Servants of Knowledge
Andhra Pradesh Gazette · Government of Andhra Pradesh

Water Resources Department - “Detailed Investigation, Designs and Construction of Pump House, Associated Civil, Electro Mechanical Works, Electrical Sub Station including installation and laying of MS Pressure Mains, Manifolds, Construction of Delivery Cistern and Canal / Piped System by gravity for Lift Irrigation Scheme at KM 106.800 on Right Side Bank of PIPRMC near Jagannadhapuram (V) in Peddavegi (M) of WG Dist under EPC Turnkey System” for Rs.68,85,00,000/- (Rupees Sixty Eight Crores and Eight Five Lakhs only) - Administrative Approval – Accorded – Orders-Issued.

Published 18 April 2023

Department
WATER RESOURCES
Type
Extraordinary
Gazette no.
392
Part
PART I
Notification no.
1-(2023-2024)
Identifier
in.gazette.andhra.2023-04-18.18606
Languages
English, Telugu

click here for IIIF manifest

Registered No. HSE-49/2016

PART I EXTRAORDINARY

No.392 AMARAVATI, TUESDAY, APRIL 18, 2023 G.35 NOTIFICATIONS BY GOVERNMENT

--x--

GOVERNMENT OF ANDHRA PRADESH

ABSTRACT

Water Resources Department - "Detailed Investigation, Designs and Construction of Pump House, Associated Civil, Electro Mechanical Works, Electrical Sub Station including installation and laying of MS Pressure Mains, Manifolds, Construction of Delivery Cistern and Canal / Piped System by gravity for Lift Irrigation Scheme at KM 106.800 on Right Side Bank of PIPRMC near Jagannadhapuram (V) in Peddavegi (M) of WG Dist under EPC Turnkey System" for Rs.68,85,00,000/- (Rupees Sixty Eight Crores and Eight Five Lakhs only) - Administrative Approval – Accorded – Orders-Issued.

WATER RESOURCES (PROJECTS.I) DEPARTMENT

G.O.Rt.No:119 Dated: 16/03/2023

Read:

From the Chief Engineer, Polavaram Irrigation Project, Dowlaiswaram, Lr.No.CE/PIP/DCE/OT1/AEE/RMC JLIS, Dated.26.02.2021, 29.06.2021, 24.09.2021, 04.02.2022 14.03.2022 and 25.05.2022.

ORDER:

In the reference read above the Chief Engineer, Polavaram Irrigation Project, Dowlaiswaram has submitted proposal of Jagannadhapuram Lift Irrigation Scheme, proposed on the Right Side of the Polavaram Irrigation Project Right Main Canal near Jagannadhapuram (V) of Pedavegi (M) to irrigate an ayacut of 5268.66 Acs (4786 Acs dry ayacut, duly deleting the same from Chinthalapudi LI Scheme and supplementation of 482.66 Acs of wet crop) for utilization of 187.68 Mcft with peak discharge of 54.25 cusecs at 16 Hrs of pumping per day. 2. The Chief Engineer, Polavaram Irrigation Project, Dowlaiswaram, while explaining the above, requested to issue necessary administrative sanction for the

work of "Detailed Investigation, Designs and Construction of Pump House, Associated Civil, Electro Mechanical Works, Electrical Sub Station including installation and laying of MS Pressure Mains, Manifolds, Construction of Delivery Cistern and Canal / Piped System by gravity for Lift Irrigation Scheme at KM 106.800 on Right Side Bank of PIPRMC near Jagannadhapuram (V) in Peddavegi (M) of WG Dist under EPC Turnkey System" for Rs. 72,18,90,000/-.

3. After careful examination, Government hereby accorded administrative sanction for the work of "Detailed Investigation, Designs and Construction of Pump House, Associated Civil, Electro Mechanical Works, Electrical Sub Station including installation and laying of MS Pressure Mains, Manifolds, Construction of Delivery Cistern and Canal / Piped System by gravity for Lift Irrigation Scheme at KM 106.800 on Right Side Bank of PIPRMC near Jagannadhapuram (V) in Peddavegi (M) of West Godavari Dist under EPC Turnkey System" for Rs. 68,85,00,000/- (Rupees Sixty Eight Crores and Eight Five Lakhs only ) in relaxation of FRBM Norms, subject to the condition that the Chief Engineer, Polavaram Irrigation Project, Dowlaiswaram shall ensure i) correctness of quantities, leads, rates and data proposed in the estimate ii) Designs & drawings shall got approved by the competent authority iii) Supporting details for the proposed LS provisions shall obtained and iv) As LA is involved, Land value certificate from the Revenue department shall obtained.

4. The expenditure is chargeable to the head of account 4700 Capital Outlay on Major Irrigation – 01 – Major Irrigation (Commercial) – MH 120 Polavaram Barrage – GH 11 State Development Schemes – SH – 27 Canals and Distributaries – 530 – Major Works – 531 OE. / 532 LA.

5. The Chief Engineer, Polavaram Irrigation Project shall take necessary action accordingly.

6. This order issues with the concurrence of the Finance (FMU.WR.II) Department vide their U.O. Note No. FIN01-FMU0MRAS (WR2)/35/2022-FMU-WR- II, dated: 17.12.2022. (Computer No.1689188)

7. This order is available on online and can be accessed at http://apegazette.cgg.gov.in. (BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)

SHASHI BHUSHAN KUMAR PRINCIPAL SECRETARY TO GOVERNMENTTo The Chief Engineer, Polavaram Irrigation Project, Dowlaiswaram. Copy to: The Director of Works & Accounts, Mangalagiri. The Pay and Account Officer, Mangalagiri. The Finance (FMU-WR.II) Department. The P.S. to Secretary to CM. The P.S. to Minister (WRD). The P.S. to Secretary (WRD). File No. ICD01-MJIR0IC05/19/2019-PROJECTS-I, Computer no. 811666. SF/SC. //FORWARDED::BY ORDER// SECTION OFFICER