1.
Short title, Exten
1.1
The Code m
(6th Amend
REGISTERED
Bihar Gaze
XTRA ORDINARY
SHED BY AUTHORITY
26 PHALGUNA 1941(S)
TNA, MONDAY, 16TH MARCH 2020
TRICITY REGULATORY COMMISSION
ity Supply Code (6th Amendment), 20
--------------
NOTIFICATION
14th March 2020
No. 30/2016–01––In exercise of power
read with section 50,43(1), 44, 46, 47(4
6 of 2003) and all powers enabling in
of difficulties of various stakehold
Commission hereby makes the 6th ame
ly Code, 2007 which was originally i
Reg-6/2006-529 dated 31 December,
nary Bihar Gazette on 10 January
endment was published in Bihar Gazet
10, second amendment in Gazette No.
d amendment was published in Gazet
fourth amendment was published in G
15 and the 5th amendment was issued
ruary 2016.
Chapter- 1
GENERAL
nt, Commencement and Applicability
may be called the "Bihar Electricity Su
dment), 2020”.
NO. PT.-40
ette
N
20
r conferred
) and 56 of
this behalf
ers, Bihar
endment in
ssued vide
2007 and
2008. The
tte No. 603
120 dated
te No. 172
Gazette No.
in Gazette
y
upply Code
2
BIHAR GAZETTE (EXTRA) 18TH FEBRUARY 2020
1.2
It shall extend to the whole state of Bihar.
1.3
This Code shall come into force with effect from the date of
publication in Bihar Gazette.
1.4
It shall apply to all Distribution Licensees engaged in the
business of supplying electricity as covered under section 14
of the Electricity Act, 2003 and the consumers of electricity.
Chapter- 2
DEFINITION
2.
Amendment of Chapter 2 of the Code:
Clause 2.1 (ee) of definition shall be substituted by the
following:
“2.1(ee)- “Maximum demand” means the maximum demand of a
consumer during a billing month which shall be largest of the
Average amount of Kilovolt amperes (KVA) or Kilo watt (KW) or
Horse Power (HP), as the case may be, delivered to the consumer at
the point of supply during any consecutive 30 minutes period
recorded by the meter with the features of reading the Maximum
Demand in KW/KVA/HP directly in the billing month”.
Chapter- 3
SYSTEM OF SUPPLY AND CLASSIFICATION OF CONSUMERS
3.
Amendment of Chapter 3 of the Code:
Clause 3.4 shall be substituted by the following:
“3.4- The Supply Voltage for different contract demands shall be
normally as follows:-
Supply Voltage
Minimum Contract
Demand
Maximum Contract
Demand
230 volts
-
Upto 7 kW
400 volts
5kW & above (3 phase)
70 kW
11 KV
50kVA
1500 KVA
33 KV
500 kVA
15000 kVA
132 KV
7500 kVA
-
220 KV
10000 kVA
-
L.T Agriculture and L.T Industrial consumers of load between 2KW
& 5KW shall have option to avail supply at 230 Volts or 400 Volts.”
Chapter-4
NEW SERVICE CONNECTION
4.
Amendment of Chapter 4 of the Code:
Clause No. 4.11 shall be substituted by the following:
“4.11- Application for new connection, Enhancement/ Reduction of
load, change of name, change of category, shall be made online via
web portal of the concerned Discoms. The application may also be
made offline, in duplicate in the prescribed form, copies of which
shall be available free of cost from the local office of the Licensee.
The format of the application forms is provided in Annexure -1(LT
connection) and Annexure-2 (HT Connection). The licensee shall
post the application forms on its website. Photocopies of a blank
form or form downloaded from the website of the licensee may also
be used by the applicant and shall be accepted by the Licensee.
3
BIHAR GAZETTE (EXTRA), 16TH MARCH 2020
Any assistance or information required in filling up the form
should be given to the consumer by the licensee.”
Clause no 4.14(a) shall be substituted by the followings:
“4.14(a)- The Licensee shall issue the acknowledgement on receipt
of application at once on the spot or through email/mobile SMS
/website application portal and any shortcomings after verification
of the application and the attached documents shall be
communicated within three working day of receipt of application on
the email/mobile SMS / website application portal mentioning the
shortcomings.”
New Clause no 4.14(e) shall be added as:
“4.14(e)- In case where the transformer is required to be provided
and installed at the cost of the consumer and such consumer
requests Discom to provide and/or installs the transformer on
rental basis, Discom may consider providing and/or installing the
transformer, provided the same is sparable and feasible. The
monthly rent for such transformer shall be charged by the Discoms
at rate specified in the Tariff Order. Such transformer shall
normally be maintained by the Discom. However if the transformer
gets defective due to reasons attributable to the consumer viz
defect
in
consumer’s
installations,
overloading,
unbalanced
loading, generation of harmonic voltage/currents etc. then the cost
of the transformer shall be borne by the consumers.”
A new paragraph shall be added at the last of the Clause
4.19(e):
“In case where shifting of distribution infrastructure is required for
executing Government Projects involving public interest at large viz
for road construction or bridge/building construction etc. and
such shifting is to be done by the concerned department itself, the
supervision charge shall be limited to 2.5% of the estimated cost”.
Chapter -6
WIRING AND APPARATUS IN CONSUMER PREMISES
5.
Amendment of Chapter 6 of the Code:
Clause 6.1 shall be substituted by the following:-
“6.1- The work of wiring in the consumer's premises shall be
carried
out by a Licensed Electrical Contractor and should
conform to the
regulation framed under section 53 of the Act.
The materials used for wiring shall conform to the relevant
specifications of the Bureau of
Indian
Standards
or
its
equivalent. Wherever applicable the materials
used shall bear
ISI or IEC mark. As soon as the consumer's installation is
completed in all respects and tested by the consumer’s contractor,
the consumer should submit, the contractor’s test report to the
licensee. The test report form (Annexure-3) for this purpose shall
be submitted to the local office of the licensee.”
The following line in Clause 6.2 shall be deleted:
“As required by Rule 45 of the Indian Electricity Rules, 1956.”
Clause no. 6.3 of the code shall be deleted:-
4
BIHAR GAZETTE (EXTRA) 18TH FEBRUARY 2020
“6.3- Clause 6.3 has been deleted.”
The following lines of Clause 6.4 shall be deleted:
“Provision of rule 32 of the Indian Electricity Rules, 1956 should be
complied with in respect of consumer’s installation.”
Clause 6.37 shall be substituted by the following:-
“6.37- The connected load of the consumer who is not covered
under demand based tariff shall be determined as per the
procedure specified in Annexure-4 (Amended up to date) of this
Code.
For the consumer under demand based Tariff, the contract
demand shall be the demand contracted by the consumer. The
billing demand shall be as specified in the tariff orders. In case of
demand based tariff verification of contracted load will not be
required.”
Clause 6.39 shall be substituted by the following:-
“6.39- The connected load of all category of consumer not covered
under demand based tariff shall be the aggregate of the
manufacturer's rating plates of all energy consuming devices in the
consumer's premises which can be used simultaneously. This shall
be
expressed in kW, kVA or HP. During the process of
determination of connected load, if the manufacturer’s rating plate
is not available, the licensee may use suitable apparatus to
determine the load of such device. If, both air-conditioner and
room heater are found in the same premises, the load of the item
with higher rating shall be taken into account. Items stocked for
the purpose of sale/ repair or genuinely as spare shall not be
considered for the purpose of determination of connected load. The
licensee shall carryout periodic survey of streetlights and record
the type of lamps being used along with their load.”
Clause 6.40 shall be substituted by the following:-
“6.40- All installations not covered under demand based tariff are
subject to rating/re-rating by the licensee at its discretion. If the
consumer is not satisfied with the rating determined by the
licensee, he may get his apparatus rated by one of the recognized
engineering institutes approved by the licensee for determination of
load of apparatus. Both the consumer and the licensee may
appoint their respective representatives to be present during the
process of determination of load at the institute. The final report
issued by the institute shall be accompanied with the details of
test(s) conducted. The rating determined by the said institute shall
be final and acceptable to both the consumer and the licensee.”
Chapter – 7
SERVICE CONNECTION RELATED MATTERS
6.
Amendment of Chapter 7 of the Code:
Clause 7.4 (j) shall be substituted by the following:-
“7.4(j)- If on inspection of premises of a consumer having
connected load based tariff, the connected load is found to be in
excess over the contracted/sanctioned load, the licensee shall
5
BIHAR GAZETTE (EXTRA), 16TH MARCH 2020
issue a notice, without prejudice to any other action to which
he may be liable under sub-regulation 11 (1) of these code, and
inform the consumer to get additional connected load sanctioned
as per the tariff or limit the drawl as per sanctioned load.
In case the consumer does not respond to the notice within 30
days of issue of such notice to get additional load sanctioned as
per the tariff or limit drawl as per sanctioned load, the licensee
may disconnect the supply to the consumer after serving fifteen
days' notice.
However, the distribution licensee may revise and enhance
the sanctioned load as per the tariff of the consumer to the extent
of connected load found on inspection provided the consumer
agrees for the same.”
Clause 7.12(1)(a) shall be substituted by the following:-
“7.12(1)(a)- Details of alteration / modification / removal of the
electrical installation along with work completion certificate and
Test report from a licensed electrical contractor where alteration of
the installation is involved. This will be applicable only for
consumer not
covered under demand based tariff.”
The following proviso shall be added at the end of Clause
7.12(5):
“Provided that no verification of connected load shall be done in
case of demand based tariff.”
Clause 7.13(2) shall be substituted by the following:-
“7.13(2)- The compulsory period of availing supply from the date of
commencement of supply or initial period of agreement shall be
one year for all consumers. The licensee may modify the structure
of the agreement formats presently in use with the approval of the
Commission in order to meet any requirement that may arise as a
consequence of the provisions of this Code so that the format is
consistent with the Act and prevailing Rules, Regulations and the
provisions of this Code.”
Clause 7.14(1) shall be substituted by the following:
“7.14(1)- The agreement shall remain in force even after
completion of the initial period of agreement until it is terminated.
All L.T. category of consumers may terminate the agreement after
giving one month’s notice. For termination of agreement, a three
months' notice in case of HT and HTSS consumers and a six
months' notice in case of EHT & Railway Traction Services is
required.
However, if the agreement is to be terminated for reasons
whatsoever, before the expiry of initial period of agreement/
compulsory period, the consumer shall be liable to pay charges as
per tariff order for the remaining period of the compulsory period
or notice period as specified above, whichever is higher.
The licensee shall arrange for special meter reading, at a
mutually acceptable date, to facilitate preparation of the final bill of
the consumer. The agreement shall be terminated on the last day
6
BIHAR GAZETTE (EXTRA) 18TH FEBRUARY 2020
of the billing month and the licensee shall raise the final bill
accordingly."
Clause 7.15(1)(a) shall be substituted by the following:
“7.15(1)(a)- The licensee may take an initial security deposit from
the prospective consumer's equivalent to the estimated charges of
specific period as indicated in the table below:-
Sl.
No.
Nature of
consumer
No. of
Months
Remarks
1.
Agricultural
Three
Annual
average
to
be
estimate/considered.
2.
Seasonal
Two
Consumption
during
the
season of operation to be
estimated/ considered.
3.
Other Consumers
Two
Annual
average
to
be
estimated /considered.
Clause 7.15(2) shall be substituted by the following:
“7.15(2)- Consumer shall have the option to make advance
payment
and
in
such
event
security
amount
shall
be
proportionately fixed. The deposit shall be accepted in the form of
cash, cheque or draft in case of LT consumers and in the form of
draft or banker’s cheque in case of HT consumers. The deposit may
also be accepted through RTGS/NEFT or any other electronic mode
of payment.
The Licensee shall maintain separate a head of account of
such security deposits. On termination of the agreement, the
security deposit will be refunded to the consumer after adjustment
of the amount, if any, remaining payable by him.”
Clause 7.15(3) shall be substituted by the following:
“7.15(3)- The amount of the security deposit obtained from the
consumer will be reviewed by the licensee, annually on the basis of
consumption during the previous 12 months. The consumer shall
be required to pay an additional security deposit or shall get
refund of the security as the case may be based on his average
consumption during the period concerned and the tariff applicable
etc. If it exceeds or is lower than the amount of the security deposit
held by the licensee by 20% the security deposit shall be enhanced
to that extent rounded off to 10 rupees.”
CHAPTER- 9
BILLING
7.
Amendment of Chapter 9 of the Code:
Clause 9.19 shall be substituted by the following:
“9.19- The licensee may send bills to consumers by hand or
through email, SMS or other electronic medium. On a written
7
BIHAR GAZETTE (EXTRA), 16TH MARCH 2020
request from a consumer the licensee shall send the bill by
registered post and this expenses of delivery of bill shall be
recoverable from the consumers.”
By order of the Commission,
Rameshwar Prasad Das,
Secretary.
————