click here for IIIF manifest
Registered No. HSE-49/2016
W.No.37 AMARAVATI, MONDAY, SEPTEMBER 14, 2026 G.529 PART II - MISCELLANEOUS NOTIFICATIONS OF INTEREST TO THE PUBLIC --x--
NOTIFICATIONS BY HEADS OF DEPARTMENTS Etc.,
MUNICIPAL ADMINISTRATION DEPARTMENT
MUNICIPAL COMMISSIONER, NAGARI MUNICIPALITY,
NAGARI.
Roc. No. G1/2025/2026.
dt: 13.09.2026
DIVISION OF NAGARI MUNICIPALITY INTO 40 (FORTY) WARDS.
[1]
FORM-VI
(Rule 13)
Delimitation of Wards in Nagari Municipality
NOTIFICATION
In Pursuance of the Provision of Rule 4 (I) of the Andhra Pradesh Municipalities (Division of Municipalities into Wards) Rules, 1994 issued by the Government in G.O.Ms.No.31, MA&UD (Elec-I), dated 03-02-1995,Objections and Suggestions were called for from residents of town in the Preliminary Notification No: 814/2026/G1, date:
05.09.2026.
In Pursuance of the Provisions of Rule 13 of the Andhra Pradesh Municipalities (Division of Municipalities into wards) Rules, 1994, residents of Nagari Municipality are hereby informed that Delimitation of the 40 Wards of Nagari Municipality is confirmed as
|
Boundary Description |
|
| (1) |
|
(2) |
| 1 |
North |
The boundary starts from Survey No. 1 and then turns towards the East and runs
along the Northern Boundary of Survey No. 3 until it reaches the North-East
Corner of Survey No. 3 of Nagari Revenue Village. |
|
East |
Starting from the above point, being the northeast corner of Survey No. 3 of
Nagari Revenue Village, the boundary proceeds southwards along the eastern
boundaries of Survey Nos. 3, 31, 50, 51, 52, 53, 57, 62, 63, 64, 70 and 72, until it
reaches Door No. 10-14-200/5. Thereafter, the boundary turns towards the west
and runs along the line until it meets the National Highway. |
|
South |
Starting from the above point, the boundary line turns towards the West and runs
along the line crossing D.No. 10-1-194 till it meets the National Highway. |
|
West |
Starting from the above point, the boundary line turns towards the North and runs
along the National Highway till it meets the municipal boundary at the North-
West Corner of Survey No. 1 of Nagari Revenue Village. |
| 2 |
North |
The boundary starts from the North-West Corner of Survey No. 1, and the
boundary line runs along the municipal boundary till it reaches the North-East
Corner of Survey No. 12 of Kakavedu Revenue Village. |
|
East |
Starting from the above point, the line turns towards the South and runs along the
Eastern Boundaries of Survey Nos. 12, 45, 46, 47, 88, 90, 84 and 81 till it reaches
D.No. 1/1/50. Thereafter, the line continues towards the South and runs along
Kakavedu Road, then turns towards the East till it reaches the Northern Boundary
of Survey No. 113. Then the line turns towards the South and runs along the
Eastern Boundaries of Survey Nos. 113, 112 and 163 till it reaches D.No. 1/4/28. |
|
South |
Starting from the above point, the line turns towards the West and runs till it
reaches D.No. 1-4-29/12. |
|
West |
Starting from the above point, the line turns towards the North and runs along the
line till it reaches D.No. 1-4-6-9. Thereafter, the line turns towards the East and
runs along the line till it reaches the Kakavedu Cheruvu Boundary of Survey No. |
|
|
163. Thence, the line turns towards the West and runs along Kakavedu Main
Road till it reaches the National Highway. Thereafter, the line turns towards the
North and runs along the National Highway till it reaches D.No. 10-14-200/1.
Thence, the line turns towards the East and runs along the line till it reaches the
Northern Boundary of Survey No. 77. Thereafter, the line turns towards the North
and runs along the Western Boundaries of Survey Nos. 74, 73, 72, 63, 62, 61 and
60 till it reaches the North-West Corner of Survey No. 60. Thence, the line turns
towards the West and runs along the Southern Boundaries of Survey Nos. 9 and 8
till it reaches Sai Baba Temple Road. Thereafter, the line turns towards the North
and runs along the Western Boundaries of Survey Nos. 8, 7, 6, 5, 12, 4, 3 and 1
till it reaches the North-West Corner of Survey No. 1. |
| 3 |
North |
The boundary starts from the North-West Corner of Survey No. 13, and the line
turns towards the East along the municipal boundary till it reaches the North-East
Corner of Survey No. 13. |
|
East |
Starting from the above point, the line proceeds along the municipal boundary and
runs from the North-East Corner of Survey No. 13 till it reaches the South-East
Corner of Survey No. 171. |
|
South |
Starting from the above point, the line turns towards the West and runs along the
Southern Boundary of Survey No. 171 till it reaches the South-West Corner of
Survey No. 171. Thereafter, the line turns towards the South and runs along the
Eastern Boundaries of Survey Nos. 174 and 190 till it reaches the North-East
Corner of Survey No. 190. Thence, the line turns towards the West and runs along
the Southern Boundaries of Survey Nos. 190, 189, 188, 184, 185 and 160 till it
reaches the South-West Corner of Survey No. 160. |
|
West |
Starting from the above point, the line turns towards the North and runs along the
Western Boundary of Survey No. 161 till it reaches the North-West Corner of
Survey No. 161. Thereafter, the line turns towards the West and runs along the
Southern Boundary of Survey No. 162. Thence, the line turns towards the North
and runs along Cheruvu Survey No. 163 till it reaches Kakavedu–Mangadu Road.
Thereafter, the line runs along the Eastern Boundaries of Survey Nos. 112 and
113 till it reaches Kakavedu Main Road. Thence, the line turns towards the North
and runs along Kakavedu Main Road till it reaches the Western Boundary of
Survey No. 123. Thereafter, the line continues towards the North and runs along
the Western Boundaries of Survey Nos. 123, 82, 83, 91, 41, 44 and 43 till it
reaches the North-West Corner of Survey No. 13. |
| 4 |
North |
The boundary starts from the North-West Corner of Survey No. 89, and the
boundary line turns towards the East and runs along the Northern Boundaries of
Survey Nos. 89 and 145 till it reaches the North-East Corner of Survey No. 146. |
|
East |
Starting from the above point at the North-East Corner of Survey No. 146, the
line runs along the Eastern Boundaries of Survey Nos. 143 to 147 till it reaches
the South-East Corner of Survey No. 147. From there, the line turns towards the
West and runs along the boundary line leading to D.No. 10-4-6-9. Thereafter, it
turns towards the South and runs along the Eastern Boundaries of Survey Nos. 97
and 98 till it reaches D.No. 1-4-29/1. The line then turns towards the East and
runs along the Southern Boundary of Survey No. 162 till it reaches the North-East
Corner of Survey No. 150, and thereafter turns towards the South and runs along
the Eastern Boundaries of Survey Nos. 150, 151 and 152 till it meets the National
Highway (NH). |
|
South |
Starting from the above point, the boundary turns towards the west and runs along
the eastern boundaries of Survey Nos. 242 and 236, until it reaches Door No. 10-
1-205.Thereafter, it continues towards the west along the boundary line until it
reaches Door No. 10-1-191. The boundary then turns towards the north and runs
along the boundary line until it reaches Door No. 1-1-10-1-169. From there, the
boundary turns towards the west and runs along the line until it reaches Door No.
10-1-142. Thereafter, it turns towards the north and runs along the line until it
meets Door No. 10-1-42-1. From there, it turns towards the west and runs along
S.V. Nagar until it meets Door No. 10-1-1. |
|
West |
Starting from the above point, the line turns towards the North and runs along
Prakasam Road up to the National Highway (NH), and thereafter continues till it
meets Kakavedu–Mangadu Road. |
| 5 |
North |
Starting from the above point at Door No. 10-1-1, the boundary turns towards the
east and runs along the line until it meets Door No. 10-1-42-1 |
|
East |
Starting from the above point, the boundary turns towards the south until it meets
Door No. 10-1-42. Thereafter, it runs along the western boundary of Survey No.
236 until it meets Door No. 10-1-191. From there, the boundary turns towards the
east until it meets Door No. 10-1-205, and then turns towards the south until it
meets Door No. 10-1-207 |
|
South |
Starting from the above point, the boundary turns towards the west and runs along
Berry Street until it meets Prakasham Road. |
|
West |
Starting from the above point, the boundary turns towards the north until it meets
Door No. 10-1-1-10 |
| 6 |
North |
Starting from the above point at D.No. 10-7-10 on Beri Street, the line runs along
Beri Street till it reaches D.No. 10-1-231. |
|
East |
Starting from the above point, the line turns towards the South and runs along the
boundary line till it reaches D.No. 10-10-244/1. Thereafter, it turns towards the
East and runs along the boundary line till it reaches D.No. 10-10-253. The line
then turns towards the South and runs along the boundary line till it reaches D.No.
10-10-203. |
|
South |
Starting from the above point, the line turns towards the West and runs along
Nagalapuram Road till it reaches the Tower Clock. |
|
West |
Starting from the above point, the line turns towards the North and runs along
Prakasam Road till it reaches D.No. 10-7-10. |
| 7 |
North |
Starting from the above point at the North-West Corner of Survey No. 245, the
line runs along the Eastern Boundary of Survey No. 242 till it reaches the South-
East Corner of Survey No. 214. |
|
East |
Starting from the above point, the line turns towards the South and runs along the
NH Road till it reaches D.No. 10-10-269/12. Thereafter, it turns and runs along
the boundary line till it reaches D.No. 10-12-122/13. The line then turns towards
the South and continues along the boundary line till it reaches D.No. 10-10-
254/A. |
|
South |
Starting from the above point, the line turns towards the West and runs along the
boundary line till it reaches D.No. 10-10-263. |
|
West |
Starting from the above point, the line turns towards the North and runs along the
Western Boundaries of Survey Nos. 251 and 245 till it reaches the North-West
Corner of Survey No. 245. |
| 8 |
North |
The boundary starts from Survey No. 160 and the line turns towards the East and
runs along the Kaluva till it reaches the North-East Corner of Survey No. 197. |
|
East |
Starting from the above point, the line turns towards the South and runs along
Indiramma Layout Road till it meets Nagalapuram Road. It then turns towards the
West and runs along the road till it reaches D.No. 2-1-55. Thereafter, the line
turns towards the East till it reaches D.No. 2-1-44. The line then turns towards the
South and runs along the boundary line till it reaches D.No. 2-1-94, and thereafter
turns towards the East till it reaches D.No. 2-1-95/C. From there, it turns towards
the South and runs along the boundary line till it meets the Kusasthali River. |
|
South |
Starting from the above point, the line turns towards the West and runs along the
Kusasthali River till it meets the Nagari–Tiruthani Road. |
|
West |
Starting from the above point, the line turns towards the North and runs along the
Nagari–Tiruthani Road
till it reaches the Tower Clock. Thereafter, it turns
towards the East and runs along Nagalapuram Road till it reaches D.No. 10-10-
203. The line then turns towards the North and runs along the boundary line till it
reaches D.No. 10-10-264/9. From there, it turns towards the East and runs along
the boundary line till it meets the NH Road. Thereafter, the line turns towards the
North and runs along the NH Road till it reaches D.No. 10-8-450/10, and then
continues up to the Kaluva in Survey No. 160. |
| 9 |
North |
The boundary starts from the South-East Corner of Survey No. 190, and the
boundary line turns towards the East and runs along the Northern Boundary of
Survey No. 172 till it reaches the North-East Corner of Survey No. 172. |
|
East |
Starting from the above point, the North-East Corner of Survey No. 172, the
boundary runs along the municipal boundary till it reaches the North-East Corner
of Survey No. 258. From there, the boundary turns Southwards and runs along the
municipal boundary till it reaches the Kushasthali River. |
|
South |
Starting from the above point, the boundary line turns towards the West and runs
along the Kushasthali River till it meets the boundary of Ward No. 8. |
|
West |
Starting from the above point, the boundary line turns towards the North and runs
along the Western Boundaries of Survey Nos. 205 and 204 till it reaches D.No. 2-
1-96/A. Thereafter, it turns towards the West and runs along the boundary line till
it reaches D.No. 2-1-95/A, and then turns towards the North till it reaches D.No.
2-1-94. The line then turns towards the West and runs along the boundary line till
it reaches D.No. 2-1-65/A. From there, it turns towards the North and runs along
Nagalapuram Road, and thereafter turns at Indiramma Layout Road till it reaches
the South-East Corner of Survey No. 190. |
| 10 |
North |
The boundary starts from the North-East Corner of Survey No. 157, and the line
turns towards the East and runs along the line till it meets D.No. 4-4-96/A, and
then turns towards the North and runs along the line till it meets D.No. 4-4-133,
and then turns towards the East and runs along the line till it meets Arakkonam
Road. Then it turns towards the North and runs along Arakkonam Road till it
meets MPP School, Keelapattu, and turns towards the East and runs along the line
till it meets the National Highway. Then it turns towards the North and runs along
the National Highway till it meets the Western Boundary of Survey No. 24, and
then turns towards the East and runs along the Kushasthali River till it meets the
North-East Corner of Survey No. 38. |
|
East& |
Starting from the above point, the Kusasthali River, i.e., at the North-East Corner |
|
south |
of Survey No. 38 of Keelapattu Revenue Village, the boundary proceeds towards
the South and runs along the municipal boundary till it meets the South-West
Corner of Survey No. 92 of Keelapattu Revenue Village at the southern municipal
boundary. |
|
West |
Starting from the above point, the line turns towards the North and runs along the
Western Boundary of Survey Nos. 92 and 91 till it meets the Chittoor–Thatchur
Expressway, and then turns towards the West and runs along the Chittoor–
Thatchur Expressway till it meets the Chennai–Tirupati National Highway. Then
it turns towards the North and runs along the National Highway till it meets the
South-East Corner of Survey No. 163 and then it turns towards the North and runs
along the line till it meets the North East corner of Survey No. 162, and then turns
towards the West and runs along the line till it meets the South-East Corner of
Survey No. 157. Then it turns towards the North and runs along the Eastern
Boundary of Survey No. 157 till it meets the North-East Corner of Survey No.
157. |
| 11 |
North |
The boundary starts from the North-West Corner of Survey No. 155, and the line
turns towards the East and runs along the Kusasthali River up to the North-East
Corner of Survey No. 157. Then it turns towards the South along the bottom of
Keelapattu Gutta, and then turns towards the East and runs along the line till it
meets the North-East Corner of Survey No. 162. |
|
East |
Starting from the above point, the North-East Corner of Survey No. 162 and runs
along the Eastern Boundary of Survey No.. 162 till it meet the Chittoor–Thatchur
Expressway. Then it turns towards the East and runs along the Chittoor–Thatchur
Expressway till it reaches the end of Suguna Nagar, and then turns towards the
South and runs along the line till it meets the South-East Corner of Survey No.
186. |
|
South |
Starting from the above point, the line turns towards the West and runs along the
Southern Municipal Boundary of Survey Nos. 186, 180, 120, 117, 116, 115, 114
and 113 till it meets the South-West Corner of Survey No. 113 of Netham
Kandriga Revenue Village. |
|
West |
Starting from the above point, the line turns towards the North and runs along the
Western Boundary of Survey Nos. 113, 131, 132, 133, 138, 151, 153 and 154 till
it meets the North-West Corner of Survey No. 155. |
| 12 |
North |
The boundary starts from the western boundary of survey number 265 and then
turn towards east and runs along the kusasthali river till it meets at Arakkonam
road and runs along the line till it meets at national highway. |
|
East |
Starting from the above point at the NH near Keelapattu Mother Teresa Nagar,
the line turns towards the South and runs along the line till it meets the South-East
Corner of Survey No. 18 of Keelapattu Revenue Village. |
|
South |
Starting from the above point, the line turns towards the West and runs along the
line till it meets near MPP School, Keelapattu, at Arakkonam Road. Then it turns
towards the South and runs along Arakkonam Road till it meets D.No. 4-4-115.
Then it turns towards the West and runs along the line till it meets D.No. 4-4-133.
Then it turns towards the South and runs along the line till it meets D.No. 4-4-
96/A. Then it turns towards the West and runs along Keelapattu Gutta till it meets
Anjaneya Swamy Temple and then turn towards north and runs along the line till
it meets at railway track. |
|
West |
Starting from the above point the line turn towards north and runs along the |
|
|
railway track till it meets at western boundary of survey number 265. |
| 13 |
North |
The boundary starts from the Mosiq and Pallipattu Road Junction, and the
boundary turns towards the East along Pallipattu Main Road till it reaches the
Tower Clock Junction. |
|
East |
Starting from the above point at the Pallipattu Road and Thiruthani Road Junction
(Tower Clock), the line turns towards the South and runs along Thiruthani Road
till the end of the Kusasthali River. |
|
South |
Starting from the above point, the line turns towards the West and runs along the
Kusasthali River till it meets Ramanaidu Colony Main Road. |
|
West |
Starting from the above point, the boundary turns towards the North and runs
along Ramanaidu Colony up to Ram Nagar B 1st Street, and turns towards the
West and runs along the road till D.No. 10-9-322. Then it turns towards the North
and runs along the road till Indira Nagar Down Point, and then turns towards the
West and runs along the street till Burial Ground Street. Then it turns towards the
North and runs along the road till Indira Nagar Road, and then turns towards the
East and runs along Indira Nagar Road till D.No. 9-11-38. Then it turns towards
the North and runs along Mosque Street till Pallipattu Road. |
| 14 |
North |
The boundary starts from the Eastern Building of Kalaignar Street, D.No. 9-10-
22, and the line turns towards the East and runs along Pallipattu Main Road till
Mosiq Street starts. |
|
East |
Starting from the above point at the Pallipattu Road and Mosque Street Junction,
the line turns towards the South and runs along Mosque Street till it meets Indira
Nagar Road, and turns towards the West and runs along Indira Nagar Road till it
meets Burial Ground Street. Then it turns towards the South and runs along the
street till Ram Nagar A Opposite Street Road Line, and turns towards the East and
runs along the street till D.No. 10-9-240/1. Then it turns towards the South and
runs along the road till D.No. 10-9-322, and then turns towards the East and runs
along Ram Nagar B 1st Street till Ramanaidu Colony Road. Then it turns towards
the South and runs along the road till it meets the Kusasthali River. |
|
South |
Starting from the above point, the boundary line turns towards the West and runs
along the boundary line up to Ramnagar - C 3rd Street. From there, it turns
towards the North and runs along the boundary line till it meets the Mosque. It
then turns towards the West and runs along the boundary line till it meets the
backside of the factory. |
|
West |
Starting from the above point, the line turns towards the North and runs along the
Western Boundary of Ram Nagar A, B and C till it meets Bhavani Nagar Road.
Then it turns towards the East and runs along Bhavani Nagar Road till it meets
Kalainyar Nagar Road, Eastern Side, D.No. 9-10-22. Then it turns towards the
North and runs along the line till it meets Pallipattu Road. |
| 15 |
North |
The boundary starts from D.No. 9-2-36/1, Shanthi Theatre, and the boundary
turns towards the East and runs along Pallipattu Main Road till Kalaignar Street,
Eastern Building, D.No. 9-2-91. |
|
East |
Starting from the above point at Pallipattu Main Road, D.No. 9-2-92, the line
turns towards the South and runs along the line till Kalaignar Road, South-East
Building. |
|
South |
Starting from the above point, the boundary line turns towards the West and runs
along Bhavani Nagar Hospital Road till it meets Arasamanu Street. From there, it
turns towards the South and runs up to Bangaru Street. It then turns towards the |
|
|
West and runs along the street till it meets Salvapattu Road and continues along
Salvapattu Road till it meets BTM Street, at the first building bearing Door No. 9-
1-1. |
|
West |
Starting from the above point, the boundary turns towards the North and runs
along the street till it meets Pallipattu Main Road. |
| 16 |
North |
Starting from the junction of NTR Nagar Road and Pallipattu Road, the boundary
line turns towards the East and runs along Pallipattu Main Road till it meets BTM
Street, at the starting street line near the building bearing Door No. 9-2-36. From
there, it turns towards the South and runs along BTM Street up to the first
building bearing Door No. 9-1-1. It then turns towards the East and runs along the
road and Bangaru Street Road till it meets Arasamanu Street Road. |
|
East |
Starting from the above point at Indira Nagar Road, D.No. 9-1-53/9, the line turns
towards the South till Ram Nagar A North Line Building, D.No. 10-9-299, Back
Side. |
|
South |
Starting from the above point, the boundary line turns towards the West and runs
along the Straight Factory. From there, it turns towards the South and runs along
the boundary line till it meets the Survey No. 217 boundary line. It then turns
towards the West and runs along the boundary line till it meets the factory. From
there, it turns towards the South and runs along the boundary line and then turns
towards the West, running along the southern side of Salvapatteda Road till it
meets the railway track. |
|
West |
Starting from the above point, the boundary line turns towards the North and runs
along the boundary line till it meets Salvapatteda Road. It then turns towards the
East and runs along the boundary line till it meets the Salvapatteda Road and
NTR Nagar Road junction. From there, it turns towards the North and runs along
NTR Nagar–Thoppayamma Road till it meets Pallipattu Main Road. |
| 17 |
North |
Starting from the southern side of Salvapatteda Road at the railway track, the
boundary line turns towards the East and runs along the boundary line till it meets
Bheema Nagar. From there, it turns towards the North and runs along the
boundary line till it meets the factory. It then turns towards the East and runs
along the boundary line till it meets the factory. From there, it turns towards the
South and runs along Ram nagar C Road. It then turns towards the East and runs
along the boundary line till it meets the Kushasthali River. |
|
East |
Starting from the above point at the Ram Nagar A Dying Unit, Survey Nos. 217
and 218 Meeting Line, the line turns towards the South and runs straight along the
Western Boundary of Ram Nagar B and C till the Kusasthali River ends. |
|
South |
Starting from the above point, the boundary turns towards the West and runs
along the Kusasthali River till it meets Railway Track Road, Survey No. 265. |
|
West |
Starting from the above point, the boundary turns towards the North and runs
along Railway Track Road till Salvapatteda Road. Then it turns towards the East
and runs along the back side of Salvapatteda Ramula Vari Gudi, and turns
towards the North and runs along NTR Nagar & Thoppamma Nagar Road till the
Northern Boundary of Salvapatteda. |
| 18 |
North |
The boundary starts from Pallipattu Main Road and Ellathamma Koil Junction,
and the line turns towards the East and runs along Pallipattu Main Road till it
meets NTR Nagar Road, by crossing the Railway Gate. |
|
East |
Starting from the above point, being the junction of Pallipattu Road and NTR |
|
|
Nagar Road, the boundary proceeds southwards along NTR Nagar Road up to its
junction with Salva Pattida Road. From there, it turns westwards and proceeds up
to the Railway Track. It then turns southwards and runs along the Railway Track
up to the south-eastern corner of Survey No. 264. |
|
South |
Starting from the above point, the boundary turns westwards and runs along the
Kusasthali River up to the southern side of Survey No. 275. |
|
West |
Starting from the above point, the boundary turns northwards and runs along
Thoppayamman Koil Street up to its junction with Prakash Nagar First Street.
From there, it turns eastwards and runs along Burial Ground Street up to Door
No. 5/4/28/6. It then turns westwards and runs along the boundary line up to Door
No. 5/4/13, and thereafter turns northwards up to the junction of Pallipattu Main
Road and Yella Tamman Koil. |
| 19 |
North |
The boundary starts from Nehru Street and Pallipattu Road Junction, and the line
turns towards the East along Pallipattu Road till it meets Ellathamma Temple
Street. |
|
East |
Starting from the above point at the Junction of Pallipattu Main Road and
Ellathamma Koil Street, the line turns towards the South at D.No. 5-4-13 and then
turns towards the East. It runs along the line till it meets Burial Ground Street at
D.No. 5-4-28/6. Then it turns towards the South and runs along Burial Ground
Street till it meets Kamaraj Street. |
|
South |
Starting from the above point, the line turns towards the West and runs along
Kamaraj Street till it meets Nehru Street. |
|
West |
Starting from the above point, the line turns towards the North along Nehru Street
till it meets Pallipattu Main Road. |
| 20 |
North |
The boundary starts from the Nehru Street and Kamaraj Street Junction, and the
line turns towards the East along Kamaraj Street till it meets Burial Ground
Street. |
|
East |
Starting from the above point at the Junction of Burial Ground Street and Kamaraj
Street, the line turns towards the South along Burial Ground Street till it meets
D.No. 5-7-33/5. |
|
South |
Starting from the above point, the line turns towards the West along the line till it
meets Nehru Street. |
|
West |
Starting from the above point, the line turns towards the North along Nehru Street
till it meets Kamaraj Street. |
| 21 |
North |
The boundary starts from Punniyamman Koil Street at Door No. 6-2-63/5 and
proceeds eastwards along Punniyamman Koil Street up to Door No. 6-3-2. |
|
East |
From the above point, the boundary proceeds southwards along Nehru Street up
to Door No. 6-3-91. From there, it proceeds eastwards along the boundary line up
to Thoppiyamman Koil Street, and then turns southwards and proceeds along the
boundary line up to the Kusasthali River. |
|
South |
From the above point, the boundary proceeds westwards along the Kusasthali
River up to the southern side of Survey No. 275. |
|
West |
From the above point, the boundary proceeds northwards along Survey Nos. 224
and 225 and reaches Door No. 6-2-63/5, thereby completing the boundary. |
| 22 |
North |
The boundary starts from the west corner of Sy.No.216 of Therani R. Village, and
the line turns towards east and runs along the Pallipattu Main Road till it meets at
Nehru Street Junction (Anganwadi School). |
|
East |
Starting from the above point, junction of Pallipattu Main Road and Nehru Street
Junction (Anganwadi School), and then turns towards south, runs along the Nehru
Street till it meets at D.No.6-2-1, and then turns towards west, runs along the
Ponniyamman Koil Street till it meets at D.No.6-2-63/5, and then turns towards
south till it meets at Kusasthali River. |
|
South |
Starting from the above point, the line turns towards west and runs along the
Kusasthali River till it meets at south-west corner of Sy.No.214. |
|
West |
Starting from the above point, the line turns towards north and runs along the
western boundary of Sy.Nos.213, 214 and till it meets the west corner of
Sy.No.216 of Therani Revenue Village. |
| 23 |
North |
The boundary starts from the western side of Survey No.140 of Satrawada
Revenue, Mitta Street up to Anna Street, and turns towards the north side till it
reaches Pallipattu Main Road, then proceeds towards the west side along the
northern side of Pallipattu Main Road up to Smasanam Road. |
|
East |
Starting from the above point, south-east Survey No.8 of Therani Revenue
Village, and passes through Mittapalem Road towards the south side till it reaches
Kusasthali River. |
|
South |
Then follows Survey No.8 of Therani Revenue Village along Kusasthali River till
it reaches Survey No.140 of Satrawada Revenue. |
|
West |
Then turns towards south along Smasanam Road and the western side of Survey
No.140 of Satrawada Revenue. |
| 24 |
North |
The boundary starts from Anna Street and then passes along Kamsali Street and
proceeds through Survey Nos.150, 151, 153 of Satrawada Revenue till it reaches
the starting point. |
|
East |
Starting from the above point, south-east Survey No.213, and eastern border of
Survey Nos.212, 211, 213 of Therani Revenue Village and eastern border of
Survey No.213. |
|
South |
Then turns towards the south side along Kusasthali River till it reaches
Mittapalem Road. |
|
West |
Then turns right side along Mittapalem Road up to Nadi Veedhi, passes through
Nadi Veedhi till it reaches Anna Street. |
| 25 |
North |
The boundary starts from Kusasthali River and ends at the western side of Survey
No.140 of Satrawada Revenue. |
|
East |
Starting from the above point, junction of Eguva Veedhi, and proceeds along
Eguva Veedhi. |
|
South |
Followed by Kusasthali River and ends at the western side of Survey No.140 of
Satrawada Revenue. |
|
West |
Then turns towards the north side along the western side of Survey Nos.129, 130,
131, 132, 133 of Satrawada Revenue up to Kusasthali River. |
| 26 |
North |
The boundary starts from the southern border of Survey No.101 of Satrawada
Revenue and runs towards the western border of Survey No.101 and runs along
the northern side of Survey No.101 till it reaches Survey No.74 of Adavikotturu
Revenue. |
|
East |
Starting from the above point, the north-east of Survey No.74 of Adavikotturu
Revenue Village, and turns towards south and runs along the eastern boundary of
Survey Nos.143, 189, 190, 190, 108, 187, 184, 183 and then turns towards west. |
|
South |
And runs along the southern boundary of Survey Nos.183, 169, 170, 160, |
|
|
159, 158 till it meets Adavi Kothuru Road and then turns towards |
|
West |
And passes along Adavi Kothuru up to reaching the southern border of Survey
No.101 of Satrawada Revenue. |
| 27 |
North |
The boundary starts from the supply channel of Sathrawada Cheruvu and then
follows the above channel and the western side of Survey Nos.158, 159, 160, 170
of Satrawada Revenue to the end point. |
|
East |
Starting from the above point, the line turns towards south and runs along the
south-east border of Survey No.153 of Satrawada Revenue. |
|
South |
Then turns towards the west side along the northern border of Survey Nos.150,
151, 153. |
|
West |
The boundary of this ward starts from Adavi Kothuru Road Junction, passes
through Chinna Street and Eswar Koil Street up to the supply channel of
Satrawada Cheruvu. |
| 28 |
North |
The boundary starts from the north-west corner of Sy.No.191, and the line turns
towards east and runs along the northern municipal boundary of Sy.No.188 till it
meets Sy.No.215 of Satrawada Revenue Village at the railway track. |
|
East |
Starting from the above point, the municipal boundary at Sy.No.215 of Satrawada
Revenue Village, that is, the railway track, and then turns towards south and runs
along the railway track till it meets the south-east corner of Sy.No.220, and runs
along the eastern boundary of Sy.Nos.224, 225, and then turns towards west and
runs along the southern boundary of Sy.Nos.225, 227 till it meets the south-east
corner of Sy.No.228, and then turns towards south and runs along the eastern
boundary of Sy.No.224, Karakantapuram boundary, till it meets Pallipattu Main
Road at D.No.6-4-101. |
|
South |
Starting from the above point, the line turns towards west and runs along
Pallipattu Main Road, Sy.Nos.228, 227, 218, 217, 210 till it meets the south-west
corner of Sy.No.176. |
|
West |
Starting from the above point, the line turns towards north and runs along the
western boundary of Sy.Nos.176, 174, 172 till it meets the north-west corner of
Sy.No.172, and then runs along the Karakantapuram boundary, Sy.Nos.172, 182,
237, 192, 237, 192 of Satrawada Revenue Village, till it meets the north-west
corner of Sy.No.191. |
| 29 |
North |
The boundary starts from the north-west corner of Kaluva, Sy.No.246 of
Satrawada Revenue Village, and the line turns towards east and then runs along
the northern boundary of Kaluva, Sy.Nos.246, 226 till it meets the north-east
corner of Sy.No.226. |
|
East |
Starting from the above point, north-east corner of Sy.No.226 of Satrawada
Revenue Village, and then turns towards south and runs along the eastern
boundary of Sy.Nos.226, 248 till it meets the south-west corner of Sy.No.2478,
and then turns towards east and runs along the line till it meets D.No.5-1-206, and
then turns towards south and runs along the line till it meets D.No.5-1-23, and
then turns towards west and runs along the line till it meets D.No.5-1-85, and then
turns towards south and runs along the line till it meets D.No.5-1-96, and then
turns towards west and runs along Rajeev Gandhi Street till it meets D.No.5-1-
130, and then turns towards south and runs along the line till it meets Ramar
Gudi, and turns towards west and runs along Ramar Gudi Street till it meets
D.No.5-1-192/2. |
|
South |
Starting from the above point, the line turns towards west and runs along |
|
|
Pallipattu Main Road till it meets the south-west corner of Sy.No.228 of Therani
Revenue Village. |
|
West |
Starting from the above point, the line turns towards north and runs in between
KVPR Peta area and Karakantapuram till it meets the Karakantapuram Ramar
Nagar Main Road, and then turns towards south and runs along the eastern
boundary of Sy.No.243,244 till it meets at the north-east corner of Sy.No.244,
Satrawada Revenue Village, and runs along the western boundary of Sy.No.246,
Satrawada Revenue Village, till it meets at the kaluva north-west corner of
Sy.No.246, Satrawada Revenue Village. |
| 30 |
North |
The boundary starts from the North-west corner of Sy.No.169 and the line turns
towards east and runs along the line till it meets the railway track. |
|
East |
Starting from the above point, the north-east corner of Sy.No.169, and then turns
towards south, runs along the eastern boundary of Sy.No.169,171,173,174,175 till
it meets at Pallipattu Main Road. |
|
South |
Starting from the above point, the line turns towards west and runs along the
Pallipattu Main Road till it meets at D.No.6-5-79, School Line Street. |
|
West |
Starting from the above point, the line turns towards north and runs along the
School Line Street till it meets at D.No.6-5-71, and then turns towards east and
runs along the line till it meets at Vinayaka Temple, and then turns towards north
and runs along the line till it meets at D.No.5-1-129/13, and then turns towards
east and runs along the line D.No.5-1-97, and then turns towards north and runs
along the line till it meets at D.No.5-1-87, and then turns towards east along the
line till it meets at D.No.5-1-23, and then turns towards north along the line till it
meets at D.No.5-1-206, and then turns towards west and runs along the southern
boundary of Sy.No.172 till it meets at the south-east corner of Sy.No.248, and
then
turns
towards north and
runs along
the western boundary of
Sy.No.172,171,169 till it meets at the north-west corner of Sy.No.169. |
| 31 |
North |
The boundary starts from the railway station with Sy.No.192, and the boundary
turns towards east with Sy.No.201 and 203, passing through Match Box Street till
the starting point of Chidambar Nagar 3rd Street,west side, with D.No.10-6-200/1 |
|
East |
Starting from the above point, west side of Chidambar Nagar 3rd Street starting
point with D.No.10-6-200/1, and then turns towards south up to New Street
starting point with D.No.9-6-76. |
|
South |
Starting from the above point, the line turns towards west and runs along the line
till it meets at D.No.9-4-34, and then turns towards north till it meets at D.No.9-7-
20, and then turns towards west and runs along the line till it meets at D.No.9-3-
111/2, and then turns towards south till it meets at Pallipattu Main Road, and then
turns towards west and runs along the Pallipattu Main Road till it meets at the
railway gate. |
|
West |
Starting from the above point, the boundary turns towards north and runs along
the railway station with Sy.No.192. |
| 32 |
North |
The boundary starts from Match Box Street and turns towards east and runs along
the line till it reaches D.No.9-7-19/1, and then turns towards south till it reaches
D.No.9-6-149, and turns towards east and runs along the line till it reaches
D.No.9-6-70. |
|
East |
Starting from the above point, New Street starting point with D.No.9-5-69, and
then turns towards south up to S.V. Koil Street starting point with D.No.10-9-
171/2, and then turns towards east and runs along the Rajeswari Theatre Street |
|
|
(Rajeswari Theatre) with D.No.10-9-185/1, and turns towards south till Pallipattu
Main Road. |
|
South |
Starting from the above point, the line turns towards west and runs along the
Pallipattu Main Road till BC Welfare Hostel with D.No.9-3-71. |
|
West |
Starting from the above point, the boundary turns towards north and runs along
Nagalamma Street up to New Street with D.No.154/15. |
| 33 |
North |
The boundary starts from Chinthamanu Street and the boundary turns towards
east along Talari Street and continues to Palaegaru Street starting point with
D.No.10-8-66. |
|
East |
Starting from the above point, Palaegaru Street starting point with D.No.10-5-69,
and then turns towards south up to Pallipattu Main Road junction near the bus
stand. |
|
South |
Starting from the above point, the line turns towards west and runs along the
Pallipattu Main Road till Rajeswari Theatre Street with D.No.10-9-157/1. |
|
West |
Starting from the above point, the boundary turns towards north up to Rajeswari
Theatre near D.No.10-9-185/1 and turns west and continues till S.V. Koil Street
starting point with D.No.10-9-171/2, and turns north till the end of Chinthamanu
Street. |
| 34 |
North |
The boundary starts from Chidambara Nagar 3rd Street, D.No.10-6-200/1, and the
boundary turns towards east along Padmavathi Nagar Street, joining Janapa
Street, Karmala Street, and continues till Prakasam Road with D.No.10-8-53. |
|
East |
Starting from the above point, Karmala Street with D.No.10-8-53, and then turns
towards south up to Palegaru Street starting point with D.No.10-8-66. |
|
South |
Starting from the above point, the line turns towards west and runs along the
Palegaru Street, joining Talari Street end point. |
|
West |
Starting from the above point, the boundary joins New Talari Street and turns
towards north up to Chidambar Nagar 3rd Street near D.No.10-6-200/1. |
| 35 |
North |
The boundary starts from Padmavathi Nagar, D.No.10-6-169, and the boundary
turns towards east along Padmavathi Nagar Street and continues till the Municipal
Office. |
|
East |
Starting from the above point, Municipal Office with door number, and then turns
towards south up to Karmala Street starting point with D.No.10-8-50. |
|
South |
Starting from the above point, the line turns towards west and runs along Karmala
Street, joining Janapa Street till New Talari Street line. |
|
West |
Starting from the above point, the boundary joins New Talari Street and turns
towards north up to Padmavathi Nagar near D.No.10-6-169. |
| 36 |
North |
The boundary starts from Kassim Kaluva north-west corner of Sy.No.121, and the
line
turns
towards
east
and
runs
along
the eastern boundary of
Sy.No.121,124,127,130,134 till it meets the National Highway. |
|
East |
Starting from the above point, north-east corner of Sy.No.133 Kaluva, then turns
towards south and runs along the National Highway up to Bypass Junction, and
runs along Prakasam Road till it meets at Guntakatta Street. |
|
South |
Starting from the above point, the boundary line turns towards the west and runs
along the western side of Padmavathi Nagar First Street until it reaches Door No.
10/6/188. It then turns towards the south and continues until it reaches Door No.
9/8/94. Thereafter, the boundary turns towards the west and runs along Old Baja
Kovil Street until it reaches Door No. 9/9/62. |
|
West |
Starting from the above point, the boundary line turns towards the north and runs |
|
|
along the line until it meets Kasimkalva. |
| 37 |
North |
The boundary line turns towards the east and runs along the line until it reaches
the MPP School. It then turns towards the north and proceeds along Chintamanu
Street until it reaches the south-west corner of Survey No. 272. Thereafter, the
boundary turns towards the north and runs along the line up to the municipal
boundary. Finally, it turns towards the east and continues along the line until it
meets the National Highway. |
|
East |
Starting from the above point, Municipal Boundary on the northern side and
north-east corner of Sy.No.82 of Nagari Revenue Village of Tirupati-Chennai
National Highway, then turns towards south and runs along the NH till it meets at
Kassim Kaluva. |
|
South |
Starting from the above point, the line turns towards west and runs along the
southern boundary of Sy.No.133,132,131,126,125,118,119 till it meets at the
south-west corner of Sy.No.119. |
|
West |
Starting from the above point, the boundary line turns towards the north and runs
along the western boundaries of Survey Nos. 260 and 257, passing through
Chintalapatteda Junction and Nagari Cheruvu. Thereafter, it turns towards the east
and continues until it reaches Door No. 11-1-37. |
| 38 |
North |
Starting from Bazaar Street Junction at Door No. 11/2/138, the boundary line
turns towards the east and runs along the lane until it reaches Door No. 11/3/47.
Thereafter, it turns towards the north and continues up to Door No. 11/6/143. The
boundary then turns towards the east and runs along Chintalapetta Main Road
until it reaches Chintamanu Road Junction. |
|
East |
Starting from the above point, the boundary line turns towards the south and runs
along Chintamanu Street until it reaches Door No. 11/7/68. |
|
South |
Starting from the above point, the boundary line turns towards the west and runs
along the line until it reaches Bazaar Street Junction, near Door Nos. 11/1/137. |
|
West |
Starting from the above point, the boundary line turns towards the north and runs
along the line until it reaches Door No. 11/2/138. |
| 39 |
North |
Starting from Door No. 11/5/88/1, the boundary line turns towards the east and
runs along the line until it reaches the ETP Plant. |
|
East |
Starting from the above point, the boundary line turns towards the south and runs
along the Main Road until it reaches Door No. 11/6/143. Thereafter, it continues
along the line up to Door No. 11/3/47. |
|
South |
Starting from the above point, the boundary line turns towards the west and runs
along the line until it reaches Door No. 11/2/138. |
|
West |
Starting from the above point, the boundary line turns towards the north and runs
along the line until it reaches Door No. 11/5/88/1. |
| 40 |
North |
The boundary starts from the north-west corner of Survey No. 244, and the line
turns towards the east and runs along the northern boundaries of Survey Nos. 244,
254, and 253 till it reaches the north-east corner of Survey No. 253. |
|
East |
Starting from the above point, the boundary line turns towards the south and runs
along the eastern boundary of Survey No. 253 and the northern boundary of
Survey No. 272 until it reaches the south-east corner of Survey No. 272. |
|
South |
Starting from the above point, the boundary line turns towards the west and runs
along Chintalapatteda Main Road until it reaches the backside of the ETP Plant.
Thereafter, it continues towards the west along the line until it reaches Door No. |
|
|
11/5/231. The boundary then turns towards the south and runs along the line until
it reaches the Cheruvu. Thereafter, it runs along the southern boundaries of
Survey Nos. 189, 187, and 218 until it meets the railway track. |
|
West |
Starting from the above point, the boundary line turns towards the north and runs
along the eastern boundaries of Survey Nos. 211, 212, and 216. Thereafter, it runs
along the municipal boundary until it reaches the north-west corner of Survey No.
244. |
Commissioner
NagariMunicipality
ఫారం(cid:3) - VI
(నిబం(cid:3)ధన 13)
నగరి పురంపాలక సం(cid:3)ఘం(cid:3)లోని వారం(cid:19)(cid:20) ల సంరిహద్దు(cid:19)(cid:23) ల పునరి(cid:24)భజన
ప్ర(cid:28)కటన
ఆం(cid:2)ధ్ర(cid:4)ప్ర(cid:6)దేశ్ ము(cid:11)న్సి(cid:13)పాలిటీస్ (ము(cid:11)న్సి(cid:13)పాలిటీలను(cid:11) వార్డు(cid:11)(cid:22) ల(cid:11)గా విభజిం(cid:2)చడం(cid:2)) న్సియమాల(cid:11), 1994లోన్సి న్సియము(cid:2) 4(1) ప్ర(cid:6)కార్డు(cid:2), ప్ర(cid:6)భ(cid:11)త్వం"(cid:2) జారీ చేసిను జిం.ఓ.ఎం(cid:2).ఎంస్. నెం(cid:2).31, ఎం(cid:2).ఏ. & య(cid:11).డి. (Elec-I), తేదీ: 03-02-1995 ఆంధార్డు(cid:2)గా, నుగరి పుర్డుపాలక సం(cid:2)ఘం(cid:2) వార్డు(cid:11)(cid:22) ల విభజనుక(cid:11) సం(cid:2)బం(cid:2)ధిం(cid:2)చి పా(cid:6) థమిక అధింసం<చను నెం(cid:2). 814/2026/G1, తేదీ: 05-09-2026 ద్వా"రా ప్రట్టAణ న్సివాసం(cid:11)ల ను(cid:11)(cid:2)డి అభC(cid:2)త్వంరాల(cid:11), సం<చనుల(cid:11) ఆంహ్వా"న్సి(cid:2)చబండినువి. ఆం(cid:2)ధ్ర(cid:4)ప్ర(cid:6)దేశ్ ము(cid:11)న్సి(cid:13)పాలిటీస్ (ము(cid:11)న్సి(cid:13)పాలిటీలను(cid:11) వార్డు(cid:11)(cid:22) ల(cid:11)గా విభజిం(cid:2)చడం(cid:2)) న్సియమాల(cid:11), 1994లోన్సి న్సియము(cid:2) 13 ప్ర(cid:6)కార్డు(cid:2), నుగరి పుర్డుపాలక సం(cid:2)ఘం ప్రరిధింలోన్సి 40 వార్డు(cid:11)(cid:22) ల సంరిహద్దు(cid:11)G ల విభజను (డీలిమిటేషన్) క్రింM(cid:2)ద్దు పేర్కొPనుQ విధ్ర(cid:2)గా ఖరార్డు(cid:11) చేయబండినుద్దున్సి నుగరి పుర్డుపాలక సం(cid:2)ఘం న్సివాసం(cid:11)ల(cid:2)ద్దురికీ ఇం(cid:2)ద్దు(cid:11)ము<ల(cid:2)గా తెలియజేయబండం(cid:11)చ(cid:11)నుQది.
| వారం
సం
ఖ్య |
సంరిహద్దు ల వివరంణ |
|
| (1) |
(2) |
|
| 1 |
ఉత్త%రం |
సంరిహద్దుG
సంర్వే" నెం.1 నుడి పా ర్డుభమై, త్వం<ర్డుZ వైపుక తిరిగి సంర్వే" నెం.3 యొకP ఉత్వం`ర్డు
సంరిహద్దుG
వెంట్ట కొనుసాగత్వం<,
నుగరి రెవెంను
|
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం, అనుగా నుగరి రెవెంను
|
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, డోర్ నెం. 10-1-194 మీద్దుగా
కొనుసాగత్వం< జాతీయ ర్డుహద్వారి నుద్దు కలసం` ది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి,
జాతీయ ర్డుహద్వారి వెంట్ట
కొనుసాగత్వం<,
నుగరి రెవెంను
|
| 2 |
ఉత్త%రం |
సంర్వే" నెం.1 యొకP వాయవC ము<ల నుడి సంరిహద్దుG
పా ర్డుభమై, మున్సి
ప్రల్ సంరిహద్దుG
వెంట్ట కొనుసాగత్వం<, కాకవేడం రెవెంను
|
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, సంర్వే" నెం.12, 45, 46, 47, 88, 90,
84 మురియ
81ల త్వం<ర్డుZ సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< డోర్ నెం.1/1/50 వర్డుక
చేర్డుత్వంది. అకPడి నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక కొనుసాగత్వం< కాకవేడం రోడం
వెంట్ట
వెంళుtత్వంది. అనుత్వంర్డు త్వం<ర్డుZ వైపుక తిరిగి సంర్వే" నెం.113 యొకP ఉత్వం`ర్డు సంరిహద్దుG
వర్డుక
చేర్డుత్వంది. అకPడి నుడి ద్దుక్షిణ వైపుక తిరిగి, సంర్వే" నెం.113, 112 మురియ 163 ల
త్వం<ర్డుZ సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< డోర్ నెం.1/4/28 వర్డుక చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, డోర్ నెం.1-4-29/12 వర్డుక
కొనుసాగత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి,
డోర్ నెం.1-4-6-9 వర్డుక
కొనుసాగత్వంది. అకPడి నుడి త్వం<ర్డుZ వైపుక తిరిగి, సంర్వే" నెం.163లోన్సి కాకవేడం చెర్డువు
సంరిహద్దుG
వర్డుక కొనుసాగత్వంది. అనుత్వంర్డు ప్రడంముర్డు వైపుక తిరిగి, కాకవేడం మెయిన్
రోడం
వెంట్ట కొనుసాగత్వం< జాతీయ ర్డుహద్వారిన్సి కలసం` ది. అకPడి నుడి ఉత్వం`ర్డు వైపుక
తిరిగి, జాతీయ ర్డుహద్వారి వెంట్ట కొనుసాగత్వం< డోర్ నెం.10-14-200/1 వర్డుక చేర్డుత్వంది.
అకPడి నుడి త్వం<ర్డుZ వైపుక తిరిగి,
సంర్వే" నెం.77 యొకP ఉత్వం`ర్డు సంరిహద్దుG
వర్డుక
కొనుసాగత్వంది. అనుత్వంర్డు ఉత్వం`ర్డు వైపుక తిరిగి, సంర్వే" నెం.74, 73, 72, 63, 62, 61
మురియ 60 ల ప్రడంముర్డు సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< సంర్వే" నెం.60 యొకP వాయవC
ము<లక చేర్డుత్వంది. అకPడి నుడి ప్రడంముర్డు వైపుక తిరిగి, సంర్వే" నెం.9 మురియ 8ల
ద్దుక్షిణ సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< సాయి బాబా టెంపుల్ రోడం ను కలసం` ది.
అనుత్వంర్డు ఉత్వం`ర్డు వైపుక తిరిగి, సంర్వే" నెం.8, 7, 6, 5, 12, 4, 3 మురియ 1 ల ప్రడంముర్డు
సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం<,
చివర్డుక సంర్వే" నెం.1 యొకP వాయవC ము<లక
చేర్డుత్వంది. |
| 3 |
ఉత్త%రం |
సంర్వే" నెం.13 యొకP వాయవC ము<ల నుడి సంరిహద్దుG
పా ర్డుభమై, త్వం<ర్డుZ వైపుక తిరిగి
మున్సి
ప్రల్ సంరిహద్దుG
వెంట్ట కొనుసాగత్వం<,
సంర్వే" నెం.13
యొకP ఈశానుC ము<లక
చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
మున్సి
ప్రల్ సంరిహద్దుG
వెంట్ట కొనుసాగత్వం<, సంర్వే" నెం.13
యొకP ఈశానుC ము<ల నుడి సంర్వే" నెం.171 యొకP ఆంగ్నేQయ ము<ల వర్డుక చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, సంర్వే" నెం.171 యొకP ద్దుక్షిణ
సంరిహద్దుG
వెంట్ట కొనుసాగత్వం< ద్వాన్సి నైర్డుతి ము<లక చేర్డుత్వంది. అకPడి నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి,
సంర్వే" నెం.174 మురియ
190 ల త్వం<ర్డుZ సంరిహద్దుG ల వెంట్ట
కొనుసాగత్వం< సంర్వే" నెం.190 యొకP ఈశానుC ము<లక చేర్డుత్వంది. అకPడి నుడి ప్రడంముర్డు
వైపుక తిరిగి, సంర్వే" నెం.190, 189, 188, 184, 185 మురియ 160ల ద్దుక్షిణ సంరిహద్దుG ల వెంట్ట
కొనుసాగత్వం<, సంర్వే" నెం.160 యొకP నైర్డుతి ము<లక చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, సంర్వే" నెం.161 యొకP ప్రడంముర్డు
సంరిహద్దుG
వెంట్ట కొనుసాగత్వం<,
సంర్వే" నెం.161 యొకP వాయవC ము<లక చేర్డుత్వంది.
అకPడి నుడి ప్రడంముర్డు వైపుక తిరిగి,
సంర్వే" నెం.162 యొకP ద్దుక్షిణ సంరిహద్దుG
వెంట్ట
కొనుసాగత్వంది.
అనుత్వంర్డు ఉత్వం`ర్డు వైపుక తిరిగి,
చెర్డువు సంర్వే" నెం.163
వెంట్ట
కొనుసాగత్వం< కాకవేడం–ముగాడం రోడం ను చేర్డుత్వంది.
అకPడి నుడి సంర్వే" నెం.112
మురియ
113ల త్వం<ర్డుZ సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< కాకవేడం మెయిన్ రోడం ను
చేర్డుత్వంది. అనుత్వంర్డు ఉత్వం`ర్డు వైపుక తిరిగి, కాకవేడం మెయిన్ రోడం
వెంట్ట కొనుసాగత్వం<
సంర్వే" నెం.123 యొకP ప్రడంముర్డు సంరిహద్దుG క చేర్డుత్వంది. అకPడి నుడి ఉత్వం`ర్డు వైపుక
కొనుసాగత్వం<, సంర్వే" నెం.123, 82, 83, 91, 41, 44 మురియ 43ల ప్రడంముర్డు సంరిహద్దుG ల వెంట్ట
కొనుసాగి, చివర్డుక సంర్వే" నెం.13 యొకP వాయవC ము<లక చేర్డుత్వంది. |
| 4 |
ఉత్త%రం |
సంర్వే" నెం.89 యొకP వాయవC ము<ల నుడి సంరిహద్దుG
పా ర్డుభమై, త్వం<ర్డుZ వైపుక తిరిగి,
సంర్వే" నెం.89 మురియ 145ల ఉత్వం`ర్డు సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< సంర్వే" నెం.146 యొకP
ఈశానుC ము<లక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ సంర్వే" నెం.146 యొకP ఈశానుC ము<ల నుడి సంరిహద్దుG
సంర్వే" నెం.143 నుడి
147 వర్డుక ఉనుQ త్వం<ర్డుZ సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం<, సంర్వే" నెం.147 యొకP ఆంగ్నేQయ
ము<లక చేర్డుత్వంది. అకPడి నుడి ప్రడంముర్డు వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట డోర్ నెం.
10-4-6-9 వర్డుక కొనుసాగత్వంది. అనుత్వంర్డు ద్దుక్షిణ వైపుక తిరిగి, సంర్వే" నెం.97 మురియ
98ల త్వం<ర్డుZ సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< డోర్ నెం.1-4-29/1 వర్డుక చేర్డుత్వంది. అకPడి
నుడి త్వం<ర్డుZ వైపుక తిరిగి, సంర్వే" నెం.162 యొకP ద్దుక్షిణ సంరిహద్దుG
వెంట్ట కొనుసాగత్వం<
సంర్వే" నెం.150 యొకP ఈశానుC ము<లక చేర్డుత్వంది. అనుత్వంర్డు ద్దుక్షిణ వైపుక తిరిగి, సంర్వే" |
|
|
నెం.150, 151 మురియ 152ల త్వం<ర్డుZ సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< జాతీయ ర్డుహద్వారి
(NH)ను కలసం` ది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, సంర్వే" నెం.242 మురియ 236ల
త్వం<ర్డుZ సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< డోర్ నెం.10-1-205 వర్డుక చేర్డుత్వంది.
అకPడి
నుడి ప్రడంముర్డు వైపుక సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< డోర్ నెం.10-1-191 వర్డుక
చేర్డుత్వంది. అనుత్వంర్డు ఉత్వం`ర్డు వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< డోర్ నెం.1-
1-10-1-169 వర్డుక చేర్డుత్వంది. అకPడి నుడి ప్రడంముర్డు వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< డోర్ నెం.10-1-142 వర్డుక చేర్డుత్వంది.
అనుత్వంర్డు ఉత్వం`ర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< డోర్ నెం.10-1-42-1 వర్డుక చేర్డుత్వంది. అకPడి నుడి
ప్రడంముర్డు వైపుక తిరిగి,
ఎంస్.వి.
నుగర్ వెంట్ట కొనుసాగత్వం< డోర్ నెం.10-1-1 వర్డుక
చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, ప్రకాశం రోడం
వెంట్ట జాతీయ
ర్డుహద్వారి (NH) వర్డుక కొనుసాగత్వంది. అకPడి నుడి మురిత్వం ఉత్వం`ర్డు వైపుక కొనుసాగత్వం<
కాకవేడం–ముగాడం రోడం ను కలసం` ది. |
| 5 |
ఉత్త%రం |
పై పేర్కొPనుQ డోర్ నెం.10-1-1 నుడి సంరిహద్దుG
త్వం<ర్డుZ వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< డోర్ నెం.10-1-42-1 వర్డుక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి డోర్ నెం.10-1-42 వర్డుక
చేర్డుత్వంది. అకPడి నుడి సంర్వే" నెం.236 యొకP ప్రడంముర్డు సంరిహద్దుG
వెంట్ట కొనుసాగత్వం<
డోర్ నెం.10-1-191 వర్డుక చేర్డుత్వంది. అకPడి నుడి త్వం<ర్డుZ వైపుక తిరిగి డోర్ నెం.10-1-
205
వర్డుక చేరి,
అనుత్వంర్డు ద్దుక్షిణ వైపుక తిరిగి డోర్ నెం.10-1-207
వర్డుక
కొనుసాగత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, బేరి వీధిం వెంట్ట కొనుసాగత్వం<
ప్రకాశం రోడం ను కలసం` ది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, కొనుసాగత్వం< డోర్ నెం.10-1-1-
10 వర్డుక చేర్డుత్వంది. |
| 6 |
ఉత్త%రం |
పై పేర్కొPనుQ బేరి వీధిం లోన్సి డోర్ నెం.10-7-10 నుడి సంరిహద్దుG
బేరి వీధిం వెంట్ట కొనుసాగత్వం<
డోర్ నెం.10-1-231 వర్డుక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< డోర్ నెం.10-10-244/1 వర్డుక చేర్డుత్వంది.
అకPడి నుడి త్వం<ర్డుZ వైపుక
తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< డోర్ నెం.10-10-253 వర్డుక చేర్డుత్వంది. అనుత్వంర్డు
ద్దుక్షిణ వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< డోర్ నెం.10-10-203 వర్డుక
చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
నాగలాపుర్డు రోడం
వెంట్ట
కొనుసాగత్వం< ట్టవర్ కా క్ వర్డుక చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, ప్రకాశం రోడం
వెంట్ట కొనుసాగత్వం<
డోర్ నెం.10-7-10 వర్డుక చేర్డుత్వంది. |
| 7 |
ఉత్త%రం |
పై పేర్కొPనుQ సంర్వే" నెం.245 యొకP వాయవC ము<ల నుడి సంరిహద్దుG
సంర్వే" నెం.242 యొకP
త్వం<ర్డుZ సంరిహద్దుG
వెంట్ట కొనుసాగత్వం<, సంర్వే" నెం.214 యొకP ఆంగ్నేQయ ము<లక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, జాతీయ ర్డుహద్వారి (NH Road)
వెంట్ట కొనుసాగత్వం< డోర్ నెం.10-10-269/12 వర్డుక చేర్డుత్వంది. అకPడి నుడి సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< డోర్ నెం.10-12-122/13 వర్డుక చేర్డుత్వంది. అనుత్వంర్డు ద్దుక్షిణ
వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< డోర్ నెం.10-10-254/A వర్డుక చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< డోర్ నెం.10-10-263 వర్డుక చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, సంర్వే" నెం.251 మురియ 245ల
ప్రడంముర్డు సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం<,
చివర్డుక సంర్వే" నెం.245 యొకP వాయవC
ము<లక చేర్డుత్వంది. |
| 8 |
ఉత్త%రం |
సంర్వే" నెం.160
నుడి సంరిహద్దుG
పా ర్డుభమై,
త్వం<ర్డుZ వైపుక తిరిగి కాలవ వెంట్ట
కొనుసాగత్వం<, సంర్వే" నెం.197 యొకP ఈశానుC ము<లక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, ఇందిర్డుము లేఅవుట్ రోడం
వెంట్ట
కొనుసాగత్వం< నాగలాపుర్డు రోడం ను కలసం` ది. అకPడి నుడి ప్రడంముర్డు వైపుక తిరిగి, రోడం
వెంట్ట కొనుసాగత్వం< డోర్ నెం.2-1-55 వర్డుక చేర్డుత్వంది. అకPడి నుడి త్వం<ర్డుZ వైపుక
తిరిగి, డోర్ నెం.2-1-44 వర్డుక చేర్డుత్వంది. అనుత్వంర్డు ద్దుక్షిణ వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ
వెంట్ట కొనుసాగత్వం< డోర్ నెం.2-1-94 వర్డుక చేర్డుత్వంది. అకPడి నుడి త్వం<ర్డుZ వైపుక
తిరిగి, డోర్ నెం.2-1-95/C వర్డుక చేర్డుత్వంది. అకPడి నుడి ద్దుక్షిణ వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< క<సంసంలి నుదిన్సి కలసం` ది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
కశంసంలి నుది వెంట్ట
కొనుసాగత్వం< నుగరి–తిర్డుత్వం`ణి రోడం ను కలసం` ది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, నుగరి–తిర్డుత్వం`ణి రోడం
వెంట్ట
కొనుసాగత్వం< ట్టవర్ కా క్ వర్డుక చేర్డుత్వంది.
అకPడి నుడి త్వం<ర్డుZ వైపుక తిరిగి,
నాగలాపుర్డు రోడం
వెంట్ట కొనుసాగత్వం< డోర్ నెం.10-10-203 వర్డుక చేర్డుత్వంది. అనుత్వంర్డు
ఉత్వం`ర్డు వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< డోర్ నెం.10-10-264/9 వర్డుక
చేర్డుత్వంది.
అకPడి నుడి త్వం<ర్డుZ వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం<
జాతీయ ర్డుహద్వారి (NH Road)ను కలసం` ది. అనుత్వంర్డు ఉత్వం`ర్డు వైపుక తిరిగి, జాతీయ
ర్డుహద్వారి వెంట్ట కొనుసాగత్వం< డోర్ నెం.10-8-450/10 వర్డుక చేర్డుత్వంది. అకPడి నుడి సంర్వే"
నెం.160లోన్సి కాలవ వర్డుక కొనుసాగత్వంది. |
| 9 |
ఉత్త%రం |
సంర్వే" నెం.190 యొకP ఆంగ్నేQయ ము<ల నుడి సంరిహద్దుG
పా ర్డుభమై, త్వం<ర్డుZ వైపుక తిరిగి,
సంర్వే" నెం.172 యొకP ఉత్వం`ర్డు సంరిహద్దుG
వెంట్ట కొనుసాగత్వం<, సంర్వే" నెం.172 యొకP ఈశానుC
ము<లక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ సంర్వే" నెం.172 యొకP ఈశానుC ము<ల నుడి సంరిహద్దుG
మున్సి
ప్రల్ సంరిహద్దుG
వెంట్ట కొనుసాగత్వం<, సంర్వే" నెం.258 యొకP ఈశానుC ము<లక చేర్డుత్వంది. అకPడి నుడి
ద్దుక్షిణ వైపుక తిరిగి, మున్సి
ప్రల్ సంరిహద్దుG
వెంట్ట కొనుసాగత్వం< , కశంసంలి నుదిన్సి చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
కశంసంలి నుది వెంట్ట
కొనుసాగత్వం< వార్డు
నెం.8 సంరిహద్దుG ను కలసం` ది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, సంర్వే" నెం.205 మురియ 204ల
ప్రడంముర్డు సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< డోర్ నెం.2-1-96/A వర్డుక చేర్డుత్వంది. అకPడి
నుడి ప్రడంముర్డు వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< డోర్ నెం.2-1-95/A వర్డుక
చేర్డుత్వంది. అనుత్వంర్డు ఉత్వం`ర్డు వైపుక తిరిగి డోర్ నెం.2-1-94 వర్డుక చేర్డుత్వంది. అకPడి
నుడి ప్రడంముర్డు వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< డోర్ నెం.2-1-65/A వర్డుక
చేర్డుత్వంది. అకPడి నుడి ఉత్వం`ర్డు వైపుక తిరిగి, నాగలాపుర్డు రోడం
వెంట్ట కొనుసాగత్వంది.
అనుత్వంర్డు ఇందిర్డుము లేఅవుట్ రోడం
వద్దుG త్వం<ర్డుZ వైపుక తిరిగి, చివర్డుక సంర్వే" నెం.190
యొకP ఆంగ్నేQయ ము<లక చేర్డుత్వంది. |
| 10 |
ఉత్త%రం |
సంర్వే" నెం.157 యొకP ఈశానుC ము<ల నుడి సంరిహద్దుG
పా ర్డుభమై, త్వం<ర్డుZ వైపుక తిరిగి
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< డోర్ నెం.4-4-96/A వర్డుక చేర్డుత్వంది. అకPడి నుడి
ఉత్వం`ర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< డోర్ నెం.4-4-133 వర్డుక |
|
|
చేర్డుత్వంది.
అకPడి నుడి త్వం<ర్డుZ వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం<
అర్డుక్కోPణ రోడం ను కలసం` ది. అనుత్వంర్డు ఉత్వం`ర్డు వైపుక తిరిగి, అర్డుక్కోPణ రోడం
వెంట్ట
కొనుసాగత్వం< కీళుప్రట్టA
MPP సం
|
|
త్త&రం'
&
ద్దుక్షిణ |
పై పేర్కొPనుQ కశంసంలి నుది వద్దుG, అనుగా కీళుప్రట్టA
రెవెంను
|
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, సంర్వే" నెం.92 మురియ 91ల
ప్రడంముర్డు సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< చిత్వం<`
ర్డు–త్వంచ<ర్
ఎంక్
ప్రెస్ వేను
కలసం` ది.అకPడి నుడి ప్రడంముర్డు వైపుక తిరిగి,
చిత్వం<`
ర్డు–త్వంచ<ర్ ఎంక్
ప్రెస్ వే వెంట్ట
కొనుసాగత్వం< చెనై–తిర్డుప్రతి జాతీయ ర్డుహద్వారిన్సి కలసం` ది. అనుత్వంర్డు ఉత్వం`ర్డు వైపుక
తిరిగి, జాతీయ ర్డుహద్వారి వెంట్ట కొనుసాగత్వం< సంర్వే" నెం.163 యొకP ఆంగ్నేQయ ము<లక
చేర్డుత్వంది.అకPడి నుడి ముళ్లీ ఉత్వం`ర్డు వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం<
సంర్వే" నెం.162 యొకP ఈశానుC ము<లక చేర్డుత్వంది. అనుత్వంర్డు ప్రడంముర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< సంర్వే" నెం.157
యొకP ఆంగ్నేQయ ము<లక
చేర్డుత్వంది.అకPడి నుడి ఉత్వం`ర్డు వైపుక తిరిగి, సంర్వే" నెం.157 యొకP త్వం<ర్డుZ సంరిహద్దుG
వెంట్ట కొనుసాగత్వం<, చివర్డుక సంర్వే" నెం.157 యొకP ఈశానుC ము<లక చేర్డుత్వంది. |
| 11 |
ఉత్త%రం |
సంర్వే" నెం.155 యొకP వాయవC ము<ల నుడి సంరిహద్దుG
పా ర్డుభమై, త్వం<ర్డుZ వైపుక తిరిగి
కశంసంలి నుది వెంట్ట కొనుసాగత్వం< సంర్వే" నెం.157 యొకP ఈశానుC ము<లక చేర్డుత్వంది.
అకPడి నుడి ద్దుక్షిణ వైపుక తిరిగి, కీళుప్రట్టA
గట్టA దిగవ భాగ వెంట్ట కొనుసాగత్వంది.
అనుత్వంర్డు త్వం<ర్డుZ వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< సంర్వే" నెం.162 యొకP
ఈశానుC ము<లక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ సంర్వే" నెం.162 యొకP ఈశానుC ము<ల నుడి సంరిహద్దుG
సంర్వే" నెం.162 యొకP
త్వం<ర్డుZ సంరిహద్దుG
వెంట్ట కొనుసాగత్వం< చిత్వం<`
ర్డు–త్వంచ<ర్ ఎంక్
ప్రెస్ వేను కలసం` ది. అకPడి
నుడి త్వం<ర్డుZ వైపుక తిరిగి, చిత్వం<`
ర్డు–త్వంచ<ర్ ఎంక్
ప్రెస్ వే వెంట్ట కొనుసాగత్వం< సంగణా
నుగర్ చివరి వర్డుక చేర్డుత్వంది.అకPడి నుడి ద్దుక్షిణ వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< సంర్వే" నెం.186 యొకP ఆంగ్నేQయ ము<లక చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, సంర్వే" నెం.186, 180, 120, 117,
116, 115, 114 మురియ 113ల ద్దుక్షిణ మున్సి
ప్రల్ సంరిహద్దుG
వెంట్ట కొనుసాగత్వం<, నెంత్వం`
కడిగ రెవెంను
|
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, సంర్వే" నెం.113, 131, 132, 133,
138, 151, 153 మురియ 154ల ప్రడంముర్డు సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం<, చివర్డుక సంర్వే"
నెం.155 యొకP వాయవC ము<లక చేర్డుత్వంది. |
| 12 |
ఉత్త%రం |
సంరిహద్దుG
సంర్వే" నుబంర్ 265 యొకP ప్రడంముర్డు వైపు నుడి పా ర్డుభమై, అకPడి నుడి
త్వం<ర్డుZ వైపుక తిరిగి కసంసంలి నుది వెంట్ట ఆంర్డుక్కోPణ ర్డుహద్వారి వర్డుక కొనుసాగత్వంది.
అకPడి నుడి ఆం ర్డుహద్వారి వెంట్ట కొనుసాగత్వం< జాతీయ ర్డుహద్వారి
(National
Highway వర్డుక చేర్డుత్వంది.
) |
|
త్త&రం' |
పై పేర్కొPనుQ కీళుప్రట్టA
ముద్దుర్ థెరిసా నుగర్ సంమీప్రలోన్సి జాతీయ ర్డుహద్వారి (NH) నుడి
సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< కీళుప్రట్టA
రెవెంను
|
|
|
గా
e ములోన్సి సంర్వే" నెం.18 యొకP ఆంగ్నేQయ ము<లక చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< కీళుప్రట్టA
MPP సం
|
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి ఉత్వం`ర్డు వైపుక తిరిగి, రైలే" ట్రా£ క్ వెంట్ట కొనుసాగత్వం< సంర్వే" నుబంర్
265 యొకP ప్రడంముర్డు సంరిహద్దుG
వర్డుక చేర్డుత్వంది |
| 13 |
ఉత్త%రం |
ముసీద్దు మురియ ప్రలిప్రట్టA
రోడం
జక్షన్ నుడి సంరిహద్దుG
పా ర్డుభమై, ప్రలిప్రట్టA
మెయిన్
రోడం
వెంట్ట త్వం<ర్డుZ వైపుక కొనుసాగత్వం< ట్టవర్ కా క్ జక్షన్ వర్డుక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రలిప్రట్టA
రోడం
మురియ తిర్డుత్వం`ణి రోడం
జక్షన్ (ట్టవర్ కా క్) నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి,
తిర్డుత్వం`ణి రోడం
వెంట్ట కొనుసాగత్వం< కశంసంలి నుది చివరి వర్డుక
చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
కశంసంలి నుది వెంట్ట
కొనుసాగత్వం< రాము నాయడం కాలనీ మెయిన్ రోడం ను కలసం` ది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, రాము నాయడం కాలనీ వెంట్ట
రామ్ నుగర్ B1 వ వీధిం వర్డుక కొనుసాగత్వంది. అకPడి నుడి ప్రడంముర్డు వైపుక తిరిగి, రోడం
వెంట్ట కొనుసాగత్వం< డోర్ నెం.10-9-322 వర్డుక చేర్డుత్వంది. అకPడి నుడి ఉత్వం`ర్డు వైపుక
తిరిగి,
రోడం
వెంట్ట కొనుసాగత్వం< ఇందిరా నుగర్ డౌన్ పాయిట్ వర్డుక చేర్డుత్వంది.
అనుత్వంర్డు ప్రడంముర్డు వైపుక తిరిగి, వీధిం వెంట్ట కొనుసాగత్వం< బంరియల్ గ్రౌంeడ్ వీధిం వర్డుక
చేర్డుత్వంది. అకPడి నుడి ఉత్వం`ర్డు వైపుక తిరిగి, రోడం
వెంట్ట కొనుసాగత్వం< ఇందిరా నుగర్
రోడం ను కలసం` ది.
అనుత్వంర్డు త్వం<ర్డుZ వైపుక తిరిగి,
ఇందిరా నుగర్ రోడం
వెంట్ట
కొనుసాగత్వం< డోర్ నెం.9-11-38 వర్డుక చేర్డుత్వంది. అకPడి నుడి ఉత్వం`ర్డు వైపుక తిరిగి,
ముసీద్దు వీధిం వెంట్ట కొనుసాగత్వం< ప్రలిప్రట్టA
రోడం ను కలసం` ది. |
| 14 |
ఉత్త%రం |
కలైంజర్ వీధిం లోన్సి త్వం<ర్డుZ వైపు ఉనుQ భవను,
డోర్ నెం. 9-10-22 నుడి సంరిహద్దుG
పా
ర్డుభమై, త్వం<ర్డుZ వైపుక తిరిగి ప్రలిప్రట్టA
మెయిన్ రోడం
వెంట్ట కొనుసాగత్వం< ముసీద్దు వీధిం
పా
ర్డుభముయ్యేC ప్రదేశం వర్డుక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రలిప్రట్టA
రోడం
మురియ ముసీద్దు వీధిం జక్షన్ నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక
తిరిగి, ముసీద్దు వీధిం వెంట్ట కొనుసాగత్వం< ఇందిరా నుగర్ రోడం ను కలసం` ది. అకPడి నుడి
ప్రడంముర్డు వైపుక తిరిగి, ఇందిరా నుగర్ రోడం
వెంట్ట కొనుసాగత్వం< బంరియల్ గ్రౌంeడ్ సీAట్ ను
కలసం` ది. అనుత్వంర్డు ద్దుక్షిణ వైపుక తిరిగి, ఆం వీధిం వెంట్ట కొనుసాగత్వం< రామ్ నుగర్ A
ఎంద్దుర్డుగా ఉనుQ వీధిం రోడ్ లైంన్ వర్డుక చేర్డుత్వంది. అకPడి నుడి త్వం<ర్డుZ వైపుక తిరిగి, ఆం
వీధిం వెంట్ట కొనుసాగత్వం< డోర్ నెం. 10-9-240/1 వర్డుక చేర్డుత్వంది.
అనుత్వంర్డు ద్దుక్షిణ
వైపుక తిరిగి, రోడం
వెంట్ట కొనుసాగత్వం< డోర్ నెం. 10-9-322 వర్డుక చేర్డుత్వంది. అకPడి
నుడి త్వం<ర్డుZ వైపుక తిరిగి, రామ్ నుగర్ B 1వ వీధిం వెంట్ట కొనుసాగత్వం< రాము నాయడం
కాలనీ రోడం ను కలసం` ది. అకPడి నుడి ద్దుక్షిణ వైపుక తిరిగి, రోడం
వెంట్ట కొనుసాగత్వం<
క<సంసంలి నుదిన్సి కలసం` ది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< రామ్ నుగర్ C 3వ వీధిం వర్డుక చేర్డుత్వంది. అకPడి నుడి ఉత్వం`ర్డు వైపుక
తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< ముసీద్దు ను కలసం` ది.
అనుత్వంర్డు ప్రడంముర్డు |
|
|
వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< ఫ్యాCకAరీ వెంనుక భాగాన్సిQ కలసం` ది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, రామ్ నుగర్ A, B మురియ Cల
ప్రశ్చిము సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< భవాన్సి నుగర్ రోడం ను కలసం` ది. అకPడి నుడి
త్వం<ర్డుZ వైపుక తిరిగి,
భవాన్సి నుగర్ రోడం
వెంట్ట కొనుసాగత్వం< కలైంజర్ నుగర్ రోడం లో
త్వం<ర్డుZ వైపు, డోర్ నెం. 9-10-22 వద్దుGక చేర్డుత్వంది. అనుత్వంర్డు ఉత్వం`ర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< ప్రలిప్రట్టA
రోడం ను కలసం` ది |
| 15 |
ఉత్త%రం |
శాతి థియ్యేట్టర్ లోన్సి డోర్ నెం. 9-2-36/1 నుడి సంరిహద్దుG
పా ర్డుభమై, త్వం<ర్డుZ వైపుక తిరిగి
ప్రలిప్రట్టA
మెయిన్ రోడం
వెంట్ట కొనుసాగత్వం< కలైంజర్ సీAట్ లోన్సి త్వం<ర్డుZ వైపు భవను, డోర్
నెం. 9-2-91 వర్డుక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రలిప్రట్టA
మెయిన్ రోడం లోన్సి డోర్ నెం. 9-2-92 వద్దుG నుడి సంరిహద్దుG
ద్దుక్షిణ
వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< కలైంజర్ రోడం లోన్సి ఆంగ్నేQయ వైపు భవను
వర్డుక చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, భవాన్సి నుగర్ హ్వాసిZట్టల్ రోడం
వెంట్ట కొనుసాగత్వం< అర్డుశంమాను సీAట్ ను కలసం` ది. అకPడి నుడి ద్దుక్షిణ వైపుక తిరిగి
బంగార్డువీధిం వర్డుక చేర్డుత్వంది.
అనుత్వంర్డు ప్రడంముర్డు వైపుక తిరిగి,
ఆం వీధిం వెంట్ట
కొనుసాగత్వం< సాల"ప్రట్టA
రోడం ను కలసం` ది.
అకPడి నుడి సాల"ప్రట్టA
రోడం
వెంట్ట
కొనుసాగత్వం< BTM సీAట్ ను,
అకPడి మొద్దుటి భవను అయిను డోర్ నెం. 9-1-1 వద్దుG
కలసం` ది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ డోర్ నెం. 9-1-1 నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, వీధిం వెంట్ట కొనుసాగత్వం<
ప్రలిప్రట్టA
మెయిన్ రోడం ను కలసం` ది. |
| 16 |
ఉత్త%రం |
యన్.టి.ఆంర్. నుగర్ రోడం
మురియ ప్రలిప్రట్టA
రోడం
జక్షన్ నుడి సంరిహద్దుG
పా ర్డుభమై,
త్వం<ర్డుZ వైపుక తిరిగి ప్రలిప్రట్టA
మెయిన్ రోడం
వెంట్ట కొనుసాగత్వం<, బి.టి.య. వీధింన్సి, డోర్
నెం. 9-2-36 గల భవను సంమీప్రలోన్సి పా ర్డుభ వీధిం ర్వేఖ వద్దుG కలసం` ది. అకPడి నుడి
సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, బి.టి.య.
వీధిం వెంట్ట కొనుసాగత్వం< మొద్దుటి భవను
అయిను డోర్ నెం. 9-1-1 వర్డుక చేర్డుత్వంది. అనుత్వంర్డు త్వం<ర్డుZ వైపుక తిరిగి, రోడం
మురియ
బంగార్డు వీధిం రోడం
వెంట్ట కొనుసాగత్వం< అరాశంమాను వీధిం రోడం ను కలసం` ది. |
|
త్త&రం' |
పై పేర్కొPనుQ ఇందిరా నుగర్ రోడం లోన్సి డోర్ నెం. 9-1-53/9 నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక
తిరిగి,రామ్ నుగర్ A ఉత్వం`ర్డు లైంన్ భవను,
డోర్ నెం. 10-9-299 వెంనుక భాగ వర్డుక
చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
స్ట్రెAయిట్ ఫ్యాCకAరీ వెంట్ట
కొనుసాగత్వంది. అకPడి నుడి ద్దుక్షిణ వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం<
సంర్వే" నెం. 217 సంరిహద్దుG
ర్వేఖను కలసం` ది. అనుత్వంర్డు ప్రడంముర్డు వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< ఫ్యాCకAరీన్సి కలసం` ది.
అకPడి నుడి ద్దుక్షిణ వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగి, అనుత్వంర్డు ప్రడంముర్డు వైపుక తిరిగి, సాల"ప్రట్టA
రోడం క ద్దుక్షిణ
వైపు వెంట్ట కొనుసాగత్వం< రైలే" ట్రా£ క్ ను కలసం` ది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< సాల"ప్రట్టA
రోడం ను కలసం` ది.
అకPడి నుడి త్వం<ర్డుZ వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< సాల"ప్రట్టA
రోడం
మురియ యన్.టి.ఆంర్.
నుగర్ రోడం
జక్షన్ ను కలసం` ది.
అకPడి నుడి ఉత్వం`ర్డు వైపుక తిరిగి,
యన్.టి.ఆంర్. నుగర్–
తోప్రZయCము రోడం
వెంట్ట కొనుసాగత్వం< ప్రలిప్రట్టA
మెయిన్ రోడం ను కలసం` ది. |
| 17 |
ఉత్త%రం |
సాల"ప్రట్టA
రోడం క ద్దుక్షిణ వైపును ఉనుQ రైలే" ట్రా£ క్ నుడి సంరిహద్దుG
త్వం<ర్డుZ వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< భీమానుగర్ ను కలసం` ది. అకPడి నుడి ఉత్వం`ర్డు వైపుక
తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< ఫ్యాCకAరీన్సి కలసం` ది. అనుత్వంర్డు త్వం<ర్డుZ వైపుక
తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< ఫ్యాCకAరీన్సి కలసం` ది.
అకPడి నుడి ద్దుక్షిణ |
|
|
వైపుక తిరిగి, కమునుగర్ C రోడం
వెంట్ట కొనుసాగత్వంది. అనుత్వంర్డు త్వం<ర్డుZ వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< క<సంసంలి నుదిన్సి కలసం` ది. |
|
త్త&రం' |
పై పేర్కొPనుQ రామ్ నుగర్ A డైయిగ్ య<న్సిట్, సంర్వే" నెం. 217 మురియ 218 కలిసే సంరిహద్దుG
ర్వేఖ నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, రామ్ నుగర్ B మురియ Cల ప్రశ్చిము సంరిహద్దుG
వెంట్ట నేర్డుగా కొనుసాగత్వం< క<సంసంలి నుది చివరి వర్డుక చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
క<సంసంలి నుది వెంట్ట
కొనుసాగత్వం< రైలే" ట్రా£ క్ రోడం
, సంర్వే" నెం. 265ను కలసం` ది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి,
రైలే" ట్రా£ క్ రోడం
వెంట్ట
కొనుసాగత్వం< సాల"ప్రటెంA డం రోడం ను కలసం` ది.
అకPడి నుడి త్వం<ర్డుZ వైపుక తిరిగి,
సాల"ప్రటెంA డం రాములవారి గడి వెంనుక భాగ వెంట్ట కొనుసాగత్వంది. అనుత్వంర్డు ఉత్వం`ర్డు
వైపుక తిరిగి, యన్.టి.ఆంర్. నుగర్ & తోప్రZము నుగర్ రోడం
వెంట్ట కొనుసాగత్వం< సాల"ప్రటెంA డం
ఉత్వం`ర్డు సంరిహద్దుG
వర్డుక చేర్డుత్వంది. |
| 18 |
ఉత్త%రం |
ప్రలిప్రట్టA
మెయిన్ రోడం
మురియ ఎంలా త్వంము క్కోయిల్ జక్షన్ నుడి సంరిహద్దుG
పా ర్డుభమై,
త్వం<ర్డుZ వైపుక తిరిగి, రైలే" గ్నేట్ మీద్దుగా ప్రలిప్రట్టA
మెయిన్ రోడం
వెంట్ట కొనుసాగత్వం< NTR
నుగర్ రోడం ను కలసం` ది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రలిప్రట్టA
రోడం
మురియ యన్.టి.ఆంర్. నుగర్ రోడం
జక్షన్ నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, యన్.టి.ఆంర్. నుగర్ రోడం
వెంట్ట కొనుసాగత్వం< సాల" ప్రటెంA డం రోడం
జక్షన్ వర్డుక చేర్డుత్వంది.
అకPడి నుడి ప్రడంముర్డు వైపుక తిరిగి,
రైలే" ట్రా£ క్ వర్డుక
కొనుసాగత్వంది. అనుత్వంర్డు ద్దుక్షిణ వైపుక తిరిగి, రైలే" ట్రా£ క్ వెంట్ట కొనుసాగత్వం< సంర్వే" నెం.
264 యొకP ఆంగ్నేQయ ము<ల వర్డుక చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
క<సంసంలి నుది వెంట్ట
కొనుసాగత్వం< సంర్వే" నెం. 275 ద్దుక్షిణ వైపు వర్డుక చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, తోప్రZయCమున్ క్కోయిల్ వీధిం
వెంట్ట కొనుసాగత్వం< ప్రకాశ్ నుగర్ 1వ వీధిం జక్షన్ వర్డుక చేర్డుత్వంది. అకPడి నుడి త్వం<ర్డుZ
వైపుక తిరిగి,
బంరియల్ గ్రౌంeడ్ వీధిం వెంట్ట కొనుసాగత్వం< డోర్ నెం. 5/4/28/6 వర్డుక
చేర్డుత్వంది. అనుత్వంర్డు ప్రడంముర్డు వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< డోర్ నెం.
5/4/13 వర్డుక చేర్డుత్వంది. అకPడి నుడి ఉత్వం`ర్డు వైపుక తిరిగి, ప్రలిప్రట్టA
మెయిన్ రోడం
మురియ ఎంలా
త్వంమున్ క్కోయిల్ జక్షన్ వర్డుక చేర్డుత్వంది. |
| 19 |
ఉత్త%రం |
నెంహº"
వీధిం మురియ ప్రలిప్రట్టA
రోడం
జక్షన్ నుడి సంరిహద్దుG
పా ర్డుభమై, త్వం<ర్డుZ వైపుక
తిరిగి ప్రలిప్రట్టA
రోడం
వెంట్ట కొనుసాగత్వం< ఎంలా త్వంము ఆంలయ వీధింన్సి కలసం` ది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రలిప్రట్టA
మెయిన్ రోడం
మురియ ఎంలా త్వంము క్కోయిల్ వీధిం జక్షన్ నుడి, డోర్
నెం. 5-4-13 వద్దుG సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, అనుత్వంర్డు త్వం<ర్డుZ వైపుక తిర్డుగత్వంది.
అకPడి నుడి సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< డోర్ నెం. 5-4-28/6 వద్దుG ఉనుQ బంరియల్
గ్రౌం
eడ్ వీధింన్సి కలసం` ది.
అనుత్వంర్డు ద్దుక్షిణ వైపుక తిరిగి,
బంరియల్ గ్రౌంeడ్ వీధిం వెంట్ట
కొనుసాగత్వం< కామురాజ్ వీధింన్సి కలసం` ది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
కామురాజ్ వీధిం వెంట్ట
కొనుసాగత్వం< నెంహº"
వీధింన్సి కలసం` ది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, నెంహº"
వీధిం వెంట్ట కొనుసాగత్వం<
ప్రలిప్రట్టA
మెయిన్ రోడం ను కలసం` ది. |
| 20 |
ఉత్త%రం |
నెంహº"
వీధిం మురియ కామురాజ్ వీధిం జక్షన్ నుడి సంరిహద్దుG
పా ర్డుభమై, త్వం<ర్డుZ వైపుక
తిరిగి కామురాజ్ వీధిం వెంట్ట కొనుసాగత్వం< బంరియల్ గ్రౌంeడ్ వీధింన్సి కలసం` ది. |
|
త్త&రం' |
పై పేర్కొPనుQ బంరియల్ గ్రౌంeడ్ వీధిం మురియ కామురాజ్ వీధిం జక్షన్ నుడి సంరిహద్దుG
ద్దుక్షిణ
వైపుక తిరిగి,
బంరియల్ గ్రౌంeడ్ వీధిం వెంట్ట కొనుసాగత్వం< డోర్ నెం. 5-7-33/5 వర్డుక
చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< నెంహº"
వీధింన్సి కలసం` ది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, నెంహº"
వీధిం వెంట్ట కొనుసాగత్వం<
కామురాజ్ వీధింన్సి కలసం` ది. |
| 21 |
ఉత్త%రం |
పోన్సిQయమున్ క్కోయిల్ వీధింలోన్సి డోర్ నెం. 6-2-63/5 నుడి సంరిహద్దుG
పా ర్డుభమై, త్వం<ర్డుZ
వైపుక పోన్సిQయమున్ క్కోయిల్ వీధిం వెంట్ట కొనుసాగత్వం< డోర్ నెం. 6-3-2 వర్డుక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, నెంహº"
వీధిం వెంట్ట కొనుసాగత్వం<
డోర్ నెం. 6-3-91 వర్డుక చేర్డుత్వంది. అకPడి నుడి త్వం<ర్డుZ వైపుక తిరిగి, సంరిహద్దుG
ర్వేఖ
వెంట్ట కొనుసాగత్వం< తోప్పిZయమున్ క్కోయిల్ వీధింన్సి కలసం` ది. అనుత్వంర్డు ద్దుక్షిణ వైపుక
తిరిగి, సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< క¿షÀసాలైం నుదిన్సి కలసం` ది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
క¿షÀసాలైం నుది వెంట్ట
కొనుసాగత్వం< సంర్వే" నెం. 275 ద్దుక్షిణ వైపు వర్డుక చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, సంర్వే" నెం. 224 మురియ 225
వెంట్ట కొనుసాగత్వం< డోర్ నెం. 6-2-63/5 వర్డుక చేర్డుత్వంది.
ఈ విధ్రగా సంరిహద్దుG
పూర్డుÂవుత్వంది. |
| 22 |
ఉత్త%రం |
తెర్డుణి రెవెంను
|
|
త్త&రం' |
పై పేర్కొPనుQ ప్రలిప్రట్టA
మెయిన్ రోడం
మురియ నెంహº"
వీధిం జక్షన్ (అగన్ వాడీ పాఠశాల)
నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, నెంహº"
వీధిం వెంట్ట కొనుసాగత్వం< డోర్ నెం. 6-2-1
వర్డుక చేర్డుత్వంది. అకPడి నుడి ప్రడంముర్డు వైపుక తిరిగి, పోన్సిQయమున్ క్కోయిల్ వీధిం వెంట్ట
కొనుసాగత్వం< డోర్ నెం.
6-2-63/5 వర్డుక చేర్డుత్వంది.
అనుత్వంర్డు ద్దుక్షిణ వైపుక తిరిగి,
కొనుసాగత్వం< క<సంసంలి నుదిన్సి కలసం` ది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
కశంసంలి నుది వెంట్ట
కొనుసాగత్వం< సంర్వే" నెం. 214 యొకP నైర్డుతి ము<ల వర్డుక చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, సంర్వే" నెం. 213 మురియ 214ల
ప్రశ్చిము సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< తెర్డుణి రెవెంను
|
| 23 |
ఉత్త%రం |
సంత్వంÄవాడం రెవెంను
|
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి, తెర్డుణి రెవెంను
|
|
ద్దుక్షిణ |
అకPడి నుడి తెర్డున్సి రెవెంను
|
|
ప్రడమ
రం |
అకPడి నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, సంశాను రోడం
మురియ సంత్వంÄవాడం రెవెంను
|
| 24 |
ఉత్త%రం |
అనాQ వీధిం నుడి సంరిహద్దుG
పా ర్డుభమై,
కసాలి వీధిం వెంట్ట కొనుసాగత్వం<,
సంత్వంÄవాడం
రెవెంను
|
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి, తెర్డున్సి రెవెంను
|
|
|
త్వం<ర్డుZ సంరిహద్దుG ల వెంట్ట కొనుసాగత్వంది. |
|
ద్దుక్షిణ |
అకPడి నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి,
క<సంసంలి నుది వెంట్ట కొనుసాగత్వం<
మిట్టAపాలెం రోడం
వర్డుక చేర్డుత్వంది. |
|
ప్రడమ
రం |
అకPడి నుడి సంరిహద్దుG
మిట్టAపాలెం రోడం
వెంట్ట కడి వైపుక తిరిగి,
నుది వీధిం వర్డుక
కొనుసాగత్వంది.
అనుత్వంర్డు నుది వీధిం వెంట్ట కొనుసాగత్వం< అనాQ వీధింన్సి కలసం` ది.
ఈ
విధ్రగా సంరిహద్దుG
పూర్డుÂవుత్వంది. |
| 25 |
ఉత్త%రం |
కశంసంలి నుది నుడి సంరిహద్దుG
పా ర్డుభమై, సంత్వంÄవాడం రెవెంను
|
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి ఎంగవ వీధిం జక్షన్ వర్డుక చేరి, అకPడి నుడి ఎంగవ వీధిం వెంట్ట
కొనుసాగత్వంది. |
|
ద్దుక్షిణ |
అనుత్వంర్డు కశంసంలి నుది వెంట్ట కొనుసాగత్వం< సంత్వంÄవాడం రెవెంను
|
|
ప్రడమ
రం |
అకPడి నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, సంత్వంÄవాడం రెవెంను
|
| 26 |
ఉత్త%రం |
సంత్వంÄవాడం రెవెంను
|
|
త్త&రం' |
పై పేర్కొPనుQ అడంవికొత్వం<`
ర్డు రెవెంను
|
|
ద్దుక్షిణ |
అకPడి నుడి సంర్వే" నెం. 183, 169, 170, 160, 159 మురియ 158ల ద్దుక్షిణ సంరిహద్దుG ల వెంట్ట
కొనుసాగత్వం< అడంవికొత్వం<`
ర్డు
రోడం ను
కలసం` ది.
అనుత్వంర్డు సంరిహద్దుG
వైపుక
తిర్డుగత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
అడంవికొత్వం<`
ర్డు వెంట్ట కొనుసాగత్వం<, సంత్వంÄవాడం రెవెంను
|
| 27 |
ఉత్త%రం |
సంత్వంÄవాడం చెర్డువు సంప్రెÆ ఛానుల్ నుడి సంరిహద్దుG
పా ర్డుభమై,
పై పేర్కొPనుQ కాలవ వెంట్ట
కొనుసాగత్వం<, సంత్వంÄవాడం రెవెంను
|
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, సంత్వంÄవాడం రెవెంను
|
|
ద్దుక్షిణ |
అకPడి నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, సంర్వే" నెం. 150, 151 మురియ 153ల ఉత్వం`ర్డు
సంరిహద్దుG ల వెంట్ట కొనుసాగత్వంది. |
|
ప్రడమ
రం |
అడంవికొత్వం<`
ర్డు రోడం
జక్షన్ నుడి ఈ వార్డు
సంరిహద్దుG
పా ర్డుభమై, చినుQ వీధిం మురియ
ఈశం"ర్డు క్కోయిల్ వీధిం మీద్దుగా కొనుసాగత్వం< సంత్వంÄవాడం చెర్డువు సంప్రెÆ ఛానుల్ వర్డుక చేర్డుత్వంది. |
| 28 |
ఉత్త%రం |
సంర్వే" నెం. 191 యొకP వాయవC ము<ల నుడి సంరిహద్దుG
పా ర్డుభమై, త్వం<ర్డుZ వైపుక తిరిగి
సంర్వే" నెం. 188 ఉత్వం`ర్డు మున్సి
ప్రల్ సంరిహద్దుG
వెంట్ట కొనుసాగత్వం<, రైలే" ట్రా£ క్ వద్దుG సంత్వంÄవాడం
రెవెంను
|
|
త్త&రం' |
,
పై పేర్కొPనుQ సంత్వంÄవాడం రెవెంను
|
|
|
సంర్వే" నెం. 220 ఆంగ్నేQయ ము<ల వర్డుక చేర్డుత్వంది. అనుత్వంర్డు సంర్వే" నెం. 224 మురియ
225ల త్వం<ర్డుZ సంరిహద్దుG ల వెంట్ట కొనుసాగత్వంది. అకPడి నుడి ప్రడంముర్డు వైపుక తిరిగి,
228
సంర్వే" నెం.
225 మురియ 227ల ద్దుక్షిణ సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< సంర్వే" నెం.
ఆంగ్నేQయ ము<ల వర్డుక చేర్డుత్వంది. అకPడి నుడి ద్దుక్షిణ వైపుక తిరిగి, సంర్వే" నెం. 224
మురియ కార్డుకట్రాపుర్డు సంరిహద్దుG
వెంట్ట కొనుసాగత్వం< డోర్ నెం. 6-4-101 వద్దుG ప్రలిప్రట్టA
మెయిన్ రోడం ను కలసం` ది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, ప్రలిప్రట్టA
మెయిన్ రోడం
వెంట్ట,
సంర్వే" నెం. 228, 227, 218 మురియ 217, 210 మీద్దుగా కొనుసాగత్వం< సంర్వే" నెం. 176 నైర్డుతి
ము<ల వర్డుక చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, సంర్వే" నెం. 176, 174 మురియ
172ల ప్రశ్చిము సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< సంర్వే" నెం. 172 వాయవC ము<ల వర్డుక
చేర్డుత్వంది.
అనుత్వంర్డు కార్డుకట్రాపుర్డు సంరిహద్దుG
వెంట్ట,
సంత్వంÄవాడం రెవెంను
|
| 29 |
ఉత్త%రం |
సంత్వంÄవాడం రెవెంను
|
|
త్త&రం' |
పై పేర్కొPనుQ సంత్వంÄవాడం రెవెంను
|
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, ప్రలిప్రట్టA
మెయిన్ రోడం
వెంట్ట
కొనుసాగత్వం<, తెర్డున్సి రెవెంను
|
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి,
కె.వి.ప్పి.ఆంర్.
పేట్ట పా త్వం
మురియ కర్డుకట్రాపుర్డు ముధ్రCగా కొనుసాగత్వం< కార్డుకట్రాపుర్డు రాముర్ నుగర్ మెయిన్
రోడం ను కలసం` ది. అకPడి నుడి ద్దుక్షిణ వైపుక తిరిగి, సంర్వే" నెం. 243 మురియ 244ల
244
త్వం<ర్డుZ సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< సంత్వంÄవాడం రెవెంను
|
| 30 |
ఉత్త%రం |
సంర్వే" నెం.
169 వాయవC ము<ల నుడి సంరిహద్దుG
పా ర్డుభమై,
త్వం<ర్డుZ వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట కొనుసాగత్వం< రైలే" ట్రా£ క్ వర్డుక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ సంర్వే" నెం. 169 ఈశానుC ము<ల నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, సంర్వే" నెం.
169, 171, 173, 174 మురియ 175ల త్వం<ర్డుZ సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< ప్రలిప్రట్టA
మెయిన్ రోడం ను కలసం` ది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, ప్రలిప్రట్టA
మెయిన్ రోడం
వెంట్ట |
|
|
కొనుసాగత్వం< డోర్ నెం. 6-5-79, సం
|
|
ప్రడమ
రం |
పై పేర్కొPనుQ డోర్ నెం. 6-5-79, సం
|
| 31 |
ఉత్త%రం |
రైలే" సేAషన్ వద్దుG ఉనుQ సంర్వే" నెం.192 నుడి సంరిహద్దుG
పా ర్డుభమై, త్వం<ర్డుZ వైపుక తిరిగి
సంర్వే" నెం.201 మురియ 203ల వెంట్ట కొనుసాగత్వం<, మాCచ్ బాక్
వీధిం మీద్దుగా ప్రయాణిచి,
డోర్ నెం.10-6-200/1 వద్దుG ఉనుQ చిద్దుబంర్ నుగర్ 3వ వీధిం పా ర్డుభ సా ను ప్రశ్చిము వైపు వర్డుక
చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ డోర్ నెం.10-6-200/1 వద్దుG చిద్దుబంర్ నుగర్ 3వ వీధిం పా ర్డుభ సా ను ప్రశ్చిము వైపు
నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, డోర్ నెం.9-6-76 వద్దుG ఉనుQ ను
|
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< డోర్ నెం.9-4-34 వర్డుక చేర్డుత్వంది. అకPడి నుడి ఉత్వం`ర్డు వైపుక తిరిగి డోర్
నెం.9-7-20 వర్డుక చేర్డుత్వంది.
అనుత్వంర్డు ప్రడంముర్డు వైపుక తిరిగి సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< డోర్ నెం.9-3-111/2 వర్డుక చేర్డుత్వంది. అకPడి నుడి ద్దుక్షిణ వైపుక తిరిగి
ప్రలిప్రట్టA
మెయిన్ రోడం ను కలసం` ది.
అనుత్వంర్డు ప్రడంముర్డు వైపుక తిరిగి,
ప్రలిప్రట్టA
మెయిన్ రోడం
వెంట్ట కొనుసాగత్వం< రైలే" గ్నేట్ వర్డుక చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, సంర్వే" నెం.192 వద్దుG ఉనుQ రైలే"
సే
Aషన్ వెంట్ట కొనుసాగత్వంది. |
| 32 |
ఉత్త%రం |
మాCచ్ బాక్
వీధిం నుడి సంరిహద్దుG
త్వం<ర్డుZ వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< డోర్ నెం.9-7-19/1 వర్డుక చేర్డుత్వంది. అకPడి నుడి ద్దుక్షిణ వైపుక తిరిగి
డోర్ నెం.9-6-149 వర్డుక చేర్డుత్వంది. అనుత్వంర్డు త్వం<ర్డుZ వైపుక తిరిగి సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< డోర్ నెం.9-6-70 వర్డుక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి డోర్ నెం.9-5-69 వద్దుG ఉనుQ ను
|
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, ప్రలిప్రట్టA
మెయిన్ రోడం
వెంట్ట
కొనుసాగత్వం< డోర్ నెం.9-3-71 వద్దుG ఉనుQ బి.సి. వెంలేÎర్ హ్వాసంAల్ వర్డుక చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి,
నాగలము వీధిం వెంట్ట
కొనుసాగత్వం< డోర్ నెం.154/15 వద్దుG ఉనుQ ను
|
| 33 |
ఉత్త%రం |
చిత్వంమాను వీధిం నుడి సంరిహద్దుG
త్వం<ర్డుZ వైపుక తిరిగి, త్వంలారి వీధిం వెంట్ట కొనుసాగత్వం<,
డోర్ నెం.10-8-66 వద్దుG ఉనుQ పాలేగార్డు వీధిం పా ర్డుభ సా ను వర్డుక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ డోర్ నెం.10-5-69 వద్దుG ఉనుQ పాలేగార్డు వీధిం పా ర్డుభ సా ను నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, బంస్ సాA డ్ సంమీప్రలోన్సి ప్రలిప్రట్టA
మెయిన్ రోడ్ జక్షన్ వర్డుక
చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, ప్రలిప్రట్టA
మెయిన్ రోడం
వెంట్ట
కొనుసాగత్వం< డోర్ నెం.10-9-157/1 వద్దుG ఉనుQ రాజేశం"రి థియ్యేట్టర్ వీధిం వర్డుక చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి డోర్ నెం.10-9-185/1
సంమీప్రలోన్సి రాజేశం"రి థియ్యేట్టర్ వర్డుక చేర్డుత్వంది. అకPడి నుడి ప్రడంముర్డు వైపుక తిరిగి,
డోర్ నెం.10-9-171/2 వద్దుG ఉనుQ ఎంస్.వి. క్కోయిల్ వీధిం పా ర్డుభ సా ను వర్డుక కొనుసాగత్వంది.
అనుత్వంర్డు ఉత్వం`ర్డు వైపుక తిరిగి, చిత్వంమాను వీధిం చివరి వర్డుక కొనుసాగత్వంది. |
| 34 |
ఉత్త%రం |
డోర్ నెం.10-6-200/1 వద్దుG ఉనుQ చిద్దుబంర్డు నుగర్ 3వ వీధిం నుడి సంరిహద్దుG
త్వం<ర్డుZ వైపుక
తిరిగి, ప్రద్వావతి నుగర్ వీధిం వెంట్ట కొనుసాగత్వం<, జనుప్ర వీధిం, కర్డుముల వీధ్రలను కలపుకొన్సి
డోర్ నెం.10-8-53 వద్దుG ఉనుQ ప్రకాశం రోడం
వర్డుక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ డోర్ నెం.10-8-53 వద్దుG ఉనుQ కర్డుముల వీధిం నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి,
డోర్ నెం.10-8-66 వద్దుG ఉనుQ పాలేగార్డు వీధిం పా ర్డుభ సా ను వర్డుక చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
పాలేగార్డు వీధిం వెంట్ట
కొనుసాగత్వం< త్వంలారి వీధిం చివరి సా ను వర్డుక చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ను
|
| 35 |
ఉత్త%రం |
డోర్ నెం.10-6-169 వద్దుG ఉనుQ ప్రద్వావతి నుగర్ నుడి సంరిహద్దుG
త్వం<ర్డుZ వైపుక తిరిగి,
ప్రద్వావతి నుగర్ వీధిం వెంట్ట కొనుసాగత్వం< మున్సి
ప్రల్ కారాCలయ వర్డుక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ మున్సి
ప్రల్ కారాCలయ నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, డోర్ నెం.10-8-
50 వద్దుG ఉనుQ కర్డుముల వీధిం పా ర్డుభ సా ను వర్డుక చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
కర్డుముల వీధిం వెంట్ట
కొనుసాగత్వం< జనుప్ర వీధింన్సి కలపుకొన్సి ను
|
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ను
|
| 36 |
ఉత్త%రం |
సంర్వే" నెం.121లోన్సి కసి కాలవ వాయవC ము<ల నుడి సంరిహద్దుG
పా ర్డుభమై, త్వం<ర్డుZ
124,
127,
130,
వైపుక తిరిగి,
సంర్వే" నెం.121,
134ల త్వం<ర్డుZ సంరిహద్దుG ల వెంట్ట
కొనుసాగత్వం< జాతీయ ర్డుహద్వారిను కలసం` ది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి సంర్వే" నెం.133లోన్సి కాలవ ఈశానుC ము<ల వద్దుGక చేరి, అకPడి
నుడి ద్దుక్షిణ వైపుక తిరిగి జాతీయ ర్డుహద్వారి వెంట్ట బైపాస్ జక్షన్ వర్డుక చేర్డుత్వంది.
అనుత్వంర్డు ప్రకాశం రోడం
వెంట్ట కొనుసాగత్వం< గట్టకట్టA వీధింక్రిం కలసం` ది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, ప్రద్దువతి నుగర్ 1వ వీధిం ప్రశ్చిము
వైపు వెంట్ట కొనుసాగత్వం< డోర్ నెం.10/6/188 వర్డుక చేర్డుత్వంది. అకPడి నుడి ద్దుక్షిణ
వైపుక తిరిగి డోర్ నెం.9/8/94 వర్డుక కొనుసాగత్వంది. అనుత్వంర్డు ప్రడంముర్డు వైపుక తిరిగి,
పాత్వం భజను క్కోయిల్ వీధిం వెంట్ట కొనుసాగత్వం< డోర్ నెం.9/9/62 వర్డుక చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< కాసి కాలవను కలసం` ది. |
| 37 |
ఉత్త%రం |
సంరిహద్దుG
ర్వేఖ త్వం<ర్డుZ వైపుక తిరిగి కొనుసాగత్వం< ఎం.ప్పి.ప్పి. పాఠశాల వర్డుక చేర్డుత్వంది.
అకPడి నుడి ఉత్వం`ర్డు వైపుక తిరిగి చిత్వంమాను వీధిం వెంట్ట కొనుసాగత్వం< సంర్వే" నెం.272
నైర్డుతి ము<ల వర్డుక చేర్డుత్వంది. అనుత్వంర్డు ఉత్వం`ర్డు వైపుక తిరిగి సంరిహద్దుG
ర్వేఖ వెంట్ట
మున్సి
ప్రల్ సంరిహద్దుG
వర్డుక చేర్డుత్వంది. చివర్డుగా త్వం<ర్డుZ వైపుక తిరిగి సంరిహద్దుG
ర్వేఖ వెంట్ట |
|
|
కొనుసాగత్వం< జాతీయ ర్డుహద్వారిను కలసం` ది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి,
తిర్డుప్రతి-చెనై జాతీయ ర్డుహద్వారిక్రిం ఆంనుకన్సి ఉనుQ నుగరి
రెవెంను
|
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, సంర్వే" నెం.133, 132, 131, 126,
125, 118, 119ల ద్దుక్షిణ సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< సంర్వే" నెం.119 నైర్డుతి ము<ల వర్డుక
చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి, సంర్వే" నెం.260 మురియ 257ల
ప్రశ్చిము సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< చిత్వంలప్రటెంA డం జక్షన్ మురియ నుగరి చెర్డువు
మీద్దుగా కొనుసాగత్వంది.
అనుత్వంర్డు త్వం<ర్డుZ వైపుక తిరిగి సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< డోర్ నెం.11-1-37 వర్డుక చేర్డుత్వంది. |
| 38 |
ఉత్త%రం |
డోర్ నెం.11/2/138 వద్దుG ఉనుQ బంజార్ వీధిం జక్షన్ నుడి సంరిహద్దుG
త్వం<ర్డుZ వైపుక తిరిగి,
లేన్ వెంట్ట కొనుసాగత్వం< డోర్ నెం.11/3/47 వర్డుక చేర్డుత్వంది. అనుత్వంర్డు ఉత్వం`ర్డు వైపుక
తిరిగి డోర్ నెం.11/6/143 వర్డుక కొనుసాగత్వంది. అకPడి నుడి త్వం<ర్డుZ వైపుక తిరిగి,
చిత్వంలప్రెట్టA మెయిన్ రోడం
వెంట్ట కొనుసాగత్వం< చిత్వంమాను రోడం
జక్షన్ వర్డుక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి,
చిత్వంమాను వీధిం వెంట్ట
కొనుసాగత్వం< డోర్ నెం.11/7/68 వర్డుక చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< డోర్ నెం.11/1/137 సంమీప్రలోన్సి బంజార్ వీధిం జక్షన్ వర్డుక చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< డోర్ నెం.11/2/138 వర్డుక చేర్డుత్వంది. |
| 39 |
ఉత్త%రం |
డోర్ నెం.11/5/88/1 నుడి సంరిహద్దుG
త్వం<ర్డుZ వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< ఈ.టి.ప్పి. పా ట్ వర్డుక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి,
మెయిన్ రోడం
వెంట్ట
కొనుసాగత్వం< డోర్ నెం.11/6/143 వర్డుక చేర్డుత్వంది.
అనుత్వంర్డు సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< డోర్ నెం.11/3/47 వర్డుక చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< డోర్ నెం.11/2/138 వర్డుక చేర్డుత్వంది. |
|
ప్రడమ
రం |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ఉత్వం`ర్డు వైపుక తిరిగి,
సంరిహద్దుG
ర్వేఖ వెంట్ట
కొనుసాగత్వం< డోర్ నెం.11/5/88/1 వర్డుక చేర్డుత్వంది. |
| 40 |
ఉత్త%రం |
సంర్వే" నెం.244 వాయవC ము<ల నుడి సంరిహద్దుG
పా ర్డుభమై, త్వం<ర్డుZ వైపుక తిరిగి, సంర్వే"
నెం.244, 254 మురియ 253ల ఉత్వం`ర్డు సంరిహద్దుG ల వెంట్ట కొనుసాగత్వం< సంర్వే" నెం.253 ఈశానుC
ము<ల వర్డుక చేర్డుత్వంది. |
|
త్త&రం' |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ద్దుక్షిణ వైపుక తిరిగి, సంర్వే" నెం.253 త్వం<ర్డుZ సంరిహద్దుG
మురియ సంర్వే" నెం.272 ఉత్వం`ర్డు సంరిహద్దుG
వెంట్ట కొనుసాగత్వం< సంర్వే" నెం.272 ఆంగ్నేQయ ము<ల
వర్డుక చేర్డుత్వంది. |
|
ద్దుక్షిణ |
పై పేర్కొPనుQ ప్రదేశం నుడి సంరిహద్దుG
ప్రడంముర్డు వైపుక తిరిగి, చిత్వంలప్రటెంA డం మెయిన్ రోడం |
30 ANDHRA PRADESH GAZETTE, September 14, 2026
---x---
Published and Uploaded by the Commissioner of Printing, Government of Andhra Pradesh at Government Regional Press, Vijayawada, www.apegazette.cgg.gov.in