EX
PUBLI
(NO.PATNA 36) PATN
Biha
Vidyut Bh
No. BERC-Case
conferred by sub sectio
of sub section (2) of sec
of the Electricity Act, 20
in that behalf, the B
makes the following Reg
1.
Short Title, Comm
1.1 These Regulations
Commission (Mul
Regulations, 202
1.2 These Regulations
notification in the
1.3 These Regulations
2.
Scope and Extent
These Regulations sha
SLDC in the State of Bih
REGISTERED
XTRA ORDINARY
SHED BY AUTHORITY
5 MAGHA 1943(S)
NA, TUESDAY, 25TH JANUARY 2022
r Electricity Regulatory Commission
hawan-II, J.L. Nehru Marg, Patna 800 021
&&&&
NOTIFICATION
The 17th November 2021
No.-SMP-07/2021-03---In exercise
on (1) of section 181 and clauses (zd),
ction 181, read with sections 32, 61, 6
003 (36 of 2003) and all other powers
ihar Electricity Regulatory Commissi
gulations.
PART-I
PRELIMINARY
mencement and Extent.
shall be called the Bihar Electricity R
lti Year Transmission Tariff and SLDC
1.
s shall come into force from the dat
Official Gazette.
shall extend to the whole of the state o
t of Application
all apply to all the Transmission Lice
har
NO. PT.-40
2
of powers
(ze) and(zf)
62, and 86,
enabling it
ion hereby
Regulatory
C Charges)
te of their
of Bihar.
ensees and
2
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
2.1 These Regulations shall be applicable for determination of tariff in
all cases covered under these Regulations from 1st April 2022 and
onwards up to FY 2024-25 or till these Regulations are amended.
2.2 These Regulations shall be applicable where the cost based/
Aggregate Revenue Requirement (ARR) based tariff is determined by
the Commission.
2.3 These Regulations shall not be applicable whose tariff has been
discovered through tariff based competitive bidding in accordance
with the guidelines issued by the Central Government and adopted
by the Commission under Section 63 of the Act.
3.
Definitions
3.1
In these regulations, unless the context otherwise requires;-
1)
"Act" means the Electricity Act, 2003 (36 of 2003);
2)
“Accounting Statement” means for each Year, the following
statements, namely :—
(i)
balance sheet, prepared in accordance with BERC (Power
Regulatory Accounting) Regulations, 2018, with reference to each
licensed or regulated business separately, duly certified by the
statutory auditors;
(ii)
profit and loss account, prepared in accordance with BERC (Power
Regulatory Accounting) Regulations, 2018, with reference to each
licensed or regulated business separately, duly certified by the
statutory auditors;
(iii)
cash flow statement, prepared in accordance with BERC (Power
Regulatory Accounting) Regulations, 2018, with reference to each
licensed or regulated business separately, duly certified by the
statutory auditors;
(iv)
balance sheet, prepared in accordance with the form contained in
the Companies Act, 1956 or Companies Act, 2013, as applicable;
(v)
profit and loss account, complying with the requirements
contained in the Companies Act, 1956 or Companies Act, 2013, as
applicable;
(vi)
cash flow statement, prepared in accordance with the applicable
Accounting Standards of the Institute of Chartered Accountants of
India;
(vii) report of the statutory auditors ;
(viii) reconciliation statement, duly certified by the statutory auditors,
showing the reconciliation between the total expenses, revenue,
assets and liabilities, of the entity as a Company and the expenses,
revenue, assets and liabilities, separately for each business
regulated
by
the
Commission
and
unregulated
business
operations;
(ix)
cost records prescribed by the Central Government under the
Companies Act,1956 or Companies Act, 2013, as applicable;
together with notes thereto, and such other supporting statements
and information as the Commission may direct :
Provided that separate Accounting Statements shall be prepared
and submitted to the Commission for each licensed Business
3
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
in accordance with the Licence conditions, and for each
regulated Business :
Provided further that, in case separate Accounting Statements are
not submitted for each licensed Business in accordance with
the Licence conditions and for each regulated Business for
the Financial Year (FY) 2022-23 onwards, the Petitions filed
by the Transmission Licensee or SLDC, as the case may be,
may be rejected by the Commission after giving the
Petitioner a reasonable opportunity of being heard:
Provided, in Case of SLDC, if separate Accounting Statement is not
available, an allocation statement duly certified by the
Statutory Auditor is to be submitted
Provided also that the Transmission Licensee or SLDC, as the
case
may
be,
shall
submit
the
Statutory
Auditor’s
comments, observations and notes to Accounts, alongwith
the Accounting Statements, and a summary of the key
issues highlighted by the Statutory Auditor and the steps
taken to address them:
Provided also that, in respect of a Local Authority engaged in the
business of distribution of electricity, the Accounting
Statement shall mean the items mentioned above as
prepared and maintained in accordance with the relevant
statutes applicable to such Local Authority:
Provided also that till the SLDC remains a part of Bihar State
Power Transmission Company Limited (BSPTCL), separate
books of accounts for SLDC shall be maintained by the Bihar
State Power Transmission Company Limited and shall be
audited and certified by the statutory auditor
3)
“Audited accounts or Audited Accounting Statements” for the
purpose of licensed or regulated business shall mean (Audited)
Regulatory Accounts prepared in accordance with BERC (Power
Regulatory Accounting) Regulations, 2018.
4)
"Additional
Capitalisation"
means
the
capital
expenditure
actually incurred after the date of commercial operation of the
transmission system and admitted by the Commission after
prudent check subject to Regulation 19 provided herein after.
5)
"Aggregate Revenue Requirement" or "ARR" means the costs
pertaining to the licensed business which are permitted, in
accordance with these Regulations, to be recovered from the tariffs
and charges determined by the Commission;
6)
“Allocation Statement” means, for each Year, a statement in
respect of each of the Other Businesses of the Transmission
Licensee undertaken for optimum utilisation of its assets, showing
the amounts of any revenue, cost, asset, liability, reserve or
provision, etc., which has been charged from or to each such Other
Business together with a description of the basis of that charge ; or
determined by apportionment or allocation between different
4
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Businesses of the Transmission Licensee, together with a
description of the basis of the apportionment or allocation :
7)
"Allotted Transmission Capacity" means the power transfer in
MW between the specified point(s) of injection and point(s) of drawal
allowed to a long-term customer or a medium-term customer on the
intra-State transmission system under the normal circumstances
and the expression "allotment of transmission capacity" shall be
construed accordingly:
Provided that the Allotted Transmission Capacity to a long-term
transmission customer or a medium-term transmission
customer shall be sum of the generating capacities allocated
to the long-term transmission customer or the medium-term
transmission customer from the generating stations and the
contracted power, if any;
8)
"Auditor" means an auditor appointed transmission licensee or
SLDC as the case may be, in accordance with the provisions of
sections 224, 233B and 619 of the Companies Act, 1956 (1of1956),
as amended from time to time or Chapter X of the Companies Act,
2013 (18 of 2013) or any other law for the time being in force;
9)
"Authority" means Central Electricity Authority constituted under
section 70 of the Electricity Act, 2003.
10) "Availability" in relation to a transmission system for a given
period means the time in hours during which period the
transmission system is capable to transmit electricity at its rated
voltage expressed in percentage of total hours in the given period
and shall be calculated as provided in Appendix-II to these
Regulations.
11) "Base Year" means the financial year immediately preceding first
year of the control period and used for the purpose of these
Regulations;
12) “Balancing and Settlement Code” means such Code as may be
stipulated by the Commission, or by the SLDC with the approval of
the Commission, for the balancing of energy accounts and
settlement of differences among the users of the grid in the State of
Bihar
13) "Beneficiary(ies)"
(a) in relation to a Transmission Licensee, the Transmission
System Users.
(b) in relation to the SLDC, the Generators including RE
Generators with Long term Access, the Distribution Licensees and Open
Access consumers who utilise the Intra-State Transmission system for
transmission of electricity and / or utilise the distribution system of a
Licensee in the State for wheeling of electricity and/or avail the services
of the SLDC relating to scheduling and real-time grid operations, State
energy accounting, operation of pool account, etc.
14) "Books of Accounts" for the purpose of licensed or regulated
business shall mean Regulatory Books of Accounts drawn up in
5
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
accordance with BERC (Power Regulatory Accounting) Regulations,
2018
15) “Bulk Power Transmission Agreement” means an executed
Agreement that contains the terms and conditions under which a
Transmission System User is entitled to access to an intra-State
transmission system of a Transmission Licensee
16) "Change in Law" means occurrence of any of the following events:
(a) enactment, bringing into effect or promulgation of any new
Indian law; or
(b) adoption, amendment, modification, repeal or re-enactment of
any existing Indian law; or
(c) change in interpretation or application of any Indian law by a
competent
court,
Tribunal
or
Indian
Governmental
Instrumentality which is the final authority under law for
such interpretation or application; or
(d) change by any competent statutory authority in any condition
or covenant of any consent or clearances or approval or
licence available or obtained for the project; or
(e) coming into force or change in any bilateral or multilateral
agreement/treaty between the Government of India and any
other Sovereign Government having implication for the
generating station or the transmission system regulated under
these Regulations.
(f)
any change in taxes or duties, or introduction of any taxes or
duties levied by the Central or any State Government
17) “Charges” means payments to be collected by the Transmission
Licensee or SLDC for the services rendered by it.
18) "Commission" means the Bihar Electricity Regulatory Commission;
19) "Conduct of Business Regulations" means the Bihar Electricity
Regulatory Commission (Conduct of Business) Regulations, 2005,
and its amendments from time to time.
20) "Contracted Capacity" means the capacity in MW contracted by a
long-term Transmission System User as part of its long-term power
procurement plan through a power purchase agreement or
arrangement, and shall be equivalent to the deemed Transmission
Capacity Right of a Transmission System User as specified under
the Regulations of the Commission governing Transmission Open
Access.
21) "Control Period" means a multi year period normally comprising of
five financial years or as may be determined by the Commission, for
submission of forecast in accordance with these Regulations;
22) "Cut off date" means 31st March of the year closing after two years
of the year of commercial operation of the project, and in case the
project is declared under commercial operation in the last quarter
of a year, the cut-off date shall be 31st March of the year closing
after three years of the year of commercial operation:
Provided that the cut-off date may be extended by the Commission if it is
proved on the basis of documentary evidence that the capitalisation
6
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
could not be made within the cut-off date for reasons beyond the control
of the project developer;
23) "Date of Commercial operation" or "COD" in case of a
transmission system shall mean the date declared by the
Transmission Licensee from 00:00 hour of which an element of the
transmission system is in regular service after successful trial
operation for transmitting electricity and communication signal
from sending end to receiving end. Date of commercial operation in
relation to a communication system or element thereof shall mean
the date declared by the transmission licensee from 00:00 hour of
which a communication system or element is put into service after
completion of site acceptance test including transfer of voice and
data to respective control centre as certified by the respective State
Load Dispatch Centre.
Provided that where the transmission line or substation is
dedicated for evacuation of power from a particular
generating
station,
the
Generating
Company
and
Transmission Licensee shall endeavour to commission the
generating
station
and
the
transmission
system
simultaneously as far as practicable and shall ensure the
same through appropriate Implementation Agreement:
Provided further that in case a transmission system or an element
thereof is prevented from regular service for reasons not
attributable to the Transmission Licensee or its supplier or
its contractors but is on account of the delay in
commissioning of the concerned generating station or in
commissioning of the upstream or downstream transmission
system, the Transmission Licensee shall approach the
Commission through an appropriate application for approval
of the date of commercial operation of such transmission
system or an element thereof.
24) “De-capitalisation” means the reduction in Gross Fixed Assets
corresponding to the removal of assets as approved by the
Commission.
25) "Existing Project" means transmission project declared under
commercial operation from a date prior to notified date of these
tariff regulations by the Commission as per Regulation 1.2.
26) "Expenditure”
means
reasonable
and
prudently
required
expenditure incurred on the following:
a) salaries and wages of staff, welfare expenses excluding
management remuneration covered below;
b) Directors remuneration, fees, expenses including facilities;
c) salaries and wages of corporate office / registered office;
d) financing cost excluding penal interest / charges;
e) interest charges on loan(s) borrowed for capitalized assets;
f) interest on temporary accommodation to the extent of approved
unrealized arrears from the consumers
g) interest on working capital
7
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
h) Return on equity;
i) financing charges applicable to operational account;
j) interest on security deposits (except the security deposits held in
the form of Bank Guarantee) from transmission System Users;
k) Impact of variation in foreign exchange rate in case of foreign
currency loan taken with due approval and is not capitalised;
l) Depreciation
m) Rents, rates and taxes, other than all taxes relating to income /
profits;
n) Legal charges;
o) Auditor’s expenses, Auditor’s fees; auditor’s expenses; Payment
to Auditors in any other capacity or for any work which is
necessary to be got done from them in connection with audit;
p) Consultancy charges for work which cannot be done in house or
is uneconomical in doing in-house or is essential to be done from
outside sources;
q) Bad debts actually written off subject to Commission’s clearance;
r) Other expenses necessary which are ancillary or incidental to the
business of electricity except penalty etc levied under the Act or
any other law in force;
27) "Extended Life" means the life of a transmission system or element
thereof beyond the period of useful life, as may be determined by
the Commission on case to case basis;
28) "Financial Year" means a period commencing on 1st April of a
calendar year and ending on 31st March of the subsequent calendar
year;
29) "Force Majeure Event" for the purpose of these regulations means
the
event
or
circumstance
or
combination
of
events
or
circumstances including those stated below which partly or fully
prevents the transmission licensee to complete the project within
the time specified in the Capital Investment Approval, and only if
such events or circumstances are not within the control of the
transmission licensee and could not have been avoided, had the
transmission licensee taken reasonable care or complied with
prudent utility practices:
(a) Act of God including lightning, drought, fire and explosion,
earthquake, volcanic eruption, landslide, flood, cyclone,
typhoon, tornado, geological surprises, or exceptionally
adverse weather conditions which are in excess of the
statistical measures for the period for which data is available;
or
(b) Any act of war, invasion, armed conflict or act of foreign
enemy, blockade, embargo, revolution, riot, insurrection,
terrorist or military action; or
(c) Industry wide strikes and labour disturbances having a
nationwide impact in India and/or state wide impact in Bihar ;
8
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
30) “High Tension” (or “HT”) means all voltages defined as “high” or
“extra high” voltage under the applicable Rules and Regulations as
specified by the Central Electricity Authority
31) “Income” shall include all income from any sources but shall not
be limited to the following:
a) Gross receipts from transmission of energy or SLDC fees &
charges, as the case may be, excluding late payment
surcharge, if any, based on the orders of the Commission;
b) Rental of meters, plant, equipment and other apparatus hired
to the consumers;
c) Income from services to consumers by way of repair or any
sale or other service other than capital receipts;
d) Interest on investments, bank balances including fixed and
call deposits and any other income in the form of interest;
e) Profit on sale of assets;
f) Wheeling of energy;
g) Non tariff income;
h) Income from other business;
i) Any receipt or refund from other sources against any expense
or likely expense which has been earlier allowed as expense
in the tariff;
j) All other general receipts arising from and ancillary or
incidental to the business of electricity supply;
k) Other general receipts in terms of Act / Regulations including
use of assets for other business whether actually recovered or
not;
32) “Indian Governmental Instrumentality” means the Government
of India, State Government and any Ministry or Department or
Board or Agency or regulatory or quasi-judicial authority controlled
by Government of India or the Government of the State where the
Project is located
33) “Intra-State Transmission System” (or “InSTS”) means any
system for conveyance of electricity by transmission lines within the
area of the State of Bihar, and includes all transmission lines, sub-
stations and associated equipment of Transmission Licensees in the
State :
Provided that the definition of point of separation between a transmission
system and distribution system and between a Generating Station and
transmission system shall be guided by the Regulations notified by the
Central Electricity Authority under clause (b) of Section 73 of the Act
34) "Implementation Agreement" means the agreement, contract or
memorandum of understanding, or any such covenant, entered into
(i) between transmission licensee and generating station or (ii)
between transmission licensee and developer of the associated
transmission system for the execution of project in coordinated
manner;
35) "License" means a License granted by the Commission under
Section 14 of the Act;
9
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
36) "Licensed Business" means the functions and activities, which the
Licensee is required to undertake in terms of the License granted by
the Commission or as a deemed Licensee under the Act;
37) “Market operation function” means the functions of scheduling,
despatch, data acquisition, energy accounting and deviation
settlement, transmission loss calculation and apportionment,
operation of pool account and congestion charge account,
administering ancillary services, information dissemination and any
other functions assigned to the SLDC by the Act or Regulations or
Orders.
38) “Non-Tariff Income” means the income relating to the regulated
Business other than from Tariff, excluding any income from Other
Business.
39) "Operation and Maintenance expenses" or "O&M expenses"
means the expenditure incurred on operation and maintenance of
the transmission system including part thereof, and includes the
expenditure
on
man-power,
repairs,
maintenance
spares,
consumables, insurance and overheads.
40) "Original Project Cost " means the actual expenditure incurred by
the transmission licensee, as per the original scope of the project
up to the cut-off date as admitted by the Commission;
41) "Project" includes transmission system comprising of specified
transmission lines, sub - stations and associated equipment.
42) "Rated Voltage" means the manufacturer’s design voltage at which
the transmission system is designed to operate or such lower
voltage at which the line is charged, for the time being, in
consultation with the long – term transmission customer(s).
43) "State Government" means Government of Bihar.
44) “State Grid Code” means the Code specified by the Commission
under clause (h) of sub-section (1) of section 86 of the Act
45) “Transmission
Capacity
Rights”
means
the
right
of
a
Transmission System User to transfer power in MW, under normal
circumstances, between such points of injection and drawal as may
be set out in the Bulk Power Transmission Agreement.
46) “Transmission System User” for the purpose of these Regulations
means the Distribution Licensees and long-term Open Access
Users, but excludes partial Open Access Users
47) "Tariff" means schedule of charges for generation, transmission,
distribution and trading of electricity as well as various charges for
providing open access of electricity, as determined by the
commission from time to time.
48) "Transformer Failure" represents number of transformer failures
of a particular capacity within the transmission system as a
percentage of the total number of transformers in that capacity.
49) "Trial Run" or "Trial Operation" Trial operation in relation to a
transmission system or an element thereof shall mean successful
charging of the transmission system or an element thereof for 24
hours at continuous flow of power, and communication signal from
10
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
sending end to receiving end and with requisite metering system,
telemetry and protection system in service enclosing certificate to
that effect from State Load Dispatch Centre.
50) "Transmission Licensee" means a person who has been granted
licence for intra state transmission of electricity and includes any
person deemed to be a transmission licensee for intra – state
transmission of electricity.
51) "Transmission
Service
Agreement"
means
an
agreement,
contract, memorandum of understanding or any such covenant,
entered into between the transmission licensee and the long – term
transmission customer for the operational phase of the project.
52) "Transmission System" means a line with associated sub stations
or a group of lines inter – connected together along with associated
sub -stations and the term includes equipment associated with
transmission lines and sub-stations.
53) "Useful life" in relation to a unit of a Transmission System from the
COD shall mean 25 years for sub-station and 35 years for
transmission line.
Provided that the useful life for AC and DC substations and GIS for
which Notice Inviting Tender is floated on or after 01.04.2022 shall be
considered as 35 years from the date of COD
3.2 The words and expressions used and not defined in these
Regulations, but defined in other Regulations or the Act, shall have the
meanings assigned to them in the other Regulations or the Act
respectively.
3.3 The words
“Application” or “Petition” shall be interpreted
synonymously.
PART-II
GENERAL PRINCIPLES
4.
Multi Year Tariff Framework
4.1 The Commission shall determine the tariff for Transmission
business or charges of SLDC operations under a Multi-Year Tariff
framework with effect from April 1st of each financial year subject to
provisions under these Regulations.
4.2 The Multi Year Tariff frameworks shall be based on the following
elements, for calculation of Aggregate Revenue Requirement and
expected revenue from tariff and charges for Transmission Business and
Fees and Charges of SLDC:
i.
Control Period, before commencement of which a forecast of the
Aggregate Revenue Requirement and expected revenue from
existing tariff in case of transmission licensee or Fees and Charges
in case of SLDC, as the case may be, shall be submitted by the
applicant and approved by the Commission;
Provided
further
that
the
performance
parameters
whose
trajectories have been specified in these Regulations shall
form the basis of projection for the Aggregate Revenue
Requirement for the entire Control Period:
11
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
ii. A detailed Business Plan based on the Operational Norms and
trajectories of performance parameters specified in the MYT
Regulations, for each year of the Control Period, shall be submitted
by the applicant for the Commission's approval subject to
provisions under these Regulations;
iii. Based on the Business Plan, the applicant shall submit a petition
with the forecast of Aggregate Revenue Requirement and expected
revenue from existing tariff and charges for each year of the Control
Period, and the Commission shall approve the transmission tariff
and Fees and Charges in case of SLDC for each year of the Control
Period;
iv. The mechanism for pass-through of approved gains or losses in
truing-up on account of uncontrollable factors as specified under
Regulation 9 of these Regulations;
v. The mechanism for sharing of approved gains or losses in truing-up
arising out of controllable factors as specified under Regulation 10
of these Regulations;
5.
Business Plan
5.1 The Transmission Licensee or SLDC, as the case may be, shall file a
Business Plan, for the Control Period by a Petition in accordance
with BERC (Conduct of Business) Regulations, 2005 and its
amendments from time to time, by 15th September of the year prior
to the commencement of the Control Period and accompanied by
such fee payable, as specified in the BERC (Fees, Fines and
Charges) Regulations, 2019 as amended from time to time.
Provided that, application for approval of the Business Plan shall
not be required to be filled for the Control Period 2022-23 to
2024-25 and all requirement of business plan shall be
incorporated in the MYT petition of this control period.
5.2 Such Business Plan shall comprise but not be limited to
infrastructure
requirement
commensurate
with
load
growth
forecast and demand projections, capital investment plan, financing
plan and physical targets.
Provided the Business Plan shall take into account schemes
costing below the threshold limit to be notified separately
that are to be developed by the State Transmission Utility on
cost plus basis in accordance with the Tariff Policy notified
by Govt. of India.
Provided that the Commission may permit SLDC to create and
maintain a separate development fund for such purposes
and from such sources of income, as the Commission may
consider appropriate, on a Petition filed by SLDC.
Provided further that in case the Commission issues guidelines
and formats, from time to time, the same shall be adhered to
by the Transmission Licensee.
5.3
The Transmission Licensee or SLDC, as the case may be, shall
make assessment of infrastructure requirement and prepare capital
investment plan in accordance with BERC (Procedure for Filing Capital
12
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Investment and Capitalization Plan) Regulations, 2018 that will spill into
the year(s) under review and new projects that will commence and may
be completed within or beyond the tariff period.
Provided that all the new intra-state transmission projects costing
above a threshold limit to be notified separately, shall be developed
through Tariff Based Competitive Bidding.
Provided also that, It is the duty of the Licensee to ensure
optimization of investments to enhance efficiency, productivity and meet
performance standards prescribed by the Commission.
5.4 The Commission shall approve the infrastructure requirement and
preparation of capital investment plan in accordance with BERC
(Procedure for Filing Capital Investment and Capitalization Plan)
Regulations, 2018. The same would be considered for computation
of ARR, wherein the amount of electricity transmitted by the
Transmission System shall be projected considering the estimated
growth plan of its Beneficiaries and any plans of new transmission
system, based on network expansion plans within the State.
5.5
The Commission may also undertake a detailed review of the
actual works compared with the works approved in the previous
Tariff Order while approving the capital expenditure for the
ensuing year.
5.6 The Transmission Licensee shall normally get prior approval of every
capital investment. In case the capital expenditure is required for
emergency work arisen due to unforeseen circumstances, the
Licensee may take up the work upto Rs.20 Crore prior to receiving
the approval from the Commission provided the emergent nature of
the scheme has been certified by its Board of Directors or by the
Authority delegated by the Board of Directors.
5.7 The Licensee shall submit an application showing detailed
justification along with supporting documents for emergent nature
of expenses within 15 days of occurrence of cause for such
emergent work, seeking post facto approval by the Commission.
5.8 Beneficiaries contribution towards cost of capital asset shall be
treated as capital receipt and credited in current liabilities until
transferred to a separate account on Commissioning of the assets.
5.9 An amount equivalent to the depreciation charge on such assets for
the year shall be appropriated from this account as income to the
statement of profit and loss over the useful life of the asset.
6.
Specific trajectory for certain variables
6.1 The Commission shall stipulate a trajectory while approving the
Business Plan, for certain variables having regard to the reorganization,
restructuring and development of the electricity industry in the State:
Provided that the variables for which a trajectory may be stipulated
shall include, but are not limited to, Capitalization Schedule
(Timely completion of Project as per original award without
cost overrun and Time overrun), Operation & Maintenance
expense norms, transmission system availability, and
transmission losses.
13
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
6.2 In case the Commission has approved the business plan by 31st
October of current year, the trajectory stipulated by the Commission in
the order approving the Business Plan submitted by the applicant, shall
be incorporated by the applicant, in its forecast of Aggregate Revenue
Requirement and/or expected revenue from tariff and charges under
these Regulations.
7.
Annual Review of Performance and True-up
7.1 Where the Aggregate Revenue Requirement and expected revenue
from tariff and charges of a Transmission Licensee or SLDC, as the case
may be, are covered under a Multi-Year Tariff framework, such
Transmission Licensee or SLDC shall be subject to an annual review of
performance and True-up during the Control Period in accordance with
these Regulations.
8.
Controllable and uncontrollable factors:
8.1 The “uncontrollable factors” shall comprise but not limited to the
following factors which are beyond the control of, and could not be
mitigated by the applicant:
(a)
Force Majeure events, such as acts of God, war, fire and natural
calamities.
(b) Change in law;
(c) Taxes and Duties;
8.2 The “controllable factors” shall comprise but not limited to the
following factors which are within the control of, and are attributable to
the applicant:
(a)
Variations in Transmission System availability;
(b)
Variations in capital expenditure and Capitalization on account of
time and/or cost overruns/ efficiencies in the implementation of a capital
expenditure project not attributable to an approved change in scope of
such project, change in statutory levies or force majeure events;
(c) Variation in Interest and Finance Charges, Return on Equity, and
Depreciation on account of variation in capitalisation as specified in
clause (b) above ;
(d) Variation in performance parameters;
(e)
Variations in Return on Equity (RoE), depreciation and working
capital requirements. However, if the Commission is satisfied that the
variation in the working capital requirement is attributable to any
uncontrollable factors, the same may be considered as uncontrollable
factor.
(f)
Variation in operation & maintenance expenses, except those
attributable to directions of the Commission or to change in Government
policy/law.
(g) Failure to meet the standards specified in the Standards of
Performance Regulations, except where exempted;
9.
Mechanism for pass-through of gains or losses on account of
uncontrollable factors
9.1
The approved aggregate gain or loss to the Licensee or SLDC,
as the case may be, on account of uncontrollable factors shall
be a pass through, as an adjustment in the tariff of the
14
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Licensee or SLDC, as the case may be, as specified in these
Regulations and as may be determined in the Order of the
Commission passed under these Regulations..
9.2
The Licensee or SLDC, as the case may be, shall submit such
details of the variations between actual expenses incurred
and revenue earned and the figures approved by the
Commission along with the detailed computations and
supporting documents as may be required for verification by
the Commission.
10. Mechanism for sharing of gains or losses on account of
controllable factors
10.1 The approved aggregate gain or loss to the Licensee or SLDC, as
the case may be, on account of controllable factors shall be dealt with
separately for aggregate gain and aggregate loss in the following manner:
(a) Aggregate gain:
(i) 50% of the amount of such gain shall be a pass through as an
adjustment in the tariff of the Licensee or SLDC, as the case may be, as
specified in these Regulations and as may be determined in the Order of
the Commission passed under these Regulations;
(ii) The balance 50% of the amount of such gain shall be on
account of Licensee or SLDC, as the case may be, and such amount
shall be utilized at the discretion of Licensee or SLDC, as the case may
be.
(b) Aggregate Loss:
(i) 50% of the amount of such loss shall normally be a pass
through as an adjustment in the tariff of the Licensee or SLDC, as the
case may be, as specified in these Regulations and as may be determined
in the Order of the Commission passed under these Regulations,
provided the Commission is satisfied that such loss is not on account of
deliberate action of the Licensee or SLDC, as the case may be;
(ii) The balance 50% of the amount of such loss shall be on
account of Licensee or SLDC and shall be absorbed by the Licensee or
SLDC, as the case may be.
Explanation: - If the State Government is providing resource gap
grant, Aggregate Loss shall be reduced by that amount for the purpose of
computation of Aggregate Loss to be qualified for a pass through.
10.2 The Licensee and SLDC, as the case may be, shall submit such
details of variation for sharing of approved aggregate gain or loss on
account of controllable factors along with the detailed computations and
supporting documents as may be required for verification by the
Commission.
Explanation: For the purpose of variation for sharing of approved
aggregate gain or loss on account of norms based expenditure, variation
will be calculated as a difference between normative expenditure as re-
calculated in truing up and actual expenses booked in the audited books
of accounts.
15
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
10.3 In case, there are other regulations which specifies for
incentive/disincentive, gains/losses will not be shared under this
regulation.
PART-III
PROCEDURE
11. Procedures relating to making of an application for approval of
Business plan and for determination of Tariff
11.1 An application (alongwith soft copy) for approval of the
Business Plan shall be made by 15th September of the year prior to the
commencement of the Control Period, in accordance with the BERC
(Conduct of Business) Regulations, 2005 and its amendments from time
to time, and accompanied by such fee payable, as specified in the BERC
(Fees, Fines and Charges) Regulations, 2019 as amended from time to
time.
Provided that the Commission may conduct a Technical Validation
Session prior to admission of the Petition.
Provided further that, application for approval of the Business Plan
shall not be required to be filled for the Control Period 2022-23 to 2024-
25 and all requirement of business plan shall be incorporated in the MYT
petition of this control period.
11.2 The Transmission Licensee in its Business Plan filings shall
submit and propose the trajectory for the achievement of quality targets.
The Commission shall specify the targets for each parameter. The
Transmission Licensee shall submit its performance on each parameter
in the form and manner specified by the Commission.
The Business Plan shall be for the entire control period and shall
inter-alia, contain:
(a)
Capital Investment Plan
(b)
The appropriate capital structure and cost of financing
(interest on debt) and return on equity, terms of the existing loan
agreements, etc;
(c)
Operation and Maintenance (O&M) expenses: This shall
include the costs estimated for the Base Year, the actual expenses
incurred in the previous control period and the projected values for each
year of the Control Period based on the proposed norms for O&M cost,
including indexation and other appropriate mechanisms;
(d)
Depreciation: Based on the original cost of the fixed assets of
the corresponding year, capitalisation schedules for each year of the
Control Period and at the rate not exceeding the rate specified by the
Central Electricity Regulatory Commission;
(e)
Performance
Targets:
A
set
of
targets
proposed
for
controllable
items
such
as
availability
of
transmission
system,
transmission losses, transformer failure rate, and any other parameters
for quality of supply. The targets shall be consistent with the Capital
Investment Plan proposed by the Transmission Licensee;
(f)
Proposals for Non-Tariff Income with item-wise description
and details;
(g)
Proposals in respect of income from Other Business;
16
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
(h)
Other Information: This shall include any other details
considered appropriate by the Transmission Licensee for consideration
during determination of tariff; and
11.3 An application (alongwith soft copy) for determination of
tariff and charges shall be made by 15th November every year, for Truing
up of expenses of previous years, for Annual Performance Review (APR) of
the Aggregate Revenue Requirement (ARR) for the current year and
determination of ARR and transmission tariff or SLDC charges for the
ensuing years of the control period. The application should contain the
data
relating
to
each
item
of
the
ARR
supported
with
the
information/data in the formats Form no-SI to Form no-P12 appended to
these Regulations, and accompanied by such fees as may be specified
under the BERC (Fees, Fines and Charges) Regulations, 2019 as
amended from time to time. All the information as required in the
formats appended to these Regulations along with justification shall be
provided in the main petition.
Provided that the Commission may require submission of
additional information/data required for determination of ARR and tariff.
11.4 The filings for Transmission Tariff shall inter-alia contain but are
not limited to the following:
(a) The Transmission System or network usage forecast for each year
of the Control Period, consistent with the Business Plan;
(b) Proposals for transmission tariff design for each year of the Control
Period, including the losses to be charged and the procedure
thereof;
(c)
Proposal for reactive energy charges;
(d) Expected Revenue from the Licensed Business, Non-Tariff Income
and income from Other Business and other matters considered
appropriate by the Transmission Licensee.
11.5 The petition for determination of tariff or SLDC charges shall
be accompanied by information for the previous year, current year (RE)
and the ensuing years of the entire control period.
Provided that the application shall be accompanied where relevant,
by a detailed tariff revision proposal and how such revision would meet
the gap, if any, in Aggregate Revenue Requirement for each year of the
Control Period.
Provided further that the information for the previous year shall be
based on audited accounts and in case audited accounts for previous
year are not available, audited accounts for the immediately preceding
year should be filed along with provisional books of annual (regulatory)
accounts for the previous year adopted by the Board of Directors of the
licensee company or SLDC, as the case may be.
11.6 The Transmission Licensee or SLDC as the case may be shall
along with the aforesaid petition submit a statement on the status of
compliance of directives, if any, issued by the Commission in its last
tariff order.
11.7 The Commission may seek clarification and additional
information on inadequacies in the application, if any, within 14 days or
17
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
as may be practicable, of filing of the application for approval of the
Business Plan and application for determination of tariff, as the case may
be.
11.8 The Transmission Licensee shall respond within the next 10
days to the Commission with all clarification and information as
required.
11.9 Upon receipt of a complete application accompanied by all
requisite information, particulars and documents in compliance with all
the requirements specified in these Regulations, the application for
approval of the Business Plan and application for determination of tariff,
as the case may be, shall be deemed to be received and The Commission
shall admit the application for approval of the Business Plan and
application for determination of tariff, as the case may be, within seven
days or as may be required, of submission of response to the
clarifications, if any, by the Transmission Licensee or SLDC, as the case
may be.
11.10 The Commission or the Secretary or the designated Officer
shall intimate to the applicant with the abridged form of application for
publication of public notice in the daily newspapers. In case of non-
submission or delay in submission of additional information, the
Commission may take suo-motu decision to formulate this abridged form
of application as it deem appropriate.
11.11 The applicant shall, within three (3) days of the intimation
given to him in accordance with Regulation 11.10, publish a notice
inviting suggestions and objections from the public, in at least two (2)
English and two (2) Hindi language daily newspapers widely circulated in
the area to which the application pertains, outlining the proposed
Business Plan or the proposed ARR and tariff, as the case may be, and
such other matters as may be stipulated by the Commission.
Provided that the applicant shall make available a hard copy
of the complete application, to any interested party, at such locations
and at such rates as may be stipulated by the Commission:
Provided further that the applicant shall also put up on its
internet website, in downloadable spreadsheet format showing detailed
computations, the application made to the Commission along with all
regulatory filings, information, particulars and documents in the manner
so stipulated by the Commission:
Provided further that the web-link to the information
mentioned in the second proviso above shall be easily accessible,
archived for downloading and shall be prominently displayed on the
applicant's internet website:
Provided also that the applicant may not provide or put up
any such information, particulars or documents, which are confidential
in nature, with the prior approval of the Commission.
Explanation
–
for
the
purpose
of
this
Regulation,
the
term
“downloadable spreadsheet format” shall mean one (or multiple, linked)
spreadsheet software files containing all assumptions, formulae,
18
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
calculations, software macros and outputs forming the basis of the
application.
11.12 The procedural aspects pertaining to the Petition contained
in this Regulation shall apply only to such an extent as may be required
by the Commission having regard to the circumstances of an individual
case, to,-
(a) a Petition filed by a Transmission Licensee under Section 36 of
the Act;
(b) a Petition filed by the SLDC under section 32 of the Act
11.13 Notwithstanding anything contained in these Regulations, in
case of delay/ non-submission of the application for approval of the
Business Plan and application for determination of tariff, as the case may
be, the Commission may initiate suo-motu proceedings mandating the
filing of the said applications.
Provided that in the event of the licensee not filing the application
despite the aforesaid proceeding, the Commission may on its own, decide
the tariff based on previous year’s tariff details and after incorporating
suitable adjustments. However before issuing tariff order under such
circumstances, comments/ suggestions/ objections from the public and
stake holders including the licensee will be invited and same will be
considered for the tariff order.
Provided further that the Commission may also pass directions
under Section 129 and/or Section 142 of the Act, if required.
12. Order approving the Business Plan and Tariff Order
12.1 An Order approving with such modifications or such
conditions as may be specified in that order or rejecting the Business
Plan shall, as far as practicable, be issued before the filing of tariff
petition separately or with the tariff order as the Commission may deem
fit and practicable.
12.2 The Commission shall, within one hundred and twenty (120)
days from receipt of a complete application for determination of ARR and
tariff and after considering all suggestions and objections received from
the public and after hearing all stakeholders and general public:-
(a) issue a Tariff Order accepting the application with such
modifications or such conditions as may be specified in that Order;
(b) reject the application for reasons to be recorded in writing, if such
application is not in accordance with the provisions of the Act and
the Rules and Regulations made there under or the provisions of
any other law for the time being in force:
12.3 An applicant shall be given a reasonable opportunity of being
heard before rejecting its application referred to under regulation 12.1
and 12.2 above.
12.4 The applicant shall publish the tariff approved by the
Commission within seven days of issue of tariff order in at least two (2)
English and two (2) Hindi daily newspapers having wide circulation in
the area of supply of the applicant and shall put up the approved tariff or
charges on its internet website.
19
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
12.5 The tariff so published shall be in force from the date
specified in the said Order and shall, unless amended or revised,
continue to be in force for such period as may be stipulated therein.
13. True-Up and Annual Performance Review
The Commission shall True-Up expenses of the previous year either
as part of the Tariff order or issue Order/s for True-Up of expenses
preceding the Tariff order of ensuing year.
(a) An order for True-Up of expenses shall be issued on annual basis.
(b) An order for True-Up of expenses shall be on the basis of expense
estimates made in the beginning of the year under consideration,
actual expenses booked in the audited books of accounts of the
Transmission Licensee or SLDC, as the case may be, for the year,
and after prudence check of data by the Commission.
(c) Where audited books of account are not available at the time of
true-up, provisional books of annual (regulatory) accounts duly
approved by the Board of Directors of the applicant company shall
be used for the provisional True-up process.
(d) The Commission shall undertake review of estimates of expenses for
the current year as a part of the tariff order on the basis of the
actual expenses incurred during the period April – September of the
current year and corresponding figures in the order for Annual
Revenue Requirement (ARR) of the current year approved by the
Commission.
(e) Estimates of expenses for the ensuing year shall be on the basis of
corresponding figures in the order for True-up of expenses of the
previous year and Annual Performance Review or Tariff Order of the
current year, as the Commission may consider reasonable and
deem fit.
(f) Notwithstanding anything contained in regulation 4 of these
Regulations, the Revenue gap/surplus arising out of Truing up
shall be considered by the Commission while determining the ARR
of
ensuing
year(s).While
approving
adjustments
towards
revenue/expenses in future years, arising out of Truing up
exercises, the Commission may allow the carrying costs as
determined by the Commission of such expenses/revenues.
However the revised estimated gap/surplus as a result of APR may
or may not be passed in the ARR of ensuing year.
14.
Adherence to Tariff Order
14.1 If a Transmission Licensee recovers a price or charge
exceeding the tariff determined under Section 62 of the Act and in
accordance with these Regulations, the excess amount shall be payable
to the person who has paid such price or charge, along with interest
equivalent to the Bank Rate of the Reserve Bank of India without
prejudice to any other liability that may be incurred by such
Transmission Licensee.
14.2 The Transmission Licensee shall submit periodic returns as
may be required by the Commission, containing operational and cost
20
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
data to enable the Commission to monitor the implementation of its
Order.
PART-IV
NORMS OF OPERATION
15. Charges for Auxiliary Energy Consumption in the Sub – Station
The charges for auxiliary energy consumption in the Sub Stations
for the purpose of air – conditioning, lighting, technical consumption etc
shall be borne by the transmission licensee as part of normative
operation and maintenance expenses.
Provided that for consumption in the Sub Stations for the
purpose of air – conditioning, lighting, technical consumption etc.,
transmission licensee shall get an electric connection from the concerned
distribution licensee and pay charges to the distribution licensee as per
the applicable retail tariff.
16. Normative Annual Transmission System Availability Factor
(NATAF):
16.1 The Normative Annual Transmission System Availability Factor for
recovery of full transmission charges shall be as under:
(a) For full recovery of Annual Transmission Charges-
(i)
AC System
98%
(ii)
HVDC System
95%
(b) For Incentive consideration-
(iii)
AC System
98.5%
(iv)
HVDC System
97.5%
Provided that recovery of full annual transmission charges below
the target availability shall be on a pro rata basis. At zero availability, no
transmission charges shall be payable
16.2 The actual availability shall be calculated in accordance with the
procedure provided in Appendix-II to these Regulations and shall be
certified by the State Load Despatch Centre (SLDC) as per the format
specified in Appendix -I of these Regulations.
16.3 The Transmission Licensee shall be entitled to incentive on
achieving annual availability beyond the target availability, in accordance
with the following formula :-
Incentive = Annual Transmission Charges x (Annual availability achieved
– Target Availability) / Target Availability;
Where,
Annual transmission Charges shall correspond to Aggregate Revenue
Requirement for each year of the Control Period for the particular
Transmission Licensee within the State:
Provided that no incentive shall be payable above the availability of
99.75 % for AC system and 98.5 % for HVDC system:
17. Quality of Supply
17.1 The Commission shall monitor the following Quality of Supply
parameters during the Control Period:
(a) Transmission System Availability
21
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
(b) Transformer Failure,
18. Safety Standards
18.1 The Transmission Licensee shall develop a Safety Manual and
follow procedures to maintain at least minimum safety standards during
construction, operation, etc. in line with the provisions of Section 53 of
the Act
19. Additional Capitalisation:
(1) The following capital expenditure which is within the original scope
of work and actually incurred after the date of commercial operation and
upto the cut-off date may be admitted by the Commission, subject to
prudence check:
(i)
deferred liabilities
(ii)
works deferred for execution
(iii)
Initial spares shall be capitalised as a percentage of the Plant and
Machinery cost upto cut-off date, subject to following ceiling norms:
a)
Transmission line - 1.00%
b)
Transmission Sub-station (Green Field) - 4.00%
c)
Transmission Sub-station (Brown Field) - 6.00%
d)
Series Compensation devices and HVDC Station - 4.00%
e)
Gas Insulated Sub-station (GIS) - 5.00%
f)
Communication system- 3.50%
Provided that once the project is commissioned, the cost of initial
spares shall be restricted on the basis of plant and machinery cost
corresponding to the project at the time of truing up.
(iv)
liabilities in connection with implementation of award of arbitration
or compliance of the order or decree of a court, and
(v)
on account of change in law
Note: (a) original scope of work along with estimates of expenditure shall
be submitted to the Commission along with application for tariff.
(b) a list of the deferred liabilities and works deferred for execution
shall also be submitted along with the application for determination of
tariff after the date of commercial operation of the transmission system.
(2) Subject to clause (3) of this regulation, the capital expenditure
of the following nature actually incurred after the cut-off date may be
admitted by the Commission, subject to prudent check.
(i)
deferred liabilities relating to work / services within the
original scope of work
(ii)
liabilities in connection with implementation of award of
arbitration or compliance of an order or decree of a court
(iii)
on account of a change in law, and
(iv)
any additional works / services which have become
necessary for efficient and successful operation of the project, but not
included in the original project cost.
(3)
Any expenditure incurred on minor items / assets bought
after the cut off date like tools and tackles, personal computers,
furniture, air-conditioners, voltage stabilizers, refrigerators, coolers, fans,
TV, washing machine, heat convectors, mattresses, carpets etc. shall not
be considered for additional capitalisation for determination of tariff with
22
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
effect from notified date of the tariff regulations by the Commission as
per Regulation 1.2
Note: The list of items is illustrative but not exhaustive.
(4) Impact of additional capitalisation on tariff, may be considered
during truing up of each financial year of the control period.
Note:
(1) Any expenditure admitted on account of committed liabilities within
the original scope of work and the expenditure deferred on techno-
economic grounds but falling within the original scope of work shall
be serviced in the normative debt equity ratio specified in these
Regulations.
(2) Any expenditure on replacement of old asset shall be considered
after writing off the entire value of the original asset from the
original capital cost.
(3) Any expenditure admitted by the Commission for determination of
tariff on account of new works not in the original scope of work shall
be serviced on normative debt – equity ratio specified in these
Regulations.
(4) Any expenditure admitted by the Commission for determination of
tariff on renovation and modernisation or life extension shall be
serviced on normative debt –equity ratio specified in these
Regulations after writing off the original amount of the replaced
asset from the original capital cost.
PART-V
FINANCIAL PRINCIPLES
20. ARR for Transmission Business
20.1 Financial Prudence-
The Transmission Licensee or SLDC ,as the case may be, shall
manage its finances in an optimum and prudent manner
Provided that the Commission may disallow a part of the Aggregate
Revenue Requirement, as an efficiency measure, if it finds the exercise of
such prudence to have been deficient
Provided also that, in case its payment obligations to other entities
are not regularly met, the Transmission Licensee or SLDC, as the case
may be, shall provide justification for such shortfall with reference to its
cash flow statement.
20.2 The financial prudence with respect to capital expenditure
shall be assessed in terms of the following parameters:—
(a) mechanism put in place for monitoring the physical progress of
projects with respect to their original schedule;
(b) optimum drawal of loans in accordance with the physical
progress of the capital expenditure schemes, and efficient utilisation of
such loans;
(c) in case the actual capital expenditure or capitalisation exceeds
10% of that approved by the Commission, the Transmission Licensee or
SLDC, as the case may be, shall submit detailed justification for such
excess along with its Petition for True-up ;
23
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
(d) in case any scheme has not been commenced during the year
despite the Commission’s approval, detailed justification shall be
submitted along with the Petition for True-up.
20.3 The Aggregate Revenue Requirement for the Transmission Licensee
or SLDC business, as the case may be, for each year of the Control
Period shall contain but not limited to the following items:
(a) Operation and Maintenance expenses;
(b) Return on Equity;
(c) Depreciation
(d) Interest and finance charges on loan capital
(e) Interest on working capital
(f) Contingency Reserve;
(g) Bad debts, if any
(h) Non-Tariff Income
(i) Income from Other Business.
(j) Revenue from short-term transmission charges
21. Operation and Maintenance Expenses
(a) The Commission shall stipulate a separate trajectory of norms for
each of the components of O&M expenses viz., Employee cost,
Repair and Maintenance (R&M) expense and Administrative and
General (A&G) expense.
Provided that such norms may be specified for a specific
Transmission Licensee or a class of Transmission Licensees.
(b) Norms shall be defined in terms of number of personnel per ckt/km
(for different categories of transmission lines for e.g. 400 KV, 220
KV, 132 KV etc. Lines) and number of personal per bay (for different
categories of bay for e.g. 400 KV, 220 KV, 132 KV etc. Bays) along
with annual expenses per personnel for Employee expenses;
combination of A&G expense per personnel and A&G expense per
substation for A&G expenses and R&M expense as percentage of
gross fixed assets for estimation of R&M expenses.
(c) One-time expenses such as expense due to change in accounting
policy and arrears paid due to pay commission recommendation
shall be excluded from the norms in the trajectory.
(d) The unforeseen expenses beyond the control of the Transmission
Licensee such as pay revision, shall be excluded from the norms in
the trajectory.
(e) The One-time expenses and the expenses beyond the control of the
Transmission Licensee shall be allowed by the Commission over
and above normative Operation & Maintenance Expenses after
prudence check.
(f) The norms in the trajectory shall be specified over the control
period with due consideration to productivity improvements.
(g) The norms shall be determined at constant prices of base year and
escalation on account of inflation shall be over and above the
baseline.
Provided that for the purpose of escalation based on Wholesale
Price Index(WPIn) and Consumer Price Index(CPIn), WPIn is to be
24
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
computed based on the average yearly inflation derived based on the
monthly Wholesale Price Index of the respective past three financial years
(including the year of Truing-up) as per the Office of Economic Advisor
Ministry of Commerce & Industry Government of India and CPIn is to be
computed based on the average yearly inflation derived based on the
monthly Consumer Price Index for Industrial Workers (all-India) of the
respective past three financial years (including the year of Truing-up) as
per the Labour Bureau Government of India, at the time of filing of
Petition.
Provided that in case the average yearly inflation derived based on the
monthly CPI and WPI indices is negative for a particular year, the same
will be excluded from the computation of yearly inflation
(h) The Transmission Licensee specific trajectory of norms shall be
identified by the Commission on the basis of absolute and relative
analysis.
(i) In absolute analysis, Transmission Licensee’s audited accounts of
operations for last three years, expenses claimed for control period,
historically approved cost, and prudence check shall be used by the
Commission to estimate values of norms.
(j) In relative analysis, performance parameters of other Transmission
Licensees within the same state or in other states, shall be
considered by the Commission to estimate norms.
Provided that other Transmission Licensees so chosen shall
have similar profile as that of the Transmission Licensee under
consideration in terms of consumer mix, type of license area (city, state,
etc.) type of substation, transmission networks, etc.
(k) Suitable average of outcomes of absolute and relative analysis shall
be taken by the Commission to fix the norms over the control
period for the Transmission Licensee.
21.1 Employee Cost
Employee cost shall be computed as per the approved norm
escalated by consumer price index (CPI), adjusted by provisions for
expenses beyond the control of the Transmission Licensee and one time
expected expenses, such as recovery/adjustment of terminal benefits,
implications of pay commission, arrears and Interim Relief, governed by
the following formula:
EMPn = (EMPb * CPI inflation) + Provision
Where:
EMPn : Employee expense for the year n
EMPb : Employee expense as per the norm
CPI inflation: is the average increase in the Consumer Price Index (CPI)
for immediately preceding three years
Provision: Provision for expenses beyond control of the Transmission
Licensee and expected one-time expenses as specified above.
Till the norms are specified by the Commission the employee cost shall
be determined on the basis of actual historical cost.
25
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
21.2 Repairs and Maintenance (R&M) Expense
Repairs and Maintenance expense shall be calculated as percentage
(as per the norm determined) of Opening Gross Fixed Assets excluding
land cost for the year governed by following formula:
R&Mn = Kb * GFAn
Where:
R&Mn : Repairs & Maintenance expense for nth year
GFAn : Opening Gross Fixed Assets for nth year
Kb : Percentage point as per the norm
21.3 Administrative and General (A&G) Expense
A&G expense shall be computed as per the norm escalated by
wholesale price index (WPI) and Consumer Price Index (CPI) in the ratio
60:40 and adjusted by provisions for confirmed initiatives (IT etc.
initiatives as proposed by the Transmission Licensee and validated by
the Commission) or other expected one-time expenses, and shall be
governed by following formula:
A&Gn = (A&Gb * WPI inflation) + Provision
Where:
A&Gn: A&G expense for the year n
A&Gb: A&G expense as per the norm
WPI inflation: is the average increase in the Wholesale Price Index (WPI)
for immediately preceding three years
Provision: Cost for initiatives or other one-time expenses as proposed by
the Transmission Licensee and validated by the Commission. Till the
norms of A&G expenses is specified by the Commission, the actual
historical cost will be considered for determination of A&G expenses.
22. Return on Equity
(a) Return on equity shall be computed on 30% of the capital base or
actual equity, whichever is lower:
Provided that assets funded by beneficiary contribution,
capital subsidies/ grants and corresponding depreciation shall not form
part of the capital base. Actual equity invested in the Transmission
Licensee or SLDC, as the case may be, as per book value shall be
considered as perpetual and shall be used for computation in this
Regulation:
Provided further that the premium if any raised by the Licensee while
issuing share capital and investment of internal resources created out of
its free reserves, for the funding of the Scheme, shall be reckoned as paid
up capital for the purpose of computing return on equity, provided such
premium amount and internal resources are actually utilized for meeting
the capital expenditure of the transmission system, and are within the
ceiling of 30% of capital cost approved by the Commission.
(b) The return on the equity invested shall be allowed from the date of
start of commercial operation and after put to use:
(c) Return on equity shall be computed at the rate of 15.5% for the
project which is commissioned w.e.f. 01.04.2015 and further
incentive equivalent to 0.5% will be allowed in the form of RoE, if
the project is completed within schedule as per the Annexure A or
26
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
original schedule period as the case may be. However, Return on
Equity for the project commissioned prior to 01.04.2015 shall be
allowed at the rate of 14%.
23. Depreciation
(i) Depreciation shall be calculated for each year of the control period
on the original cost of the fixed assets of the corresponding year. No
advance shall be granted against depreciation.
(ii) Depreciation shall not be allowed on assets funded by capital
subsidies, beneficiary contributions or grants.
(iii) Depreciation shall be calculated annually on the basis of assets
capitalised and put to use based on the straight line method over
the useful life of the asset and at the rate not exceeding the rate
specified by the Central Electricity Regulatory Commission from
time to time.
The residual value of assets shall be considered as 10% and depreciation
shall be allowed to a maximum of 90% of the original cost of the asset.
The Transmission Licensee or SLDC, as the case may be, shall submit
separate
detail
of
fully
depreciated
asset
along
with
year
of
commissioning and year of attaining ninety percent depreciation with the
tariff petition.
Provided that freehold land shall not be treated as a depreciable
asset and its cost shall be excluded while computing 90% of the original
cost of the asset.
Provided further that the cost of lease hold land shall be amortised
evenly within the leased period.
(iv) The original capital cost of the asset shall include Additional
Capitalisation on account of Foreign Exchange Rate Variation as
allowed by the Government / Bihar Electricity Regulatory
Commission.
(v)
Depreciation shall be chargeable from the first year of operation of
the asset. For part of the year, depreciation shall be charged on pro
rata basis.
(vi) A provision of replacement of assets shall be made in the capital
investment plan.
(vii) The licensee(s) shall submit certified copy of the Asset Register
with the list of fully depreciated Transmission lines, substation,
transformers, etc. along with the details of disposed off assets and
amount received therefore with the tariff petition.
24. Interest and finance charges on loan capital
(a) The Transmission Licensee or SLDC, as the case may be, shall
provide detailed loan-wise, project wise and utilization-wise details
of all the loans.
(b) If the equity actually deployed is more than 30 % of the capital cost,
equity in excess of 30 % shall be treated as normative loan:
Provided that where equity actually deployed is less than
30% of the capital cost, the actual loan shall be considered for
determination of interest on loan:
27
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
(c) Actual loan or normative loan, if any, shall be referred as gross
normative loan in this Regulation.
(d) The normative loan outstanding as of 1st April of control period
shall be computed by deducting the cumulative repayment as
approved by the Commission (basis as mentioned below) up to
31st March of current period (a year before control period) from the
gross normative loan.
(e) The repayment for the control period shall be deemed to be equal to
the depreciation allowed for the year.
(f) Notwithstanding
any
moratorium
period
availed
by
the
Transmission Licensee or SLDC, as the case may be, the repayment
of the loan shall be considered from the first year of the control
period as per annual depreciation allowed.
(g) The rate of interest shall be the weighted average rate of interest
calculated on the basis of actual loan portfolio at the beginning of
each year of the control period, in accordance with terms and
conditions of relevant loan agreements, or bonds or non-convertible
debentures:
Provided that if no actual loan is outstanding but normative
loan is still outstanding, the last available weighted average rate of
interest shall be applicable.
Provided further that if no actual loan is outstanding but
normative loan is still outstanding and the last available weighted
average rate of interest is also not available, rate of interest equal to the
State Bank (one-year tenor) Marginal Cost of Funds-based Lending Rate
(‘MCLR’) shall be applicable.
Provided further that the interest on loan shall be calculated
on the normative average loan of the year by applying the weighted
average rate of interest:
Provided also that exception shall be made for the existing loans which
may have different terms as per the agreements already executed if the
Commission is satisfied that the loan has been contracted for and
applied to identifiable and approved projects:
(h) The Transmission Licensee or SLDC, as the case may be, shall
make every effort to refinance the loan as long as it results in net
benefit to the beneficiaries.
Provided that the cost associated with such refinancing shall
be eligible to be passed through in tariffs and the benefit on account of
refinancing of loan and interest on loan shall be shared in the ratio of
50:50 between the Transmission Licensee or SLDC and the beneficiaries.
Provided further that the Transmission Licensee shall
submit the calculation of such benefit to the Commission for its
approval.
(i) The Transmission Licensee shall enable tracking of the loans
converted into grants under schemes like BRGF, PSDF, APDRP, R-
APDRP, RGGVY, DDUGVY, RSVP, etc or any other loan from the
Central or State Government by providing information and data
regularly to the Commission, for enabling the Commission to
28
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
recover from Transmission Licensee or SLDC, as the case may be,
the amount of interest on loans which have been passed on to the
beneficiaries in the earlier years and have been converted into grant
subsequently so that the recovered amount is passed on to the
beneficiaries.
(j) Addition to loan during the year for interest purpose will be
restricted to the quantum of assets capitalized and put to use.
(k) The excess interest during construction on account of time and/or
cost overrun as compared to the approved completion schedule and
capital cost or on account of excess drawal of the debt funds
disproportionate to the actual requirement based on Scheme
completion status, shall be allowed or disallowed partly or fully on a
case to case basis, after prudence check by the Commission. The
transmission licensee shall endeavour to adhere the time schedule
for various transmission system in accordance with Annexure-A
appended for these regulations.
Provided that where the excess interest during construction is on
account of delay attributable to an agency or contractor or supplier
engaged by the Transmission Licensee, any liquidated damages recovered
from such agency or contractor or supplier shall be taken into account
for computation of capital cost:
Provided further that the extent of liquidated damages to be considered
shall depend on the amount of excess interest during construction that
has been allowed by the Commission.
(l) The above interest computation shall exclude interest on loan
amount, normative or otherwise, to the extent of capital cost
funded by Consumer Contribution, Deposit Works, Grants or
Capital Subsidy.
25. Interest during Construction (IDC), Incidental Expenditure
during Construction (IEDC):
(A)
Interest during Construction (IDC)
(i)
Interest during construction shall be computed corresponding to
the loan from the date of infusion of debt fund, and after taking into
account the prudent phasing of funds upto Scheduled Date of
Commercial operation (SCOD).
(ii)
In case of additional costs on account of IDC due to delay in
achieving the SCOD, the SLDC or the transmission licensee as the case
may be, shall be required to furnish detailed justifications with
supporting documents for such delay including prudent phasing of
funds.
Provided that if the delay is not attributable to the SLDC or the
transmission licensee as the case may be, and is due to uncontrollable
factors as specified in Regulation 8 of these regulations, IDC may be
allowed after due prudence check.
Provided further that only IDC on actual loan may be allowed beyond the
SCOD to the extent, the delay is found beyond the control of SLDC or the
transmission licensee, as the case may be, after due prudence and taking
into account prudent phasing of funds.
29
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
(B) Incidental Expenditure during Construction (IEDC)
(i)
Incidental expenditure during construction shall be computed from
the zero date and after taking into account pre-operative expenses up to
Scheduled Date of Commercial operation (SCOD).
Provided that any revenue earned during construction period up to
SCOD on account of interest on deposits or advances, or any other
receipts may be taken into account for reduction in incidental
expenditure during construction.
(ii)
In case of additional costs on account of IEDC due to delay in
achieving the SCOD, the transmission licensee or SLDC as the case may
be, shall be required to furnish detailed justification with supporting
documents for such delay including the details of incidental expenditure
during the period of delay and liquidated damages recovered or
recoverable corresponding to the delay.
Provided that if the delay is not attributable to the transmission licensee
or SLDC as the case may be, and is due to uncontrollable factors as
specified in Regulation 8, IEDC may be allowed after due prudence
check.
Provided further that where the delay is attributable to an agency or
contactor or supplier engaged by the transmission licensee or SLDC, the
liquidated damages recovered from such agency or contractor supplier
shall be taken into account for computation of capital cost.
(iii)
In case the time over-run beyond SCOD is not admissible after due
prudence, the increase of capital cost on account of cost variation
corresponding to the period of time over run may be excluded from
capitalization irrespective of price variation provisions in the contracts
with supplier or contractor of the transmission licensee or SLDC.
26. Interest on working capital
(a) The Transmission Licensee shall be allowed interest on the
estimated level of working capital for the financial year, computed
as follows:
(i) Receivables equivalent to two (2) month of transmission charges
calculated on target availability level.
(ii) O&M Expenses of one (01) month.
(iii)Maintenance spares @ 40% of R&M expenses for one month.
Provided that for the purpose of Truing-up for any year, the working
capital requirement shall be re-computed on the basis of the values of
revised normative Operation & Maintenance expenses and actual
Revenue from Transmission Charges as reflected in the Audited Accounts
excluding incentive, if any, and other components of working capital
approved by the Commission in the Truing-up before sharing of gains
and losses.
Less:
(iv) Return on equity and contribution to contingency reserves
equivalent to two months.
(v) Amount of security deposits from Transmission System users, if
any, held during the year except the security deposits held in the
form of Bank Guarantee from Transmission System Users.
30
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
(b) Interest on working capital shall be on normative basis and rate of
interest shall be equal to the State Bank (one-year tenor) Marginal
Cost of Funds-based Lending Rate (‘MCLR’) as of the date on which
petition for determination of tariff is filed plus 150 basis points. The
rate of interest for the purpose of Truing-up shall be the weighted
average MCLR of the concern Financial Year plus 150 basis points.
(c) Interest shall be allowed on the amount held as security deposit
(except the security deposit held in the form of Bank Guarantee)
from Transmission System Users at the Bank Rate (RBI Base Rate)
as at the date on which the application for determination of tariff is
filed. The interest allowed shall be subject to true up at weighted
average Bank Rate of the concern Financial Year.
(d) If the State Government is providing resource gap grant and/or
subsidy, the working capital shall be reduced by two months
equivalent of that amount.
27. Tax on Return on Equity
1) The base rate of return on equity as allowed by the Commission
under Regulation 22 shall be grossed up with the effective tax rate
of the respective financial year. For this purpose, the effective tax
rate shall be considered on the basis of actual tax paid in the
respect of the financial year in line with the provisions of the
relevant Finance Acts by the concerned transmission licensee or
SLDC, as the case may be. The actual tax on income from other
business including deferred tax liability (i.e. income on business
other than business of transmission or SLDC, as the case may be)
shall not be considered for the calculation of effective tax rate.
2) Rate of return on equity shall be rounded off to two decimal places
and shall be computed as per the formula given below:
Rate of pre-tax return on equity = Base rate / (1-t)
Where “t” is the effective tax rate in accordance with Clause (1) of this
regulation and shall be calculated at the beginning of every financial year
based on the estimated profit and tax to be paid estimated in line with
the provisions of the relevant Finance Act applicable for that financial
year to the company on pro-rata basis by excluding the income of non-
SLDC or non-transmission business, as the case may be, and the
corresponding tax thereon. In case of licensee/SLDC paying Minimum
Alternate Tax (MAT), “t” shall be considered as MAT rate including
surcharge and cess.
llustration:-
(i) In case of the licensee paying Minimum Alternate Tax (MAT) @ 20.96%
including surcharge and cess:
Rate of return on equity = 15.50/(1-0.2096) = 19.61%
(ii) In case of licensee paying normal corporate tax including surcharge
and cess:
(a) Estimated Gross Income from the licensee business for FY 2017-18 is
Rs 1000 crore.
(b) Estimated Advance Tax for the year on above is Rs 240 crore.
31
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
(c) Effective Tax Rate for the year 2017-18 = Rs 240 Crore/Rs 1000 Crore
= 24%
(d) Rate of return on equity = 15.50/ (1-0.24) = 20.39%
(3) The Licensee or SLDC, as the case may be, shall true up the grossed
up rate of return on equity at the end of every financial year based on
actual tax paid together with any additional tax demand including
interest thereon, duly adjusted for any refund of tax including interest
received from the income tax authorities pertaining to the tariff period
2022-23 to 2024-25 on actual gross income of any financial year.
However, penalty, if any, arising on account of delay in deposit or short
deposit of tax amount shall not be claimed by the Licensee or SLDC as
the case may be. Any under-recovery or over-recovery of grossed up rate
on return on equity after truing up, shall be recovered or refunded to
beneficiaries on year to year basis.
28. Contribution to Contingency Reserve
(a) If the Transmission Licensee or SLDC, as the case may be, has
made an appropriation to the Contingency Reserve, a sum not more
than 0.5 percent of the original cost of fixed assets at the beginning
of the year shall be allowed annually towards such appropriation in
the calculation of ARR.
Provided that where the amount of such Contingency Reserves
exceeds five (5) per cent of the original cost of fixed assets, no further
contribution shall be allowed.
Provided further that such contribution shall be invested in
securities authorised under the Indian Trusts Act, 1882 within a period
of six months of the close of the Year.
(b) The Contingency Reserve shall not be drawn upon during the term
of the license except to meet such charges as may be approved by
the Commission, such as following:
(i)
Expenses or loss of profits arising out of accidents, strikes or
circumstances which the management could not have prevented;
(ii)
Expenses on replacement or removal of plant or works other than
expenses required for normal maintenance or renewal;
(iii)
Compensation payable under any law for the time being in force
and for which no other provision is made:
Provided that such drawal from contingency reserve shall be
computed after making due adjustment for any other compensation that
may have been received by the Licensee as part of an insurance cover:
(c) No diminution in the value of contingency reserve as mentioned above
shall be allowed to be adjusted as a part of tariff.
29. Bad and Doubtful Debts :
Bad and Doubtful Debts shall be allowed as a legitimate business
expense provided the transmission licensee actually identifies and writes
off bad debts as per the transparent policy approved by the Commission.
In case there is any recovery of bad debts already written off, the
recovered bad debt will be treated as other income as an uncontrollable
item.
32
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
30. Delayed Payment Charge and Interest on Delayed Payment:
In case the payment of bills of transmission charges or SLDC Fees
and Charges by the Beneficiary, as the case may be, is delayed beyond a
period of 60 days from the date of billing, Delayed Payment Charge at the
rate of 1.25% per month on the billed amount shall be levied for the
period of delay by the Transmission Licensee or SLDC, as the case may
be, notwithstanding anything to the contrary as may have been
stipulated in the Agreement or Arrangement with the Beneficiaries or as
applicable in the Electricity (Late Payment Surcharge) Rules, 2021 in
case of Power Purchase Agreements, Power Supply Agreements and
Transmission Service Agreement.
31. Non-Tariff Income
(i)
All incomes being incidental to electricity business and derived by
the Licensee from sources, including but not limited to profit derived
from disposal of assets, rents, late payment surcharge, income from
investments other than contingency reserves, miscellaneous receipts
from the Beneficiaries, income to Licensed business from the Other
Business of the Transmission Licensee or SLDC, as the case may be,
shall constitute Non-Tariff Income of the Licensee.
Provided that the interest earned from investments made out of
Return on Equity corresponding to the regulated Business shall not be
included in Non-Tariff Income.
(ii)
The amount received by the Licensee on account of Non-Tariff
Income shall be deducted from the Aggregate Revenue Requirement in
calculating the net revenue requirement of such Licensee.
32. Income from Other Business
Where the Transmission Licensee is engaged in any other business
under Section 41, the income from such business will be deducted from
the Aggregate Revenue Requirement in calculating the revenue
requirement of the Licensee in the manner and in proportion as may be
specified by the Commission in BERC (Treatment of Income of Other
Businesses of Transmission Licensees and Distribution Licensees)
Regulations, 2013 and its amendments from time to time.
Provided that the Licensee shall follow a reasonable basis for
allocation of all joint and common costs between the Transmission
Business and the Other Business and shall submit the Allocation
Statement as approved by the Board of Directors to the Commission
along with the application for determination of tariff;
Provided further that where the sum total of the direct and
indirect costs of such Other Business exceed the revenues from such
Other Business or for any other reason, no amount shall be allowed to be
added to the Aggregate Revenue Requirement of the Transmission
Licensee on account of such Other Business.
33. Annual Transmission Charges (ATC)
33.1 The annual Transmission charges of the transmission system shall
be computed on annual basis, in accordance with norms contained in
these regulations, aggregated as appropriate, and recovered on monthly
basis as transmission charge from the users.
33
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
33.2 The Transmission charge (inclusive of incentive/disincentive) for AC
system payable for a calendar month shall be:
ARR X (NDM/NDY) x (TAFM/NATAF)
Where;
NATAF= 98%
NDM = Number of days in the month
NDY = Number of days in the year
TAFM = Transmission System availability factor for the month, in percent
computed in accordance with Appendix-II.
34. Sharing of charges for Intra-State Transmission Network
34.1 The Aggregate Revenue Requirement of the Transmission Licensee,
as approved by the Commission, shall be shared by all long-term users
and medium-term users of the transmission system on monthly basis in
the ratio of their respective contracted transmission capacities to the
total contracted transmission capacity, in accordance with the following
formula:
TCn= (Transmission ARR net of incentive/disincentive) x (NDM/NDY) x
CCn/SCC
Where,
TCn = transmission charges for the month payable by the nth long-term
user or medium-term user of the transmission system;
Transmission
ARR
=
Aggregate
Revenue
Requirement
of
the
Transmission Licensee, determined in accordance with Regulation 68 of
these Regulations;
CCn = capacity contracted in MW by the nth long-term user or medium-
term user of the transmission system during the month;
SCC = sum of capacities contracted in MW by all long-term users and
medium-term users of the transmission system during the month:
NDM=Number of days in the month
NDY=Number of days in the year
Provided that the TCn shall be payable on monthly basis by each
long-term user or medium-term user of the transmission system and
shall be collected by the State Transmission Utility (STU).
35. Sharing of SLDC Charges
35.1 The SLDC Charges payable by the Transmission System Users
shall be computed in accordance with the following formula:-
SLDC Charges payable for a month SCn =(SC/12)*(ACn/SACn)
Where, SCn= SLDC charge payable by Transmission System users
SC= Approved SLDC Aggregate Revenue Requirement for the year
ACn= Actual installed capacity of nth Transmission System users in case
of generating stations including RE generators /long term and medium
term contracted capacities in case of sellers/aggregated allocated
capacity and contracted capacity in case of distribution licensee/long
term contracted capacity in case of buyer.
SACn= Sum of actual installed capacity of nth Transmission System
users in case of generating stations including RE generators (within
Bihar), long term and medium term contracted capacities in case of
34
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
sellers, aggregated allocated capacity and contracted capacity in case of
distribution licensee and long term contracted capacity in case of buyer.”
35.2 The SLDC Charges approved for the Year shall be equally spread
over the 12 months of the Year and SLDC Charges per MW per month
shall be computed by SLDC accordingly.
35.3 Notwithstanding anything contained in these regulations, the
Commission after conducting study and due regulatory process may
notify the revised sharing and recovery of annual transmission charges of
the transmission licensee.
36. Short-term bilateral transactions and short-term collective
transactions
36.1 For short-term bilateral transactions and short-term collective
transactions through power exchanges, the transmission tariff shall be
denominated in Rs/kWh and shall be:
Tc= ARR/Ei
Where Ei=total energy input into the intra-State transmission system
during the financial year.
36.2 The revenue from short-term open access charges for each yearly
period (t) of Control Period shall be taken to be same as that prevalent
during the yearly period one year before the commencement of the
Control Period. However, the adjustments due to variation in actual
revenue from short-term open access charges shall be undertaken during
annual truing up.
37. Separation of Transmission and SLDC functions
37.1 The Transmission Licensee shall separate its business into
transmission and SLDC functions, and segregate its accounts between
these two businesses, once the accounts of these two businesses are
segregated SLDC shall file a separate application for determination of its
fee and charges in accordance with these regulations.
Till the segregation of the accounts is completed, the Transmission
Licensee shall submit an Allocation Statement that contains the
apportionment of costs and revenues to that business. The Allocation
Statement, approved by the Board of Directors of the Licensee, shall be
accompanied with an explanation of the methodology for apportionment
which should be consistent over the Control Period.
37.2 SLDC charges shall be payable by various utilities as may be
determined by the Commission in accordance with these Regulations.
Provided that the RLDC Fees and Charges payable by the SLDC in
accordance with the relevant Orders issued by the Central Electricity
Regulatory Commission from time to time shall be allowed to be
recovered by the SLDC through the Fees and Charges as approved by the
Commission.
Provided further that, the ERPC Charges payable to the ERPC’s
Secretariat shall be allowed to be recovered by the SLDC through the
Fees and Charges as approved by the Commission.
37.3 The SLDC shall have to produce documentary proof towards
payment of such Charges at the time of Truing up.
35
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Provided that any variation between the approved RLDC Fees and
Charges and ERPC Charges and that actually paid by the SLDC shall be
considered during the true-up as per audited accounts, subject to
prudence check and any other factor considered appropriate by the
Commission.
38. Incentive/Disincentive
38.1 The
Transmission
Licensee
shall
be
entitled
to
incentive/disincentive on account of deviation from target availability set
by commission. The transmission charges referred to in Regulation 33 of
these Regulations are inclusive of such incentives and disincentives on
account of availability of system.
38.2 Incentive shall be shared by the long-term and medium term
customers in the ratio of their respective contracted transmission
capacities to the total contracted transmission capacity.
39. Rebate
(1)
For payment of bills of the transmission licensee through
letter of credit on presentation or through NEFT/RTGS within a period of
2 days of presentation of bills by the transmission licensee, a rebate of
2% shall be allowed.
(2)
Where payments are made on any day after 2 days and
within a period of 30 days of presentation of bills by the transmission
licensee, a rebate of 1% shall be allowed.
40. Late Payment Surcharge: In case the payment of any bills for
charges payable under these Regulations is delayed by a beneficiary(ies)
beyond a period of 60 days from the date of billing a late payment
surcharge at the rate of 1.25% per month on billed amount shall be
levied for the period of delay by the
Transmission
Licensee,
notwithstanding anything to the contrary as may have been stipulated in
the Agreement or Arrangement with the Beneficiaries or as applicable in
the Electricity (Late Payment Surcharge) Rules, 2021 in case of Power
Purchase Agreements, Power Supply Agreements and Transmission
Service Agreement.
PART-VI
MISCELLANEOUS
41. Power to amend
The Commission may, at anytime, amend, alter or modify any
provision of these Regulations.
42. Power to remove difficulties
If any difficulty arises in giving effect to the provisions of these
Regulations, the Commission may, by general or specific order, make
such provisions not inconsistent with the provisions of the Act, as may
appear to be necessary for removing the difficulty.
43. Right to vary terms and conditions
The terms and conditions for determination of tariff specified in
these regulations are in the nature of general framework on the basis of
which the tariff shall be determined. The Commission reserves its right to
vary these terms and conditions, as and when deems fit.
36
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
44. Limitation of Power of Commission
Nothing in these regulations shall be deemed to limit the powers of
the Commission to deal with any matter or exercise any power under the
relevant Acts for which no regulations have been made / framed and to
make such orders as it may consider appropriate to meet the ends of
justice in any case.
45. Repeal and savings
(a) Save as otherwise provided in these regulations, BERC (Multi Year
Transmission Tariff and SLDC Charges) Regulations, 2018 are
hereby repealed.
(b) Notwithstanding
such
repeal,
any
proceedings
before
the
Commission pertaining to the period prior to the commencement of
this Control Period, including Petitions for True up of exercises,
annual performance review, etc. shall be governed by respective
previous regulations.
By order of the Commission,
Sd./Illegible,
Secretary.
Appendix-I
(See Reg. 16.2)
FORMAT FOR ISSUANCE OF AVAILABILITY CERTIFICATE BY SLDC
On the letterhead of SLDC
Ref:
To
..........
Date:
..........
Sub: Transmission System Availability Certificate
for......................... (Name of Transmission Licensee) for the
month……
Ref:
...
With reference to the above, SLDC has received the computation
of
transmission
system
availability
with
interruption
details
of
Transmission network for the month__________, computed in accordance
with the BERC (Multi Year Transmission Tariff) Regulations,2021.
The overall Transmission System Availability of the Transmission
network for the month _________, computed in accordance with
Appendix-II of the BERC (MYT) Regulations, 2021, and after considering
the provisions of BERC (MYT) Regulations, 2021, is ________________ %.
Authorised Signatory
Copy to ___________
37
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Appendix-II
(See Reg. 16.2)
1.
Transmission system availability factor for a calendar month
(TAFM) shall be calculated by the respective Transmission Licensee
certified by the SLDC, separately for each AC and HVDC transmission
system and grouped according to sharing of transmission charges.
2.
NAFM for A.C. and HVDC system / sub-systems shall be
calculated as follows:
% TAFM for AC system
o X AVo + p X AVp + q X AVq + r X AVr
= ----------------------------------------------------------X 100
o + p + q + r
% TAFM for HVDC system
s X AVs + t X AVt
= ----------------------------------X 100
S + t
Where
o = Total number of AC lines.
AVo = Availability of o number of AC lines.
p = Total number of bus reactors/switchable line reactors
AVp = Availability of p number of bus reactors/switchable line reactors
q = Total number of ICTs.
AVq = Availability of q number of ICTs.
r = Total number of SVCs.
AVr = Availability of r number of SVCs.
s = Total number of HVDC poles
AVs = Availability of s number of HVDC poles
t = Total number of HVDC back-to-back station blocks
AVt = Availability of t number of HVDC back-to-back station blocks
The weightage factor for each category of transmission elements shall be
as under:
(a) For each circuit of AC line – Surge Impedance Loading for
Uncompensated line (SIL) multiplied by ckt-km. As specified in
Annexure-B.
However, for the voltage levels and/or conductor configurations not listed
in Annexure-B, appropriate SIL based on technical considerations may
be used for availability calculation under intimation to long-term
transmission customers.
For compensated AC line, Surge Impedance Loading (SIL) shall be as
certified by the SLDC considering the compensation on the line.
For shunt compensated line the reduced value of SIL shall be taken in
accordance with the location of the reactor. Similarly in case of the lines
with series compensation the higher SIL shall be taken as per the
percentage of compensation.
38
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
(b) For each HVDC pole- The rated MW capacity x ckt-km.
(c) For each ICT bank – The rated MVA capacity.
(d) For SVC- The rated MVAR capacity (inductive and capacitive).
(e) For Bus Reactor/switchable line reactors – The rated MVAR capacity.
(f) For HVDC back-to-back station connecting two Regional grids/Intra
State Sub-Stations- Rated MW capacity of each block.
The availability for each category of transmission elements shall be
calculated based on the weightage factor, total hours under
consideration and non-available hours for each element of that category.
FORMULAE FOR CALCULATION OF AVAILABILITY OF EACH
CATEGORY OF TRANSMISSION
ELEMENTS
AVo(Availability of o no. of AC lines)=
∑
ௐ(்ି்ே)
்
ୀଵ
∑
𝑊𝑖
ୀଵ
൘
AVs(Availability of s no. of HVDC pole)=
∑
ௐ(்ି்ே
)
்
∑
𝑊𝑗
௦
ୀଵ
൙
௦
ୀଵ
AVq(Availability of q no. of ICTs)=
∑
ௐ(்ି்ே)
்
ୀଵ
∑
𝑊𝑘
ୀଵ
൘
AVr(Availability of r no. of SVCs)=
∑
0.5𝑊𝐼𝑙(𝑇𝐼𝑙−𝑇𝑁𝐴𝐼𝑙)
𝑇𝐼𝑙
ୀଵ
+ ∑
0.5 𝑊𝑐𝑙(𝑇𝑐𝑙−𝐴𝐶𝑙)
𝑇𝑐𝑙
ୀଵ
∑
0.5𝑊𝐼𝑙
ୀଵ
+ ∑
0.5 𝑊𝑐𝑙
ୀଵ
൙
AVp(Availability of p no. of Switched Bus Reactor)=
∑
𝑊𝑚(𝑇𝑚−𝑇𝑁𝐴𝑚)
𝑇𝑚
ୀଵ
∑
𝑊𝑚
ୀଵ
൙
AVt (Availability of t no. of HVDC Back-to back Blocks)=
∑
𝑊𝑛(𝑇𝑛−𝑇𝑁𝐴𝑛)
𝑇𝑛
௧
ୀଵ
∑
𝑊𝑛
௧
ୀଵ
൙
Where Wi = Weightage factor for ithtransmission line
Wj = Weightage factor for jth HVDC pole
Wk = Weightage factor for kth ICT
WIl&WCl = Weightage factors for inductive & capacitive operation of lth
SVC
Wm = Weightage factor for mth bus reactor
Wn = Weightage factor for nth HVDC back to back block
39
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Ti, Tj, Tk, TIl, TCl, -
The total hours of ith AC line,jth HVDC pole, kth
ICT, lth SVC Tm&Tn (Inductive Operation), lth SVC (Capacitive
Operation),mth Switched Bus Reactor &nth HVDC back-to-back block
during the period under consideration (excluding time period for outages
not attributable to transmission licensee .
TNAi ,TNAj , TNAk -
The non-availability hours (excluding the time
period for outages not attributable to transmission licensee taken as
deemed availability) for ith AC line, jth HVDC pole, KthICT, lth SVC
(Inductive Operartion), ith SVC (Capacitive Operation), mth Switched Bus
Reactor and nth HVDC back-to-back block.
TNAIl, TNACl, TNAm,
TNAn
Note :-
"Factors have been applied in the above formula of NAFM such that a 315
MVA transformer would have the same weightage as a 200 km long D/C
line with twin conductors, and a 50 MVAR switched reactor would have
one-fourth the weightage of a 315 MVA transformer. The transmission
lines shall have a weightage proportional to their circuit – km and number
of sub-conductors (to which the current carrying capacity is directly
proportional). Voltage has been omitted by design for the present, to
deliberately enhance the weightage for 220 kV and 132 kV lines (as they
are critical for supply to beneficiaries), and to suppress the weightage for
765 kV lines (since they presently carry power much below their
capability). The Commission may review and modify the formula when the
situation changes in future".
4.
The transmission elements under outage due to following reasons
shall be deemed to be available:
i.
Shut down availed for maintenance or construction of
elements of another transmission scheme. If the other
transmission scheme belongs to the Transmission Licensee,
SLDC may restrict the deemed availability period to that
considered reasonable for the work involved.
ii.
Switching off of a transmission Iine to restrict over voltage
and manual tripping of switched reactors as per the
directions of SLDC.
5.
Outage
time
of
transmission
elements
for
the
following
contingencies shall be excluded from the total time of the element under
period of consideration.
i.
Outage of elements due to acts of God and force majeure
events beyond the control of the Transmission Licensee. However, onus
of satisfying the SLDC that element outage was due to aforesaid events
and not due to design failure shall rest with the Transmission Licensee.
A reasonable restoration time for the element shall be considered by
SLDC and any additional time taken by the Transmission Licensee for
restoration of the element beyond the reasonable time shall be treated as
outage time attributable to the Transmission Licensee. SLDC may
consult the Transmission Licensee or any expert for estimation of
40
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
reasonable restoration time. Circuits restored through ERS (Emergency
Restoration System) shall be considered as available.
ii
Outage caused by grid incident/disturbance not attributable
to the Transmission Licensee, e.g. faults in substation or bays owned by
other agency causing outage of the transmission licensee's elements, and
tripping of lines, ICTs, HVDC, etc. due to grid disturbance. However, if
the element is not restored on receipt of direction from SLDC while
normalizing the system following grid incident/disturbance within
reasonable time, the element shall be considered not available for the
period of outage after issuance of SLDC's direction for restoration.
6.
The format for issuance of Availability Certificate by SLDC is given
in Appendix-I.
Annexure – A
(See Regulation 24)
Time schedule for completion of various transmission system
Sl.
No.
Transmission Work
Plain Area
(months)
Difficult Hilly
Terrain / Forest
Area (months)
a
765 kV S/C Transmission line
36
42
b
+/-500 KV HVDC Transmission line
30
36
c
400 KV D/C Quad Transmission line
38
44
d
400 KV D/C Triple Transmission line
36
42
e
400 KV D/C Twin Transmission line
34
40
f
400 KV S/C Twin Transmission line
30
36
g
220KV D/C Twin Transmission line
34
40
h
220 KV D/C Transmission line
30
36
i
220 KV S/C Transmission line
26
32
j
132 KV D/C Transmission line
20
26
k
132 KV S/C Transmission line
16
22
l
132 KV/33 KV AC Sub-Station
12
15
m
New 220 KV AC Sub-Station
24
27
n
New 400 KV AC Sub-Station
30
33
o
New 765 kV AC Sub-Station
36
40
41
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
p
HVDC bi-pole terminal
42
44
q
HVDC back-to-back
32
34
Annexure – B
(see Appendix-II)
SURGE IMPEDANCE LOADING (SIL) OF AC LINES
Sr. No.
Line
voltage(kV)
Conductor Configuration
SIL (MW)
1.
765
Quad Bersimis
2250
2.
400
Quad Bersimis
691
3.
400
Twin Moose
515
4.
400
Twin AAAC
425
5.
400
Quad Zebra
647
6.
400
Quad AAAC
646
7.
400
Triple Snowbird
605
8.
400
ACKC(500/26)
556
9.
400
Twin ACAR
557
10.
220
Twin Zebra
175
11.
220
Single Zebra
132
12.
132
Single Panther
50
13.
66
Single Dog
10
INDEX OF FORMATS S1 TO P12 FOR ARR & TARIFF FILING BY TRANSMISSION LICENSEES AND
THE SAME SHALL BE USED BY SLDC
Summary Formats
1
S1
Profit & Loss Account
2
S2
Balance Sheet
3
S3
Cash flow statement
Financial Formats
4
F1
Annual Revenue Requirement
5
F2
Allotted Transmission Capacity and Charges to be paid by Long Term Transmission
Customers
6
F3
Projection of Sales, Connected Load and Demand
7
F4
Revenue at current tariff rates and at proposed tariff rates
8
F5
Details of Transmission Lines and Substations including Investment plan
9
F6
Normative Parameters Considered for Tariff Computations
10
F7
Gross Fixed Assets(GFA) and Depreciation
11
F8
User contributions and grants towards cost of capital assets
12
F9
Details of Loans
13
F10
Details of Equity
14
F11
Interest, IDC & Financing Charges
15
F12
Details of Lease
42
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
16
F13
Operations & Maintenance Cost
17
F14
Employee expenses
18
F15
R&M Expenses
19
F16
Administrative & General Expenses
20
F17
Short Term Open access consumers
21
F18
Details of Non-tariff Income
22
F19
Working Capital Interest
23
F20
Details of Income from Other Business
24
F21
Details of Expenses Capitalised
25
F22
Net Prior Period Expenses/Income & Extraordinary Items
26
F23
Contribution to Contingency Reserve, details of grant
27
F24
Allocation Statement of Expenses of SLDC
Performance Formats
28
P1
Transmission Losses (For Transmission Licensee)
29
P2
Energy Delivered by Transmission licensee to the Distribution Licensees/ Bulk consumers
at interface points
30
P3
Details of Electrical Accidents
31
P4
Abstract of Outages due to feeder tripping
32
P5
Major System Disturbances
33
P6
Frequency Variation
34
P7
Voltage Fluctuation
35
P8
Licensee wise Load shedding carried out during the year
36
P9
Details of Overloaded Feeders
37
P10
Details of over loaded Transformers
38
P11
Failure of Transformers
39
P12
Key Ratios
Name of Transmission Licensee
Statement of Projected Profit and Loss
Form No: S1
Rs Crores
Particulars
Current
Year
(i. e. RE)
Ensuing
years (Projection)
FY
(n+1)
FY
(n+2)
FY
(n+3)
A
Revenue/Income
1
Revenue from operations
a)Revenue from Transmission/Wheeling charges
-NBPDCL
-SBPDCL
-Others (Pl, specify)
2
Non-tariff income
3
Revenues through subsidies & grants (If any)
4
Any other Income
Total Revenue*
43
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
B
Expenditure
1
Repair and Maintenance Cost
2
Employee costs
3
Administration expenses
4
Other Expenses
5
Extraordinary items (specify items)
Less: Expenses Capitalized
C
Depreciation and Related debits
D
Interest & Finance Charges
Less: Interest Capitalized
G
TOTAL EXPENDITURE (B+C+D)*
H
Profit/Loss (A-G)
* Pertaining to Transmission Business Only, SLDC shall file
separately
Signature of Petitioner
Name of Transmission Licensee
Projected Balance Sheet
Form No: S2
Rs Crores
Particulars
Current Year
(i. e. RE)
Ensuing
years (Projection)
FY
(n+1)
FY
(n+2)
FY
(n+3)
Assets
Non-current assets
-------
-------
-------
Current assets
-------
-------
-------
Total Assets
EQUITY AND LIABILITIES
Equity
-------
-------
-------
LIABILITIES
-------
-------
Total Equity and Liabilities
Signature of Petitioner
44
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Projected Cash Flow Statement
Form No: S3
Rs Crores
Particulars
Current
Year
(i. e. RE)
Ensuing
years (Projection)
FY
(n+1)
FY
(n+2)
FY
(n+3)
A
Cash flows from operating activities
i
Net (loss) / Profit
Adjustments For
ii
----------
iii
----------
iv
----------
B
Net Cash flows from operating activities
Cash Flow from Investing Activities
i
----------
ii
----------
iii
----------
C
Net Cash used in Investing Activities
Cash Flow from Financing Activities
i
----------
ii
----------
iii
----------
Net Cash generated from Financing Activities
D
Total Cash generated/(lost)
E
Cash & Cash Equivalents as at beginning of the
Financial Year
F
Cash & Cash Equivalents as at end of the Financial
Year
Signature of Petitioner
Name of Transmission Licensee
Annual Revenue Requirement
Form No: F1
(Rs. Crores)
Particulars
Previous Year
Current
Year (i.
e. RE)
Ensuing
years (Projection)
Approved
in
MYT/RE
Actual
FY
(n+1)
FY
(n+2)
FY
(n+3)
I.
Energy Available (MU)
78700
II.
Energy Transmitted/Wheeled (MU)
75812
III.
Loss %
3.67%
IV.
Transmission Cost per unit (Rs/U)
#REF!
V
Total Transmission System Capacity (in
MW)
VI.
Transmission Cost per MW
VII.
Max Demand handled by the
transmission system (in MW)
A.
Income from Transmission Function
1
Receipts
45
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
a
Transmission/Wheeling Charges at
current tariff rates
b
Subsidy from Govt. (If any)
Total Receipts ( A)
B
Expenditure
1
O&M Expenses
i
Employee Expenses
ii
R&M Expense
iii
A&G Expense
iv.
Share of Holding Company Expenses
Total O&M expenses ( i+ii+iii+iv)
0
0
0
0
0
2
Return on Equity
3
Depreciation
4
Interest and finance charges on Loan
Capital
Less: IDC, if any
5
Interest on Working Capital
6
Contribution towards Contingency
Reserve
7
Bad Debts
Total Expenditure ( B)
C
Other Deductions
1
Income from other Business
2
Non tariff income
3
Revenue from Short Term transmission
charges
Total Other Deductions ( C)
D
Net ARR for Transmission Function (
B-C)
E
Shortfall/Excess before tariff revision
impact (A-D)
F
Tariff Revision Impact
G
Shortfall/Excess after tariff revision
impact (E-F)
Note: The ARR of SLDC shall be filed separately by SLDC. Expenses will be net of Expenditure capitalized.
Signature of Petitioner
Name of Transmission Licensee
Form No: F2
Allotted Transmission Capacity and Charges to be paid by Long Term Transmission Customers
Allotted Transmission Capacity of Long Term Transmission Customers ( CL)
(In MW)
Particulars
Previous Year
Current
Year
(i. e.
RE)
Ensuing
years (Projection)
Approved
in
MYT/RE
Actual
FY
(n+1)
FY
(n+2)
FY
(n+3)
A
Distribution Licensees
1
North Bihar Power Distribution Company
Limited
2
South Bihar Power Distribution Company
Limited
3
Others
i.
ii.
46
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
B
Bulk Consumers/Long Term Open Access
Customers (If any)
1
2
Sum of Total Alloted Transmission
Capacity to all the long term
Transmission system customers (SCL)
Charges to be paid by Long Term Transmission Customers/month
Rs. Crore
A
Distribution Licensees
1
North Bihar Power Distribution Company
Limited
#REF!
2
South Bihar Power Distribution Company
Limited
#REF!
3
Others
#REF!
i.
ii.
B
Bulk Consumers/Long Term Open
Access Consumers (If any)
1
2
Total
Name of Transmission Licensee
Projection of Sales, Connected Load and Demand
Form No: F3
A) Projection of sales (MU)
Particulars
Previous Year
Current
Year
(i. e. RE)
Ensuing
years (Projection)
Approved
in
MYT/RE
Actual
FY
(n+1)
FY
(n+2)
FY
(n+3)
A
Distribution Licensees
1
North Bihar Power Distribution
Company Limited
2
South Bihar Power Distribution
Company Limited
3
Others
`-------
B
Bulk Consumers/Long Term
Open Access Consumers (If
any)
1
2
TOTAL
-
-
-
-
-
-
B) Projection of Connected Load (in KW)
A
Distribution Licensees
1
North Bihar Power Distribution
Company Limited
2
South Bihar Power Distribution
Company Limited
3
Others
`-----
47
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
B
Bulk Consumers/Long Term
Open Access Consumers (If
any)
1
TOTAL
-
-
-
-
-
-
C) Projection of Maximum or Peak Demand (in MW) (Unrestricted)
A
Distribution Licensees
1
North Bihar Power Distribution
Company Limited
2
South Bihar Power Distribution
Company Limited
3
Others
`--
B
Bulk Consumers/Long Term
Open Access Consumers (If
any)
1
2
TOTAL
-
-
-
-
-
-
D) Projection of Minimum Demand (in MW)
A
Distribution Licensees
1
North Bihar Power Distribution
Company Limited
2
South Bihar Power Distribution
Company Limited
3
Others
`---
B
Bulk Consumers/Long Term
Open Access Consumers (If
any)
1
2
TOTAL
-
-
-
-
-
-
E) Projection of Average Demand (in MW)
A
Distribution Licensees
1
North Bihar Power Distribution
Company Limited
2
South Bihar Power Distribution
Company Limited
3
Others
`--
B
Bulk Consumers/Long Term
Open Access Consumers (If
any)
1
2
TOTAL
-
-
-
-
-
-
Signature of Petitioner
48
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Revenue
Form No: F4
At Current Tariff Rates
Rs. Crores
Particulars
Previous Year
Current
Year
(i. e.
RE)
Ensuing
years (Projection)
Approved
in MYT/RE
Actual
FY
(n+1)
FY
(n+2)
FY
(n+3)
A
Distribution Licensees
1
North Bihar Power
Distribution Company
Limited
2
South Bihar Power
Distribution Company
Limited
3
Others
i.
ii.
TOTAL
-
-
-
-
-
-
B
Bulk Consumers/Long
Term Open Access
Consumers (If any)
1
2
TOTAL
-
-
-
-
-
-
Grand Total
-
-
-
-
-
-
At Proposed Tariff Rates
Ensuing
years (Projection)
FY (n+1)
FY (n+2)
FY (n+3)
A
Distribution Licensees
1
North Bihar Power Distribution Company
Limited
South Bihar Power Distribution Company
Limited
3
Others
i.
ii.
TOTAL
B
Bulk Consumers/Long Term Open Access
Consumers (If any)
1
2
TOTAL
Grand Total
Less
Tariff at Current Rates
-
Impact of Tariff Revision
49
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
(a) Details of Transmission Lines and Substations
Form No: F5
Transmission Lines
No
Name of
line
Type of line
AC/ HVDC
S/C or
D/C
No. of
Sub-
conductor
s
Voltage
level kV
Line
length
Ckt.-Km.
Date of
Commercial
operation
/Put in use
1
2
-
-
(b) Substations
No
Name of
Sub-
station
Type of
Substation
Conventional
/ GIS
Voltage
level kV
No. of
transform
ers /
Reactors/
SVC etc
(with
capacity)
No. of
Bays
Date of
Commerc
ial
operation
/Put in
use
Covered in
this petition
(Yes/No)
1
2
-
*Note:- Information to be provided for Previous Year, Current Year & Ensuing Control Period
(c) Details of Installed Transformer at Substation
Sl.No
Voltage Ratio of
Transformer (kV/kV)
Details of Transformers
Total number
Total Capacity (MVA)
1
400/220
2
400/132
3
220/132
4
220/33
132/33
Note: Information required for Previous years, current year and Ensuing years
50
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Form No: F5
(d) Investment Plan (Scheme-wise)
(Rs. in Cr.)
Name of scheme / Project
Name of line/ Sub-station etc
Approved
Outlay
Progressive
upto the
beginning of
previous year
Previous year
Current year
(RE)
Ensuing Years
(Projection)
Progressive
Capital
expenditure upto
the end of
ensuing year (s)
Approved in
MYT/RE
Actual*
Capitalization
Capital
Expenditure
(CWIP)
Approved in
MYT/RE
Capitalization
Capital
Expenditure
(CWIP)
Capitalization
Capital Expenditure
(CWIP)
Capitalization
Capital Expenditure
(CWIP)
Capitalization
Capital
Expenditure
(CWIP)
Capitalization
Capital
Expenditure(
CWIP)
Total
**
**
**
**Must be in agreement with the figures shown in audited account, otherwise a reconciliation statement must be accompanied.
* Please furnish seperately details regarding approval of Capital Investment under BERC (Procedure for Filing Capital Investment and
Capitalization Plan) Regulations, 2018 and indiacte the portion which is not approved under BERC (Procedure for Filing Capital Investment and
Capitalization Plan) Regulations, 2018.
Note:
The amount of grants and loans shall be furnished separately scheme wise and funding agency wise.
Additional column may be inserted(if required) for Ensuing Years (Projection).
All Information for previous year, current year (RE), Ensuing year must be in line with information approved in MYT/Business Plan (if any),
other-wise a statement showing complete details of variation must be accompanied.
CWIP shall mean Capital Work in Progress
(e) Investment Plan (Year-wise)
S.N
Year
Originally
proposed
Approved
by the
Commission
Revised
Revised approval
by the
Commission in
review
Actual
expenditure
ii) Information for the current year to be given in columns 1 to 5 co-relating the information given in
MYT/Business Plan (if any)
iii) Amount of grants and loans shall be furnished separately funding Agencywise and yearwise.
51
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
(f) Abstract of Capital Cost for the existing Project, Capital Cost Estimates and
Schedule of Commissioning for the New projects
Form No:F5
Rs Crores
Particulars
Previous Year
Current
Year
(i. e. RE)
Ensuing
years (Projection)
Approved
in
MYT/RE
Actual
FY (n+1)
FY (n+2)
FY
(n+3)
1
Capital Cost
Foreign Component
Foreign Exchange rate
considered for the admitted cost
Domestic Component
IDC including Financing
Charges
Capital cost admitted as on-------
(Give reference of the BERC
relevant Order with Petition No.
& Date )
2
Less : Capital
Expenditure(CWIP)
3
Less : User contributions and
Grants
-
-
-
4
Total Capital Cost admitted
5
Increase /Decrease due to
FERV
6
Capital Cost for Purposes of
ARR*
*Must be in agreement with the figures shown in Form No: F5 (page-2), otherwise a reconciliation statement
must be accompanied.
Note
1. Copy of approval letter should be enclosed. Deviation in capital cost and scope of work if any, must be
submitted in detailed.
2. Details of IDC & Financing Charges are to be furnished as per FORM- .
(g) Financial Package of Capital cost Admitted
Rs. Crores
Particulars
Capital Cost as
Approved
Capital Cost Incurred
Capital cost
Admitted
Currency
Amount
Currency
Amount
Currency
Amount
Loans
Loan-I
Loan-II
and so on
Total Loan
Equity
Foreign
Domestic
Total Equity
Total Capital cost
Debt : Equity Ratio
Provide details for True-up period, Current Year and each of ensuing years separately.
52
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Form No: F5
(h) Capital Cost Estimates and Schedule of
commissioning for New Projects
Particulars
Present Day Cost
Completed Cost
Date of approval of the Capital cost estimates:
Price level of approved estimates
As of End of ________
Qtr. Of the year _________
As on Scheduled COD
of the Station
Foreign Exchange rate considered for the Capital
cost estimates
Capital Cost excluding IDC, FC, FERC & Hedging Cost
Foreign Component, if any (In Million US $ or the
relevant Currency)
Domestic Component (Rs. crores)
Capital cost excluding IDC, FC, FERC & Hedging
Cost (Rs. crores)
IDC, FC, FERC & Hedging Cost
Foreign Component, if any (In Million US $ or the
relevant Currency)
Domestic Component (Rs. crores)
Total IDC, FC, FERC & Hedging Cost (Rs.
crores)
Rates, taxes & duties considered
Capital cost Including IDC, FC, FERC & Hedging Cost
Foreign Component, if any (In Million US $ or the
relevant Currency)
Domestic Component (Rs. crores)
Capital cost Including IDC, FC, FERC & Hedging
Cost (Rs. crores)
Schedule of Commissioning
((Scheduled DOC elementwise))
-------------------------
-------------------------
---------------------------
COD of last Unit/ Block
Note:
1. Copy of approval letter should be enclosed.
2. Details of Capital cost are to be furnished as per
Form F5-5 or Form 14(Additional Capitalization)
as
applicable.
3. Details of IDC & Financing Charges are to be
furnished as per Form 20
Signature of Petitioner
53
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
(i) Break-up of Project Cost for Transmission System
Form No: F5
Rs. Crores
No
Break Down
As per
original
estimates
Actual
capital
expenditure
( Opening )
Variation
(B-C)
Reasons
for
Variation
A
B
C
D
E
A
Transmission Line
1
Preliminary works
1.1
Design & Engineering
1.2
Priliminary investigation,Right of way,
forest clearance, PTCC , general civil
works etc.
Total Preliminary works
-
-
2
Transmission Lines material
2.1
Towers Steel
2.2
Conductor
2.3
Earth Wire
2.4
Insulators
2.5
Hardware Fittings
2.6
Conductor & Earthwire accessories
2.7
Spares
2.8
Erection, Stringing & Civil works
including foundation
Total Transmission Line Materials
-
-
3
Taxes and Duties
3.1
Custom Duty
3.2
Other Taxes & Duties
* Pertaining to Transmission Business
Only, SLDC shall file separately
-
-
Total -Transmission lines
-
-
B.
Substations
4
Preliminary works & land
4.1
Design & Engineering
4.2
Land
4.3
Site preparation
Total Preliminary works & land
-
-
5
Civil Works
5.1
Control Room & Office Building
including HVAC
5.2
Township & Colony
5.3
Roads and Drainage
5.4
Foundation for structures
5.5
Misc. civil works
Total Civil Works
-
-
6
Substation Equipments
6.1
Switchgear (CT,PT, Circuit Breaker,
Isolator etc)
6.2
Transformers
6.3
Compensating Equipment (Reactor,
SVCs etc)
6.4
Control , Relay & Protection Panel
6.5
PLCC
6.6
HVDC package
54
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
6.7
Bus Bars/ conductors/Insulators
6.8
Outdoor lighting
6.9
Emergency D.G. Set
6.1
Grounding System
6.1
Structure for switchyard
Total Substation Equipments
-
-
-
7
Spares
8
Taxes and Duties
8.1
Custom Duty
8.2
Other Taxes & Duties
Total Taxes & Duties
-
-
Total (Sub-station)
-
-
-
9
Construction and pre-commissioning
expenses
9.1
Site supervision & site admn.etc.
9.2
Tools and Plants
9.3
construction Insurance
Total Construction and pre
commissioning expenses
-
-
-
10
Overheads
10
Establishment
10
Audit & Accounts
10
Contingency
Total Overheads
-
-
-
11
Total Cost
-
-
12
IDC, FC, FERV & Hedging Cost
12
Interest During Construction (IDC)
12
Financing Charges (FC)
12
Foreign Exchange Rate Variation
(FERV)
12
Hedging Cost
Total of IDC, FC, FERV & Hedging
Cost
-
-
13
Capital Cost incl. IDC, FC, FERV &
Hedging Cost
-
-
Note:
1. In case of time & Cost over run, a detailed note giving reasons of such time and cost over run
should be submitted clearly bring out the agency responsible and whether such time & cost over
run was beyond the control of the transmission licensee.
2. Above statement to be provided separately for each transmission line commissioned during the
ARR period
55
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
(j) Break-up of Construction/ Supply/ Service packages
Form No: F5
SL.
Particulars
1
2
3
4
5
6
----
1
Name/ No. of Construction / Supply /
Service Package (and Schemes/plan)
2
Scope of works1 (in line with head of
cost break-ups as applicable)
3
Whether awarded through ICB/DCB/
Departmentally/ Deposit Work
4
No. of bids received
5
Date of Award
6
Actual Date of Start of work
Original Scheduled date of Start of
work
7
Actual date of Completion of Work
Original Scheduled date of
Completion of work
8
Value of Award2 in (Rs. Lakhs)
9
Firm or With Escalation in prices
10
Actual capital expenditure till the
completion or up to COD whichever
is earlier for work capitalized during
the period(Rs.Cr.)
- Taxes & Duties and IEDC (included
in above)
- IDC, FC, FERV & Hedging
Cost(included in above)
11
Actual capital expenditure till the end
of the period(Rs.Cr.) for Capital work
under progress
- Taxes & Duties and IEDC (included
in above)
- IDC, FC, FERV & Hedging
Cost(included in above)
12
Actual capital expenditure already
capitalized in earlier years(Rs.Cr.)
- Taxes & Duties and IEDC (included
in above)
- IDC, FC, FERV & Hedging
Cost(included in above)
13
Sub -total (10+11+12)
Note:
1. Above statement to be provided separately for each work commissioned during the period,
work under progress and part capitalization done in earlier years.
2. Statement as Per Form F5-6 to be duly reconciled with corresponding Cost Break Up to be
provided as per Form F5-5 , for each transmission line commissioned
during the True-up, Review and ARR period
* Pertaining to Transmission Business Only, SLDC shall file separately
Signature of Petitioner
56
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
(k) Statement of Additional Capitalization
Form No: F5
Rs. Crores
No
Year
Work/ Equipment
proposed to be
added after COD up
to Cut off Date/
Beyond Cut off Date
Amount
capitalised
and Proposed
to be
capitalised
Justification
Regulations
under which
covered
Admitted
Cost1
1
2
3
4
5
6
7
8
9
10
11
12
13
Note:
1 Fill the form in chronological order year wise along with detailed justification clearly bring out the
necessity and the benefits accruing to the beneficiaries.
2 In case initial spares are purchased alongwith any equipment, then the cost of such spares should
be indicated separately.
* Pertaining to Transmission Business Only, SLDC shall file separately
57
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
(l) Statement of Capital Works in Progress
Form No: F5
Rs. Crores
Particulars
Previous Year
Current
Year
(i. e.
RE)
Ensuing
years (Projection)
Approved
in
MYT/RE
Actual
FY
(n+1)
FY
(n+2)
FY (n+3)
A
a
Opening Capital
Expenditure(CWIP)
b
Amount of IDC, FC, FERV
& Hedging cost included in
a above
B
a
Addition/Adjustment in
Capital Expenditure(CWIP)
during the period
b
Amount of IDC, FC, FERV
& Hedging cost included in
a above
C
a
Capitalization/Transfer to
Gross Fixed asset during
the period
b
Amount of IDC, FC, FERV
& Hedging cost included in
a above
D
a
Closing Capital
Expenditure(CWIP)
b
Amount of IDC, FC, FERV
& Hedging cost included in
a above
* Pertaining to Transmission Business Only, SLDC shall file separately
58
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Form No: F5
(m) Capital Work-In-Progress (CWIP) ((Rs. Crores))
S.N
Particulars
Previous year
(Actuals)
Current year (RE)
Ensuing year (s)
(Projections)
Loan
Grant
Equity
Loan
Grant
Equity
Loan
Grant
Equity
1
Opening CWIP
2
New Investment
3
Less
Capitalization(a+b)
a) CWIP Capitalization
b) New Investment
capitalization
4
Closing CWIP (1+2-3)
* Pertaining to Transmission Business Only, SLDC shall file separately
Name of Transmission Licensee
Normative Parameters Considered for Tariff Computations
Form No: F6
Particulars
Previous Year
Current
Year
(i. e. RE)
Ensuing
years (Projection)
Approved
in MYT/RE
Actual
FY
(n+1)
FY
(n+2)
FY
(n+3)
1
Target Availability
%
AC System
%
98
98
HVDC bi-pole links
%
92
92
92
HVDC back-to-back
Stations
%
95
95
95
2
Normative O&M per
ckt.km, if any
Rs.
Crores
1
1
1
3
Normative O&M per bay,
if any
Rs.
Crores
0.25
0.25
0.25
4
Normative A&G expenses
per ckt.km, if any
Rs.
Crores
0.30
0.30
0.30
5
Normative A&G per bay,
if any
Rs.
Crores
0.10
0.10
0.10
6
Normative R&M
expenses
% of
GFA
1
1
1
7
Maintenance Spares for
Working Capital, if any
% of
O&M
40%
40%
40%
8
Receivables for Working
Capital
in
Months
2
2
2
9
Effective Rate of Return
on Equity
%
10
Base Rate of Reserve
Bank as on
________________
%
11
State Bank one-year
‘MCLR’ as on ___
%
12
Bank Rate as on ___
%
59
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
(a) Reconciliation of Gross Fixed Assets(GFA) admitted with
Gross Fixed Assets(GFA) of Financial Account
Form No: F7
Rs. Crores
Particulars
Previous Year
Current
Year
(i. e. RE)
Ensuing
years (Projection)
Approved
in
MYT/RE
Actual
FY
(n+1)
FY
(n+2)
FY
(n+3)
A
Gross Fixed Assets ( as at
beginning of the year):
1.GFA as per
(Financial/Statutory
Account)
2.Expenditure allowed but
not capitalized in
Financial/Statutory Account
3.Expenditure Capitalized in
Financial/Statutory Account
but not allowed.
4. Admitted GFA(1+2-3)
B
Addition/ adjustment to
Gross Fixed Assets
(During the year):
5.Expenditure capitalized in
Financial/Statutory Account
6.Expenditure allowed but
not capitalized in
Financial/Statutory Account
7.Expenditure Capitalized in
Financial/Statutory Account
but not allowed.
C
Gross Fixed Assets (as at
end of the year) Admitted by
the commission( 4+5+6-7)
Signature of Petitioner
60
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Form No: 7
(b) Gross Fixed Assets (GFA) (Information to be supplied for the previous year (actuals), current year (RE) and the ensuring year (s) (projections)
(Rs. in Cr.)
S.N
Particulars(i.e
Assets Group)
GFA at the beginning of the
year
Addition to GFA during the
year
Adjustment to GFA on
account of assets
sold/discarded etc
GFA at the end of the year
Con
sum
er
Cont
ributi
on
By
gra
nts
Loa
n
E
q
ui
ty
T
ot
al
Con
sum
er
Cont
ributi
on
By
gra
nts
L
o
a
n
Eq
uity
T
ot
al
Con
sum
er
Cont
ributi
on
By
gra
nts
Loa
n
E
q
ui
ty
T
ot
al
Con
sum
er
Cont
ributi
on
B
y
gr
a
nt
s
Loa
n
Eq
uity
T
ot
al
1
2
3
4
5
6
8
9
10
11
12
13
14
15
16
17
18
19
1
Land and land
rights
2
Buildings
3
Hydraulic works
4
Other civil works
5
Plant and
Machinery
6
Lines and cable
network
7
Vehicles
8
Furniture and
Fixtures
9
Office equipment
10
Others, if any (pl.
specify)
Total
(c) Bifurcation of Fixed Assets into IDC and IEDC etc.
S.N
Particulars
Previous Year
Current
Year
(RE)
Ensuing
years
Approved in
MYT/RE
Actual
1
Opening Gross Fixed Assets
a
Additions in Gross Fixed Assets
b
Amount of IDC, FC, FERV & Hedging cost
included in B(a) above
c
Amount of IEDC (excluding IDC, FC, FERV
& Hedging cost) included in B(a)
* Pertaining to Transmission Business
Only, SLDC shall file seperately
2
Closing Gross Fixed Assets
(d) Bifurcation of Fixed Assets into Depreciable and Non-depreciable assets etc.
1
Gross fixed assets of the beginning of the
year
Less: Value of non depreciable assets (i.e
land)
2
Additions during the year
Less: Value of non depreciable assets (i.e
land)
3(i)
IDC, FC, FERV & Hedging cost
3(ii)
Amount of IEDC
4
Adjustment for assets sold/discarded etc
5
Closing GFA
6
Average GFA (Excluding Value of non
depreciable assets)
7
Weighted Average Rate of Depreciation
8
Gross Depreciation
9
Opening grants*
10
Grants* during the year
11
Adjustment for assets sold/discarded etc
12
Total Grants*
13
Average Grants*
14
Weighted Average rate of Depreciation
15
Depreciation for GFA on Grants
16
Net Depreciation of GFA(8-15)
*grants includes consumer contributions.
61
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
(e) Value of Depreciation Charges (Rs. Crores)
Form No: 7
S.N
Particulars (i.e
Assets Group)
Accumulated
Depreciation
Accumulated
Accumulated
depreciation at the beginning of
the year
charges during the year
depreciation adjustment on
account of assets
sold/discarded etc
depreciation at the end of
the year
Con
sum
er
Cont
ributi
on
By
grant
s
Loa
n
Eq
uity
Tot
al
Con
sum
er
Cont
ributi
on
L
o
a
n
Eq
uity
Tot
al
Consu
mer
Contri
bution
By
gra
nts
Loa
n
E
q
ui
ty
Tot
al
Con
sum
er
Cont
ributi
on
By
gra
nts
L
o
a
n
Eq
uity
T
ot
al
1
2
3
4
5
6
8
9
10
11
12
13
14
15
16
17
18
19
1
Land and land
rights
2
Buildings
3
Hydraulic works
4
Other civil works
5
Plant and
Machinery
6
Lines and cable
network
7
Vehicles
8
Furniture and
Fixtures
9
Office
equipment
10
Others, if any
(pl. specify)
Total
* Pertaining to Transmission Business Only, SLDC shall file separately
Name of Transmission Licensee
(d) Statement of Assets Not in Use
Form No: F7
Rs. Crores
Financial Year*
Sl. No.
Date of
Acquisition/Installation
Historical
Cost/Cost
of
Acquisition
Date of
withdrawal
operations
Accumulated
Depreciation
on date of
withdrawal
Written
down
value on
date of
withdrawal
-
-
-
*Note:- Information to be provided for Previous Year, Current Year & Ensuing Control
Period
Signature of
Petitioner
62
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
User contributions and grants towards cost of capital assets (Rs. Crores)
Form No: F8
Particulars
Previous Year
Current Year
Ensuing Year/years
Balance
at the
start of
the year
Addit
ions
Balanc
e at the
end of
the
Year
Addit
ions
Balanc
e at the
end of
the
Year
Additi
ons
Balance
at the end
of the
Year
1
User contributions Towards Cost
Of Capital Assets
-
2
Grant Towards Cost Of Capital
Assets
A
Total (1+2)
-
-
-
-
-
-
Amount utilized for Assets forming
part of Depreciable GFA
3
User contributions Towards Cost
Of Capital Assets
-
4
Grant Towards Cost Of Capital
Assets
B
Total (3+4)
-
-
-
-
Amount utilized for Assets forming
part of non-Depreciable GFA
5
User contributions Towards Cost
Of Capital Assets
-
6
Grant Towards Cost Of Capital
Assets
C
Total (5+6)
-
Amount remains un-utilized (A-B-C)
7
User contributions Towards Cost
Of Capital Assets
-
8
Grant Towards Cost Of Capital
Assets
C
Total (7+8)
D
Amount utilized for CWIP out of
"C" above
E
Amount kept in Bank out of "C"
above
F
Depreciation on assets created
out of grants (Admitted)
G
Depreciation. on assets created
out of grants (Financial/Statutory
Account)
* Pertaining to Transmission Business Only, SLDC shall file separately
63
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
(a) Details of Loans for the year
Form No: F9
S.N
Particulars
Purpose
of loan
Opening
balance
Rate of
Interest
Additi
on
during
the
year
Repayment
during the
year
Closing
balance
Amount
of
interest
paid*
1
2
3
4
5
6
7
8
*The amount of penal interest, if any, to be shown separately.
(b) Further Details in case of Foreign Loans
S.N
Particulars
Date
Amount
(Foreign
Currency)
Exchange
Rate
Amount
in Rs.
Crore
Name of Currency
Loan drawal
Scheduled Principal
Repayment
Actual Principal
Repayment
Scheduled Interest
payment
Actual Interest payment
Period of hedging
Cost of hedging
* Pertaining to Transmission Business Only, SLDC shall file separately
Note: Information to be supplied separately for the previous year (actuals), current year(RE)
and ensuing years
(c) Information Regarding Restructuring of Outstanding Loans During the Year
S.N
Source of loan
Amount
of
original
loan
Old rate
of
interest
Amount
already
restructured
Revised
rate of
interest
Amount now
being
restructured
New rate
of
interest
1
2
3
4
5
6
7
8
64
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
(d) Domestic loans, bonds and financial leasing
Form No: F9
Rs. Crores
Sl.
No.
Particulars
Opening Balance at the
beginning of the year
Amount
received
during the
year
Principal
repayment
Interest
Closing Balance
Principal
not
overdue
Principal
overdue
Interest
overdue
Total
Due
Paid
Due
Paid
%
Principal
Interest
Overdue
A
LONG-TERM
1
LIC
2
REC
3
PFC
4
Bonds
5
Bank
6
APDRP
7
Any Other,
please specify
Sub Total (A)
-
-
-
-
-
-
-
-
-
-
-
B
SHORT-TERM
1
2
3
4
Sub Total (A)
-
-
-
-
-
-
-
-
-
-
-
Total (A+B)
-
-
-
-
-
-
-
-
-
-
-
*Note:- Loanwise information to be provided for Previous Year, Current Year & Control period. Also indicate
rate of interest and other conditions.
* Pertaining to Transmission Business Only, SLDC shall file separately
Signature of Petitioner
65
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Form No: F9
(e) Statement of Reconciliation of Net Actual Loan ( opening ) with Net Normative Loan
(Opening)
(Rs. In Crore)
Particulars
Previous
year
Current
year
(RE)
Ensuing Years
FY
(n+1)
FY
(n+2)
FY (n+3)
Net Actual Loan as per
Books of Accounts as on
:
Domestic
Foreign
-
-
-
-
-
Add: Repayment Made till
Date
Gross Actual Loan
-
-
-
-
-
Add: Equity considered
as normative loan
Gross Normative Loan
-
-
-
-
-
Less : Depreciation
Recovered as per ARR till
Date
Net Normative Loan
-
-
-
-
-
* Pertaining to Transmission Business Only, SLDC shall file separately
66
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Details of Equity
Form No: F10
(a) Details of Foreign Equity
Rs. Crores
S.
No
.
Particulars
Previous Year
Current Year (i. e. RE)
Ensuing
years (Projection)
Date
Amount
(Foreign
Currency)
Excha
nge
Rate
Amount in
Indian
Rupee
Date
Amount
(Foreign
Currency)
Exchange
Rate
Amount in
Indian
Rupee
Date
Amount
(Foreign
Currency)
Exchange
Rate
Amount
in Indian
Rupee
Currency11
1
Infusion
2
Currency21
1
Infusion
2
Total
1 Name of the currency to be mentioned e.g. US $, etc.
2 In case of equity infusion more than once during the year, Exchange rate at the date of each infusion to be
provided
(b) Details of Indian Equity
Rs. Crores
S.No.
Particulars
Previous Year
Current Year (i. e.
RE)
Ensuing
years (Projection)
Date
Amount
Date
Amount
Date
Amount
1
Infusion
2
-
3
-
Total
* Pertaining to Transmission Business Only, SLDC shall file separately
(c)
Total return on equity
Rs. Crores
1
Amount of total asset created
during the year
2
Less asset created from grant
3
Less asset created from users
contribution
4
Net asset Created
5
Amount of equity addition
6
Equity (Opening Balance)
7
Equity (Closing Balance)
8
Average Equity
9
Base rate of Return on
Equity%
Tax Rate ( Enclose detailed
calculation alongwith
supporting documents)%
Effective Rate of Return on
Equity
10
Return o Equity (Rs. In crore)
11
Equity entitled to incentive
12
Incentive
13
Additional Return
14
Total Return on Equity
(d) Details of total equity infused
S.No.
Particulars
Previous
year
Current
year
(RE)
Ensuing
Years
Shareholders’ Funds
1
Equity Share Capital
2
Share Premium utilized for
Capital Expenditure
3
Free Reserves utilized for
Capital Expenditure
Total Equity
67
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Interest and Finance Charges(Rs. Crores)
Form No: F11
S.N.
Source of loan
Purpose of
loan
Previous
year
(Actuals)
Current
year (RE)
Ensuing year
(s)
1
2
3
4
5
6
1
SLR Bonds
2
Non SLR Bonds
3
LIC
4
REC
5
PFC
6
Commercial Banks
7
Bills discounting
8
Lease rental
9
Others, if any (Please
specify)
10
Total
11
Add State Govt. Loan
12
Total (10 +11)
13
Less IDC
14
Net Interest
15
Add prior period
adjustment *
16
Total Interest
17
Finance charges
18
Total Interest and
finance charges
* Year-wise details should be submitted with documentary evidence. Further Rate of interest of
various loans to be indicated in a separate sheet.
* Pertaining to Transmission Business Only, SLDC shall file separately
Particulars
Quantum in
Foreign
currency
Exchange
Rate on
draw
down
date
Amount in
Indian
Rupee
Note: Drawal
of debt and
equity shall be
on paripassu
basis to meet
the
commissioning
schedule.
Drawal of
higher equity
in the
beginning is
permissible.
Also specify
basis of
allocation to
particular
project.
1
Loans
1.1
Foreign Loans
1.1.1
Foreign Loan 1
Draw down Amount
IDC
Financing charges
1.1.2
Foreign Loan 2
- -
- -
Total Draw down
Amount
-
-
-
Total IDC
-
-
-
Total Financing charges
68
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Interest (IDC) Capitalized
S.N.
Name of scheme
/Project
Source of
loan
Interest capitalized
As on
beginning
of previous
year
During
Previous
year
(Actuals)
During
Current
year
(RE)
During
ensuing
year (s)
1
2
3
4
5
6
1
2
Name of Transmission Licensee
Lease details(Rs. Crores)
Form No: F12
S.N
Name of
Lesser
Assets
Leased
Lease
Rentals
Primary
Period
Secondary
Descriptions
Gross
Amount
on
ended /
ending by
period ending
by
1
2
3
4
5
6
7
8
Note: Statement showing Cost benefits analysis of lease must be accompanied.
Name of Transmission Licensee
Operations & Maintenance Cost
Form No: F13
Rs. Crores
Sl.No
Particulars
Previous Year
Current
Year
(i. e. RE)
Ensuing
years (Projection)
Approved in
MYT/RE
Actual
FY
(n+1)
FY
(n+2)
FY
(n+3)
1
Repair &
Maintenance
Expenses
2
Employee
Expenses
2
Administrative and
General Expenses
Less :
4
Expenses
Capitalized
Net O&M
Expenses
-
-
-
-
-
-
Signature of Petitioner
* Pertaining to Transmission Business Only, SLDC shall file separately
69
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
(a) Employee Expenses
Form No:F14
Rs. Crores
S.N
Particulars
Previous Year
Current Year(RE)
Ensuing Year (s)
Approved in
MYT/RE
Actual
1
Salaries & Allowances
(i)
Existing Employees
(ii)
New Employees
(ii)
Total
2
Contribution to
Terminal Benefits
(Accrual Basis)
3
Total of Salary &
Allowances and Terminal
Benefits
4
Amount Capitalised
5
Net Amount
6
Grand Total
Note:
(i)
Terminal benefits paid for the period before the date of reorganisation i.e. 01.11.2012, shall not
be considered.
(ii)
In respect of continuing employees as on the date of reorganisation and newly appointed
employees after re-organisation date the terminal benefits shall be allowed.
(iii)
In respect of item 6, a brief description to be appended.
* Pertaining to Transmission Business Only, SLDC shall file separately
Name of Transmission Licensee
(b) Consumer Price Inflation
Form No: F14
Particulars
PY 5
PY 4
PY3
PY 2
PY 1
CY
Ensuing
years (Projection)
FY
(n-5))
FY
(n-4)
FY
(n-3)
FY
(n-2)
FY
(n-1)
FY
(n)
FY
(n+1)
FY
(n+2)
FY
(n+3)
Annual Average CPI
Index
CPI Inflation
#####
#####
#####
Annual Average WPI
Index
WPI Inflation
Note
CPI and WPI Inflation computed for current year shall be considered for control period at the time of filing of
ARR.CPI inflation shall be determined at the time of truing up.
Signature of Petitioner
* Pertaining to Transmission Business Only, SLDC shall file separately
70
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
(c) Employee Strength
Form No: F14
S.N
Particulars
Previous
year
(Actuals)
Current
Year
(R.E)
Ensuing
years
(Projection)
1
2
3
4
5
6
7
1
Number of employees at the
beginning of FY _______
a)
Technical
b)
Non Technical (Administration)
c)
Non Technical(Revenue, Finance
and Accounts)
2
No. of employees added during
FY ______
a)
Technical
b)
Non Technical (Administration)
c)
Non Technical(Revenue, Finance
and Accounts)
3
Number of employees retiring/
leaving during the FY_____
a)
Technical
b)
Non Technical (Administration)
c)
Non Technical(Revenue, Finance
and Accounts)
4
Number of employees at the end
of the FY (1+2-3)
a)
Technical
b)
Non Technical (Administration)
* Pertaining to Transmission Business Only, SLDC shall file separately
Name of Transmission Licensee
Form No: F14
(d) Employees Productivity Parameters
(in Crore)
S.N
Particulars
Previous year
Current
Ensuing
Year (R.E)
years (Projection)
Approved
in
MYT/RE
(Actuals)
1
2
3
4
5
6
7
8
1
Number of employees
2
Number of Sub-stations
3
Total capacity of Sub-stations
(MVA)
4
Transmission line length in
ckt/km
5
Energy Received at STU-CTU
interface (Units)
6
Employees per MU of energy
handled (5/1)
7
Employees cost
8
Employees cost in paise / kWh
(7/5)
71
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
R&M Expenses
Form No: F15
Rs. Crores
Particulars
Previous Year
Current
Year (i.
e. RE)
Ensuing
years (Projection)
*Normative
/Approved
in MYT/RE
Actua
l
FY (n)
FY
(n+1)
FY
(n+2)
FY
(n+3)
1
Average Gross Fixed Assets
2
Percentage point as per the norm
(%)
3
Repair & Maintenance Expenses
0
0
0
0
0
*Normative/Approved in MYT/RE: If norms are specified by the Commission for concern year, Normative
figures shall be given. In case norms are not specified latest approved figures in MYT or Revised
Estimate(RE) as the case may be shall be given.
Further details of component wise R&M Expenses
Particulars
Previous Year
Current
Year (i.
e. RE)
Ensuing
years (Projection)
*Normative
/Approved
in MYT/RE
Actual
FY (n)
FY
(n+1)
FY
(n+2)
FY
(n+3)
1
Plant & Machinery
2
Building
3
Hydraulic works & civil works
4
Line cable & network
* Pertaining to Transmission
Business Only, SLDC shall file
separately
6
Furniture & fixtures
7
Office equipments
8
Any other expenses (please specify)
9
Total expenses
10
Less capitalized
11
Net Expenses
12
Total expenses charged to revenue
* Year-wise details of these charges may be provided with documentary evidence
72
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Administration and General Expenses
Form No: F16
Rs. Crores
Particulars
Previous Year
Current
Year (i.
e. RE)
Ensuing
years (Projection)
Approved
in
MYT/RE
Actual
FY
(n+1)
FY
(n+2)
FY
(n+3)
Rent, rates & taxes
Insurance
Telephone, postage & Telegrams
Consultancy fees
Technical fees
Other professional charges
Conveyance & travel expenses
Electricity & Water charges
Freight
Other material related expenses
Penalty/Fine Paid (if any)
Any other expenses (please specify)
Total expenses
Less Capitalised
Net expenses
Total expenses charged to revenue
* Year-wise details of these charges may be provided with documentary evidence.
* Pertaining to Transmission Business Only, SLDC shall file separately
Name of Transmission Licensee
Short Term Open Access Consumers
Form No: F17
Rs. Crores
Particulars
Previous Year
Current
Year (i.
e. RE)
Ensuing
years (Projection)
Approved
in MYT/RE
Actual
FY (n+1)
FY (n+2)
FY (n+3)
Number of Short Term Open
Access Customers
Amount
Retained by Licensee
0
0
0
0
0
0
Payable to Beneficiaries
0
0
0
0
0
0
Signature of Petitioner
73
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Details of Non-tariff Income
Form No: F18
Rs. Crores
No
Particulars
Previous Year
Current
Year (i.
e. RE)
Ensuing
years (Projection)
Approved
in
MYT/RE
Actual
FY (n+1)
FY
(n+2)
FY
(n+3)
1
Profits derived from disposal of
assets
2
Rents
3
Income from Investments other
than Contingency reserves
4
Interest on Loans and Advances
to Lessors
5
Interest on Advances to
Suppliers / Contractors
6
Delayed Payment surcharge
7
Meter Rent
8
Miscellaneous Receipts from
consumers
9
Interest on loans and Advances
to Staff
10
Income/Fee/Collection against
staff welfare activities
11
Others, please specify
Total
-
-
-
-
-
-
* Pertaining to Transmission Business Only, SLDC shall file separately
Name of Transmission Licensee
Working Capital Interest
Form No: F19
Rs. Crores
Particulars
Previous Year
Current
Year (i.
e. RE)
Ensuing
years (Projection)
Approved
in MYT/RE
Actual
FY
(n+1)
FY
(n+2)
FY
(n+3)
1
Receivables equivalent to two (2)
month of transmission charges
calculated on target availability
level
0.00
2
O&M Expenses of one month
3
Maintenance spares@40% of
R&M expenses for one month
4
Less:
(i) Depreciation, ROE, and
contribution to contingency
reserve equivalent to two
months.
(ii) Security deposit if any, held
during the year
(iii) two months equivalent of
74
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
grant received from the State
Govt.
Total Working Capital
Interest Rate
12.50%
Interest on Working Capital
* Pertaining to Transmission Business Only, SLDC shall file separately
Name of Transmission Licensee
Investments in Non business related activities
Form No: F20
Rs. Crores
Sl.
No.
Description of
investment
Balance at
the
beginning
of the year
Further
Investments
during the
year
Investments
realised
during the
year
Balance at
the end of
the year
Remarks
Details of Income from Other
Business (Rs. In Crore)
No
Particulars
Previous
year
Current
year (RE)
Ensuing Years
I
Receipts from other
Business
I
Less: Expenses from
other business
E
Revenue of other
Business
R=I-E
0
0
0
0
II
Assets of Licensed
business utilized in other
business
A
Total assets of other
business (including the
assets utilized of the
Licensed Business)
C
Allocation of Revenue to
Licensed Business
decided by the
Commission
X
III
Due to Licensed
Business (to be
deducted from ARR)*
X*(R*A/C)
Note:- Information to be provided for Previous Year, Current Year & each year of Control period
*In case Gross Receipts exceed expenditure of other business in (I) above (where Gross receipt is less
than expenditure of other business in (I) above no amount shall be deducted from ARR of Licensee).
* Pertaining to Transmission Business Only, SLDC shall file separately
75
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Details of Expenses Capitalised
Form No: F21
Rs. Crores
Sl.
No.
Particulars
Previous Year
Current
Year (i. e.
RE)
Ensuing
years (Projection)
Approved
in
MYT/RE
Actual
FY
(n+1)
FY
(n+2)
FY (n+3)
1
Interest & Finance
charges Capitalised
175.69
2
Other expenses
capitalised:
a. Employee expenses
120.24
b. R&M Expenses
0
c. A&G Expenses
6
d. Depreciation
0
e. Others, if any
0
Total of 2
Grand Total
Signature of Petitioner
Name of Transmission Licensee
Net Prior Period Expenses / Income
Form No: F22
Rs. Crores
Sl.No.
Particulars
Previous Year
Current year (RE)
A
Income relating to previous years:
1
Interest income for prior periods
2
Income Tax prior period
3
Excess Provision for Depreciation
4
Excess Provision for Interest and Fin.
Charges
5
Other Excess Provision
6
Others (please specify)
Sub-Total A
-
-
B
Expenditure relating to previous
years
1
Employee Cost
2
Depreciation
3
Interest and Finance Charges
4
Admn. Expenses
5
Withdrawal of Revenue Demand
6
Material Related
7
Others (please specify)
Sub-Total B
-
-
Net prior period Credit/(Charges) : A-
B
-
-
* Pertaining to Transmission Business Only, SLDC shall file separately
Sl.No.
Particulars
1
Extraordinary Credits
76
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
a
--
TOTAL CREDITS
- -
2
Extraordinary Debits
a
--
TOTAL DEBITS
- -
Name of Transmission Licensee
Form No: F23
Contribution to Contingency Reserve(Rs. Crores)
S.N
Particulars
Amount
1
2
3
1
Fixed Assets
2
%age appropriation to the contingency reserve
3
Appropriation to the contingency amount
4
Amount invested in securities
5
Drawal from the contingency reserve (Please specify)
(i)
(ii)
(iii)
Total drawal
Information Regarding Grant/Subsidy from State Govt/Central Govt.
S.N
Particulars
Previous
Year
Current
Year
Ensuing
Years
1
2
3
4
5
A
Amount from State Govt.
i) Purpose for which grant received
(a)
(b)
ii) Targeted categories for subsidy
* Pertaining to Transmission Business Only, SLDC shall file
separately
(b)
B
Amount from Central Govt.
i) Purpose for which grant received
(a)
(b)
77
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Allocation statement of Expenses of SLDC
Form No: F24
Rs. Crores
Particulars
Previous year
Current Year
Ensuing Years
Total
Expe
nses
of
STU
Allo
cate
d %
SLDC
Share
Total
Expe
nses
of
STU
Alloc
ated
%
SLDC
Share
Total
Expen
ses of
STU
Alloc
ated
%
SLDC
Share
Expenditure
a
O&M Expenses
i
R&M Expense
ii
Employee Expenses
iii
A&G Expense
Total O&M expenses
( i+ii+iii)
0
0
0
b
Depreciation
c
Interest on Loan
f
Return on Equity
g
Others, please specify
Total Expenditure
78
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Transmission Losses (For Transmission Licensee)
Form No: P1
S.No.
Details
Previous Year
Current Year
Ensuing Years
A
Losses in 400 KV system
1
Total Energy delivered by Generating
Stations and Inter State/Intra State tie-
links at the interface points of the Intra
State Transmission system
2
Energy Delivered to next (Lower) Voltage
level of the Transmission System
3
Sum of all the energy delivered at this
voltage level to the State Distribution
System
4
Transmission loss in system (A1-A2-A3)
5
Transmission loss in (Transco) system
(%) {A4/A1} x 100
B
Losses in 220 KV system
Previous Year
Current Year
Ensuing Years
1
Total Energy delivered by Generating
Stations and Inter State/Intra State tie-
links at the interface points of the Intra
State Transmission system
2
Energy Delivered to next (Lower) Voltage
level
3
Sum of all the energy delivered at this
voltage level to the State Distribution
System
4
Transmission loss in system (B1-B2-B3)
5
Transmission loss in (Transco) system
(%) {B4/B1} x 100
C
Loss Calculation at 132 KV
Previous Year
Current Year
Ensuing Years
FY (n-1)
FY (n)
FY (n+1)
* Pertaining to Transmission Business
Only, SLDC shall file separately
2
Energy Delivered to next (Lower) Voltage
level
3
Sum of all the energy delivered at this
voltage level to the State Distribution
System
4
Transmission loss in system (C1-C2-C3)
5
Transmission loss in (Transco) system
(%) {C4/C1} x 100
D
Total Losses in the Transmission
system
Previous Year
Current Year
Ensuing Years
1
Total Energy delivered by Generating
Stations and Inter State tie-links at the
interface points of the Intra State
Transmission system
2
Sum of all the energy delivered by the
Transmission system in to the State
Distribution System
3
Transmission loss in system (D1-D2)
4
Transmission loss in (Transco) system
(%) {(D3/D1) x 100}
Signature of Petitioner
79
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Energy Delivered by Transmission licensee to the Distribution Licensees/
Bulk consumers at interface points
Form No:P2
Voltage level
Name of Sub-
Station
Distribution Licensee / Bulk Consumer
Total Energy
delivered
NBPDCL
SBPDCL
Others,
specify
MUs
MUs
MU
MUs
1
2
3
4
9
10
220 KV
i
ii
iii
iv
132 kV
I
ii
iii
iv
33 kV
i
ii
iii
iv
* Pertaining to Transmission Business Only, SLDC shall file separately
Total for all
voltages
Details to be provided for previous years, current year and for each year of control period.
Name of Transmission licensee
Details of Electrical Accidents
Form No:P3
Type of Accident
Previous Year
Current year (RE)
No. of Accidents
No. of Accidents
Fatal
Non Fatal
Total
Fatal
Non Fatal
Total
Human
-
-
Other, if any, (please specify)
-
-
Total
-
-
-
-
-
-
* Pertaining to Transmission Business Only, SLDC shall file separately
80
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of the Transmission Licensee
Abstract of Outages due to feeder tripping
Form No: P4
SNo.
Detail
Previous Years
Current Years
Ensuing Years
No. of
feeders
No. of
trippings
Total
Duration
of
Trippings
(hrs.)
Average
duration
of
interrupt
ion per
feeder
No. of
feeders
No. of
trippings
Total
Duration
of
Trippings
(hrs.)
Average
duration
of
interrupti
on per
feeder
No. of
feeders
No. of
trippings
Total
Duration
of
Trippings
(hrs.)
Average
duration of
interruption
per feeder
1
Feeder
voltage
Level
(400
KV)
2
Feeder
voltage
Level
(220
KV)
3
Feeder
voltage
Level
(132
KV)
* Pertaining to Transmission Business Only, SLDC shall file separately
Name of Transmission Licensee
Major System Disturbances
Form No: P5
S.
No.
Disturbances
Previous Years
Current
Years
Ensuing Years
Number
Total
Duration
(Hrs.)
Number
Total
Duration
(Hrs.)
Number
Total
Duration
(Hrs.)
A
Disturbances when DISCOM
supply has been effected for
more than 1 hr.
i
Due to 400 kV transformer
failures
ii
Due to 400 kV transmission
line outage
iii
Due to 400 kV sub-station
equipment (CT, CVT etc.)
failure
iv
Due to 220 kV transformer
failure
v
Due to 220 kV transmission
line failure
vi
Due to 220 kV sub-station
equipment (CT, CVT etc).
failure
vii
Due to 132 kV transformer
failure
viii
Due to 132 kV transmission
line failure
ix
Due to 132 kV sub-station
equipment (CT, CVT etc).
failure
B
Estimated unserved energy
due to such interruptions
C
Other Transmission
disturbances when DISCOM
81
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
supply has got effected
i
ii
iii
iv
v
* Pertaining to Transmission Business Only, SLDC shall file separately
Name of Transmission Licensee
Frequency Variation
Form No:P6
Sl.
No.
Frequency
Previous Years
Current Years
Ensuing Years
No. of
Hours
As
percentage
of total
hours in
the year
(%)
No. of
Hours
As
percentage
of total
hours in
the year
(%)
No. of
Hours
As
percentage
of total
hours in the
year (%)
1
Above 50.5 Hz
2
50.5 - 5.2 Hz
3
50.2 - 49.8 Hz
4
49.8 - 49.5 Hz
5
49.5 - 49.0 Hz
6
49.0 - 48.5 Hz
7
Below 48.5 Hz
* Pertaining to Transmission Business Only, SLDC shall file separately
82
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Voltage Fluctuation
Form No: P7
Name of Sub-
Station
Transf
ormat
ion
Capac
ity
Reactive
Compensati
on
provided
Previous Year
Current Year
Ensuing Years
Time during which voltage in an year
Time during which voltage in an year
Time during which voltage in an year
More than
upper limit in
%age
Between
upper &
lower limit
Less than
lower limit in
%age
More than
upper limit in
%age
Between upper
& lower limit
Less than
lower limit in
%age
More than
upper limit in
%age
Between
upper &
lower limit
Less than
lower limit in
%age
Hou
rs
%ag
e
Hou
rs
%ag
e
Hou
rs
%ag
e
Hou
rs
%age
Hours
%age
Hou
rs
%ag
e
Hou
rs
%ag
e
Hours
%a
ge
Hou
rs
%age
400 kV level
i
ii
iii
iv
220 kV Level
i
ii
iii
iv
132 kV level
i
ii
iii
* Pertaining to Transmission Business Only, SLDC shall file separately
Note:
Upper Limit is 420KVrms and lower limit is 360KVrms in case of 400 kv level
Upper Limit is 245KVrms and lower limit is 200KVrms in case of 220 kv level
.
Upper Limit is 145 kVrms and lower limit is 120 KV rms in case of 132 kv level
Name of Transmission Licensee
Licensee wise Load shedding carried out during the year
Form No: P8
S.
No.
Particulars
NBPDCL
SBPDCL
Load shedding during the Year (In Hrs.)
1
On SLDC's instructions
a
To control excess drawal
b
To control equipment damage
c
Under force majeure conditions
2
Due to maintenance or outage of own network
3
Any other reason
Total load shedding for the Year
Details to be provided for previous two years, base year and for each year of control period.
83
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Details of Overloaded Feeders
Form No:P9
S.No.
Voltage Level
No. of
feeders
Feeder
length
(ckt. Km.)
No. of
feeders
overloaded
Line length
overloaded
feeders
(ckt. Km.)
% number of
Overloaded
feeders in
Area
% length of
overloaded
feeders in
Area
Previous Year
1
400 KV
2
220 KV
3
132 KV
Current Year
1
400 KV
2
220 KV
3
132 KV
* Pertaining to Transmission Business Only, SLDC shall file separately
Note:
Equipment considered as overloaded if carrying more than 110% of rated load for average 1 hour per day.
Details to be provided for previous two years, base year and for each year of control period.
Signature of Petitioner
84
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission licensee
Details of over loaded Transformers
Form No.: P10
Sl.
No.
Rated Voltage
Previous Years
Current Years
Ensuing Years
Rated
Capacity
Actual Load
on
Transformer
% of
Transform
ers over
loaded
Rated
Capacity
Actual Load
on
Transformer
% of
Transforme
rs over
loaded
Rated
Capacity
Actual Load
on
Transformer
% of
Transfor
mers
over
loaded
1
400/220/33 KV
Transformers
Capacity
i
ii
iii
iv
Total
-
-
-
-
-
-
-
-
-
2
220/132/33KV
Transformers
Capacity
i
ii
iii
iv
Total
-
-
-
-
-
-
-
-
-
3
220/132KV
Transformers
* Pertaining to
Transmission Business
Only, SLDC shall file
separately
i
ii
iii
iv
Total
-
-
-
-
-
-
-
-
-
4
132/33KV
Transformers
Capacity
i
ii
iii
iv
Total
-
-
-
-
-
-
-
-
-
Note:- Details may be submitted Area wise (Circle wise).
Signature of Petitioner
85
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Failure of Transformers
Form No: P11
S.
No.
Transformation
ratio
Previous Years
Current Years
Ensuing Years
Total No. of
Transformers
No. of
failures
Total
Duration of
failure
(hrs.)
Total No. of
Transformers
No. of
failures
Total
Duration
of failure
(hrs.)
No. of
Transformers
No. of
failures
Total
Duration
of failure
(hrs.)
1
400/220/33 KV
Transformers
Capacity
i
ii
iii
iv
Total
-
-
-
-
-
-
-
-
-
2
220/132/33KV
Transformers
Capacity
i
ii
iii
iv
Total
-
-
-
-
-
-
-
-
-
3
220/132KV
Transformers
* Pertaining to
Transmission
Business Only,
SLDC shall file
separately
i
ii
iii
iv
Total
-
-
-
-
-
-
-
-
-
4
132/33KV
Transformers
Capacity
i
ii
iii
iv
Total
-
-
-
-
-
-
-
-
-
86
BIHAR GAZETTE (EXTRA) 25TH JANUARY 2022
Name of Transmission Licensee
Key Ratios
Form No: P12
S.No
Particulars
Previous Year
Current Year
Ensuing Years
A
Financial & Material
Management
1
Annual capital expenditure/net
book value
2
Total Transmission cost/Energy
Transmitted
3
Employee cost as a percentage
of total cost
4
Operating expenses / Revenue
from Transmission of power
5
Cost of capital invested
6
Debt Service Coverage Ratio
7
Cost of total Stores Inventory/100
Km of transmission lines
9
Working Capital to Revenue from
Transmission of power
B
HR Management
1
Energy Transmitted (MU) per
Employee
2
Total line length/employee (Km.)
3
Connected Load per Employee
(MVA)
4
Transmission Income per
Employee
5
Training participation days per
employee
C
Operational Performance
1
Unplanned outage/total outage
(Fault breakdown / total outage)
* Pertaining to Transmission
Business Only, SLDC shall file
separately
Signature of Petitioner
————
PUBLISHED AND PRINTED BY THE SUPERINTENDENT,
BIHAR SECRETARIAT PRESS, PATNA.
Bihar Gazette (Extra) 36—571+10—Egazette