafter vide its Letter dated10/10/1996 at Exhibit 34, requested time to file their
comments. The Assistant Labour Commissioner, after considering the request of the Party II/Company,
thereafter placed the matter for further discussions/conciliation on 14-10-1996. On the said day, the
proceedings before the Conciliation Officer reads thus.
‘… the union stated that it is unjustified to give more time to the management and denied the contention
of the management that they want to study the charter of demand which is not correct as the said charter of
demand has been submitted by the union in the month of Feb1996. The management however had several
meetings with the union on the charter of demand and when no outcome in the said meetings therefore the
union approached the conciliation machinery for the intervention and reiterated their stand as the
management had no justification for asking time. Further the union stated that the management is forcing and
illegally suspending the workmen. However next joint discussion is fixed in the office of ALC on
24/10/1996 …’.
29. Accordingly, the Minutes of Meeting drawn at Exhibit 37 detailing the business of the day and
before concluding the Minutes, the Conciliation Officer held that “both the Parties have stuck up to their own
stand; as such, he suggested that they should both think about their stand taken by them so as to have an
amicable solution and postponed the discussions to 28/10/1996 at 11.00 a.m.” The joint discussions
continued on 28-10-1996 and in the Minutes of Meeting which was drawn on 28/10/1996 at Exhibit 38, the
Conciliation Officer, once again, held that “both the parties had stuck to their own stand as the said Union
was not ready to amend their demands and the said Company was not ready to give any offer and, as such,
there is no need to have further discussion at this level. Hence the discussion is closed both the parties to
await for further report.”
30. The Assistant Labour Commissioner, vide its Letter dated 29-10-1996 at Exhibit 39, forwarded to
the Commissioner, Labour, the report of failure of discussion on the Charter of Demands raised by the union
and the Management of M/s. MRF Ltd Goa, along with his original file for its perusal and further necessary
actions thereupon. The Office of the Commissioner, Labour, vide his Letter dated 15-11-1996 at Exhibit 40,
called upon the President of the Party I/Union, of which the Workman concerned is the member, for
discussing the matter with him.
31. Further the Office of the Labour Commissioner, vide his Letter dated 14-01-1997 at Exhibit 41,
informed the President of the Union of which Union the concerned Workman is the member stating that the
Hon’ble Minister for Labour wanted to explore the possibility of an amicable settlement on the whole
dispute and if required to hold on more meetings with the party. The Office of the Labour Commissioner
thereafter, vide his letter dated 11-02-1997 at Exhibit 42, called upon both the parties for a joint discussion to
be held on 17-02-1997 at 3.00 p.m. in the Office of the Labour Commissioner. It is pertinent for this Hon’ble
Tribunal to note that there were no further correspondences, nor was there any report or write-up produced
before this Hon’ble Tribunal about the joint discussion which was proposed to be held on 17-02-1997 in the
Office of the Labour Commissioner. The submission of the Failure Report to the Labour Commissioner, by
the Conciliation Officer, is an inter departmental affair. Even after submission of the Failure Report by the
Assistant Labour Commissioner, the Labour Commissioner thought it appropriate to call upon the parties for
further joint discussion. The matter did not stop at that stage and that there was an intervention by the
Hon’ble Minister for Labour who too felt it appropriate to have a joint discussion with both the parties.
32. It is therefore the contention of the Party I/Workman that in the event, even assuming without
admitting that the joint discussion had failed, it was incumbent upon the Conciliation Officer to submit his
Failure Report to the Government but it was not done until such time the Unionof the Party I/Workman
preferred a Writ Petition before the Hon’ble Bombay High Court at Goa, pursuant to which the Additional
Government Pleader produced on record Order No. ALC/PONDA/Ch. of Demands/MRF dated 05-06-1997.
Thus, it is submitted that the Conciliation Officer did not send the Failure Report in view of the date being
fixed for further discussions even after the Failure Report was sent by the Assistant Labour Commissioner to
his Superior, i.e., the Office of the Labour Commissioner and, further, from the Office of the Labour
Commissioner, the joint discussions were proposed to be held with the intervention of the Hon’ble Minister
for Labour.
1319
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 39
26TH DECEMBER, 2025
33. The perusal of the Outward Register at Exhibit 48 Colly, would confirm that the File,
ALC/Ponda/Ch. Of Demand/MRF was forwarded to the Hon’ble Labour Minister. It is also important to note
that the Office of the Labour Commissioner, vide his letter dated 14-01-1997 at Exhibit 41informed the
Union of the Party I/Workman that the Hon’ble Labour Minister wanted to explore the possibility of an
amicable settlement on the whole dispute; therefore, it could not be said that the Failure Report was indeed
sent to the Government vide this Outward Number 2424 dated04/06/1997 by the Office of the Labour
Commissioner. As such the contention of the Party II/Company that there were no conciliation proceedings
pending before the authorities at the time when the workman was dismissed from the services, same being
devoid of any substance. Itis abundantly clear that the Hon’ble Labour Minister wanted to have joint
discussion with both the parties and, therefore, by no stretch of imagination can it be construed that the File
containing the Minutes of the Failure sent to the Hon’ble Labour Minister is the Failure Report being sent to
the Government of Goa under the provisions of Section 12(3) of the Industrial Disputes Act, 1947.
34. The records speak for itself and the document to that effect shows that the Party I/Workman was
dismissed on 28-10-1996 and the Outward Register seems to suggest that the so-called Failure Report was
forwarded on 04-06-1997. Thus, it is clear from the records that the services of the Party I/Workman were
terminated when the matter was sub-judice for conciliation before the Conciliation Officer; therefore, the
Party I/Workman, through oral as well as documentary evidence, was able to prove his defence of the Party
II/Company having clearly violated the requirements prescribed under the provisions Section 3 (2)(a)(b) of
the Industrial Disputes Act, 1947.
35. Shri Rohidas Naik has highlighted the relevant and material facts pertaining to the conciliation
proceeding before the Labour Commissioner. The said witness, Shri Rohidas Naik stood by his testimony in
the cross-examination to support and substantiate the defence of the Party I/Workman as regards to the Party
II/Company violating the mandatory provisions of Section 33 of the Act. In addition to the oral testimony
and documentary evidence on record, the Party I/Workman has placed reliance in the case of Jaipur Zila
Sahadari Bhoomi Vikas Bank Ltd. V/s. Ram Gopal Sharma and Others [(2002) 2 SCC 244].
36. Therefore the ratio laid down in the case of Jaipur Zila Sahadari Bhoomi Vikas Bank Ltd.
(Supra) has come to the rescue of this Workman. The Party I/Workman has been able to establish that his
termination was illegal as the same was done pending the Charter of Demands, in which Charter of Demands
he too was a concerned workman. Therefore, the Party II ought to have refrained from taking any action
pending such conciliation proceeding before the Authority. Section 33 of the Industrial Disputes Act, sub-
section (1) reads as under:
Conditions of service, etc., to remain unchanged under certain circumstances during pendency of
proceedings.- (1) During the pendency of any conciliation proceeding before [an arbitrator or] a conciliation
officer or a Board or of any proceeding before a Labour Court or Tribunal or National Tribunal in respect of
an industrial dispute, no employer shall,- (a) in regard to any matter connected with the dispute, alter, to the
prejudice of the workmen concerned in such dispute, the conditions of service applicable to them
immediately before the commencement of such proceeding; or (b) for any misconduct connected with the
dispute, discharge or punish, whether by dismissal or otherwise, any workman concerned in such dispute”.
37. Furthermore, as per the ratio laid down in Lokmat Newspaper Pvt. Ltd. v/s Shankar Prasad
(1999) 6 SCC it is but obvious that the impugned termination of the said Workman on 28/10/1996, amounts
to unfair labour practice. The relevant portion is reproduced which reads thus.
‘… (19) NOW it must be stated that the impugned termination order was passed against the respondent-
workman on 22-06-1982. Within three days thereof, the respondent raised an industrial dispute by filing a
complaint under Section 28 of the Maharashtra Act alleging that the impugned termination order amounted
to unfair labour practice. Before the impugned termination order was passed by the management, it had
already served a notice under Section 9-A of the 1. D. Act to the respondents union to the effect that it
proposed to introduce a change in the conditions of service of the respondent and other members of the
union on the ground that it was proposing to rationalise the printing work at the appellants concern at Nagpur
by setting up photo-type machine for carrying out the work of composing, resulting in substantial reduction
in the work of composing by hand. It may be stated that the respondent was employed as a foreman in the
hand-composing department of the appellant at the relevant time. The respondents union objected to the said
notice of change and approached the Conciliation Officer under Section 12 (1) of the I.D. Act which reads as
under:
1320
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 39
26TH DECEMBER, 2025
12. Duties of Conciliation Officers.- 1 Where an industrial dispute exists or is apprehended, the
conciliation officer may, or where the dispute relates to a public utility service and a notice under Section 22
has been given, shall hold conciliation proceedings in the prescribed manner.
(20) The Conciliation Officer took the dispute in conciliation within his discretion even though as
appellant concerned was not a public utility service it was not mandatory for the Conciliation Officer to start
conciliation proceedings. As the report of the Conciliation Officer submit to the State government shows, he
invited the management and the respondents union for preliminary discussions on 14-4-1982 in his office
and thereafter the matter was adjourned during conciliation from time to time.
(21) It can therefore, be said that by 14-04-1982 the matter was taken up for investigation and thus the
conciliation proceedings had commenced. It is also well established on the record of the case that the parties
could not come to any settlement with the result that on 22-06-1982 the investigation was closed by the
Conciliation Officer at 4.35 p.m. at Nagpur. Immediately thereafter the, appellant passed the impugned order
of termination against the respondent and others on the very same day i.e. on 22-6-1982 at 5.00 p.m. The
said order was placed on the notice board of the appellants office at Nagpur on the evening of that day. It is
not in dispute between the parties that thereafter the Conciliation Officer submitted his report to the
government which reached the State government on 13-8-1982.
(22) ON the aforesaid facts, the question arises whether the impugned termination order dated 22/6/1982
was passed during the pendency of the conciliation proceedings. It is not in dispute between the parties that
before passing such an order no express permission in writing was obtained by the appellant from the
Conciliation Office. The Labour court/the Industrial court and the learned Single Judge of the High court
have taken the view that because investigation was closed by the conciliator by 4.35 p.m. on 22-6-1982,
immediately thereafter the conciliation proceedings could be said to have ended and were not pending before
him. Consequently at 5.00 p.m. on that very day when the appellant issued the impugned order, it did not
violate Section 33 of the I. D. Act. While, on the other hand, the division bench of the High court inthe
impugned judgment has taken the view that merely because the conciliator closed the investigation in the
evening of 22-6-1982 till he prepared his report as per Section 12(4 of the I. D. Act and till that report
reached the government, conciliation proceedings were deemed to have continued and had not got
terminated till 13-08-1982 and as in the meantime on 22/6/1982, the impugned termination order was passed
without following the procedure of Section 33(1) of the I.D. Act which got vitiated in law.
(23) UNDER these circumstances, a moot question arises whether the impugned retrenchment order was
passed on 22-6-1982 during the pendency of conciliation proceedings. It cannot be disputed that the
impugned order was directly connected with the matter in dispute before the Conciliation Officer wherein
the question of legality of notice under Section 9-A of the I. D. Act was under consideration for the purpose
of arriving at any settlement between the parties in this connection. The impugned order had definitely
altered to the prejudice of the respondent his conditions of service. It was not a case of retrenchment
simplicities but was a consequential retrenchment on the introduction of the scheme of rationalisation as
contemplated by Section 9-A read with Schedule Invite No. 1 of the I.D. Act.
(24) WE shall refer to these provisions in greater detail later on while considering the question of
legality of notice under Section 9-A of the I. D. Act. For the time being, it is sufficient to note that the
question of violation of Section 33 (1) of the I. D. Act has a direct nexus with the further question whether on
22-6-1982 when the impugned termination-order was passed, conciliation proceedings were pending before
the authority or not.
(25) IN order to answer these questions, it is necessary to note Ss. (4) of Section 12 of the 1.D. Act
which reads as under: & quot; (4) If no such settlement is arrived at, the conciliation officer shall, as soon as
practicable after the close of the investigation, send to the appropriate government a full report setting forth
the steps taken by him for ascertaining the facts and circumstances relating to the dispute and for bringing
about a settlement thereof, together with a full statement of such facts and circumstances, and the reasons on
account of which, in his opinion, a settlement could not be arrived at. A mere look at this provision shows
that if the Conciliation Officer finds during conciliation proceedings that no settlement is arrived at between
the disputing parties, then after closing the investigation he has, as soon as practicable, to send to the
appropriate government a full report setting forth the steps taken by him for ascertaining the facts and
circumstances relating to the dispute and has also to mention all other details as required to be mentioned in
the report under Section 12 (4) of the I. D. Act.
1321
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 39
26TH DECEMBER, 2025
(26) The aforesaid statutory requirements leave no room for doubt that after closing the investigation
and after having arrived at the conclusion that no settlement is possible between the parties, the Conciliation
Officer had to spend some more time before submitting his detailed written report about failure of
consideration for information and necessary action by the State government. In the very nature of things,
therefore, such requirement will take at least a couple of days, if not more, for the Conciliator after closing
the investigation to enable him to send an appropriate report to the State Government. It is, therefore,
obvious that on 22-6-1982 when by 4.35 p.m. the Conciliation Officer declared that settlement was not
possible between the parties and he closed the investigation, neither his statutory function did not come to an
end nor did he became functus officio. His jurisdiction had to continue till he submitted his report as per
Section 12(4) to the appropriate government. Even such preparation of the report and sending of the same
from his end to the appropriate government would obviously have taken at least a few days after 22-6-1982.
It must, therefore, be held that the conciliator remained in charge of the conciliation proceedings at least for a
couple of days after 22-6-1982. It is, therefore, difficult to appreciate how within half an hour after the
closing of investigation by the conciliator and before his getting even a breathing time to prepare his detailed
written report about failure of conciliation to be sent to the government as per Section 12(4), the appellant
could persuade itself to presume that conciliation proceedings had ended and, therefore, it was not required
to follow the procedure of Section 33(1) and straightaway could pass the impugned order of retrenchment
within 25 minutes of the closing of the investigation by the conciliator on the very same day. It is difficult to
appreciate the reasoning of the Labour court that after the closer of investigation the conciliator became
functus officio and the management could not have approached him for express written permission to pass
the impugned order. It is easy to visualise that even on the same day i.e. on 22-6-1982 or even on the next
day, before the conciliator had time even to start writing his report, such an express permission could have
been asked for by the appellant as the conciliator by then could not be said to have washed his hand off the
conciliation proceedings. He remained very much seized of these proceedings tilt at least the time the report
left his end apart from the further question whether conciliation proceedings could be said to have continued
till the report reached the State government. Thus, on the express language of Section 12(4) the conclusion is
inevitable that closer of investigation by 4.35 p.m. on 22-6-1982 did not amount to termination of
conciliation proceedings by that very time. The argument of learned counsel for the appellant was that closer
of investigation automatically amounted to termination of conciliation proceedings. This argument proceeds
on a wrong premise that closer of investigation by the conciliator is the same as closer of conciliation
proceedings. The legislature while enacting Section 12(4) has deliberately not used the words closer of
conciliation but, on the contrary, provided that after closer of investigation something more was required to
be done by the conciliator as laid down under Section 12(4) before he can be said to have done away with
conciliation proceedings earlier initiated by him. On this conclusion alone the decision rendered by the
division bench of the High Court that the impugned order of termination dated 22-6-1982 was issued by the
appellant without following the procedure of Section 33(1) of the I. D. Act has to be sus-tained.…’.
38. The Ld. Adv. Shri S. B. Karpe, appearing for Party II in support of their defence on the issue of
alleged violation of Section 33, placed reliance in the case of East Asiatic & Allied V/s Shelke (B.L.) (1961
ILLJ162 Bom), Ambuja Cement V/s U B Group, Gopinath Daulat Dalvi V/s State of Maharashtra,
Suresh Vithoo Nare V/s Dharamsi Morarji Chemicals1991 Lab. I.C. 1932 Bom, and VIP Industries
Shramik Sangh V/s. VIP Industries Ltd. MANU/MH/1929/2024.
39. Relying on the ratios in the citations above, Ld. Adv. Shri S. B. Karpe submitted that unless the
Conciliation Officer applies his mind and decides to enter in conciliation, the conciliation cannot be said to
have commenced.
40. The above contention of Ld. Adv. Shri S. B. Karpe is contrary to the records produced by the Party
I/Workman and the evidence on record supports the defence taken by him as regard to his termination being
illegal and in contraventions to the provisions of Section 33. The same is duly supported by the ratio in the
case of Lokmat Newspaper Pvt. Ltd. (Supra), as the provisions of Section 33 (2) (b) has been settled in the
case of Lokmat (Supra), the same being later in time than the ones relied upon by the Party II. Hence, it is
the contention of the Party I Workman that the facts in question and the provisions of law involved in the
case of Lokmat (Supra) are the same as in the present reference. Therefore, it directly applies to the case in
hand, giving no room to this Tribunal to deviate from the ratio laid down in the citation above.
41. That, except a mere submission being made “that unless the Conciliation Officer applies his mind
and decides to enter in conciliation, the conciliation cannot be said to have been commenced” there is
nothing produced by the Management. Nor could the management discard theevidence adduced by the Party
1322
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 39
26TH DECEMBER, 2025
I/Workman, which clearly indicates his termination being ordered pending the conciliation proceedings sans
the Failure Report, which clearly shows that the termination was prior to submitting the Failure Report to the
Government of Goa.
42. Thus, this is a clear case of violation of mandatory provisions of Section 33 (2) (b) of the Industrial
Disputes Act, 1947. Hence, the ratio laid down in the case of Jaipur Zila would be squarely applicable to the
present reference, wherein it is held “Amendments to Section 33 of the I.D. Act in the year 1956 were made
at a time when no remedy under the Industrial Disputes Act was available to the individual workman to
challenge the termination of his employment. At that time, the dismissal of an individual workman could
form the subject-matter of an industrial dispute only if it was espoused by the fellow workmen. In those
days, dismissal of workmen who actively participated in raising an industrial dispute was not uncommon. In
order to obviate this contingency, Section 33 imposed an obligation on the employer to seek approval or
permission for the dismissal of any workman to be effected during the pendency of an industrial dispute.
Apart from imposing an obligation on the employer to file such an application, in order to protect the
workman against any termination which might be made without seeking approval or permission, Section 33-
A was enacted creating a right in favour of the aggrieved workman to file a complaint which will be dealt
with like adjudication of an industrial dispute. In other words, a right which was not available to the
individual workman to approach the Labour Court or Tribunal for adjudication of a dispute relating to his
dismissal was conferred by Section 33-A.”
43. The Supreme Court in the case under review has ruled that failure to apply for approval by the
employer would make the order of dismissal inoperative and that the workman may get wages and other
benefits. It was also held that even if the application for approval is granted by the authority, still the
aggrieved could make a complaint under Section 33-Achallenging the approval. It is to be considered
whether an interpretation can be placed on Section 33 to the effect that even without a judicial declaration
about the validity of the order of dismissal, as a result of the failure to seek approval or permission, the
workman could straightaway proceed on the footing that the dismissal is invalid and inoperative and work
out his rights for recovery of wages and other benefits. The case law placed before the Supreme Court does
not support the present ruling. Inorder to dispel any doubt in the minds of the litigants and the lower courts,
it may be clarified that no dismissed workman can claim the relief of reinstatement without a declaration by
a competent court that the order of termination is not valid and no punitive order of termination be interfered
without any technical grounds if such an order is otherwise justified on merits.
44. The Party I/Workman thus have successfully discharged his burden to prove that the domestic
enquiry held against him was not fair and proper, the same being in violation of provision of Section 33 of
the Industrial Disputes Act, 1947. Consequently, the charges of unauthorized absenteeism cannot be said to
be proved again for the reason that there has been violations of mandatory provisions of the Industrial
Disputes Act. The act of violations of provisions of Section 33(2)(a)(b) of the Industrial Disputes Act by the
Party II/Company since goes to the root of the matter therefore the entire enquiry amounts to be void ab
initio so also the Order of Dismissal of the Party I Workman becomes illegal and unjustified. Hence, the
Issue No. 1 stands answered in favour of the Party I/Workman in the affirmative. Consequently, this Tribunal
holds that the management has failed to discharge their burden of proving the misconduct to which the Issue
No. 2 has been answered against the management in the negative.
45. Additional Issue No. 4A: While discussing the Issue Nos.1 and 2, this Tribunal has taken into
consideration all the sequential events to show that the Employer/Party II has violated the mandatory
provisions of the Industrial Disputes Act, 1947. Thus, this is a fit case where the ratio laid down in the case
of Jaipur Zilla squarely applies, leaving no room for any further prolonged litigation but to put a full stop to
the entire reference by applying the ratio laid down in the case of Jaipur Zilla (Supra).
46. It is pertinent to note that in the case of Jaipur Zila (Supra) while referring to the case of
Strawboard Mfg. Co. v/s Gavin, the Humble Apex Court observed that “the application for approval was
rejected by the Tribunal”. Dealing with the consequence of such rejection, the Supreme Court held that “If
the Tribunal does not approve of the action taken by the employer, the result would be that the action taken
by him would fail and thereupon the workman would be deemed never to have been dismissed or discharged
and would remain in the service of the employer. In such abase no specific provision as to reinstatement is
necessary and by the very fact of the Tribunal not approving the action of the employer, the dismissal or
discharge of the workman would be of no effect and the workman concerned would continue to be in service
as if there never was any dismissal or discharge by the employer”.
1323
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 39
26TH DECEMBER, 2025
47. Considering this observation, this Tribunal is of the opinion that no further purpose will be served if
this Tribunal proceeds to pass the Part Award on the preliminary issues only and keeps the reference alive for
holding enquiry on other issues when the termination of the Party I/Workman itself is illegal and void, the
same being in violation of provisions of Section 33 (2) (a) (b) of the Industrial Disputes Act, 1947.
Hence, the final Order.
ORDER
i.
It is held that the action of the management of M/s. MRF Ltd, Usgao Ponda in terminating the
services of Shri Santana Costa with effect from 28-10-1996 is illegal and unjustified.
ii.
Consequently, the Party II/M/s MRF Limited, Usgao, Ponda-Goa is hereby directed to re-instate
in service the Party I/Workman, Shri Santana Costa with full back wages from 28-10-1996.
iii.
No Order as to Cost.
Vijayalaxmi R. Shivolkar, Presiding Officer, Industrial Tribunal & Labour Court.
Panaji.
——— ♦♦♦———
Department of Revenue
Order
Read:- Order No. 30/01/2005-RD/6929 dated 21-04-2025.
The Government of Goa is pleased to make modification in Sr. No. 22 of above mentioned Order of
Collector South is as under:
Sr.
No.
Name of the Section of Collectorate
Name of Assistant
Public Information
Officer (APIO)
Name of Public
Information Officer
(PIO)
First Appellate Authority
(FAA)
22
Office of Dy. Collector of
concerned Taluka
UDC
Awal Karkun of
concerned Taluka
Dy. Collector /SDO-I/II
of concerned Taluka
Agnelo L D’souza, Under Secretary (Rev-II).
Porvorim.
__________
Order
Read:- Order No. 30/01/2005-RD/6928 dated 21-04-2025.
The Government of Goa is pleased to make modification in Sr. No. 14 of above mentioned Order of
Collector North is as under:
Sr.
No.
Name of the Section of Collectorate
Name of Assistant Public
Information Officer
(APIO)
Name of Public
Information Officer
(PIO)
First Appellate Authority
(FAA)
14
Office of Dy. Collector of
concerned Taluka
UDC
Awal Karkun of
concerned Taluka
Dy. Collector/SDO-I/II
of concerned Taluka
Agnelo L D’souza, Under Secretary (Rev-II).
Porvorim.
No. 30/01/2005-RD-I/7746
Date : 23-Dec-2025
No. 30-01-2005-RD-I/7747
Date : 12-Dec-2025
1324
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 39
26TH DECEMBER, 2025
Department of Tourism
Order
Ref.: Notification No. N-5/3/(1629)2025-DT/4186 dated 30-10-2025.
As per Notification No. N-5/3(1629)/2025-DT/4186 dated 30-10-2025 Goa Aerosports Rules, 2025,
Government is pleased to constitute a Technical Committee having jurisdiction over the whole of the State of
Goa (North Goa and South Goa).
North Goa
1.
Director, Department of Tourism
Chairman
2.
Dy. Director, Department of Tourism (North)
Vice Chairman
3.
Assistant Director (North)
Member Secretary
4.
Representative of District Collector, North
Member
5.
Representative of SP North Goa
Member
6.
Representative of Department of Civil Aviation, Porvorim-Goa
Member
7.
Chief Medical Officer or his Representative of concerned District, Campal,
Panaji-Goa
Member
8.
Representative of NIMAS/ABVIMAS
Member
9.
Representative of Aero Club of India (ACI)- National Airsports Control (NAC)
or its appointed Commission
Member
10.
Assistant Tourist Office (North)
Member
South Goa
1.
Director, Department of Tourism
Chairman
2.
Dy. Director, Department of Tourism (South)
Vice Chairman
3.
Assistant Director (South)
Member Secretary
4.
Representative of District Collector, (South)
Member
5.
Representative of SP South Goa
Member
6.
Representative of Department of Civil Aviation, Porvorim-Goa
Member
7.
Chief Medical Officer or his Representative of concerned District, Campal,
Panaji-Goa
Member
8.
Representative of NIMAS/ABVIMAS
Member
9.
Representative of Aero Club of India (ACI)- National Airsports Control (NAC)
or its appointed Commission
Member
10.
Assistant Tourist Office (South)
Member
The Committee shall constitute a quorum of at least 50% of the members for the meeting or inspection.
In the absence of the Chairman, the Vice Chairman may be delegated the authority to convene and preside
No. 5/3(1629)/2025/DT/620
Date : 16-Dec-2025
1325
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 39
26TH DECEMBER, 2025
over meetings. In the event Vice Chairman is unable to conduct an inspection, he may authorize the Assistant
Director to carry out the inspection on his behalf, while remaining responsible for convening meetings of the
Technical Committee.
To inspect and certify Aerosports equipments manufactured and homologated by an internationally
recognized certification authority in coordination with the operator, from safety and airworthiness
perspective.
The Committee shall meet as and when meeting is convened by the Chairman.
Kedar Naik, GCS, Director of Tourism.
Panaji.
1326
OFFICIAL GAZETTE — GOVT. OF GOA
SERIES II No. 39
26TH DECEMBER, 2025
www.goaprintingpress.gov.in
Published by the Director, Printing & Stationary,
Government Printing Press,
Mahatma Gandhi Road, Panaji-Goa 403 001.
Price—Rs. 13.00
PRINTED AT GOVERNMENT PRINTING PRESS, PANAJI-GOA—356/80-12/2025.