The B
The B
The B
The B
E
PUBL
(NO.PATNA 825)
Bih
NO. 01— In exerci
Section 181 (2) (zd) of the E
in this behalf, and after pre
hereby makes the following
1. Short title and c
(i)
These R
Commiss
Renewab
(ii)
These re
official G
Commiss
commenc
(iii) These Re
2. Definitions and
1) In these re
(a)
‘A
(b)
'A
ca
by
lo
su
un
REGISTE
Bihar Gaze
Bihar Gaze
Bihar Gaze
Bihar Gaze
EXTRA ORDINARY
LISHED BY AUTHORIT
19 ASHWIN 1944(S)
PATNA, TUESDAY, 11TH OCT
har Electricity Regulatory Commission
———
Notification
The 2nd August 2022
ise of powers conferred under Sections 61,66,8
Electricity Act, 2003 (36 of 2003), and all other
evious publication, the Bihar Electricity Regula
regulations, namely:
commencement.—
Regulations may be called the Bihar Elect
sion (Terms and Conditions for Tariff de
ble Energy Sources) Regulations, 2022.
gulations shall come into force on the date of
Gazette, and unless reviewed earlier or
sion, shall remain in force for a period of 3 year
cement.
egulations shall extend to the whole of the State o
Interpretation.—
egulations, unless the context otherwise require
Act’ means the Electricity Act, 2003 (36 of 2003
Auxiliary energy consumption' or 'AUX' in rela
ase of a generating station means the quantum of
y auxiliary equipment of the genre ting station
osses within the generating station, expressed as a
um of gross energy generated at the generator te
nits of the generating station;
ERED NO. PT.-40
ette
ette
ette
ette
TY
TOBER 2022
6(1)(e) read with
powers enabling it
atory Commission
tricity Regulatory
etermination from
Publication in the
extended by the
rs from the date of
of Bihar.
es,
3);
tion to a period in
f energy consumed
n, and transformer
a percentage of the
erminals of all the
2
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
(c)
‘Biomass’ means wastes produced during agricultural and forestry
operations (for example straws and stalks) or produced as
a by-product of processing operations of agricultural produce
(e.g., husks, shells, de- oiled cakes,); wood produced in dedicated
energy plantations or recovered from wild bushes or weeds; and the
wood waste produced in some industrial operations;
(d)
‘Biomass gasification’ means the process of incomplete combustion
of biomass resulting in production of combustible gases consisting
of a mixture of carbon monoxide(CO), hydrogen (H2) and traces of
methane (CH4);
(e)
‘Biogas’ means a gas produced when organic matter like crop
residues, sewage and manure breaks down (ferments) in an
oxygen-free environment;
(f)
‘ Capital cost’ means the capital cost of a project as referred to in
Regulations 13, 2533,40 & 46
(g)
'Commission' means the Bihar Electricity Regulatory Commission
referred to in sub-section (1) of section 82 of the Act;
(h)
‘Conduct of Business Regulations’ means the Bihar Electricity
Regulatory Commission (Conduct of Business) Regulations 2005, as
amended time to time.
(i)
‘Control Period’ means the period during which the norms for
determination of tariff specified in these regulations Shall remain
valid;
(j)
‘Floating solar project’ or ‘FPV’ means a solar PV power project
where the arrays of photovoltaic panels on a structure of the project
float on top of a body of water, such as artificial basin or lake,
with the help of floater, anchoring and mooring system;
(k)
‘Grid Code’ means the Central Electricity Regulatory Commission
(Indian Electricity Grid Code) Regulations, 2010 as amended from
time to time or any subsequent re-enactment thereof;
(l)
‘Gross calorific value’ or ‘GCV’ in relation to a fuel used in a
generating station means the heat produced in kCal by complete
combustion of one kilogram of solid fuel or one liter of liquid fuel
or one standard cubic meter of gaseous fuel, as the case may be;
(m)
‘Gross station heat rate’ or ‘Gross SHR’ means the heat energy
input in kCal required to generate one kWh of electrical energy
at generator terminals of a generating station;
(n)
‘Installed capacity' or 'IC’ means the summation of the name plate
capacities of all the units of the generating station or the capacity of
the generating station (reckoned at the generator terminals). In case
of Solar PV power projects and Floating solar. Project Installed
Capacity shall be sum of name plate capacities (Nominal AC power)
of the inverters of the project;
(o)
‘Inter-connection point’ shall mean interface point of renewable
energy generating facility with the transmission system or
distribution
system, where the energy is injected, as the case
maybe, and include:
I.
in relation to wind power projects, solar PV power projects,
renewable hybrid energy projects and renewable energy with
storage Projects, line isolator on outgoing feeder on HV side of
the pooling sub-station; and
II. in relation to small hydro projects, biomass gasifier-based
power projects, non-fossil fuel-based co-generation projects
3
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
and solar thermal power projects, line isolator on outgoing
feeder on HV side of generator transformer.
(p)
‘ MNRE’ means the Ministry of New and Renewable Energy of the
Government of India;
(q)
‘Municipal solid waste’ or ‘MSW’ means and includes commercial
and residential wastes generated in a municipal or notified area in
either solid or semi-solid form and excludes industrial hazardous
wastes, but includes treated bio- medical wastes;
(r)
‘Non-fossil fuel-based co-generation project’ means a generating
station that uses the process in which more than one form of
energy (such as steam and electricity) are produced in a
sequential manner by use of biomass;
(s)
‘Operation and Maintenance expenses’ or ‘O&M expenses’ means
the expenditure incurred on operation and maintenance of the
project, or part thereof, and includes the expenditure on manpower,
repairs, spares, consumables, insurance and overheads;
(t)
‘Project’ means a generating station or an evacuation system up to
inter- connection point, as the case may be, and in case of a small
hydro project includes all components of generating facility such as
dam, intake water conductor System Power generating station and
generating units of the scheme, as apportioned to power generation;
(u)
‘Pumped storage hydro project’ means a hydro power project
which generates power through water stored as potential energy,
pumped from a lower elevation reservoir to a higher elevation
reservoir;
(v)
‘Refuse derived fuel’ or ‘RDF’ means segregated combustible
fraction of solid waste other than chlorinated plastics in the form
of pellets or fluff produced by drying, de-stoning, shredding,
dehydrating, and compacting combustible components of solid
waste that can be used as fuel;
(w)
‘Renewable energy’ or ‘RE’ means the electricity generated from
renewable energy sources;
(x)
‘Renewable energy project’ means a generating station that produces
electricity from renewable energy sources;
(y)
‘Renewable energy source’ means renewable source of energy such
as water, wind, sunlight, biomass, bagasse, municipal solid waste
and other such sources as approved by the MNRE;
(z)
‘Renewable energy with storage project’ means a combination
of renewable energy project with storage or a combination of
renewable hybrid energy project with storage at the same inter-
connection point;
(aa)
‘Renewable hybrid energy project’ means a renewable energy
project that produces electricity from a combination of renewable
energy sources, connected at the same inter-connection point;
(bb) ‘Small hydro project’ means a hydro power project with an installed
capacity up to and including 25 MW or as defined the Government
of India, from time to time at a single location;
(cc) ‘Solar PV power project’ means a project that uses sunlight for
direct conversion into electricity through photovoltaic technology
and is based on technologies such as crystalline silicon or thin
film or any other technology as approved by MNRE;
(dd)
‘Solar thermal power project’ means a project that uses sunlight
for direct conversion into electricity through concentrated solar
4
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
power technology and is based on line focus or point focus
principle;
(ee) ‘State Nodal Agency’ means the Bihar Renewable Energy
Development Agency (‘BREDA’) or such other entity as may be
designated by the Commission from time to time.
(ff) ‘Storage’ means energy storage system utilizing method sand
technologies like, solid state batteries, flow batteries, pumped
storage, compressed air, fuel cells, hydrogen storage or any other
technology, to store various forms of energy and to deliver the
stored energy in the form of electricity;
(gg) ‘Tariff period’ for renewable energy projects will be same as their
Useful Life and tariff period shall be considered from the date of
commercial operation of such power projects.
(hh) ‘Useful Life’ in relation to project, including dedicated evacuation
system, from the date of commercial operation of such project,
shall mean the following: -
S.No
RE Project
Useful Life
(Years)
1.
Wind energy power project
25
2.
Bio mass power project with Rankine cycle
technology
25
3.
Non-fossil fuel cogeneration project
25
4.
Small Hydro Plant
40
5.
Municipal Solid Waste (MSW)/ and
25
6.
Refuse Derived Fuel (RDF) based power
project
25
7.
Solar PV/Solar thermal power project
25
8
Biomass Gasifier based power project
25
9
Biogas based power project
25
(ii) ‘ Year’ means a financial year.
(2) Save as aforesaid and unless repugnant to the context or if
the subject matter otherwise requires, words and expressions
used in these regulations and not defined, but defined in
the Act, or the Indian Electricity Grid Code or Bihar Electricity
Grid code or the Central Electricity Regulatory Commission
(Terms and conditions of Tariff) Regulations, 2019 shall have
the meanings assigned to them respectively in the Act or the
Indian Electricity Grid Code or Bihar Electricity Grid code or
the Central Electricity Regulatory Commission (Terms and
condition Tariff) Regulations, 2019.
3.
Scope and extent of application.—These regulations shall apply to cases
where tariff for a grid connected generating station or a unit thereof commissioned during
the Control Period and based on renewable energy sources, is to be determined by the
Commission under Section 62 read with Section 86 of the Act:
Provided that in cases of Biomass power based on Rankine cycle, non- fossil
fuel-based cogeneration projects, Solar PV, Solar Thermal power projects,
Biomass gasifier, Biogas power project, Municipal solid waste and Refuse
derived fuel- based power projects, these regulations shall apply subject to the
fulfillment of eligibility criteria specified in Regulation 4 of these Regulations.
5
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
4.
Eligibility Criteria.—
(a) Wind power project –The project that uses new wind turbine generators and
is located at sites, on-shore or off-shore, approved by State Nodal Agency
or Appropriate Government.
(b) Small hydro project – The project that uses new plant and machinery and is
located at sites approved by State Nodal Agency or Appropriate
Government.
(c) Biomass power project with Rankine cycle technology– The project that uses
new plant and machinery, is based on Rankine cycle technology, and does
not use any fossil fuel.
d) Non-fossil fuel based co-generation project – The project that uses new plant
and machinery, and is based on topping cycle mode of co-generation.
Topping cycle mode of co- generation – Any facility autosensing-fossil fuel
input for the power generation and also utilizes the thermal energy
generated for useful heat applications in other industrial activities
simultaneously:
Provided that for the co-generation facility to qualify under topping cycle
mode, the sum of useful power output and one half the useful thermal output
be greater than 45% of the facility’s energy consumption, during crushing
season. Explanation- For the purposes of this clause.
(a)
‘Useful power output’ is the gross electrical output from the
generator. There will be an auxiliary consumption in the cogeneration
plant itself (e.g. the boiler feed pump and the FD/ID fans). In order to
compute the net power output, it would be necessary to subtract the
auxiliary consumption from the gross output. For simplicity of
calculation, the useful power output is defined as the gross electricity
(kWh) output from the generator.
(b) ‘Useful Thermal Output’ is the useful heat (steam) that is provided to
the process by the cogeneration facility.
(c)
‘Energy Consumption’ of the facility is the useful energy input that is
supplied by the fuel (normally bagasse or other such biomass).
(d) ‘Topping Cycle means a co-generation process in which thermal
energy produces electricity followed by useful heat application.
(e) Solar Power project, floating solar project and solar thermal
power project – The project is based on technologies approved by
MNRE.
Provided that floating solar project installed with existing renewable
energy project other than ground mount-
Solar PV project shall be treated as renewable hybrid energy project.
(f) Renewable hybrid energy project– The rated capacity of generation
from one renewable energy source is at least 25% of the rated
capacity of generation from other renewable energy source(s), which
operate at the same point of interconnection.
Provided that energy is injected into grid at the same interconnection
point and metering is done at such common interconnection point
accordingly.
(g) Biomass gasifier based power project – The project uses new plant
and machinery, and has a grid connected system that uses 100%
producer gas engine, coupled with gasifier technologies approved
by MNRE.
(h) Biogas based power project – The project uses new plant and
machinery and has a grid connected system that uses 100% biogas
fired engine, coupled with biogas technology for Co- digesting
6
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
agriculture residues, manure and other bio- waste as approved by
MNRE.
(i) Municipal solid waste based power projects – The project uses
new plant and machinery based on Rankine cycle technology, and
uses municipal solid waste as fuel.
(j) Refuse derived fuel based power projects – The project uses new
plant and machinery based on Rankine cycle technology, and uses
refuse derived fuel as fuel.
Chapter 1:
General Principles
5.
Control Period.—The Control Period or Review Period under these Regulations
shall be of three (3) years, of which the first year shall be the financial year 2022-23.
Provided that the tariff determined as per these Regulations for the RE projects
commissioned during the Control Period, shall continue to be applicable for the
entire duration of the Tariff Period as specified in Regulation 6 below.
Provided further that the revision in Regulations for next Control
Period shall be undertaken six months prior to the end of the first Control
Period and in case Regulations for the next Control Period are not notified
until commencement of next Control Period, the tariff norms as per these
Regulations shall continue to remain applicable until notification of the revised
Regulations subject to adjustments as per revised Regulations.
6.
Tariff Period.—
a)
The Tariff Period for Renewable Energy power projects will be same as
their Useful Life as defined in Regulation 2 (hh) of these Regulations.
b)
Tariff period under these Regulations shall be considered from the date of
commercial operation of the renewable energy generating stations.
c)
Tariff determined as per these Regulations shall be applicable for
Renewable Energy power projects, for the duration of the Tariff Period as
stipulated under Clause (a) and (b).
7.
Project Specific tariff.—
(a)
The tariff shall invariably be determined through a transparent process
of competitive bidding in accordance with the Guidelines issued by the
Central Government under Section 63 of the Act, and the Commission
shall adopt such tariff in accordance with the Guidelines issued by the
Central Government under Section 63 of the Act.
Provided that the tariff for Solar PV Power Projects below threshold
limit of eligibility for participating in Competitive Bidding shall be
considered equal to the following cases, in order of priority:
(i)
Latest Tariff discovered through Competitive Bidding by the
concerned Distribution Licensee/ State Nodal Agency for
similar project to be established in the State of Bihar and
adopted by the Commission.
(ii)
The Tariff discovered through Competitive Bidding for similar
project by Other Distribution Licensee(s) in the State, if any
and to be established in the State of Bihar & adopted by the
Commission;
(iii)
Latest Tariff discovered through Competitive Bidding for
similar project in the neighboring State of Bihar and adopted
by the appropriate Commission.
7
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
(b)
Further, the Project Specific Tariff, on case to case basis, shall be
determined by the Commission for the following types of projects:
(i)
Biogas based projects;
(ii) Solar Thermal Power Projects;
(iii) Small Hydro Projects
(iv) Other hybrid projects include renewable–renewable or renewable–
conventional sources, for which renewable technology is approved
by MNRE;
(v) Any other new renewable energy technologies approved by
MNRE.
(c)
Determination of Project specific tariff for generation of electricity from
such renewable energy sources shall be in accordance with such terms and
conditions as stipulated under relevant Regulations/ Orders of
BERC/CERC.
Provided that the financial norms as specified under these Regulations,
except for capital cost, shall be ceiling norms while determining the project
specific tariff.
8.
Petition and proceedings for determination of tariff.—
(1) The generic tariff shall be determined by the Commission on annual basis in
accordance with these Regulations for the following types of renewable
energy projects, for which norms have been specified under the
Regulations:
a) Biomass power project based on Rankine cycle technology;
b) Non-fossil fuel based cogeneration projects.
c) Biomass gasifier power project.
d) MSW/RDF project based on Rankine cycle.
Provided that the generic tariff determined for the year, in which an
RE project is commissioned, shall be applicable for such RE Project
of same type and shall remain valid for the tariff period.
(2) A petition for determination of project specific tariff shall be
accompanied by such fee as may be determined by Regulations and shall
be accompanied by
a)
Information in forms 1.1, 1.2, 2.1 and 2.2 as the case may be, and
as appended in the regulations;
b)
Detailed project report outlining technical and operational details,
site specific aspects, premise for capital cost and financing plan
etc.
c)
A statement of all applicable terms and conditions and expected
expenditure for the period for which tariff is to be determined.
d)
A statement containing full details of calculation of any subsidy
and incentive received, due or assumed to be due from the Central
Government and/or State Government. This statement shall also
include the proposed tariff calculated without consideration of the
subsidy and incentive.
e)
Any other information that the Commission requires the petitioner
to submit.
(3) The proceedings for determination of tariff shall be in accordance with the
BERC (Conduct of Business) Regulations, 2005.
9. Tariff Structure.—
and The tariff for renewable energy sources shall consist of the following
components:
(a) Return on equity;
(b) Interest on loan;
8
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
(c)
Depreciation;
(d) Interest on working capital;
(e) Operation and Maintenance expenses;
Provided that for renewable energy projects having fuel cost component,
like biomass power projects with Rankine cycle technology, biomass
gasifier based power projects, biogas based power projects, non-fossil
fuel based co-generation projects and refuse derived fuel based power
projects, single part tariff with two components, fixed cost component
and fuel cost component, shall be determined.
10.
Tariff Design.—
(1)
The generic tariff shall be determined, on levelized basis, considering the
year of commissioning of the project, for the tariff period of the project:
Provided that for renewable energy projects having single part
tariff with two components, fixed cost component shall be determined on
levelized basis considering the year of commissioning of the project
while fuel cost component shall be determined on year of operation
basis in the Tariff Order to be issued by the Commission.
(2)
For the purpose of levelized tariff computation, discount factor
equivalent to post-tax weighted average cost of capital shall be
considered.
(3)
The above principles shall also apply for project specific tariff.
11.
Treatment for Over-Generation.—In case a renewable energy project, in a
given year, generates energy in excess of the capacity utilization factor or plant load factor,
as the case may be, specified under these Regulations, the renewable energy project may sell
such excess energy to any entity, provided that the first right of refusal for such excess
energy shall vest with the concerned beneficiary. In case the concerned beneficiary purchases
the excess energy, the tariff for such excess energy shall be 75 percent of the tariff applicable
for that year.
12.
Dispatch principles for electricity generated from Renewable Energy Sources:
(1) All renewable energy power plants except for biomass power plants with
installed capacity of 10 MW and above, and non- fossil fuel based
cogeneration plants shall be treated as ‘MUST RUN’ power plants and
shall not be subjected to ‘merit order dispatch’ principles.
(2) The biomass power generating station with an installed capacity of 10 MW
and above and non-fossil fuel based co- generation projects shall be
subjected to scheduling and dispatch code as specified under Bihar
Electricity Grid Code (BEGC) and BERC (Deviation Settlement
Mechanism and Related Matters) Regulations including amendments
thereto.
(3) Scheduling of wind and solar energy shall be governed as per the aforesaid
provisions of Bihar Electricity Grid Code (BEGC) and BERC (Deviation
Settlement Mechanism and Related Matters) Regulations including
amendments thereto.
9
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
st
Chapter 2:
Financial Principles
13. Capital Cost.—Norms for capital cost, as specified in relevant chapters of these
regulations, shall be inclusive of land cost, pre-development expenses, all capital work
including plant & machinery, civil work, erection, commissioning, financing cost, interest
during construction, and evacuation infrastructure up to inter- connection point.
Provided that for project specific tariff determination, the generating company
shall submit the break-up of capital cost items along with its petition in the
manner specified under Regulation 8.
14. Debt Equity Ratio.—
a. For determination of generic tariff and project specific tariff, the debt
equity ratio shall be considered as 70:30.
Provided that, for project specific tariff, where the equity actually
deployed is more than 30% of the capital cost, equity in excess of 30%
shall be treated as normative loan;
Provided further that for project specific tariff where equity actually
deployed is less than 30% of the capital cost, the actual equity shall be
considered for determination of tariff;
Provided also that the equity invested in foreign currency shall be
designated in Indian rupees on the date of each investment;
Provided also that debt equity ratio shall be considered after deducting
the amount of Grant or capital subsidy received for the project for
arriving at the amount of debt and equity.
Explanation- The premium, if any, raised by the generating company,
while issuing share capital and investment of internal resources created out
of its free reserve, for the funding of the project, shall be reckoned as paid
up capital for the purpose of computing return on equity, only if such
premium amount and internal resources are actually utilized for meeting
the capital expenditure of the renewable energy project.
b. The project developer shall submit the resolution of the Board of the
company or approval of the competent authority in other cases regarding
infusion of funds from internal resources in support of the utilization made
or proposed to be made to meet the capital expenditure of the renewable
energy project.
15. Loan Tenure and Interest on Loan.—
(1) Loan Tenure.—For determination of generic tariff and project specific
tariff, loan tenure of 10 years shall be considered.
(2) Interest on Loan.—
(a)
The loans arrived at in the manner indicated in Regulation 14 shall be
considered as gross normative loan for calculation for interest on
loan. For project specific tariff, the normative loan outstanding as on
1st of April of every year shall be worked out by deducting the
cumulative repayment up to 31st March of previous year from the
gross normative loan.
(b)
For the purpose of computation of tariff, normative interest rate of two
hundred (200) basis points above the average State Bank of India
Marginal Cost of Funds based Lending Rate (MCLR) (one-year tenor)
prevalent during the last available six months shall be considered.
(c)
Notwithstanding any moratorium period availed by project developer,
the repayment of loan shall be considered from the first year of
commercial operation of the project and shall be equal to the
annual depreciation allowed.
10
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
16.
Depreciation.—
a. The value base for the purpose of depreciation shall be the capital
cost of the project admitted by the Commission. The salvage value of
the project shall be considered as 10% and depreciation shall be
allowed up to maximum of 90% of the capital cost of the project:
Provided that, no depreciation shall be allowed to the extent of grant
or capital subsidy received for the project.
b. Depreciation rate of 7.0 % per annum for first 10 years and
remaining depreciation to be spread during remaining useful life of
the RE projects considering the salvage value of the project as 10%
of project cost shall be considered.
c. Depreciation shall be computed from the first year of commercial
operation:
Provided that, for determination of project specific tariff, in case of
commercial operation of the project for part of the year, depreciation
shall be computed on pro-rata basis.
17. Return on Equity.—
a. The value base for equity shall be as determined under Regulation 14.
b. The normative Return on Equity shall be 14%. The normative Return on
Equity shall be grossed up by the latest available notified Minimum
Alternate Tax (MAT) rate for the first 20 years of the Tariff Period and by
the latest available notified Corporate Tax rate for the remaining Tariff
Period.
18. Interest on Working Capital.—
a. The Working Capital requirement in respect of solar PV power
projects, floating solar projects and solar thermal power projects shall
be computed in accordance with the following:
i. Operation and Maintenance expenses for one month;
ii. Receivables equivalent to 45 days of tariff for sale of electricity
calculated on normative Capacity Utilization Factor; and
iii. Maintenance spares equivalent to 15% of Operation and
Maintenance expenses.
b.
The Working Capital requirement in respect of biomass power
projects with Rankine cycle technology, biogas power projects,
biomass gasifier based power projects, non- fossil fuel based co-
generation projects, municipal solid waste based power projects and
refuse derived fuel based power projects shall be computed in
accordance with the following:
i.
Fuel costs for four months equivalent to normative Plant
Load Factor; however, in case of non-fossil fuel co-
generation, fuel cost for one month will be considered.
ii.
Operation and Maintenance expense for one month;
iii. Receivables equivalent to 45 days of tariff for sale of
electricity calculated on the plant load factor; and
iv. Maintenance spares equivalent to 15% of Operation and
Maintenance expenses.
c. In case of renewable hybrid energy projects, the Working Capital
requirement shall be sum of the Working Capital requirement determined
as per norms applicable for renewable energy sources, in proportion to
their rated capacity in the project.
d. Interest on Working Capital shall be at interest rate equivalent to the
normative interest rate of three hundred and fifty (350) basis points
11
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
above the average State Bank of India Marginal Cost of Funds based
Lending Rate (MCLR) (one-year tenor) prevalent during the last
available six months.
19. Calculation of capacity utilization factor and plant load factor.—The number
of hours in a year for calculation of capacity utilization factor and plant load factor,
as the case may be, shall be considered as 8760.
20. Operation and Maintenance Expenses.—
a. ‘Operation and Maintenance or O&M expenses’ shall comprise repair and
maintenance (R&M), establishment including employee expenses, and
administrative and general expenses.
b. Operation and Maintenance expenses shall be determined for the Tariff
Period of the project based on normative O&M expenses specified in these
regulations for the first year of the Control Period.
c. Normative O&M expenses allowed during first year of the Control Period
i.e. financial year 2022-23 under these regulations shall be escalated at the
rate of 3.84% per annum for the Tariff Period.
21. Rebate.—
a.
For payment of bills of the generating company through revolving and
valid letter of credit on presentation or through National Electronic Fund
Transfer (NEFT) or Real Time Gross Settlement (RTGS) payment mode
within a period of 5 days of presentation of bills, a rebate of 1.5% on bill
amount shall be allowed.
Explanation: In case of computation of ’5 days’, the number
of days shall be counted consecutively without considering any
holiday. However, in case the last day or 5th day is official holiday, the
5th day for the purpose of rebate shall be construed as the immediate
succeeding working day.
b.
Where payments are made on any day after 5 days within a period of one
month from date of presentation of bills by the generating company, a
rebate of 1% shall be allowed.
22. Late payment surcharge.—In case the payment of any bill for charges payable
under the regulations is delayed beyond a period of 45 days from the date of presentation of
bills, a late payment surcharge at the rate of 1.50% per month shall be levied by the generating
company.
23. Subsidy or incentive by the Central or the State Government.—
a. The Commission shall take into consideration any incentive, grant or
subsidy from the Central or State Government, including accelerated
depreciation benefit, availed by the project, while determining the tariff
under these regulations:
Provided that the following principles shall be considered for
ascertaining income tax benefit on account of accelerated depreciation, if
availed, for the purpose of tariff determination:
i)
Assessment of benefit shall be based on normative capital cost,
accelerated depreciation rate and corporate income tax rate as per
relevant provisions of Income Tax Act, 1961 as amended from
time to time; and
ii)
Capitalization of renewable energy projects during second half of
the fiscal year.
iii) Per unit benefit shall be derived on levelized basis at discount
factor equivalent to weighted average cost of capital.
12
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
b. Any grant, subsidy or incentives availed by renewable energy project,
which is not considered at time of determination of tariff, shall be
deducted by the beneficiary in subsequent bills after receipt of such
grant, subsidy or incentive in suitable instalments or within such period
as may be stipulated by the Commission.
c. In case the Central or State Government or their agencies provide any
generation-based incentive, which is specifically over and above the
tariff, such incentive shall neither be taken into account while
determining the tariff nor be deducted by the beneficiary in subsequent
bills raised by the particular Renewable energy project.
24. Statutory Charges.—The renewable energy project developer shall recover from
the beneficiaries, the statutory charges imposed by the State an Central Government such as
water cess, electricity duty on auxiliary consumption subject to maximum of normative
auxiliary consumption.
Chapter 3:
Parameters for biomass power projects based on Rankine cycle technology
25. Capital Cost.—
a. The normative capital cost for first year of the Control Period i.e. financial
year 2022-23 shall be as under:
Biomass power projects based on
Rankine cycle technology
Capital Cost
(₹ lakhs/ MW)
Project [other than rice straw and juliflora
(plantation) based project] with water-cooled
condenser
559
Project [other than rice straw and Juliflora
(plantation) based project] with air-cooled
condenser
600
For rice straw and juliflora (plantation) based
project with water-cooled condenser
6 1 1
For rice straw and juliflora (plantation) based
project with air-cooled condenser
652
b.
The capital cost for biomass power projects based on Rankine cycle
technology as specified for first year of the Control Period shall remain
valid for the entire duration of the Control Period unless reviewed
earlier by the Commission.
26. Plant Load Factor.—For the purpose of determination of tariff, the Plant Load
Factor Shall be considered as 80%.
27. Auxiliary Consumption.—The normative auxiliary consumption shall be as
follows: -
a) For projects using water-cooled condenser:10%
b) For projects using air-cooled condenser: 12%
28. Station Heat Rate.—The Station Heat Rate shall be:
a) For projects using travelling grate boilers: 4200 kCal/kWh
b) For projects using AFBC boilers: 4125 kCal/kWh
29. Operation and Maintenance expenses.—Normative O&M Expenses for the first
year of the Control Period i.e. financial year 2022-23 shall be ₹50.06 lakhs per MW and shall
be escalated at the rate at the rate specified in Regulation 20 of these Regulations for the
Tariff Period.
13
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
30. Use of Fossil Fuel.—The use of fossil fuels shall not be allowed:
Provided that for biomass power projects based on Rankine cycle
technology commissioned on or before 31.03.2017, use of fossil fuels to the extent
of 15% in terms of gross calorific value on annual basis, shall be allowed for the
Useful Life of the project from the date of commercial operation.
31. Gross Calorific Value.—The gross calorific value of biomass fuel, for the
purpose of determination of tariff, shall be at 3100 kCal/kg.
32. Fuel Cost.—Biomass fuel price during first year of the Control Period i.e.
financial year 2022-23 shall be ₹3921.60/ MT and shall be escalated at the rate of 5% per
annum to arrive at the base price for subsequent years of the Control Period, unless reviewed
earlier by Commission. For the purpose of determining levelized tariff, a normative escalation
factor of 5% per annum shall be applicable on biomass fuel price.
Chapter 4:
Parameters for non-fossil fuel based co-generation Projects
33. Capital Cost.—Normative capital cost for the non-fossil fuel based co-generation
projects shall be ₹492 lakhs/MW for the first year of Control Period i.e. financial year 2022-23
and will remain valid for the entire duration of the Control Period unless reviewed earlier by
the Commission.
34. Plant Load Factor.—The plant load factor shall be considered as 53% for the
computation of tariff.
35. Auxiliary Consumption.—The auxiliary consumption shall be considered as 8.5%
for the computation of tariff.
36. Station Heat Rate.—The Station Heat Rate of 3600 kCal/ kWh for power
generation component alone shall be considered for computation of tariff for non-fossil fuel
based co-generation projects.
37. Gross Calorific Value.—The gross calorific value for bagasse shall be considered
as 2250 kCal/kg. For the use of biomass fuels other than bagasse, gross calorific value as
specified under Regulation 31 shall be applicable.
38. Fuel Cost.—
a. The price of bagasse for first year of the Control Period i.e. financial year
2022-23 shall consider as ₹2507/ MT and shall be escalated at the rate of
5% per annum to arrive at the base price for subsequent years of the Control
Period, unless specifically reviewed by Commission. For the purpose of
determining levellized tariff, a normative escalation factor of 5% per annum
shall be applicable on bagasse prices.
b. For use of biomass other than bagasse in non-fossil fuel based
co generation projects, the biomass prices as specified under Regulation 32
shall be applicable.
39. Operation and Maintenance expenses.—Normative O&M expenses during the
first year of the Control Period, i.e. financial year 2022-23, shall be ₹26.44 lakhs per MW and
shall be escalated at the rate specified in Regulation 20 of these Regulations for Tariff Period.
14
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
Chapter 5:
Parameters for biomass gasifier based power projects
40. Capital Cost.—Normative capital cost for biomass gasifier based power projects
shall be ₹593 lakhs/MW during first year of Control Period i.e. financial year 2022-23 and
will remain valid for the entire duration of the Control Period unless reviewed earlier by the
Commission.
41. Plant Load Factor.—Plant load factor for determination of tariff shall be
considered as 85%.
42. Auxiliary Consumption.—The auxiliary consumption shall be considered as 10%
for the determination of tariff.
43. Specific fuel consumption.—Normative specific fuel consumption shall be 1.25
kg per kWh.
44. Operation and Maintenance expenses.—Normative O&M expenses for the first
year of the Control period i.e. financial year 2022-23 shall be ₹66.11 lakhs per MW and shall
be escalated at the rate specified in Regulation 20 of these Regulations for Tariff Period.
45. Fuel Cost.—Biomass fuel price for biomass gasifier-based power projects shall be
the same as for biomass power project based on Rankine cycle technology as mentioned.
Chapter 10:
Parameters for municipal solid waste based power projects and refuse derived
fuel based power projects.
46. Capital Cost.— The capital cost for the power projects which use MSW based
on Rankine Cycle Technology shall be ₹1500 Lakhs/MW and for refuse derived fuel based
Power Plant shall be ₹900 Lakhs/MW
47. Plant Load Factor.—
a.
Plant load factor for determining tariff for municipal solid waste based
power project sand refuse derived fuel-based power projects shall be:
Sl. No.
Plant load factor
MSW
RDF
a)
During stabilization period
65%
65%
b)
During the remaining period of
the first year
(after stabilization period)
65%
65%
c)
2nd year onwards
75%
80%
b.
The stabilization period shall not be more than 6 months from the date of
commercial operation of the project.
48. Auxiliary Consumption.—The auxiliary consumption for determination of tariff
shall be considered as 15%.
49. Station Heat Rate.—The Station Heat Rate for determination of tariff shall
be considered as 4200 kcal/kWh.
50. Operation and Maintenance Expenses.—Normative O&M expenses for the first
year of the Control period i.e. financial year 2022-23 shall be ₹67.58 lakhs per MW for
RDF and 112.63 lakhs per MW for MSW project sand shall be escalated at the rate specified
in Regulation 20 of these Regulations for Tariff Period
15
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
51. Gross Calorific Value.—
a.
The gross calorific value
of RDF for the purpose of determination of
tariff shall be at 2500 kcal/kg.
b. The gross calorific value of MSW shall be determined by the Commission
on a case to case basis while determining the project specific tariff.
52. Fuel-Cost.—
a. Price of refuse derived fuel during financial year 2022-23 shall be
considered as ₹2297.61 per MT and shall be escalated at the rate of 5% per
annum to arrive at the base price for subsequent years of the Control Period,
unless specifically reviewed by Commission. For the purpose of
determining levelized tariff , a normative escalation factor of 5% per
annum shall be applicable.
Fuel cost shall be considered as nil for municipal solid waste:
Provided that the Commission may consider allowing transportation
cost of such fuel while determining the project specific tariff.
Chapter 11
Miscellaneous
53. Deviation from norms.—Tariff for electricity generated from a generating station
based on renewable energy sources, may also be agreed between the generating company and
beneficiary, in deviation from the norms specified in these regulations:
Provided that the levelized tariff of the project calculated on the basis of the norms
specified in these regulations shall be the ceiling levelized tariff.
54. Guidelines of Competent Authority.—Policy/guidelines issued by the Ministry
of Power, Government of India, MNRE, State Government and any other competent authority
in this regard from time to time shall prevail.
55. Power to Relax.—The Commission may by general or special order, for reasons to
be recorded in writing, and after giving an opportunity of hearing to the parties likely to be
affected may relax any of the provisions of these regulations on its own motion or on an
application made before it by an interested person.
56. Power to remove difficulties.—If any difficulty arises in giving effect to the
provisions of these regulations, the commission may, be general or specific order, make such
provisions not inconsistent with the provisions of the Act, as may appear to be necessary for
removing the difficulty.
57. Power to Amend.—The Commission may from time to time add, vary, alter,
modify or amend any provisions of these regulations on its own motion or on any application
made before it by an interested person.
58. Repeal and savings.—Save as otherwise provided in these regulations, Bihar
Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from
Renewable Energy Sources) Regulations, 2017 and its amendments are hereby repealed.
By Order of the Commission,
(Sd)-Illegible,
Secretary.
16
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
Form-1.1:
Form Template for (Solar thermal, small hydro, other hybrid Projects)
S. N o
Assumption
Head
Sub-Head
Sub-Head(2)
Unit
Parameter
1
Power
Generation
Capacity
Installed Power Generation
Capacity Auxiliary Consumption
factor
CUF/ PLF
Commercial Operation Date
Useful Life
MW
%
%
mm/yyyy
years
2
Project Cost
Capital Cost/
MW
Normative Capital Cost
Capital Cost
Capital Subsidy, If any Net
Capital Cost
Rs.Lakh/ MW
Rs. Lakh
Rs. Lakh
Rs. Lakh
3
Financial
Assumptions
Debt Equity
Tariff Period Debt
Years
%
Equity
%
Total Debt Amount
Rs. Lakh
Debt
Component
Total Equity Amount
Loan Amount
Moratorium Period
Rs. Lakh
Rs. Lakh
Years
Repayment Period
(include Moratorium)
Years
Interest Rate
%
Equity amount
Rs.Lakh
Equity
Component
Return on Equity for first 20
years
Return on Equity 21th year
onwards
Discount Rate
%p.a
%p.a
%
Depreciation
Depreciation Rate for 1st 10 Yrs.
Depreciation Rate 11th years
onward Generation Based
Incentives. If any
%
%
Rs. Lakh p.a.
Incentives
Period for GBI
Years
4
Operation &
Maintenance
Normative O&M
expense
Rs. Lakh/MW
O&M expanses
per annum
Escalation
factor for O&M
expense
Rs. Lakh
%
5
Working
Capital
O&M expense
Receivables
Maintenance
Spares Interest
on Working
Capital
% of O&M expenses
Month Days
%
% p.a
17
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
Form-1.2 a
Form Template for (solar thermal, other hybrid projects): Determination
of Tariff Component
Units Generation
Unit
Yr-1
Yr-2
Yr-3
Yr-4
Yr-5
Yr-6
Yr-7
Yr-8
Yr-9
yr-10
Yr-11 Yr-12
Yr-13
Installed Capacity
MW
Net Generation
MU
Tariff Components (Fixed
charge)
Unit
Yr-1
Yr-2
Yr-3
Yr-4
Yr-5
Yr-6
Yr-7
Yr-8
Yr-9
Yr-10
Yr-11 Yr-12
Yr-13
O&M Expenses
Rs Lakh
Depreciation
Rs Lakh
Interest on term loan
Rs Lakh
Interest on working Capital
Rs Lakh
Return on Equity
Rs Lakh
Total Fixed Cost
Rs. Lakh
Per Unit Tariff components
(fixed)
Unit
Yr-1
Yr-2
Yr-3
Yr-4
Yr-5
Yr-6
Yr-7
Yr-8
Yr-9
Yr-10
Yr-11 Yr-12
Yr-13
PU O&M Expenses
Rs/kWh
PU Depreciation
Rs/kWh
PU Interest on term loan
Rs/kWh
PU Interest on working Capital
Rs/kWh
PU Return on Equity
Rs/kWh
PU Tariff Components (Total)
Rs/kWh
Levellised Tariff
Unit
Yr-1
Yr-2
Yr-3
Yr-4
Yr-5
Yr-6
Yr-7
Yr-8
Yr-9
Yr-10
Yr-11 Yr-12
Yr-13
Discount Factors
Discounted Tariff components
(total)
Rs/kWh
Levellised Tariff (total)
Rs/kWh
Units Generation
Unit
Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23
Yr-24 Yr-25
Installed Capacity
MW
Net Generation
MU
Tariff Components (Fixed charge)
Unit
Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23
Yr-24 Yr-25
O&M Expenses
Rs Lakh
Depreciation
Rs Lakh
Interest on term loan
Rs Lakh
Interest on working Capital
Rs Lakh
Return on Equity
Rs Lakh
Total Fixed Cost
Rs. Lakh
Per Unit Tariff components (fixed)
Unit
Yr-14
Yr-15
Yr-16
Yr-17
Yr-18
Yr-19
Yr-20
Yr-21
Yr-22
Yr-23
Yr-24
Yr-25
PU O&M Expenses
Rs/kWh
PU Depreciation
Rs/kWh
PU Interest on term loan
Rs/kWh
PU Interest on working Capital
Rs/kWh
PU Return on Equity
Rs/kWh
PU Tariff Components (Total)
Rs/kWh
Levellised Tariff
Unit
Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23
Yr-24 Yr-25
Discount Factors
Discounted Tariff components (total)
Rs/kWh
Levellised Tariff (total)
Rs/kWh
18
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
Form-1.2 b
Form Template for (small hydro): Determination of Tariff Component
Units Generation
Unit
Yr-1
Yr-2
Yr-3
Yr-4
Yr-5
Yr-6
Yr-7
Yr-8
Yr-9
yr-10
Yr-11 Yr-12
Yr-13
Installed Capacity
MW
Net Generation
MU
Tariff Components (Fixed
charge)
Unit
Yr-1
Yr-2
Yr-3
Yr-4
Yr-5
Yr-6
Yr-7
Yr-8
Yr-9
Yr-10
Yr-11 Yr-12 Yr-13
O&M Expenses
Rs Lakh
Depreciation
Rs Lakh
Interest on term loan
Rs Lakh
Interest on working Capital
Rs Lakh
Return on Equity
Rs Lakh
Total Fixed Cost
Rs
Lakh
Per Unit Tariff components
(fixed)
Unit
Yr-1
Yr-2
Yr-3
Yr-4
Yr-5
Yr-6
Yr-7
Yr-8
Yr-9
Yr-10
Yr-11 Yr-12 Yr-13
PU O&M Expenses
Rs/kWh
PU Depreciation
Rs/kWh
PU Interest on term loan
Rs/kWh
PU Interest on working Capital
Rs/kWh
PU Return on Equity
Rs/kWh
PU Tariff Components (Total)
Rs/kWh
Levellised Tariff
Unit
Yr-1
Yr-2
Yr-3
Yr-4
Yr-5
Yr-6
Yr-7
Yr-8
Yr-9
Yr-10
Yr-11 Yr-12 Yr-13
Discount Factors
Discounted Tariff components
(total)
Rs/kWh
Levellised Tariff (total)
Rs/kWh
Units Generation
Unit
Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23
Yr-24 Yr-25
Installed Capacity
MW
Net Generation
MU
Tariff Components (Fixed charge)
Unit
Yr-14
Yr-15
Yr-16
Yr-17
Yr-18
Yr-19
Yr-20
Yr-21
Yr-22
Yr-23
Yr-24
Yr-25
O&M Expenses
Rs Lakh
Depreciation
Rs Lakh
Interest on term loan
Rs Lakh
Interest on working Capital
Rs Lakh
Return on Equity
Rs Lakh
Total Fixed Cost
Rs Lakh
Per Unit Tariff components (fixed)
Unit
Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23
Yr-24 Yr-25
PU O&M Expenses
Rs/kWh
PU Depreciation
Rs/kWh
PU Interest on term loan
Rs/kWh
PU Interest on working Capital
Rs/kWh
PU Return on Equity
Rs/kWh
PU Tariff Components (Total)
Rs/kWh
Levellised Tariff
Unit
Yr-14
Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23 Yr-24 Yr-25
Discount Factors
Discounted Tariff components
(total)
Rs/kWh
Levellised Tariff (total)
Rs/kWh
19
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
Units Generation
Unit
Yr-26
Yr-27
Yr-28
Yr-29
Yr-30
Yr-31
Yr-32
Yr-33
Yr-34
Yr-35
Yr-36
Yr-37
Yr-38
Yr-39
Yr-40
Installed Capacity
MW
Net Generation
MU
Tariff Components (Fixed
charge)
Unit
Yr-26
Yr-27
Yr-28
Yr-29
Yr-30
Yr-31
Yr-32
Yr-33
Yr-34
Yr-35
Yr-36
Yr-37
Yr-38
Yr-39
Yr-40
O&M Expenses
Rs Lakh
Depreciation
Rs Lakh
Interest on term loan
Rs Lakh
Interest on working Capital
Rs Lakh
Return on Equity
Rs Lakh
Total Fixed Cost
Rs. Lakh
Per Unit Tariff components
(fixed)
Unit
Yr-26
Yr-27
Yr-28
Yr-29
Yr-30 Yr-31 Yr-32 Yr-33 Yr-34
Yr-35
Yr-36
Yr-37 Yr-38
Yr-39
Yr-40
Levellised Tariff
Unit
Yr-26 Yr-27 Yr-28 Yr-29 Yr-30 Yr-31 Yr-32 Yr-33 Yr-34 Yr-35
Yr-36 Yr-37 Yr-38 Yr-39 Yr-40
PU Depreciation
Discount Factors
Rs/kWh
PDUiscInotuenrteesdt Tonartieffrcmomloapnonents
(total)
Rs/kWh
Levellised Tariff (total)
Rs/kWh
PU Return on Equity
Rs/kWh
PU Tariff Components (Total)
Rs/kWh
20
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
Form-2.1:
Form Template for (Biogas)
S.
No
Assumption
Head
Sub-Head
Sub-Head(2)
Unit
Parameter
1
Power
Generation
Capacity
Installed Power Generation
Capacity Auxiliary Consumption
factor
MW
%
CUF/ PLF (during stabilization upto
6 months)
%
CUF/PLF (during 1st year
stabilization)
CUF/PLF (2nd year onwards)
Commercial Operation Date
%
%
mm/yyyy
Useful life
years
2
Project Cost
Capital Cost/
MW
Normative Capital Cost
Rs.Lakh/ MW
Rs. Lakh
Rs. Lakh
Rs. Lakh
Capital Cost
Capital Subsidy, If any
Net Capital Cost
3
Financial
Assumptions
Debt Equity
Tariff Period
Debt
Years
%
%
Rs. Lakh
Rs. Lakh
Rs. Lakh
Years
Years
%
Rs.Lakh
%p.a
%p.a
%
%
%
Rs. Lakh
p.a. Years
Equity
Total Debt Amount
Debt
Component
Total Equity Amount
Loan Amount
Moratorium Period
Repayment Period
(include Moratorium)
Interest Rate
Equity amount
Equity
Component
Return on Equity for first 20 years
Return on Equity 21th
year onwards
Discount Rate
Depreciation
Depreciation Rate for 1st 10 Yrs.
Depreciation Rate 11th years
onward
Generation Based Incentives. If any
Incentives
Period for GBI
4
Operation &
Maintenance
Normative O&M
expense
Rs.
Lakh/MW
O&M expanses
per annum
Escalation factor
for O&M
expense
Rs. Lakh
%
5
Working Capital
O&M expense
Receivables
Maintenance
Spares Interest
on Working
Capital
% of O&M expenses
Month
Days Rs.Lakh
%
%p.a
6
Fuel related
assumptions
Specific Fuel
consumption
During stabilization
Post stabilization
kg/Kwh
kg/Kwh
21
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
Fuel Type & mix
fuel type-1
fuel type-2
Biodegradable Municipal Solid Waste
Specific Fuel Consumption fuel type 1
Specific Fuel Consumption fuel type2
Specific Fuel Consumption MSW
Price (fuel type-1)/yr-1
Price (fuel type-2)/yr-1
Biodegradable Municipal Solid
Waste Price/yr-1
fuel price escalation factor
%
%
%
Kg/Kwh
Kg/Kwh
Kg/Kwh
Rs/MT
Rs/MT
Rs/MT
%p.a
22
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
Form-2.2
Form Template for (Biogas)
Determination of Tariff Component
Units Generation
Unit
Yr-1
Yr-2
Yr-3
Yr-4
Yr-5
Yr-6
Yr-7
Yr-8
Yr-9
yr-10
Yr-11 Yr-12
Yr-13
Installed Capacity
MW
Net Generation
MU
Tariff Components (Fixed charge)
Unit
Yr-1
Yr-2
Yr-3
Yr-4
Yr-5
Yr-6 Yr-7 Yr-8
Yr-9 Yr-10 Yr-11 Yr-12
Yr-13
O&M Expenses
Rs Lakh
Depreciation
Rs Lakh
Interest on term loan
Rs Lakh
Interest on working Capital
Rs Lakh
Return on Equity
Rs Lakh
Total Fixed Cost
Rs. Lakh
Tariff Components (Variable charge)
Unit
Yr-1 Yr-2
Yr-3
Yr-4
Yr-5
Yr-6
Yr-7
Yr-8
Yr-9
Yr-10
Yr-11 Yr-12 Yr-13
fuel type-1
Rs Lakh
fuel type-2
Rs Lakh
Municipal Solid Waste
Rs Lakh
Sub-total (Fuel Costs)
Rs Lakh
Fuel cost allocable to power
%
Total Fuel Costs
Rs Lakh
Per Unit Tariff components
(fixed)
Unit
Yr-1
Yr-2
Yr-3
Yr-4
Yr-5
Yr-6
Yr-7
Yr-8
Yr-9
Yr-10
Yr-11 Yr-12 Yr-13
PU O&M Expenses
Rs/kWh
PU Depreciation
Rs/kWh
PU Interest on term loan
Rs/kWh
PU Interest on working Capital
Rs/kWh
PU Return on Equity
Rs/kWh
PU Tariff Components (Fixed)
Rs/kWh
PU Tariff Components
(Variable)
Rs/kWh
PU Tariff Components (Total)
Rs/kWh
Levellised Tariff
Unit
Yr-1 Yr-2
Yr-3
Yr-4
Yr-5
Yr-6
Yr-7
Yr-8
Yr-9
Yr-10
Yr-11 Yr-12
Yr-13
Discount Factors
Discounted Tariff components
(fixed)
Rs/kWh
Discounted Tariff components
(variable)
Rs/kWh
Discounted Tariff components
(total)
Rs/kWh
Levellised Tariff (fixed)
Rs/kWh
Levellised Tariff (variable)
Rs/kWh
Levellised Tariff (total)
Rs/kWh
Units Generation
Unit
Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23
Yr-24 Yr-25
Installed Capacity
MW
Net Generation
MU
Tariff Components (Fixed
charge)
Unit
Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23
Yr-24 Yr-25
O&M Expenses
Rs Lakh
Depreciation
Rs Lakh
Interest on term loan
Rs Lakh
Interest on working Capital
Rs Lakh
Return on Equity
Rs Lakh
Total Fixed Cost
Rs
Lakh
23
BIHAR GAZETTE (EXTRA), 11TH OCTOBER 2022
Tariff Components (Variable
charge)
Unit
Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23
Yr-24 Yr-25
fuel type-1
Rs Lakh
fuel type-2
Rs Lakh
Municipal Solid Waste
Rs Lakh
Sub-total (Fuel Costs)
Rs Lakh
Fuel cost allocable to power
%
Total Fuel Costs
Rs Lakh
Per Unit Tariff components
(fixed)
Unit
Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23
Yr-24 Yr-25
PU O&M Expenses
Rs/kWh
PU Depreciation
Rs/kWh
PU Interest on term loan
Rs/kWh
PU Interest on working Capital
Rs/kWh
PU Return on Equity
Rs/kWh
PU Tariff Components (Fixed)
Rs/kWh
PU Tariff Components
(Variable)
Rs/kWh
PU Tariff Components (Total)
Rs/kWh
Levellised Tariff
Unit
Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23
Yr-24 Yr-25
Discount Factors
Discounted Tariff components
(fixed)
Rs/kWh
Discounted Tariff components
(variable)
Rs/kWh
Discounted Tariff components
(total)
Rs/kWh
Levellised Tariff (fixed)
Rs/kWh
Levellised Tariff (variable)
Rs/kWh
Levellised Tariff (total)
Rs/kWh
(Sd)-Illegible,
Secretary.
————
PUBLISHED AND PRINTED BY THE SUPERINTENDENT,
BIHAR SECRETARIAT PRESS, PATNA.
Bihar Gazette (Extra) 825—571+10—Egazette
Website: http://egazette.bih.nic.in