Bihar Electricity Regulatory Commission

———

NOTIFICATION

28th July 2025

Bihar Electricity Regulatory Commission (Renewable Purchase Obligation, its

Compliance and REC Framework Implementation) Regulations, 2025

No.-BERC-04—In exercise of powers conferred under sections 61, 66, 86(1)(e)

and 181 of the Electricty Act, 2003 (36 of 2023) and all other powers enabling it in this

behalf and also in compliance of Ministry of Power, Govt. of India Notification no. S.O.

4617(E) dated 20th October 2023 notifying Renewable Puchase Obligation trajectory till

2029-30 for share and type of consumption from different non-fossil fuel sources

(renewable energy) and after previous publication, the Bihar Electricity Regulatory

Commission (hereinafter referred to as ‘Berc’ or ‘Commission’) hereby makes the

following Regulations namely:

1. Short Title and Commencement

1.1 These Regulations may be called the Bihar Electricity Regulatory

Commission (Renewable Purchase Obligation, its Compliance and REC

Framework Implementation) Regulations, 2025.

1.2 These Regulations shall come into force from the date of their publication

in the Bihar Gazette.

1.3 These Regulations shall extend to the whole of the State of Bihar.

2. Definitions and Interpretation

2.1 In these Regulations, unless the context otherwise requires,

2

BIHAR GAZETTE (EXTRA) 4th SEPTEMBER 2025

a) ‘Act’ means the Electricity Act, 2003 (Act No.36 of 2003) and

subsequent amendment thereof;

b) ‘Area of Supply’ means the area within which the distribution licensee

is authorized to supply electricity;

c) ‘Central Agency’ means the agency operating the National Load

Dispatch Centre or such other agency as the Central Commission may

designate from time to time;

d) ‘Central Commission’ means the Central Electricity Regulatory

Commission referred to in sub section (1) of section 76 of the Act;

e) ‘Certificate’ means the renewable energy certificate issued by the

Central Agency in accordance with the procedures prescribed by it

and under the provisions specified in the Central Electricity

Regulatory Commission (Terms and Conditions for recognition and

issuance of Renewable Energy Certificate for Renewable Energy

Generation) Regulations, 2022; and subsequent amendments thereof;

f) ‘Commission’ means the Bihar Electricity Regulatory Commission;

g) ‘Distributed Renewable Energy’ means the electricity fed into the

electric system at a voltage level of below 33KV using rooftop solar

PV system [or such other forms of renewable sources as may be

approved by the Commission from time to time or as recognized by

the Ministry of New and Renewable Energy, Government of India]

h) ‘Distribution Licensee’ means a licensee authorized to operate and

maintain a distribution system for supplying electricity to the

consumers in his area of supply;

i) “Green Energy” means the electrical energy from renewable sources

of energy including hydro and storage (if the storage uses renewable

energy) or any other technology as may be notified by the

Government of India from time to time and shall also include any

mechanism that utilises green energy to replace fossil fuels including

production of green hydrogen or green ammonia as per provision of

clause G of sub-rule (2) of rule (4) of Electricity (Promoting

Renewable Energy Through Green Energy Open Access), Rules, 2022

j) ‘Obligated Entity’ means the distribution licensee, consumer(s)

owning the captive power plants and Open Access Consumer(s) in the

state of Bihar which is mandated to fulfill renewable purchase

obligation under these Regulations;

k) ‘Open Access Consumer’ means a consumer availing Open Access

under subsection (2) of section 42 of the Act;

l) ‘Person’ shall include any company or body corporate or association

or body of indiviuals, whether incorporate or not, or artificial juridical

person;

m) ‘Power Exchange’ means any exchange operating as the power

exchange for electricity in terms of the orders issued by the Central

Commission;

n) ‘Prosumer’ means a person who consumes electricity from the grid

and can also inject electricity into the grid for distribution licensee,

using same point of supply;

o) ‘Quantum of Purchase’ means percentage share of total purchase of

electricity from renewable energy sources as specified in these

3

BIHAR GAZETTE (EXTRA) 4th SEPTEMBER 2025

Regulations. The quantum would be the sum of all direct purchases

from generating stations based on renewable energy sources, purchase

from any other licensee and Power purchased from exchange which

would arise from renewable energy sources.

p) ‘Renewalbe Energy Sources’ means non-conventional or renewable

electricity generating sources such as Hydro Power Projects

[including Pump Storage Projects (PSps) and small Hydro Projects

(SHPs)], wind, solar, biomass including husk and bagasse based

cogeneration, urban/municipal solid waste, or such other sources,

(which are generally inexhaustible and can be replenished in a short

period of time) as approved by the Ministry of New and Renewable

Energy, Governement of India or by the state of Bihar;

q) Renewable Purchase of Obligation (RPO): RPO is a requirement

specified by BERC u/s 86(1)(e) of the Electricity Act for the obligated

entities, to purchase minimum level of renewable energy out of total

consumption of electricity by the obligated entities.

Explanation: Consumption of Electricity shall mean energy input in the

system of obligated entities at its boundary.

r) ‘Small Hydro Projects’ means a hydropower project with an installed

capacity up to and including 25 MW or, as defined by the Government

of India, from time to time at a single location;

s) ‘State’ means the state of Bihar;

t) ‘State Agency’ means Bihar Renewable Development Agency

(BREDA);

u) ‘Supply’ in relation to electricity, means the sale of electricity to a

licensee or a consumer;

v) ‘Year’ means a financial year.

2.2 The words and expressions used and not defined in these Regulations but

defined in the Act shall have meanings assigned to them in the Act.

Expression used herein but not specifically defined in these Regulations or

in the Act but defined in any other Regulations, Rules issued by the

appropriate authority shall have the same meaning assigned to them.

3. Applicability of Renewable Purchase Obligation

3.1 These Regulations shall be applicable to all Obligated Entity such as:

I) Distribution licensee

II) Any other person consuming electricity.

(a) generated from conventional Captive Generating Plant having

capacity of 1MW and above for his own use.

(b) Through cogeneration from sources other than renewable sources.

(c) By procurement from conventional electricity generation through

Open Access and for third party sale.

Provided that for such obligated entities who are availing power partly through

open access/captive plant and partly through discoms, the RPO shall be

applicable to the extent of consumption of electricity from sources other than

distribution licensee concerned.

4. Renewable Purchase Obligation

4.1 Every Obligated Entity shall at-least purchase following source wise

energy from Renewable Sources as specified below:-

4

BIHAR GAZETTE (EXTRA) 4th SEPTEMBER 2025

Finacial

Year

Wind

RPO

Hydro

Power

Obligation

(HPO)

Distributed

renewable

energy

Other

RPO

Total

RPO

2025-26

1.45%

1.22%

2.10%

28.24%

33.01%

2026-27

1.97%

1.34%

2.70%

29.94%

35.95%

2027-28

2.45%

1.42%

3.30%

31.64%

38.81%

2028-29

2.95%

1.42%

3.90%

33.10%

41.36%

2029-30

3.48%

1.33%

4.50%

34.02%

43.33%

The Renewable Power Obligation will be on total consumption of electricity by

the Obligated Entity as below:

(a) The wind renewable energy component shall be met by energy produced

from Wind Power Projects (WPPs) commissioned after the 31st of March

2024.

Provided that any shortfall in achievement of ‘Wind RPO’ in a

particular year may be met with hydro renewable energy which is in excess

of that energy component for that year and vice-versa.

(b) Hydro Power Obligation (HPO) shall be met only by energy produced from

Hydro Power Projects [including Pump Storage Projects (PSPs) and Small

Hydro Projects (SHPs)], commissioned after the 31st March, 2024;

Provided that, HPO obligation of the state/DISCOM may be met out of

the free power being provided to the state of Bihar from the Hydro Power

Projects commissioned after the 31st March 2024.

Provided further that the hydro renewable energy component may also

be met from Hydro Power Projects located outside India as approved by the

Central Government on a case-to-case basis.

In case, the free power mentioned above is insufficient to meet the HPO

obligations, then the Obligated Entity would have to buy the additional

hydro power to meet its HPO obligation or may have to buy corresponding

amount of Renewable Energy Certificate corresponding to such shortfall in

Hydro Power.

(c) The distributed renewable energy component shall be met only from the

energy generated from renewable energy projects that are less than 10 MW

in size and shall include solar installations under all configurations (net

metering, gross metering, virtual net metering, group net metering, behind

the meter installations and any other configuration) notified by the Central

Government.

Provided that the compliance against distributed renewable energy shall

ordinarily be considered in terms of energy (Kilowatt hour units):

Provided further that in case the designated consumer is unable to

provide generation data against distributed renewable energy installations,

the reported capacity shall be transformed into distributed renewable energy

generations in terms of energy by a multiplier of 3.5 units per kilowatt per

day (kWh/Kw/day).

(d) Other RPO may be met by energy produced from any renewable energy

power project including power purchased from exchanges other than

specified in (a), (b) and (c) above and shall comprise energy from all WPPs

and Hydro Power Projects [including Pump Storage Projects (PSPs) and

Small Hydro Projects (SHPs)], including free power, commissioned before

1st April, 2024.

5

BIHAR GAZETTE (EXTRA) 4th SEPTEMBER 2025

Shortfalls in wind renewable energy or Hyrdo renewable energy

consumption obligations in a given year may be offset by surplus consumption

from the Other renewable energy component, and vice-versa.

Further, in case of ‘Other RPO’, any shortfall remaining in achievement of

‘Other RPO’ category in a particular year can be met with either excess energy

consumed from wind power projects, commissioned after 31st March 2024

beyond ‘Wind RPO’ for that year or with, excess energy consumed from eligible

Hydro Power Projects [including Pump Storage Projects (PSPs) and Small

Hydro Projects (SHPs)], commissioned after 31st March 2024 beyond ‘HPO’ for

that year or partly from both.

Provided that any shortfall in achievement of ‘Wind RPO’ in a particular

year can be met with excess energy consumed from Hydro Power Plants, which

is in excess of ‘HPO’ for that year and vice versa.

Provided also that Renewable Energy purchased through bundled power

shall qualify for Renewable Purchase Obligation compliance to the extent of

Renewable Energy content in the bundled power.

Provided further that Distribution Licensee shall be eligible to utilize the

renewable energy generated from Prosumers supplying power to such Licensee

under the Gross Metering, Net Billing and Net Metering arrangement as the case

may be towards meeting the RPO compliance, provided that the Prosumer

should not be an Obligated Entity under these Regulations.

Provided further that Distribution Licensee shall compulsorily procure

100% power generated from waste to energy plants in the state.

Provided also that Commission may review minimum percentange of

compliance specified in the above Regulations depending upon prevailing

situation in succeeding years.

4.2 There shall be uniform renewable purchase obligation, on all obligated entities

in area of a distribution licensee. Any Obligated Entity, may elect to generate,

purchase and consume renewable energy to meet their obligation by one or

more of the following methods:-

(A) Own Generation from renewable energy sources:- There shall not be any

capacity limit for installation of power plants from renewable energy

sources, by obligated entities for their own consumption and such plants

may be set up at any location in India and power shall be transmitted by

using open access:

Provided that the generating plant may be set up by the entity itself

or by a developer with which the entity enters into a power purchase

agreement.

(B) By procuring Renewable Energy through Open Access from any

Developer either directly or through a trading licensee or through power

markets.

Explanation:

(1) Developer means the generating company who generate electrical energy from

renewable sources of energy.

(2) Trading Licensee means a person who has been granted a license by

appropriate commission, for Purchase of electricity for resale thereof.

(C) By purchasing of Renewable Energy Certificates in accordance with the

applicable Regulations.

6

BIHAR GAZETTE (EXTRA) 4th SEPTEMBER 2025

(D) Purchase of green hydrogen or green ammonia; --the Obligated Entity

can also meet their Renewable Purchase Obligation by purchasing green

hydrogen or green ammonia and the quantum of such green hydrogen or

green ammonia would be computed by considering the equivalence to the

green hydrogen or green ammonia produced from one MWh of

electricity from the renewable sources or its multiples and norms in this

regard shall be notified by the CERC.

Provided that the obligated entity shall endeavor to source the

mandatory percentage purchase from renewable sources within the State

on the basis of their Commercial viability. In case, they are not able to

meet the purchase obligation from such sources located in the State, they

shall have the option to purchase the shortfall from outside the State. The

energy generated from renewable sources in the State which is used by

generator itself or sold to third party under open access, the same will be

considered under the mandatory minimum percentage of power purchase.

4.3 The Licensee or its successor entities shall submit half yearly progress

report on the capacity addition, purchase of electricity from such projects

and the energy generated from renewable sources in the State which is

used by generator itself or sold to third party under Open Access to the

Commission and also post them on their website.

4.4 The Commission may, suo-motu or at the request of licensee, revise the

percentage targets for a year as per clause 4.1 of these Regulations keeping

in view supply constraints or other factors beyond the control of the

licensee.

5. Certificates under the Regulations of the Central Commission

5.1 Subject to the terms and conditions contained in these Regulations the

Certificates issued under the Central Electricity Regulatory Commission

(Terms and Conditions for Renewable Energy Certificates for Renewable

Energy Generation) Regulations, 2022 shall be the valid instruments for

the discharge of the mandatory obligations set out in these Regulations for

the obligated entities to purchase electricity from renewable energy

sources.

Provided that, in the event of an obligated entity seeking to fulfil its

RPO by purchase of Certificates, the obligation to purchase electricity

from various Renewable Energy Sources as stipulated in Clause 4.1 and

4.1 (a) may be fulfilled by purchase of appropriate Certificates as per

Central Electricity Regulatory Commission (Terms and Conditions for

Renewable Energy Certificates for Renewable Energy Generation)

Regulations, 2022.

5.2 Subject to such direction as the Commission may give from time to time,

the Obligated Entity shall act consistent with the Central Electricity

Regulatory Commission (Terms and Conditions for Renewable Energy

Certificates for Renewable Energy Generation) Regulations, 2022 notified

by the Central Commission in regard to the procurement of the certificates

for fulfillment of the Renewable Purchase Obligation under under these

Regulations.

5.3 The proof of certificates purchased by the obligated entities from any

source as envisaged under CERC (Terms and Conditions for REC for

Renewable Energy Generation) Regulations, 2022 shall be submitted by

7

BIHAR GAZETTE (EXTRA) 4th SEPTEMBER 2025

the obligated entities to the Commission within a monthe of the purchase

of the certificate.

6. State Agency

6.1 The State Agency shall be the agency for accreditation and recommending

the renewable energy projects for registration and to undertake functions

under these Regulations.

6.2 The State Agency shall function in accordance with the directions issued

by the Commission and shall act in consistent with the procedures/rules

laid by Central Agency for discharge of its functions under the Central

Electricity Regulatory Commission (Terms and Conditions for Renewable

Energy Certificates for Renewable Energy Generation) Regulations, 2022.

6.3 The State Agency shall submit half yearly status with respect to

compliance of RPO by the obligated entities to the Commission within 30

days after completion of 1st and 2nd half of financial year in the format as

annexed as Annexure-1 to these Regulations and may suggest appropriate

action to the Commission, if required for compliance of the renewable

purchase obligation.

6.4 If the Commission is satisfied that the State Agency is not able to

discharge its functions satisfactorily, it may be general or special order,

and by recording reasons in writing, designate any other agency to

function as State Agency as it considers appropriate.

7. Distribution Licensee

7.1 Each distribution licensee shall indicate, along with sufficient proof

thereof, the estimated quantum of purchase from renewable energy sources

for the ensuring year in tariff (ARR of MYT)/annual performance review

petition in accordance with Regulations notified by the Commission. The

estimated quantum of purchase shall be in accordance with clause 4.1 and

4.1(a) of these Regulations.

7.2 Despite availability of renewable energy sources, if distribution licensee

fails to fulfill the minimum quantum of purchase from renewable energy

sources, it, without prejudice to the penalty to which it may be liable under

section 142 of the Act, shall be liable to pay compensation as per clause 9

of these Regulations.

8. Captive and Open Access User(s)/Consumer(s)

8.1 The quantum of RPO mentioned in clause 4.1 and 4.1(a) shall be

applicable to all captive and open access user(s)/consumers(s) as per

Regulation 3.1 of these Regualtions.

8.2 Every Captive and Open Access Consumers(s)/user(s) shall have to submit

necessary details regarding total consumption of electricity and purchase

of energy from renewable sources for fulfillment of RPO on yearly basis

on or before 30th April to the State Agency.

8.3 Captive and Open Access Consumer(s) User(s) shall purchase renewable

energy as stated in clause 4.1 and 4.1(a) of these Regulations. If the

Captive user(s) and Open Access Conumer(s) are unable to fulfill the

criteria as specified in clause 8.2 of these Regulations, the shortfall of the

targeted quantum would attract payment of regulatory charge as per the

Regulation 9 of these Regulations.

8

BIHAR GAZETTE (EXTRA) 4th SEPTEMBER 2025

9. Effect of Default

9.1 If an Obligated Entity does not fulfil the renewable purchase obligation as

provided under these Regualtions during any year and also does not

purchase the required certificates, the Commission may direct the

Obligated Entity to deposit into a separate fund to be created under

provisions of Bihar RE policy 2025, such amount as the Commission may

determine on the basis of the shortfall in units of RPO.

Provided that the fund so created shall be utilized as may be directed

by the Commission, partly for purchase of the certificates and partly for

development

of

transmission/sub-transmission

infrastructure

for

evacuation of power from generating stations based on renewable energy

sources.

Provided further that the obligated entities shall not be authorized to

use the fund created in pursuance of the above, without prior approval of

the Commission

Porvided also that if the obligated entities fail to deposit the amount

directed by the Commission within 15 days of the communication of such

direction, the obligated entities shall be in breach of its license condition.

9.2 Where any Obligated Entity fails to comply with the obligation to purchase the

required percentage of power from renewable energy sources or the Renewable

Energy Certificates, it shall also be liable for penalty as may be decided by the

Commission under section 142 of the Act.

Provided that in case of genuine difficulty in complying with the renewable

purchase obligation because of non- availability of power or any other reason

beyond control of the obligated entity, the obligated entity concerned can

approach the Commission for carry forward of compliance requirement to the

next year. However, crtedit for excess purchase from renewable energy sources

would not be adjusted in the ensuring year.

Provided further that where the Commission has consented to carry forward

of compliance requirement, the provision of clause (9.1) of the Regulation or the

provision of section 142 of the Act shall not be invoked.

10. Appointment of Compliance Auditors & Monitoring Committee

10.1 The Commision may appoint from time-to-time Compliance Auditors to inquire

into and report on compliance of these Regulations. The Auditor shall also certify

the fund operated by the State Agency and created under Regulation (9.1) of

these Regulations.

10.2 The Commission may appoint Monitoring Committee to ensure compliance of

these Regulations from time to time.

11. Overriding Effect

Notwithstanding anything contained contrary to-

a) The BERC (Multi year Distribution Tariff) Regulation, 2024

b) The BERC (Terms and Conditions of Intera-State Open Access) Regulation,

2018

c) The BERC (Terms and Conditions of Green Energy Open Access) Regulation,

2025

d) The BERC (Terms and Conditions for Tariff determination from Renewable

Energy Sources) Regulation, 2023;

and any other relevant Regulations notified by te Commission under section

181 of the Electricity Act 2003; these Regulations will have over riding effect.

12. Power to Remove Difficulties

9

BIHAR GAZETTE (EXTRA) 4th SEPTEMBER 2025

if any difficulty arises in giving effect to any of the provisions of these Regulations,

the Commission may, either suo-motu or on an application made to it, by general or

special order, direct the licensee/generator or any other person to take suitable

action, not being inconsistent with the Act, Which appears to the Commission to be

necessary or expedient for the purpose of removing the difficulty.

13. Issue of Orders and Directions

Subject to the provisions of the Act and these Regulations, the Commssion may,

from time to time, issue orders and practice directions with regard to the imp-

lementation of these Regulations and procedure to be followed for such

implementation and matters incidental or ancillary thereto.

14. Saving of Inherent powes of the Commission

Nothing contained in these Regulations shall limit or otherwise affect the inherent

powers of the Commission to adopt a procedure, which is at variance with any of the

provisions of these Regulations, if the Commission, in view of the special

circumstances of the matter or class of matters and for reasons to be recorded in

wirting, deems in necessary or expedient to depart from the procedure specified in

these Regulations.

15. Power to Amend

The Commission may from time to time add, vary, alter, suspend, modify, amend or

repeal any provision of these Regulations.

Nadeem Ahmad,

Secretary.

ANNEXURE-I

Half yearly Formats to be submitted by State Agency to the Commission:

Name of the obligated entity Financial year:

Quarter:

Sl. No.

Particulars

Formula

Unit

Value

1.

Energy input in the system of obligated entities

MU

2.

Total RPO Target

%

3.

Total Renewable Energy purchase requirement

1*2

MU

Target level of RPO

4.

WPO Target

%

5.

Wind power purchase requirement

1*4

MU

6.

HPO Target

%

7.

Hydro power purchase requirement

1*6

MU

8.

Distributed RE obligation target

%

9.

Distributed RE Purchase requirement

1*8

MU

10.

Other RPO Target

%

11.

Other RE Purchase requirement

1*10

MU

Source wise RPO Obligation

14.

Wind Power Purchase

MU

15.

Surplus/Deficit in Wind Power Purchase (+/-)

14-5

MU

16.

WPO Achievement

[If (15>0, 100%,

(15+if (18>0, min

(15,18),0)))]/1

%

17.

Hydro Power Purchase

MU/

18.

Surplus/Deficti on Hydro Power Purchase (+/-)

17-7

MU

19.

HPO Achievement

[If (18>0, 100%,

(18+if (15>0, min

(15,18),0)))]/1

%

20.

Energy Purchased from Distributed RE

MU

21.

Surplus/ Deficit in Distirbuted RE (+/-)

20-9

MU

22.

Distributed RE Purchase achievement

20/1

%

23.

Other RE purchase

a+b+c+d+e

MU

10

BIHAR GAZETTE (EXTRA) 4th SEPTEMBER 2025

a.

Bagasse

MU

b.

Biomass

MU

c.

Biogas

MU

d.

Solar

MU

e.

Surplus Wind/Hydro beyond target level

Max (0,16+18)

MU

24.

Surplus/Deficit in Other Re Purchase (+/-)

23-11

MU

25.

Other RPO Achievement

23/1

%

RPO obligation (overall)

29.

Total Renewable Energy Purchase Achievement

14+17+20+23

MU

30.

Total RPO Achievement

29/1

%

———