PUBLI

(NO.PATNA 997) PA

Bihar El

No. BERC SMP No-

Sections 61,66,86(1)(e) rea

(36 of 2003), and all othe

publication, the Bihar E

following regulations, nam

1. Short title and

1) These Regul

Commission

Renewable E

2) These regula

in the officia

the Commiss

the date of co

3) These Regula

2.

Definitions an

context otherwise requires

a)

‘Act’ mean

b)

'Auxiliary e

of a genera

by

auxilia

transforme

as a perce

generator t

REGISTERED

Bihar Gazett

Bihar Gazett

Bihar Gazett

Bihar Gazett

XTRA ORDINARY

SHED BY AUTHORITY

2 KARTIKA 1939(S)

ATNA, TUESDAY, 24TH OCTOB

ectricity Regulatory Commission

————

NOTIFICATION

The 24th October 2017

-10/2017–06— In exercise of powers confe

ad with Section 181 (2) (zd) of the Electricit

r powers enabling it in this behalf, and aft

Electricity Regulatory Commission hereby

mely:

d commencement

ations may be called the Bihar Electricity

(Terms and Conditions for Tariff determin

Energy Sources) Regulations, 2017.

ations shall come into force on the date of

al Gazette, and unless reviewed earlier or e

sion, shall remain in force for a period of 3

ommencement.

ations shall extend to the whole of the Stat

nd Interpretation.—In these regulations,

s,

ns the Electricity Act, 2003 (36 of 2003);

energy consumption' in relation to a per

ating station means the quantum of energy

ary

equipment

of

the

generating

st

er losses within the generating station

entage of the sum of gross energy gener

terminals of all the units of the generating s

NO. PT.-40

tetetete

BER 2017

erred under

ty Act, 2003

ter previous

makes the

y Regulatory

nation from

publication

extended by

3 years from

e of Bihar.

unless the

riod in case

y consumed

tation,

and

n, expressed

rated at the

station;

2

BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017

c)

‘Biomass’ means wastes produced during agricultural and

forestry operations (for example straws and stalks) or produced

as a by-product of processing operations of agricultural produce

(e.g., husks, shells, de-oiled cakes, etc); wood produced in

dedicated

energy

plantations

or

recovered

from

wild

bushes/weeds; and the wood waste produced in some industrial

operations;

d)

‘Biomass

gasification’

means

a

process

of

incomplete

combustion of biomass resulting in production of combustible

gases consisting of a mixture of Carbon monoxide (CO),

Hydrogen (H2) and traces of Methane (CH4), which is called

producer gas;

e)

‘Biogas’ means a gas created when organic matter like crop

residues, sewage and manure breaks down in an oxygen-free

environment;

f)

‘Capital cost’ means the capital cost as defined in regulations

12, 26, 27, 28, 29, 30 & 31;

g)

'Commission'

means

the

Bihar

Electricity

Regulatory

Commission referred to in sub-section (1) of section 82 of the

Act;

h) ‘Conduct of Business Regulations’ means the Bihar Electricity

Regulatory Commission (Conduct of Business) Regulations, 2005

as amended from time to time;

i)

‘Control Period or Review Period’ means the period during

which the norms for determination of tariff specified in these

regulations shall remain valid;

j)

‘Gross calorific value’ or ‘GCV’ in relation to a fuel used in

generating station means the heat produced in kCal by complete

combustion of one kilogram of solid fuel or one liter of liquid fuel

or one standard cubic meter of gaseous fuel, as the case may be;

k)

‘Gross station heat rate’ or ‘GHR’ means the heat energy input

in k.Cal required to generate one kWh of electrical energy at

generator terminals of a thermal generating station;

l)

‘Hybrid Solar Thermal Power Plant’ means the solar thermal

power plant that uses other forms of energy input sources along

with solar thermal energy for electricity generation, and wherein

not less than 75% of electricity is generated from solar energy

component;

m) ‘Installed capacity' or 'IC’ means the summation of the name

plate capacities of all the units of the generating station or the

capacity of the generating station (reckoned at the generator

terminals), approved by the Commission from time to time;

n) ‘Inter-connection

Point’

shall

mean

interface

point

of

renewable energy generating facility with the transmission

system or distribution system, as the case may be:

i.

For solar photovoltaic Projects, inter-connection point shall

be line isolator on outgoing feeder on HV side of the pooling

sub-station;

"Pooling sub-station" means a sub-station developed by the

developer/ generator pooling of generation from individual

turbine is done for interface with receiving sub-station.

3

BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017

ii.

in relation to small hydro power, biomass power and non

fossil fuel based cogeneration power projects and solar

thermal Power Projects the, inter-connection point shall be

line isolator on outgoing feeder on HV side of generator

transformer;

o)

‘MNRE’ means the Ministry of New and Renewable Energy of

the Government of India;

p)

‘Municipal solid waste’ means and includes commercial and

residential wastes generated in a municipal or notified areas in

either solid or semi-solid form excluding industrial hazardous

wastes but including treated bio-medical wastes;

q)

‘Non-firm power’ means the power generated from renewable

sources, the hourly variation of which is dependent upon

nature’s phenomenon like sun, cloud, wind, etc., that cannot be

accurately predicted;

r)

‘Non fossil fuel based co-generation’ means the process in

which more than one form of energy (such as steam and

electricity) are produced in a sequential manner by use of

biomass provided the project may qualify to be a co-generation

project if it fulfills the eligibility criteria as specified in

Regulation 4;

s)

'Operation and maintenance expenses’ or ‘O&M expenses'

means the expenditure incurred on operation and maintenance

of the project, or part thereof, and includes the expenditure on

manpower, repairs, spares, consumables, insurance and

overheads;

t)

'Project' means a generating station or the evacuation

system upto inter-connection point, as the case may be, and in

case of a small hydro generating station includes all components

of generating facility such as dam, intake water conductor

system, power generating station and generating units of the

scheme, as apportioned to power generation;

u) ‘Refuse derived fuel’ means segregated combustible fraction of

solid waste other than chlorinated plastics in the form of pellets

or fluff produced by drying, de-stoning, shredding, dehydrating,

and compacting combustible components of solid waste that can

be used as fuel;

v)

‘Renewable Energy’ means the grid quality electricity generated

from renewable energy sources;

w) ‘Renewable Energy Power Plants’ means the power plants

other than the conventional power plants generating grid quality

electricity from renewable energy sources;

x)

‘Renewable Energy Sources’ means renewable sources such as

small hydro, wind, solar including its integration with combined

cycle, biomass, bio fuel cogeneration, urban or municipal waste

and other such sources as approved by the MNRE;

y)

‘Small Hydro’ means Hydro Power projects with a station

capacity up to and including 25 MW;

z)

‘Solar PV power’ means the Solar Photo Voltaic power project

that uses sunlight for direct conversion into electricity

through Photo Voltaic technology;

aa) ‘Solar Thermal power’ means the Solar Thermal power project

that uses sunlight for direct conversion into electricity through

4

BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017

Concentrated Solar Power technology based on either line focus

or point focus principle;

bb) ‘Tariff period’ means the period for which tariff is to be

determined by the Commission on the basis of norms specified

under these Regulations;

cc) ‘Useful Life’ in relation to a unit of a generating station including

evacuation system shall mean the following duration from the

date of commercial operation (COD) of such generation facility,

namely:-

Sl

No

RE Projects

Useful

Life

(Years)

1

Wind energy power project

25

2

Bio mass power project with Rankine cycle technology

20

3

Non-fossil fuel cogeneration project

20

4

Small Hydro Plant

35

5

Municipal Solid Waste (MSW)/ and

Refuse Derived Fuel (RDF) based power project

20

6

Solar PV/Solar thermal power project

25

7

Biomass Gasifier based power project

20

8

Biogas based power project

20

dd)

‘Year’ means a financial year.

Save as aforesaid and unless repugnant to the context or if the

subject- matter otherwise requires, words and expressions used

in these regulations and not defined, but defined in the Act, or

the Indian Electricity Grid Code or Bihar Electricity Grid code or

the Central Electricity Regulatory Commission (Terms and

conditions of Tariff) Regulations, 2012 shall have the meanings

assigned to them respectively in the Act or the Indian Electricity

Grid Code or Bihar Electricity Grid Code or the Central Electricity

Regulatory

Commission

(Terms

and

conditions

of

Tariff)

Regulations, 2012.

3. Scope and extent of application.—These regulations shall apply in

all cases where tariff, for a generating station or a unit thereof based on

renewable sources of energy, is to be determined by the Commission under

Section 62 read with Section 86 of the Act.

Provided that in cases of Biomass power based on Rankine cycle, non-

fossil fuel based cogeneration projects, Solar PV , Solar Thermal power projects,

Biomass gasifier, Biogas power project, Municipal solid waste and Refuse

derived fuel based power projects, these regulations shall apply subject to the

fulfillment of eligibility criteria specified in Regulation 4 of these Regulations.

4. Eligibility Criteria

a) Small hydro project – The project shall qualify to be termed as

small hydro project if it is located at the sites approved by State

Nodal Agency/State government using new plant and machinery,

and installed power plant capacity to be lower than or equal to 25

MW at single location.

b) Biomass power project based on Rankine cycle technology –

The project shall qualify to be termed as Biomass power projects if

it is using new plant and machinery based on Rankine cycle

technology and using biomass fuel sources, without use of fossil

fuel.

5

BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017

c) Non-fossil fuel based co-generation project: The project shall

qualify to be termed as a non-fossil fuel based co-generation

project, if it is using new plant and machinery and is in

accordance with the definition and also meets the qualifying

requirement outlined below:

Topping cycle mode of co-generation – Any facility that uses non-fossil

fuel input for the power generation and also utilizes the thermal energy

generated

for

useful

heat

applications

in

other

industrial

activities

simultaneously.

Provided that for the co-generation facility to qualify under topping cycle

mode, the sum of useful power output and one half the useful thermal output

be greater than 45% of the facility’s energy consumption, during season.

Explanation- For the purposes of this clause,

(i)

‘Useful power output’ is the gross electrical output from the

generator. There will be an auxiliary consumption in the

cogeneration plant itself (e.g. the boiler feed pump and the FD/ID

fans). In order to compute the net power output it would be

necessary to subtract the auxiliary consumption from the gross

output. For simplicity of calculation, the useful power output is

defined as the gross electricity (kWh) output from the generator.

(ii) ‘Useful Thermal Output’ is the useful heat (steam) that is

provided to the process by the cogeneration facility.

(iii) ‘Energy Consumption’ of the facility is the useful energy input

that is supplied by the fuel (normally bagasse or other such

biomass fuel).

(iv) 'Topping Cycle' means a co-generation process in which thermal

energy produces electricity followed by useful heat application.

d) Solar PV and Solar Thermal Power Project – The project shall

qualify to be termed as Solar PV and Solar Thermal Power project,

if it is based on technologies as approved by MNRE.

e) Biomass Gasifier based Power Project – The project shall qualify

to be termed as a biomass gasifier based power project, if it is

using new plant and machinery and having a grid connected

system that uses 100% producer gas engine, coupled with gasifier

technologies approved by MNRE.

f) Municipal solid waste (MSW) based power projects – The

project shall qualify to be termed as a Municipal solid waste

(MSW) based power project if it is using new plant and machinery

based on Rankine cycle technology and using Municipal solid

waste (MSW) as fuel sources

g) Refuse derived fuel (RDF) based power projects – The project

shall qualify to be termed as a Refuse derived fuel (RDF) based

power project, if it is using new plant and machinery based on

Rankine cycle technology and using Refuse derived fuel (RDF) as

fuel sources

h) Wind power project – using new wind turbine generators, located

at the sites approved by State Nodal Agency/State Government.

i) Biogas based Power Project – The project shall qualify to be

termed as a biogas based power project, if it is using new plant

and machinery and having grid connected system that uses 100%

Biogas fired engine, coupled with Biogas technology for co-

digesting agriculture residues, manure and other bio waste as

may be approved by MNRE.

6

BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017

5. Control Period or Review Period.— The Control Period or Review

Period under these Regulations shall be of three (3) years, of which the first year

shall be the financial year 2017-18.

Provided that the tariff determined as per these Regulations for the RE

projects commissioned during the Control Period, shall continue to be

applicable for the entire duration of the Tariff Period as specified in Regulation

6 below.

Provided further that the revision in Regulations for next Control Period

shall be undertaken six months prior to the end of the first Control Period and

in case Regulations for the next Control Period are not notified until

commencement of next Control Period, the tariff norms as per these

Regulations shall continue to remain applicable until notification of the revised

Regulations subject to adjustments as per revised Regulations.

6. Tariff Period

a) The Tariff Period for Renewable Energy power projects will be

same as their Useful Life as defined in Regulation 2 (z) (cc) of

these Regulations.

b)

Tariff period under these Regulations shall be considered from

the date of commercial operation of the renewable energy

generating stations.

c)

Tariff determined as per these Regulations shall be applicable for

Renewable Energy power projects, for the duration of the Tariff

Period as stipulated under Clause (a) and (b).

7. Project Specific tariff

(a) Project specific tariff, on case to case basis, shall be determined

by the Commission for the following types of projects:

(i)

Biogas based projects;

(ii)

Hybrid Solar Thermal Power Projects;

(iii) Small Hydro Projects

(iv) Other hybrid projects include renewable–renewable or

renewable–conventional

sources,

for

which

renewable

technology is approved by MNRE;

(v) Any other new renewable energy technologies approved by

MNRE.

(vi) Wind Power projects.

(b) Determination of Project specific tariff for generation of electricity

from such renewable energy sources shall be in accordance with

such terms and conditions as stipulated under relevant

Regulations/Orders of BERC/CERC.

Provided that the financial norms as specified under these Regulations,

except for capital cost, shall be ceiling norms while determining the project

specific tariff.

8. Petition and proceedings for determination of tariff

(1)

The Commission shall determine the generic tariff on the basis

of suo-motu proceeding at the beginning of each year of the

Control period for the following types of projects, for which

norms have been specified under the Regulations:

(a)

Solar PV including Rooftop Solar PV and Solar Thermal.

(b)

Biomass Power Projects based on Rankine Cycle

Technologies.

(c)

Non-fossil fuel based cogeneration projects.

(d)

Biomass gasifier projects.

7

BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017

(e)

MSW/RDF project based on Rankine cycle.

(2)

A petition for determination of project specific tariff shall be

accompanied by such fee as may be determined by Regulations

and shall be accompanied by:

a)

Information in forms 1.1, 1.2, 2.1 and 2.2 as the case may

be, and as appended in these regulations;

b)

Detailed project report outlining technical and operational

details, site specific aspects, premise for capital cost and

financing plan etc.

c)

A statement of all applicable terms and conditions and

expected expenditure for the period for which tariff is to be

determined.

d)

A statement containing full details of calculation of any

subsidy and incentive received, due or assumed to be due

from the Central Government and/or State Government.

This statement shall also include the proposed tariff

calculated without consideration of the subsidy and

incentive.

e)

Any other information that the Commission requires the

petitioner to submit.

(3)

The proceedings for determination of tariff shall be in

accordance with the BERC (Conduct of Business) Regulations,

2005.

9. Tariff Structure.—The tariff for renewable energy technologies shall

be single part tariff consisting of the following fixed cost components:

(a) Return on equity;

(b) Interest on loan capital;

(c) Depreciation;

(d) Interest on working capital;

(e) Operation and maintenance expenses;

Provided that for renewable energy technologies having fuel cost

component, like RDF fuel based Waste to Energy projects, biomass

power projects and non-fossil fuel based cogeneration, Biomass gasifier

projects, single part tariff with two components, fixed cost component

and fuel cost component, shall be determined.

10. Tariff Design

(1)

The generic tariff shall be determined on levellised basis for the

Tariff Period.

Provided that for renewable energy technologies having single

part tariff with two components, tariff shall be determined on levellised

basis considering the year of commissioning of the project for fixed cost

component while the fuel cost component shall be specified on year of

operation basis.

(2)

For the purpose of levellised tariff computation, the discount

factor equivalent to Post Tax weighted average cost of capital

shall be considered.

(3)

Levellisation shall be carried out for the ‘useful life’ of the

Renewable Energy project while Tariff shall be specified for the

period equivalent to ‘Tariff Period’.

11. Despatch principles for electricity generated from Renewable

Energy Sources:

(1) All renewable energy power plants except for biomass power

plants with installed capacity of 10 MW and above, and non-

8

BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017

fossil fuel based cogeneration plants shall be treated as ‘MUST

RUN’ power plants and shall not be subjected to ‘merit order

despatch’ principles.

(2) The biomass power generating station with an installed capacity

of 10 MW and above and non-fossil fuel based co-generation

projects shall be subjected to scheduling and despatch code as

specified under Indian Electricity Grid Code (IEGC) and Central

Electricity

Regulatory

Commission

(Deviation

Settlement

Mechanism and Related Matters) Regulations, 2014 including

amendments thereto.

(3) Scheduling of wind and solar energy shall be governed as per

the aforesaid provisions of Central Electricity Regulatory

Commission (Indian Electricity Grid Code) (Third Amendment)

Regulations,

2015

and

Central

Electricity

Regulatory

Commission (Deviation Settlement Mechanism and related

matters) (Second Amendment) Regulations, 2015 as amended

from time to time.”

12. Capital Cost—The norms for the Capital cost as specified in these

Regulations shall be inclusive of all capital work including plant and

machinery, civil work, erection and commissioning, financing and interest

during construction, and evacuation infrastructure up to inter-connection

point.

Provided that for project specific tariff determination, the generating

company shall submit the break-up of capital cost items along with its petition

in the manner specified under Regulation 8.

13. Debt Equity Ratio

(1) For generic tariff to be determined based on suo-motu proceeding,

the debt equity ratio shall be 70:30.

(2) For Project specific tariff, the following provisions shall apply:-

If the equity actually deployed is more than 30% of the capital cost,

equity in excess of 30% shall be treated as normative loan.

Provided that where equity actually deployed is less than 30% of the

capital cost, the actual equity shall be considered for determination of tariff:

Provided further that the equity invested in foreign currency shall be

designated in Indian rupees on the date of each investment.

14. Loan and Finance Charges.—For the purpose of determination of

tariff, loan tenure of 10 years shall be considered.

15 Interest Rate.—

(a) The loans arrived at in the manner indicated in the Regulation 13

shall be considered as gross normative loan for calculation for

interest on loan. The normative loan outstanding as on 1st April of

every year shall be worked out by deducting the cumulative

repayment up to March 31st of previous year from the gross

normative loan.

(b) For the purpose of computation of tariff, normative interest rate of

two hundred (200) basis points above the average State Bank of

India MCLR (one year tenor) prevalent during the last available six

months shall be considered.

(c) Notwithstanding any moratorium period availed by the generating

company, the repayment of loan shall be considered from the first

year of commercial operation of the project and shall be equal to

the annual depreciation allowed.

9

BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017

16. Depreciation

(1) The value base for the purpose of depreciation shall be the

Capital Cost of the asset admitted by the Commission. The

Salvage value of the asset shall be considered as 10% and

depreciation shall be allowed up to maximum of 90% of the

Capital Cost of the asset.

(2) Depreciation rate of 7.0 % per annum for first 10 years and

remaining depreciation to be spread during remaining useful life

of the RE projects considering the salvage value of the project as

10% of project cost shall be considered.

(3) Depreciation shall be chargeable from the first year of

commercial operation Provided that in case of commercial

operation of the asset for part of the year, depreciation shall be

charged on pro rata basis.

17. Return on Equity

(1) The value base for the equity shall be 30% of the capital cost or

actual equity (in case of project specific tariff determination) as

determined under Regulation 13.

(2) The normative Return on Equity shall be 14 %, to be grossed

up by prevailing MAT as on 1st April of previous year for the

entire useful life of the project.

18. Interest on Working Capital

(1)

The Working Capital requirement in respect of Solar PV and

Solar thermal power projects shall be computed in accordance

with the following:

Solar PV / Solar thermal

a) Operation & Maintenance expenses for one month;

b) Receivables equivalent to 2 (Two) months of energy charges

for sale of electricity calculated on the normative CUF;

c) Maintenance spare @ 15% of operation and maintenance

expenses

(2)

The Working Capital requirement in respect of biomass power

projects with Rankine Cycle technology, Biomass Gasifier

based power projects, non-fossil fuel based co-generation,

Muncipal Solid Waste and Refuse Derived Fuel projects shall

be computed in accordance with the following clause :

a) Fuel costs for four months equivalent to normative PLF;

However, in case of non-fossil fuel co-generation, fuel cost

for one month will be considered.

b) Operation & Maintenance expense for one month;

c) Receivables equivalent to 2 (Two) months of fixed and

variable charges for sale of electricity calculated on the

target PLF;

d) Maintenance spare @ 15% of operation and maintenance

expenses

(3)

Interest on Working Capital shall be at interest rate equivalent

to the normative interest rate of three hundred (300) basis

points above the average State Bank of India MCLR (One Year

Tenor) prevalent during the last available six months for the

determination of tariff.

19. Calculation of CUF/PLF.—The number of hours for calculation of

CUF/PLF (wherever applicable) for various RE technologies shall be 8760.

10

BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017

20. Operation and Maintenance Expenses

(1)

‘Operation and Maintenance or O&M expenses’ shall comprise

repair and maintenance (R&M), establishment including

employee expenses, and administrative and general expenses.

(2)

Operation and maintenance expenses shall be determined for

the Tariff Period based on normative O&M expenses specified

by the Commission subsequently in these Regulations for the

first Year of Control Period.

(3)

Normative O&M expenses allowed during first year of the

Control Period (i.e. FY 2017-18) under these Regulations shall

be escalated at the rate of 5.72% per annum over the Tariff

Period.

21. Rebate.

(1)

For payment of bills of the generating company through letter

of credit, a rebate of 2% shall be allowed.

(2)

Where payments are made other than through letter of credit

within a period of one month of presentation of bills by the

generating company, a rebate of 1% shall be allowed.

22. Late payment surcharge.—In case the payment of any bill for

charges payable under these regulations is delayed beyond a period of 60 days

from the date of billing, a late payment surcharge at the rate of 1.25% per

month shall be levied by the generating company.

23. Sharing of Clean Development Management (CDM) Benefits.—

The proceeds of carbon credit from approved CDM project shall be shared

between generating company and concerned beneficiaries in the following

manner, namely-

a) 100% of the gross proceeds on account of CDM benefit to be

retained by the project developer in the first year after the date

of commercial operation of the generating station;

b) In the second year, the share of the beneficiaries shall be 10%

which shall be progressively increased by 10% every year till it

reaches 50%, where after the proceeds shall be shared in equal

proportion, by the generating company and the beneficiaries.

24. Subsidy or incentive by the Central / State Government.—The

Commission shall take into consideration any incentive or subsidy offered by

the Central or State Government, including accelerated depreciation benefit if

availed by the generating company, for the renewable energy power plants while

determining the tariff under these Regulations.

Provided that the following principles shall be considered for ascertaining

income tax benefit on account of accelerated depreciation, if availed, for the

purpose of tariff determination:

i) Assessment of benefit shall be based on normative capital cost,

accelerated Depreciation rate as per relevant provisions under

Income Tax Act and corporate income tax rate.

ii) Capitalization of RE projects during second half of the fiscal year.

Per unit benefit shall be derived on levellised basis at discount

factor equivalent to weighted average cost of capital.

25. Taxes and Duties.—Tariff determined under these regulations shall

be exclusive of taxes and duties as may be levied by the appropriate

Government:

Provided that the taxes and duties levied by the appropriate Government

shall be allowed as pass through on actual incurred basis.

11

BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017

26. Technology specific parameters for Biomass Power Projects

based on Rankine Cycle Technology.

I. Technology Aspect.—The norms for tariff determination specified

hereunder are for biomass power projects based on Rankine cycle technology

application using water cooled condenser.

II. Capital Cost.—The normative capital cost for FY 2017-18 for

Biomass Projects shall be as under:

Biomass Rankine Cycle Projects

Capital Cost

(FY 2017-18)

(Rs. lakhs/MW)

Project [other than rice straw and juliflora

(plantation) based project] with water cooled

condenser

559.03

Project [other than rice straw and

Juliflora(plantation) based project] with air cooled

condenser

600.44

For rice straw and juliflora (plantation) based

project with water cooled condenser

610.80

For rice straw and juliflora(plantation) based

project with air cooled condenser

652.20

III. Capital Cost Indexation Mechanism.—The Capital Cost for

Biomass Power Projects based on Rankine Cycle Technology as specified for

first year of the control period will remain valid for the entire duration of the

control period unless reviewed earlier by the Commission.

IV. Plant Load Factor

(1)

Threshold Plant Load Factor for determining fixed charge

component of Tariff shall be:

a)

During Stabilisation: 60%

b)

During the remaining period of the first year (after

stabilization): 70%

c)

From 2nd Year onwards: 80 %

(2)

The stabilisation period shall not be more than 6 months from the

date of commissioning of the project.

V. Auxiliary Consumption.—The auxiliary power consumption

factor shall be as follows:-

a) For the project using water cooled condenser:

i. During first year of operation : 11%

ii. From 2nd year onwards : 10%

b) For the project using air cooled condenser:

i. During first year of operation : 13%

ii. From 2nd year onwards : 12%

VI. Station Heat Rate.—The Station Heat Rate for biomass power

projects shall be :

a) For projects using travelling grate boilers : 4200 kCal/kWh

b) For projects using AFBC boilers : 4125 kCal/ kWh

VII. Operation and Maintenance Expenses

(1)

Normative O&M expenses for the first year of the Control period

(i.e. FY 2017-18 shall be Rs. 40 Lakh per MW.

12

BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017

(2) Normative O&M expenses allowed at the commencement of the

Control Period (i.e. FY 2017-18) under these Regulations shall be

escalated at the rate of 5.72% per annum.

VIII. Fuel Mix

(1) The biomass power plant shall be designed in such a way that it

uses different types of non-fossil fuels available within the

vicinity of biomass power project such as crop residues, agro-

industrial residues, forest residues etc. and other biomass fuels

as may be approved by MNRE.

(2) The Biomass Power Generating Companies shall ensure fuel

management plan to ensure adequate availability of fuel to meet

the respective project requirements.

IX. Use of Fossil Fuel.—The use of fossil fuels shall not be allowed.

Provided that for the biomass power projects commissioned on or before

the date of publication of these Regulations in official Gazette, the use of fossil

fuels to the extent of 15% in terms of calorific value on annual basis shall be

allowed for the tariff period from the date of commissioning.

X. Monitoring Mechanism for the use of fossil fuel

(1)

The Project developer shall furnish a monthly fuel usage

statement and monthly fuel procurement statement duly certified

by Chartered Accountant to the beneficiary (with a copy to

appropriate agency appointed by the Commission for the purpose

of monitoring the fossil and non-fossil fuel consumption) for each

month, along with the monthly energy bill. The statement shall

cover details such as -

a)

Quantity of fuel (in Tonnes) for each fuel type (biomass fuels

and fossil fuels) consumed and procured during the month

for power generation purposes,

b)

Cumulative quantity (in Tonnes) of each fuel type consumed

and procured till the end of that month during the year,

c)

Actual (gross and net) energy generation (denominated in

units) during the month,

d)

Cumulative actual (gross and net) energy generation

(denominated in units) until the end of that month during

the year,

e)

Opening fuel stock quantity (in tonnes),

f)

Receipt of fuel quantity (in tonnes) at the power plant site

and

g)

Closing fuel stock quantity (in tonnes) for each fuel type

(biomass fuels and fossil fuels) available at the power plant

site.

(2)

Non-compliance with the condition of fossil fuel usage by the

project developer, during any financial year, shall result in

withdrawal of applicability of tariff as per these Regulations for

such biomass based power project.

XI. Calorific Value.—The Calorific Value of the biomass fuel used for the

purpose of determination of tariff shall be at 3174 kCal/kg.

XII. Fuel Cost for FY 2017-18.—Biomass fuel price during first year of

the Control Period (i.e. FY 2017-18) shall be Rs. 3073.05/MT .For each

subsequent year of the Tariff Period, the normative escalation factor of 5% per

annum shall be applicable at the option of the biomass project developer or

shall be as decided by the Commission.

13

BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017

27. Technology specific parameters for Non-fossil fuel based

Cogeneration Projects.

I. Technology Aspect.—A project shall qualify as a non-fossil fuel

based Co-generation project, if it is in accordance with the

eligibility criteria as specified under Regulation 4(c).

II. Capital Cost.—The normative capital cost for the non-fossil fuel

based cogeneration projects shall be Rs. 492.5 Lakh/MW for high

boiler pressure projects for the first year of Control Period (i.e. FY

2017-18), and will remain valid for the entire duration of the

control period unless reviewed earlier by the Commission.

III. Plant Load Factor.—

(1) For the purpose of determining fixed charge, the plant load

factor for non-fossil fuel based cogeneration projects shall be

computed on the basis of plant availability for number of

operating days considering operations during crushing

season and off-season as specified under clause (2) below and

load factor of 92%.

(2) The number of operating days shall be as follows:

IV.

Auxiliary Consumption.—The auxiliary power consumption

factor shall be 8.5% for the computation of tariff.

V.

Station Heat Rate.—The Station Heat Rate of 3600 kCal / kWh

for power generation component alone shall be considered for

computation of tariff for non-fossil fuel based Cogeneration

projects.

VI.

Calorific Value.—The Gross Calorific Value for Bagasse shall be

considered as 2250 kCal/kg. For the use of biomass fuels other

than bagasse, calorific value as specified under Regulation 26

shall be applicable.

VII.

Fuel Cost

(1) The price of Bagasse first year of the Control Period (i.e. FY

2017-18) shall be Rs. 1964.71/MT. For each subsequent year

of the Control Period, the normative escalation factor of 5% per

annum shall be applicable at the option of the project

developer or as decided by the Commission.

(2) For use of biomass other than bagasse in co-generation

projects, the biomass prices as specified under Regulation 26

shall be applicable.

VIII. Operation and Maintenance Expenses

(1) Normative O&M expenses during first year of the Control

period (i.e. FY 2017-18) shall be Rs. 21.13 Lakh per MW.

(2) Normative O&M expenses allowed at the commencement of

the Control Period (i.e. FY 2017-18) under these Regulations

shall be escalated at the rate of 5.72% per annum.

28.

Technology specific parameters for Solar PV Power Project

and Rooftop Solar PV Projects.

I. Technology Aspects.—Norms for Solar Photovoltaic (PV) power under

these Regulations shall be applicable for grid connected PV systems that

directly convert solar energy into electricity and are based on the technologies

such as crystalline silicon or thin film etc. as may be approved by MNRE.

150 days (crushing) + 60 days (off-season)

days operating days = 210

53%

14

BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017

II. Capital Cost.—The normative capital cost shall be Rs 442.18

lakhs/MW based on prevailing market trends for Solar PV projects and

also Rooftop solar PV projects.

The above capital cost shall remain valid during the control period

unless reviewed earlier by the Commission

III. Capacity Utilisation Factor.—The Capacity utilization factor for

Solar PV project shall be 19%. Provided that the Commission may deviate from

above norm in case of project specific tariff determination in pursuance of

Regulation 7 and 8.

IV. Operation and Maintenance Expenses

(1)

The O&M expenses for Solar PV project shall be Rs. 7.40

Lakh/MW.

(2)

Normative O&M expenses allowed at the commencement of the

Control Period (i.e. FY 2017-18) under these Regulations shall

be escalated at the rate of 5.72% per annum over the Tariff

Period.

.V. Auxiliary Consumption—The auxiliary consumption shall be 0.25%

of gross generation.

Provided that the Commission may deviate from the above norm in case

of project specific tariff determination in pursuance of Regulation 7 and

Regulation 8.

29. Technology specific parameters for Solar Thermal Power Project.

I. Technology Aspects.—Norms for Solar thermal power under

these Regulations shall be applicable for Concentrated solar

power (CSP) technologies viz. line focusing or point focusing, as

may be approved by MNRE, and uses direct sunlight,

concentrating it several times to reach higher energy densities

and thus higher temperatures whereby the heat generated is

used to operate a conventional power cycle to generate

electricity.

II. Capital Cost.—The capital cost for Solar Thermal Projects shall be

Rs 1200 Lakh/MW for FY 2017-18.

The above capital cost shall remain valid during the entire control

period unless reviewed earlier by the Commission.

III. Capacity Utilisation Factor (CUF).—The Capacity Utilisation

Factor shall be 23%.

Provided that the Commission may deviate from the above

norm in case of project specific tariff determination in pursuance

of Regulation 7 and Regulation 8.

IV. Operation and Maintenance Expenses

(1)

The O&M expenses shall be Rs 19.81 Lakhs/MW for Solar

Thermal project.

(2)

Normative O&M expenses allowed at the commencement

of the Control Period (i.e. FY 2017-18) under these

Regulations shall be escalated at the rate of 5.72% per

annum over the Tariff Period.

The above cost shall remain valid during the control period

unless reviewed earlier by the Commission.

V. Auxiliary Consumption.— The auxiliary consumption shall

be 10%.

Provided that the Commission may deviate from the above

norm in case of project specific tariff determination in

pursuance of Regulation 7 and Regulation 8.

15

BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017

30. Technology specific parameters for Biomass Gasifier Power

Projects.

I.

Technology Aspect.—The norms for tariff determination are

specified hereunder for biomass gasifier based power projects:

II. Capital Cost.—The normative capital cost for the biomass

gasifier power projects based on Rankine cycle shall be Rs.

592.88 Lakh/MW (FY 2017-18 during first year of Control Period)

and shall be same for subsequent years unless specifically

ordered by the Commission. After taking into account of capital

subsidy of Rs 150.00 lakhs/MW, net project cost shall be Rs.

442.88 Lakh/MW for FY 2017-18.

III. Plant Load Factor.—Plant Load Factor for determining fixed

charge component of Tariff shall be 85%.

IV. Auxiliary Consumption.—The auxiliary consumption shall be

10% for the determination of tariff.

V. Specific fuel consumption.—Normative specific fuel consumption

shall be 1.25 kg per kWh.

VI. Operation and Maintenance Expenses

(1) Normative O&M expenses for the first year of the Control period

(i.e. FY 2017-18) shall be Rs. 52.83 Lakh per MW Normative

O&M expenses allowed at the commencement of the Control

Period (i.e. FY 2017-18) under these Regulations shall be

escalated at the rate of 5.72% per annum.

VII. Fuel Mix

(1)

The Biomass Gasifier based power plant shall be designed in

such a way that it uses different types of non-fossil fuels

available within the vicinity of biomass power project such as

crop residues, agro- industrial residues, forest residues etc.

and other biomass fuels as may be approved by MNRE.

(2)

The Biomass Gasifier based Power Generating Companies shall

ensure fuel management plan to ensure adequate availability

of fuel to meet the respective project requirements.

VIII. Fuel Cost.—Biomass fuel price for the Biomass gasifier based

power project applicable for FY 2017-18 shall be the same as for

the biomass based power project (Rankine cycle) as mentioned

in Regulation 26.

31.

Technology specific parameters for power projects using

Municipal solid waste/refuse derived fuel and based on Rankine cycle

technology.

I.

Technology Aspect.—Norms for tariff determination specified

for power projects which use municipal solid waste (MSW) and

refuse derived fuel (RDF) and shall be based on Rankine cycle

technology application, combustion or incineration, Bio-

methanation, Pyrolysis and High end gasifier technologie

II.

Capital Cost.—The capital cost for the power projects which use

MSW based on Rankine Cycle Technology shall be Rs. 1500

Lakhs/MW and for refuse derived fuel based Power Plant shall

be Rs. 900 Lakhs/MW.

III.

Plant Load Factor

(1) The Plant Load Factor for determining fixed charge

component of tariff for the power projects which use

municipal solid waste (MSW) and refuse derived fuel (RDF)

shall be as below:

16

BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017

PLF

MSW

RDF

a) During Stabilisation

65%

65%

b) During the remaining period of the

first year (after stabilization)

65%

65%

c) From 2nd Year onwards

75%

80%

(2) The stabilisation period shall not be more than 6 months

from the date of commissioning of the project

IV.

Auxiliary Consumption.—The auxiliary consumption for the

power projects which use municipal solid waste and refuse

derived fuel shall be 15%.

V.

Station Heat Rate.—The Station Heat Rate for power projects

which use municipal solid waste and refuse derived fuel shall

be 4200 kcal/kWh.

VI.

Operation and Maintenance Expenses

1.

The O&M expenses shall be 6% of normative capital cost for

the MSW/RDF Projects.

2.

Normative O&M expenses allowed at the Commencement of

the Control period, shall be escalated at the rate of 5.72%

per annum.

VII. Calorific Value.—The Calorific Value of the refuse derived fuel

(RDF) fuel used for the purpose of determination of tariff shall

be at 2500 kcal/kg.

VIII. Fuel Cost.—Refuse derived fuel (RDF) price during FY 2017-18

shall be Rs 1,800 per MT. For each subsequent year of the

Tariff Period, the normative escalation factor of 5% per annum

shall be applicable at the option of the refuse derived fuel (RDF)

project developer.

No fuel cost shall be considered for determination of tariff for

the power projects using municipal solid waste (MSW).

32. Deviation from Norms.—Tariff for sale of electricity generated from

a generating station based on renewable energy sources, may also be agreed

between a generating company and a licensee, in deviation from the norms

specified in these regulations subject to the conditions that the levellised tariff

over the useful life of the project on the basis of the norms in deviation does not

exceed the levellised tariff calculated on the basis of the norms specified in

these regulations.

33. Solar Power Banking

(i)

The facility of banking of solar power will be provided by Bihar

State Power Holding Co. Ltd. (BSPHCL)/distribution licensee to

solar power generated for captive use, group captive use and for

third party sale

(ii) 2% of the energy fed into the grid for banking by the generator

will be paid as banking charge to BSPHCL/distribution licensee.

(iii) Banking facility will be available for full calendar year. In case

energy fed into the grid for banking is not consumed within the

same calendar year, it cannot be used by the generator or its

user

in

the

subsequent

calendar

year.

However,

the

BSPHCL/distribution licensee will pay to the generator for the

unused energy during the calendar year at the average power

17

BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017

purchase cost of BSPHCL/distribution licensee during that

calendar year.

(iv) Adequate metering facility will be provided by the distribution

licensee to enable measurement of input and consumed energy

at different points of time including provision of check meters of

appropriate accuracy class at consumer's end, calibrated

annually.

(v) In case of third party sale of solar power, the transmission

licensee, distribution licensee and/or SLDC, as the case may

be, will provide open access within 30 days of application on

payment of required open access charges as determined by the

Commission and the generator in addition to 2% banking

charge, will pay to the BSPHCL/ distribution licensee wheeling

and transmission charges and T&D losses as determined by the

Commission for the voltage level at which power is fed into the

grid. However, no cross-subsidy surcharge will be paid.

(vi) Drawal of Banked energy shall not be permitted during the peak

hours.

(vii) Solar Power Developer having no PPA for supply of power to

DISCOM should draw power during shutdown/maintenance of

the plant of the applicable UI rate plus 5% of the maximum UI

rate or applicable rate for purchase of power from renewable

energy source, whichever is higher.

34. Guidelines of Competent Authority.—Policy/guidelines issued by

the Ministry of Power, Government of India, MNRE, State Government and any

other competent authority in this regard from time to time shall prevail.

35. Power to Relax.—The Commission may by general or special order,

for reasons to be recorded in writing, and after giving an opportunity of hearing

to the parties likely to be affected may relax any of the provisions of these

regulations on its own motion or on an application made before it by an

interested person.

36. Power to remove difficulties.—If any difficulty arises in giving

effect to the provisions of these regulations, the commission may, be general or

specific order, make such provisions not inconsistent with the provisions of the

Act, as may appear to be necessary for removing the difficulty.

37. Power to Amend.—The Commission may from time to time add,

vary, alter, modify or amend any provisions of these regulations on its own

motion or on any application made before it by an interested person.

38. Repeal and savings.—

Save as otherwise provided in these regulations, Bihar Electricity

Regulatory Commission (Terms and Conditions for Tariff Determination from Solar

Energy Sources) Regulations, 2010 read with its amendments are hereby

repealed.

By Order of the Commission,

PARMANAND SINGH,

Secretary.

18

BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017

Form-1.1: Form Template for Solar PV including Rooftop Solar PV/Solar

Thermal

S.

No

Assumption

Head

Sub-Head

Sub-Head(2)

Unit

Parameter

1

Power

Generation

Capacity

Installed Power Generation

Capacity

Capacity Utilization Factor

Commercial Operation Date

Useful Life

MW

%

mm/yyyy

years

2

Project Cost

Capital

Cost/MW

Normative Capital Cost

Capital Subsidy

If any

Net Capital Cost

Rs.

Lakh/MW

Rs. Lakh

Rs. Lakh

Rs. Lakh

3

Financial

Assumptions

Debt Equity

Debt

Component

Equity

Component

Depreciation

Incentives

Tariff Period

Debt

Equity

Total Debt Amount

Total Equity Amount

Loan Amount

Moratorium Period

Repayment Period (include

Moratorium)

Interest Rate

Equity amount

Return on Equity for first

10 years

Return on Equity 11th year

onwards

Discount Rate

Depreciation Rate for 1st 10

Yrs.

Depreciation Rate 11th years

onward

Generation Based Incentives.

If any

Period for GBI

Years

%

%

%

Rs. Lakh

Rs. Lacs

Years

Years

%

Rs. Lakh

%p.a

%p.a

%

%

%

Rs. L p.a.

Years

4

Operation &

Maintenance

Normative O&M

expense

O&M expanse

per annum

Escalation

factor for O&M

expense

Rs.

Lakh/MW

Rs. Lakh

%

5

Working

Capital

O&M expense

Receivables

Interest on

Working Capital

Month

Month

%

p.a

19

BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017

Form-1.2: Form Template for (Biomass Power, Municipal Solid

Waste, Refuse Derived Fuel or Non-fossil fuel based Co gen)

S. No

Assumption

Head

Sub-Head

Sub-Head(2)

Unit

Parame

ter

1

Power

Generation

Capacity

Installed Power Generation Capacity

Auxiliary Consumption factor PLF

(during stabilisation upto 6 months)

PLF (during 1st year stabilisation)

PLF (2nd year onwards)

Commercial Operation Date

Useful Life

MW

%

%

%

%

mm/yyyy

years

2

Project Cost

Capital

Cost/MW

Normative Capital Cost

Capital Cost Capital Subsidy,

If any

Net Capital Cost

Rs.Lakh/

MW

Rs. Lakh

Rs. Lakh

3

Financial

Assumptions

Debt Equity

Debt

Component

Equity

Component

Depreciation

Incentives

Tariff Period

Debt

Equity

Total Debt Amount

Total Equity Amount

Loan Amount

Moratorium Period

Repayment Period (include

Moratorium)

Interest Rate

Equity amount

Return on Equity for first 10 years

Return on Equity 11th year onwards

Discount Rate

Depreciation Rate for 1st 10 Yrs.

Depreciation Rate 11th years

onward

Generation Based Incentives.

If any period for GBI

Years

%

%

%

Rs. Lakh

Rs. Lacs

Years

Years

%

Rs.Lakh

%p.a

%p.a

%

%

%

Rs. L p.a.

Years

4

Operation &

Maintenance

Normative

O&M

expense

O&M

expanses per

annum

Escalation

factor for

O&M

expense

Rs.

Lakh/MW

%

5

Working

Capital

O&M

expense

Receivables

Interest on

Working

Capital

Rs.Lakh

Month

%

p.a

6

Fuel related

assumptions

Station Heat

Rate

During stabilisation

post stabilisation

Biomass fuel type-1

kCal/Kwh

kCal/Kwh

%

20

BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017

S. No

Assumption

Head

Sub-Head

Sub-Head(2)

Unit

Parame

ter

Fuel Type &

mix

Biomass fuel type-2

Municipal Solid Waste fuel

Refuse Derived Fuel

fossil fuel (coal)

GCV of Biomass fuel type-1

GCV of Biomass fuel type-2

GCV of Municipal Solid Waste fuel

GCV of Refuse Derived Fuel

GCV of fossil fuel (coal)

Biomass Price (fuel type-1) yr-1

Biomass Price (fuel type-2) yr-1

Municipal Solid Waste Price/yr-1

Refuse Derived Fuel Price/yr-1

fuel price escalation factor

%

%

%

%

kCal/Kwh

kCal/Kwh

kCal/Kwh

kCal/Kwh

kCal/Kwh

Rs/MT

Rs/MT

Rs/MT

Rs/MT

%p.a

21

BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017

Form-2.1: Form Template for (Solar PV/Solar thermal) : Determination of Tariff

Components

Units Generation

Unit

Yr-1

Yr-2

Yr-3

Yr-4

Yr-5

Yr-6

Yr-7

Yr-8

Yr-9

Yr-10

Yr-11

Yr-12

Yr-13

Installed Capacity

MW

Net Generation

MU

Units Generation

Unit

Yr-14

Yr-15

Yr-16

Yr-17

Yr-18

Yr-19

Yr-20

Yr-21

Yr-22

Yr-23

Yr-24

Yr-25

Installed Capacity

MW

Net Generation

MU

Tariff Components (Fixed charge)

Unit

Yr-1

Yr-2

Yr-3

Yr-4

Yr-5

Yr-6

Yr-7

Yr-8

Yr-9

Yr-10

Yr-11

Yr-12

Yr-13

O&M Expenses

Rs Lakh

Depreciation

Rs Lakh

Interest on term loan

Rs Lakh

Interest on working Capital

Rs Lakh

Return on Equity

Rs Lakh

Total Fixed Cost

Rs Lakh

Tariff Components (Fixed charge)

Unit

Yr-14

Yr-15

Yr-16

Yr-17

Yr-18

Yr-19

Yr-20

Yr-21

Yr-22

Yr-23

Yr-24

Yr-25

O&M Expenses

Rs Lakh

Depreciation

Rs Lakh

Interest on term loan

Rs Lakh

Interest on working Capital

Rs Lakh

Return on Equity

Rs Lakh

Total Fixed Cost

Rs Lakh

Per Unit Tariff components

Unit

Yr-1

Yr-2

Yr-3

Yr-4

Yr-5

Yr-6

Yr-7

Yr-8

Yr-9

Yr-10

Yr-11

Yr-12

Yr-13

PU O&M Expenses

Rs/kWh

PU Depreciation

Rs/kWh

PU Interest on term loan

Rs/kWh

PU Interest on working Capital

Rs/kWh

PU Return on Equity

Rs/kWh

PU Tariff Components

Rs/kWh

Levellised Tariff

Unit

Yr-1

Yr-2

Yr-3

Yr-4

Yr-5

Yr-6

Yr-7

Yr-8

Yr-9

Yr-10

Yr-11

Yr-12

Yr-13

Discount Factors

Discounted Tariff components

Rs/kWh

Levellised Tariff

Rs/kWh

Per Unit Tariff components

Unit

Yr-14

Yr-15

Yr-16

Yr-17

Yr-18

Yr-19

Yr-20

Yr-21

Yr-22

Yr-23

Yr-24

Yr-25

PU O&M Expenses

Rs/kWh

PU Depreciation

Rs/kWh

PU Interest on term loan

Rs/kWh

PU Interest on working Capital

Rs/kWh

PU Return on Equity

Rs/kWh

PU Tariff Components

Rs/kWh

Levellised Tariff

Unit

Yr-14

Yr-15

Yr-16

Yr-17

Yr-18

Yr-19

Yr-20

Yr-21

Yr-22

Yr-23

Yr-24

Yr-25

Discount Factors

Discounted Tariff components

Rs/kWh

Levellised Tariff

Rs/kWh

22

BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017

Form-2.2: Form Template for (Biomass Power, Municipal Solid Waste, Refuse

Derived Fuel or Non-fossil fuel based Cogen) : Determination of Tariff Component

Form-2.2: contd.

Units Generation

Unit

Yr-1

Yr-2

Yr-3

Yr-4

Yr-5

Yr-6

Yr-7

Yr-8

Yr-9

Y+++++

+++++++

+++++++

++++++

…r-10

Yr-11

Yr-12

Yr-13

Installed Capacity

MW

Net Generation

MU

Tariff Components (Fixed charge)

Unit

Yr-1

Yr-2

Yr-3

Yr-4

Yr-5

Yr-6

Yr-7

Yr-8

Yr-9

Yr-10

Yr-11

Yr-12

Yr-13

O&M Expenses

Rs Lakh

Depreciation

Rs Lakh

Interest on term loan

Rs Lakh

Interest on working Capital

Rs Lakh

Return on Equity

Rs Lakh

Total Fixed Cost

Rs Lakh

Tariff Components (Variable charge)

Unit

Yr-1

Yr-2

Yr-3

Yr-4

Yr-5

Yr-6

Yr-7

Yr-8

Yr-9

Yr-10

Yr-11

Yr-12

Yr-13

Biomass fuel type-1

Rs Lakh

Biomass fuel type-2

Rs Lakh

Fossil fuel (coal)

Rs Lakh

Municipal Solid Waste

Rs Lakh

Refuse Derived Fuel

Rs Lakh

Sub-total (Fuel Costs)

Rs Lakh

Fuel cost allocable to power

%

Total Fuel Costs

Rs Lakh

Per Unit Tariff components (fixed)

Unit

Yr-1

Yr-2

Yr-3

Yr-4

Yr-5

Yr-6

Yr-7

Yr-8

Yr-9

Yr-10

Yr-11

Yr-12

Yr-13

PU O&M Expenses

Rs/kWh

PU Depreciation

Rs/kWh

PU Interest on term loan

Rs/kWh

PU Interest on working Capital

Rs/kWh

PU Return on Equity

Rs/kWh

PU Tariff Components (Fixed)

Rs/kWh

PU Tariff Components (Variable)

Rs/kWh

PU Tariff Components (Total)

Rs/kWh

Levellised Tariff

Unit

Yr-1

Yr-2

Yr-3

Yr-4

Yr-5

Yr-6

Yr-7

Yr-8

Yr-9

Yr-10

Yr-11

Yr-12

Yr-13

Discount Factors

Discounted Tariff components (fixed)

Rs/kWh

Discounted Tariff components (variable)

Rs/kWh

Discounted Tariff components (total)

Rs/kWh

Levellised Tariff (fixed)

Rs/kWh

Levellised Tariff (variable)

Rs/kWh

Levellised Tariff (total)

Rs/kWh

23

BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017

————

PUBLISHED AND PRINTED BY THE SUPERINTENDENT,

BIHAR SECRETARIAT PRESS, PATNA.

Bihar Gazette (Extra) 997—571+400—Egazette

Website: http://egazette.bih.nic.in

Units Generation

Unit

Yr-14

Yr-15

Yr-16

Yr-17

Yr-18

Yr-19

Yr-20

Yr-21

Yr-22

Yr-23

Yr-24

Yr-25

Installed Capacity

MW

Net Generation

MU

Tariff Components (Fixed charge)

Unit

Yr-14

Yr-15

Yr-16

Yr-17

Yr-18

Yr-19

Yr-20

Yr-21

Yr-22

Yr-23

Yr-24

Yr-25

O&M Expenses

Rs Lakh

Depreciation

Rs Lakh

Interest on term loan

Rs Lakh

Interest on working Capital

Rs Lakh

Return on Equity

Rs Lakh

Total Fixed Cost

Rs Lakh

Tariff Components (Variable charge)

Unit

Yr-14

Yr-15

Yr-16

Yr-17

Yr-18

Yr-19

Yr-20

Yr-21

Yr-22

Yr-23

Yr-24

Yr-25

Biomass fuel type-1

Rs Lakh

Biomass fuel type-2

Rs Lakh

Fossil fuel (coal)

Rs Lakh

Municipal Solid Waste

Rs Lakh

Refuse Derived Fuel

Rs Lakh

Sub-total (Fuel Costs)

Rs Lakh

Fuel cost allocable to power

%

Total Fuel Costs

Rs Lakh

Per Unit Tariff components (fixed)

Unit

Yr-14

Yr-15

Yr-16

Yr-17

Yr-18

Yr-19

Yr-20

Yr-21

Yr-22

Yr-23

Yr-24

Yr-25

PU O&M Expenses

Rs/kWh

PU Depreciation

Rs/kWh

PU Interest on term loan

Rs/kWh

PU Interest on working Capital

Rs/kWh

PU Return on Equity

Rs/kWh

PU Tariff Components (Fixed)

Rs/kWh

PU Tariff Components (Variable)

Rs/kWh

PU Tariff Components (Total)

Rs/kWh

Levellised Tariff

Unit

Yr-14

Yr-15

Yr-16

Yr-17

Yr-18

Yr-19

Yr-20

Yr-21

Yr-22

Yr-23

Yr-24

Yr-25

Discount Factors

Discounted Tariff components (fixed)

Rs/kWh

Discounted Tariff components (variable)

Rs/kWh

Discounted Tariff components (total)

Rs/kWh

Levellised Tariff (fixed)

Rs/kWh

Levellised Tariff (variable)

Rs/kWh

Levellised Tariff (total)

Rs/kWh