The B
The B
The B
The B
EX
PUBLI
(NO.PATNA 300) PA
BIHAR ELEC
No. Case No. B
conferred under section
2003 (Act 36 of 2003),
other powers enabling
the Bihar Electricity
regulations for the ban
energy based Captive Ge
1.
Short title, exten
1.1 These regulations
Commission (Ban
energy based Cap
1.2 These Regulations
1.3 These regulations
notification in the
2.
Definitions and
2.1 In these Regulatio
a)
"Act" mean
subsequent
b)
"Agreemen
distribution
REGISTERED
Bihar Gazett
Bihar Gazett
Bihar Gazett
Bihar Gazett
XTRA ORDINARY
SHED BY AUTHORITY
13 CHAITRA 1940(S)
ATNA, TUESDAY, 3RD APRIL 20
CTRICITY REGULATORY COMMISSION
————
NOTIFICATION
The 2nd April 2018
BERC/SMP-34/2017-04––In exercise
ns 61, 66,86(1)(e) and 181 of the Elec
Rules and Regulations made thereund
it in this behalf, and after previous p
Regulatory Commission makes the
nking of power from fossil fuel and
enerating Plant :
nt and commencement
s may be called the Bihar Electricity R
nking of Power from fossil fuel and
ptive Generating Plant) Regulations,
s extend to the whole of the State of Bih
s shall come into force from the da
e Official Gazette of Government of Biha
Interpretations
ons, unless the context otherwise requir
ns the Electricity Act, 2003 (36 of
t amendments thereof;
nt” means an agreement entered in
n licensee and the captive generator;
NO. PT.-40
tetetete
018
of powers
ctricity Act,
der and all
publication,
e following
renewable
Regulatory
renewable
2018.
har.
ate of their
ar.
res:
2003) and
nto by the
2
BIHAR GAZETTE (EXTRA) 3RD APRIL 2018
c)
"Authority’’ means Central Electricity Authority referred in
sub-section (1) of Section 70 of the Act;
d)
“Banking of Power’’ is the process under which a captive
fossil fuel or renewable energy based generating plant
(whether it has a separate electric connection or not) supplies
power to the grid not with the intention of selling it to either
a third party or to a licensee, but with the intention of
exercising its eligibility to draw back this power from the grid
in the event of deficit of power, emergency, maintenance or
shutdown of the plant.
e)
"Bi-directional meter" means an appropriate energy meter
capable of recording both import and export of electricity or a
pair of meters one each for recording the import and export
of electricity as the case may be; which shall be an integral
part of the metering system;
f)
"Billing cycle or billing period’’ means the period for
which regular energy bills as specified by the Commission,
are prepared by the licensee;
g)
‘’Captive Generating Plant’’ means a power plant as
defined under clause 3 of The Electricity Rules, 2005 as
amended time to time, Such captive plant may have co-
located or distant located consumption plant
h)
"Commission"
means
Bihar
Electricity
Regulatory
Commission constituted under the Act;
i)
"Distribution licensee" or "Licensee" means a person
granted a license under Section 14 of the Act authorizing
him to operate and maintain a distribution system for
supplying electricity to the consumers in his area of supply;
j)
"Financial year" or "Year" means the period beginning
from first of April in an English calendar year and ending
with the thirty first of the March of the next year;
k)
"Inter connection point" means the interface of captive
power generation facility system with the network of
transmission/ distribution licensee;
l)
"Invoice" means either a monthly bill / supplementary bill or
a monthly invoice/ supplementary Invoice raised by the
distribution licensee;
m)
“MNRE’’ means Ministry of New and Renewable Energy,
Government of India;
n)
"Settlement period" means the period beginning from first
of April in an English calendar year and ending with the
thirty first of the March of the next year;
(o)
"Tariff order" in respect of a licensee means the most recent
order issued by the Commission for that licensee indicating
the rates to be charged by the licensee from various
categories of consumers for supply of electrical energy and
services and its validity has not expired;
3
BIHAR GAZETTE (EXTRA), 3RD APRIL 2018
p)
‘’Wheeling’’ means the operation whereby the distribution
system or associated facility of a transmission licensee, as
the case may be, are used by another person for the
conveyance of electricity on payment of charges to be
determined under Section 62 of the Act;
2.2 All other words and expressions used in these Regulations and not
specifically defined herein above, but defined in the Act or any law
passed by the Parliament applicable to the electricity industry in
the State shall have the meaning assigned to them in the Act or in
such law.
3.
Scope and Application
3.1 These Regulations shall apply to the distribution licensee and all
captive fossil fuel and renewable energy based generating plant in
the State of Bihar supplying power to the grid not with the
intention of selling it to either a third party or to a licensee, but
with the intention of exercising its eligibility to draw back this
power from the grid in the event of deficit of power, emergency,
maintenance or shutdown of the plant.
3.2 The eligible captive generator may have fossil fuel based or
renewable energy based generating plant.
3.3
The captive generating plant shall interconnect and operate safely
in parallel with the grid.
4.
General Principles
4.1 The distribution licensee shall offer the provision of banking of
power arrangement to the eligible captive generator, who intends to
avail such facility, in its area of supply on non-discriminatory basis
in accordance with the guidelines issued by the Distribution
licensee.
Provided that the distribution licensee shall offer the provision of
banking of power to the eligible captive generator for the target
capacity as specified under these Regulations;
Provided further that the interconnection of such system with the
grid is undertaken as per technical standards specified by the
Central Electricity Authority.
4.2
Banking of power upto 100% of the surplus energy as agreed
between the eligible captive generator and distribution licensee
shall be allowed.
4.3
The injection of power into the grid as well as drawal of power from
the distribution licensee by the captive generator shall be subject
to day ahead scheduling.
Provided that the renewable energy based captive generator
shall for the time being be exempted from day ahead scheduling,
however the renewable energy based captive generator shall abide
by instruction of SLDC.
Provided further that as and when forecasting and
scheduling mechanism is made applicable to Renewable energy
projects, these renewable energy based captive generators shall
abide by such regulations
4
BIHAR GAZETTE (EXTRA) 3RD APRIL 2018
4.4
The eligible captive generator shall be permitted to withdraw
banked power during a particular financial year in the same year.
Provided that Drawal of banked power shall not be permitted
during the peak hours.
4.5
The settlement of the banked power shall be made on month to
month basis.
4.6
The banked power remaining unutilized on the expiry of the
financial year shall be treated as sold to the distribution licensee.
4.7
There shall be Banking Charges chargeable @12.5% of the banked
energy.
Provided that in case of renewable energy based generating plants,
the banking charges shall be 2% of the banked energy.
Provided further that no banking charges shall be applicable on
unutilized banked power.
4.8
The distribution licensee, within three months from the date of
gazette notification of these regulations, shall issue guidelines and
procedures on Banking of power in its licensed area.
4.9
The Distribution licensee shall allow non-discriminatory open
access to eligible captive generating plant under banking
arrangement in the event of withdrawal of banked energy at its
distant located consumption units,
Provided that the eligible renewable energy based captive
generating plant shall be exempted from transmission/ wheeling
charges
5.
Capacity Targets
5.1 The capacity of the captive generating plant of any eligible captive
generator under these Regulations shall not be less than one MW
or MWp as the case may be.
5.2
The maximum capacity of any eligible captive generator shall be
governed by clause 3 of The Electricity Rules, 2005 as amended
from time to time.
5.3
The distribution licensee shall provide banking of power facility to
eligible captive generator as long as cumulative capacity reaches
80% of rated capacity of the connected power transformer of the
licensee.
5.4
The eligible captive generator will utilize the same service line and
installation for injection of power into the grid as well as drawal of
power from the distribution licensee.
6.
Interconnection with the Grid
6.1 The interconnection of the captive generating system with the grid
shall conform to the technical specifications, standards and
provisions as provided in the Central Electricity Authority
(technical Standards for connectivity of the Distributed Generation
resources)
Regulations,2013 as amended from time to time.
5
BIHAR GAZETTE (EXTRA), 3RD APRIL 2018
6.2
The distribution Licensee shall also ensure that interconnection of
the captive generating system with the distribution system of the
Licensee conforms to the relevant provisions of the Central
Electricity Authority(Measures related to Safety and Electric
Supply) Regulations,2010 as amended from time to time.
6.3
The captive generator having Rooftop Solar system may install grid
interactive Solar power system with or without battery backup.
Provided that if the Solar Energy Generator, prefers connectivity
with battery backup (full load backup/partial load backup), in all
such cases the inverter shall have separate backup wiring to
prevent the battery/Solar power to flow into the grid in the absence
of grid supply and manual isolation switch shall also be provided.
6.4
The captive generator shall be responsible for safe operation,
maintenance and rectification of any defect of their generating
system up to the point of meter beyond which the responsibility of
safe operation &maintenance shall rest with the Distribution
Licensee.
6.5
The distribution licensee shall have the right to disconnect the
captive
generator
at
any
time
in
the
event
of
possible
threat/damage to its distribution system,
7.
Metering Arrangement
7.1 The metering system shall be as per the provisions of CEA
(Installation &operation of meters) Regulations, 2006 as amended
from time to time.
7.2
The captive generating plant shall install bi-directional Availability
Based Tariff compliant Special Energy Meters (SEM) and are
installed in such a way that they are conveniently accessible for
reading.
7.3 Check meters shall be mandatory for eligible captive generating
plant.
7.4 The meters shall be tested, installed and sealed in accordance with
the provisions of CEA (Installation and operation of Meters)
Regulations, 2006as amended from time to time. It shall be tested
by the licensee and installed in presence of representative of
captive
generating
plant
and
the
licensee
with
due
acknowledgement. It shall be jointly inspected and sealed by the
licensee on behalf of both the parties.
Provided that the eligible consumer shall follow the metering
specifications, provisions for placement of meter as developed by
the distribution licensee from time to time.
7.5 The meter reading shall be taken by the distribution licensee and
shall form the basis of commercial settlement. The copy of the
meter reading statement shall be handed over to the representative
of the captive generating plant as soon as meter reading is taken.
7.6
The cost towards testing and installation of main & check meter
shall be borne by the eligible captive generating plants.
6
BIHAR GAZETTE (EXTRA) 3RD APRIL 2018
8.
Commercial Settlement
8.1
For each billing period, the licensee shall show the quantum of
injected electricity by the eligible captive generator in the billing
period, quantum of withdrawn electricity by the eligible captive
generator in the billing period, net electricity qualifying for
payment by the eligible captive generator for that billing period and
net carried over electricity to the next billing period separately;
8.2
If the electricity injected exceeds the electricity withdrawn during
the billing period, such excess injected electricity shall be carried
forward to next billing period as electricity credit and may be
utilized to net electricity injected or withdrawn in future billing
periods;
8.3
If the electricity withdrawn exceeds the electricity injected by the
eligible captive generator, the distribution licensee shall raise
invoice for the net electricity withdrawn by the captive generating
plant after taking into account banking charges and any electricity
credit balance remaining from previous billing period;
8.4
The net energy withdrawn during the billing period shall be treated
as consumed by the captive generating plant and shall be billed by
the distribution licensee at the average cost of supply as approved
by the Commission in the tariff order for the relevant year.
8.5
The banked power remaining unutilized on the expiry of the
financial year shall be treated as sold to the distribution licensee
and shall be paid to the captive generating plant by the
distribution licensee at the average power purchase cost as
approved by the Commission in the tariff order for the relevant
year.
8.6
In case of any dispute in billing it would be settled through mutual
consent and if the issue still remains unresolved, it shall be settled
by
the
Bihar
Electricity
Regulatory
Commission
following
appropriate procedure.
9.
Renewable Purchase Obligation.—The quantum of electricity
generated by eligible captive generator based on renewable energy
shall qualify towards compliance of Renewable Purchase Obligation
(RPO) for the distribution licensee.
Provided that non-solar renewable energy based generation
shall qualify towards non-solar RPO and solar renewable energy
based generation shall qualify towards solar RPO.
Provided further that the quantum of electricity generated by
eligible captive generator based on fossil fuel shall not qualify
towards compliance of Renewable Purchase Obligation (RPO) for
the distribution licensee.
7
BIHAR GAZETTE (EXTRA), 3RD APRIL 2018
10. Eligibility to Participate under Renewable Energy Certificate
Mechanism.—The issuance of renewable energy certificate to
renewable energy based captive generator shall be as per the
eligibility criteria specified under Central Electricity Regulatory
Commission (Terms and Conditions for recognition and issuance of
Renewable Energy Certificate for Renewable Energy Generation)
Regulations, 2010 and subsequent amendments thereof;
11. Penalty or Compensation.—In case of failure of providing non-
discriminatory banking of power facility, the provisions of penalty
shall be as per the provisions of the Act.
12. Power to give Directions.—The Commission may from time to
time issue such directions and orders as considered appropriate
for the implementation of these Regulations
13. Power to Relax.—The Commission may by general or special
order, for reasons to be recorded in writing, and after giving an
opportunity of hearing to the parties likely to be affected may relax
any of the provisions of these Regulations on its own motion or on
an application made before it by an interested person
14. Power to Amend.—The Commission may from time to time add,
vary, alter, suspend, modify, amend or repeal any provisions of
these Regulations.
By the order of the Commission,
PARMANAND SINGH,
Secretary.
————
PUBLISHED AND PRINTED BY THE SUPERINTENDENT,
BIHAR SECRETARIAT PRESS, PATNA.
Bihar Gazette (Extra) 300—571+400—Egazette
Website: http://egazette.bih.nic.in