TRANSMISSION CORPORATION OF
ANDHRA PRADESH LIMITED
Chief Engineer, 400kV Construction, APTRANSCO, Vidyut Soudha, Vijayawada.
Lr.No.CE/400kV Const/SE/400kV/PM/D1-A(S)/400kV Schemes/D.No.459/18. Dt: 31.12.18
NOTIFICATION OF REVISED 400 kV TRANSMISSION SCHEME NAMELY "TRANSMISSION SCHEMES FOR EVACUATION OF POW ER FROM 960 (12 X 80) MW POLAVARAM HYDRO ELECTRIC PROJECT IN EAST GODAVARI DISTRICT OF ANDHRA PRADESH W HICH IS UNDER CONSTRUCTION BY APGENCO.
NOTIFICATION
Transmission Corporation of Andhra Pradesh Limited has proposed "Revised Transmission Scheme for evacuation of power from 960 (12 x 80) MW Polavaram Hydro Electric Project in East Godavari District of Andhra Pradesh which is under construction by APGENCO", with the erection of the following Transmission Lines and Bay extensions. The total estimated cost of the revised scheme is Rs.332.10 Crores and Interest During Construction of Rs.26 Crores. The Scheme is proposed for completion during the year 2020-2021 and will result in reduction of EHT transmission losses, improvement of voltage profiles & meets the additional load demand in the region and surrounding areas.
2 ANDHRA PRADESH GAZETTE EXTRAORDINARY [Part-IIIn exercise of the powers conferred vide G.O.Ms.No.115, Dated: 07-10-2003 of Government of Andhra Pradesh, APTRANSCO or their authorized representatives shall have the powers for placing of the electric supply lines or electric plant for the transmission of electricity or for the purpose of telephonic or telegraphic communications necessary for the proper co-ordination of works that a telegraphic authority possesses under the provision of the Indian Telegraph Act, 1885 (Central Act-13 of 1885).
Any person interested/aggrieved may make representation to the Chief Engineer/ 400 kV Construction, APTRANSCO, Vidyut Soudha, Vijayawda within two (2) months from the date of publication of this notification.
Representations received after the due date will not be considered and APTRANSCO will take-up the above works after due date with/without modification as it deems fit after making enquiry, if necessary.
Sd/-.,
Chief Engineer,
400kV Construction.