(NO

subse

181,

other

hereb

1.

2.

3.

Th

P

.PATNA 1

No. BER

ection (1) of

read with se

r powers en

by makes the

Short Titl

Thes

Commiss

The

the Offici

The

Scope of A

The

of Bihar.

The

covered u

28 or till t

The

Revenue R

Definition

3.1 In th

he B

EX

PUBLI

1137) PA

Bihar

RC-SMP N

f section 181

ections 61, 6

abling it in

e following R

le, Commen

se regulatio

ion (Multi Y

se Regulatio

ial Gazette.

ese Regulatio

Application

ese Regulati

ese Regulati

under these R

these Regula

ese Regulat

Requiremen

ns:-

hese regulat

Bih

XTRA

SHED

8 AGRAHA

ATNA, FRI

r Electricity

NOT

The 1st N

No-17/2024-

1 and clause

62, and 86, o

that behalf

Regulations.

P

PRE

ncement and

ons shall

Year Distribu

ons shall com

ons shall ext

.—

ions shall ap

ions shall be

Regulations

ations are am

ions shall b

nt (ARR) bas

ions, unless

har G

ORDI

BY A

AYANA 194

IDAY, 29T

Regulatory

———

TIFICATION

November 2

04–– In

s (zd), (ze) a

of the Electr

f, the Bihar

.

PART-I

LIMINARY

d Extent.—

be called

ution Tariff)

me into force

tend to the w

ply to all the

e applicable f

from 1st Apr

mended.

be applicable

sed tariff is d

the context

RE

Ga

INARY

UTHO

46(S)

TH NOVE

y Commissio

N

2024

exercise of

and (zf) of s

ricity Act, 2

Electricity

Y

the Bihar

Regulations

e from the da

whole of the

e Distributio

for determin

ril 2025 onw

e where the

determined b

otherwise re

GISTERED

zett

Y

ORITY

MBER 20

on

f powers c

sub section (

2003 (36 of 2

Regulatory

Electricity

s, 2024.

ate of their n

State of Bih

on Licensees

nation of tari

wards and up

e cost base

by the Comm

equires,-

NO. PT.-4

te

024

conferred b

(2) of sectio

2003) and a

Commissio

y Regulator

notification i

har.

in the State

ff in all case

pto FY 2027

ed/Aggregat

mission.

0

by

on

all

on

ry

in

es

7-

te

2

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

(1)

“Act” means the Electricity Act, 2003(36 of 2003);

(2)

“Aggregate Revenue Requirement” or “ARR” means the costs

Pertaining to the licensed business which are permitted, inacordance

with these Regulations, to be recovered from the tariffs and charges

determined by the Commission.

(3)

“Aggregate Technical and Commercial Losses” or “AT&C” isthe

difference between energy input units into the system and the units

for which payment is collected;

(4)

"Audited Accounts" for the purpose of these regulations

means(Audited)Regulatory Accounts prepared in accordance with

BERC(Power Regulatory Accounting)Regulations, 2018.

(5)

“Base Rate of Late Payment Surcharge” means the marginal cost of

funds based on lending rate for one year of the State Bank of India, as

applicable on the 1st April of the financial year in which the period

lies, plus five per cent and in the absence of marginal cost of funds

based lending rate, any other arrangement that substitutes it, which

the Central Government may, by notification, in the Official Gazette,

specify: Provided that if the period of default lies in two or more

financial years, the base rate of Late Payment Surcharge shall be

calculated separately for the periods falling in different years .

(6)

“Base Year” means the financial year immediately preceding first

year of the control period and used for the purposes of these

Regulations;

(7)

"Books of Accounts" means Regulatory Books of Accounts drawnup

in

accordance

with

BERC(Power

Regulatory

Accounting)Regulations, 2018, as amended from time to time

(8)

“Commission”

means

the

Bihar

Electricity

Regulatory

Commission;

(9)

“Conduct of Business Regulations” means the Bihar Electricity

Regulatory Commission (Conduct of Business) Regulations, 2005, as

amended from time to time.

(10) “Control Period” means the multi-year period comprising of three

Years from April 1, 2025 to March 31, 2028 or as may be extended

by the Commission, for submission of forecast in accordance with

these Regulations;

(11) "Due date" means the date by which the bill for the charges for

power supplied by the generating company or electricity trading

licensee or for the transmission service provided by a transmission

licensee are to be paid, in accordance with the agreement, as the case

may be, and if not specified in the agreement, forty-five days from the

date of presentation of the bill by such generating company,

electricity trading licensee or transmission licensee:

Provided that if due date for payment of any invoice falls on

a bank non-working day, the next bank working day shall be

considered as due date for payment;

3

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

(12) "Expenditure” means reasonable and prudently required expenditure

incurred on the following:

a)

Purchase of energy less rebate availed/to be availed and

excluding late payment surcharge;

b)

Salaries and wages of staff, welfare expenses including

management remuneration covered below;

•

Directors

remuneration,

fees,

expenses

including

facilities;

•

Salaries and wages of corporate office/registered office;

c)

Financing cost excluding penal interest/charges;

d)

Interest charges on loan(s) borrowed for capitalized assets;

e)

Interest on temporary accommodation to the extent of approved

unrealized arrears from the consumers

f)

Interest on working capital

g)

Return on equity;

h)

Financing charges applicable to operational account;

i)

Interest on security deposits(in cash)from consumers;

j)

Interest on advance received from consumers ,if any against

sales;

k)

Impact of variation in foreign exchange rate incase of foreign

currency loan taken with due approval and is not capitalised;

l)

Depreciation

m)

Rents, rates and taxes, other than all taxes relating to income/

profits;

n)

Legal charges;

o)

Auditor’s expenses, Auditor’s fees; auditor’s expenses

;Payment to Auditors in any other capacity or for any work

which is necessary to be got done from them in connection

with audit;

(r) Consultancy charges for work which cannot be done in house

or is un economical in doing in-house or is essential to be

done from outside sources;

(s) Bad debts actually written off subject to Commission’s

clearance;

(t) Other expenses necessary which are ancillary or incidental to

the business of electricity except penalty etc levied under the

Actor any other law inforce;

(13) “Financial Year” means a period commencing on 1st April of a

calendar year and ending on 31st March of the subsequent calendar

year;

(14) “Income” shall include all income from any sources but shall not be

limited to the following:

a)

sale of energy or gross receipts from sale of energy less

discounts/rebates given based on the orders of the Commission;

b)

Rental of meters, plant, equipment and other apparatus hired to

the consumers;

c)

Income from services to consumers by way of repair or any

sale or other service other than capital receipts;

d)

Interest on investments, bank balances including fixed and call

deposits and any other income in the form of interest;

4

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

e)

Profit on sale of assets;

f)

Wheeling of energy;

g)

Non tariff income;

h)

Income from other business;

i)

Cross subsidy surcharge u/s 42(2) of the Act;

j)

Additional surcharge u/s 42(4)of the Act;

k)

Any receipt or refund from other sources against any expense

or likely expense which has been earlier allowed as expense in

the tariff;

l)

All other general receipts arising from and ancillary or incident

al to the business of electricity supply;

m)

Other general receipts interms of Act/Regulations including

use of assets for other business whether actually recovered or

not;

(15) "Late Payment Surcharge" means the charges payable by a distribution

licensee to a generating company or electricity trading licensee for

power procured from it, or by a user of a transmission system to a

transmission licensee on account of delay in payment of monthly

charges beyond the due date as per Rule 2 (g) of Late Payment

Surcharge Rule, 2022.

(16) “Licence” means a licence granted under clause (b) of section 14 of

the Act;

(17) “Licensed Business” means the functions and activities, which the

licensee is required to undertake interms of the licence granted by

the Commission or being a deemed licensee as referred under sections

14 and 172 of the Act;

(18) “Licensee” means a person who has been granted a licence and shall

include a deemed licensee;

(19) “Non-Tariff Income” means income relating to the licensed

business other than from tariff wheeling and retail supply) and

excluding income from receipts on account of cross-subsidy

surcharge and additional surcharge, any income from other business;

(20) “Other Business” means any other business of the distribution

licensee for optimum utilisation of its assets with in the meaning of

Section 51 of the Act;

(21) "Outstanding dues" means the dues of a generating company,

electricity trading licensee, or a transmission licensee, not stayed by a

competent court or Tribunal or dispute resolution agency as

designated in the Power Purchase Agreement, which remains unpaid

by the beneficiary beyond the due date and includes the amount of

instalment not paid after the re- determined due date;

(22) “Payment security mechanism" means Letter of Credit or Letter of

Credit backed by Escrow Account as per the agreement. Provided

that, advance payment shall constitute payment security if there are

no outstanding dues.

(23) “Retail Supply Business” means the business of sale of electricity by a

distribution licensee to the consumers within the area of supply in

accordance with the terms of the licence for distribution and retail

supply of electricity;

5

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

(24) “Wheeling” means the operation whereby the distribution system and

associated facilities of a distribution licensee are used by another

person for the conveyance of electricity on payment of charges to be

determined under section 62 or section 42(2)of the Act;

(25) “Wheeling Business” means the business of operating and

maintaining a distribution system for conveyance of electricity in the

area of supply of the distribution licensee.

3.2 The words and expressions used and not defined in these Regulations, but

defined in other Regulations or the Act, shall have the meanings assigned

to them in the other Regulations or the Act respectively.

3.3 The words “Application” or“ Petition” shall be interpreted synonymously.

PART-II

GENERAL PRINCIPLES

4

Multi Year Tariff Framework—The Commission shall determine the tariff or

distribution business under a Multi-Year Tariff framework with effect from April

1st of each financial year subject to provisions under regulations 8,12,13 and 14

of these Regulations.

The Multi-Year Tariff framework shall be based on the following

elements, for calculation of Aggregate Revenue Requirement and expected

revenue from tariff and charges for Distribution Business:

(i)

Control Period, before commencement of which aforecast of the

Aggregate Revenue Requirement and expected revenue from

existing tariff and charges shall be submitted by the applicant and

approved by the Commission;

(ii)

A detailed Business Plan based on the Operational Norms

specified in these regulations and trajectories of performance

parameters, for each year of the Control Period, shall be submitted

by the applicant for the Commission's approval, subject to

provisions under regulations 8,12,13, and 14 of these Regulations;

(iii)

Based on the Business Plan, the applicant shall submit a petition

with the forecast of Aggregate Revenue Requirement and expected

revenue from existing tariff for each year of the Control Period,

and the Commission shall approve the tariff for each year of the

Control Period;

(iv)

The mechanism for pass-through of approved gains or losses on

account of uncontrollable factors as specified by the Commission

in these Regulations;

(v)

The mechanism for sharing of approved gains or losses arising out

of controllable factors as specified by the Commission in these

Regulations;

5.

Business Plan.—

5.1

The Distribution Licensee shall file a Business Plan for the Control Period

i. e. FY 2025-26 to FY 2027-28, by way of a separate petition along with

the tariff petition for the first year of the Control Period i.e. 2025-26 for

approval of the commission. The petition for approval of Business Plan

shall be filed in accordance with BERC (Conduct of Business)

Regulations, 2005 as amended from time to time, accompanied by such

fee payable, as specified in the BERC (Fees, Fines and Charges)

6

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Regulations, 2019 as amended from time to time.

5.2

Such Business Plan shall comprise but not limited to detailed

category/sub-category-wise sales and demand projections, power

procurement plan, capital Investment plan, financing plan and physical

targets.

Provided that in case the Commission issues guidelines and

formats, from time to time, the same shall be adhered to by the

Distribution Licensee.

5.3 The Distribution Licensee shall make assessment of infrastructure

requirement and prepare capital investment plan in accordance with BERC

(Procedure

for

Filing

Capital

Investment

and

Capitalization

Plan)Regulations, 2018 that wills pill into the year(s)under review and

new projects that will commence and may be completed within or beyond

the tariff period. It is the duty of the Distribution Licensee to ensure

optimization of investments to enhance efficiency, productivity and meet

performance standards prescribed by the Commission.

5.4 The Commission shall approve the capital investment plan in accordance

with BERC (Procedure for Filing Capital Investment and Capitalization

Plan) Regulations, 2018, as amended from time to time

5.5 The Commission may also undertake a detailed review of the actual works

compared with the works approved in the previous Tariff Order while

approving the capital expenditure for the ensuing year.

5.6

The Distribution Licensee shall normally get prior approval of every

capital investment, incase the capital expenditure is required for

emergency work arisen due to unforeseen circumstances, the Licensee

may take up the work upto Rs. 5 Crore prior to receiving the approval

from the Commission provided the emergent nature of the scheme has

been certified by its Board of Directors or by the Authority delegated by

the Board of Directors.

5.7

The Licensee shall submit an application showing detailed justification

along with supporting documents for emergent nature of expenses within

15 days of occurrence of cause for such investment, seeking post facto

approval by the Commission.

5.8

The Distribution Licensees shall access and project the power purchase

requirement in accordance with Bihar Electricity Regulatory Commission

(Power Purchase and Procurement Process of Licensee) Regulations,

2018.

6. Forecast.—

6.1

The applicant, based on the Business Plan, shall submit the forecast of

Aggregate Revenue Requirement and expected revenue from tariff, for the

Control Period by a Petition in accordance with BERC (Conduct of

Business) Regulations, 2005, as amended from time to time, by 15th

November of the year prior to the commencement of the Control Period

and accompanied by such fee payable, as specified in the BERC(Fees,

Fines and Charges) Regulations, 2019 as amended from time to time.

6.2

The forecast of Aggregate Revenue Requirement shall be developed using

the assumptions relating to the behaviour of individual variables that

comprise the Aggregate Revenue Requirement during the Control Period.

6.3

The forecast of expected revenue from tariff and charges shall be

developed based on the following:

7

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

(a)

Estimates of category/sub-category wise quantum of electricity to be

supplied to consumers and wheeled on behalf of Distribution System

Users for each financial year within the Control Period; and

(b)

Prevailing tariff as on the date of making the application.

7. Specific trajectory for certain variables.—

7.1

The Commission shall stipulate a trajectory while approving the Business

Plan, for certain variables having regard to the reorganization,

restructuring and development of the electricity industry in the State:

Provided that the variables under regulation 7 for which a

trajectory may be stipulated shall include, but are not limited to, Operation

& Maintenance expense norms, supply availability, wires availability,

distribution losses, collection efficiency and AT&C Losses.

Provided also that the AT&C losses reduction trajectory to be

approved by the Commission for tariff determination shall be in

accordance with the trajectory agreed to the State Government of Bihar

and approved by the Central Government under any national scheme or

programme, or other wise as may be decided by the Commission from

time to time.

7.2

In case the Commission has approved the business plan by 31st October of

current year, the trajectory stipulated by the Commission in the order

approving the Business Plan submitted by the applicant, shall be

incorporated by the applicant, in its forecast of Aggregate Revenue

Requirement and/or expected revenue from tariff and charges under

regulation 6.3 of these Regulations.

8.

Annual Review of Performance and True-up.—Where the Aggregate Revenue

Requirement and expected revenue from tariff and charges of a Distribution

Licensee are covered under a Multi-Year Tariff framework, such Distribution

Licensee shall be subject to an annual review of performance and True-up during

the Control Period in accordance with these Regulations.

9.

Controllable and uncontrollable factors.—

9.1 The“ uncontrollable factors” shall comprise but not limited to the

following factors which are beyond the control of, and could not be

mitigated by the applicant:

(a)

Force Majeure events, such as acts of war, fire and natural

calamities;

(b)

Change inlaw;

(c)

Taxes and Duties;

(d)

Variation in metered sales; if the Distribution Licensee has

adequate power availability;

(e)

Variation in the cost of power generation and/or power purchase

due to the circumstances specified in regulations 20 of these

Regulations;

(f)

Variation in the cost of power purchase due to the circumstances

specified in regulation 10.1.4 of Bihar Electricity Regulatory

Commission (Power Purchase & Procurement Process of Licensee)

Regulations, 2018, provided procedure for procurement of power

in such circumstances have been complied.

9.2

The “controllable factors” shall comprise but not limited to the following

factors which are within the control of, and are attributable to the

applicant:

8

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

(a)

Variations in capital expenditure on account of time and/or cost

overruns/ efficiencies in the implementation of a capital project not

attributable to an approved change in scope of such project, change

in statutory levies or force majeure events;

(b)

Variations in distribution losses which shall be measured as the

difference between the units in put into the distribution system and

the units billed for the same year;

(c)

Variations in Return on Equity (RoE), depreciation and working

capital requirements. However, if the Commission is satisfied that

the variation in the working capital requirement is attributable to

any uncontrollable factors, the same may be considered as

uncontrollable factor;

(d)

Failure to meet the standards specified in the Standards of

Performance Regulations, except where exempted;

(e)

Variations in operation & maintenance expenses, except those

attributable to directions of the Commission or to change in

Government policy/law;

(f)

Variation in Wires Availability and Supply Availability, within the

control of Distribution Licensee.

10.

Mechanism for pass-through of gains or losses on account of uncontrollable

factors.—The approved aggregate gain or loss to the Distribution Licensee on

account of uncontrollable factors shall be a pass through, as an adjustment in the

tariff of the Distribution Licensee, as specified in these Regulations and as maybe

determined in the Order of the Commission passed under these Regulations.

The Distribution Licensee shall submit such details of the variations

between actual and the figures approved by the Commission along with the

detailed computations and supporting documents as may be required by the

Commission.

11. Mechanism for sharing of gains or losses on account of controllable factors.—

11.1

The approved aggregate gain or loss to the Distribution Licensee on

account of controllable factors shall be dealt separately for aggregate gain

and aggregate loss respectively in the following manner:

(a) Aggregate gain:

(i) Two-third of the amount of such gain shall be apass through as

an adjustment in the tariff of the Distribution Licensee, as

specified in these Regulations and as may be determined in the

Order of the Commission passed under these Regulations;

(ii) The balance one-third of the amount of such gain shall be on

account of Distribution Licensee and such amount shall be

utilized at the discretion of Distribution Licensee.

9

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

(b) Aggregate Loss:

(i) One-third of the amount of such loss shall normally be apass

through as an adjustment in the tariff of the Distribution

Licensee as specified in these Regulations and as may be

determined in the Order of the Commission passed under these

Regulations, provided the Commission is satisfied that such loss

is not on account of deliberate action of the Distribution

Licensee;

(ii) The balance two-third of the amount of such loss shall be on

account of Distribution Licensee.

Explanation:1- If the State Government is providing resource gap grant,

Aggregate Loss shall be reduced by that amount for the

purpose of computation of Aggregate Loss to be qualified

for a pass through.

11.2 The Distribution Licensee shall submit such details of variation for sharing

of approved aggregate gain or loss on account of controllable factors along

with the detailed computations and supporting documents as maybe

required for verification by the Commission.

Explanation:

For the purpose of variation for sharing of approved

aggregate gain or loss on account of norms based

expenditure. Variation will be calculated as a difference

between normative expenditure as re-calculated in truing

up and actual expenses booked in the audited books of

accounts.

11.3

In case, there are other regulations which specifies for incentive/

disincentive, in that case gains/losses will not be shared under this

regulation.

Provided that losses, during any year of the control period,

above the limit as approved by the Commission under AT&C loss

reduction trajectory for the control period and in accordance with

Regulation (7) above shall not be passed on to the consumers.

PART-III

PROCEDURE

12.

Procedures relating to making of an application for determination of Tariff:-

12.1 An application (alongwith soft copy) for approval of the Business Plan

shall be made by15th September of the year prior to the commencement of

the Control

Period, in accordance with the BERC(Conduct of Business)

Regulations, 2005 and its amendments from time to time, and

accompanied by such fee payable,

as specified in the BERC (Fees,

Fines and Charges) Regulations, 2019” as amended from time to time.

Provided that, application for approval of the Business Plan shall

not be required to be filled for the Control Period and all requirement of

business plan shall be incorporated in the MYT petition of this control

period.

12.2 An application (alongwith softcopy)for determination of tariff shall be

made by 15th November every year, for Truing up of expenses of previous

years, for Annual Performance Review(APR) of the Aggregate Revenue

Requirement(ARR)for the current year and determination of ARR and

tariff for retail sale of electricity for the ensuing years of the control

10

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

period. The application should contain the data relating to each item of the

ARR supported with the information/data in the formats 1 to 41 appended

to these Regulations, revenue income on existing tariff, revenue income on

proposed tariff, tariff design, structure and rates for retail sale of

electricity, etc with explanatory notes and accompanied by such fees as

may be specified under the BERC(Fees, Fines and Charges)Regulations,

2019 as amended from time to time. All the information as required in the

formats appended to these Regulations along with justification shall be

provided in the main petition.

12.3 The petition for determination of tariff shall be accompanied by

information for the previous year, current year revised estimate and the

ensuing years of the entire control period capturing the expected revenues

from the tariff and charges including miscellaneous charges at existing

rates along with detailed assumptions, parameters required in annual true-

up, Annual Performance Review exercise, Annual Revenue Requirement

etc.

Provided that the application shall be accompanied where relevant,

by a detailed tariff revision proposal showing sub-category-wise tariff and

how such revision would meet the gap, if any, in Aggregate Revenue

Requirement for each year of the Control Period.

Provided further that the information for the previous year shall be

based on audited accounts and in case audited accounts for the previous

year are not available, audited accounts for the immediately preceding

year should be filed along with provisional books of annual(regulatory)

accounts for the previous year duly approved by the Board of Directors of

the licensee company.

12.4 The Distribution Licensee shall along with the aforesaid petition submit a

statement on the status of compliance of directives, if any, issued by the

Commission in its last tariff order.

12.5

The petition for determination of tariff shall include the details of actual

subsidy received from the State Government vis-à-vis claimed by the

Distribution Licensee in the True-up petition for the previous year.

12.6

The Commission may seek clarification and additional information on

inadequacies if any, in the application within fourteen (14) days or as may

be practicable, of filing of the application for approval of the Business

Plan and application for determination of tariff, as the case may be.

12.7

The Distribution Licensee shall respond to the Commission within the

next ten (10) days with all clarifications and information as required.

12.8

The Commission shall admit the application for approval of the Business

Plan and application for determination of tariff, as the case may be within

seven (7) days or as may be required, of submission of response to the

clarifications, if any, by the Distribution Licensee.

12.9

Upon receipt of a complete application accompanied by all requisite

information, particulars and documents incompliance withal the

requirements specified in these Regulations, the application for approval

of the Business Plan and application for determination of tariff, as the case

may be, shall be deemed to be received and the Commission or the

Secretary or the designated Officer shall intimate to the applicant with the

abridged form of application for publication of public notice in the daily

newspapers. In case of non-submission or delay in submission of

11

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

additional information, the Commission may take suo-motu decision to

formulate this abridged form of application as it deem appropriate.

Provided that the applicant shall make available a hard copy of the

complete application, to any interested party, at such locations and at such

rates as may be stipulated by the Commission.

Provided further that the applicant shall also put up on its internet

website,

in

downloadable

spreadsheet

format

showing

detailed

computations, the application made to the Commission along with all

regulatory filings, information, particulars and documents in the manner

so stipulated by the Commission.

Provided further that the web-link to the information mentioned in

the second proviso above shall be easily accessible, archived for

downloading and shall be prominently displayed on the applicant's internet

website.

Provided also that, the applicant may not provide or put up any

such information, particulars or documents, which are confidential in

nature, with the prior approval of the Commission.

Explanation–for the purpose of this Regulation, the term“ downloadable

spreadsheet

format”

shall

mean

one(or

multiple,

linked)spreadsheet software files containing all assumptions,

formulae, calculations, software macros and outputs forming the

basis of the application.

12.10 Notwithstanding anything contained in these Regulations, in case of delay/

non- submission of the application for approval of the Business Plan and

application for determination of tariff, as the case may be, the Commission

may initiate suo-motu proceedings mandating the filing of the said

applications.

Provided that in the event of the licensee not filing the application

despite the aforesaid proceeding, the Commission may on its own, decide

the tariff based on previous year’s tariff details and after incorporating

suitable adjustments. However before issuing tariff order under such

circumstances, comments/suggestions/objections from the public and

stake holders including the licensee will be invited and same will be

considered for the tariff order.

Provided further that, the Commission may also pass directions

under Section 129 and/or Section 142 of the Act, if required.

13. Order approving the Business Plan and Tariff Order.—

13.1

An Order approving with such modifications or such conditions as may be

specified in that order or rejecting the Business Plan shall, as far as

practicable, be issued before filing of tariff petition separately or with the

tariff order as the Commission may deem fit and practicable.

13.2 The Commission shall, within one hundred and twenty(120)days from

receipt of a complete application for determination of ARR and tariff and

after considering all suggestions and objections received from the public

and after hearing all stakeholders and general public:-

12

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

(a)

Issue a Tariff Order accepting the application with such

modifications or such conditions as may be specified in that Order;

(b)

reject the application for reasons to be recorded in writing, if such

application is not in accordance with the provisions of the Act and

the Rules and Regulations made there under or the provisions of

any other law for the time being inforce:

Provided that, an applicant shall be given a reasonable

opportunity of being heard before rejecting its application.

13.3 The applicant shall publish the tariff approved by the Commission within

seven (7) days of issue of tariff order in at least two (2) English and two

(2) Hindi daily newspapers having wide circulation in the area of supply

of the applicant and shall put up the approved tariff / tariff schedule on its

internet website and make available for sale, a booklet containing such

tariff schedule to any person upon payment of reasonable reproduction

charges.

13.4

The tariff so published shall be in force from the date specified in the said

Order and shall, unless amended or revised, continue to be inforce for such

period as may be stipulated therein.

14. True-up and Annual Performance Review.—The Commission shall True-Up

expenses of the previous year either as part of the Tariff order or issue Order/s for

True-Up of expenses preceding the Tariff order of ensuing year:

(a)

An order for True-Up of expenses shall be issued on annual basis.

(b)

An order for True-Up of expenses shall be on the basis of expense

estimates made in the beginning of the year under consideration, actual

expenses booked in the audited books of accounts of the Distribution

Licensee for the year, and after prudence check of data by the

Commission.

(c)

Where audited books of account are not available at the time of true up,

provisional books of annual (regulatory) accounts duly approved by the

Board of Directors of the applicant company shall be used for the

provisional True-up process.

(d) The Commission shall undertake review of estimates of expenses for the

current year as a part of the tariff order on the basis of the actual expenses

incurred during the period April – September of the current year and

corresponding figures in the order for Annual Revenue Requirement

(ARR) of the current year approved by the Commission.

(e) Estimates of expenses for the ensuing year shall be on the basis of

corresponding figures in the order for True-up of expenses of the previous

year and Annual Performance Review or Tariff Order of the current year,

as the Commission may consider reasonable and deem fit.

(f) Notwithstanding anything contained in regulation 4 of these Regulations,

the Revenue gap/surplus arising out of Truing up shall be considered by

the Commission while determining the ARR of ensuing year(s). While

approving adjustments towards revenue/expenses in future years, arising

out of Truingup exercises, the Commission may allow the carrying costs

as per Ministry of Power – Electricity (Late Payment Surcharge and

Related Matters) Rules, 2022 as amended from time to time of such

expenses/revenues. However the revised estimated gap/surplus as a result

of APR shall not be passed in the ARR of ensuing year.

15. Adherence to Tariff Order.—

13

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

15.1 If a Distribution Licensee recovers a price or charge exceeding the tariff

determined under Section 62 of the Act and in accordance with these

Regulations, the excess amount shall be payable to the person who has

paid such price or charge, alongwith interest equivalent to the Bank Rate

of the Reserve Bank of India without prejudice to any other liability that

may be incurred by such Distribution Licensee.

15.2 The Distribution Licensee shall submit periodic returns as may be required

by the Commission, containing operational and cost data to enable the

Commission to monitor the implementation of its Order.

PART-IV

SALES, POWER PURCHASE QUANTUM AND COST

16. Sales forecast.—

16.1

Forecasting Methodology.— Metered sales shall be treated as an

uncontrollable parameter; and un-metered sales shall be treated as a

controllable parameter.

Provided that, open access transactions shall not form part of the

sales.

Provided further that absolute sales forecast of metered category

shall be based on past trends in each of the slabs of consumer categories.

Provided further that, incase of un-metered category, sales forecast

shall be based on the norms developed asper Regulation 16.2 of these

regulations.

Provided further that in cases where slab-wise sales to each metered

consumer category are not available in audited books of accounts and only

consolidated sales are available, the Distribution Licensee shall include the

slab-wise sales alongwith the Business Plan and Tariff petition.

Provided also that in case of occurrence of materially significant

findings during audit check as per Regulation 16.3 of these regulations,

prudent adjustment in forecasted sales shall be carried out.

16.2 Methodology for determination of norms of unmetered sales.—

(a) Till the time 100% metering of electricity consumers is achieved in

the area of operation of Distribution Licensee, an independent study

shall be conducted on yearly basis by the Distribution Licensee as per

Regulation 17 of these regulations to assess actual consumption of

power by unmetered consumer segment;

(b) The study referred to in clause (a) of this Regulation shall cover

actual consumption in the block (hours of usage, specifications of

motor

power

etc.)demonstrating

seasonal

impact,

economic

development, demographics, consumption pattern, etc. This would

aid to develop norms pertaining to electricity consumption in un-

metered consumer segments.

(c) Stratified random sampling shall be used to identify consumers

inblock/district for study which would be, well distributed

representation of the block under purview such that sampled

consumers shall exhibit same demographic profile, energy

consumption pattern, water level etc. of the block.

Provided that the sample selected shall be from all the

subdivisions in the state.

14

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

16.3

Overhaul Exercise.—

(a) A team shall be formed by Distribution Licensee to validate the status

of meters, load of metered and un-metered consumers and category

classification of consumers in the area of operations of Distribution

Licensee.

(b) The over haul exercise shall be a year-long assessment study

conducted on monthly basis.

(c) For the over haul exercise, consumers shall be sampled for a monthly

over haul from the circles served by the Distribution Licensee.

Provided that the sample so chosen shall be close representation of

geographic,

demographic,

industrial/

commercial/

residential/

agricultural spread served by the Distribution Licensee

(d) In the event, inconsistencies are found in the number of metered

consumers, status of the meters, load at consumer premises or

category classification of the consumers, the forecast arrived at in

Regulation 16.1 on the basis of historical audited sales shall be

adjusted accordingly as specified in Regulation 16.1.

17. Study of un-metered sales.—

17.1

Study of Agricultural feeders not segregated insignificant numbers.—

(a) The sample of consumers selected shall be monitored and the

readings of consumption can be taken from the meters installed at

each DT in the sample area.

(b) The load of all the consumers connected on the DT in each of the

sample area shall be validated each month to account for any

additional load or replacement of old motor with new motor by the

consumers.

(c) Based on the result of year long month-wise study, the consumption

pattern for selected subdivisions shall be established.

(d) The results of the study shall be extrapolated to adjoining areas with

similar water level and the same cropping patterns.

(e) The month-wise analysis of the sample selected for the establishment

of norms shall be submitted to the Commission at regular intervals so

that the directions of the Commission are incorporated before the

completion of study.

17.2 Study of Agricultural feeders segregated insignificant numbers.—

(a) Meters shall be installed at input points of the feeder at the sub-station

and based on the load flow study the technical loss of the feeder will

be evaluated.

(b) The difference of the feeder meter consumption and technical losses

will be agricultural consumption.

Provided

that

such

computation

of

agricultural

consumption may include commercial losses the percentage of which

shall be worked out by the Distribution Licensee during the annual

study.

15

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

(c) The study report shall be submitted to the Commission by 31st

October so that the Commission have enough time to conduct

validation check and analysis in collaboration with an independent

agency and with due assistance of team designated by the Distribution

Licensee.

(d) The Distribution Licensee shall be informed as late as morning of the

day scheduled for inspection by the Commission to have reality check

and to ensure that power supply and the Distribution Licensee’s

personnel are available.

(e) Any significant deviation in the parameters reported in annual study

from the baseline study may necessitate revision of norms by the

Commission.

18. Treatment of Aggregate Technical and Commercial Loss.

18.1 Aggregate Technical and Commercial Loss shall be considered as a

controllable parameter. The Commission shall approve AT&C Loss

targets on the basis of approved distribution loss and collection efficiency

targets.

Provided that the AT&C loss so computed shall be in alignment

with the AT&C loss trajectory approved under Regu lation 7 of this

regulation.

18.2

Distribution Loss.— Based on the assessment of metered and un-metered

sales as per Regulations 16 and17 of these regulations, the Commission

shall update existing baseline of distribution losses. Provided that circle-

wise distribution loss reduction targets shall be approved by the

Commission on the basis of circle-wise distribution loss, circle-wise

differential tariff byway of separate and distinct distribution loss surcharge

may also be considered by the Commission, if the Commission considers

it appropriate and practicable.

18.3

Collection Efficiency.— The Commission shall approve collection

efficiency targets. To reflect true position of Collection Efficiency,

Revenue/Tariff subsidy actually received (not subsidy booked) shall be

considered.

18.4 The AT&C Loss shall be computed in accordance with the formula and

methodology provided in Regulations 18.5 below.

18.5

Formula and methodology for computation of AT&C Loss.— The

formula and methodology for computation of AT & C losses shall be

prescribed under Additional Disclosure Statement 4: Statement of

(Aggregate Technical and Commercial, AT & C) loss in the Electricity

Distribution (Accounts and Additional Disclosure) Rules, 2024 Ministry

of Power, Govt. of India as below:

16

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Note:

(i)

In column (2) collection efficiency to be capped at 100%.

(ii) For calculation of AT&C loss, revenue and trade receivables shall include

only:

(a) Sale of power to LT, HT and EHT consumers net of rebate to

consumers;

(b) Other receipts from consumers (such as meter rents, service rentals,

recoveries for theft of power and malpractices, etc.);

(c) FAC/FCA/ FPPCA/PPAC;

(iii) For calculation of AT&C loss, revenue and trade receivables shall

exclude:

(a) Electricity duty/other taxes;

(b) Wheeling of energy;

(c) Open access sale;

(d) Sale of power through inter-State sale/ energy traded/UI/ DSM/ inter

DISCOM sale;

(e) Delayed payment surcharge/ late payment surcharge.

17

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

19. Power Purchase Quantum and Cost.—

(a)

Based on the demand estimates grossed up with distribution losses as

determined by regulation 18 of these regulations and transmission losses,

the power purchase quantum shall be calculated in accordance with

BERC(Power Purchase & Procurement Process of Licensee) Regulations,

2018.

Provided that the power purchase quantum shall be net of sale of

surplus power, if any.

(b)

The Power Purchase cost for the power purchase quantum as referred in

(a) Above shall be inclusive of inter-state transmission and POSOCO

charges but excluding revenue from sale of surplus power`, if any.

Provided that the power purchase cost calculated above shall be net of

rebate at such rate as specified in CERC Tariff Regulations.

Provided further that the power purchase cost referred above shall

be excluding late payment surcharge(LPSC).

(c)

Revenue from sale of surplus power shall be estimated at per unit

weighted average price of bilateral purchases.

Power Purchase Planning.—Comprehensive Power Procurement Plan

approved inaccordance with the BERC(Power Purchase& Procurement

Process of Licensee) Regulations, 2018 shall be submitted as part of MYT

petition to the Commission.

20. FUEL AND POWER PURCHASE ADJUSTMENT SURCHARGE (FPPAS)

20.1 “Fuel and Power Purchase Adjustment Surcharge” (FPPAS) means the

increase in cost of power, supplied to consumers, due to change in Fuel

cost, power purchase cost and transmission charges with reference to cost

of supply approved by the State Commission.

20.2 Fuel and Power Purchase adjustment surcharge shall be calculated by the

DISCOMs on monthly basis and shall be billed to the consumers

automatically without going through regulatory approval process

according to the formula prescribed by the Commission subject to true-up

on an annual basis. Automatic pass through shall be adjusted for monthly

billing in accordance with these regulations.

The petition for true-up of FPPAs for a financial year shall be submitted

by the DISCOMs to the Commission by 31st May of the next financial

year and the true-up shall be completed by 30 th June of next Financial

Year.

20.3 Fuel and Power Purchase Adjustment Surcharge shall be computed and

charged by the distribution licensee, in (n+2)th month, on the basis of

actual variation, in cost of fuel and power purchase for the power procured

during the nth month. For example, the fuel and power purchase

adjustment surcharge on account of changes in tariff for power supplied

during the month of April of any financial year shall be computed and

billed in the month of June of the same financial year:

Provided that in case the distribution licensee fails to compute and

charge fuel and power purchase adjustment surcharge within this time

line, except in case of any force majeure condition, its right for recovery

of costs on account of fuel and power purchase adjustment surcharge shall

be forfeited and in such cases, the right to recovery the fuel and power

purchase adjustment surcharge determined during true-up shall also be

forfeited.

18

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

20.4 The distribution licensee may decide, fuel and power purchase adjustment

surcharge or a part thereof, to be carried forward to the subsequent month

in order to avoid any tariff shock to consumers, but the carry forward of

fuel and power purchase adjustment surcharge shall not exceed a

maximum duration of two months and such carry forward shall only be

applicable, if the total fuel and power purchase adjustment surcharge for a

Billing Month, including any carry forward of fuel and power purchase

adjustment surcharge over the previous month exceeds twenty per cent of

the variable component of approved tariff.

20.5 The carry forward shall be recovered within one year or before the next

tariff cycle whichever is earlier and the money recovered through fuel and

power purchase adjustment surcharge shall first be accounted towards the

oldest carry forward portion of the fuel and power purchase adjustment

surcharge followed by the subsequent month.

20.6 In case of carry forward of fuel and power purchase adjustment surcharge,

the carrying cost at the rate of State Bank of India Marginal Cost of

Funds-based Lending Rate plus one hundred and fifty basis points shall be

allowed till the same is recovered through tariff and this carrying cost shall

be trued up in the year under consideration.

20.7 Depending upon quantum of fuel and power purchase adjustment

surcharge, the automatic pass through shall be adjusted in such a manner

that,

(i)

If fuel and power purchase adjustment surcharge ≤5%, 100% cost

recoverable of computed fuel and power purchase adjustment

surcharge by distribution licensee shall be levied automatically

using the formula.

(ii)

If fuel and power purchase adjustment surcharge>5%, 5% fuel and

power purchase adjustment surcharge shall be recoverable

automatically as per 20.7(i) above. 90% of the balance fuel and

power purchase adjustment surcharge shall be recoverable

automatically using the formula and the differential claim shall be

recoverable after approval by the State Commission during true up.

20.8 The revenue recovered on account of pass-through fuel and power

purchase adjustment surcharge by the distribution licensee, shall be trued

up later for the year under consideration and the true up for any financial

Year shall be completed as per extant rule/ regulation.

20.9 In case of excess revenue recovered for the year against the fuel and

power purchase adjustment surcharge, the same shall be recovered from

the licensee at the time of true up along with its carrying cost to be

charged at the rate approved by the Commission for working capital in the

ARR determination of the relevant financial year and the under recovery

of fuel and power purchase adjustment surcharge shall be allowed during

true up, to be billed along with the automatic Fuel and Power Purchase

Adjustment Surcharge amount.

20.10 The distribution licensee shall submit such details, in the stipulated

formats, of the variation between expenses incurred and the fuel and

power purchase adjustment surcharge recovered, and the detailed

computations and supporting documents, as required by the State

Commission, during true up of the normal tariff.

20.11 To ensure smooth implementation of the fuel and power purchase

19

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

adjustment surcharge mechanism and its recovery, the distribution

licensee shall ensure that the licensee billing system is updated to take this

into account and a unified billing system shall be implemented to ensure

that there is a uniform billing system irrespective of the billing and

metering vendor through interoperability or use of open source software as

available.

20.12 The licensee shall publish all details including the fuel and power purchase

adjustment surcharge formula, calculation of monthly fuel and power

purchase adjustment surcharge and recovery of fuel and power purchase

adjustment surcharge (separately for automatic and approved portions) on

its website and archive the same through a dedicated web address.

20.13 Computation of Fuel and Power Purchase Adjustment Surcharge:

Formula:

Where:

nth month means the month in which billing of fuel and power

purchase adjustment surcharge component is done. This fuel and power

purchase adjustment surcharge is due to changes in tariff for the power

supplied in (n-2)th month.

A is Total units procured in (n-2)th Month (in kWh) from all

Sources including Long-term, Medium –term and Short-term Power

purchases (To be taken from the bills issued to distribution licensees).

B is bulk sale of power from all Sources in (n-2)th Month. (in

kWh) = (to be taken from provisional accounts to be issued by State

Load Dispatch Centre by the 10th day of each month).

C is incremental Average Power Purchase Cost= Actual average

Power Purchase Cost (PPC) from all Sources in (n-2) month (Rs./

kWh) ( computed) - Projected average Power Purchase Cost (PPC)

from all Sources (Rs./ kWh)- (from tariff order)

D = Actual inter-state and intra-state Transmission Charges in the

(n-2)th Month, (From the bills by Transcos to Discom) (in Rs)

E = Base Cost of Transmission Charges for (n-2)th Month. =

(Approved Transmission Charges/12) (in Rs)

Z = [{Actual Power purchased from all the sources outside the

State in (n-2) th Month. (in kWh)* (1 – Interstate transmission losses in

% /100 ) + Power purchased from all the sources within the State(in

kWh)}*(1 – Intra state losses in %/100) – B] in kWh

ABR = Average Billing Rate for the year (to be taken from the Tariff

Order in Rs/kWh)

Distribution Losses (in %) = Target Distribution Losses (from Tariff

Order) Inter-state transmission Losses (in %) = As per Tariff Order

20.14 The Power Purchase Cost shall exclude any charges on account of

Deviation Settlement Mechanism.

20.15 Other charges which include Ancillary Services and Security Constrained

Economic Despatch shall not be included in Fuel and Power Purchase

Adjustment Surcharge and adjusted though the true-up approved by the

Commission.

20

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

PART-V

FINANCIAL PRINCIPLES

21.

Component of ARR.—The Aggregate Revenue Requirement (ARR) for the

Distribution Business of the Distribution Licensee for each year of the Control

Period, shall inter-alia contain but not limited to the following financial

parameters:

A.

Quantum and Cost of power procurement in accordance with BERC

(Power Purchase and Procurement Process of Licensee) Regulation, 2018

as amended from time to time.

B.

Transmission and load dispatch charges

C.

Operation and Maintenance expenses

D.

Depreciation

E.

Contingency Reserves

F.

Interest on loan and other finance charges

G.

Interest on Working Capital

H.

Return on Equity

I.

Bad debts, ifany

J.

Non-Tariff Income; and

K.

Income from Other Business

L.

Interest on security deposit.

22. Operation & Maintenance Expenses.—

(a)

The Commission shall stipulate a separate trajectory of norms for each of

the components of O&M expenses viz., Employee cost, Repair and

Maintenance (R&M) expense and Administrative and General (A&G)

expense.

Provided that such norms may be specified for a specific

Distribution Licensee or a class of Distribution Licensees.

(b)

Norms shall be defined in terms of combination of number of personnel

per 1000 consumers and number of personnel per substation along with

annual expenses per personnel for Employee expenses; combination of

A&G expense per personnel and A&G expense per 1000 consumers for

A&G expenses and R&M expense as percentage of gross fixed assets for

estimation of R&M expenses.

(c)

One-time expenses such as expense due to change in accounting policy

and arrears paid due to pay commission recommendation shall be

excluded from the norms in the trajectory.

(d)

The unforeseen expenses beyond the control of the Distribution Licensee

such as pay revision, shall be excluded from the norms in the trajectory.

(e)

The One-time expenses and the expenses beyond the control of the

Distribution Licensee shall be allowed by the Commission over and above

normative Operation & Maintenance Expenses after prudence check.

(f)

The norms in the trajectory shall be specified over the control period with

due consideration to productivity improvements.

(g)

The norms shall be determined at constant prices of base year and

escalation on account of inflation shall be over and above the baseline.

Provided that for the purpose of escalation based on Wholesale Price

Index (WPIn) and Consumer Price Index(CPIn),WP In is to be computed

based on the average yearly inflation derived based on the monthly

Wholesale Price Index of the respective past three financial

21

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

years(including the year of Truing-up)as per the Office of Economic

Advisor Ministry of Commerce & Industry Government of India and CPIn

is to be computed based on the average yearly inflation derived based on

the monthly Consumer Price Index for Industrial Workers(all-India)of the

respective past three financial years(including the year of Truing-up)as per

the Labour Bureau Government of India, at the time of filing of Petition.

(h)

The Distribution Licensee specific trajectory of norms in terms of

Regulation 7 shall be identified by the Commission on the basis of

absolute and relative analysis.

(i)

In absolute analysis, Distribution Licensee’s audited accounts of

operations for last three years, expenses claimed for control period,

historically approved cost, and prudence check shall be used by the

Commission to estimate values of norms.

(j)

In relative analysis, performance parameters of other Distribution

Licensees within the same state or in other states, shall be considered by

the Commission to estimate norms.

Provided that other Distribution Licensees so chosen shall have

similar profile as that of the Distribution Licensee under consideration

interms of consumer mix, type of license area(city, state, etc.)type of

distribution networks, viz., underground/overhead, High Tension

(HT)consumer, Low Tension(LT)consumer ratio, etc.

(k)

Suitable average of outcomes of absolute and relative analysis shall

betaken by the Commission to fix the norms over the control period for

the Distribution Licensee.

Employee Cost.— Employee cost shall be computed as per the approved

norm escalated by consumer price index (CPI),

adjusted by provisions for expenses beyond the control

of the Distribution Licensee and one-time expected

expenses, such as recovery/adjustment of terminal

benefits, implications of pay commission, arrears and

Interim Relief, governed by the following formula:

EMPn = (EMPb * CPI inflation) + Provision

Where:

EMPn: Employee expense for the year,

EMPb: Employee expense as per the norm

CPI inflation: is the average increase in the Consumer Price Index (CPI) for

immediately preceding three years.

Provision: Provision for expenses beyond control of the Distribution Licensee

and expected one-time expenses as specified above.

Till the norms are specified by the Commission, the employee cost shall be

determined on the basis of actual historical cost.

22

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Repairs and Maintenance (R&M) Expense.— Repairs and Maintenance expense

shall be calculated as percentage (as per the norm determined) of Opening Gross Fixed

Assets excluding land cost for the year governed by following formula:

R&Mn = Kb * GFAn

Where:

R&Mn: Repairs & Maintenance expense for nth year

GFAn: Opening Gross Fixed Assets for nth year

Kb: Percentage point as per the norm

Administrative and General (A&G) Expense.— A&G expense shall be computed

as per the norm escalated by wholesale price index (WPI) and adjusted by provisions for

confirmed initiatives (IT etc. initiatives as proposed by the Distribution Licensee and

validated by the Commission) or other expected one-time expenses, and shall be

governed by following formula:

A & Gn= (A & Gb*WPI inflation) +Provision Where:

A & Gn: A&G expense for the yearn A & Gb: A & G expense as per the norm

WPI inflation: is the average increase in the Wholesale Price Index (WPI) for

immediately preceding three years

Provision:

Cost or initiatives or other one-time expenses as proposed by the

Distribution Licensee and validated by the Commission.

Till the norms of A&G expenses is specified by the Commission,

the actual historical cost will be considered for determination of

A&G expenses.

23.

Treatment of Depreciation.—

(a)

Depreciation shall be calculated for each year of the control period on the

original cost of the fixed assets of the corresponding year.

(b)

Depreciation shall not be allowed on assets funded by capital subsidies,

consumer contributions or grants.

(c)

Depreciation shall be calculated annually on the basis of assets capitalised

and put to use based on the straight line method over the useful life of the

asset at rate not exceeding the rate specified by the Central Electricity

Regulatory Commission for Transmission utility.

(d)

The residual value of assets shall be considered as 10% and depreciation

shall be allowed to a maximum of 90% of the original cost of the asset.

The Distribution Licensee shall submit separate detail of fully

depreciated asset along with year of commissioning and year of attaining

ninety percent depreciation with the tariff petition.

Provided that freehold land shall not be treated as a depreciable

asset and its cost shall be excluded while computing 90% of the original

cost of the asset.

Provided further that cost of leasehold land shall be amortized

evenly within the leased period.

(e)

Depreciation shall be charged from the first year of commercial operation

of the asset. Provided that in case the operation of the asset is for a part of

the year, depreciation shall be charged on proportionate basis.

(f)

A provision of replacement of assets shall be made in the capital

investment plan.

23

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

24. Contribution to Contingency Reserve—

24.1 If the Distribution Licensee has made an appropriation to the Contingency

Reserve, a sum not more than 0.5 per cent of the original cost of fixed

assets at the beginning of the year shall be allowed annually towards such

appropriation in the calculation of ARR.

Provided that where the amount of such Contingency Reserves

exceeds five (5) per cent of the original cost of fixed assets, no further

contribution shall be allowed.

Provided further that such contribution shall be invested

insecurities authorised under the Indian Trusts Act, 1882 within a period

of six months of the close of the Year.

24.2

The Contingency Reserve shall not be drawn upon during the term of the

license except to meet such charges as may be approved by the

Commission, such as following:

(a)

Expenses or loss of profits arising out of accidents, strikes or

circumstances which the management could not have prevented;

(b)

Expenses on replacement or removal of plant or works otherthan

expenses required for normal maintenance or renewal;

(c)

Compensation payable under any law for the time being inforce

and for which no other provision is made:

Provided that such drawal from contingency reserve shall be

computed after making due adjustment for any other compensation

that may have been received by the Licensee as part of an

insurance cover.

24.3

No diminution in the value of contingency reserve as mentioned above

shall be allowed to be adjusted as a part of tariff.

25. Treatment of loan and other finance charges.—

(a)

The Distribution Licensee shall provide detailed loan-wise, project-wise

and utilization-wise details of all the loans.

(b)

If the equity actually deployed is more than 30% of the capital cost, equity

in excess of 30% shall be treated as normative loan. Provided that where

equity actually deployed is less than 30% of the capital cost, the actual

loan shall be considered for determination of interest on loan.

(c)

Actual loan or normative loan, if any, shall be referred as gross normative

loan in this Regulation.

(d)

The normative loan outstanding as of 1st April of control period shall be

computed by deducting the cumulative repayment as approved by the

Commission (basis as mentioned below) up to 31st March of current

period (a year before control period) from the gross normative loan.

(e)

There payment for the control period shall be deemed to be equal to the

depreciation allowed for the year.

(f)

Notwithstanding any moratorium period availed by the Distribution

Licensee, the repayment of the loan shall be considered from the first year

of the control period as per annual depreciation allowed.

(g)

The rate of interest shall be the weighted average rate of interest calculated

on the basis of actual loan portfolio at the beginning of each year of the

control period, in accordance with terms and conditions of relevant loan

agreements, or bonds or non-convertible debenture.

Provided that if no actual loan is outstanding but normative loan is

24

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

still outstanding, the last available weighted average rate of interest shall

be applicable;

Provided further that if no actual loan is outstanding but normative

loan is still outstanding and the last available weighted average rate of

interest is also not available, rate of interest equal to the State Bank one-

year Marginal Cost of Funds-based Lending Rate (‘MCLR’) shall be

applicable;

Provided further that the interest on loan shall be calculated on the

normative weighted average loan of the year by applying the weighted

average rate of interest;

Provided also that exception shall be made for the existing loans

which may have different terms as per the agreements already executed if

the Commission is satisfied that the loan has been contracted for and

applied to identifiable and approved projects;

(h)

The Distribution Licensee shall make every effort to refinance the loan as

long as it results in net benefit to the consumers.

Provided that the cost associated with such refinancing shall be

eligible to be pass through in tariffs and the benefit on account of

refinancing of loan and interest on loan shall be shared in the ratio of

50:50 between the Distribution Licensee and the consumers. Provided

further that the Distribution Licensee shall submit the calculation of such

benefit to the Commission for its approval.

(i)

The Distribution Licensee shall enable tracking of the loans converted into

grants under schemes like R-APDRP, RGGVY, DDUGJY, IPDS etc. or

any other loan from the Central or State Government by providing

information and data regularly to the Commission, for enabling the

Commission to recover from Distribution Licensee the amount of interest

on loans which have been passed on to the consumers in the earlier years

and have been converted into grant subsequently so that the recovered

amount is passed on to the consumers..

(j)

Addition to loan during the year for Interest purpose will be restricted to

the quantum of assets capitalized and put to use out of actual or normative

loan.

(k)

Details of expenses on account of rebates for prompt payment, Power

factor rebate for maintaining power factor above 0.90, other finance

charges, guarantee fee etc except refinancing charges shall also be

separately filed by the licensee with the ARR under the head “Interest on

loan and other finance charges”.

Interest during Construction (IDC).—

(i)

Interest during construction shall be computed corresponding to the loan

from the date of infusion of debt fund, and after taking into account the

prudent phasing of funds up to Scheduled Date of Commercial operation

(SCOD).

(ii)

In case of additional costs on account of IDC due to delay in achieving the

SCOD, the Licensee shall be required to furnish detailed justifications

with supporting documents for such delay including prudent phasing of

funds.

25

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Provided that if the delay is not attributable to the Licensee and is

due to uncontrollable factors as specified in these regulations, IDC may be

allowed after due prudence check.

Provided further that only IDC on actual loan may be allowed

beyond the SCOD to the extent, the delay is found beyond the control of

licensee after due prudence and taking into account prudent phasing of

funds.

Incidental Expenditure during Construction (IEDC).—

(i)

Incidental expenditure during construction shall be computed from the

zero date and after taking into account pre-operative expenses up to

Scheduled Date of Commercial operation (SCOD).

Provided that any revenue earned during construction period up to

SCOD on account of interest on deposits or advances, or any other

receipts may be taken into account for reduction in incidental expenditure

during construction.

(ii)

In case of additional costs on account of IEDC due to delay in achieving

the SCOD, the licensee shall be required to furnish detailed justification

with supporting documents for such delay including the details of

incidental expenditure during the period of delay and liquidated damages

recovered or recoverable corresponding to the delay.

Provided that if the delay is not attributable to the licensee and is

due to uncontrollable factors as specified in these regulations, IEDC may

be allowed after due prudence check.

Provided further that where the delay is attributable to an agency or

contractor or supplier engaged by the licensee, the liquidated damages

recovered from such agency or contractor supplier shall be taken into

account for computation of capital cost.

(iii) In case the time over-run beyond SCOD is not admissible after due

prudence, the increase of capital cost on account of cost variation

corresponding to the period of time over run may be excluded from

capitalization irrespective of price variation provisions in the contracts

with supplier or contractor of the licensee.

26.

Interest on Working Capital.— The Distribution Licensee shall be allowed

interest on estimated level of working capital for the financial year, computed as

follows:

(a)

45 days equivalent of expected revenue.

(b)

Maintenance spares@ 40% of R&M expenses for one month

Less:

(i)

Power purchase cost, transmission charges and load dispatch charges

For one month.

(ii)

Depreciation, return on equity and contribution to contingency reserves

equivalent to 45 days.

(iii) Amount of security deposits and advance from consumers or Distribution

System users, if any, held during the year.

Provided that the interest on working capital shall be on normative

basis and rate of interest shall be equal to the State Bank one-year Marginal

Cost of Funds-based Lending Rate ('MCLR') as of the date on which

petition for determination of tariff is filed plus 150 basis points. The rate of

interest for the purpose of Truing-up shall be the weighted average MCLR

of the concern Financial Year plus 150 basis points.

26

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Provided further that interest shall be allowed on consumer security

deposits and security deposits from Distribution System users held during

the year at the rate as of the date on which petition for determination is

filed. The interest allowed shall be subject to true up at weighted average

Bank Rate of the concern Financial Year.

Provided also that if the State Government is providing resource

gap grant and/or direct subsidy to consumers, the working capital shall be

reduced by 45 days equivalent of that amount.

27.

Treatment of Return on equity.—

(a)

Return on equity shall be computed on 30% of the capital base or actual

equity, whichever is lower.

Provided that assets funded by consumer contribution, capital

subsidies/grants and corresponding depreciation shall not form part of the

capital base. Actual equity invested in the Distribution Licensee as per

book value shall be considered as perpetual and shall be used for

computation in this Regulation.

Provided further that the premium if any raised by the Licensee

while issuing share capital and investment of internal resources created out

of its free reserves, for the funding of the Scheme, shall be reckoned as

paid up capital for the purpose of computing return on equity, provided

such premium amount and internal resources are actually utilized for

meeting the capital expenditure of the distribution system, and are within

the ceiling of 30% of capital cost approved by the Commission.

(b)

The return on the equity invested shall be allowed from the date of start of

commercial operation after put to use.

(c)

Rate of return on equity shall be allowed not more than 14.0% for all

projects. However, further incentive equivalent to 0.5% will be allowed in

the form of RoE, if the project is completed within original schedule

period.

28.

Bad and Doubtful Debts.—Bad and Doubtful Debts shall be allowed as a

legitimate business expense provided the distribution licensee actually identifies

and writes off bad debts as per the transparent policy approved by the

Commission. In case there is any recovery of bad debts already written off, the

recovered bad debt will be treated as other income as an uncontrollable item.

29. Tax on Return on Equity.—

29.1 The base rate of return on equity as allowed by the Commission under

Regulation 27 shall be grossed up with the effective tax rate of the

respective financial year. For this purpose, the effective tax rate shall be

considered on the basis of actual tax paid in the respect of the financial year

in line with the provisions of the relevant Finance Acts by the concerned

the Distribution Licensee, as the case may be. The actual tax on income

from other business including deferred tax liability (i.e. income on business

other than business of distribution, as the case may be) shall not be

considered for the calculation of effective tax rate.

29.2 Rate of return on equity shall be rounded off to two decimal places and

shall be computed as per the formula given below:

Rate of pre-tax return on equity = Base rate/(1-t)

Where “t” is the effective tax rate in accordance with Clause (1) of this

regulation and shall be calculated at the beginning of every financial year

based on the estimated profit and tax to be paid estimated in line with the

27

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

provisions of the relevant Finance Act applicable for that financial year to

the company on pro-rata basis by excluding the income of non-distribution

business and the corresponding tax thereon. In case of licensee paying

Minimum Alternate Tax (MAT), “t” shall be considered as MAT rate

including surcharge and cess.

Illustration:-

(i)

In case of the licensee paying Minimum Alternate Tax(MAT) @

20.96% including surcharge and cess:

Rate of return on equity=14/(1-0.2096)=17.71%

(ii)

Incase of licensee paying normal corporate tax including surchargee

and cess:

(a)

Estimated Gross Income from the licensee business for

FY 2017-18 is Rs 1000 crore.

(b)

Estimated Advance Tax for the year on above is Rs 240crore.

(c)

Effective Tax Rate for the year 2017-18= Rs 240 Crore/

Rs 1000 Crore = 24%

(d)

Rate of return on equity=14/(1-0.24) =18.42%

The Licensee shall true up the grossed up rate of return on equity at

the end of every financial year based on actual tax paid together with any

additional tax demand including interest thereon, duly adjusted for any

refund of tax including interest received from the income tax authorities

pertaining to the tariff period 2025-26 to 2027-28 on actual gross income of

any financial year. However, penalty, if any, arising on account of delay in

deposit or short deposit of tax amount shall not be claimed by the Licensee.

Any under-recovery or over-recovery of grossed up rate of return on equity

after truing up, shall be recovered or refunded to beneficiaries on year to

year basis.

30.

Non-Tariff Income.—

(a)

All incomes being incidental to electricity business and derived by the

Licensee from sources, including but not limited to profit derived from

disposal of assets, income from rent of land and buildings, delayed

payment surcharge, meter rent (if any), income from investments other than

contingency reserves, interest income on advance to suppliers and

contractors, income from rent from staff quarters, income from rent from

contractors, income from hire charges from contactors and others,

supervision charges for capital works, income from recovery against theft

and/or pilferage of electricity, income from advertisements, income from

sale of tender documents, miscellaneous receipts from the consumers.

Provided that Delayed Payment Surcharge to the extent of financing

cost on the principal amount corresponding to the Delayed Payment

Surcharge shall not be treated as non-tariff income. The financing cost on

the principal amount corresponding to the Delayed Payment Surcharge

shall be allowed at weighted average MCLR of the concern Financial Year

plus 150 basis points.

Provided further that the interest earned from investments made out

of Return on Equity corresponding to the regulated Business of the

Distribution Licensee shall be included in Non-Tariff Income.

(b)

The amount received by the Licensee on account of Non-Tariff Income

shall be deducted from the Aggregate Revenue Requirement in calculating

the net revenue requirement of Distribution Licensee.

28

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

31.

Income from Other Business.—Where the Distribution Licensee is engaged in

any other business, the income from such business will be deducted from the

Aggregate Revenue Requirement in calculating the revenue requirement of the

Licensee in the manner and in proportion as may be specified by the Commission

in BERC (Treatment of Income of Other Businesses of Transmission Licensees

and Distribution Licensees) Regulations, 2013, as amended from time to time.

Provided that the Licensee shall follow a reasonable basis for allocation of

all joint and common costs between the Distribution Business and the Other

Business and shall submit the Allocation Statement as approved by the Board of

Directors to the Commission along with the application for determination of tariff;

Provided further that where the sum total of the direct and indirect costs of

such Other Business exceed the revenues from such Other Business or for any

other reason, no amount shall be allowed to be added to the Aggregate Revenue

Requirement of the Distribution Licensee on account of such Other Business.

32.

Treatment of Regulatory Assets.—

(a)

Regulatory assets shall not be created against cost/loss incurred in normal

course of business except in case of natural calamity or forced majeure

conditions and extraordinary situations as the Commission deems fit and

proper.

(b)

The amortization schedule corresponding to the regulatory asset shall be

approved by the Commission and put in effect along with creation of the

regulatory asset. The amortization schedule shall normally provide for

recovery of the regulatory asset within a period not exceeding seven years.

(c)

The carrying cost of the regulatory asset shall be in line with the State Bank

one-year Marginal Cost of Funds-based Lending Rate (‘MCLR’)for the

tenure for which regulatory asset has been created plus 150 basis points.

33.

Late Payment Surcharge.—The applicability and modalities of Late payment

Surcharge payable by the distribution licensee(s) shall be in accordance with the

Electricity (Late Payment Surcharge), Rules 2021, as amended from time to time.

PART-VI

WHEELING AND RETAIL SUPPLY BUSINESS

34.

Segregation of Wheeling Business and Retail Supply Business.—Every

Distribution Licensee shall maintain separate accounting records for the Wheeling

Business and Retail Supply Business and shall prepare an Allocation Statement to

enable the Commission to determine the Tariff separately for:—

(a)

Wheeling Business;

(b)

Retail Supply of electricity:

Provided that in case complete accounting segregation has not been done

between the Wheeling Business and Retail Supply Business of the Distribution

Licensee, the Commission shall stipulate the ratio of allocation of the Aggregate

Revenue Requirement of the Distribution Licensee based on data obtained from

the Distribution Licensees. The following broad principles shall be followed for

allocation of costs towards wheeling business and supply business, out of the total

annual Aggregate Revenue Requirements determined:

Power purchase cost shall be allocated to the Retail Supply business.

Operation and Maintenance expenses shall be segregated between wheeling and

retail supply businesses in such manner as may be determined by the

Commission;

29

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Majority of the capital expenditure related expenses, viz., depreciation,

interest and return on equity, shall be included under the wheeling business;

Explanation.— The Retail Supply Business would require only a small component of

the capital expenditure towards billing and collection activity..

35.

Target Availability and Recovery of ARR.—

(a)

Recovery of the annual Aggregate Revenue Requirement determined as

per the norms under these regulations shall be based on achievement of the

target availability index as under:

The Availability index shall be computed for both Wheeling Business and

Retail Supply Business of the Distribution Licensee on yearly basis as per

following:

For Wheeling Business:

Wheeling Network Availability Index (%) = (1-(SAIDI/8760)) X 100

Where,

SAIDI = Sum of all customer interruption durations/Total number of

consumers served

For Retail Supply Business:

The Supply Availability shall be measured on the basis of power

contracted by the Distribution Licensee on a long-term basis as per the

power procurement plan under following heads:

Base Load Supply Availability = ((Actual Contracted Base Load

Supply(MW))X(Number

of

Off-Peak

hours))/((Base

Load

in

MW)X(Number of Off-Peak hours)) Peak Load Supply Availability =

((ActualContractedPeakLoadSupply(MW))X(NumberofPeakhours))/((Pea

k Load in MW) X (Number of Peak hours)) Supply Availability Index =

75% of Base Load Supply Availability + 25% of Peak Load Supply

Availability

(b)

The Distribution Licensee shall maintain data on planned maintenance

outages, load shedding, force majeure outages and trippings.

(c)

The incentive/disincentive shall exclude the circumstances when the actual

supply differs from the contracted supply due to force majeure situations,

weather conditions, extreme monsoon failure, station outages, etc. which

are beyond the control of the Distribution Licensee.

(d)

The Commission shall specify progressively increasing normative levels

of Availability for Wheeling and Supply Business of the Distribution

Licensee on the basis of past performance over the control period.

Provided that the Availability of Retail Supply Business shall not

be lower than 90% and shall gradually increase to 95% or 98% in no less

than three years.

(e)

The incentive/disincentive shall be considered as +/- 0.2% of ARR for

every percentage point increase/decrease in Availability vis-à-vis the

normative levels of availability.

Provided that, the maximum incentive/disincentive shall be limited to +/-

2% of ARR.

36.

Subsidy:-

(a)

The Commission shall determine the ARR and Tariff without considering

subsidy.

Provided that if the State Government declares subsidy for the

categories of consumers after notification of Tariff Order, the licensee

30

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

shall incorporate the same in the tariff and intimate the Commission with

the revised Tariff Schedule that shall be charged if the subsidy is received

in advance.

Provided further that in case the State Government declares

subsidy in advance or during tariff filing proceedings and the licensee

incorporates the subsidy in the petition, the Commission shall notify two

tariff schedules, one with subsidy and the other without subsidy.

Provided also that the Government’s subsidy provided for or

declared shall be supported by documentary evidence of time schedule of

payment, mode of the payment of the subsidy and categorization of the

subsidy amount into subsidized consumer categories.

(b)

The Commission may clarify in the tariff order, post the declaration from

the Government, the quantum of Government’s subsidy as applicable to

the fuel cost adjustment along with the range (%) of variable cost upto

which the fuel adjustment cost shall not be passed to the consumers,

category wise classification, mode of payment and schedule of payment

etc.

(c)

In case of no disbursement or delayed disbursement of subsidy by the

Government, the licensee shall charge consumers as per the tariff schedule

which is approved by the Commission without consideration of subsidy.

(d)

In case the amount of subsidy by the Government is not utilized in full, the

balance amount of subsidy amount shall be used for adjusting in ARR of

the ensuing year(s).

Provided that in case the Government directs to utilize such

unutilized balance of subsidy in some other manner, the same shall not be

used for adjusting in the ARR of the relevant year(s).

(e)

The accounting of the subsidy payable under section 65 of the Act, shall

be done by the distribution licensee, in accordance with the Standard

Operating Procedures issued by the Central Government, in this

regard.

(f)

The Commission shall issue a quarterly report for each distribution

licensee, in its jurisdiction, giving findings whether demands for subsidy

were raised by the distribution licensee in the relevant quarter based on

accounts of the energy consumed by the subsidised category and consumer

category wise per unit subsidy declared by the State Government, the

actual payment of subsidy in accordance with section 65 of the Act and

the gap in subsidy due and paid as well as other relevant details.

Explanation: The term “Unit” means Kilo Watt Hour (kWh) or Kilo Watt

(kW) or Horse Power (HP) or Kilo Volt Ampere (kVA), in accordance

with the relevant Regulations or the Tariff Orders issued by the

Commission.

(g)

The quarterly report shall be submitted by the distribution licensee within

thirty days from end date of the respective quarter.

(h)

If subsidy accounting and the raising bills for subsidy is not found in

accordance with the Act or Rules or Regulations issued there under,

appropriate action shall be taken against the concerned officers of the

licensee for non-compliance as per provisions of the Act.

37. Cross Subsidy, Allocation of Cost to Serve and Tariff Design.—

31

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

(a)

The Commission shall notify a roadmap for reduction of cross subsidies

within control period. The road map shall also have intermediate

milestones, based on the approach of a gradual reduction in cross subsidy.

(b)

The Distribution Licensee shall compute the consumer category-wise cost

of supply as per the methodology elaborated below.

(c)

The additional surcharge levied on any Open Access Consumer shall not

be more than the per unit fixed cost of power purchase of the distribution

licensee concerned:

Provided that for a person availing General Network Access or Open

Access, the additional surcharge shall be linearly reduced from the value in the

year in which General Network Access or Open Access was granted so that, if it

is continued to be availed by this person, the additional surcharge shall get

eliminated within four years from the date of grant of General Network Access or

Open Access.

Provided further that the additional surcharge shall not be applicable for

Open Access Consumer to the extent of contract demand being maintained with

the distribution licensees.

Provided also that the additional surcharge shall be applicable only for the

Open Access Consumers who are or have been consumers of the concerned

Distribution licensee.

Explanation.– For the purpose of this rule, General Network Access and Temporary-

GNA shall have the same meaning as defined in the Central Electricity

Regulatory Commission (Connectivity and General Network Access to the inter-

State Transmission System) Regulations, 2022 as amended from time to time.

(d)

Allocation of Cost: The Cost to serve shall be allocated to the consumer

categories in the following manner:

Step 1: Functionalization of Cost - Total cost shall be divided on the basis of

functions performed such as power purchase, transmission, distribution

etc.

The additional surcharge levied on any Open Access consumer

shall not be more than the per unit fixed cost of power purchase of the

distribution licensee concerned.

Provided that a person availing General Network Access or Open

Access, the additional surcharge shall be linearly reduced from the value

in the year in which General Network Access or Open Access is granted

so that, if it is continued to be availed by this person, the additional

surcharge shall get eliminated within four year from the date of grant of

GNA or OA.

Step 2: Classification of Cost–Each of the functionalized costs shall be further

classified, based on its intrinsic nature into Demand related cost, Energy

related cost, and Customer related cost. Demand related costs shall

generally be of fixed nature, related to capacity creation and shall include

interest on capital borrowing, depreciation, etc. Energy cost shall be

related to quantum of electricity consumption of consumer, such as fuel

cost, interest on working capital, etc. Consumer related cost shall include

operating expenses associated with meter reading, billing, and accounting.

Step 3: Allocation of Cost.—

(i)

Allocation of Demand Costs : Demand costs of all three functions

shall be allocated among consumer categories on the basis of

average coincident peak demand of the tariff categories (average of

32

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

past 12 months). To facilitate determination of average coincident

peak demand for the various tariff categories, load research shall

be made an integral part of the operations of the DISCOMs and

systematic load research exercises shall be initiated.

(ii)

Allocation of Energy Costs: Energy related costs of Distribution

functions shall be allocated to consumer categories on the basis of

ratio of electricity consumption of each consumer category to the

total electricity consumption under the purview of the Distribution

Licensee. Energy related costs of Power purchase shall be

allocated to various tariff categories on the basis of block approach

on merit order dispatch and incremental principle, where each

tariff category shall be allocated the incremental (energy related)

power purchase cost on the basis of their respective share in the

incremental power purchase. For the purpose of operationalising

the block approach and incremental principle, the Commission

shall identify and notify a suitable year as the "base year".

(iii) Allocation of Customer Costs: Customer related costs shall be

allocated to consumer categories on the basis of the ratio of

number of consumers in each category to total number of

consumers under the purview of the Distribution Licensee.

(e)

Summation of allocated Demand cost, Energy cost and Customer cost

across functions shall be total Cost to serve for respective consumer

categories. Cost to serve reduced by revenue from a consumer category

shall give total subsidy for that category. Total subsidy for a consumer

category reduced by Government subsidy, if any, shall be cross-subsidy

for that consumer category.

(f)

The consumers below poverty line who consume power below a specified

level, as determined by the commission in Tariff Order, shall receive a

special support through cross subsidy.

(g)

Cross-subsidy surcharge and additional surcharge in Open Access.—

(i) The amount received or to be received by the licensee on account of

cross-subsidy surcharge and additional surcharge, as approved by the

Commission from time to time in accordance with the Regulations

specified by the Commission, shall be shown separately against the

consumer category that is permitted open access as per the phasing

plan.

(ii) Cross-subsidy surcharge and additional surcharges shall be shown as

revenue from the tariff from the consumer categories who have been

permitted open access and such amount shall be utilized to meet the

cross-subsidy requirements of subsidized categories and fixed costs of

the Distribution Licensee arising out of his obligation to supply.

Provided that, the licensee shall provide such details in its annual

fillings.

(iii) The surcharge payable by the consumers permitted for open access

shall be computed as per following formula:

S=T-[C/(1-L/100)+D+R];

Where S is the surcharge

T is the tariff payable by the relevant category of consumers,

including

reflecting

the

Renewable

Purchase

Obligation.

C is the per unit weighted average cost of power purchase by the

33

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Licensee, including the cost of meeting the Renewable Purchase

Obligation.

D is the aggregate of transmission, distribution, and wheeling charge

applicable to the relevant voltage level.

L is the aggregate of transmission (including CTU), distribution, and

commercial losses, expressed as a percentage applicable to the

relevant voltage level.

R is the per unit cost of carrying regulatory assets.

However, taking into consideration the overall objectives of the

Electricity Act and the power scenario in the licensee’s area, the

Commission may determine the surcharge either lower or higher than

surcharge computed using the formula provided above.

Provided that the surcharge shall not exceed 20% of Average

Cost of Supply for the consumers seeking open access.

(h)

Tariff Design.—

(1) The tariff design shall be in accordance with Bihar Electricity

Regulatory Commission (Fixation of Charges for Supply of

Electricity by Distribution Licensee)Regulations, 2018.

(2) The Commission shall be guided by the objective that the tariff

progressively reflects the efficient and prudent cost of supply of

electricity.

(3) After the costs have been allocated based on the method specified in

clauses (c) and (d) above, tariffs for different consumer categories

shall be designed with due regard to factors provided under section

62(3) of the Act.

(4) The time of day tariff would be structured across three times slabs to

denote normal, peak and off-peak periods. The time-periods would

vary according to different seasons of the year i.e. summer, winter

and the monsoon season.

(5) The peak and off-peak hours during seasons shall be as notified by

the State Load Dispatch Centers in advance.

(6) The Time of Day tariff for Commercial and Industrial consumers

having maximum demand more than ten Kilowatt shall be mandatory

and other consumers except agricultural consumers, the Time of Day

tariff shall be made effective not later than 1st April, 2025 and a Time

of Day tariff shall be made effective immediately after installation of

smart meters, for the consumers with smart meters.

Provided that, the Time of Day Tariff specified by the

Commission for Commercial and Industrial consumers during peak

period of the day shall not be less than 1.20 times the normal tariff

and for other consumers, it shall not be less than 1.10 times the

normal tariff:

Provided further that, tariff for solar hours of the day, specified

by the Commission in respective tariff orders shall be at least twenty

percent less than the normal tariff for that category of consumers:

Provided also that the Time of Day Tariff shall be applicable on

energy charge component of the normal tariff:

Provided also that the duration of peak hours shall not be more

than solar hours as specified by the Commission in respective tariff

orders.

34

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

PART-VII

MISCELLANEOUS

38.

Power to amend.—The Commission may, at anytime, amend, alter or modify

any provision of these Regulations.

39.

Power to remove difficulties.—If any difficulty arises in giving effect to the

provisions of these Regulations, the Commission may, by general or specific

order, make such provisions not inconsistent with the provisions of the Act, as

may appear to be necessary for removing the difficulty.

40.

Right to vary terms and conditions.—The terms and conditions for determination

of tariff specified in these regulations are in the nature of general framework on

the basis of which the tariff shall be determined. The Commission reserves its

right to vary these terms and conditions, as and when deems fit.

41.

Limitation of Power of Commission.—Nothing in these regulations shall be

deemed to limit the powers of the Commission to deal with any matter or exercise

any power under the relevant Acts for which no regulations have been made /

framed and to make such orders as it may consider appropriate to meet the ends of

justice in any case.

42.

Repeal and savings.—

(a)

Save as otherwise provided in these regulations, BERC(Multi Year

Distribution Tariff) Regulations, 2021, and its amendments thereof from

time to time are hereby repealed.

(b)

Notwithstanding such repeal, any proceedings before the Commission

pertaining to the period prior to the commencement of the fourth Control

Period, including Petitions filed for True up of expenses, annual

performance review, etc. shall be governed by the erstwhile regulations.

By order of the Commission,

Sd/-Illegible,

Secretary.

35

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

TARIFF PETITION FOR FY ………..

Name of the Distribution Licensee

FORMAT-1

Energy Sales and Number of Consumers

Sl

No

Category/ Subcategory

Previous Year

(Actuals)

Current year

(RE)

Ensuing

year(s)(Projections)

No of consumers at

the end of the year

Sanctioned/Contracted

load at the end of the

year (KW)

Energy sales during the

year (MU)

No Of consumers at the

end of the year

Sanctioned/Contracted

load at the end of the

year (KW)

Energy sales during the

year (MU)

No Of consumers at the

end of the year

Sanctioned/Contracted

load at the end of the

year (KW)

Energy sales during the

year(MU)

A

DOMESTIC SERVICES

1

KutirJyoti

KJ metered:

1 to 50 units

51-100

And so on------

Sub total

2

DS-I

Metered

1 to 50 units

51-100

>100 units

Sub total

3

DS-II

1-100 Units

101-200 U

201-300 U

And so on--

Sub total

B

NON-DOMESTIC SERVICES

1

NDS-I

1-100

101-200

>200

2

NDS-II

upto 0.5 kW

above 0.5 kW:

1-100

101-200

>200

Sub Total of B

C

STREET LIGHT SERVICES

1

SSUnmetered Supply

2

SS Metered Supply

Sub Total of C

36

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

D

IRRIGATION AND

AGRICULTURAL SERVICES

1

IAS-I Unmetered

2

IAS-I Metered

3

IAS-II

Sub Total of D

E

PWW

HAR GHAR NAL

F

LOW TENSION SERVICES

1

LTIS-I

2

LTIS-II

Sub total of F

G

HIGH TENSION SERVICES

1

HTS-I

2

HTS-II

3

HTS-III

4

HTS-IV

5

HTSS

Sub total of G

H

RAILWAY TRACTION SERVICES

I

Distr. Franchisee

J

Nepal

K

Other bilateral sales (Pl. specify)

Grand Total(A to K)

Note: 1. Detail of Sales to Nepal, other bilateral sales etc should be separately filed with copy of

invoices for Previous year, Current year and Ensuing years as per the prescribed format.

37

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Format - 2

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee :

Billing Efficiency, Collection Efficiency and AT&C Loss

[In Percentage]

Particular

Previous FY

Current FY

Ensuing Years

Billing

efficiency

Collection

efficiency

AT&C Loss

Billing

efficiency

Collection

efficiency

AT&C Loss

Billing

efficiency

Collection

efficiency

AT&C Loss

38

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT-3

Tariff Petition for Financial Year ____________Name of the Distribution

Licensee:

(A ) Source-wise Capacity Allocation (in MW) and Power Purchase (in MU)

From Different Sources

S.N

Name of Source

Total Capacity

(MW)

Share of

Discom

(MW)

Previous

year

(Actuals)

Current

Year (R.E)

(MU)

Ensuing

year (s)

(Projection)

MW

MU

MW

MU

MW

MU

1

2

3

4

5

6

7

8

9

10

A Through Inter-State Transmission

(i) ………

(ii) ……..

……

Sub Total

B Through Intra-State Transmission

(i) ………

(ii) ……..

……..

Sub Total

C Distributed Generation

D TOTAL (A+B+C)

(B) Other important aspects related to Open Access

Previous

year

(Actuals)

Current

Year

Ensuing

year (s)

(Projection)

Remarks

Number of Consumers eligible for Open

Access (having Contracted load more than 1

MW) (Nos.)

Total Contracted load of the eligible Open

Access Consumers (MW)

Number of Open Access Consumers availing

Open Access (Nos)

Total Contracted load of the Consumers

availing Open Access (MW)

% of eligible Open Access Consumers availing

Open Access

Number of Applications Received

Number of Applications Processed

Average time for approval of Open

Access(Days)

Total Quantum of power availed by Eligible

Open Access Consumers in the Year (MU)

39

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

(C) Other important aspects related to Open Access

Wheeling Charges

HT Level (Rs. /kWh)

Wheeling Losses

HT Level (%)

Transmission Charge

Long Term /Medium Term (Rs./MW/month)

Short Term/short term collective/renewable energy

(Rs./kWh)

Transmission Loss(%)

Cross Subsidy Surcharge (Rs. /kWh)

HT Category

For 132 kV consumers

For 33 kV consumers (other than HTSS)

For 11 kV consumers (other than HTSS)

For HTSS consumers (33 kV & 11 kV)

Methodology Adopted for computation of Cross

Subsidy Surcharge

40

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT- 4

Name of the Distribution Licensee TARIFF PETITION FOR FY ……........................

Energy Requirement and Energy Balance

Sl

No

Particulars

Unit

Previous Year

Actuals

Current

Year (RE)

Ensuing Years

(projections)

A

Energy Requirement

1

Energy sales

MU

2

Less: Inter-state sales, if any

MU

3

Energy sales excluding Inter-state sales, if

any

MU

4

Distribution Loss

%

5

Add: Distribution Loss

MU

6

Total energy required at Distribution

periphery

MU

7

Add: Inter-state sales, if any

MU

8

Total energy required at Distribution

periphery including Inter-state sales

MU

9

StateTransmission Loss

%

10

Add: StateTransmission Loss

MU

11

Total energy required at State Transmission

periphery

MU

B

Energy Available

1

From Central Sector

MU

2

From IPP

MU

3

From State Generating Stations

MU

4

From Renewable Sources

MU

5

UI (Net)

MU

6

Others(please specify)

MU

7

CTU losses

%

8

CTU Losses

MU

9

Net power available at State periphery

(1+2+3+4+5+6-8)

MU

10

Energy Surplus/(Deficit) at State Periphery

MU

41

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT-5

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee :

Power Purchase Cost

S I. N o.

Power Purchase Sources

% age allocation MW

Previous Year

Current Year

Ensuing Year (s)

Energy MU

Fixed Char ge

rate (Rs/MW

Fixed charge Rs. Cr.

Energy Rate Rs./kWh

Energy charge Rs. Cr.

Other charges

(pl. specify) Rs. cr.

Total Cha rgesRs. Cr.

Avg. Ta-riff Rate

Rs./kWh

Energy MU

Fixed Charge rate

(Rs/MW

Fixed charge Rs. Cr.

Energy Rate Rs./kWh

Energy charge Rs. Cr.

Other charges (pl. specify)

Rs. cr.

Total Charges Rs. Cr.

Avg. Tariff Rate Rs./kWh

Energy MU

Fixed Charge rate (Rs/MW

Fixed charge Rs. Cr.

Energy Rate Rs./kWh

Energy charge

Rs. Cr.

Other charges (pl. specify)

Rs. cr.

Total Charges

Rs. Cr.

Avg. Tariff Rate

Rs./kWh

1

2

3

4

5

6

7

8

9

10

11

12

13

14 15

16

17

18 19

20 21

22 23

24

25

26

27

Central

Sector

Stations

1

NTPC

Stations

Farakka

1,2&3

Talchar

Kahalgoan

1 &2

Barh – Stg

2U #1

Nabinagar

- NTPC

NTPC

Total

2

NHPC

Stations

Rangit

Teesta

NHPC

Total

3

PTC

Stations

Chukka

Tala

PTC Total

4

DVC

Sub Total

Central

Stations

5

State

Generating

Stations

BTPS

KBUNL

Stage 1 U#

1

KBUNL

Stage 1 U#

2

SGS Total

6

Medium/

Short

Term/

Others

……

……

…….

Others

Total

42

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

S I. N o.

Power Purchase Sources

% age allocation MW

Previous Year

Current Year

Ensuing Year (s)

Energy MU

Fixed Char ge

rate (Rs/MW

Fixed charge Rs. Cr.

Energy Rate Rs./kWh

Energy charge Rs. Cr.

Other charges

(pl. specify) Rs. cr.

Total Cha rgesRs. Cr.

Avg. Ta-riff Rate

Rs./kWh

Energy MU

Fixed Charge rate

(Rs/MW

Fixed charge Rs. Cr.

Energy Rate Rs./kWh

Energy charge Rs. Cr.

Other charges (pl. specify)

Rs. cr.

Total Charges Rs. Cr.

Avg. Tariff Rate Rs./kWh

Energy MU

Fixed Charge rate (Rs/MW

Fixed charge Rs. Cr.

Energy Rate Rs./kWh

Energy charge

Rs. Cr.

Other charges (pl. specify)

Rs. cr.

Total Charges

Rs. Cr.

Avg. Tariff Rate

Rs./kWh

1

2

3

4

5

6

7

8

9

10

11

12

13

14 15

16

17

18 19

20 21

22 23

24

25

26

27

7

Renewable

Power

Purchase

BSHPC

Sugar Mills

Solar Power

Purchase

REC (Solar)

REC (Non-

Solar)

Renewable

Total

Total Power

Purchase

This is to certify that no earlier year purchase cost have been included in this table. The above table is

only for current year transactions pertaining to power purchase.

43

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 6

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Employee Details

S.N

Particulars

Previous

year

(Actuals)

Current

Year

(R.E)

Ensuing

years

(Projection)

1

2

3

4

5

1

Number of employees at the beginning of FY _______

a)

Technical

b)

Non Technical (Administration)

c)

Non Technical(Revenue, Finance and Accounts)

2

No. of employees added during

FY ______

a)

Technical

b)

Non Technical (Administration)

c)

Non Technical(Revenue, Finance and Accounts)

3

Number of employees retiring/ leaving during the FY_____

a)

Technical

b)

Non Technical (Administration)

c)

Non Technical(Revenue, Finance and Accounts)

4

Number of employees at the end of the FY (1+2-3)

a)

Technical

b)

Non Technical (Administration)

c)

Non Technical(Revenue, Finance and Accounts)

44

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 7

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee :

Employee Cost

S.N

Particulars

Previous Year

Current

Year(RE)

Ensuing

Year (s)

Approved in MYT/RE Actual

1

Salaries & Allowances

(i)

Existing Employees

(ii)

New Employees

(ii)

Total

2

Contribution to Terminal Benefits (Accrual

Basis)

3

Total of Salary & Allowances and Terminal

Benefits

4.

Amount Capitalised

5.

Net Amount

6.

Grand Total

Note:

(i) Terminal benefits paid for the period before the date of reorganisation i.e.

01.11.2012, shall not be considered.

(ii) In respect of continuing employees as on the date of reorganisation and newly

appointed employees after re-organisation date the terminal benefits shall be

allowed.

(iii) In respect of item 6, a brief description to be appended.

FORMAT – 8

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee :

Employee Productivity Parameters

S.N

Particulars

Previous year

Current

Year

(R.E)

Ensuing

years

(Projection)

Approved in

MYT

Actuals

1

2

3

4

5

6

1

Number of consumers (in Lakh)

2

Connected load in kW

3

Distribution line in circuit KM

4

Energy sold in MU

5

Employees per MU of energy sold

6

Employees per 1000 consumers

7

Share of employees cost in total costs

8

Employees cost in paise / kWh of energy sold

9

Distribution line circuit KM per employee

45

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 9

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Repair and Maintenance Expenses

S.N

Particulars

Previous year

Current

Year (R.E)

Ensuing years

(Projection)

Approved in

MYT

Actuals

1

2

3

4

5

6

1

Plant & Machinery

2

Building

3

Hydraulic works & civil works

4

Line cable & network

5

Vehicles

6

Furniture & fixtures

7

Office equipments

8

Total expenses

9

Less capitalized

10

Net Expenses

11

Total expenses charged to revenue

* Year-wise details of these charges may be provided with documentary evidence

FORMAT – 10

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Administration and General Expenses(Rs. in Cr.)

S.N

Particulars

Previous year

Current

Year

(R.E)

Ensuing years

(Projection)

Approved in

MYT

Actuals

1

2

3

4

5

6

1

Rent, rates & taxes

2

Insurance

3

Telephone, postage & Telegrams

4

Consultancy fees

5

Technical fees

6

Other professional charges

7

Conveyance & travel expenses

8

Electricity & Water charges

9

Freight

10

Other material related expenses

11

Penalty/Fine Paid (if any)

12

Any other expenses

13

Total expenses

14

Less Capitalised

15

Net expenses

46

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

S.N

Particulars

Previous year

Current

Year

(R.E)

Ensuing years

(Projection)

Approved in

MYT

Actuals

1

2

3

4

5

6

16

Total expenses charged to revenue

* Year-wise details of these charges may be provided with documentary evidence.

FORMAT – 11

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Investment Plan (Scheme-wise)

Rs. in crore

S.N

Name

of

scheme

/

Project

Approved

Outlay

Progressive

upto the beginning

of

previous year

Previous year

Current year (RE)

Ensuing

Years (Projection)

Progressive

Capital expenditure

upto the end of

ensuing year (s)

Approved

in

MYT/RE

Actual

Approved in

MYT/RE

Actual

Capitalization

Capital Expenditure

(CWIP)

Capitalization

Capital Expenditure

(CWIP)

Capitalization

Capital Expenditure

(CWIP)

Capitalization

Capital Expenditure

(CWIP)

Capitalizatio

n

Capital

Expenditure

(CWIP)

Capitalizatio

n

Capital

Expenditure

(CWIP)

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

Total

*

*

*

*Must be in agreement with the figures shown in audited account, otherwise a reconciliation

statement must be accompanied.

Note :

The amount of grants and loans shall be furnished separately scheme wise and funding

agency wise.

Additional column may be inserted(if required) for Ensuing Years (Projection).

All Information for previous year, current year (RE), Ensuing year must be in line with information

approved in MYT/Business Plan (if any), other-wise a statement showing complete details of variation

must be accompanied.

CWIP shall mean Capital Work in Progress

The MOU/Agreement signed with Central/State government for each project for which capital expenditure

has been claimed shall be furnished, to the extent possible

47

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 12

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Investment Plan (Year-wise)

S.N

Year

Originally

proposed

by the Discom

Approved by

the Commission

Revised by

the Discom

Revised approval

by the Commission

in review

Actual

expenditure

1

2

3

4

5

6

7

Note: i ) Information for previous year to be given in columns 1 to 7 co-relating the information given in

current or earlier MYT/Business Plan (if any).

ii) Information for the current year to be given in columns 1 to 5 co-relating the information given in

MYT/Business Plan (if any)

iii) Amount of grants and loans shall be furnished separately funding Agency wise and year wise.

Details of Expenses Capitalised(Rs. Crores)

Sl.No.

Particulars

Previous year

Current

year

(RE)

Ensuing years

(Projections)

Approved

in MYT

(Actuals)

1

Interest & Finance charges

Capitalised

175.69

2

Other expenses capitalised:

a. Employee expenses

120.24

b. R&M Expenses

0

c. A&G Expenses

6

d. Depreciation

0

e. Others, if any, please specify

0

Grand Total

301.93

0

0

0

48

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 13

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Fixed Assets

(Rs. in

Cr.)

S.N

Particulars

Previous Year

Current Year

Ensuing

Years of

the

control

period

1

2

3

4

1 Gross fixed asset (GFA) at beginning of the year*

2 Less accumulated depreciation

3 Net GFA at beginning of the year

4 Less accumulated grant including consumer contribution

5 Net fixed asset at beginning of the year

S.N Particulars

WIP

Fixed Assets

1

2

3

4

1 As on 31st March of previous year

Add capital expenditure during current year

Total:

Less transferred to fixed assets

2 As on 31st March of current year

Add capital expenditure during ensuing year

Total:

Less transferred to fixed assets

3 As on 31st March of ensuing year*

S.N Particulars

Amount

1

2

3

1 Accumulated Depreciation

2 As on 31st March of previous year

3 Add: Depreciation for current year

4 As on 31st March of current year

5 Consumers Contribution

6 As on 31st March of previous year

7 Addition during current year

8 As on 31st March of current year

9 Asset created from grants

10 As on 31st March of previous year

11 Addition during current year

12 As on 31st March of current year

*Amount of WIP must be in agreement with the figures shown in format-11 and amount of Fixed

Assets must be in agreement with the figures shown in format-14, otherwise a reconciliation

statement must be accompanied.

Note

(1) Compiled and audited Annual Account should be submitted for the previous year.

(2) The Actual figures / data from April to September and budgeted figures / data

from October to March relating to the year in which the tariff petition is submitted should be submitted

49

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 14

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee :

Gross Fixed Assets (GFA) (Information to be supplied for the previous year (actuals), current year

(RE) and the ensuring year (s) (projections)(Rs. in Cr.)

S.N

Particulars(i.e Assets

Group)

GFA at the

beginning of the

year

Addition to GFA

during the year

Adjustment to

GFA on account

of assets

sold/discarded

etc

GFA at the end of

the year

Consumer

Contribution

By grants

Loan

Equity

Total

Consumer

Contribution

By grants

Loan

Equity

Total

Consumer

Contribution

By grants

Loan

Equity

Total

Consumer

Contribution

By grants

Loan

Equity

Total

1

2

3

4

5

6

8

9 10

11

12 13 14 15

16

17

18

19

1 Land and land rights

2 Buildings

3 Hydraulic works

4 Other civil works

5 Plant and Machinery

6 Lines and cable network

7 Vehicles

8 Furniture and Fixtures

9 Office equipment

10 Others, if any (pl. specify)

Total

50

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 15

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Value of Depreciation Charges

(Information to be supplied for the previous year (actuals), current year (RE) and the ensuring year (s)

(projections)

Rs. crore

S.N

Particulars(i.e Assets

Group)

Accumulated

depreciation at

the beginning of

the year

Depreciation

charges during the

year

Accumulated

depreciation

adjustment on

account of assets

sold/discarded

etc

Accumulated

depreciation at the

end of the year

Consumer

Contribution

By grants

Loan

Equity

Total

Consumer

Contribution

By grants

Loan

Equity

Total

Consumer

Contribution

By grants

Loan

Equity

Total

Consumer

Contribution

By grants

Loan

Equity

Total

1

2

3

4

5

6

8

9

10

11

12

13 14

15

16

17

18 19

1 Land and land rights

2 Buildings

3 Hydraulic works

4 Other civil works

5 Plant and Machinery

6 Lines and cable network

7 Vehicles

8 Furniture and Fixtures

9 Office equipment

10

Others, if any (pl.

specify)

Total

51

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 16

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Depreciation Charges (Rs. Crores)

Sl.No.

Particulars

Previous Year

Current Year

Ensuing Year

(s)

1

Gross fixed assets of the

beginning of the year

2

Additions during the year

3

IDC

4

Adjustment

for

assets

sold/discarded etc

5

Closing GFA

6

Average GFA

7

Weighted Average Rate of

Depreciation

8

Gross Depreciation

9

Opening grants

10

Grants during the year

11

Adjustment

for

assets

sold/discarded etc

12

Total Grants

13

Average Grants

14

Weighted

Average

rate

of

Depreciation

15

Depreciation

for

GFA

on

Grants

16

Net Depreciation of GFA on

loans

(8-15)

Note: In the case of assets utilised which have reached the residual value, after recovery of

depreciation in full, details of such assets shall be furnished separately along with their

residual value, so as to enable the Commission to pass on the required benefit to the

consumers

FORMAT – 17

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Capital Work-In-Progress (CWIP)( (Rs. Crores))

S.N

Particulars

Previous

year(Actuals)

Current year(RE)

Ensuing year (s)

(Projections)

Loan Grant Equity Loan Grant Equity Loan

Grant Equity

1 Opening CWIP

2 New Investment

3 Less Capitalization(a+b)

a) CWIP Capitalization

b)New Investment capitalization

4 Closing CWIP (1+2-3)*

*Amount of WIP must be in agreement with the figures shown in format-11, otherwise a

reconciliation statement must be accompanied.

52

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Break-up of Construction/ Supply/ Service packages

Particulars

1

2

3

4

5

6

---

1

Name/ No. of Construction / Supply / Service Package (and

Schemes/plan)

2

Scope of works1 (in line with head of cost break-ups as applicable)

3

Whether awarded through ICB/DCB/ Depatmentally/ Deposit Work

4

No. of bids received

5

Date of Award

6

Actual Date of Start of work

Original Scheduled date of Start of work

7

Actual date of Completion of Work

Original Scheduled date of Completion of work

8

Value of Award2 in (Rs. Lakhs)

9

Firm or With Escalation in prices

1

0

Actual capitalexpenditure till the completion or up to COD whichever is

earlier for work capitalized during the period(Rs.Cr.)

- Taxes & Duties and IEDC (included in above)

- IDC, FC, FERV & Hedging Cost(included in above)

1

1

Actual capitalexpenditure till the end of the period(Rs.Cr.) for Capital

work under progress

- Taxes & Duties and IEDC (included in above)

- IDC, FC, FERV & Hedging Cost(included in above)

1

2

Actual capitalexpenditure already capitalized in earlier years(Rs.Cr.)

- Taxes & Duties and IEDC (included in above)

- IDC, FC, FERV & Hedging Cost(included in above)

1

3

Sub -total (10+11+12)

0

0

0

0

0

0

0

Note: Above statement to be provided separately for each work commissioned during the

period, work under progress and part capitalization done in earlier years.

FORMAT – 18

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Details of Loans for the year

(Information to be supplied separately for the previous year (actuals), current year(RE)

and ensuing years (projections)

S.N

Particulars

Purpose

of loan

Opening

balance

Rate of

Interest

Addition

during

the year

Repayment

during the

year

Closing

balance

Amount

of

interest

1

2

3

4

5

6

7

8

Note : The amount of penal interest, if any, to be shown separately.

53

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 19

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Information Regarding Restructuring of Outstanding Loans During the

Year

(Rs. Crores)

S.N

Source of

loan

Amount of

original

loan

Old rate

of

interest

Amount

already

restructured

Revised

rate

of interest

Amount now

being

restructured

New rate of

interest

1

2

3

4

5

6

7

8

FORMAT – 20

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Interest and Finance Charges (Rs. Crores)

S.N.

Source of loan

Purpose of

loan

Previous year

(Actuals)

Current year (RE) Ensuing year

(s)

(Projections)

1

2

3

4

5

1

SLR Bonds

2

Non SLR Bonds

3

LIC

4

REC

5

Commercial Banks

6

Bills discounting

7

Lease rental

8

PFC

9

Others, if any (Please specify)

10 Total

11 Add State Govt. Loan

12 Total (10 +11)

13 Less capitalisation

14 Net Interest

15 Add prior period adjustment *

16 Total Interest

17 Finance charges

18 Total Interest and

finance charges

**

* Year-wise details should be submitted with documentary evidence.

Note-1-Rate of interest of various loans to be indicated in a separate sheet, as part of Format-20

**Must be in agreement with audited account

54

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 21

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Interest (IDC) Capitalized

(Rs. Crores)

S.N

.

Name

of

schem

e

/Proje

ct

Source of

loan

Interest capitalized

As on beginning of previous

year

During

Previou

s year

(Actual

s)

During Current year

(RE)

During

ensuing

year (s)

(Projection

s)

1

2

3

4

5

6

1

2

3

4

5

6

FORMAT – 22

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Lease details

(Rs. Crores)

S.N

Name of

Lesser

Assets

Leased

on

Lease

Rentals

Primary

Period

ended /

ending by

Secondary

period ending

by

Descriptions

Gross

Amount

1

2

3

4

5

6

7

8

Note: Statement showing Cost benefits analysis of lease must be accompanied.

55

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 23

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Interest on Working Capital

(Rs. Crores)

S.N

Particulars

Amount

Previous

Year

Current Year

Ensuing

Year (s)

1

2

3

4

5

1

Two months equivalent of expected revenue

2

Maintenance spares @40% of R&M expenses

for one month

3

Less:

(i) Power purchase cost, Load despatch

charges and transmission charges for one

month.

(ii) Depreciation, ROE, and contribution to

contingency reserve equivalent to two

months.

(iii) Amount of security deposits and advance

from consumers or Distribution System users,

if any, held during the year

(iv) Grant received from the State Govt. for

power purchase and other O&M expenses etc

equivalent to two months.

4

Net working capital

5

Interest rate

6

Interest on working capital

FORMAT – 24

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Contribution to Contingency Reserve

(Rs. Crores)

S.N

Particulars

Amount

1

2

3

1

Fixed Assets

2

%age appropriation to the contingency reserve

3

Appropriation to the contingency amount

4

Amount invested in securities

5

Drawal from the contingency reserve (Please specify)

(i)

(ii)

(iii)

Total drawal

56

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 25

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Information Regarding Amount of Equity & Loan

(Rs. Crores)

S.N

Particulars

Amount of

equity

Amount of

loan

Ratio of equity &

loan

1

2

3

4

5

1

Amount of total asset

2

Less asset created from grant

3

Less asset created from consumer

contribution

4

Net asset

5

Amount of loan (debt)

6

Amount of equity

7

Debt equity ratio

8

Amount of equity eligible for return

9

Rate of return on equity

10

Amount of return on equity

Note : Any change in equity balance from previous year must be Supported with documentary

evidence.

Details of Capital Base (Rs. Crores)

S.N

Particulars

Previous Year

Current Year Ensuing Year

1

2

3

4

5

1 Gross Capital at beginning of the year

2 Less accumulated depreciation

3 Net capital at beginning of the year

4

Less:Accumulated Grant and Consumer Contribution(i-ii)

(i) Accumulated Gross Grant and consumer contribution

(ii) Less: Accumulated Grant and consumer contribution amortized

5

Net capital at beginning of the year

FORMAT – 26

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Information Regarding Amount of Income Tax Paid

(for previous financial years)

(Rs. Crores)

S.N

Particulars

During previous financial year

1

2

3

1

Amount of taxable income from the licensed business

i)

Amount of Income Tax paid

ii)

Challan No. & Date through which Income Tax paid

iii)

Name of Banks in which the amount was deposited

iv)

PAN No. of the depositor

2

Amount of income from other than licensed business

i)

Amount of Income Tax paid

ii)

Challan No. & Date through which Income Tax paid

iii)

Name of Banks in which the amount was deposited

iv)

PAN No. of the depositor

Note: A separate sheet is required to be submitted as a part of this format showing calculation of effective

tax rate of the respective financial year

57

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 27-A

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Non Tariff Income

(on existing rates)

(Rs. in crores)

S.N.

Source of loan

Previous year

(Actuals)

Current year

(RE)

Ensuing year (s)

(Projections)

1

2

3

4

5

1

Service rent

2

Delayed payment surcharge

3

Amount assessed in cases of UUE/Theft of energy

4

Misc. receipts

5

Misc. charges

6

Wheeling charges

7

Interest on staff loans & advance

8

Income from trading

9

Income from welfare activities

10

Excess on verification

11

Interest on investments & bank balances

12

Total Income

13

Add Prior period income *

14

Total Non tariff income

* Year wise details of prior period income may be provided

FORMAT – 27-B

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Non Tariff Income (on proposed tariff)

(Rs. in crores)

S.N.

Source of loan

Current year

(RE)

Ensuing year (s)

(Projections)

1

2

4

5

1

Service rent

2

Delayed payment surcharge

3

Amount assessed in cases of UUE/Theft of energy

4

Misc. receipts

5

Misc. charges

6

Wheeling charges

7

Interest on staff loans & advance

8

Income from trading

9

Income from welfare activities

10

Excess on verification

11

Interest on investments & bank balances

12

Total Income

13

Add Prior period income *

14

Total Non tariff income

* Year wise details of prior period income may be provided

58

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 28

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Information Regarding Revenue from Other Business

(Rs. Crores)

S.N

Particulars

Amount

1

2

3

1

Total Revenue from other business

2

Income from other business to be considered

for licensed business as per regulations

Note:

To be supplied for previous year, current year and ensuing year for which

license for other business was operating

FORMAT – 29

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Aggregate Revenue Requirement (ARR)

(Rs. in crores)

S.N.

Source of loan

Previous year

(Actuals)

Current year

(RE)

Ensuing year

1

2

3

4

5

1. Power purchase cost

2. PGCIL & other transmission charges

3. State Transmission charges

4. O&M Expenses

i) Employee Cost

ii) R&M expenses

iii) A&G expenses

5. Share of Holding Company expenses

6. Depreciation

7. Interest and Finance charges

8. Interest on working capital

9. Return on equity

10. Income Tax

11. Interest on security deposit

12. Bad debts (if any)

13. Contingency reserves (if any)

14. Total Revenue Requirement

15. Less: Non-tariff income

16. Aggregate Revenue Requirement

59

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 30-A

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Revenue from Sale of energy at existing tariff

Sl

No

Category/ Subcategory

Previous year actuals

Current year (RE)

Ensuing year(s)(Projections)

No. of Consumers

Connected/Sanctioned

Load/Demand

Energy sales (MU)

Applic

able

Tariff

for

Revenue

from sale of

energy (Rs.

Crores)

Applic

able

Tariff

for

No. of Consumers

Connected/Sanctioned

Load/Demand

Energy sales (MU)

Revenue

from sale

of energy

(Rs.

Crores)

Applicable

(existing)

Tariff for

No. of Consumers

Connected/Sanctioned

Load/Demand

Energy sales (MU)

Revenue

from sale

of energy

at

existing

Tariff(Rs.

Crores)

Fixed charge

Energy charge

Fixed charge

Energy charge

Total revenue

Fixed charge

Energy charge

Fixed charge

Energy charge

Total revenue

Fixed charge

Energy charge

Fixed charge

Energy charge

Total revenue

A

DOMESTIC

SERVICES

1

KutirJyoti

KJ metered

1-50

51-100

101-200

201-300

>300

Sub total

2

DS-I

Metered

1 to 50 units

51-100

101-200

>200 units

Sub total

3

DS-II

1-100 Units

101-200 U

201-300 U

>300 units

4

DS-III

B

NON-

DOMESTIC

SERVICES

1

NDS-I

1-100

101-200

>200

2

NDS-II

upto 0.5

kW

Above 0.5

kW

1-100

60

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Sl

No

Category/ Subcategory

Previous year actuals

Current year (RE)

Ensuing year(s)(Projections)

No. of Consumers

Connected/Sanctioned

Load/Demand

Energy sales (MU)

Applic

able

Tariff

for

Revenue

from sale of

energy (Rs.

Crores)

Applic

able

Tariff

for

No. of Consumers

Connected/Sanctioned

Load/Demand

Energy sales (MU)

Revenue

from sale

of energy

(Rs.

Crores)

Applicable

(existing)

Tariff for

No. of Consumers

Connected/Sanctioned

Load/Demand

Energy sales (MU)

Revenue

from sale

of energy

at

existing

Tariff(Rs.

Crores)

Fixed charge

Energy charge

Fixed charge

Energy charge

Total revenue

Fixed charge

Energy charge

Fixed charge

Energy charge

Total revenue

Fixed charge

Energy charge

Fixed charge

Energy charge

Total revenue

101-200

>200

C

STREET

LIGHT

SERVICES

1

SSUnme

tered

Supply

2

SS

Metered

Supply

Sub Total

of C

D

IRRIGATIO

N AND

AGRICULT

URAL

SERVICES

1

IAS-I

Unmeter

ed

2

IAS-I

Metered

3

IAS-II

Sub Total

of D

E

PWW

Har-

GharNal

F

LOW

TENSION

SERVICES

1

LTIS-I

2

LTIS-II

Sub total of F

G

HIGH

TENSION

SERVICES

1

HTS-I

2

HTS-II

3

HTS-III

4

HTS-IV

5

HTSS

Sub total

of G

H

RAILWAY

TRACTION

SERVICES

I

Distr.

Franchisee

61

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Sl

No

Category/ Subcategory

Previous year actuals

Current year (RE)

Ensuing year(s)(Projections)

No. of Consumers

Connected/Sanctioned

Load/Demand

Energy sales (MU)

Applic

able

Tariff

for

Revenue

from sale of

energy (Rs.

Crores)

Applic

able

Tariff

for

No. of Consumers

Connected/Sanctioned

Load/Demand

Energy sales (MU)

Revenue

from sale

of energy

(Rs.

Crores)

Applicable

(existing)

Tariff for

No. of Consumers

Connected/Sanctioned

Load/Demand

Energy sales (MU)

Revenue

from sale

of energy

at

existing

Tariff(Rs.

Crores)

Fixed charge

Energy charge

Fixed charge

Energy charge

Total revenue

Fixed charge

Energy charge

Fixed charge

Energy charge

Total revenue

Fixed charge

Energy charge

Fixed charge

Energy charge

Total revenue

J

Nepal

K

Other

bilateral

sales (Pl.

specify)

Grand

Total(A to K)

Note:

1. Distribution Licensee shall file Slab Wise category wise details of revenue from sales in above format for

Distribution Franchisee area. Also detail of revenue from sales to Nepal, other bilateral sales etc should be separately

filed with copy of invoices for Previous year, Current year and Ensuing years as per the prescribed format.

FORMAT – 30-B

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Revenue from Sale of energy at proposed tariff

Sl

No

Category/Sub-category

No. of Consumers

Connected/

Sanctioned

Load/

Demand

Ensuing year(s) (Projections)

Applicable

(proposed)

Tariff for

Energy sales (MU)

Revenue from

sale of energy at

proposed Tariff

(Rs. Crore)

Fixed

charge

Energy

charge

Fixed

charge

Energy

charge

Total

revenue

A

DOMESTIC SERVICES

1

KutirJyoti

KJ metered:

1 to 50 units

51-100

And so on-------

Sub total

2

DS-I

Metered

1 to 50 units

51-100

And so on-------

Sub total

3

DS-II

1-100 Units

101-200 U

62

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Sl

No

Category/Sub-category

No. of Consumers

Connected/

Sanctioned

Load/

Demand

Ensuing year(s) (Projections)

Applicable

(proposed)

Tariff for

Energy sales (MU)

Revenue from

sale of energy at

proposed Tariff

(Rs. Crore)

Fixed

charge

Energy

charge

Fixed

charge

Energy

charge

Total

revenue

201-300 U

And so on-------

Sub total

B

NON-DOMESTIC SERVICES

1

NDS-I

1-100

101-200

>200

2

NDS-II

upto 0.5 kW

above 0.5 kW:

1-100

101-200

>200

Sub Total of B

C

STREET LIGHT SERVICES

1

SSUnmetered Supply

2

SS Metered Supply

Sub Total of C

D

IRRIGATION AND

AGRICULTURAL SERVICES

1

IAS-I Unmetered

2

IAS-I Metered

3

IAS-II

Sub Total of D

E

PWW

HAR GHAR NAL

F

LOW TENSION SERVICES

1

LTIS-I

2

LTIS-II

Sub total of F

G

HIGH TENSION SERVICES

1

HTS-I

2

HTS-II

3

HTS-III

4

HTS-IV

5

HTSS

63

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Sl

No

Category/Sub-category

No. of Consumers

Connected/

Sanctioned

Load/

Demand

Ensuing year(s) (Projections)

Applicable

(proposed)

Tariff for

Energy sales (MU)

Revenue from

sale of energy at

proposed Tariff

(Rs. Crore)

Fixed

charge

Energy

charge

Fixed

charge

Energy

charge

Total

revenue

H

RAILWAY TRACTION

SERVICES

I

Distr. Franchisee

J

Nepal

K

Other bilateral sales (Pl.

specify)

Grand Total(A to K)

Note: 1. Distribution Licensee shall file Slab Wise category wise details of revenue from sales in

above format for Distribution Franchisee area, Nepal, other bilateral sales etc

64

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 31

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Revenue Gap (Ensuing Year)

(B) At Existing Tariff for Ensuing Year (FY ……………………….)

(Rs. Crore)

Sl.No.

Particulars

Amount

1.

Aggregate Revenue Requirement (ARR)

2.

Less : Non Tariff Income

3.

Add : Recovery of revenue gap / (Surplus) of past period, if any

4.

Net ARR

5.

Less : Power Purchase Cost disallowed, if any

6.

Less : Revenue from Existing Tariff

7.

Less : Revnue from sale of power to other Agency

8.

Gap (4–5–6)

9.

Total grant from State Govt.

10.

Grant used for compensating disallowed power

11.

Balance resource grant assistance from Stat Govt. (9–10)

12.

Net Gap/(Surplus) at existing tariff (8–11)

(B) At Proposed Tariff for Ensuing Year (FY ……………………….)

(Rs. Crore)

Sl.No.

Particulars

Amount

1.

Aggregate Revenue Requirement (ARR)

2.

Less : Non Tariff Income

3.

Add : Recovery of revenue gap / (Surplus) of past period, if any

4.

Net ARR

5.

Less : Power Purchase Cost disallowed, if any

6.

Less : Revenue from Existing Tariff

7.

Less : Revnue from sale of power to other Agency

8.

Gap (4–5–6)

9.

Total grant from State Govt.

10.

Grant used for compensating disallowed power

11.

Balance resource grant assistance from Stat Govt. (9–10)

12.

Net Gap/(Surplus) at existing tariff (8–11)

65

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 32

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Information Regarding Grant/Subsidy from State Govt/Central Govt. (Rs.

Crore)

S.N

Particulars

Previous Year

Current Year

Ensuing Years

1

2

3

4

5

A

Amount from State Govt.

i) Purpose for which grant received

(a)

(b)

ii) Targeted categories for subsidy

(a)

(b)

B

Amount from Central Govt.

i) Purpose for which grant received

(a)

(b)

Note : The details of commitment of the government and the guidelines for utilisation of the amount received

as grant or subsidy is to be supported by documentary evidence with separate explanation in the tariff

petition.

FORMAT – 33

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

(for ensuing financial year FY…..)

(A) Voltage-wise Technical Loss and Energy Sale

(B) Voltage-wise Commercial Loss

SI.

No.

Voltage

Level

KV

Energy Sale

(MU)

Technical

Loss (MU)

Sales +

Tech Loss

(MU)

Commercial

Loss

(MU)

Energy Sales + Tech.

Loss + Commercial

Loss (energy input at

state periphery)

(MU)

1

2

1

220

2

132

3

33

4

11

5

0.4

Total

SI.

No.

Voltage Level

(KV)

Technical

Losses (%)

Cumulative

Loss (%)

Energy Sale

(MU)

Energy

input (MU)

Technical Loss

(MU)

1

2

3

4

5

6

7=(6-5)

1

220

2

132

3

33

4

11

5

0.4

Total

66

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

(C) Voltage-wise Allocation of Power Purchase Cost

SI.

No.

Voltage

Level

KV

Energy

Sale

(MU)

Energy Sales +

Technical loss +

Comml. loss

(MU)

Unit cost of

power purchase

approved by

the Commission

(Rs./unit)

Power

Purchase

Cost

(Rs. Crore)

Cost of Power

per unit sale

of Energy

(Rs./unit)

1

2

3

4

5

6 = (4*5)

7= (6÷3)

1

220

2

132

3

33

4

11

5

0.4

Total

(D) Total Network Cost

SI.

No.

Particulars

Amount

(Rs. Cr)

1

Employee Cost

2

R&M costs

3

A&G expenses

4

Holding Company

5

Depreciation

6

Interest & Finance Charges

7

Interest on Working Capital

8

RPO fund

9

Return on Equity

10

Less: IDC

11

Total (1 to 7)

12

Transmission cost

13

Total cost

14

Energy Sales (MU)

15

Network Cost per unit sale of energy (Distribution +

Transmission) (Rs./kWh)

(E) Voltage-wise Allocation of Network Cost

SI.No.

Voltage Level

Energy Sale

(MU)

Network Cost

(Rs./Unit)

Total Network Cost

(Rs. Cr)

1

220

2

132

3

33

4

11

5

0.4

Total

(F) Voltage-wise Cost of Supply

Sl.No.

Supply Voltage

Cost of power

purchase

(Rs./unit)

Network cost

(Rs./unit)

Cost of supply

(Rs./unit)

1

2

3

4

5

1

220/132

2

33

3

11

4

LT

Note : The detailed work-out of energy sales, technical losses, commercial losses and network cost at different

voltage levels should be submitted separately with the tariff petitions.

67

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 34

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Tariff Structure and Rate

Sl

No.

Category & Consumption

Rates on Existing Tariff

Rates on Proposed Tariff

FC

Rs./kVA or kw

or HP

EC

ps./Unit

FC

Rs./kVA or

kw or HP

EC

ps./Unit

A

Low Tension Supply

1.0

Domestic

1.1

KutirJyoti

K.J.Metered)

1.2

DS-I (Rural)

Metered -

First 50 Units

51 - 100 Units

Above 100 Units

1.3

DS-II

1-100 Units

101-200 U

>200 units

1.4

DS-III

2 .0

Non Domestic

2.1

NDS-I

1-100

101-200

>200

2.2

NDS-II

upto 0.5 kW

Above 0.5 kW

1-100

101-200

>200

3.0

Irrigation & Agriculture

3.1

IAS-I Unmetered

IAS-I Metered

IAS-II

4.0

Low Tension Industrial

4.1

(i) LTIS – I

4.2

(ii) LTIS – II

5.0

Pubic Water Works

6.0

Street Light Services

6.1

SS Unmetered Supply

6.2

SS Metered Supply

B

High Tension Supply

7.1

(i) HTS - I

7.2

(i) HTS – II

7.3

HTS - III

7.4

HTS - IV

7.5

HTSS-

8.0

RTS

FC - Fixed Charge

EC - Energy Charge

68

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 35

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Computation of Cross Subsidy

Sl.

Category of consumers

At existing tariff rate

At proposed tariff rate

Avg. Tariff

rate

(Rs./kWh)

Avg. Cost

of Supply

(Rs./kWh)

% of

average

cost

Avg. Tariff

rate

(Rs./kWh)

Avg. Cost

of Service

(Rs./kWh)

% of

average

cost

1

KutirJyoti

2

DS-I

3

DS-II

3a

DS-III

4

NDS - I

5

NDS-II

6

Irrigation IAS – I

7

Irrigation IAS – II

8

L.T.I.S.-I

9

L.T.I.S.-II

10

Public Water work

11

Street light (Metered)

12

Street light (Unmetered)

13

H.T.S.-I

14

H.T.S.-II

15

H.T.S.-III

16

H.T.S.-IV

17

H.T.S.S.

18

R.T.S.

69

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 36

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Wheeling & Open Access Charges

Sl.

No.

Particulars

Total

Fixe

d

Cost

33kV

Wire cost

11kV

Wire

busines

s

Retail

supply

busines

s

Wire

busines

s

Retail

supply

busines

s

1

Employee cost

2

R&M Cost

3

A&G expenses

4

Depreciation

5

Interest and finance charges

6

Interest on working capital

7

Return on equity

8

Less: Non-tariff income

9

Total Cost (Rs. Cr.)

10

Energy input (MU)

11

Wheeling charges

(sl. no. 9/10)

12

Cross Subsidy surcharge category of

consumers

(i) HTS-I

(ii)HTS-II

(iii)HTS-III

(IV)HTS-IV

(V) HTSS

(VI) RTS

13

Reactive energy charge

14

SLDC charges

15

Standby Charges, if any

16

Additional surcharge, if any

Note : The detailed work-out of costs towards wire business and retail supply business, wheeling charges,

cross subsidy surcharge for each category of consumers, reactive energy charges, SLDC charges and

additional surcharge should be submitted separately with the tariff petition.

FORMAT – 37

Tariff Petition for Financial Year ____________

Name of the Distribution Licensee : _______

Investments in Non business related activities (Rs. Crores)

Sl.No.

Description

of

investment

Balance at the

beginning of

the year

Further

Investments

during the

year

Investments

realised

during the

year

Balance at

the end of

the year

Remarks

*Note:- Information to be provided for Previous Year, Current Year & each year of Control period

70

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Details of Income from Other Business (Rs. In Crore)

S.No

Particulars

Previous

year

Current

year

(RE)

Ensuing Years

I

Receipts from other Business

I

Less: Expenses from other business

E

Revenue of other Business

R=I-E

0

0

0

II

Assets of Licensed business utilized in other

business

A

Total assets of other business (including the

assets utilized of the Licensed Business)

C

Allocation of Revenue to Licensed Business

decided by the Commission

X

III

Due to Licensed Business (to be

deducted from ARR)

X*(R*A/C)

#DIV/0!

#DIV/0!

#DIV/0!

Note- In case Gross Receipts exceed expenditure of other business in (I) above (where Gross receipt is less than

expenditure of other business in (I) above no amount shall be deducted from ARR of Licensee).

Details of Electrical Accidents

Type of Accident

Previous Year

Current year (RE)

No. of Accidents

No. of Accidents

Fatal

Non Fatal

Total

Fatal

Non Fatal

Total

Human

-

-

Other, if any, (please specify)

-

-

Total

-

-

-

-

-

-

71

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 38

Net Prior Period Expenses / Income(Rs. Crores)

Sl.No.

Particulars

Previous Year

Current year (RE)

A

Income relating to previous years:

1

Interest income for prior periods

2

Income Tax prior period

3

Excess Provision for Depreciation

4

Excess Provision for Interest and Fin.

Charges

5

Other Excess Provision

6

Others (please specify)

Sub-Total A

-

-

B

Expenditure relating to previous years

1

Employee Cost

2

Depreciation

3

Interest and Finance Charges

4

Admn. Expenses

5

Withdrawal of Revenue Demand

6

Material Related

7

Others (please specify)

Sub-Total B

-

-

Net prior period Credit/(Charges) : A-B

-

-

Note-Year wise details of prior period income may be provided

Extraordinary Items(Rs. Crores)

Sl.No.

Particulars

Previous Year

Current year (RE)

1

Extraordinary Credits

a

`--

TOTAL CREDITS

-

-

2

Extraordinary Debits

a

`--

TOTAL DEBITS

-

-

72

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

FORMAT – 39

Statement of Equity

Loan Details

Previous

year

Current

year (RE)

Ensuing

years

1

Equity (Opening Balance)

2

Net additions during the year

3

Equity (Closing Balance)

4

Average Equity

5

Base Rate of Return on Equity%

#REF!

#REF!

6

Tax Rate ( Enclose detailed calculation

alongwith supporting documents)%

7

Effective Rate of Return on Equity

8

Retrurn o Equity (Rs. In crore)

9

Equity entitled to incentive

10

Incentive

11

Additional Return

12

Total Return on Equity

0

0

S.No.

Particulars

Previous

year

Current

year (RE)

Ensuing

years

Shareholders’ Funds

1

Equity Share Capital

2

Share Premium utilized for Capital Expenditure

2

Free Reserves utilized for Capital Expenditure

Total Equity

FORMAT – 40

Statement of Reconciliation of Net Actual Loan ( opening ) with Net Normative Loan ( Opening ) (Rs. In Crore)

Particulars

Previous

year

Current

year

(RE)

Ensuing

years

Net Actual Loan as per Books of Accounts as on :

Dometic

Foreign

-

-

-

Add:Repayment Made till Date

Gross Actual Loan

-

-

-

Add:Equity considered as normative loan

Gross Normative Loan

-

-

-

Less : Depreciation Recovered as per ARR till Date

Net Normative Loan

-

-

-

73

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Statement of Reconciliation of Gross Fixed Assets(GFA) admitted with Gross Fixed Assets(GFA) of

Financial Account(Rs. Crores)

SL

Particulars

Previous Year

Current

Year

(i. e.

RE)

Ensuing

years

(Projection

Approved in

MYT/RE

Actual

A

Gross Fixed Assets ( as at begining of the

year):

1. GFA as per (Financial/Statutory Account)

2 .Expenditure allowed but not capitalized in

Financial/Statutory Account

3. Expenditure Capitalized in Financial/Statutory Account

but not allowed.

4. Admitted GFA(1+2-3)

B

Addition/ adjustment to Gross Fixed Assets

(During the year):

5. Expenditure capitalized in Financial/Statutory Account

6. Expenditure allowed but not capitalized in

Financial/Statutory Account

7. Expenditure Capitalized in Financial/Statutory Account

but not allowed.

C

Gross Fixed Assets (as at end of the year)

Admitted by the commission ( 4+5+6-7)

FORMAT – 41

Consumer contributions and grants towards cost of capital assets (Rs. Crores)

SL

Particulars

Previous Year

Current

Year

Ensuing

Year/ years

Balance at the

start of the year

Additions

Balance at the

end of the Year

Additions

Balance at the

end of the Year

Additions

Balance at the

end of the Year

1

Consumer contributions Towards Cost Of

Capital Assets

-

#REF!

#REF!

2

Grant Towards Cost Of Capital Assets

A

Total (1+2)

-

-

-

-

#REF!

#REF!

Amount utilized for Assets forming part of

Depreciable GFA

3

Consumer contributions Towards Cost Of

Capital Assets

-

#REF!

#REF!

4

Grant Towards Cost Of Capital Assets

B

Total (3+4)

-

-

-

-

#REF!

-

#REF!

Amount utilized for Assets forming part of non-

Depreciable GFA

5

Consumer contributions Towards Cost Of

Capital Assets

-

#REF!

#REF!

6

Grant Towards Cost Of Capital Assets

C

Total (5+6)

-

-

-

-

#REF!

-

#REF!

74

BIHAR GAZETTE (EXTRA) 29TH NOVEMBER 2024

Amount remains un-utilized (A-B-C)

7

Consumer contributions Towards Cost Of

Capital Assets

-

#REF!

#REF!

8

Grant Towards Cost Of Capital Assets

C

Total (7+8)

-

-

-

-

#REF!

-

#REF!

D

Amount utilized for CWIP out of "C" above

E

Amount kept in Bank out of "C" above

F

Depreciation on assets created out of grants

(Admitted)

G

Depreciation. on assets created out of

grants (Financial/Statutory Account)

Note: Submission of D&E must be equal to C, otherwise a reconciliation statement must be

accompanied.

————

PUBLISHED AND PRINTED BY THE SUPERINTENDENT,

BIHAR SECRETARIAT PRESS, PATNA.

Bihar Gazette (Extra) 1137—571+10—Egazette

Website: http://egazette.bih.nic.in