The B
The B
The B
The B
EX
PUBLI
(NO.PATNA 1146) PATN
BIHAR ELECTRI
Bihar Electricity Regu
Intra-State tra
No. BERC-SMP-18
Section 181 (za) read with
Act, 2003 (36 of 2003) an
Electricity Regulatory Co
Regulatory Commission (S
Licensees) Regulations, 20
1. Short title, Ext
(1) These Regul
Commission
Transmission
(2)
These regula
(3)
These regula
publication i
2. Scope.—These
Transmission licensees.
3. Definitions.—(1
requires:-
(a) “Act” mean
from time to
REGISTERED
Bihar Gazett
Bihar Gazett
Bihar Gazett
Bihar Gazett
XTRA ORDINARY
SHED BY AUTHORITY
18 ASVINA 1941(S)
NA, THURSDAY, 10TH OCTOBE
ICITY REGULATORY COMMISSION, PATN
———
NOTIFICATION
The 10th October, 2019
ulatory Commission (Standards of Perform
ansmission Licensees) Regulations, 2019
8/2019-04—In exercise of powers confe
h section 57 (1), 57 (2) and 86 (1) (i) of th
d all other powers enabling it in this behal
ommission hereby makes the Bihar State
Standards of Performance of Intra-State Tr
019:-
CHAPTER 1
PRELIMINARY
tent and Commencement: -
ations may be called the Bihar Electricity
(Standards
of
Performance
of
n Licensees) Regulations, 2019.
ations extend to the whole of the state of Bi
ations shall come into force from the d
in the Official Gazette.
regulations shall be applicable to all the
1) In these Regulations, unless the contex
s the Electricity Act, 2003 (36 of 2003) a
time.
NO. PT.-40
tetetete
R 2019
NA
mance of
9
erred under
e Electricity
lf, the Bihar
e Electricity
ransmission
y Regulatory
Intra-State
har.
ate of their
Intra-State
xt otherwise
as amended
2
BIHAR GAZETTE (EXTRA) 10th OCTOBER 2019
(b) “Affected person” means a user of the intra-State transmission
system who is affected due to non-adherence to the Standards of
Performance specified in these regulations by the intra-State
transmission licensee.
(c) “Commission”
means
the
Bihar
Electricity
Regulatory
Commission referred to in sub- section (1) of section 82 of the Act.
(d) “Intra-State Transmission System (InSTS)” shall have the same
meaning as defined in Section 2 (37) of the Act.
(e)
“Intra-State
Transmission
Licensee”
means
a
licensee
including a deemed intra- State transmission licensee authorized
to establish, operate and maintain transmission lines of the intra-
State Transmission System.
(f)
“User” means a user of any segment/ element of the intra-State
Transmission System and shall include all generators, State
Transmission Utilities, Discoms or load serving entities directly
connected to the intra-State Transmission System including Bulk
Consumers and any other entity/ person.
(g)
“Year” means a financial year.
(2) Words and expressions used in these regulations and not defined
herein but defined in the Act or any of the regulations made by the
Commission, shall have the meanings as assigned to them respectively in the
Act, and regulations made by the Commission from time to time.
CHAPTER 2
OBJECTIVE, NORMS AND METHODOLOGY
4. Objective.—The objectives of these regulations are to ensure
compliance of the Standards of Performance by the intra-State transmission
licensees and to provide for an efficient, reliable, coordinated and economical
system of electricity transmission, non-adherence of which would entitle the
affected parties to compensation.
5. Standards of Performance.—
(1) All intra-State transmission licensees shall comply with the
Standards of Performance specified in these regulations:
(a)
Transmission System Availability
(i)
The
transmission
system
availability
shall
be
calculated element-wise on monthly basis, in the
manner as provided in the Bihar Electricity Regulatory
Commission (Multi Year Transmission Tariff and SLDC
Charges) Regulations, 2018, as amended from time to
time and any subsequent enactment thereof.
(ii) The deemed availability of the transmission elements
under outage shall be as Specified in the Bihar
Electricity
Regulatory
Commission
(Multi
Year
Transmission Tariff and SLDC Charges) Regulations,
2018, as amended from time to time and any
subsequent enactment thereof.
(iii) The
element-wise
monthly
availability
of
the
transmission system shall not be below the availability
as given under:
3
BIHAR GAZETTE (EXTRA), 10th OCTOBER 2019
Sl.
No.
Transmission Elements
Availability
(% of time)
(i)
AC Transmission line
90
(ii)
ICTs
90
(iii)
Reactors
90
(iv)
Static VAR Compensator
90
(v)
Series Compensator
90
(vi)
HVDC (Back-to-back Stations and bi-pole links)
85
Notes:—(1) Tower collapse shall not be counted for the purpose
of calculation of monthly availability of AC transmission
line and HVDC bipole line.
(2) Failure of Inter-Connecting Transformer (ICT) and Reactor
shall not be counted for the purpose of calculation of
availability of Inter-Connecting Transformer and Reactor.
(iv) The element-wise monthly availability shall be certified
by the SLDC or Member Secretary of the State Power
Committee.
(b)
Restoration time.—Restoration time for different types of
failures
of
transmission
line
and
Inter-Connecting
Transformer (ICT) and reactors shall not exceed the
following time limit:
Sl.
No.
Types of failures
Restoration Time
(Days)
1.
Insulator failure
Plain Terrain
1
Hilly Terrain
2
2.
Tower after collapse by Emergency
Restoration System (ERS)
12
3.
Tower after collapse
Plain Terrain
30
River Bed
50
Hilly Terrain
50
4.
Snapping of phase conductor
Plain Terrain
2
Hilly Terrain
3
5.
Failure of earth wire
Plain Terrain
2
Hilly Terrain
3
6.
Failure of Inter Connecting Transformers (ICTs)
Restoration of the failed ICT
120
7.
Failure of Reactors
Restoration of the failed reactor
120
6. Any failure by the intra-State transmission licensee to maintain the
standards of performance specified in these regulations shall render the said
licensee liable to payment of compensation to an affected person claiming such
compensation under the provisions of the Act.
4
BIHAR GAZETTE (EXTRA) 10th OCTOBER 2019
Provided that the payment of compensation by the Intra-State
transmission licensee shall be without prejudice to any penalty, which may be
imposed or any prosecution which may be initiated by the Commission as
provided in the Act.
7. Methodology for compensation.—An affected person who has
suffered a loss on account of non-adherence to the Standard of Performance by
any intra-State transmission licensee may make an appropriate application to
the Commission for award of compensation:
In case of non compliance of the order/ direction passed by the
commission, proceeding u/s 142 of Electricity Act, 2003 will be initiated.
Provided that the Commission shall determine the compensation after
giving reasonable opportunity to the transmission licensees of being heard:
Provided further that the compensation to be paid by the intra-State
transmission licensee to the affected party shall be limited to the transmission
charges as determine by the commission in the Tariff order from time to time.
Provided further that the intra-State transmission licensee shall not be
entitled to recover the amount of compensation awarded through tariff from the
users of the transmission of electricity:
Provided also that no claim for compensation shall be entertained if the
application for the claim is filed after expiry of a period of ninety days from the
end of the month when the availability of the transmission system falls short of
the availability specified in Clause 5 (a) and ninety days from the date of
restoration of transmission element, as the case may be, for the standards
prescribed in Clause (b) of Regulation 5 of these regulations.
CHAPTER 3
INFORMATION TO BE FURNISHED BY THE INTRA-STATE
TRANSMISSIONLICENSEES
8. Information to be furnished by the intra-State Transmission
Licensees.—
(1) All intra- State transmission licensees, in accordance with section
59 of the Act, shall furnish to the Commission, (a) the level of
performance achieved, and (b) the number of cases in which
compensation was paid, and (c) the aggregate amount of the
compensation, in the formats in the Schedule of these
regulations.
(2) Such information in the requisite formats shall be submitted to
the Commission twice during the financial year, on six monthly
basis by 31st October and 30th April for the periods April to
September and October to March respectively.
(3) All intra-State transmission licensees shall display on their web-
sites the actual performance against the specified Standards of
Performance on a monthly basis and the aggregate amount of
compensation paid, if any, in the formats enclosed in the
Schedule.
5
BIHAR GAZETTE (EXTRA), 10th OCTOBER 2019
CHAPTER 4
MISCELLANEOUS
9. Power to Relax.— The Commission may, if it considers necessary or
expedient to do so and for the reasons to be recorded in writing, relax
adherence to any specific Standard of Performance during Force Majeure
conditions such as war, mutiny, civil commotion, riot, flood, cyclone, Storm,
lightning, earthquake, grid failure, and strike/curfew, lockout, fire affecting the
intra-State Transmission Licensee's installations and operation activities, or
under such other specific circumstances:
Provided that the Intra-State Transmission Licensee shall not be
discharged from its liability on account of its failure to maintain the Standards
of Performance under these regulations if such failure can be attributed to the
negligence or deficiency or lack of preventive maintenance of the intra-state
transmission system or failure to take reasonable precaution which has
resulted in loss to the affected person.
10. Power to remove difficulties.— If any difficulty arises in giving
effect to any of the provisions of these Regulations, the Commission may, by
general or specific order, make such provisions not inconsistent with the
provisions of the Act, as may appear to be necessary for removing the difficulty.
11. Power to Amend.—The commission may, at any time after
consultation with the licensees and other persons likely to be affected add, vary,
alter, modify or amend any provisions of these regulations.
By order,
Rameshwar Pd. Das,
Secretary.
6
BIHAR GAZETTE (EXTRA) 10th OCTOBER 2019
SCHEDULE
I.
AC Transmission Line/ ICT/ Static VAr Compensator/ Series
Compensator/ HVDC (Back-to-Back Stations and Bi-Pole Links)/ Line
Rectors/ Bus Reactors Outage Details for the month of ________
Element
Name
Outage
Restoration
Duration of Outage
Attributable to
Reason of
Outage
%
Availability
Date
Time
Date
Time
Intra-State
Transmission
Licensee
Others
System
constraint/
Natural
calamity/
Militancy
Deemed
Available
Reason
of
Outage
Hrs:Min
Hrs:Min
Hrs:Min
Hrs:Min
II. Elements where restoration time has exceeded the standards
specified in Regulation 5 (b).
Element Name
Restoration time as specified
in Regulation 5 (b)
(in days)
Actual restoration time
(in days)
III. Details of compensation paid by the intra-State transmission
licensee
Element
Name
Violation of Regulation
5 (a)
Violation of Regulation 5
(b)
Compensation
paid (in Rs.)
%
Availability
prescribed
Actual %
Availability
Restoration
time
prescribed
(in days)
Actual
restoration
time
(in days)
Total
7
BIHAR GAZETTE (EXTRA), 10th OCTOBER 2019
IV. Data to be furnished by the intra-State Transmission Licensees
to SLDC
(1)
The Dependability Index defined as D=Nc/ (Nc+Nf)
Where Nc is the number of correct operations during the given
time interval and Nf is the number of failures to operate at
internal power system faults
(2)
The Security Index defined as S= Nc/(Nc+Nu)
where Nu is the number of unwanted operations.
(3)
The Reliability Index defined R= Nc/(Nc+Ni)
where Ni is the number of incorrect operations and is the sum of Nf
and Nu.
(4)
From above 1/S+1/D= 1/R+1
(5)
The number of trippings of each transmission element. Five or
more trippings of a transmission element in a month to be put on the
website by the intra-State Transmission Licensees and reported to the
Commission by SLDC
Note.—
1.
The data for these indices are presently prescribed for collection
by the System Operator.
2.
These indices shall be computed by the SLDC and furnished to
the Commission on monthly basis.
V.
Data to be compiled by the intra-State Transmission
Licensees
The restoration times for different types of failures of a
transmission line and failure of Inter-Connecting Transformer
(ICT) and reactor in the following format:
8
BIHAR GAZETTE (EXTRA) 10th OCTOBER 2019
Sl.
No.
Types of failures
Restoration Time
(Days)
A.
Elements of the Transmission line for Single Circuit (S/C), Double
Circuit (D/C) and Multi-Circuit (M/C) towers for each KV class separately
1.
Insulator failure
Terrain type
Plain
River bed
Hilly
(i) Insulator failure in single phase
(ii) Insulator failure in two phases
(iii) Insulator failure in three phases
2.
Tower after collapse by Emergency
Restoration System (ERS) for S/C, D/C and
M/C separately
3.
Tower after collapse without Emergency
Restoration System (ERS) for S/C, D/C and
M/C separately
4.
Tower damage (not collapse)
One arm damage
Two arms damage
5.
Snapping of phase conductor
Conductor snapping in single phase
Conductor snapping in two phases
Conductor snapping in three phases
6.
Failure of earth wire
7.
Insulator failure with conductor snapping
8.
Any other combination of failures
B.
Elements of the sub-station for each kV class separately
1.
Failure of Inter Connecting Transformers (ICTs)
Restoration of the failed ICT
Other major failures in ICTs
Single
phase
unit
Three phase
unit
(i) Replacement of faulty bushings
(ii) Replacement of failed/ blasted bushings
(iii) Replacement of faulty tap changers
2.
Failure of Reactors
Restoration of the failed reactor
By order,
Rameshwar Pd. Das,
Secretary.
————
PUBLISHED AND PRINTED BY THE SUPERINTENDENT,
BIHAR SECRETARIAT PRESS, PATNA.
Bihar Gazette (Extra) 1146—571+400—Egazette
Website: http://egazette.bih.nic.in