No. BERC-Suo M

conferred by sub sectio

section (2) of section 1

Act, 2003 (36 of 2003) a

Electricity Regulatory C

1.

Short Title and

1.1

These regulation

Commission (Mu

1.2

These Regulation

in the Official Ga

2.

Scope and Exten

REGISTE

Bihar Gaze

Bihar Gaze

Bihar Gaze

Bihar Gaze

EXTRA ORDINARY

LISHED BY AUTHORIT

24 BHADRA, 1937(S)

PATNA, TUESDAY, 15TH SEPTEMB

r Electricity Regulatory Commission

Vidyut Bhawan, J.L. Nehru Marg, Patna

——————

NOTIFICATION

The 11th September, 2015

Motu Proceeding No. 30/2014/06–In ex

on (1) of section 181 and clauses (zd), (z

81, read with sections 61, 62, and 86,

and all other powers enabling it in that b

Commission hereby makes the following R

PART-I

PRELIMINARY

Commencement

ns shall be called the Bihar Electr

ulti Year Distribution Tariff) Regulations,

ns shall come into force from the date of

azette.

nt of Application

ERED NO. PT.-40

ette

ette

ette

ette

TY

BER 2015

xercise of powers

ze) and (zf) of sub

of the Electricity

behalf, the Bihar

Regulations.

ricity Regulatory

2015.

their notification

2

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

2.1

These Regulations shall apply to all the Distribution Licensees in the

State of Bihar.

2.2

These Regulations shall be applicable for determination of tariff in all

cases covered under these Regulations from 1st April 2016 and onwards

up to FY 2021 [ i.e., till 31st March 2021] or till these Regulations are

amended..

2.3

These Regulations shall be applicable where the cost based/Aggregate

Revenue Requirement (ARR) based tariff is determined by the

Commission.

2.4

These Regulations shall extend to the whole of the State of Bihar.

3.

Definitions

3.1

In these regulations, unless the context otherwise requires, -

(1)

“Act” means the Electricity Act, 2003 (36 of 2003);

(2)

“Aggregate Revenue Requirement” or “ARR” means the costs

pertaining to the licensed business which are permitted, in accordance

with these Regulations, to be recovered from the tariffs and charges

determined by the Commission;

(3)

“Base Year” means the financial year immediately preceding first year of

the control period and used for the purposes of these Regulations;

(4)

“Commission” means the Bihar Electricity Regulatory Commission;

(5)

“Conduct of Business Regulations” means the Bihar Electricity

Regulatory Commission (Conduct of Business) Regulations, 2005, and its

amendments from time to time.

(6)

“Control Period” means a multi-year period normally comprising of five

financial years or as may be determined by the Commission, for

submission of forecast in accordance with these Regulations;

(7)

“Expenditure” Reasonable and required expenditure actually incurred

on the following:

(a) purchase of energy;

(b) salaries and wages of staff, welfare expenses excluding management

remuneration covered below;

(c) Directors remuneration, fees, expenses including facilities;

(d) salaries and wages of corporate office / registered office;

(e) financing cost excluding penal interest / charges;

(f) interest charges on loan(s) borrowed for capitalized assets;

(g) interest on temporary accommodation to the extent of approved

unrealized arrears from the consumers

(h) interest on working capital

(i) Return on equity;

3

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

(j) Income Tax

(k) financing charges applicable to operational account;

(l) interest on cash security deposits from consumers;

(m) interest on advance against sales from consumers, if any;

(n) Impact of variation in foreign exchange rate in case of foreign

currency loan taken with due approval and is not capitalised;

(o) Depreciation

(p) Rents, rates and taxes, other than all taxes relating to income /

profits;

(q) Legal charges;

(r) Auditor’s expenses, Auditor’s fees; auditor’s expenses; Payment to

Auditors in any other capacity or for any work which is necessary to

be got done from them in connection with audit;

(s) Consultancy charges for work which cannot be done in house or is

uneconomical in doing in-house or is essential to be done from

outside sources;

(t) Bad debts actually written off subject to Commission’s clearance;

(u) Other expenses necessary which are ancillary or incidental to the

business of electricity except penalty etc levied under the Act or any

other law in force;

(8)

“Financial Year” means a period commencing on 1st April of a calendar

year and ending on 31st March of the subsequent calendar year;

(9)

“Income” shall include all income from any sources but shall not be

limited to the following:

(a) sale of energy or gross receipts from sale of energy less discounts /

rebates given based on the orders of the Commission;

(b) Rental of meters, plant, equipment and other apparatus hired to the

consumers;

(c) Income from services to consumers by way of repair or any sale or

other service other than capital receipts;

(d) Interest on investments, bank balances including fixed and call

deposits and any other income in the form of interest;

(e) Profit on sale of assets;

(f) Wheeling of energy;

(g) Non tariff income;

(h) Income from other business;

(i) Transmission of energy;

(j) Cross subsidy surcharge u/s 42(2) of the Act;

(k) Additional surcharge u/s 42(4) of the Act;

(l) Any receipt or refund from other sources against any expense or likely

expense which has been earlier allowed as expense in the tariff;

(m) All other general receipts arising from and ancillary or incidental to

the business of electricity supply;

(n) Other general receipts in terms of Act / Regulations including use of

assets for other business whether actually recovered or not;

(10)

“Licence” means a licence granted under clause (b) of section 14 of the

Act;

(11)

“Licensed Business” means the functions and activities, which the

licensee is required to undertake in terms of the licence granted by the

4

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

Commission or being a deemed licensee as referred under sections 14

and 172 of the Act;

(12)

“Licensee” means a person who has been granted a licence and shall

include a deemed licensee;

(13)

“Non-Tariff Income” means income relating to the licensed business

other than from tariff (wheeling and retail supply), and excluding any

income from other business, cross-subsidy surcharge and additional

surcharge;

(14)

“Other Business” means any other business of the distribution licensee

for optimum utilisation of its assets within the meaning of Section 51 of

the Act;

(15)

“Retail Supply Business” means the business of sale of electricity by a

distribution licensee to the consumers within the area of supply in

accordance with the terms of the licence for distribution and retail

supply of electricity;

(16)

“Wheeling” means the operation whereby the distribution system and

associated facilities of a distribution licensee are used by another person

for the conveyance of electricity on payment of charges to be determined

under section 62 of the Act, and in the event where use of the

distribution system and associated facilities is by a consumer, on

payment of a surcharge in addition to the charges for wheeling as may be

determined by the Commission under the first proviso to sub-section (2)

of Section 42 of the Act, an additional surcharge on the charges of

wheeling, as may be specified by the Commission, if applicable, to meet

the fixed cost of such distribution licensee arising out of his obligation to

supply, under Sub-section (4) of Section 42 and wheeling charges under

clause (c) of sub-section (1) of Section 62;

(17)

“Wheeling Business” means the business of operating and maintaining a

distribution system for conveyance of electricity in the area of supply of

the distribution licensee.

3.2

The words and expressions used and not defined in these Regulations,

but defined in the Act, shall have the meanings respectively assigned to

them in the Act.

3.3

The words “Application” or “Petition” shall be interpreted synonymously.

5

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

PART-II

GENERAL PRINCIPLES

4.

Multi Year Tariff Framework

4.1

The Commission shall determine the tariff for distribution business

under a Multi-Year Tariff framework with effect from April 1st of each

financial year subject to provisions under regulations 8,12,13 and 14 of

these Regulations..

4.2

The Multi-Year Tariff framework shall be based on the following

elements, for calculation of Aggregate Revenue Requirement and

expected revenue from tariff and charges for Distribution Business:

i. Control Period, before commencement of which a forecast of the

Aggregate Revenue Requirement and expected revenue from existing

tariff and charges shall be submitted by the applicant and approved

by the Commission;

ii. A detailed Business Plan based on the Operational Norms and

trajectories of performance parameters specified in the MYT

Regulations, for each year of the Control Period, shall be submitted by

the applicant for the Commission's approval, subject to provisions

under regulations 8,12,13,and 14 of these Regulations;

iii. Based on the Business Plan, the applicant shall submit a petition

with the forecast of Aggregate Revenue Requirement and expected

revenue from existing tariff for each year of the Control Period, and

the Commission shall approve the tariff for each year of the Control

Period;

iv. The mechanism for pass-through of approved gains or losses on

account of uncontrollable factors as specified by the Commission in

these Regulations;

v. The mechanism for sharing of approved gains or losses arising out of

controllable factors as specified by the Commission in these

Regulations;

5.

Business Plan

5.1

The Distribution Licensee shall file a Business Plan, for the Control

Period which shall comprise but not be limited to detailed category-wise

sales and demand projections, power procurement plan, capital

investment plan, financing plan and physical targets.

6

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

Provided that in case the Commission issues guidelines and

formats, from time to time, the same shall be adhered to by the

Distribution Licensee.

5.2 (a) The capital investment plan shall show separately, on-going projects that

will spill into the year(s) under review and new projects (along with

justification) that will commence but may be completed within or beyond

the tariff period. The Commission shall consider and approve the capital

investment plan for which the Distribution Licensee shall provide

relevant technical and commercial details.

Provided that for schemes involving capital expenditure greater

than INR 5 Crore, the Distribution Licensee shall seek prior approval of

the Commission.

(b) The Distribution Licensee shall submit detailed supporting documents

while seeking approval from the Commission.

Provided that supporting documents shall include but not be

limited to purpose of investment, capital structure, capitalization

schedule, financing plan and cost-benefit analysis:

(c) The approval of the capital expenditure by the Commission for the

ensuing year shall be in accordance with load growth, system extension,

rural electrification, distribution loss reduction or quality improvement

as proposed in the Distribution Licensee’s supporting documents.

(d) The Commission may also undertake a detailed review of the actual

works compared with the works approved in the previous Tariff Order

while approving the capital expenditure for the ensuing year.

(e) In case the capital expenditure is required for emergency work, the

licensee shall submit an application, containing all relevant information

along with reasons justifying the emergent nature of the proposed work,

seeking post facto approval by the Commission.

(f) The Distribution Licensee shall take up the work prior to receiving the

approval from the Commission provided that the emergent nature of the

scheme has been certified by its Board of Directors.

(g) If the scheme involves capital expenditure of less than INR 5 Crore, and

included in the capital investment plan referred in regulation 5.2, the

Distribution Licensee shall undertake the execution of the scheme with

simultaneous notification to the Commission with all of the relevant

supporting documents.

7

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

(h) Consumer’s contribution towards cost of capital asset shall be treated as

capital receipt and credited in current liabilities until transferred to a

separate account on Commissioning of the assets.

(i) An amount equivalent to the depreciation charge on such assets for the

year shall be appropriated from this account as income to the profit and

loss account over the useful life of the asset.

5.3

The Distribution Licensees shall project the power purchase requirement

after considering effect of target set for Energy Efficiency (EE) and

Demand Side Management (DSM) schemes.

6.

Forecast

6.1

The applicant, based on the Business Plan, shall submit the forecast of

Aggregate Revenue Requirement and expected revenue from tariff, for the

Control Period by a Petition in accordance with BERC (Conduct of

Business) Regulations, 2005 and its amendments from time to time, by

15th November of the year prior to the commencement of the Control

Period and accompanied by such fee payable, as specified in the BERC

(Fees, Fines and Charges) Regulations, 2005 as amended from time to

time.

6.2

The forecast of Aggregate Revenue Requirement shall be developed using

the assumptions relating to the behaviour of individual variables that

comprise the Aggregate Revenue Requirement during the Control Period.

6.3

The forecast of expected revenue from tariff and charges shall be

developed based on the following:

(a) Estimates of quantum of electricity to be supplied to consumers and

wheeled on behalf of Distribution System Users for each financial year

within the Control Period; and

(b) Prevailing tariff as on the date of making the application.

7.

Specific trajectory for certain variables

7.1

The Commission shall stipulate a trajectory while approving the

Business Plan, for certain variables having regard to the reorganization,

restructuring and development of the electricity industry in the State:

Provided that the variables for which a trajectory may be

stipulated shall include, but are not limited to, Operation & Maintenance

expense norms, supply availability, wires availability and distribution

losses.

8

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

7.2

In case the Commission has approved the business plan by 31st October

of current year, the trajectory stipulated by the Commission in the order

approving the Business Plan submitted by the applicant, shall be

incorporated by the applicant, in its forecast of Aggregate Revenue

Requirement and/or expected revenue from tariff and charges under

regulation 6.3 of these Regulations.

8.

Annual Review of Performance and True-up

8.1

Where the Aggregate Revenue Requirement and expected revenue from

tariff and charges of a Distribution Licensee are covered under a Multi-

Year Tariff framework, such Distribution Licensee shall be subject to an

annual review of performance and True-up during the Control Period in

accordance with these Regulations.

Provided that in case of excruciating and extra-ordinary

circumstances, at any time notwithstanding the Annual Review, the

Distribution Licensee may file appropriate application before the

Commission.

9.

Controllable and uncontrollable factors

9.1

The “uncontrollable factors” shall comprise the following factors which

are beyond the control of, and could not be mitigated by the applicant:

(a) Force Majeure events, such as acts of war, fire and natural calamities.

(b) Change in law;

(c) Taxes and Duties;

(d) Variation in sales; if the Distribution Licensee has adequate power

availability.

(e) Supply availability beyond the control of Distribution Licensee, subject to

prudence check and finding of the Commission during True-up exercise.

(f)

Variation in the cost of power generation and/or power purchase due to

the circumstances specified in regulations 19 (d) and 20 of these

Regulations.

9.2

Some illustrative variations or expected variations in the performance of

the applicant, which may be attributed by the Commission to

controllable factors include, but are not limited to the following:

(a) Variations in capital expenditure on account of time and/or cost

overruns/ efficiencies in the implementation of a capital expenditure

project not attributable to an approved change in scope of such project,

change in statutory levies or force majeure events;

9

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

(b) Variations in distribution losses which shall be measured as the

difference between the units input into the distribution system and the

units billed for the same year.

(c) Variations in Return on Equity (RoE), depreciation and working capital

requirements; However, if the Commission is satisfied that the variation

in the working capital requirement is attributable to any uncontrollable

factors, the same may be considered as uncontrollable factor.

(d) Failure to meet the standards specified in the Standards of Performance

Regulations, except where exempted;

(e) Variation

in

operation

&

maintenance

expenses,

except

those

attributable to directions of the Commission or to change in Government

policy/law

(f)

Variation in Wires Availability and Supply Availability, within the control

of Distribution Licensee.

10.

Mechanism for pass-through of gains or losses on account of

uncontrollable factors

10.1 The approved aggregate gain or loss to the Distribution Licensee on

account of uncontrollable factors shall be a passed through, as an

adjustment in the tariff of the Distribution Licensee, as specified in these

Regulations and as may be determined in the Order of the Commission

passed under these Regulations.

11.

Mechanism for sharing of gains or losses on account of controllable

factors

11.1 The approved aggregate gain or loss to the Distribution Licensee on

account of controllable factors including distribution losses shall be on

account of the Distribution Licensee.

PART-III

PROCEDURE

12.

Procedures relating to making of an application for determination of

Tariff

12.1 An application for approval of the Business Plan shall be made by 15th

September of the year prior to the commencement of the Control Period,

in accordance with the BERC (Conduct of Business) Regulations, 2005

and its amendments from time to time, and accompanied by such fee

payable, as specified in the BERC (Fees, Fines and Charges) Regulations,

2005” as amended from time to time.

10

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

Provided that where no separate fee has been specified for filing of

a Business Plan, the applicant shall pay fees as may be determined by

the Commission.

12.2 An application for determination of tariff shall be made by 15th

November every year, for Truing up of expenses of previous years, for

Annual Performance Review (APR) of the Aggregate Revenue Requirement

(ARR) for the current year and determination of ARR and tariff for retail

sale of electricity for the ensuing years of the control period. The

application should contain the data relating to each item of the ARR

supported with the information/data in the formats 1 to 36 appended to

these Regulations, revenue income on existing tariff, revenue income on

proposed tariff, tariff design, structure and rates for retail sale of

electricity, etc with explanatory notes and accompanied by such fees as

may be specified under the BERC (Fees, Fines and Charges) Regulations,

2005 as amended from time to time. All the information as required in

the formats appended to these Regulations along with justification shall

be provided in the main petition and submission of information

separately in the formats is not mandatory.

Provided the Commission may require submission of additional

information/data required for determination of ARR and tariff.

Proceedings held by the Commission for determination of ARR and tariff

shall be in accordance with the BERC (Conduct of Business) Regulations,

2005, as amended from time to time.

12.3 The petition for determination of tariff shall be accompanied by

information for the previous year, current year (RE) and the ensuing

years of the entire control period capturing the expected revenues from

the tariff and charges including miscellaneous charges at existing rates

along with detailed assumptions, parameters required in annual true-up,

Annual Performance Review exercise, etc.

Provided that the application shall be accompanied where

relevant, by a detailed tariff revision proposal showing category-wise

tariff and how such revision would meet the gap, if any, in Aggregate

Revenue Requirement for each year of the Control Period.

Provided further that the information for the previous year shall be

based on audited accounts and in case audited accounts for previous

year are not available, audited accounts for the immediately preceding

11

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

year should be filed along with annual accounts for the previous year

adopted by the Board of Directors of the licensee company.

12.4 The Distribution Licensee shall along with the aforesaid petition submit a

statement on the status of compliance of directives, if any, issued by the

Commission in its last tariff order.

12.5 The petition for determination of tariff shall include the details of actual

subsidy received from the State Government vis-à-vis claimed by the

Distribution Licensee in the True-up petition for the previous year:

12.6 The Commission may seek clarification and additional information on

inadequacies in the application, if any, within 14 days or as may be

practicable, of filing of the application for approval of the Business Plan

and application for determination of tariff, as the case may be.

12.7 The Distribution Licensee shall respond within the next 10 days to the

Commission with all clarification and information as required.

12.8 The Commission shall admit the application for approval of the Business

Plan and application for determination of tariff, as the case may be,

within seven days or as may be required, of submission of response to

the clarifications, if any, by the Distribution Licensee.

12.9 Upon receipt of a complete application accompanied by all requisite

information, particulars and documents in compliance with all the

requirements specified in these Regulations, the application for approval

of the Business Plan and application for determination of tariff, as the

case may be, shall be deemed to be received and the Commission or the

Secretary or the designated Officer shall intimate to the applicant with

the abridged form of application for publication of public notice in the

daily newspapers. In case of non-submission or delay in submission of

additional information, the Commission may take suo-motu decision to

formulate this abridged form of application as it deem appropriate.

12.10 The applicant shall, within three (3) days of the intimation given to him

in accordance with Regulation 12.9, publish a notice inviting suggestions

and objections from the public, in at least two (2) English and two (2)

Hindi language daily newspapers widely circulated in the area to which

the application pertains, outlining the proposed Business Plan or the

proposed ARR and tariff, as the case may be, and such other matters as

may be stipulated by the Commission.

12

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

Provided that the applicant shall make available a hard copy of the

complete application, to any interested party, at such locations and at

such rates as may be stipulated by the Commission:

Provided further that the applicant shall also put up on its

internet website, in downloadable spreadsheet format showing detailed

computations, the application made to the Commission along with all

regulatory filings, information, particulars and documents in the manner

so stipulated by the Commission:

Provided further that the web-link to the information mentioned in

the second proviso above shall be easily accessible, archived for

downloading and shall be prominently displayed on the applicant's

internet website:

Provided also that the applicant may not provide or put up any

such information, particulars or documents, which are confidential in

nature, with the prior approval of the Commission.

Explanation – for the purpose of this Regulation, the term “downloadable

spreadsheet format” shall mean one (or multiple, linked) spreadsheet

software files containing all assumptions, formulae, calculations, software

macros and outputs forming the basis of the application.

12.11 Notwithstanding anything contained in these Regulations, in case of

delay/ non-submission of the application for approval of the Business

Plan and application for determination of tariff, as the case may be, the

Commission may initiate suo-motu proceedings mandating the filing of

the said applications.

Provided that in the event of the licensee not filing the application despite

the aforesaid proceeding, the Commission may on its own, decide the

tariff based on previous year’s tariff details and after incorporating

suitable adjustments. However before issuing tariff order under such

circumstances, comments/ suggestions/ objections from the public and

stake holders including the licensee will be invited and same will be

considered for the tariff order.

Provided further that the Commission may also pass directions

under Section 129 and/or Section 142 of the Act, if required.

13.

Order approving the Business Plan and Tariff Order

13.1 An Order approving with such modifications or such conditions as may

be specified in that order or rejecting the Business Plan shall, as far as

13

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

practicable, be issued before the issue of tariff order separately or with

the tariff order as the Commission may deem fit and practicable.

13.2 The Commission shall, within one hundred and twenty (120) days from

receipt of a complete application for determination of ARR and tariff and

after considering all suggestions and objections received from the public

and after hearing all stakeholders and general public:-

(a) issue a Tariff Order accepting the application with such modifications

or such conditions as may be specified in that Order;

(b) reject the application for reasons to be recorded in writing, if such

application is not in accordance with the provisions of the Act and the

Rules and Regulations made thereunder or the provisions of any

other law for the time being in force:

Provided that an applicant shall be given a reasonable opportunity

of being heard before rejecting its application.

13.3 The applicant shall publish the tariff approved by the Commission within

seven days of issue of tariff order in at least two (2) English and two (2)

Hindi daily newspapers having wide circulation in the area of supply of

the applicant and shall put up the approved tariff / tariff schedule on its

internet website and make available for sale, a booklet containing such

tariff schedule to any person upon payment of reasonable reproduction

charges.

13.4 The tariff so published shall be in force from the date specified in the

said Order and shall, unless amended or revised, continue to be in force

for such period as may be stipulated therein.

14.

True-Up Order

The Commission shall True-Up expenses of the previous year either as

part of the Tariff order or issue Order/s for True-Up of expenses

preceding the Tariff order of ensuing year.

(a) An order for True-Up of expenses shall be issued on annual basis.

(b) An order for True-Up of expenses shall be on the basis of expense

estimates made in the beginning of the year under consideration, actual

expenses booked in the audited books of accounts of the Distribution

Licensee for the year, and after prudence check of data by the

Commission.

14

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

(c) Where audited books of account are not available at the time of true-up

provisional books of accounts duly approved by the Board of Directors of

the applicant company shall be used for the provisional True-up process.

(d) Estimates of expenses for the ensuing year shall be on the basis of

corresponding figures in the order for True-up of expenses of the

previous year and Annual Performance Review or Tariff Order of the

current year, as the Commission may consider reasonable and deem fit.

(e) Notwithstanding

anything

contained

in

regulation

4

of

these

Regulations, the Revenue gap/surplus arising out of Truing up shall be

considered by the Commission while determining the ARR of ensuing

year(s).While approving adjustments towards revenue/expenses in future

years, arising out of Truing up exercises, the Commission may allow the

carrying

costs

as

determined

by

the

Commission

of

such

expenses/revenues. However the revised estimated gap/surplus as a

result of APR shall not be passed in the ARR of ensuing year.

15.

Adherence to Tariff Order

15.1 If a Distribution Licensee recovers a price or charge exceeding the tariff

determined under Section 62 of the Act and in accordance with these

Regulations, the excess amount shall be payable to the person who has

paid such price or charge, along with interest equivalent to the Bank

Rate of the Reserve Bank of India without prejudice to any other liability

that may be incurred by such Distribution Licensee.

15.2 The Distribution Licensee shall submit periodic returns as may be

required by the Commission, containing operational and cost data to

enable the Commission to monitor the implementation of its Order.

PART IV

SALES, POWER PURCHASE QUANTUM AND COST

16.

Metered Sales forecast

16.1 Forecasting Methodology

Metered sales shall be treated as an uncontrollable parameter:

Provided that open access transactions shall not form part of the

sales:

Provided further that sales forecast shall be based on past trends in each

of the slabs of consumer categories. The cumulative annual growth rate

(CAGR) of past 3 years of sales within each of the slabs of a consumer

15

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

category as approved in True-up orders shall be used to forecast up to

short and medium (5 years) time range:

Provided also that in case of following occurrences, prudent

adjustment of forecasted metered sales shall be carried out:

a) Abnormal trend or variation in the growth rate of particular category

/ slab consumer mix in any given area (on the basis of proposed city

plan,

tax

holidays,

Government

incentives

for

industrial

establishments, migration of consumers due to open access, etc.)

b) Abnormal trend in the growth rate of a particular slab/category of

consumers.

c) Inflection point in economic cycle (boom, slowdown, recession or

expansion)

d) Variations in weather conditions

e) Materially significant findings during audit check as per Regulation

16.2 of these regulations.

Provided also that in cases where slab-wise sales to each consumer

category are not available in audited books of accounts and only

consolidated sales are available, the Distribution Licensee shall include

the slab-wise sales along with the Business Plan and Tariff petition.

16.2 Overhaul Exercise

(a) A team shall be formed by Distribution Licensee to validate the status

of meters, load of metered consumers and category classification of

consumers in the area of operations of Distribution Licensee.

(b) The overhaul exercise shall be a year-long assessment study

conducted on monthly basis for the first year subsequent to the

notification of these Regulations.

(c) For the overhaul exercise, consumers shall be sampled for a monthly

overhaul from the circles served by the Distribution Licensee.

Provided that the sample so chosen shall be close representation

of geographic, demographic, industrial/ commercial/ residential/

agricultural spread served by the Distribution Licensee:

(d) In the event, inconsistencies are found in the number of metered

consumers, status of the meters, load at consumer premises or

category classification of the consumers, the forecast arrived at in

Regulation 16.1 on the basis of CAGR of historical (3 years) audited

sales shall be adjusted accordingly as specified in Regulation 16.1.

16

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

17.

Unmetered Sales Forecast

17.1 Methodology for determination of unmetered sales

(a) Till the time 100% metering of electricity consumers is achieved in area

of operation of Distribution Licensee, an independent study shall be

conducted by the Distribution Licensee to assess actual consumption of

power by unmetered consumer segment:

(b) For three years including the date of notification of these Regulations,

yearlong, month-wise, block-wise study referred in Clause (a) of

Regulation 17.1 above shall be conducted by the Distribution Licensee

and submitted to the Commission.

(c) The study referred to in clause (b) of this Regulation shall cover actual

consumption in the block (hours of usage, specifications of motor power

etc.)

demonstrating

seasonal

impact,

economic

development,

demographics, consumption pattern, etc. This would aid to develop

baseline norms pertaining to electricity consumption in un-metered

consumer segments.

(d) Baseline norms shall be established after completion of study in the first

year which shall be revised/fine-tuned in the remaining two subsequent

years.

(e) After three years of annual study leading to streamlining of processes,

study shall be conducted on alternate year basis.

(f) Stratified random sampling shall be used to identify consumers in

block/district of study which would be, well distributed representation of

the block under purview such that sampled consumers shall exhibit

same demographic profile, energy consumption pattern, water level etc.

of the block.

Provided that the sample selected shall be from all the subdivisions in

the state.

17.2 Study of Agricultural feeders not segregated in significant numbers

(a) The sample of consumers selected shall be monitored and the readings of

consumption can be taken from the meters installed at each DT in the

sample area.

(b) The load of all the consumers connected on the DT in each of the sample

area shall be validated each month to account for any additional load or

replacement of old motor with new motor by the consumers.

17

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

(c) Based on the result of yearlong month-wise study, the consumption

pattern for selected subdivisions shall be established.

(d) The results of the study shall be extrapolated to adjoining areas with

similar water level and the same cropping patterns.

(e) The month-wise analysis of the sample selected for the establishment of

baseline shall be submitted to the Commission at regular intervals so

that the directions of the Commission are incorporated before the

completion of study.

17.3 Study of Agricultural feeders segregated in significant numbers

(a) During the study, meters shall be installed at input points of the feeder

at the sub-station and based on the load flow study the technical loss of

the feeder will be evaluated.

(b) The difference of the feeder meter consumption and technical losses will

be agricultural consumption.

Provided that such computation of agricultural consumption may

include commercial losses the percentage of which shall be worked out

by the Distribution Licensee during the annual study.

(c) From every subsequent year, the study report shall be submitted to the

Commission by 31st October for the Commission to have enough time to

conduct validation check and analysis in collaboration with an

independent agency and with due assistance of team designated by the

Distribution Licensee.

(d) The Distribution Licensee shall be informed as late as morning of the day

scheduled for inspection by the Commission to have reality check and to

ensure that power supply and the Distribution Licensee’s personnel are

available.

(e) Any significant deviation in the parameters reported in annual study

from the baseline study may necessitate revision of norms by the

Commission.

18.

Treatment of Distribution Loss

18.1 Distribution Loss

Distribution loss shall be considered as a controllable parameter. Based

on the assessment of metered and un-metered sales as per Regulations

16 and 17 of these regulations, the Commission shall update existing

baseline of distribution losses:

18

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

Provided that circle-wise distribution loss reduction targets shall

be approved by the Commission on the basis of circle-wise distribution

loss, circle-wise differential tariff by way of separate and distinct

distribution loss surcharge may also be considered by the Commission, if

the Commission considers it appropriate and practicable.

19.

Power Purchase Quantum and Cost

(a) Based on the demand estimates, the power purchase quantum and cost

shall be calculated.

(b) The approved Power Purchase Quantum and cost shall be net of

expected revenue from sale of surplus power, if any, during lean period.

(c) Revenue from sale of surplus power shall be estimated at per unit

weighted average price of bilateral purchases.

(d) If there is a short term requirement of power by the Distribution Licensee

and such requirement is on account of any factor beyond the control of

the Licensee (shortage/non-availability of fuel, snow capping of hydro

resources inhibiting power generation in sources stipulated in the plan,

unplanned/forced outages of power generating units or acts of God),

then the cost shall be passed on to the customers with the approval of

the Commission.

Provided that the extra cost of the power so purchased shall

normally be allowed subject to maximum rate of average cost of power

purchase

from

long

term

and

medium

term

sources.

However

notwithstanding any provisions under these Regulations, Commission may

consider to allow a rate higher than the average cost of power purchase

from long term and medium term sources for extra power so purchased on

the basis of actual cost incurred subject to the maximum of the rate at

which transaction of energy has taken place in the energy exchange,

provided the licensee justifies the rate before the Commission with all

relevant documents.

19.1 Power Purchase Planning

(a) Comprehensive Power Procurement Plan shall be submitted as part of

MYT petition to the Commission.

(b) The Distribution Licensee shall prepare a short term (less than 1 year)

and a medium term (5 years) plan, separately stated for peak and off-

peak periods, for unrestricted demand of electricity for each consumer

19

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

category in its area of operation as per Regulation 16 and Regulation 17

of these regulations.

(c) The demand projected shall be grossed-up with distribution losses (as

determined by Regulation 18 of these regulations) and transmission

losses to arrive at power purchase requirement for the Distribution

Licensee.

(d) The Distribution Licensee shall assess quantum of power available at its

disposal from state’s generating plants, central generating utilities, IPPs

etc. and month-wise deficit/surplus schedule shall be developed,

separately stated for both peak and off-peak period:

(e) The procurement plan for medium term shall be through competitive

bidding.

(f) Long-term procurement plan shall include proposals about acquisition of

demand side resources through "standard bid" or "competitive demand

side resource bidding process". The procurement shall also include

power from plants using renewable sources of energy at least to the

extent stipulated by the Commission.

(g) Due to in-firm nature of power from renewable sources of energy,

alternate firm source of power (equivalent in terms of energy units) may

be specified in the procurement plan (over and above total energy

required).

(h) Fixed cost pertaining to such alternate firm source of power, if any, shall

be allowed to the Distribution Licensee and actual cost shall be Trued-

up.

20.

Treatment of Incremental Power procurement cost

20.1 Identification of Incremental cost and process of recovery

(a) The Distribution Licensee shall recover the incremental cost incurred

due to the following:

1. Own generation if the Distribution Licensee has its own generation.

2. Cost due to variation in cost of power purchase on account of increase

in fuel cost.

(b) The incremental cost on own generation and power purchase shall be

computed and charged on the basis of actual variation in fuel cost and

power purchase cost vis-a-vis the cost approved in the tariff order and

shall not be computed on the basis of estimated or expected variation in

fuel/power purchase cost and shall be computed on the basis of formula

20

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

provided in regulation 20.2 below, and shall be charged with prior

approval of the Commission.

(d) The Distribution Licensee shall submit details of the incremental cost

incurred and to be charged to all consumers for the entire month, along

with the detailed computations and supporting documents as may be

required for approval and verification by the Commission within first 15

days of the month end.

(e) The Commission shall examine the incremental cost proposed by the

Distribution Licensee with supporting documents submitted by the

Licensee.

(f) The Distribution Licensee shall upgrade the billing and IT systems to

incorporate Incremental Costs (IC) as a component in tariff design.

20.2 Formula for computation of Incremental cost

The formula and terms and conditions for calculation of the incremental

charge on account of increase in fuel cost and power purchase cost

namely fuel and power purchase cost adjustment (FPPCA) charges shall

be as under:

FPPCA

(Paise /

kWh)

=

Qc(Rc2–Rc1)+Qo(Ro2–Ro1)+Qpp(Rpp2–Rpp1)+Vz+A

x100

(Qpg1 + Qpp1+Qpp2) x

Where,

Qc

=

=

Quantity of coal consumed during the adjustment period in Metric Tons (MT)

(SHR x QPg) (1+TSL)x1000 / GCV, or actual whichever is less

Rc1

=

Weighted average base rate of coal supplied ex-power station coal yard as

approved by the Commission for the adjustment period in Rs. / MT

Rc2

=

Weighted average actual rate of the coal supplied ex-power station coal yard for

the adjustment period in Rs. / MT

Qo

=

Actual Quantity of oil (in KL) consumed during the adjustment period or

normative oil consumption as per Tariff order whichever is less.

Ro1

=

Weighted average base rate of oil ex-power station (Rs./KL) approved by the

Commission for the adjustment period.

Ro2

=

Weighted average actual rate of oil ex-power station supplied (Rs. / KL) during

the adjustment period.

Qpp

=

Total power purchased from different sources (kWh) = Qpp2+Qpp3

Qpp1

=

Qpp3 in kWh

TL

=

Transmission loss (CTU) (in percentage terms).

Qpp2

=

Power purchase from sources with delivery point within the state transmission

or distribution system (in kWh)

L .

100

1 –

TL

100

l –

21

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

Qpp3

=

Power purchase from sources on which CTU transmission loss is applicable (in

kWh)

Rpp1

=

Average rate of power purchase as approved by the Commission

(Rs. / kWh)

Rpp2

=

Average rate of power purchased during the adjustment period (Rs. / kWh)

Qpg

=

Own power generation (kWh)

Qpg1

=

Own power generation (kWh) at generator terminal – approved auxiliary

consumption

L

=

Percentage T&D loss as approved by the Commission or actual, whichever is

lower.

SHR

=

Station Heat Rate as approved by the Commission (Kcal / kWh)

TSL

=

Percentage Transit and Stacking Loss as approved by the Commission.

GCV

=

Weighted average gross calorific value of coal as fired basis during the

adjustment period (Kcal / Kg).

VZ

=

Amount of variable charges on account of change of cost of unknown factors

like water charges, taxes or any other unpredictable and unknown factors not

envisaged at the time of tariff fixation subject to prior approval of the

Commission (Rs.)

A

=

Adjustment, if any, to be made in the current period to account for any excess

/ shortfall in recovery of fuel or power purchase cost in the past adjustment

period, subject to the approval of the Commission (Rs.)

If there are more than one power stations owned by the Licensee Qc, Rc1, Rc2,

Qo, Ro1, Ro2, Qpg and Qpg1 will be computed separately for each power station

and sum of the increase/decrease of cost of all power stations shall be taken

into consideration.

Terms and conditions for application of the FPPCA formula

1)

The basic nature of FPPCA is ‘adjustment’ i.e. passing on the increase

or decrease in the fuel costs and power purchase costs, as the case

may be, compared to the approved fuel costs and power purchase costs

in the Tariff Order.

2)

The operational parameters / norms fixed by the Commission in the

Tariff Regulations / Tariff Order shall be the basis of calculating FPPCA

charges.

3)

The FPPCA will be recovered every month in the form of an incremental

energy charge (Rs/kwh) in proportion to the energy consumption of the

month in which incremental cost has been incurred and shall not

exceed 10% of the approved avg. cost of supply in the Tariff order and

balance amount, if any, in the FPPCA over and above this ceiling shall

be carried forward to be billed in subsequent month.

4)

Incremental cost of power purchase due to deviation in respect of

generation mix or power purchase at higher rate shall be allowed only

if it is justified to the satisfaction of the Commission.

5)

Any cost increase by the licensee by way of penalty, interest due to

delayed payments, and due to operational inefficiencies shall not be

allowed.

6)

FPPCA charges shall be levied on all categories of consumers.

7)

Distribution licensee shall file detailed computation of actual fuel cost

in Rs./kWh for each month for each of power stations of the state

22

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

generators as well as cost of power purchase (Fixed and Variable) from

each source/station and a separate set of calculations with reference

to permitted level of these costs.

8)

The data in support of the FPPCA claims shall be duly authenticated

by an officer of the licensee, not below the rank of Chief Engineer on an

affidavit supported with the certified copy of energy bills of power

purchase, transmission and RLDC charges, bill for coal purchase and

its transportation cost, oil purchase bill and the quantity of coal and oil

consumed during the month.

9)

Levy of FPPCA charge will be allowed only when it is ten (10) paise or

more per unit. If it is less than 10 (ten) paise/unit, the same may be

carried forward for adjustment in the next month.

10)

The incremental cost per kWh due to the FPPCA arrived for a month

shall be recovered in the energy bill of the month subsequent to the

order of the Commission approving FPPCA with full details of rate and

unit(s) on which FPPCA charges have been billed. The Generating

Company and the Distribution Licensee shall provide along with the

proposal of FPPCA (as applicable to them) for a month, a compliance

report of the previous order of the commission in respect of FPPCA.

20.3 Incremental cost realisation per unit of electricity consumption

The Commission may approve recovery of incremental cost on account of

fuel and power purchase cost from the consumers in one or more

monthly installment.

PART V

FINANCIAL PRINCIPLES

21.

Components of ARR

The Aggregate Revenue Requirement (ARR) for the Distribution Business

of the Distribution Licensee for each year of the Control Period, shall

contain the following financial parameters:

A. Quantum and Cost of power procurement from various sources

B. Transmission and load dispatch charges

C. Operation and Maintenance expenses;

D. Depreciation

E. Contingency Reserves;

F. Interest on Loan;

G. Interest on Working Capital;

H. Return on Equity;

I. Bad debts, if any

J. Income Tax;

23

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

K. Non-Tariff Income; and

L. Income from Other Business

M. Interest on security deposit.

22.

Operation & Maintenance Expenses

(a) The Commission shall stipulate a separate trajectory of norms for each of

the components of O&M expenses viz., Employee cost, Repair and

Maintenance (R&M) expense and Administrative and General (A&G)

expense.

Provided that such norms may be specified for a specific Distribution

Licensee or a class of Distribution Licensees.

(b) Norms shall be defined in terms of combination of number of personnel

per 1000 consumers and number of personnel per substation along with

annual expenses per personnel for Employee expenses; combination of

A&G expense per personnel and A&G expense per 1000 consumers for

A&G expenses and R&M expense as percentage of gross fixed assets for

estimation of R&M expenses:

(c) One-time expenses such as expense due to change in accounting policy

and arrears paid due to pay commission recommendation shall be

excluded from the norms in the trajectory.

(d) The unforeseen expenses beyond the control of the Distribution Licensee

such as pay revision, shall be excluded from the norms in the trajectory.

(e) The One-time expenses and the expenses beyond the control of the

Distribution Licensee shall be allowed by the Commission over and above

normative Operation & Maintenance Expenses after prudence check.

(f) The norms in the trajectory shall be specified over the control period with

due consideration to productivity improvements.

(g) The norms shall be determined at constant prices of base year and

escalation on account of inflation shall be over and above the baseline.

(h) The Distribution Licensee specific trajectory of norms shall be identified

by the Commission on the basis of absolute and relative analysis.

(i) In absolute analysis, Distribution Licensee’s audited accounts of

operations for last three years, expenses claimed for control period,

historically approved cost, and prudence check shall be used by the

Commission to estimate values of norms.

24

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

(j) In relative analysis, performance parameters of other Distribution

Licensees within the same state or in other states, shall be considered by

the Commission to estimate norms.

Provided that other Distribution Licensees so chosen shall have

similar profile as that of the Distribution Licensee under consideration in

terms of consumer mix, type of license area (city, state, etc.) type of

distribution networks, viz., underground/overhead, High Tension (HT)

consumer, Low Tension (LT) consumer ratio, etc.

(i) Suitable average of outcomes of absolute and relative analysis shall be

taken by the Commission to fix the norms over the control period for the

Distribution Licensee.

22.1 Employee Cost

Employee cost shall be computed as per the approved norm escalated by

consumer price index (CPI), adjusted by provisions for expenses beyond

the control of the Distribution Licensee and one time expected expenses,

such as recovery/adjustment of terminal benefits, implications of pay

commission, arrears and Interim Relief, governed by the following

formula:

EMPn = (EMPb * CPI inflation) + Provision

Where:

EMPn : Employee expense for the year n

EMPb : Employee expense as per the norm

CPI inflation : is the average increase in the Consumer Price Index (CPI)

for immediately preceding three years

Provision : Provision for expenses beyond control of the Distribution

Licensee and expected one-time expenses as specified above.

Till the norms is specified by the Commission the employee cost shall be

determined on the basis of actual historical cost.

22.2 Repairs and Maintenance (R&M) Expense

Repairs and Maintenance expense shall be calculated as percentage (as

per the norm determined) of Opening Gross Fixed Assets for the year

governed by following formula:

R&Mn = Kb * GFAn

Where:

R&Mn : Repairs & Maintenance expense for nth year

GFAn : Opening Gross Fixed Assets for nth year

25

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

Kb : Percentage point as per the norm

22.3 Administrative and General (A&G) Expense

A&G expense shall be computed as per the norm escalated by wholesale

price index (WPI) and adjusted by provisions for confirmed initiatives (IT

etc.

initiatives as proposed by the Distribution Licensee and validated by the

Commission) or other expected one-time expenses, and shall be governed

by following formula:

A&Gn = (A&Gb * WPI inflation) + Provision

Where:

A&Gn: A&G expense for the year n

A&Gb: A&G expense as per the norm

WPI inflation: is the average increase in the Wholesale Price Index (WPI)

for immediately preceding three years

Provision: Cost for initiatives or other one-time expenses as proposed by

the Distribution Licensee and validated by the Commission.

Till the norms of A&G expenses is specified by the Commission, the

actual historical cost will be considered for determination of A&G

expenses.

23.

Treatment of Depreciation

(a) Depreciation shall be calculated for each year of the control period on

the original cost of the fixed assets of the corresponding year.

(b) Depreciation shall not be allowed on assets funded by capital

subsidies, consumer contributions or grants.

(c) Depreciation shall be calculated annually on the basis of assets

capitalised and put to use based on the straight line method over the

useful life of the asset and at the rate specified by the Central

Electricity Regulatory Commission.

(d) The residual value of assets shall be considered as 10% and

depreciation shall be allowed to a maximum of 90% of the original

cost of the asset.

The Distribution Licensee shall submit separate detail of fully

depreciated asset along with year of commissioning and year of

attaining ninety percent depreciation with the tariff petition..

26

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

Provided that Land shall not be treated as a depreciable asset and

its cost shall be excluded while computing 90% of the original cost of

the asset:

(e) Depreciation shall be charged from the first year of commercial

operation of the asset.

Provided that in case the operation of the asset is for a part of the

year, depreciation shall be charged on proportionate basis:

(f) A provision of replacement of assets shall be made in the capital

investment plan.

24.

Contribution to Contingency Reserve

(a) If the Distribution Licensee has made an appropriation to the

Contingency Reserve, a sum not less than 0.25 per cent and not more

than 0.5 per cent of the original cost of fixed assets shall be allowed

annually towards such appropriation in the calculation of ARR:

(b) The amount so appropriated shall be invested in securities authorized

under the Indian Trusts Act, 1882 within a period of six months of close

of the financial year.

Provided that no diminution in the value of contingency reserve

shall be allowed to be adjusted as a part of tariff.

(c) The Contingency Reserve shall not be drawn upon during the term of the

license except to meet such charges as may be approved by the

Commission, such as following:

(i)

Expenses or loss of profits arising out of accidents, strikes or

circumstances which the management could not have prevented;

(ii)

Expenses on replacement or removal of plant or works other than

expenses required for normal maintenance or renewal;

(iii)

Compensation payable under any law for the time being in force

and for which no other provision is made:

Provided that such drawal from contingency reserve shall be

computed after making due adjustment for any other compensation that

may have been received by the Licensee as part of an insurance cover:

25.

Treatment of Interest on loan

(a) The Distribution Licensee shall provide detailed loan-wise, project-

wise and utilization-wise details of all the loans.

(b) If the equity actually deployed is more than 30 % of the capital cost,

equity in excess of 30 % shall be treated as normative loan:

27

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

Provided that where equity actually deployed is less than 30% of the

capital cost, the actual loan shall be considered for determination of

interest on loan:

(c) Actual loan or normative loan, if any, shall be referred as gross

normative loan in this Regulation.

(d) The normative loan outstanding as of 1st April of control period shall

be computed by deducting the cumulative repayment as approved by

the Commission (basis as mentioned below) up to 31st March of

current period (a year before control period) from the gross normative

loan.

(e) The repayment for the control period shall be deemed to be equal to

the depreciation allowed for the year.

(f) Notwithstanding any moratorium period availed by the Distribution

Licensee, the repayment of the loan shall be considered from the first

year of the control period as per annual depreciation allowed.

(g) The rate of interest shall be the weighted average rate of interest

calculated on the basis of actual loan portfolio at the beginning of

each year of the control period, in accordance with terms and

conditions of relevant loan agreements, or bonds or non-convertible

debentures:

Provided that if no actual loan is outstanding but normative loan

is still outstanding, the last available weighted average rate of interest

shall be applicable.

Provided further that the interest on loan shall be calculated on

the normative average loan of the year by applying the weighted

average rate of interest:

Provided also that exception shall be made for the existing loans

which may have different terms as per the agreements already

executed if the Commission is satisfied that the loan has been

contracted for and applied to identifiable and approved projects:

(h) The Distribution Licensee shall make every effort to refinance the loan

as long as it results in net benefit to the consumers.

Provided that the cost associated with such refinancing shall be

eligible to be passed through in tariffs and the benefit on account of

refinancing of loan and interest on loan shall be shared in the ratio of

50:50 between the Distribution Licensee and the consumers.

28

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

Provided further that the Distribution Licensee shall submit the

calculation of such benefit to the Commission for its approval.

(i) The Distribution Licensee shall enable tracking of the loans converted

into grants under schemes like APDRP, R-APDRP, RGGVY, RSVP, etc

or any other loan from the Central or State Government by providing

information and data regularly to the Commission, for enabling the

Commission to recover from Distribution Licensee the amount of

interest on loans which have been passed on to the consumers in the

earlier years and have been converted into grant subsequently so that

the recovered amount is passed on to the consumers.

(j) Addition to loan during the year for interest purpose will be restricted

to the quantum of assets capitalized and put to use.

26.

Interest on Working Capital

The Distribution Licensee shall be allowed interest on estimated level of

working capital for the financial year, computed as follows:

a) O&M expenses for one month

b) Two months equivalent of expected revenue

c) Maintenance spares @ 40% of R&M expenses for one month:

Less:

(j) Power purchase cost, transmission charges and load dispatch charges of

one month

(ii) Depreciation, return on equity and contribution to contingency reserves

(iii) Security deposits from consumers, if any.

Provided that the interest on working capital shall be on normative basis

and rate of interest shall be equal to the State Bank Advance Rate (SBAR) as

of the date on which petition for determination of tariff is accepted by the

Commission.

Provided further that interest shall be allowed on consumer security

deposits and security deposits from Distribution System users at the Bank

Rate as of the date on which the petition for determination of tariff is

accepted by the Commission.

Provided further that if the State Government is providing resource gap

grant or subsidy, working capital shall be reduced by that amount.

29

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

27.

Treatment of Return on equity

(a) Return on equity shall be computed on 30% of the capital base or

actual equity, whichever is lower:

Provided that assets funded by consumer contribution, capital

subsidies/ grants and corresponding depreciation shall not form part

of the capital base. Actual equity invested in the Distribution Licensee

as per book value shall be considered as perpetual and shall be used

for computation in this Regulation:

(b) The return on the equity invested shall be allowed from the date of

start of commercial operation:

(c) The project which will be commissioned w.e.f. 01.04.2016 will be

allowed RoE of 15.5% and if project is completed in schedule period

0.5% incentives in form of RoE will be allowed.

28. Bad and Doubtful Debts :

Bad and Doubtful Debts shall be allowed as a legitimate business

expense provided the distribution licensee actually identifies and

writes off bad debts as per the transparent policy approved by the

Commission. In case there is any recovery of bad debts already

written off, the recovered bad debt will be treated as other income.

29.

Income Tax

a) Income Tax, if any, on the Licenced business of the Distribution

Licensee shall be treated as expense and shall be recoverable from

consumers through tariff. However, tax on any income other than

that through its Licenced business shall not be a pass through, and it

shall be payable by the Distribution Licensee itself.

b) The income tax actually payable or paid shall be included in the ARR.

The actual assessment of income tax should take into account

benefits of tax holiday, and the credit for carry forward losses

applicable as per the provisions of the Income Tax Act 1961 shall be

passed on to the consumers.

c) Tax on income, if any, liable to be paid shall be limited to tax on

return on the equity component of capital employed. However any tax

liability on incentives due to improved performance shall not be

considered.

30

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

30.

Non-Tariff Income

a) All incomes being incidental to electricity business and derived by the

Licensee from sources, including but not limited to profit derived from

disposal of assets, rents, delayed payment surcharge, meter rent (if

any), income from investments other than contingency reserves,

miscellaneous receipts from the consumers, other miscellaneous

receipts, income to Licensed business from the Other Business of the

Distribution Licensee and any other income mentioned in Schedule-5

of The Electricity (Supply)Annual Accounts Rule 1985 shall constitute

Non-Tariff Income of the Licensee

b) The amount received by the Licensee on account of Non-Tariff Income

shall be deducted from the Aggregate Revenue Requirement in

calculating the net revenue requirement of Distribution Licensee.

31.

Income from Other Business

Where the Distribution Licensee is engaged in any other business, the

income from such business will be deducted from the Aggregate Revenue

Requirement in calculating the revenue requirement of the Licensee in

the manner and in proportion as may be specified by the Commission in

BERC (Treatment of Income of Other Businesses of Transmission

Licensees and Distribution Licensees) Regulations, 2013 and its

amendments from time to time.

Provided that the Licensee shall follow a reasonable basis for

allocation of all joint and common costs between the Distribution

Business and the Other Business and shall submit the Allocation

Statement as approved by the Board of Directors to the Commission

along with the application for determination of tariff;

Provided further that where the sum total of the direct and

indirect costs of such Other Business exceed the revenues from such

Other Business or for any other reason, no amount shall be allowed to be

added to the Aggregate Revenue Requirement of the Distribution

Licensee on account of such Other Business.

32.

Treatment of Regulatory Assets

(a) Regulatory assets shall not normally be created against cost/loss

incurred in normal course of business.

(b) The amortization schedule corresponding to the regulatory asset shall

be approved by the Commission and put in effect along with creation

31

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

of the regulatory asset. The amortization schedule shall normally

provide for recovery of the regulatory asset within a period not

exceeding three years.

(c) The carrying cost of the regulatory asset shall be in line with the State

Bank Advance Rate (SBAR) for the tenure for which regulatory asset

has been created.

(d) There shall not be a long gap in truing up of accounts of the

Distribution Licensee so as to prevent the need for creation of the

regulatory asset.

PART-VI

WHEELING AND RETAIL SUPPLY BUSINESS

33.

Segregation of Wheeling Business and Retail Supply Business

The Distribution Licensee shall maintain separate books of

accounts for Wheeling Business and Retail Supply Business. For such

period until accounts are segregated and separate books of accounts are

maintained, the Commission shall stipulate the ratio of allocation of all

expenses and return component, based on data obtained from the

Distribution Licensees. The following broad principles shall be followed

for allocation of costs towards wheeling business and supply business,

out of the total annual Aggregate Revenue Requirements determined:

(a)

Power purchase cost shall be allocated to the Retail Supply

business

(b)

Operation and Maintenance expenses shall be segregated between

wheeling and retail supply businesses in such manner as may be

determined by the Commission;

(c)

Majority of the capital expenditure related expenses, viz.,

depreciation, interest and return on equity, shall be included

under the wheeling business;

Note – The Retail Supply Business would require only a small component

of the capital expenditure towards billing and collection activity.

PART- VII

NORMS OF OPERATION

34.

Target Availability and Recovery of ARR

(a) Recovery of the annual Aggregate Revenue Requirement determined

as per the norms under these regulations shall be based on

achievement of the target availability index as under:

32

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

The Availability index shall be computed for both Wheeling Business

and Retail Supply Business of the Distribution Licensee on yearly

basis as per following:

For Wheeling Business:

Wheeling Network Availability Index (%) = (1-(SAIDI/8760)) X 100

Where,

SAIDI = Sum of all customer interruption durations/Total number of

consumers served

For Retail Supply Business:

The Supply Availability shall be measured on the basis of power

contracted by the Distribution Licensee on a long-term basis as per

the power procurement plan under following heads:

Base Load Supply Availability = ((Actual Contracted Base Load Supply

(MW)) X (Number of Off-Peak hours)) / ((Base Load in MW) X (Number

of Off-Peak hours)) Peak Load Supply Availability = ((Actual

Contracted Peak Load Supply (MW)) X (Number of Peak hours)) /

((Peak Load in MW) X (Number of Peak hours)) Supply Availability

Index = 75% of Base Load Supply Availability + 25% of Peak Load

Supply Availability

(b) The Distribution Licensee shall maintain data on planned

maintenance outages, load shedding, force majeure outages and

tripping's.

(c) The incentive/disincentive shall exclude the circumstances when the

actual supply differs from the contracted supply due to force majeure

situations, weather conditions, extreme monsoon failure, station

outages, etc. which are beyond the control of the Distribution

Licensee.

(d) The Commission shall specify progressively increasing normative

levels of Availability for Wheeling and Supply Business of the

Distribution Licensee on the basis of past performance over the

control period.

Provided that the Availability of Retail Supply Business shall not be

lower than 90% and shall gradually increase to 95% or 98% in no less

than three years 1

33

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

(e) The additional ARR shall be considered as +/- 0.2% of ARR for every

percentage point increase/decrease in Availability vis-à-vis the

normative levels of availability.

Provided that the maximum additional return that can be

earned/reduced shall be +/- 2% of ROE

PART-VIII

SUBSIDY, CROSS SUBSIDY AND TARIFF DESIGN

35.

Subsidy

(a) The Commission shall determine the ARR and Tariff without

considering subsidy.

Provided that if the State Government declares subsidy for the

categories of consumers after notification of Tariff Order, the licensee

shall incorporate the same in the tariff and intimate the Commission

with the revised Tariff Schedule that shall be charged if the subsidy is

received in advance:

Provided further that in case the State Government declares subsidy

in advance or during tariff filing proceedings and the licensee

incorporates the subsidy in the petition, the Commission shall notify two

tariff schedules, one with subsidy and the other without subsidy:

Provided also that the Government’s subsidy provided for or declared

shall be supported by documentary evidence of time schedule of

payment, mode of the payment of the subsidy and categorization of the

subsidy amount into subsidized consumer categories:

(b) The Commission may clarify in the tariff order, post the declaration

from the Government, the quantum of Government’s subsidy as

applicable to the fuel cost adjustment along with the range (%) of

variable cost upto which the fuel adjustment cost shall not be passed

to the consumers, category wise classification, mode of payment and

schedule of payment etc.

(c) In case of no disbursement or delayed disbursement of subsidy by the

Government, the licensee shall charge consumers as per the tariff

schedule which is approved by the Commission without consideration

of subsidy.

(d) In case the amount of subsidy by the Government is not utilized in

full, the balance amount of subsidy amount shall be used for

adjusting in ARR of the ensuing year(s)

34

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

36.

Cross Subsidy, Allocation of Cost to Serve and Tariff Design

(a) The Commission shall notify a roadmap for reduction of cross

subsidies within control period. The road map shall also have

intermediate milestones, based on the approach of a gradual

reduction in cross subsidy.

(b) The Distribution Licensee shall compute the consumer category-wise

cost of supply as per the methodology elaborated below.

(c) Allocation of Cost: The Cost to serve shall be allocated to the

consumer categories in the following manner:

Step 1: Functionalization of Cost - Total cost shall be divided on the

basis of functions performed such as power purchase, distribution etc.

Step 2: Classification of Cost –Each of the functionalized costs shall be

further classified, based on its intrinsic nature into Demand related cost,

Energy related cost and Customer related cost. Demand related costs

shall generally be of fixed nature, related to capacity creation and shall

include interest on capital borrowing, depreciation etc. Energy cost shall

be related to quantum of electricity consumption of consumer, such as

fuel cost, interest on working capital, etc. Consumer related cost shall

include operating expenses associated with meter reading, billing and

accounting.

Step 3: Allocation of Cost

i.

Allocation of Demand Costs: Demand costs of all three functions

shall be allocated among consumer categories on the basis of

average coincident peak demand of the tariff categories (average of

past 12 months). To facilitate determination of average coincident

peak demand for the various tariff categories, load research shall

be made an integral part of the operations of the DISCOMs and

systematic load research exercises shall be initiated.

ii.

Allocation of Energy Costs: Energy related costs of Distribution

functions shall be allocated to consumer categories on the basis of

ratio of electricity consumption of each consumer category to the

total electricity consumption under the purview of the Distribution

Licensee. Energy related costs of Power purchase shall be

allocated to various tariff categories on the basis of block approach

on merit order dispatch and incremental principle, where each

tariff category shall be allocated the incremental (energy related)

35

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

power purchase cost on the basis of their respective share in the

incremental power purchase. For the purpose of operationalising

the block approach and incremental principle, the Commission

shall identify and notify a suitable year as the "base year".

iii.

Allocation of Customer Costs: Customer related costs shall be

allocated to consumer categories on the basis of the ratio of

number of consumers in each category to total number of

consumers under the purview of the Distribution Licensee.

(d) Summation of allocated Demand cost, Energy cost and Customer cost

across functions shall be total Cost to serve for respective consumer

categories. Cost to serve reduced by revenue from a consumer

category shall give total subsidy for that category. Total subsidy for a

consumer category reduced by Government subsidy, if any, shall be

cross-subsidy for that consumer category.

(e) The consumers below poverty line who consume power below a

specified level, say 30 units per month, shall receive a special support

through cross subsidy.

(f) Cross-subsidy surcharge and additional surcharge in Open Access

(1) The amount received or to be received by the licensee on account

of cross-subsidy surcharge and additional surcharge, as approved

by the Commission from time to time in accordance with the

Regulations specified by the Commission, shall be shown

separately against the consumer category that is permitted open

access as per the phasing plan.

(2) Cross-subsidy surcharge and additional surcharge shall be shown

as revenue from the tariff from the consumer categories who have

been permitted open access and such amount shall be utilized to

meet the cross-subsidy requirements of subsidized categories and

fixed costs of the Distribution Licensee arising out of his obligation

to supply.

Provided that the licensee shall provide such details in its annual

filings.

(g) Tariff Design

(1) The Commission shall be guided by the objective that the tariff

progressively reflects the efficient and prudent cost of supply of

electricity.

36

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

(2) After the costs have been allocated based on the method specified

in clauses (c) and (d) above, tariffs for different consumer

categories shall be designed with due regard to factors provided

under section 62(3) of the Act.

(3) The time of day tariff would be structured across three time slabs

to denote normal, peak and off-peak periods. The time-periods

would vary according to different seasons of the year i.e. summer,

winter and the monsoon season. The peak tariff would be 20%-

30% higher than the normal tariff and the off-peak tariff would be

priced 15%-20% lower than the normal tariff.

(4) The peak and off-peak hours during seasons shall be as notified

by the State Load Dispatch Centers in advance.

(5) Time of Day tariff shall be introduced in a phased manner,

wherein in phase 1 it would be compulsory for HT Consumers, in

phase 2 – compulsory for LT consumers consuming more than 25

KW and in phase 3 compulsory for LT consumers consuming more

than 10 KW.

PART IX

MISCELLANEOUS

37.

Power to amend

The Commission may, at anytime, amend, alter or modify any provision

of these Regulations.

38.

Power to remove difficulties

If any difficulty arises in giving effect to the provisions of these

Regulations, the Commission may, by general or specific order, make

such provisions not inconsistent with the provisions of the Act, as may

appear to be necessary for removing the difficulty.

39.

Right to vary terms and conditions

The terms and conditions for determination of tariff specified in these

regulations are in the nature of general framework on the basis of which

the tariff shall be determined. The Commission reserves its right to vary

these terms and conditions, as and when deems fit.

40.

Limitation of Power of Commission

Nothing in these regulations shall be deemed to limit the powers of the

Commission to deal with any matter or exercise any power under the

relevant Acts for which no regulations have been made / framed and to

37

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

make such orders as it may consider appropriate to meet the ends of

justice in any case.

41.

Repeal and savings

(a) Save as otherwise provided in these regulations, regulations 79 to 93

under chapter 5 & 6 of the BERC (Terms and Conditions for

Determination of Tariff) Regulations, 2007, and its amendments from

time to time are hereby repealed.

(b) The other part of BERC (Terms and Conditions for determination of

Tariff) Regulations, 2007 and its amendments shall remain applicable

and where a difference is found in the Regulation relating to MYT of

distribution licensee the provision of these Regulations shall prevail

(c) Notwithstanding such repeal, any proceedings before the Commission

pertaining to the period prior to the commencement of the Control

Period, including Petitions for True up of expenses, annual performance

review, etc. shall be governed by BERC (Terms and Conditions of

Determination of Tariff) Regulations 2007 and its amendments from time

to time.

By order of the Commission,

PARMANAND SINGH,

Secretary.

38

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

Sl.No. Format Sl.

Particulars

Page

No.

1.

Format-1

Energy Sales

35

2.

Format-2

Distribution Losses

36

3.

Format-3

Source-wise Quantum of Power Purchase

37

4.

Format-4

Energy Requirement and Energy Balance

38

5.

Format-5

Power Purchase Cost

39-40

6.

Format-6

Employee Details

41

7.

Format-7

Employee Cost

42

8.

Format-8

Employees Productivity Parameters

43

9.

Format-9

Repair and Maintenance Expenses

44

10.

Format-10

Administration and General Expenses

45

11.

Format-11

Investment Plan (Scheme-wise)

46

12.

Format-12

Investment Plan (Year-wise)

47

13.

Format-13

Fixed Assets

48

14.

Format-14

Gross Fixed Assets (GFA)

49

15.

Format-15

Value of Assets and Depreciation Charges

50

16.

Format-16

Depreciation Charges

51

17.

Format-17

Capital Work-In-Progress

52

18.

Format-18

Details of Loans for the year

53

19.

Format-19

Information Regarding Restructuring of

Outstanding Loans During the Year

54

20.

Format-20

Interest and Finance Charges

55

21.

Format-21

Interest Capitalized

56

22.

Format-22

Lease details

57

23.

Format-23

Interest on Working Capital

58

24.

Format-24

Contribution to Contingency Reserve

59

25.

Format-25

Information Regarding Amount of Equity &

Loan

60

26.

Format-26

Information Regarding Amount of Income

Tax Paid (for previous financial years)

61

27.

Format-27-A

Non Tariff Income (on existing rates)

62

28.

Format-27-B

Non Tariff Income (on proposed tariff)

63

29.

Format-28

Information Regarding Revenue from Other

Business

64

30.

Format-29

Aggregate Revenue Requirement (ARR)

65

31.

Format-30-A

Revenue from Existing Tariff

66

32.

Format-30-B

Revenue from Proposed Tariff

67

33.

Format-31

Revenue Gap (Ensuing Year)

68

34.

Format-32

Information Regarding Grant/Subsidy from

State Govt/Central Govt.

69

35.

Format-33

Voltage-wise Cost of Supply

70-71

36.

Format-34

Tariff Structure and Rate

72-73

37.

Format-35

Computation of Cross Subsidy

74

38.

Format-36

Wheeling & Open Access Charges

75

39

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

FORMAT - 1

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee :

Energy Sales

(Separately for previous, current and ensuing financial years of control period)

S.N

Category of Consumers

No. of

Consumers at the

end of the year

(Nos.)

Connected Load at

the end of the

year(KW)

Energy Sale /

Demand (MUs)

1

2

3

4

5

1

Domestic

(a) 'Kutir Jyothi'

Metered

Unmetered

(b) Domestic Service I (DS I)

Metered

Unmetered

(c) Domestic Service II (DS II)

Metered

(d) Domestic Service III (DS III)

Metered

Sub - Total

2

Non Domestic Services (NDS)

(a) NDS-I

(b) NDS-II

(d) NDS-III

Sub - Total

3

Irrigation and Agricultural Service (I.A.S)

IAS - I Metered

IAS - I Unmetered-

IAS - II Metered -

IAS - II Unmetered -

Sub - Total

4

L.T. Industrial Service (L.T.I.S)

(a) LTIS-I

(b) LTIS-II

5

Street light Service

SS-I Metered

SS-II Unmetered

Sub - Total

6

11 kV High Tension Service (HTS I)

7

33 kV High Tension Service (HTS II)

8

132 kV High Tension Service (HTS III)

9

High Tension specified service (HTSS)

Sub - Total

10

Railway Traction Service (RTS)

Sub - Total

Grand Total

11

Total Sale 1 to 10)

12

Sales to Electricity Traders, if any

13

Sales to Other Distribution Licensees, if any

14

Total Sales in the State.

15

Sales outside State/UI

16

Sales to Nepal

17

Gross Sales

Note: (1) Month-wise agriculture consumption data as per sample meters may also be supplied for different years

separately for mono block and submersible agricultural pump sets.

(2) The information shall be given as required by the Commission to determine the tariff.

(3) Category of consumers in column 2 should be as per tariff structure proposed in the tariff petition.

(4) Slab-wise and connected load-wise consumption in those categories in which tariff rate is provided slab-

wise shall be submitted separately.

40

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

Format - 2

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee :

Distribution Losses

[In Percentage]

Particular

Previous FY

Current FY

Ensuing Years

Distribution

Losses

FORMAT-3

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee:

Source-wise Capacity Allocation (in MW) and Power Purchase (in MU)

From Different Sources

S.N

Name of Source

Total

Capacity

(MW)

Share of

Discom

(MW)

Previous

year

(Actuals)

Current

Year (R.E)

(MU)

Ensuing

year (s)

(Projection)

MW

MU

MW

MU

MW

MU

1

2

3

4

5

6

7

8

9

10

A

Through Inter-State Transmission

(i) ………

(ii) ……..

(iii) ……..

(iv) ………

(v) …….

……

Sub Total

B

Through Intra-State Transmission

(i) ………

(ii) ……..

(iii) ……..

(iv) ………

(v) …….

……..

Sub Total

C

Distributed Generation

D

TOTAL (A+B+C)

41

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

FORMAT-4

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee :

Energy Requirement and Energy Balance for FY _______

Particular

Unit

Previous

FY

Current FY

Ensuing Years

A.

ENERGY REQUIREMENT

1)

Energy, Sales within the area

MU

2)

Distribution loss

%

3)

Distribution losses

MU

4)

Energy required at distribution periphery

MU

5)

Energy transferred to other discom

MU

6)

Energy transferred to other states/UI

MU

7)

Total Energy required (4+5+6)

MU

8)

State Transmission losses

%

9)

State Transmission losses

MU

10)

Energy required at state transmission

periphery (7+9)

MU

B.

ENERGY AVAILABILITY

1)

From Central Sector

MU

2)

From State Generating Stations

MU

3)

From Renewable Sources

MU

4)

Others

MU

5)

Total Power Available (MU)

MU

6)

CTU Transmission losses on (1)

%

7)

CTU Transmission losses

MU

8)

Net Power Available at state periphery (5–7)

MU

9)

Surplus / (Deficit) Energy at Distribution

peripheral (B8-A10)

MU

42

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

FORMAT-5

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee :

Power Purchase Cost

SI.

No.

Power

Purchase

Sources

%age

allocation

MW

Previous Year

Energy

MU

Fixed

Charge

rate

(Rs/MW

Fixed

charge

Rs.

Cr.

Energy

Rate

Rs./kWh

Energy

charge

Rs. Cr.

Total

Charges

Rs. Cr.

Avg.

Tariff

Rate

Rs./kWh

Energy

MU

1

2

3

4

5

6

7

8

9

10

Central

Sector

Stations

1

NTPC

Stations

Farakka

1,2&3

Talchar

Kahalgoan

1 &2

Barh – Stg

2U #1

Nabinagar

- NTPC

NTPC

Total

2

NHPC

Stations

Rangit

Teesta

NHPC

Total

3

PTC

Stations

Chukka

Tala

PTC Total

4

DVC

Sub Total

Central

Stations

5

State

Generating

Stations

BTPS

KBUNL

Stage 1 U#

1

KBUNL

Stage 1 U#

2

SGS Total

6

Medium/

Short

Term/

Others

……

……

…….

Others

Total

7

Renewable

Power

Purchase

BSHPC

Sugar

Mills

Solar

Power

Purchase

REC

(Solar)

REC (Non-

Solar)

Renewable

Total

Total

Power

Purchase

43

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

Current Year

Ensuing Year (s)

Fixed

Charge

rate

(Rs/MW

Fixed

charge

Rs.

Cr.

Energy

Rate

Rs./kWh

Energy

charge

Rs. Cr.

Total

Charges

Rs. Cr.

Avg.

Tariff

Rate

Rs./kWh

Energy

MU

Fixed

Charge

rate

(Rs/MW

Fixed

charge

Rs.

Cr.

Energy

Rate

Rs./kWh

Energy

charge

Rs. Cr.

Total

Charges

Rs. Cr.

Avg.

Tariff

Rate

Rs./kWh

11

12

13

14

15

16

17

18

19

20

21

This is to certify that no earlier year purchase cost have been included in this table. The

above table is only for current year transactions pertaining to power purchase.

44

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

FORMAT - 6

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Employee Details

S.N

Particulars

Previous year

(Actuals)

Current

Year (R.E)

Ensuing

years

(Projection)

1

2

3

4

5

6

7

1

Number of employees at the beginning

of FY _______

2

No. of employees added during

FY ______

3

Number of employees retiring/ leaving

during the FY_____

4

Number of employees at the end of the

FY (1+2-3)

FORMAT - 7

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee :

Employee Cost

(Rs. in Cr.)

S.N

Particulars

Previous Year

Current Year

Ensuing Year (s)

1

Salaries & Allowances

(i) Existing Employees

(ii) New Employees

(ii) Total

2

Contribution to Terminal Benefits (Accrual

Basis)

3

Total of Salary & Allowances and Terminal

Benefits

4. Amount Capitalised

5. Net Amount

6. Grand Total

Note:

(i) No terminal benefits shall be paid before the date of reorganisation i.e.

01.11.2012.

(ii) In respect of continuing employees as on the date of reorganisation and newly

appointed employees after reorganisation date the terminal benefits shall be

allowed.

(iii) In respect of item 6, a brief description to be appended.

45

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

FORMAT - 8

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee :

Employees Productivity Parameters

S.N

Particulars

Previous year

(Actuals)

Current

Year (R.E)

Ensuing

years (Projection)

1

2

3

4

5

6

7

1

Number of consumers (in Lakh)

2

Connected load in kW

3

Distribution line in circuit KM

4

Energy sold in MU

5

Employees per MU of energy sold

6

Employees per 1000 consumers

7

Share of employees cost in total costs

8

Employees cost in paise / kWh of energy

sold

9

Distribution line circuit KM per employee

FORMAT - 9

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Repair and Maintenance Expenses

(Rs. in lakhs)

S.N

Particulars

Previous year

(Actuals)

Current year

(RE)

Ensuing years

(Projections)

1

2

3

4

5

6

7

1

Plant & Machinery

2

Building

3

Hydraulic works & civil works

4

Line cable & network

5

Vehicles

6

Furniture & fixtures

7

Office equipments

8

Total expenses

9

Less capitalized

10

Net Expenses

11

Total expenses charged to

revenue

* Year-wise details of these charges may be provided with documentary evidence

46

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

FORMAT - 10

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Administration and General Expenses

(Rs. in lakhs)

S.N

Particulars

Previous year

(Actuals)

Current year

(RE)

Ensuing years

(Projections)

1

2

3

4

5

6

7

1

Rent, rates & taxes

2

Insurance

3

Telephone, postage &

Telegrams

4

Consultancy fees

5

Technical fees

6

Other professional charges

7

Conveyance & travel

expenses

8

Electricity & Water charges

9

Freight

10

Other material related

expenses

11

Penalty/Fine Paid (if any)

12

Any other expenses

13

Total expenses

14

Less Capitalised

15

Net expenses

16

Total expenses charged to

revenue

* Year-wise details of these charges may be provided with documentary evidence.

47

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

FORMAT - 11

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Investment Plan (Scheme-wise)

(Rs. in lakhs)

S.N

Name of

scheme /

Project

Approved

Outlay

Previous

year

(actuals)

Current year

(RE)

Ensuing

Years (Projection)

Progressive

Expenditure upto

ensuing year (s)

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

Note :

The amount of grants and loans shall be furnished separately scheme wise and funding

agency wise.

FORMAT - 12

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Investment Plan (Year-wise)

(Rs. in lakhs)

S.N

Year

Originally

proposed

by the Discom

Approved by

the Commission

Revised by

the Discom

Revised approval

by the Commission

in review

Actual

expenditure

1

2

3

4

5

6

7

Note: i ) Information for previous year to be given in columns 1 to 7

ii) Information for the current year to be given in columns 1 to 5

iii) Amount of grants and loans shall be furnished separately funding Agencywise and yearwise.

48

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

FORMAT -13

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Fixed Assets

(Rs. in lakhs)

S.N

Particulars

Previous Year

Current Year

Ensuing

Years of the

control

period

1

2

3

4

1

Gross fixed asset (GFA) at beginning of the year

2

Less accumulated depreciation

3

Net GFA at beginning of the year

4

Less accumulated consumer contribution

5

Net fixed asset at beginning of the year

S.N Particulars

WIP

Fixed Assets

1

2

3

4

1 As on 31st March of previous year

Add capital expenditure during current year

Total:

Less transferred to fixed assets

2 As on 31st March of current year

Add capital expenditure during ensuing year

Total:

Less transferred to fixed assets

3 As on 31st March of ensuing year

S.N Particulars

Amount

1

2

3

1

Accumulated Depreciation

2

As on 31st March of previous year

3

Add: Depreciation for current year

4 As on 31st March of current year

5 Consumers Contribution

6 As on 31st March of previous year

7 Addition during current year

8 As on 31st March of current year

9 Asset created from grants

10 As on 31st March of previous year

11 Addition during current year

12 As on 31st March of current year

Note (1) Compiled and audited Annual Account should be submitted for the previous year.

(2) The Actual figures / data from April to September and budgeted figures / data

from October to March relating to the year in which the tariff petition is submitted should

be submitted

49

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

FORMAT - 14

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee :

Gross Fixed Assets (GFA)

(Rs. in lakhs)

S.N

Assets

group

GFA at the

beginning of

previous year

Addition

during

previous

year

Closing

balance at the

end of

previous year

Addition

during the

current

year

Closing

balance at

the

end of

current year

Addition

during

ensuing

year

Closing

balance at

the end of

ensuing

year

1

2

3

4

5

6

7 Total

FORMAT –15

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Value of Assets and Depreciation Charges

(Information to be supplied for the previous year (actuals), current year (RE)

and the ensuring year (s) (projections)

Rs. Crores

S.N

Particulars

Assets value at the beginning

ofthe year

Rate of

depreciation

Depreciation charges

Accumulated depreciation

Consumer

Contribution

By

grants

Loan

Consumer

Contribution

By grants

Loan

Consumer

Contribution

By

grants

Loan

1

2

3

4

5

6

7

8

9

10

11

12

1

Land and land

rights

2

Buildings

3

Hydraulic

works

4

Other civil

works

5

Plant and

Machinery

6

Lines and cable

network

50

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

7

Vehicles

8

Furniture and

Fixtures

9

Office

equipment

10

Total

(vii) Other

Grand Total (i

to vii)

FORMAT –16

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Depreciation Charges

Sl.No.

Particulars

Previous

Year

Current

Year

Ensuing

Year (s)

1

Gross fixed assets of the beginning of the year

2

Additions during the year

3

IDC

4

Closing GFA

5

Average GFA

6

Weighted Average Rate of Depreciation

7

Gross Depreciation

8

Opening grants

9

Grants during the year

10

Total Grants

11

Average Grants

12

Weighted Average rate of Depreciation

13

Depreciation for GFA on Grants

14

Net Depreciation of GFA on loans

(7-13)

Note: In the case of assets utilised which have reached the residual value, after recovery of

depreciation in full, details of such assets shall be furnished separately along with their residual

value, so as to enable the Commission to pass on the required benefit to the consumers through

tariff.

51

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

FORMAT – 17

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Capital Work-In-Progress (CWIP)

(Rs. in lakhs)

S.N

Particulars

Previous year

(Actuals)

Current year

(RE)

Ensuing year (s)

(Projections)

1

2

3

4

5

1

Opening CWIP

2

New Investment

3

Less Capitalization

(a)

CWIP

(b)

New Investment

4

Closing CWIP (1+2-3)

5

Funding

(a)

CWIP Capitalization

(i)

Grant

(ii)

Loan

(b)

New Investment Capitalization

(i)

Grant

(ii)

Loan

6

Total capitalisation

(i)

Total Grant

(ii)

Total Loan

FORMAT - 18

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Details of Loans for the year

(Information to be supplied separately for the previous year (actuals), current year(RE)

and ensuing years (projections)

(Rs. in lakhs)

S.N

Particulars

Opening

balance

Rate of

Interest

Addition

during the year

Repayment

during the year

Closing

balance

Amount of

interest

paid

1

2

3

4

5

6

7

8

Note : The amount of penal interest, if any, to be shown separately.

52

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

FORMAT – 19

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Information Regarding Restructuring of Outstanding Loans During the Year

(Rs. in lakhs)

S.N

Source of

loan

Amount of

original loan

Old rate

of

interest

Amount

already

restructured

Revised rate

of interest

Amount now

being

restructured

New rate of

interest

1

2

3

4

5

6

7

8

FORMAT - 20

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Interest and Finance Charges

(Rs. in lakhs)

S.N.

Source of loan

Previous year

(Actuals)

Current year

(RE)

Ensuing year (s)

(Projections)

1

2

3

4

5

1

SLR Bonds

2

Non SLR Bonds

3

LIC

4

REC

5

Commercial Banks

6

Bills discounting

7

Lease rental

8

PFC

9

Others

10

Total

11

Add State Govt. Loan

12

Total (10 +11)

13

Less capitalisation

14

Net Interest

15

Add prior period

adjustment *

16

Total Interest

17

Finance charges

18

Total Interest and

finance charges

* Year-wise details should be submitted with documentary evidence.

Rate of interest of various loans to be indicated in a separate sheet, as part of Format-20

53

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

FORMAT - 21

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Interest Capitalized

(Rs. in lakhs)

S.N.

Interest capitalized

Previous year

(Actuals)

Current year (RE)

Ensuing year (s)

(Projections)

1

2

3

4

5

1

2

3

4

5

FORMAT - 22

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Lease details

(Rs. in lakhs)

S.N Name of Lesser

Gross Assets

(Rs. in crores)

Lease

earned

on

Lease

Rentals

Primary Period

ended / ending

by

Secondary

period ending by

1

2

3

4

5

6

7

54

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

FORMAT - 23

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee :

Interest on Working Capital

(Rs. in lakhs)

S.N

Particulars

Amount

Previous Year

Current Year

Ensuing Year (s)

1

2

3

4

5

1

O&M expenses for one

month

2

Two months equivalent of

expected revenue:

After deducting:

3

Maintenance spares @

40% of R&M expenses for

one month

4

Less:

(i) Power purchase cost,

Load dispatch charges and

transmission charges for

one month.

(ii) Depreciation, ROE, and

contribution to

contingency reserve.

(iii) Security deposit from

consumer if any

(iv) grant received from

the State Govt. for power

purchase and other O&M

expenses.

6

Net working capital

7

Interest rate

8

Interest on working

capital

55

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

FORMAT - 24

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Contribution to Contingency Reserve

(Rs. in lakhs)

S.N

Particulars

Amount

1

2

3

1

Fixed Assets

2

%age appropriation to the contingency reserve

3

Appropriation to the contingency amount

4

Amount invested in securities

5

Drawal from the contingency reserve

(i)

(ii)

(iii)

Total drawal

FORMAT - 25

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Information Regarding Amount of Equity & Loan

(Rs. in lakhs)

S.N

Particulars

Amount of

equity

Amount of

loan

Ratio of equity

& loan

1

2

3

4

5

1 Amount of total asset

2 Less asset created from grant

3

Less asset created from consumer

contribution

4 Net asset

5 Amount of loan (debt)

6 Amount of equity

7 Debt equity ratio

8 Amount of equity eligible for return

9 Rate of return on equity

10 Amount of return on equity

Note : Any change in equity balance from previous year must be

Supported with documentary evidence.

56

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

Details of Capital Base

S.N

Particulars

Previous Year

Current Year

Ensuing Year

1

2

3

4

5

1 Gross Capital at beginning of the year

2 Less accumulated depreciation

3 Net capital at beginning of the year

4 Less accumulated consumer contribution

5 Net capital at beginning of the year

FORMAT - 26

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Information Regarding Amount of Income Tax Paid

(for previous financial years)

(Rs. in lakhs)

S.N

Particulars

During previous

financial year

1

2

3

1 Amount of taxable income from the licensed business

i) Amount of Income Tax paid

ii) Challan No. & Date through which Income Tax paid

iii) Name of Banks in which the amount was deposited

iv) PAN No. of the depositor

2 Amount of income from other than licensed business

i) Amount of Income Tax paid

ii) Challan No. & Date through which Income Tax paid

iii) Name of Banks in which the amount was deposited

iv) PAN No. of the depositor

57

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

FORMAT – 27 - A

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Non Tariff Income

(on existing rates)

(Rs. in crores)

S.N.

Source of loan

Previous year

(Actuals)

Current year

(RE)

Ensuing year (s)

(Projections)

1

2

3

4

5

1

Meter / Service rent

2

Delayed payment surcharge

3

Amount assessed in cases of

UUE/Theft

4

Misc. receipts

5

Misc. charges

6

Wheeling charges

7

Interest on staff loans & advance

8

Income from trading

9

Income from welfare activities

10

Excess on verification

11

Interest on investments & bank

balances

12

Total Income

13

Add Prior period income *

14

Total Non tariff income

* Year wise details of prior period income may be provided

58

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

FORMAT – 27 - B

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Non Tariff Income

(on proposed tariff)

(Rs. in crores)

S.N.

Source of loan

Current year

(RE)

Ensuing year (s)

(Projections)

1

2

4

5

1

Meter / Service rent

2

Delayed payment surcharge

3

Amount assessed in cases of

unauthorised use of energy

4

Misc. receipts

5

Misc. charges

6

Wheeling charges

7

Interest on staff loans & advance

8

Income from trading

9

Income from welfare activities

10

Excess on verification

11

Interest on investments & bank

balances

12

Total Income

13

Add Prior period income *

14

Total Non tariff income

* Year wise details of prior period income may be provided

59

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

FORMAT - 28

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Information Regarding Revenue from Other Business

(Rs. in lakhs)

S.N

Particulars

Amount

1

2

3

1

Total Revenue from other business

2

Income from other business to be considered

for licensed business as per regulations

Note:

To be supplied for previous year, current year and ensuing year for which

licence for other business was operating

FORMAT - 29

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Aggregate Revenue Requirement (ARR)

(Rs. Crore)

Sl.No.

Particulars

Previous

Year

Current

Year

Ensuing

Years

1.

Power purchase cost

2.

PGCIL & other transmission charges

3.

State Transmission charges

4.

O&M Expenses

i)

Employee Cost

ii)

R&M expenses

iii)

A&G expenses

5.

Share of Holding Company expenses

6.

Depreciation

7.

Interest and Finance charges

8.

Interest on working capital

9.

Return on equity

10.

Income Tax

11.

Interest on security deposit

12.

Bad debts (if any)

13.

Contingency reserves (if any)

14.

Total Revenue Requirement

15.

Less: Non-tariff income

16.

Aggregate Revenue Requirement

60

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

FORMAT – 30-A

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Revenue from Existing Tariff

S.N

Particulars

Previous yr.

(Actuals)

Rs. Cr.

Current yr.

(RE)

Rs. Cr.

Ensuing yr.

(Projections)

%

Realisation

Unit sold

(MU)

Avg. Tariff

Rate (Rs.

kWh)

Amount

(Rs. Cr.)

1

2

3

4

5

6

7

8

1

Domestic

a)

(i) 'Kutir Jyothi' Scheme Metered

(ii)Unmetered

b)

Domestic Service I (DS I)

(i) Metered

(ii) Unmetered

c)

Domestic Service II (DS II)

Metered

d)

Domestic Service III (DS III)

Metered

Sub - Total

2

Non Domestic Services (NDS)

NDS-I : Unmetered

NDS-I: Metered

NDS-II : Metered

NDS-III : Metered

Sub - Total

3

Irrigation and Agricultural

Service (IAS)

a)

IAS - I : Metered

IAS - I : Unmetered –

b)

IAS - II : Metered

IAS - II : Unmetered -

Sub - Total

4.

Low Tension Industrial Service

(LTIS)

LTIS-I : Metered

LTIS-II : Metered

5.

Public Water Works

Metered

6.

Street light Service

SS-I : Metered

SS- II : Unmetered

Sub - Total

7.

High Tension

7.1 11 kV High Tension Service (HTS

I)

7.2 33 kV High Tension Service (HTS

II)

7.3 132 kV and above High Tension

Service (EHTI)

7.4 High Tension specified service

(HTSS)

Sub - Total

8.

Railway Traction Service (RTS)

8.1

RTS 132 KV

8.2

RTS 25 KV

Sub - Total

9

Sales to Other Distribution

Licensees

10

Outside State, (including UI) if

any *

11

Discoms own use

12

Add MMC and Other Charges

Grand Total

61

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

Note:

(1) Month-wise agriculture assessment data as per sample meters may also be supplied for different years

(2) The information shall be given as specified by the Commission to determine the tariff.

(3) Category of consumers in column 2 should be as per tariff structure proposed in the tariff

petition.

* State-wise details to be provided.

FORMAT – 30-B

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee :

Revenue from Proposed Tariff

Ensuing year (Projections)

S.N

Particulars

Unit Sold

(MU)

Average Tariff Rate

(Rs./kWh)

Amount (Rs.

Cr.)

%

Realisation

1

2

3

4

5

1

Domestic

a)

(i) 'Kutir Jyothi' Scheme Metered

(ii)Unmetered

b)

Domestic Service I (DS I)

(i) Metered

(ii) Unmetered

c)

Domestic Service II (DS II)

Metered

d)

Domestic Service III (DS III)

Metered

Sub - Total

2

Non Domestic Services (NDS)

NDS-I : Unmetered

NDS-I Metered

NDS-II : Metered

NDS-III : Metered

Sub - Total

3

Irrigation and Agriucltural Service

(IAS)

a)

IAS - I : Metered

IAS - I : Unmetered –

b)

IAS - II : Metered

IAS - II : Unmetered -

Sub - Total

4.

Low Tension Industrial Service

(LTIS)

LTIS-I : Metered

LTIS-II : Metered

5.

Public Water Works

Metered

6.

Street light Service

SS-I : Metered

SS- II : Unmetered

Sub - Total

7.

High Tension

7.1 11 kV High Tension Service (HTS I)

7.2 33 kV High Tension Service (HTS II)

7.3 132 kV and above High Tension

Service (EHTI)

7.4 High Tension specified service

(HTSS)

Sub - Total

8.

Railway Traction Service (RTS)

8.1

RTS 132 KV

8.2

RTS 25 KV

Sub - Total

9

Sales to Other Distribution

Licensees

10

Outside State, (including UI) if any *

11

Discoms own use

62

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

12

Add MMC and Other Charges

Grand Total

Note:

(1) Month-wise agriculture assessment data as per sample meters may also be supplied for different

years

(2) The information shall be given as specified by the Commission to determine the tariff.

(3) Category of consumers in column 2 should be as per tariff structure proposed in the tariff

petition.

* State-wise details to be provided.

FORMAT – 31

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Revenue Gap (Ensuing Year)

(A) At Existing Tariff for Ensuing Year (FY ……………………….)

(Rs. Crore)

Sl.No.

Particulars

Amount

1.

Aggregate Revenue Requirement (ARR)

2.

Less : Non Tariff Income

3.

Add : Recovery of revenue gap / (Surplus) of past period, if any

4.

Net ARR

5.

Less : Power Purchase Cost disallowed, if any

6.

Less : Revenue from Existing Tariff

7.

Less : Revnue from sale of power to other Agency

8.

Gap (4–5–6)

9.

Total grant from State Govt.

10.

Grant used for compensating disallowed power

11.

Balance resource grant assistance from Stat Govt. (9–10)

12.

Net Gap/(Surplus) at existing tariff (8–11)

13.

(B) At Proposed Tariff for Ensuing Year (FY ……………………….)

(Rs. Crore)

Sl.No.

Particulars

Amount

1.

Aggregate Revenue Requirement (ARR)

2.

Less : Non Tariff Income

3.

Add : Recovery of revenue gap / (Surplus) of past period, if any

4.

Net ARR

5.

Less : Power Purchase Cost disallowed, if any

6.

Less : Revenue from Existing Tariff

7.

Less : Revnue from sale of power to other Agency

8.

Gap (4–5–6)

9.

Total grant from State Govt.

10.

Grant used for compensating disallowed power

11.

Balance resource grant assistance from Stat Govt. (9–10)

12.

Net Gap/(Surplus) at existing tariff (8–11)

13.

63

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

FORMAT – 32

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Information Regarding Grant/Subsidy from State Govt/Central Govt.

(Rs. Crore)

S.N

Particulars

Previous Year

Current Year

Ensuing Years

1

2

3

4

5

A

Amount from State Govt.

i) Purpose for which grant received

(a)

(b)

(c)

(d)

ii) Targeted categories for subsidy

(a)

(b)

(c)

(d)

B

Amount from Central Govt.

i) Purpose for which grant received

(a)

(b)

(c)

(d)

Note :

The details of commitment of the government and the guidelines for utilisation of the amount

received as grant or subsidy is to be supported by documentary evidence with separate explanation in the

tariff petition.

FORMAT – 33

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

(for ensuing financial year FY…..)

(A) Voltage-wise Technical Loss and Energy Sale

SI.

No.

Voltage Level

(KV)

Technical

Losses (%)

Cumulative

Loss (%)

Energy Sale

(MU)

Energy

input (MU)

Technical

Loss (MU)

1

2

3

4

5

6

7=(6-5)

1

220

2

132

3

33

4

11

5

0.4

Total

64

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

(B) Voltage-wise Commercial Loss

SI.

No.

Voltage Level

KV

Energy

Sale (MU)

Technical

Loss (MU)

Sales + Tech

Loss

(MU)

Commercial

Loss

(MU)

Energy Sales + Tech.

Loss + Commercial

Loss (energy input at

state periphery)

(MU)

1

2

1

220

2

132

3

33

4

11

5

0.4

Total

(C) Voltage-wise Allocation of Power Purchase Cost

SI.

No.

Voltage

Level

KV

Energy

Sale

(MU)

Energy Sales +

Technical loss +

Comml. loss

(MU)

Unit cost of

power purchase

approved by

the Commission

(Rs./unit)

Power Purchase

Cost

(Rs. Crore)

Cost of

Power per

unit sale of

Energy

(Rs./unit)

1

2

3

4

5

6 = (4*5)

7= (6÷3)

1

220

2

132

3

33

4

11

5

0.4

Total

(D) Total Network Cost

SI.

No.

Particulars

Amount

(Rs. Cr)

1

Employee Cost

2

R&M costs

3

A&G expenses

4

Holding Company

5

Depreciation

6

Interest & Finance Charges

7

Interest on Working Capital

8

RPO fund

9

Return on Equity

10

Less: IDC

11

Total (1 to 7)

12

Transmission cost

13

Total cost

14

Energy Sales (MU)

15

Network Cost per unit sale of energy (Distribution +

Transmission) (Rs./kWh)

65

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

(E) Voltage-wise Allocation of Network Cost

SI.No.

Voltage Level

Energy Sale

(MU)

Network Cost

(Rs./Unit)

Total Network Cost

(Rs. Cr)

1

220

2

132

3

33

4

11

5

0.4

Total

(F) Voltage-wise Cost of Supply

Sl.No.

Supply Voltage

Cost of power

purchase

(Rs./unit)

Network cost

(Rs./unit)

Cost of supply

(Rs./unit)

1

2

3

4

5

1

220/132

2

33

3

11

4

LT

Note : The detailed work-out of energy sales, technical losses, commercial losses and network cost at different

voltage levels should be submitted separately with the tariff petitions.

FORMAT – 34(1/2)

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Tariff Structure and Rate

Sl

No.

Category & Consumption

Rates on Existing Tariff

Rates on Proposed Tariff

FC

Rs./kVA

EC

ps./Unit

MMC

Unit

FC

Rs./kVA

EC

ps./Unit

MMC

Unit

A

Low Tension Supply

1.0

Domestic

1.1

Kutir Jyoti

K.J. Rural (Unmetered)

K.J. Rural (Metered)

K.J. Urban (Metered)

1.2

DS-I (Rural)- I-ph 2kW

Unmetered

Metered -

First 50 Units

51 - 100 Units

Above 100 Units

1.3

DS - II (Metered)

Single Phase - Upto 7 kW

Three Phase - 5kW and above

1-100 U/Month

101 - 200 U/Month

201 -300 U/Month

above 300 U/Month

1.4

DS-III Metered for multi

storey

2 .0

Non Domestic

2.1

NDS – I – for Rural

Unmetered

Metered

1-100 U/Month

101 - 200 U/Month

above 200 U/Month

2.2

NDS - II (Metered)

1 - 7kW - Single Phase

5kW and above -Three Phase

1-100U/m

101-200 U/m

above 200 U/m

66

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

Sl

No.

Category & Consumption

Rates on Existing Tariff

Rates on Proposed Tariff

FC

Rs./kVA

EC

ps./Unit

MMC

Unit

FC

Rs./kVA

EC

ps./Unit

MMC

Unit

2.3

NDS-III - Places of Worships

1-100U/M

101-200U/M

Above 200U/M

3.0

Irrigation & Agriculture

3.1

(i) Pvt. Agriculture - IAS – I

(a) Unmetered Supply

per HP per month

(b) Metered Supply

Units Rate - Paise / U

3.2

(ii) State Tubewell IAS - II

(a) Unmetered Supply

per HP per month

(b) Metered Supply

Units Rate - Paise / U

4.0

Low Tension Industrial

4.1

(i) LTIS - I

4.2

(ii) LTIS - II

5.0

Pubic Water Works

6.0

Street Light Services

6.1

SS-I Metered Supply units rate

6.2

SS-II Unmetered

Fixed Charges

Light Point Wattage

per 100W per month (Rs.)

FORMAT-34 (2/2)

B

High Tension Supply

7.1

(i) HTS - I (11 / 6.6 kV)

7.2

(i) HTS - II (33kV)

7.3

HTS - III (132kV)

7.4

HTSS- (33kV/ 11kV)

8.0

Railways

(i) RTS - I (132kV)

(ii) RTS - II (25kV)

FC - Fixed Charge

EC - Energy Charge

67

BIHAR GAZETTE (EXTRA), 15TH SEPTEMBER 2015

FORMAT – 35

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Computation of Cross Subsidy

Sl.

Category of consumers

At existing tariff rate

At proposed tariff rate

Avg. Tariff

rate

(Rs./kWh)

Avg. Cost

of Supply

(Rs./kWh)

% of

average

cost

Avg. Tariff

rate

(Rs./kWh)

Avg. Cost of

Service

(Rs./kWh)

% of

average

cost

1

Kutir Jyoti

2

DS‐I

3

DS‐II

4

DS-III

5

NDS ‐ I

6

NDS‐II

7

NDS ‐ III

8

Irrigation IAS – I

9

Irrigation IAS – II

10

L.T.I.S.‐I

11

L.T.I.S.‐II

12

Public Water work

13

Street light‐I (Metered)

14

Street light‐II

(Unmetered)

15

H.T.S.‐I

16

H.T.S.‐II

17

H.T.S.‐III

18

H.T.S.S.

19

R.T.S.

68

BIHAR GAZETTE (EXTRA) 15TH SEPTEMBER 2015

FORMAT – 36

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Wheeling & Open Access Charges

Sl.

No.

Particulars

Total Fixed

Cost

33kV

Wire cost

11kV

Wire

business

Retail

supply

business

Wire

business

Retail supply

business

1

Employee cost

2

R&M Cost

3

A&G expenses

4

Depreciation

5

Interest and finance

charges

6

Interest on working capital

7

Return on equity

8

Less: Non-tariff income

9

Total Cost (Rs. Cr.)

10

Energy input (MU)

11

Wheeling charges

(sl. no. 9/10)

12

Cross Subsidy surcharge

category of consumers

(i) HTS-I

(ii)HTS-II

(iii)HTSS

13

Reactive energy charge

14

SLDC charges

15

Additional surcharge, if

any

Note :

The detailed work-out of costs towards wire business and retail supply business, wheeling charges,

cross subsidy surcharge for each category of consumers, reactive energy charges, SLDC charges and

additional surcharge should be submitted separately with the tariff petition.

————