REGISTERED NO. PT.-40
EXTRA ORDINARY
PUBLISHED BY AUTHORITY
1 PAUSHA 1947(S)
(NO.PATNA 1798) PATNA, MONDAY, 22ND DECEMBER 2025
BIHAR ELECTRICITY REGULATORY COMMISSION
———
NOTIFICATION
The 26th November 2025
REGULATIONS FOR RESOURCE ADEQUACY FRAMEWORK
No. BERC Case No. 28/2025-07—In exercise of the powers conferred under Section 181
of the Electricity Act, 2003 (36 of 2003), read with section 61, 66, and 86 thereof and all other
powers enabling it in this behalf, and after previous publication, the Bihar Electricity Regulatory
Commission hereby makes the following Regulations, namely – Bihar Electricity Regulatory
Commission (Framework for Resource Adequacy) Regulations, 2025.
Chapter-1
Preliminary
1.
Short Title, Extent, and Commencement.—
1.1 These Regulations may be called the Bihar Electricity Regulatory
Commission (Framework for Resource Adequacy) Regulations, 2025.
1.2 These Regulations shall extend to the whole state of Bihar
1.3 These Regulations shall come into force from the date of their notification
in the Official Gazette.
2. Objective.—
2.1
The objective of these Regulations is to enable the implementation of
Resource Adequacy framework by outlining a mechanism for planning of
generation resources to reliably meet the projected demand under various
scenarios in a cost effective manner. These Regulations further aims to ensure
that the load is served reliably in accordance with specified reliability
standards, through an optimal capacity mix that promotes efficiency, optimal
utilization of resources, sustainability, and grid security.
2.2
The Resource Adequacy frame work shall cover a mechanism for demand
2
BIHAR GAZETTE (EXTRA) 22ND DECEMBER 2025
assessment and forecasting, generation resource planning, procurement
planning, and monitoring & compliance.
3.
Scope and Applicability.—These Regulations shall apply to the generating
companies, distribution licensees, State Load Despatch Centre, State Transmission
Utility, and other grid connected entities within the State of Bihar.
4.
Definitions.—
4.1 In these Regulations, unless the context otherwise requires,
a.
“Act” means the Electricity Act, 2003(36 of 2003)and subsequent
amendments thereof.
b.
“Authority” means Central Electricity Authority referred to in
sub-section(1) of Section 70 of the Act.
c.
"Capacity Credit” or “CC” means a percentage of a resource’s name
plate capacity that can be counted towards resource adequacy
requirements.
d.
“Commission”or “State Commission” means the Bihar Electricity
Regulatory Commission (BERC) constituted under the Act.
e.
“Expected Energy Not Served” or “EENS” means the expected
amount of load (MWh) that may not be served for each year within
the time horizon for Resource Adequacy planning.
f.
“Long term”means ten years for development of demand forecast,
generation resource plan, and procurement plan.
g.
“Long Term Distribution Resource Adequacy Plan” or “LT-DRAP”
means plan for assessment of long-term resource adequacy by the
distribution licensee.
h.
“Loss of Load Probability”or “LOLP”means probability that a
system’s load will Exceed the generation and firm power contracts
available to meet that load in a year.
i.
“Normalized Energy Not Served” or “NENS” is normalization of the
EENS by Dividing it by the total system load.
j.
“Planning Reserve Margin” or “PRM” means a specified percentage
of available capacity above peak demand as may be stipulated by
Authority or Commission for the purpose of generation resource
planning.
k.
“Resource Adequacy” or “RA” means a mechanism to ensure
adequate supply of generation to serve expected demand (including
peak, off peak and in all operating conditions) reliably in compliance
with specified reliability standards for serving the load in a cost
effective manner through an optimum generation mix with a focus on
integration of environmentally benign technologies after taking into
account the need, inter alia, for flexible resources, storage systems for
energy shift, and demand response measures for managing the
intermittency and variability of renewable energy sources
l.
“Short term” means one year for development of demand forecast,
generation resource plan, and procurement plan.
n.
“Short-Term Distribution Resource Adequacy Plan” or “ST-DRAP”
means plan for assessment of short-term resource adequacy by the
distribution licensee.
4.2. All other words and expressions used in these Regulations, although not
specifically defined herein above, but defined in the Guidelines for Resource
Adequacy Framework issued by Centre Government, Act, or the Guidelines
issued there under shall have the meaning assigned to them in the Act. The
other words and expressions used herein but not specifically defined in these
Regulations or in the Act but defined under any law passed by the Parliament
3
BIHAR GAZETTE (EXTRA) 22ND DECEMBER 2025
applicable to the electricity industry in the State shall have the meaning
assigned to them in such law.
Chapter- 2
General
5.
Resource Adequacy Framework.—
5.1. Resource Adequacy framework entails the planning of generation resources
for reliably meeting the projected demand in compliance with specified
reliability standards for serving the load with an optimum generation mix.
5.2. Resource Adequacy framework shall cover following important steps:
a) Demand assessment and forecasting
b) Generation resource planning
c) Procurement planning
d) Monitoring and compliance
5.3. The distribution licensee shall develop and prepare Long-Term Distribution
Resource Adequacy Plan (LT-DRAP) and Short-Term Distribution Resource
Adequacy Plan (ST-DRAP) in accordance with the conditions outlined under
these Regulations.
Chapter- 3
Demand Assessment and Forecasting
6.
Long-term Demand Forecast.—
6.1. Demand assessment and forecasting is an important step for Resource
Adequacy assessment. It shall entail hourly or sub-hourly assessment and
forecasting of demand within the distribution area of distribution licensee for
multiple horizons (short//long-term) using comprehensive input data, policies
& drivers and scientific mathematical modeling tools.
6.2. The distribution licensee shall be responsible for the assessment and
forecasting of demand (MW) and energy (MWh) within its own control area.
6.3. The distribution licensee shall determine the load forecast for each consumer
category for which the Commission has determined separate retail tariff.
6.4. The distribution licensee shall determine the load forecast for a consumer
category by adopting any of the following and/or combination of following
methodologies:
(a)
compounded average growth rate (CAGR);
(b)
end use or partial end use.
(c)
trend analysis.
(d)
Auto-regressive integrated moving average (ARIMA);
(e)
AI including machine learning, ANN techniques;
(f)
econometric (specifying the parameters used, algorithm, and source of
data); and
(g)
Any other methodology
6.5. The distribution licensee may use Authority’s Electric Power Survey (EPS)
projections as base and/or projections arrived applying above-mentioned
methodologies after recording the merits of the method. Further, distribution
licensee should use best fit of various methodologies for the purpose of
demand/load forecast taking into consideration probabilistic modelling
approach for various scenarios (viz. most probable, business as usual,
aggressive) as outlined under Regulation 6.14 of these Regulations.
6.6. For the purposes of deciding the load forecast for a consumer category and the
methodology to be used for load forecasting of a consumer category, the
distribution licensee must conduct statistical analysis and shall select the
method for which standard deviation is lowest and R-square is highest.
4
BIHAR GAZETTE (EXTRA) 22ND DECEMBER 2025
6.7. The distribution licensee shall utilize state-of-the-art tools, scientific and
mathematical methodologies, and comprehensive database such as but not
limited to weather data, historical data, demographic and econometric data,
consumption profiles, impact of policies and drivers etc. as may be applicable
to their control area.
6.8. The distribution licensee may modify the load assessed/estimated on either
side, for each consumer category, by considering the impact for each of the
but not limited to the following activities. The impact shall be considered by
developing trajectories for each of the activities based on the economic
parameters, policies, historical data, and projections for the future.
(a) demand-side management;
(b) open access;
(c) distributed energy resources;
(d) demand response measures;
(e) electric vehicles;
(f) tariff signals;
(g) changes in specific energy consumption,
(h) increase in commercial activities with electrification
(i) increase in number of agricultural pump sets and its solarization
(j) changes in consumption pattern from seasonal consumers
(k) availability of supply; AND
(l) policy influences such as 24X7 supply to all customers, LED penetration,
efficient use of fans/appliances, increased use of appliances for
cooking/heating applications, electrification policies, distributive energy
resources, storage, and policies, which can impact econometric
parameters, impact of national hydrogen mission etc. For each policy, a
separate trajectory should be developed for each consumer category.
6.9. The distribution licensee may also take into consideration any other factor not
mentioned in Regulation 6.8 of these regulations after recording the merits of
its consideration.
6.10. Load profile of the consumer categories for which load research has been
conducted may be refined on the basis of load research analysis. A detailed
explanation for refinement conducted must be provided.
6.11. The summation of energy forecast (MWh) for various consumer categories
upon adjusting for captive, prosumer, and open access load forecast, as
obtained as per Regulations 6.4 to 6.10, of these regulations as the case may
be, shall be the base data for load forecast for the licensee.
6.12. The licensee shall calculate the load forecasts (in MWh) by adding a loss
trajectory approved by the Commission in the latest tariff order. In absence of
the loss trajectory as approved by the Commission for the planning horizon,
an appropriate loss trajectory stipulated by State or National policies shall be
considered with a detailed explanation.
6.13. The peak demand (in MW) shall be determined by considering the average
load factor, load diversity factor, seasonal variation factors for the last three
years and the load forecasts (in MWh) obtained in Regulation 6.12 of these
regulations. If any other appropriate load factor is considered for future years,
a detailed explanation shall be provided.
6.14. The distribution licensee shall conduct sensitivity and probability analysis to
determine the most probable demand forecast. The distribution licensee must
also develop long term demand forecasts for all possible scenarios, while
ensuring that at least three different scenarios (most probable, business as
usual, and aggressive scenarios) are developed.
5
BIHAR GAZETTE (EXTRA) 22ND DECEMBER 2025
7.
Short term (Hourly/Sub-hourly) Demand Forecast.—
7.1. The distribution licensee shall develop a methodology for hourly or sub-
hourly demand forecasting and shall maintain a historical database.
7.2. For the purpose of ascertaining hourly load profile and for assessment of
contribution of various consumer categories to peak demand, load research
analysis shall be conducted and influence of demand side management
measures, load shift measures, time of use etc. shall be factored in by
distribution licensee with inputs from state load dispatch center. A detailed
explanation for refinement conducted must be provided.
7.3. The distribution licensee shall utilize state-of-the-art tools, scientific &
mathematical methodologies and comprehensive data such as but not limited
to weather data, historical data, demographic and econometric data,
consumption profiles, policies & drivers etc. as may be applicable to their
control area.
8.
Aggregation of Forecasted Demand at State.—
8.1. The distribution licensee shall produce hourly or sub-hourly 1-year short-term
(ST) forecast and submit it to SLDC by 15th April of each year for the
ensuing year.The distribution licensee shall also produce Long term demand
forecasts on a rolling basis and submit it to STU by 15th April of each year for
the ensuing years.
8.2. STU and SLDC based on the demand estimates of the distribution licensees
of the State, shall estimate aggregate demand(MW and MWh) respectively for
long-term (rolling basis), and short term for the entire State duly considering
the load diversity,congruency, seasonal variation aspects etc.
8.3. The state level demand forecast produced under Regulation 8.2 above shall be
submitted by STU (long term) and SLDC (short-term)to the Authority, NLDC
and RLDC by 15th May of each year for the ensuring year(s).
Chapter-4
Generation Resource Planning
9.
Generation resource assessment and planning is the second step after demand
assessment and forecasting and entails assessment of the existing and contracted
resources considering their capacity credit and identification of incremental
capacity requirement to meet forecasted demand including planning reserve
margin.
10.
Key contours and important steps in Generation Resource Planning.—
10.1. Generation resource planning shall entail the following steps namely, (a)
capacity crediting of generation resources, (b) assessment of planning
reserve margin, and (c) ascertaining resource adequacy requirement and
allocation for obligated entities.
10.2. The distribution licensee shall map all its contracted existing resources,
upcoming resources, and retiring resources to develop the existing resource
map in MW for the long term.
10.3. The mapping shall include critical characteristics and parameters of the
generating machines, such as heat rate, auxiliary consumption, ramp-up
rate, ramp-down rate, etc., for thermal machines; hydrology and machine
characteristics, etc., for hydro machines; and renewable resources, their
Capacity factors/CUFs, etc. for renewable resource–based power plants to
be considered in the resource plan. All the characteristics and parameters
with their values for each generating machine considered shall be provided
in the resource plan.
6
BIHAR GAZETTE (EXTRA) 22ND DECEMBER 2025
10.4. Constraints such as penalties for unmet demand, forced outages, spinning
reserve requirements, system emission limits as defined in State and
Central electricity grid codes, emission norms specified by the Ministry of
Environment and Forest etc shall be identified and enlisted.
10.5. The distribution licensee shall also include a planning reserve as specified
by the Authority or Commission, as the case may be. In the absence of any
guidelines from the Commission, the distribution licensee can consider
suitable planning reserve. The value of planning reserve considered shall
be stipulated in the resource plan along with justifications.
11.
Capacity Crediting of Generation Resources.—
11.1. Proper estimation of Capacity Credit (CC) is essential for determining the
capacity requirements to be tied up by Distribution Licensees for meeting
their own as well as coincident peak demand obligations. The Distribution
Licensee shall compute the CC factors for its contracted generation
resources by adopting the most appropriate methodology from among those
recommended in the Guidelines for Resource Adequacy Framework issued
by the Ministry of Power, or as specified by the Authority. The Distribution
Licensee may adopt any other suitable methodology for computing CC
factors, provided that the rationale and merits of such methodology are duly
recorded and justified.
11.2. For the purpose of Inter-state contracted RE generation or intra-state RE
resources, contribution of CC factor for the RE or generation resource
where such resource is located into grid (viz. inter-state or intra-state, as
the case may be) as contracted by the distribution licensee shall be
considered.
11.3. CC of conventional sources such as coal, gas, nuclear etc can be estimated
as:
Capacity Credit of Conventional Sources = Installed Capacity
*(1 Auxiliary Power)
*Availability While computing the Availability of these power plants, the
following factors, in addition to other relevant considerations, may also be
taken into account:
(i)
Fuel availability, planned maintenance, forced outages etc.
(ii) For highly seasonal sources such as Hydro(Run of the River; RoR),
Biomass:- Past generation data say for last 5 years
(iii) Hydro generators (with Pondage; dam-based/storage-based) may
provide higher output during peak demand hours due to available
storage associated with these generators.
11.4. The distribution licensee(s) shall share CC factors for their contracted
resources along with justification for its computations with State Load
Despatch Center.
11.5 The CC determination exercise shall be undertaken for each year of
preceding five years and the average of these CC values for a particular
generation resource shall normally be taken as resultant CC value for that
resource.
Provided that while computing CC values of preceding years the
distribution licensee shall exclude abnormal values attributable to
events/circumstances such as act of God, disaster declared by competent
authority/Government, act of war etc
11.6. Taking into consideration the methodologies adopted under this Regulation
for CC determination, SLDC shall calculate state-specific CC factors
considering the aggregate State Demand and contracted RE generation
resources available to the State and shall submit such CC factor information
to the Authority, NLDC and RLDC from time to time.
7
BIHAR GAZETTE (EXTRA) 22ND DECEMBER 2025
12. Assessment of Planning Reserve Margin (PRM)
12.1. Planning Reserve Margin (PRM) as a percentage of peak load represents the
excess generation resource or planning reserve required to be considered for
the purpose of generation resource planning.
12.2. Such Planning Reserve Margin (PRM) shall be based on the reliability
indices in terms of Loss of Load Probability and Normalized Energy Not
Served (NENS), as may be specified by the Authority and the same shall be
considered by distribution licensees in their planning for resource adequacy
requirement and generation resource capacity planning.
12.3. The capacity planning by the distribution licensee and State level resource
adequacy planning by STU/SLDC shall factor in PRM while developing
state-level Integrated Resource Plan.
13. Resource Adequacy Requirement and its Allocation.—
13.1. Upon applying CC factors as determined under Regulation 11 of these
regulations and determining adjusted capacity for contracted generation
resources (existing and planned), the sum of such adjusted contracted
generation capacity (existing and planned) over a time axis of 15-minute
intervals or longer, but not more than one hour, shall form the resource map
of the distribution licensee.
13.2. The distribution licensee shall subtract the resource map developed in
regulation 13.1 from the demand forecast developed in regulations 6 and 7
of these Regulations to identify the resource gap. The resource gap in terms
of Resource Adequacy (RA) compliance for the distribution licensee for
long and short term shall be developed in the manner as specified in these
Regulations.
13.3. The distribution licensee shall conduct sensitivity and probability analysis to
determine the most probable resource gap. The distribution licensee shall
also develop resource gap plans for possible scenarios, while ensuring that
at least three different scenarios (most probable, business as usual, and
aggressive) are developed.
13.4. Based on most probable scenario, distribution licensee shall undertake
development of Long-term Distribution Resource Adequacy Plan (LT-
DRAP) and Short-term Distribution Resource Adequacy Plan (ST-DRAP)
exercise. The distribution licensee while developing LT-DRAP and ST-
DRAP shall be guided by Long-term National Resource Adequacy Plan
(LT- NRAP) and Short-term National Resource Adequacy Plan (ST-
NRAP).
13.5 The Resource Adequacy Plan will essentially lay down the quantum and
type of resources required in the portfolio of a distribution licensee to
meet the demand in an optimal (least cost and secure) manner. The plan
shall give the year-on-year optimal generation (conventional plus
Renewable) and storage capacities required to meet the system demand and
the planning reserve margin securely and at least cost.
13.6 Considering State’s share in the national peak as allocated in LT-NRAP,
SLDC shall allocate each distribution licensee’s share in the national peak
within 15 days of the publication of LT-NRAP.
13.7 The LT-DRAP and ST-DRAP so developed by distribution licensee shall be
submitted to the Authority, STU and SLDC by 15th August of each year.
8
BIHAR GAZETTE (EXTRA) 22ND DECEMBER 2025
Chapter- 5
Procurement Planning
14.
Procurement planning shall consist of.—
(a)
determining the optimal power procurement resource mix,
(b)
deciding on the modalities of procurement type and tenure, and
(c)
engaging in optimum utilisation of contracted capacities and efficient
management of surplus energy contracted.
15.
Procurement Resource Mix.—
15.1. The distribution licensee in its power procurement strategy shall lay
emphasis on the optimal procurement generation resource mix that shall
enable smooth RE integration in its portfolio of power procurement resource
options while meeting reliability standards.
15.2. For identification of the optimal generation procurement resource mix,
optimization techniques and least-cost modelling shall be employed in order
to avoid stranding of assets. The distribution licensee shall engage in
adoption of least cost modelling and optimization techniques and
demonstrate the same in its overall power procurement planning exercise to
be submitted to the Commission for approval.
15.3. Procurement by distribution licensees shall be consistent with the identified
resource mix and considering overall national electricity plan and policies
notified by the Appropriate Government from time to time.
16. Procurement Type and Tenure.—
16.1. The distribution licensee, while determining the modalities and tenure of
procurement of resource mix, shall, subject to fulfilment of conditions of
optimum and least cost generation procurement planning, ensure that at the
initial level, available capacity within the State shall be optimized. For
further optimization, procurement contract shall be decided first within the
region subject to the least cost resource availability considering
transmission constraints & cost of transmission for procurement from
outside the region and then across regions if necessary.
16.2. In its overall power procurement planning approach, the distribution
licensee shall lay greater emphasis on adequate contracting through long-
& medium-term arrangements as well as on optimum utilization of
generation resources in a cost-effective manner.
16.3 The distribution licensee must ensure that procurement process for the
projected demand is undertaken and completed sufficiently in advance so
that the procured capacity becomes available when it is required to serve
the projected load. The following table gives the number of years before
which procurement process will normally be completed in advance as
compared to the year of projected requirement for various types of
generation and types of procurement:
Resource
Long Term
Medium Term
Coal/Lignite Based Capacity
7
2
Hydro
9
2
Solar
2
1
Wind
3
1
PSP
5
3
Other Storage
2
1
Nuclear
9
3
9
BIHAR GAZETTE (EXTRA) 22ND DECEMBER 2025
16.4. Assessment through Annual Rolling Plan shall ascertain incremental
capacity addition requirement through long, medium or short term upon
factoring in existing and planned procurement initiatives of the distribution
licensee. The Plan shall also incorporate planned utilization of surplus
energy contracted/proposed to be contracted to optimize the power
purchase cost.
16.5. The distribution licensees shall identify the generation resource mix and
procurement strategy in long-term, and short-term horizon. The distribution
licensee, within 15 days of receipt from the Authority, shall file duly vetted
(by the Authority) LT-DRAP, ST-DRAP along with the Annual rolling
plan before the Commission for approval.
16.6 The Commission will normally approve LT-DRAP and ST-DRAP of the
distribution licensees within 45 days of filing of these plans (complete in
all respect) each year for the ensuring year(s) incl. annual rolling plans, as
the case may be, upon taking into consideration various scenarios as well
as allocation of Resource Adequacy requirement allocated to the
State/distribution licensee based on its contribution to the National peak or
National RA requirement as determined by Authority or the NLDC or the
RLDC , as the case may be.
16.7. The distribution licensee in accordance with the orders of the Commission
shall contract capacities, if any required, and submit the Annual Rolling
Plan to STU/SLDC by 15th January of each year for the relevant year(s).
Thereafter, within next 10 days STU and SLDC shall submit state-level
aggregated plan to RLDC. enabling it to timely submit regional-level
aggregated plan to NLDC
17.
Optimum utilisation of contracted capacities and efficient management of
surplus energy contracted.—
17.1.
With an overall objective of optimizing the power purchase cost while
meeting the reliability standards the distribution licensee, on best effort
basis,
shall
engage
in
efficient
management
of
surplus
contracted/proposed to be contracted capacities. In order to ensure
optimum and least cost generation resource procurement planning, each
distribution licensee shall give due consideration to the factors such as
its share in the state, regional and national coincident peak; seasonal
requirement and possibility of sharing generation
capacity seasonally with other States. The distribution licensee will also
explore options like; capacity sharing, power banking, energy storage
system, bilateral arrangement etc while preparing the Resource
Adequacy plan and optimally utilize the platform for inter/intra -state
capacity sharing or trading mechanism created by the Central
Commission and optimize the power purchase costs as far as possible.
17.2.
The distribution licensee shall submit information about contracted
capacity to the SLDC and the STU for compliance verification.
17.3.
The distribution licensee, shall seek approval of the Commission on the
procurement plan as well as Annual Rolling Plans.
10
BIHAR GAZETTE (EXTRA) 22ND DECEMBER 2025
Chapter- 6
Monitoring and Compliance
18.
Monitoring and Compliance.—
18.1. Monitoring and Reporting: Based on the LT-DRAP and ST-DRAP,
STU and SLDC shall communicate the state-aggregated capacity
shortfall to the State Commission by 15th September of each year for
the ensuring year(s) and advise the distribution licensees to commit
additional capacities.
18.2.
Treatment for shortfall in RA Compliance: Distribution licensees shall
comply with the RA requirement as approved by the Commission.
Failure of a distribution licensee to meet the approved RA requirement
shall render the defaulting licensee liable for payment of non-
compliance charge as determined by the Commission on case-to-case
basis
Chapter- 7
Roles and Responsibilities and Timelines
19.
Data Requirement and Sharing Protocol.—
19.1. Distribution licensees shall maintain and share with STU/SLDC, all data
related to demand assessment and forecasting such as but not limited to
consumer data, historical demand data, weather data, demographic and
econometric variables, T&D losses, actual electrical energy requirement
and availability including curtailment, peak electricity demand, and
peak met along with changes in demand profile (e.g.: agricultural shift,
time of use, etc.), historical hourly load shape, etc
19.2. Distribution Licensee shall maintain all statistics and database
pertaining to policies and drivers, such as LED penetration, efficient fan
penetration, appliance penetration, increased usage of electrical
appliances for cooking, etc., in households, increase in commercial
activities for geographic areas/regions, increase in number of
agricultural pumps and solarization within control area, changes in
specific energy consumption, consumption pattern from seasonal
consumers such as tea plants, DSM and DERs, EVs and OA, National
Hydrogen Mission, reduction of AT&C losses, etc. shall also be shared.
19.3. Distribution Licensee shall maintain at least past 10 years of statistics in
its database pertaining to consumption profiles for each class of
consumers, such as domestic, commercial, public lighting, public water
works, irrigation, LT industries, HT industries, railway traction, bulk
(non-industrial HT consumers), open access, captive power plants,
insights from load survey, contribution of consumer category to peak
demand, seasonal variation aspects, etc. shall also be shared.
19.4. SLDC shall maintain the licensee-specific as well as aggregate for state
as whole, the statistics and database pertaining to aggregate demand
assessment and forecasting data mentioned above and share state-level
assessment with the Authority and the NLDC for regional/national
assessment from time to time.
19.5. The distribution licensee shall share information and data pertaining to
the existing and contracted capacities with their technical and financial
characteristics including hourly generation profiles to with STU and
SLDC for computation of state-level capacity credit factors and for
preparation of state-level assessment.
19.6. SLDC and STU shall aggregate generation data and share state-level
assessment with the Authority and NLDC for assessment of RA
requirement.
11
BIHAR GAZETTE (EXTRA) 22ND DECEMBER 2025
19.7. STU shall communicate allocation of regional and national RA
requirement to the distribution licensees.
20.
Timelines
20.1. Distribution licensees shall submit demand forecasts to SLDC and STU
by 15th April of each year for the ensuring year(s).
20.2. SLDC/STU shall aggregate and submit state-level forecasts to the
Authority, the NLDC and RLDC by 15th May of each year for the
ensuring year(s).
20.3. Distribution licensees shall perform LT-DRAP and ST-DRAP exercise
and submit it to the Authority, STU and SLDC by 15th August of each
year for the ensuring year(s).
20.4 Filing of duly vetted LT-DRAP, ST-DRAP along with proposed
procurement plan, annual rolling plants etc within 15 days of receipt of
LT DRAP (from the Authority) and ST-DRAP from SLDC
20.5. Submission of Annual Rolling Plan by distribution licensees to
STU/SLDC by 15th January of each year.
Chapter- 8
Miscellaneous
21.
Power to Give Directions.—
20.1. The Commission may from time to time issue such directions and
orders as considered appropriate for implementation of these
regulations.
22.
Power to Relax.—
22.1. The Commission may by general or special order, for reasons to be
recorded in writing, and after giving an opportunity of hearing to the
parties likely to be affected, may relax any of the provisions of these
Regulations on its own motion or on an application made before it by an
interested person.
23. Power to Remove Difficulties.—
22.1. If any difficulty arises in giving effect to the provisions of these
Regulations, the Commission may, by an order, make such provisions,
not inconsistent to the provision of the Act and these Regulations, as may
appear to be necessary for removing the difficulty.
24.
Repeal and Savings.—
24.1
Save as otherwise provided in these regulations, the Bihar Electricity
Regulatory Commission (Power Purchase and Procurement Process of
Licensee) Regulations, 2018shall stand repealed from the date of
commencement of these Regulations.
24.2
Notwithstanding such repeal, anything done or any action taken or
purported to have been done under the repealed regulations, shall be
deemed to have been doneor taken under the relevant provisions of these
regulations.
By order,
Sd-Illegible,
Secretary, BERC.
———
PUBLISHED AND PRINTED BY THE SUPERINTENDENT,
BIHAR SECRETARIAT PRESS, PATNA,
BIHAR GAZETTE (EXTRA) 1798-571+10
Website:https://egazette.bihar.gov.in