The B

The B

The B

The B

EX

PUBLI

(NO.PATNA 452) PAT

BIHAR ELECTRI

No. BERC/Suo-Motu

conferred under section 181

2003 (36 of 2003) and Regul

of Tariff) Regulations, 2007

Regulatory Commission her

terms and conditions for de

(FPPCA), namely:-

1. Short title, exte

called the Bihar Electricit

determination of Tariff) (Fi

(ii)

These Regulatio

(iii)

These Regulati

the gazette of B

2. Definitions and

otherwise requires:

(a)

“Act” means t

(b)

“Commission”

(c)

“FPPCA” mea

(d)

“Licensees” m

(e)

“Regulations”

and Condition

REGISTERED

Bihar Gazett

Bihar Gazett

Bihar Gazett

Bihar Gazett

XTRA ORDINARY

SHED BY AUTHORITY

12 BHADRA 1934(S)

TNA, MONDAY, 3RD SEPTEMBER 20

ICITY REGULATORY COMMISSION, PAT

—————

NOTIFICATION

The 31st August, 2012

u Proceeding No.29/2012-03-875—In exercise o

read with sections 45(2), 61 and 62(4) of the El

lation 30 of BERC (Terms and Conditions for d

and all powers enabling it in that behalf, the Bih

reby amends the following regulations for sp

etermination of Fuel and Power Purchase Cos

ent and commencement.—(i) These regulati

ty Regulatory Commission (Terms and Co

irst Amendment) Regulations, 2012.

ons extend to the whole of the State of Bihar.

ions shall come into force w.e.f the date of its p

Bihar.

Interpretations.—In these Regulations, unles

the Electricity Act, 2003.

” means the Bihar Electricity Regulatory Comm

ans Fuel and Power Purchase Cost Adjustment.

mean licensees under the Act.

” mean the Bihar Electricity Regulatory Commi

ns for determination of Tariff) Regulations, 2007

NO. PT.-40

tetetete

012

TNA

of the powers

lectricity Act,

determination

har Electricity

pecifying the

t Adjustment

ions may be

onditions for

publication in

s the context

mission.

ission (Terms

7.

2

BIHAR GAZETTE (EXTRA) 3RD SEPTEMBER 2012

(f)

“Schedule” refers to the schedule appended to these Regulations.

(g)

“Secretary” means Secretary of the Bihar Electricity Regulatory

Commission.

(h)

“State Govt.” means the Government of Bihar.

3. Amendments.—(i) The regulation 21(1) will be substituted as below :-

“No tariff or any part thereof shall ordinarily be amended more frequently

than once in any financial year, except in respect of any charges expressly

permitted under the terms of the Fuel and Power Purchase Cost

Adjustment formula as specified in the Schedule appended to these

Regulations”.

(ii) The following shall be added at the end of regulation 83 (a) “The formula

for adjustment on account of Fuel and Power Purchase Cost is specified

in the Schedule appended to these Regulations.”

By the order of the commission,

Sd./Illegible,

Secretary.

Schedule

FUEL AND POWER PURCHASE COST ADJUSTMENT (FPPCA) FORMULA

The amount of Fuel and Power Purchase Cost Adjustment (FPPCA) charges shall be

computed as under:-

FPPCA

(Paise /

kWh)

=

Qc(Rc2–Rc1)+Qo(Ro2–Ro1)+Qpp(Rpp2–Rpp1)+Vz+A

x100

(Qpg1 + Qpp1+Qpp2) x (1– L)

Where,

Qc

=

=

Quantity of coal consumed during the adjustment period in Metric

Tons (MT)

(SHR x QPg) (1+TSL)x1000 / GCV, or actual whichever is less

Rc1

=

Weighted average base rate of coal supplied ex-power station coal yard as

approved by the Commission for the adjustment period in Rs. / MT

Rc2

=

Weighted average actual rate of the coal supplied ex-power station coal yard

for the adjustment period in Rs. / MT

Qo

=

Actual Quantity of oil (in KL) consumed during the adjustment period or

normative oil consumption as per Tariff order whichever is less.

Ro1

=

Weighted average base rate of oil ex-power station (Rs./KL) approved by the

Commission for the adjustment period.

100

3

BIHAR GAZETTE (EXTRA), 3RD SEPTEMBER 2012

Ro2

=

Weighted average actual rate of oil ex-power station supplied (Rs. / KL)

during the adjustment period.

Qpp

=

Total power purchased from different sources (kWh) = Qpp2+Qpp3

Qpp1

=

Qpp3 in kWh

100

TL

=

Transmission loss (CTU) (in percentage terms).

Qpp2

=

Power purchase from sources with delivery point within the state

transmission or distribution system (in kWh)

Qpp3

=

Power purchase from sources on which CTU transmission loss is applicable

(in kWh)

Rpp1 =

Average rate of power purchase as approved by the Commission

(Rs. / kWh)

Rpp2 =

Average rate of power purchased during the adjustment period (Rs. / kWh)

Qpg

=

Own power generation (kWh)

Qpg1

=

Own power generation (kWh) at generator terminal – approved auxiliary

consumption

L

=

Percentage T&D loss as approved by the Commission or actual, whichever is

lower.

SHR

=

Station Heat Rate as approved by the Commission (Kcal / kWh)

TSL

=

Percentage Transit and Stacking Loss as approved by the Commission.

GCV

=

Weighted average gross calorific value of coal as fired basis during the

adjustment period (Kcal / Kg).

VZ

=

Amount of variable charges on account of change of cost of unknown factors

like water charges, taxes or any other unpredictable and unknown factors not

envisaged at the time of tariff fixation subject to prior approval of the

Commission (Rs.)

A

=

Adjustment, if any, to be made in the current period to account for any

excess / shortfall in recovery of fuel or power purchase cost in the past

adjustment period, subject to the approval of the Commission (Rs.)

If there are more than one power stations owned by the Licensee Qc, Rc1, Rc2, Qo,

Ro1, Ro2, Qpg and Qpg1 will be computed separately for each power station and sum of the

increase/decrease of cost of all power stations shall be taken into consideration.

1– TL

4

BIHAR GAZETTE (EXTRA) 3RD SEPTEMBER 2012

Terms and conditions for application of the FPPCA formula

1)

The basic nature of FPPCA is ‘adjustment’ i.e. passing on the increase or decrease, as

the case may be.

2)

The operational parameters / norms fixed by the Commission in the Tariff

Regulations / Tariff Order shall be the basis of calculating FPPCA charges.

3)

The FPPCA will be recovered in every month in the form of an incremental energy

charge (Rs/kwh) in proportion to the energy consumption and shall not exceed 10%

of the approved avg. cost of supply in the Tariff order and balance amount, if any, in

the FPPCA over and above ceiling shall be carried forward to be billed in

subsequent month.

4)

Incremental cost of power purchase due to deviation in respect of generation mix or

power purchase at higher rate shall be allowed only if it is justified to the satisfaction

of the Commission.

5)

Any cost increase by the Licensee by way of penalty, interest due to delayed

payments, etc. and due to operational inefficiencies shall not be allowed.

6)

FPPCA charges shall be levied on all categories of consumers.

7)

Distribution Licensee shall file detailed computation of actual fuel cost in Rs./kWh

for each month for each of power stations of the state generators as well as cost of

power purchase (Fixed and Variable) from each source/station and a separate set of

calculations with reference to permitted level of parameters.

8)

The data in support of the FPPCA claims shall be duly authenticated by an officer of

the licensee, not below the rank of Chief Engineer on an affidavit supported with the

certified copy of energy bills of power purchase, transmission and RLDC charges,

coal and its transportation cost, oil purchase bill and the quantity of coal and oil

consumed during the month.

9)

Levy of FPPCA charge will be allowed only when it is ten (10) paise or more per

unit.

10)

The incremental cost per kWh due to this FPPCA arrived for a month shall be

recovered in the energy bill of the month subsequent to the order of the commission

approving FPPCA with full details of rate and unit(s) on which FPPCA charges have

been billed. The BSEB shall provide along with the proposal of FPPCA of a month, a

compliance report of the previous order of the commission in respect of FPPCA.

By the order of the commission,

Sd./Illegible,

Secretary.

————

PUBLISHED AND PRINTED BY THE SUPERINTENDENT,

BIHAR SECRETARIAT PRESS, PATNA.

Bihar Gazette (Extra) 452—571+400—Egazette

Website: http://egazette.bih.nic.in