APPOINTMENT OF M/s RECPDCL AS BID PROCESS COORDINATOR FOR TRANSMISSION SCHEME FOR EVACUATION OF POWER FROM THE PROPOSED 1350 MW (9*150 MW) UPPER SILERU PUMPED STORAGE PROJECT, ALLURI SITARAMARAJU DISTRICT - CONSTRUCTION OF 400 KV QMDC LINE (145 KM APPROX.) FROM THE PROPOSED UPPER SILERU PUMPED STORAGE PROJECT TO THE UNDER CONSTRUCTION 400/220/132/ 33KV SS KAKINADA ALONG WITH CONSTRUCTION OF 2Nos 400KV BAYS AT 400/220/132/33KV SS KAKINADA. (G.O.Rt.No.31, Energy (P.1), 10th April, 2026.)