The Petroleum and Natural Gas Regulatory Board (Determination of Natural Gas Pipeline Tariff) Regulations, 2008.

Published 20 November 2008

Ministry
Petroleum and Natural Gas Regulatory Board
Department
NOT available
Office
NOT available
Gazetteid
NOT available ( 2733 )
Identifier
in.gazette.central.e.2008-11-20.2733
Languages
English, Hindi
Published at
Original source ↗

REGD. NO . D. 1.-33004/99 रजिस्ट्रीसं० डी० एल०-33004/99

भारत का राजपत्र The Gazette of India

असाधारण

EXTRAORDINARY

भाग 11खण्ड 3-उप- खण्ड (1)

PART II-Section 3-Sub-section (1)

प्राधिकार से प्रकाशित

PUBLISHED BY AUTHORITY

से 614]

नई दिल्ली, बृहस्पतिवार , नवम्बर 20 , 2008 /कार्तिक 29, 1930

No. 614]

NEW DELHL THURSDAY, NOVEMBER 20, 2008/KARTIKΑ 29, 1930

पेट्रोलियम और प्राकृतिक गैस विनियामक बोर्ड

अधिसूचना

नई दिल्ली, 20 नवम्बर , 2008

सा.का.नि. 807(अ).-पेट्रोलियम और प्राकृतिक गैस विनियामक बोर्ड अधिनियम, 2006 (2006 का 19 ) की भारा 61 द्वारा प्रदत्त शक्तियों का प्रयोग करते हुए, पेट्रोलियम और प्राकृतिक गैस विनियामक बोर्ड एतद्‌द्वारा , निम्नलिखित विनियम बनाती है :

1. संक्षिप्त नाम और प्रारंभ

( 1 ) इन विनियमों को पेट्रोलियम और प्राकृतिक गैस विनियामक बोर्ड ( प्राकृतिक गैस पाइपलाइन शुल्क का निर्धारण ) विनियम, 2008 कहा आएगा ।

(2 ) ये राजपत्र में प्रकाशन की तारीख से प्रवृत्त होंगे ।

2. परिभाषाएं

( 1 ) इन विनियमों में जब तक कि संदर्भ से अन्यथा अपेक्षित न हो,-

( क) ' अधिनियम ' से पेट्रोलियम और प्राकृतिक गैस विनियामक बोर्ड अधिनियम , 2006 अभिप्रेत है;

(ख ) ' नियत दिन ' से । अक्तूबर, 2007 की तारीख अभिप्रेत है ;

( ग ) ' बोर्ड' से अधिनियम की धारा 3 की उप- धारा ( 1 ) के तहत गठित पेट्रोलियम और प्राकृतिक गैस विनियामक बोर्डअभिप्रेत है;

( घ ) ' प्राकृतिक गैस पाइपलाईन की क्षमता' से पेट्रोलियम और प्राकृतिक गैस विनियामक बोर्ड ( प्राकृतिक गैस पाइपलाइनें बिछाने , उनका निर्माण , प्रचालन अथवा विस्तार करने के लिए व्यक्तियों/फर्मों को प्राधिकृत करना ) विनियम, 2008 में यथाविनिर्दिष्ट प्राकृतिक गैस पाइपलाइन की क्षमता अभिप्रेत है :

बशर्ते कि नियस दिन से पहले प्राकृतिक गैस पाइपलाइन बिछाने , उसका निर्माण , प्रचालन और विस्तार करने के लिए केन्द्र सरकार द्वारा प्राधिकृत कंपनी के संबंध में प्राकृतिक गैस पाइपलाइन की क्षमता निर्धारित करने के लिए संगत विनियमों में विनिर्दिष्ट आधार पर बोर्ड द्वारा यथा अनुमोदित होगी;

4611 01/2008

(1) THE GAZETTE OFINDIA : EXTRAORDINARY

[PART II-SEC ,3 (1))

(ड.) 'प्रारंभिक इकाई प्राकृतिक गैस पाइपलाइन शुल्क' से निम्नांकित तिथि से प्रारंभ होने वाली अवधि के लिए निर्धारित इकाई प्राकृतिक गैस पाइपलाइन शुल्क अभिप्रेत है-

(00 यदि प्राकृतिक गैस पाइपलाइन इन विनियमों की अधिसूचना की तारीख को अथवा उसके बाद संस्थापित की जाती है तो किसी भी वित्तीय वर्ष में प्राकृतिक गैस पाइपलाइन की संस्थापना और उस वित्तीय वर्ष के अंतिम दिन पर समाप्ति कीतारीख, या

(ii) यदि प्राकृतिक गैस पाइपलाइन इन विनियमों की अधिसूचना से पूर्व संस्थापित की जाती है तो किसी भी वित्तीय वर्ष में प्राकृतिक गैस पाइपलाइन के इन विनियर्मा के अधिकार क्षेत्र में आने और उस वित्तीय वर्ष के अंतिम दिन को समाप्ति की तारीखः

बशर्ते कि यदि प्राकृतिक गैस पाइपलाइन की संस्थापना की तारीख अथवा किसी भी वित्तीय वर्ष में प्राकृतिक गैस पाइपलाइन के इन विनियमों के अधिकार क्षेत्र के भीतर आने की तारीख , जैसा भी मामला हो, और उस वित्तीय वर्ष के अंतिम दिन के बीच की अवधि एक सौ तिरासी दिनों से कम है तो प्रारंभिक इकाई प्राकृतिक गैस पाइपलाइन शुल्क प्राकृतिक गैस पाइपलाइन की संस्थापना की तारीख से प्रारंभ होने अथवा प्राकृतिक गैस पाइपलाइन के किसी भी वित्तीय वर्ष में इन विनियमों के अधिकार क्षेत्र में आने की तारीख की अवधि के लिए होगी और उसे तत्काल अगले वित्तीय वर्ष के अंतिम दिन तक बढ़ाया जाएगा;

परंतु यह और कि प्रारंभिक इकाई प्राकृतिक गैस पाइपलाइन शुल्क प्रथमतः अनंतिग आधार पर नियत किया जाएगा और तत्पश्चात अनुसूची ' क' के खंड 9 के अधीन विनिर्दिष्ट आधार और समय-सीमा के अनुसार अंतिम रूप से नियत किया जाएगा।

(च) 'प्राकृतिक गैस पाइपलाइन' से प्राकृतिक गैस के परिवहन के लिए स्पर लाइनों सहित किसी भी पाइपलाइन से अभिप्रेत है और इसमें सभी संलग्न उपस्कर और कंप्रैशर , स्टोरेज मुविधाएं, मीटरी यूनिटें जैसी सुविधाएं शामिल हैं लेकिन निम्नलिखित शामिल नहीं हैं: -

(1 ) किसी विशिष्ट उपभोक्ता को उसकी जरूरत पूरी करने के लिए न कि उसे आगे बेचने के लिए प्राकृतिक गैस के परिवहन हेतु समर्पित पाइपलाइन;

(ii) किसी नगर अथवा स्थानीय प्राकृतिक गैस वितरण नेटवर्क जो कि पेट्रोलियम और प्राकृतिक गैस विमानकीय बोर्ड ( नगर अथवा स्थानीय प्राकृतिक गैस वितरण नेटवर्क बिछाने, उसका निर्माण, प्रचालन अथवा विस्तार करने के लिए कंपनियों को प्राधिकृत करना) विनियम, 2008 द्वारा विनियमित हो, भारत का राजपत्र असाधारण

[ भाग - खण्ड 3 (i) ]

(छ) ' प्राकृतिक गैस पाइपलाइन शुल्क" से प्राकृतिक गैस के परिवहन के लिए प्राकृतिक गैस पाइपलाइन हेतु रुपयों में प्रति मिलियन ब्रिटिश थर्मल यूनिट (रुपए/एमएमबीटीयू) (सांविधिक करों और उपकरों को छोड़कर) शुल्क की यूनिट दर अभिप्रेत है,

(ज) 'शुल्क समीक्षा' से उप-विनियम (इ. ) के अधीन यथाविनिर्दिष्ट प्रारंभिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क अवधि की समाप्ति के बाद पाँच उत्तरोत्तर वर्षों की समाप्ति के पश्चात की जाने वाली प्रथम शुल्क समीक्षा के साथ बोर्ड द्वारा प्रत्येक पाँच उत्तरोत्तर वर्षों के बाद यूनिट प्राकृतिक गैस पाइपलाइन शुल्क की समीक्षा अभिप्रेत है;

बशर्ते कि शुल्क समीक्षा के समय इस प्रकार निर्धारित यूनिट प्राकृतिक गैस पाइपलाइन शुल्क अगली शुल्क समीक्षा तक की अवधि के लिए लागू होगा;

(झ) "शुल्क क्षेत्र" से वह क्षेत्र अभिप्रेत है-

(i ) जिसकी लंबाई तीन सौ किलोमीटर हो और जो मूल स्थान से लेकर अंतिम स्थान तक प्राकृतिक गैस पाइपलाइन के भार्ग के साथ-साथ हो; 2

बशर्ते कि प्राकृतिक गैस पाइपलाइन का अंतिम क्षेत्र तीन सौ. किलोमीटर अथवा उससे कम हो सकता है,

परंतु यह और कि तीन सौ किलोमीटर से कम लंबाई की कोई भी प्राकृतिक गैस पाइपलाइन एक क्षेत्र के रूप में गिनी जाएगी; और

(ii) प्राकृतिक गैस पाइपलाइन के साथ-साथ प्राकृतिक गैस पाइपलाइन की कुल लंबाई के दस प्रतिशत तक की धौड़ाई वाला एक कॉरीडोर जिसमें स्पर साड़ी की लंबाई शामिल न हो अथवा दोनों तरफ प्राकृतिक गैस पाइपलाइन की सतह पर निकटतम बिंदु से पचास किलोमीटर लंबा हो. और जिसमें प्राकृतिक गैस पाइपलाइन का मूल स्थान और अंतिम छोर शामिल हो, जो भी कम हो, और-

(क) प्रथम शुल्क क्षेत्र उस किसी क्षेत्र के संदर्भ के साथ मिना आफ्ना जिसमें प्राकृतिक गैस पाइपलाइन का इंजेक्शन बिंदु पड़ता हो; और

(ख) पश्चातवर्ती क्षेत्र शुल्क क्षेत्र अथवा शुल्क क्षेत्रों जैसा भी मामला हो, को प्राकृतिक गैस पाइपलाइन में प्राकृतिक गैस प्रदान करने के लिए संविदात्मक मार्ग के किसी भी ओर अलग-अलग गिना जाएगा;

बशर्ते कि उसी स्रोत से प्राकृतिक गैस के परिवहन के लिए प्राकृतिक गैस पाइपलाइन शुल्क क्षेत्र के भीतर अवस्थित सभी उपभोक्ताओं के लिए एक- THE GAZETTE OF INDIA : EXTRAORDINARY

[PART -SEC. 3 (i) ]

समान होगाः

बशर्ते यह और कि कंपनीक्षेत्र में अवस्थित किसी भी उपभोक्ता को प्राकृतिक गैस की पूर्ति प्राकृतिक गैस पाइपलाइन से एक नई स्पर लाइन बिछाकर उसका निर्माण, प्रचालन और विस्तार करने की तकनीकी वाणिज्यिक व्यवहार्यता के अध्यधीन करेगी ।

स्पष्टीकरणः-

इस खंड के प्रयोजनार्थ प्राकृतिक गैस पाइपलाइन में मूल स्थान और अंतिम स्थान और शुल्क क्षेत्र अथवा शुल्क क्षेत्रों जैसा भी मामला हो, का आनुक्रमिक संख्यांकन प्राधिकार पत्र में यथासूचित अथवा बोर्ड द्वारा प्राकृ‌क्लिक गैस पाइपलाइन शुल्‌क के निर्धारण के अनुसार होना चाहिए।

(2) इन विनियमों में प्रयुक्त और अपरिभाषित लेकिन अधिनियम अथवा उसके अंतर्गत बनाए गए नियमों अथवा विनियों में परिभाषित शब्दों और अभिव्यक्तियों का वही अर्थ होगा जो अधिनियम अथवा नियमों अथवा विनियमों, जैसा भी मामला हो , में लिया गया है ।

3. लागूहोना

ये विनियम उस कंपनी पर लागू होंगे-

(1) जो नियत दिन से पूर्व प्राकृतिक गैस पाइपलाइन बिछाने उसका निर्माण, प्रचालन अथवा विस्तार करने के लिए पेट्रोलियम और प्राकृतिक गैस विनियामक बोर्ड (प्राकृतिक गैस पाइपलाइनें बिछाने, उनका निर्माण, प्रधालन अथवा विस्तार करने के लिए व्यक्तियों /फर्मों को प्राधिकृत करना) विनियम, 2008 के विनियम 17 के अधीन केंद्र सरकार द्वारा प्राधिकृत हो;

(2) नो नियत दिन से पूर्व प्राकृतिक गैस पाइपलाइन बिछाने, उसका निर्माण, प्रचालन अथवा विस्तार कर रहा हो. और पेट्रोलियम और प्राकृतिक गैस विनियामक बोर्ड (प्राकृतिक गैस पाइपलाइन बिछाने, उसका निर्माण, प्रचालन अथवा विस्तार करने के लिए कंपनियों को प्राधिकृत करना) विनियम, 2008 के विनियम 18 के अधीन बोर्ड द्वारा प्राधिकृत हो; और

(3) जो एक समर्पित पाइपलाइन बिछाने उसका निर्माण , प्रचालन अथवा विस्तार कर रहा है जिसे पेट्रोलियम और प्राकृतिक गैस विनियामक बोर्ड ( प्राकृतिक गैस पाइपलाइनों बिछाने, उसका निर्माण, प्रचालन अथवा विस्तार करने के लिए कंपनियों को प्राधिकृत करना) विनियम, 2008 के विनियम 19 के उपविनियम ( 1 ) अथवा (2) के अधीन एक प्राकृतिक गैस पाइपलाइन में परिवर्तित किया जाता है ।

5

भारत का राजपत्र असाधारण

[भाग 11- खण्ड 3 (i) ]

4. प्राकृतिक गैस पाइपलाइन शुल्क का निर्धारण

विनियम 3 के खंड ( 1 ) अथवा ( 2) के अधीन आने वाले कंपनी के संबंध में प्राकृतिक गैस पाइपलाइन शुल्क अनुसूची ' क' में दी गई प्रक्रिया के अनुसार निर्धारित किया जाएगा।

5. प्राकृतिक गैस पाइपलाइन शुल्क के निर्धारण हेतु कंपनी द्वारा डाटा प्रस्तुत करने के निमित्त फॉर्म

प्रत्येक कंपनी बोर्ड को वित्तीय लागतें और अन्य डाटा अनुसूची 'क' के संलग्नक में दिए गए चार्म में प्रस्तुत करेगी । यदि, इन विनियमों की अधिसूचना के दिन को, प्राकृतिक गैस पाइपलाइन-

( 1 ) चालू नहीं है, तो प्राकृतिक गैस पाइपलाइन की संस्थापना की संभावित तारीख से पहले कम से कम छह महीने अथवा इन विनियमों की अधिसूचना की तारीख के नब्बे दिनों के भीतर, जो भी बाद में हो, अथवा

(

2) पहले से चालू है, तो निम्नलिखित में संदर्भित किसी कंपनी के संबंध में-

(क) विनियम 3 का खंड ( 1 ) , इन विनियमों की अधिसूचना के नब्बे दिनों के भौतर,

(ख) विनियम 3 का खंड (2) , बोर्ड द्वारा प्राधिकार क्षेत्र के नब्बे दिनों के भीतरः अभवा

(ग) विनियम 3 का खंड (3) , बोर्ड द्वारा प्राधिकार की तारीख के नब्बे दिनों के भौतरः

बशर्ते कि कंपनी विनियम 3 के खंड ( 1 ) में संदर्भित प्राकृतिक गैस पाइपलाइन की संस्थापन्ना की तारीख अथवा विनियम 3 के खंड (2 ) अथवा खंड (3) में संदर्भित प्राकृतिक गैस पाइपलाइन को बोर्ड द्वारा प्राधिकृत करने की तारीख, जैसा मामला हो, से इन विनियमों पर आधारित "लेखा आधार पर " प्रारंभिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क नेमा जब तक कि कोई प्रारंभिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क अनंतिम रूप से नियत नहीं कर देता;

परंतु यह और कि कंपनी उसके द्वारा इस प्रकार प्रभारित प्रारंभिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क और बोर्ड द्वारा अनंतिम रूप से नियत शुल्क के बीच के अंतर के लिए उपभोक्ताओं के साथ पूर्व प्रभावी रूप से समायोजन करेगा।

6. विविध

यदि इन विनियमों के किसी उपबंध के निवर्धन के संबंध में कोई विवाद उठला है तो बोर्ड का निर्णय अंतिम होगा।

6

THE GAZETTE OF INDIA : EXTRAORDINARY

[PART 11-SEC. 3(1)

अनुसूची क

(विनियम 4 और 5 देखें)

प्राकृतिक गैस पाइपलाइन शुल्क के निर्धारण हेतु प्रक्रिया

प्राकृतिक गैस पाइपलाइन शुल्क प्राकृतिक गैस पाइपलाइन में लगाई गई पूंजी के मानकीय स्तर पर प्रतिलाभ की उचिल दर तथा प्रचालन व्यय के मानकीय स्तर पर विचार करके निर्धारित किया जाएगा।

स्पष्टीकरणः-

'मानकीय स्तर अभिव्यक्ति उस स्तर के संदर्भ में होगी जो एक दक्ष प्राकृतिक गैस पाइपलाइन को बिख्यने, उसके निर्माण, प्रचालन और विस्तार के लिए अपेक्षित प्रचालन व्यय और पूंजी की मात्रा के संदर्भ में इसके आर्थिक कार्यकाल के लिए तर्कसंगत और न्यायसंगत हो।

1. वित्तीय व्यवहार्यता

कंपनी जिस पर ये विनियम लागू होते हैं , प्राकृतिक गैस पाइपलाइन परियोजना को समस्त तकनीकी, प्रचालनात्मक, वित्तीय और लागत डाटा जोकि प्राकृतिक गैस पाइपलाइन शुल्क के निर्धारण में बोर्ड द्वारा अपेक्षित हो , प्रस्तुत करेगी।

2. प्राकृतिक गैस पाइपलाइन शुल्क के निर्धारण हेतु पढति

एक अवधि के लिए प्रभारित किए जाने वाले प्राकृतिक गैस पाइपलाइन शुल्क की यूनिट दर खंड 3 में यथाविनिर्दिष्ट प्रतिलाम की उचित दर पर विचार करते हुए ' रियायती नगदी प्रवाह' (डीसीएफ) पद्धति' पर आधारित परियोजना के प्रतिलाभ की आंतरिक दर होने के लिए गणना की जाएगी। डीसीएफ पद्धत्ति की प्रयोज्यता के संगत मापदंड नीचे खंड 4 से 6 में विस्तार से दिए गए हैं ।

3. प्रतिलाभ की तर्कसंगत दर

लग्ग्रई गई पूंजी पर प्रतिलाभ की दर लगाई गई पूंजी पर प्रतिलाभ की दर होगी जो कर पश्चात बारह प्रतिशत के बराबर है। लगाई गई पूंजी पर प्रतिलाभ की दर एक प्राकृतिक गैस पाइपलाइन परियोजना पर एक बार लागू करने पर परियोजना के संपूर्ण आर्थिक कार्यकाल के लिए नियत हो जाएगी।

रियायती नगदी प्रवाह पद्धति परियोजना के लाभ को तर्कसंगत दर पर इन प्रवाहों को छूट देकर परियोजना के आर्थिक कार्यकाल के लिए पूंजी और प्रचालन व्यय के बहिर्प्रवाहों से अंतप्रवाह‌ को बराबर करने से संबंधित है। मात्रा और बहिर्षवाहों का अनुमान आर्थिक कार्यकाल से लगाया जाता है जिससे प्रतिलाभ की आंतरिक दर प्राप्त करने हेतु परियोजना द्वारा अर्जित किए जाने वाले अपेक्षित प्राकृलिक गैस पाइपलाइन शुल्क का निर्धारण होता है।

भारत का राजपत्र असाधारण

[ भाग II - खण्ड 3 (1) ]

टिप्पणीः

लगाई गई पूंजी पर प्रतिलाभ की कर पूर्व दर समय - समय पर यथासंशोधित आयकर अधिनियम, 1961 के प्रावधानों के अनुसार एक कारपोरेट निर्धारिती के लिए लागू आयकर की अभिहित दर द्वापरा बारह प्रतिशत सकलित कर निकाली जाती है ।

4. लगाई गई कुल पूंजी पर प्रतिलाभ

(1) परियोजना के आर्थिक कार्यकाल के लिए इसमें लगाई गई पूंजी पर प्रतिलाभ का निर्धारण करने के लिए कुल लगाई गई पूंजी पर प्रतिलाभ की तर्कसंगत दर लागू की जाएगी और प्राधिकृत कंपनी किसी भी उपयुक्त तरीके से परियोजना का वित्तपोषण करने में स्वतंत्र है ।

(2) लगाई गई कुल पूंजी संचित अवमूल्यन को कम करके और मानकीय कार्यपूंजी को जोड़कर परियोजना में सकल अचल परिसंपत्तियों के बराबर होगी (अवमूल्यन को छोड़कर प्रचालने लागतों के तीस दिनों के बराबर और प्राप्य अठारह दिनों का प्राकृतिक गैस पाइपलाइन शुल्क) ।

(3) सकल अचल परिसंपत्तियां अर्जन की अपनी वास्तविक ऐतिहासिक लागत (पश्चातवर्ती किसी प्रतिस्थापन अथवा सुधार अथवा आशोधन की लागत सहित) अथवा बोर्ड द्वारा मानकीय रूप से निर्धारित , जो कि कमतर हो और एक दक्ष अवसंरचना सृजित करने और उसे बनाए रखने के लिए सिद्धांतों के आधार पर आर्थिक कार्यकाल के लिए प्राकृतिक गैस पाइपलाइन परियोजना में अपेक्षित लागत के बराबर होगी; अर्थात्

(क) लगाई गई कुल पूंजी के निर्धारण में अचल संपति में कोई निवेश अनुलग्नक 2 में उल्लिखित आधार के अनुसार होगा:-

(ख) भारत में कहीं भी समान परियोजनाओं, यदि कोई हों, में पूंजीगत लागतें समानता के आधार पर बैंचमार्क वाली हों,

(ग) अधिकतम अनुमत्य प्रचालन दबाव के संबंध में पाइपलाइन के डिजाइन और प्रचालन पद्धति ज्ञान की उपयुक्तताः

2

अवमूल्यन की गणना सुव्यवस्थित पद्धति आधार पर संकल अचल परिसंपत्तियों की कीमत पर कंपनी अधिनियम, 1956 की अनुसूची-VI में यथाविनिर्दिष्ट अवमूल्यन की दर लागू करके की जाएगी।

3 इसमें निर्धारित किए गए आधार और मापदंड सर्वांगपूर्ण नहीं हैं और ये विद्याराधीन विशिष्ट प्राकृतिकः मैस पाइपलाइन परियोजना पर निर्भर करते हुए अलग-अलग हैं जिन्हें बोर्ड पारदर्शी तरीके से लागू कर सकता है ।.

8.

THE GAZETTE OF INDIA : EXTRAORDINARY

[PART 11-SEC. 3 (1 )]

(घ) उपलब्ध उपयुक्त प्रौद्योगिकी के मूल्यांकन के आधार पर कंप्रेसर, मीटरी पद्धतियों , एससीएडीए, अपेक्षित अग्निशमन प्रणाली जैसे उपस्करों और सुविधाओं का इष्टतम उपयोग;

(ड. ) स्पर लाड़नें;

(च) कंप्रेसरों के लिए डिजाइन मापदंड; और

(छ) प्राकृतिक गैस पाइपलाइन में प्रमुख उपस्करों की सुविधाओं की लागतों, उसके विद्याने अथवा निर्माणगत लागतों, परियोजना प्रबंधन परामर्श सेवा और प्रचालनपूर्व व्यय का आकलन करना।

5. प्रधालन लागतें

प्राकृतिक गैस पाइपलाइन की आर्थिक कालावधि में इसके परिचालन और अनुरक्षण में अपेक्षित प्रचालन लागतों की निम्नलिखित कार्यात्मक लागत शीर्ष के अतिरिक्त वास्तविक आधार अथवा बोर्ड द्वारा किए गए मानकीय मूल्यांकन, जो भी कम हो, के आधार पर गणना की जाएगी; अर्थात्

(1) उपभोज्य वस्तुएं

(2) उपयोगिताएं-

(क) विद्युत;

(ख) ईंधन (प्राकृतिक गैस की लागत और प्राकृतिक गैस पाइपलाइ‌न में खपत हुई प्रणाली- उपयोग प्राकृतिक गैस की मात्रा पर वसूल न हुए प्राकृतिक गैस पाइपलाइन शुल्क सहित);

(ग) जल;

(3) वेतन और भत्ते;

(4) मरम्मत और अनुरक्षणः

प्रचालन लागतें वे हैं जो प्राकृतिक गैस पाइपलाइन के प्रचालन के सृजित वास्तविक परिसंपत्ति के सही रखरखाव और अनुरक्षण हेतु अनिवार्य होती हैं और इनमें ऋणों पर ब्याज, वसूल न किए जा सकने वाले कर्ज, विक्रय संवर्धन, विज्ञापन व्यय (निविदा व्यय को छोड़कर) पूंजी अथवा डिबेंचर अथवा बांड अथवा किसी ऋण के लिए किया गया व्यय , राजस्व खाते पर विनिमय अंतर जैसी कोई वित्तीय लागत शामिल नहीं है लेकिन सामान्य बैंक प्रभार , बैंक गारंटी प्रभार, एलसी प्रभार और बोली के लिए प्रभार तथा प्राधिकार की शर्तों के अनुसार अपेक्षित निष्पादन बांड शामिल है ।

9

भारत का राजपत्र : असाधारण

[भाग [[-खण्ड3 (1)]

(5) परिसम्पत्तियों (लाभ की हानि के मूल्य सहित) और लाइन पैक मात्रा पर बीमा प्रीमियम;

(6) संबंधित प्रशासनिक और प्राकृतिक गैस पाइपलाइन में प्रचालनों के स्तर के अन्नुरूप उपरिव्यय [उप खंड (5) के उप खंड (1) के अंतर्गत गैर- वर्गीकरण सीमा तक];

(7) कम्पनी अधिनियम, 1956 की अनुसूची VI के अनुसार दरों पर आधारित सुष्यविस्थत प्रणाली आधार पर अचल परिसम्पतियों पर मूल्य हास; और

(8) कुल नियोजित पूंजी पर प्रतिलाभ में शामिल अचल परिसम्पत्ति से या प्रचालन लागत के रूप में माने गए व्यय में से वसूली-योग्य विविध आय , लेकिन इसमें ब्याज से हुई आय, विक्री अथवा किसी अचल या अन्य सम्पत्ति के अंतरण से हुआ लाभ या हानि शामिल नहीं है, यदि कोई है तो वह प्रयालन लागत से हुआ लाभ होगा ।

6. यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के निर्धारण में विचार की जाने वाली मात्रा

(1) परियोजना की मितव्ययी कालावधि पर यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के निर्धारण में गुणक के रूप में मानी गई प्राकृतिक गैस की मात्रा का निर्धारण मानकीय आधार पर निम्नानुसार किया जाएगा:-

(क) प्राकृतिक गैस पाइपलाइन के प्रचालन के प्रथम पांच वर्षों के प्रत्येक वर्ष के लिए गुणक कंपनी की क्षमता आवश्यकता और पेट्रोलियम तथा प्राकृतिक गैस विमानकीय बोर्ड (प्राकृतिक गैस पाइप लाइनें बिछाने, निर्माण , प्रधालम या विस्तार करने के लिए कंपनियों को प्राधिकृत करना) विनियम, 2008 के अन्तर्गत निर्धारित अन्य कंपनियों के साथ तय की गई संविदागत क्षमला के योग को नीचे दिए गए आधार पर इस वर्ष के लिए सागू प्रतिशत उपयोग से गुणा करके निकाला जाएगा:-

प्रतिशत उपयोग

प्राकृतिक गैस पाइपलाइन प्रश्चासन वर्ष

60%

पहला

70%

दूसरा

80%

तीसरा

90%

चौथा

100%

(

ख) प्राकृतिक गैस पाइपलाइन के प्रचालन के छठे और बाद के वर्षों के लिए गुणक निम्नलिखित के समान होंगे:-

4611-G/08-2 10

THE GAZETTE OF INDIA: EXTRAORDINARY

[PART 11-SEC. 3 ( 1) ]

(1) कंपनी की क्षमता आवश्यकला और पेट्रोलियम तथा प्राकृतिक गैस विमानकीय बोर्ड (प्राकृतिक गैस पाइपलाइनें बिछाने , निर्माण, प्रचालन या विस्तार करने के लिए कंपनियों को प्राधिकृत करना) विनियम, 2008 के अन्तर्गत निर्धारित अन्य कंपनियाँ के साथ तय की गई संविदागन क्षमता के योग का 100 प्रतिशत; और

(ii) प्राकृतिक गैस पाइपलाइन के प्रचालन के तत्काल पहले के वर्ष के दौरान पेट्रोलियम और प्राकृतिक गैस विमानकीय बोर्ड (प्राकृतिक गैस पाइपलाइलें बिछाने , निर्माण, प्रचालन या विस्तार करने के लिए कंपनियों को प्राधिकृत करना) दिनियम, 2008 में निर्धारित अतिरिक्त क्षमला के लिए समान वाहक आधार पर परिवहन की गई प्राकृतिक गैस की वास्तविक भात्रा ।

स्पष्टीकरण-

किसी वर्ष में समान वाहक आधार पर परिवहन की गई दास्तविक मात्रा और उप- खण्ड ( 1) की मद (ख) की उप मद (ii) के अंतर्गत गुणक में शामिल मात्रा के बीच के अन्तर का समायोजन यूनिट प्राकृतिक गैस पाइपलाइन शुल्क की डीसीएफ गणना में भावी आधार पर किया जाएगा

(2) उप-खण्ड ( 1) के अंतर्गत निर्धारिल प्राकृतिक गैस की मात्रा को निम्नलिखित प्रयोजन के लिए एमएमबीटीयू के रूप में इसकी ऊर्जा में परिवर्तित किया जाएगा: -

(क) जिन विभिन्न प्राकृतिक गैसों का परिवहन कंपनी द्वारा इस वर्ष के दौरान किए आने की संभावना है उनके साथ मूल्य की आरित औसत को ध्यान में रखते हुए अनंतिम यूनिट प्राकृतिक गैस पाइपलाइन शुल्क का निर्धारण;

(ख) प्रारम्भिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क अवधि के दौरान ग्राहको को सुपुर्द की गई प्राकृतिक गैस के परित औसत ताप मूल्य को ध्यान में रखते हुए अन्तिम प्रारम्भिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क का निर्धारष्णः

(12) प्रारम्भिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क अवधि के अन्त से प्रथम शुल्क समीक्षा की देय तारीख तक की अवधि के बीच ग्राहकों को सुपुर्द की गई प्राकृतिक गैस के भारित औसत ताप मूल्य को ध्यान में रखते हुए प्रथन्न शुल्क समीक्षा;

(घ) शुल्क समीक्षा और विछली शुल्क समीक्षा के बीच की अवधि के दौरान ग्राहकों को सुपुर्द की गई प्राकृतिक गैस के आरिल औसत ताप मूल्य को ध्यान में रखते हुए बाद की कोई शुल्क समीक्षा।

11

भारत का राजपत्र असाधारण

[भाग 11- खण्ड 3(1) ]

7. मितव्ययी कालावधि

प्राकृ‌तिक गैस पाइपलाइन की मितव्ययी कालावधि पेट्रोलियम और प्राकृतिक गैस विमानक्रीय बोर्ड (प्राकृतिक गैस पाइपलाइन बिछाने, निर्माण, प्रचालन या विस्तार करने के लिए कंपनियों को प्राधिकृत करना) विनियम , 2008 में विनिर्दिष्ट किए गए के अनुसार होगी।

8. धुल्क क्षेत्रों में यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के संविभाजन की कार्यविधि

(1) कंपनी बोर्ड के अनुमोदन के लिए पेट्रोलियम और प्राकृतिक गैस विमानकीय बोर्ड (प्राकृतिक गैस पाइपलाइनें बिछाने, निर्माण प्रचालन या विस्तार करने के लिए कंपनियों को प्राधिकृत करना) विनियम, 2008 के विनियम 7 के उप-विनियम (क), (ख) और (ग) के अन्तर्गत विनिर्दिष्ट पद्धति को अपनाते हुए विनियम 5 के अन्तर्गत विनिर्दिष्ट तरीके से परियोजना की मितव्ययी कालावधि के दौरान सम्पूर्ण शुल्क क्षेत्रों के यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के संविभाजन से संबंधित गणना प्रस्तुत करेगी बशर्तें कि -

(क) ऐसी पद्धति को अपनाते हुए बोली देने की कोई आवश्यकता न हो;

(ख) विभिन्न शुल्क क्षेत्रों में यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के ऐसे संविभाजन के लिए कोई तरजीह लागू न हो; और

(ग) कंपनी ऐसे संविभाजन का निर्धारण करने के लिए स्वयं की संख्या का उपयोग करे ।

(2) निम्नलिखित अवधि के दौरान प्रत्येक शुल्क क्षेत्र के लिए यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के संविभाजन के लिए विभिन्न शुल्क क्षेत्रों में वास्तव में परिवहन की गई मांत्रा कंपनी द्वारा परिवहन की हुई समझी गई मात्रा से अलग होने के कारण कंपनी द्वारा प्राकृतिक गैस पाइपलाइन शुल्क की वसूली में अधिक उपलब्धि या कम उपलब्धि के लिए ग्राहकों के साथ कंपनी द्वारा कोई समायोजन नहीं किया जाएगाः

(क) प्रारम्भिक प्राकृतिक गैस पाइपलाइन शुल्क की अवधि;

(ख) प्रारम्भिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के समाप्त होने के पश्चात पहले पांच और बाद के वर्ष; और

दो लगातार शुल्क समीक्षाओं के बीच की अवधि। (ग)

9. प्रारम्भिक गैस पाइपलाइन शुल्क का निर्धारण और यूनिट प्राकृतिक गैस पाइपलाइन शुल्क की समीक्षा

( 1) यूनिट प्राकृतिक गैस पाइपलाइन शुल्क का निर्धारण इसकी मितव्ययी कालावधि के लिए किया जाएगा और निम्नलिखित के दौरान लेवल किया जाएगा- 12

THEGAZETTE OF INDIA : EXTRAORDINARY

[PART ] 1-SEC. 3 (1)]

(क) प्रारम्भिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के लिए लागू अवधि;

(ख) प्रारम्भिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क की समाप्ति के पश्चात पांच लगातार वर्षों की अवधि; और

(ग) किन्हीं दो लगातार शुल्क समीक्षाओं के बीच की अवधि।

(2) प्रारम्भिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क और सभी शुल्क क्षेत्रों के लिए इसके संविभाजन का निर्धारण अनन्तिम गणनाओं के आधार पर किया जाएगा।

(3) प्रारम्भिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क से संबंधित अंतिम गणनाएं निम्नलिखित के लिए अपेक्षित समायोजनों को ध्यान में रखकर की जाएंगी:-

(क) खण्ड 4 और खण्ड 5 में दिए गए के अनुसार वास्तविक पूंजी और प्रचालन लागत का मानकीय बोर्ड द्वारा रूप से आकलित लागत , जो भी कम हो;

( ख) खण्ड 6 के उप-खण्ड ( 1) की मद (क) के अनुसार मानी गई मात्रा, और

(ग) खण्ड 6 के उप खण्ड (2) की मद (ख) के अनुसार मात्रा का उसकी ऊर्जा समानता में परिवर्तन।

(4) कंपनी उप खण्ड (2) के अन्तर्गत अनन्तिम गणना के आधार पर वसूल किए गए प्राकृतिक गैस पाइपलाइन शुल्क और उप- खण्ड (3 ) के अन्तर्गत अंतिम गणना के अनुसार वसूली योग्य शुल्क के बीच के अंतर को ग्राहकों के साथ समायोजित करेगी ।

(5) उप-खण्ड (3) के अन्तर्गत विनिर्दिष्ट अन्तिम यूनिट प्राकृतिक गैस पाइपलाइन शुल्क बोर्ड द्वारा इसे संशोधित किए जाने तक पहली शुल्क समीक्षा होने की अवधि के लिए लागू होंगे ।

(6) कंपनी बोर्ड के अनुमोदन के लिए सभी शुल्क क्षेत्रों के लिए प्रारम्भिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के संविभाजन सहित इसकी अनन्तिम गणना करने सहित विनियम 5 के अन्तर्गत विनिर्दिष्ट रूप और समय में इन विनियमों के अधिसूचित होने के पश्चात् यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के निर्धारण के आंकड़े प्रस्तुत करेगी।

बशर्ते कि सभी शुल्क क्षेत्रों के लिए प्रारम्भिक प्राकृतिक गैस पाइपलाइन शुल्क के संविभाजन सहित इसकी अंतिम गणना प्ररम्भिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के लिए लागू अवधि की अंतिम तारीख से तीन माह पहले प्रस्तुत की जाए ।

(7) कंपनी सभी शुल्क क्षेत्रों के लिए प्रारम्भिक प्राकृतिक गैस पाइपलाइन शुल्क के संविभाजन सहित इसकी गणना विनियम-5 में विनिर्दिष्ट रूप में प्रत्येक शुल्क समीक्षा के समय निम्नलिखित से तीन माह के अन्दर प्रस्तुत करेगी: - 13

भारत का राजपत्र असाधारण

[ भाग - खण्ड 3 (ⅰ) ]

(क) प्रारम्भिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के पश्चात् लगातार पांच वर्षों के अंतिम वर्ष के अन्त में; या

(ख) पूर्ववर्ती शुल्क समीक्षा अवधि के अंत में

बशर्ते कि गणना में वास्तविक लागत , वित्तीय और प्रधालन आंकड़े या बोर्ड द्वारा मानकीय रूप से आकलित आंकड़े जो भी उप-खण्ड (क) और (ख) जैसा भी मामला हो, के अन्तर्गत निर्दिष्ट अवधि से संबंधित खण्ड 4 और 5 के अनुसार कम हो।

(8) प्रारम्भिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के पश्चात लगातार पांच वर्षों या किसी शुल्क समीक्षा के दौरान पाए गए निम्नलिखित अन्तरों के लिए समायोजना परियोजना की मितव्ययी कालावधि की शेष अवधि को ध्यान में रखते हुए भावी आधार पर डीसीएफ गणनाओं में किया जाएगा, नामतः

(क) पूंजीगत और प्रचालन लागतों से संबंधित प्रस्तविक निष्पादन के कारण हुए अन्तर, जिनकी खण्ड 4 और 5 के अन्तर्गत पहचान किए गए मानकीकृत मानदण्डों के साथ तुलना की गई हो,

(ख) खण्ड 6 के उप-खण्ड ( 1) की उप-मद (ii) के स्पष्टीकरण के अन्तर्गत मावाओं से संबंधित अन्तर; और

(ग) खण्ड 8 के उप-खण्ड (2) के अन्तर्गत ऊर्जा समानता में अन्तर।

(9) बोर्ड स्वयं या कंपनी के अनुरोध पर, जैसा भी भामला हो, निम्नलिखित को ध्यान में रखते हुए दो शुल्क समीक्षाओं के बीच किसी भी समय यूनिट प्राकृतिक गैस पाइपलाइन शुल्क की समीक्षा कर सकता है-

(0) नियोजित पूंजी पर प्रतिफल की दर को मिलाकर उपयोग की गई आयकर की लागू नाममात्र दर;

(ii) यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के निर्धारण में प्रयुक्त किसी मानदण्ड में हुआ अचानक परिवर्तन।

(10 ) किसी शुल्क समीक्षा के पश्चात् निर्धारित किए गए प्रारम्भिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क और यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के पश्चात लगातार पांच वित्तीय वर्षों की अवधि के लिए अनन्तिम और अंतिम प्रारम्भिक यूनिट प्राकृतिक गैस पाइपलाइन शुल्क, यूनिट प्राकृतिक गैस पाइपलाइन शुल्क बोर्ड द्वारा संशोधित किए जाने तक लागू रहेंगे ।

14

THE GAZETTE OF INDIA : EXTRAORDINARY

[ P11-- SEC, 3 ( ) ]

सलग्नक 1

[देखें विनियम 5]

परियोजना पूंजी लागत स्वर (कैपेक्स अहरी प्रवाह),

एकडे

क्र. सं. विवरण

आईएनआर

भारतीय रुपए

योग

देशी मुद्रा

के संयंत्र और मशीनरी

1 रसीविंग टर्मिनल देखें संलग्नक 1 (क) ]

2 कंप्रेशर स्टेशन (देखें संलग्नक १ ( ख)]

3 मध्यवर्ती टर्मिनल [देखें संलग्नक 1 (ग)

4 सुपुर्दगी टर्मिनल (देखें संलग्नक 1 (थ) )

5 पाइपलाइन देखें संलग्नक 1 (ड. ) ]

उप-योन (क)

ख इंजीनियरिंग लागत

1 विस्तृत इंजीनियरिंग प्रापण, निर्माण, पर्यवेक्षच्य और परियोजभा प्रबंधन

2 उपर्युक्त पर सेवा कर

उर -योग (ख)

र स्थल संबंधित लागत

भूमि

1

2 अन्य कोई (ब्यौरा दिया जाए)

उप-योगम)

छ मालिक की लागत, शुरुआती खर्च

1 शुरुआती और स्थापित खर्च

2 मालिक का प्रबंधन सार्थ

उपयोग (घ)

3. अन्य लागल

1 आकस्मिकताएं और वृद्धि

2 प्रारंभिक और प्रचालन-पूर्व खर्च

3 निर्माण अवधि तथा वित्त पोषण प्रभार

4 कार्य पूंजी के लिए मार्जिन धनराशि

उप -योग (ड.)

योग (क ख ग घ+5.

(*) आईएनआर विदेशी मुद्रा भारतीय रुपए मैं परिवर्तित

टिप्पणीः विस्तृत अनुमान गणना मद ड. मैं दी जाए 15

असाधारण

भारत का राजपत्र

[भागः] । -खण्ड 3 (i ) ]

संलग्नक 1 (क) [देखें विनियम 5]

रसिविंग टर्मिनस की पूंजीगत सागत

सोम

क्र. स. विवरण

आईएमआर

तकनीकी विविष्टिবা

भारतीय स्पए

विदेशी मार

प्रमुख सर्द

1 सपर देप तथा पिन सिमनलर

2 मीटरिंग प्रणाली

3 कार्टरिज फिल्टर्स

4 अग्नि सुरक्षा प्रणाली

5 विपत आपूर्ति व्यवस्था

6 कप्रशर

दर क्षमता आपूनिक के अनुसार 7 अन्य कोई मद (ब्यौरा दिया जाए)

उप -थोन

ख यस्क सामग्री

1

2 इलेक्ट्रिकल

3 इंस्ट्रूमेंटेशन

4 अन्य कोई मद (ब्यौरा दिया जाए)

उप-योम

अतिरिक्त पूजे (ब्यौरा दिव्य आए)

उप-मोम

यांत्रिक

1

2 इलेक्ट्रिकल्स

3 इस्टमेटेशन

4 सिविल कागे

5

6

अभि अन्य कोई मद (ब्यौरा दिया जाए)

उप -योग

कर और शुस्क

1 समुद्री माझ

2 सीमा शुल्क

पादरतमार डालम

अतदेशीय भाड़ा

उत्पाद और सीएसटी

3 5456

कार्य ठेका कर

7

अन्य कोई लागू कर और शुल्क (ब्यौरा ६)

उप-योम

योग (क से इ. )

आईएमआर विदेशी मुदा भारतीय उपप में परिवर्तित 16

THE GAZETTE OF INDIA : EXTRAORDINARY

[PART 11-SEC . 3 (0) ]

संलग्नक 1 (ख)

[देखें विनियम 5]

कंप्रेशर की पूंजीगत लागत

क्र.सं. विवरण

प्रमुख मर्द

1

प्रेशर

2 स्क्रैपर टैप तथा पिग सिगनलर 3 मीटरिंग प्रणाली

4 कार्टरिज फिल्टर्स

5 अग्नि सुरक्षा प्रणाली

6 विद्युत आपूर्ति व्यवस्था

7 अन्य कोई मद (स्यौरा दिया जाए)

बस्क सामग्री

1 पाइपिंग

2 इलेक्ट्रिकल

3 इंस्ट्रूमेंटेशन

4 अन्य कोई म्यद (क्यौरा दिया जाए

开 अतिरिक्त पूर्व (ब्यौरा दिया आए)

व

यांत्रिक

3

4 सिविल कार्य

5

अन्य कोई मद (क्यौरा दिया जाए)

कर और भम्क

1- समदा भाग

2 सीमा शुल्क

3

4 अतदशाम भा

उत्पाद और सीएसटी

कार्य ठेका कर

7

बामा

अन्य कोई लाभकर और शुल्क ( क्यारा है।

आईएनआर

तकनीकी विशिष्टियां

योग (*)

भारतीय रुपए

विदेशी मुद्रा

दर क्षमता आपतिकती के अनुसार

उप -योग

उप -वोग

उप -योन

उम -पोग

बाग ( तसे ज. )

आईवी महा भारतीय से परिवर्तित 17

भारत का राजपत्र असाधारण

[ भाग [ 1-खण्ड 3 (1) ]

संलग्नक 1 (ग) [देखें विनियम 5]

मध्यवती टर्मिनल की पूंजीगत मागत

योग

आईएनआर

विवरण

क्र.सं.

भारतीय रुपए विदेशी मुद्रा

प्रमुख मदै

दर क्षमता आपतिको के अमेसार 1 सरूपर टैप तथा पिग सिगनलर

मौदरिक प्रणाली

2

3 कार्टरिज फिल्टर्स

4 अग्नि सुरक्षा प्रणाली

5 विद्युत आपूर्ति व्यवस्था

7 अन्य कोई मद (ब्यौरा दिया जाए)

उप -योग

1

2

3 इसमेंटेशन

4 अन्य कोई मद (ब्यौरा दिया जाए)

उप -योग

अतिरिक्त पूजे (घ्यौरा दिया जाए)

उप-योज

उत्थापन

1 यांत्रिक

2

3

4 सिविल कार्य

5 भूमि

अन्य कोई मंद (स्यौरा दिया जाए)

उप -योग

कर और शुरुक

1 समुद्री माझ

सामा शुल्क

2

3

4

5 उत्पाद और सीएसटी

कार्य ठेका कर

7

मा

8 अन्य कोई लाग कर और शुल्क (ब्यौरा है)

उप -योग

बीम (क से .)

( आईएनआर विदेशी मुद्रा कामेच रुपए में परिवर्तित [PART I-SIC. 307 ]

THE GAZETTE OF INDIA : EXTRAORDINARY

18

संलग्नक 1 (घ)

[देखे विनियम 5]

भूर्दगी टर्मिनल की पूंजीगत लागत

क्र.से.  विवरण
                                                       आईएनआर           एफई          योग                 तकनीकी विशिष्टियां
                                                        भारतच रुपए    विदेशी मुद्रा
         प्रमुख मर्दै
  1      स्क्रैपर टैप तथा दिग सिगनलर
  2      मीटरिंग प्रणाली                                                                       दर क्षमता आपतिकता के अनुसार
  3     कार्टरिज फिल्टर्स
  4     अग्नि सुरक्षा प्रणाली
  5     ठिद्युत आपूर्ति व्यवस्था
  6      अन्य कोई भद (ब्यौरा दिया जाए)
                                               उप-योग
         बल्क सामग्री
  1
  2     इलेक्ट्रिकल
  3     इंस्ट्रूमेंटेशन
  4     अन्य कोई मद (ब्यौरा दिया जाए)
                                               उप -योग
  म     अतिरिक्त्त पूर्जे (ब्यौरा दिखा आए)
                                               उप-योग
        उत्थापन
  1     यात्रिक
  2     इलेक्ट्रिकल्स
  3     इंस्ट्रूमेंटेशन
 4      सिविल कार्य
  5     भूमि
  6     अन्य कोई मद ( ब्यौरा दिया जाए)
                                               उप-योग
 3.     कर और शुल्क
  1     समुद्री भाड़ा
 2      सीमा शुल्क
 3      बंदरगाह हैंडलिंग
 4      अतर्देशीय भाडा
  5     उत्पाद और सोएसटी
  6     कार्य ठेका कर
 7      बीमा
 8      अन्य कोई लागू कर और शुल्क (ब्यौरा दें।
                                              उप-योग

योग (क से 5. ) * आईएनआर विदेशी मुद्रा भारतीय रुपए में परिवर्तित 19

असाधारण

भारत का राजपत्र

[ भाग । -खण्ड 3(1 ) ]

संलग्नक 1 ( ड. )

देखें विनियम 5]

पाइपलाइ‌नों की पूंजीगत लागत

क्र. सं. विवरण                                आईएनआर       एफई       बोग (*)         तकनीकी विशिष्टियां
 क      प्रमुख मर्द
  1    सर्वेक्षण और भूमि अन्वेषण
  2     भूमि, आरओय और फसल मुआवजा
  3    लाइन पाइपस                                                              बाहरी व्यास और दीवारों की मोटाई
  4    लाइन सामग्री
  5    कोटिंग और पाइप परिवहन
  6    पाइपलाइन बिपना
  7    कैथडिग सुरक्षा
  a    ओएफसी , टेलिकॉम और टेलीस्परवाइजरी प्रणाली
  9     एससीएडीए और एपीपीएस प्रणाली
  11   विद्युत स्रोत
  12   अन्य कोई मद ( ब्यौरा दिया जाए)
                                       उप-योग
       लघु मर्द
  1    समुद्री भाड़ा
  2    सीमा शुल्क
  3    बंदरगाह हैंडलिंग
  4    अंतर्देशीय भाड़ा
  5    उत्पाद और सीएसटी
  6    कार्य ठेका कर
  7    बीमा
       अन्य कोई मद (म्यौरा दिया जाए)

उप-योग

योग (कख)

((*) आईएनआर विदेशी मुद्रा भारतीय रूपए में परिवर्तित 20

THE GAZETTE OF INDIA : EXTRAORDINARY

[PART II --Set: 3 (1 )]

वर्ष4

वर्ष३

वर्ष2

वर्ष1

संलग्नक1(च) देखेंविनिधन51

ग्रामऔरहानिलेखा($)

उपयिमताएं(विद्युत,धिनऔरजल)

उपभोज्यऔररसायन

एलएनएमआधारपरमुल्यकामलथागईखातेमेंडालागयाविविधखर्च(प्रत्येककास्थौरादें)

मरम्मतऔररखरखाव

सामान्यप्रशासननिकखवं(प्राधिकरणकेअमदानकेअनुसारबोलीबांडऔरनिष्पादनपरबैंकप्रभारसहित)

उपयुक्तखर्थ(दरसहित)केलिएकार्यपूंजीआवश्यकतामेंप्रयोगअनुसारकार्यपूजीऋणपरब्याज

वैतन अन्यकोईखसे(स्यौरादियाजाए

कुलप्रचालमसामतबाहरी-प्रवाह

मुभ्यएसम्याजऔरकरसेपूर्वपीजीडीआईटी)(1-2)

आवधिकऋणपरब्याज(दरसहित) मुम्यहासऔरकरपूरेलाम(पोचोटी)(3-4-5)

बीमा(लाइनपेकमारासंहित)

कुमअतर-प्रवाह

कर पूर्वनाम(पौबीटी)(6-7) करप्रावधान(विद्यमानआयकरनियमोंकेअनु‌मारदै)

ग

*प्राकृतिकगैसपाइपलाइनशुल्कसेराजस्व

R 9

2

10करउपरांतस्राम(पौरटी)(8-9) पचाग्रेनसेनबन्द(सीएफओ)(10+7)नकदप्रवाहशीटमेंस्थानांतरित

टिप्पणी

67

1. प्राकृतिकगैसपाइपलाइनशुल्कप्राकृतिकगैसपम्पलाइनमेंपरिवहनकीगईप्राकृतिकगैसकीवास्तविकमात्रापरआधारितहोनायाहिएजिसेपौआईआरआरपरविचारकरतेहुए अपनाईगईडीसीएफपद्धतिद्वारानिर्धारितकियाजाएगा,जिसस्तरपरनिवलअंतर-प्रवाहपरियाजनाकीआर्थिकआयुकेनिवलबाहरीप्रवाहकेबराबरहोबा।

4.मोहयैदअभ्म,यदिलागूहों,कोमप्जनासहितअलगसेदर्शायाजाएगा। 5.लेखा-परीक्षितसाभऔरहान्तिलेखा,जहांकहींलागूहो,संलग्नकियाजाए।

2प्राकृतिकगैसपाइपलाइनकेविस्तारकेलिएउपर्युक्तकेलिएउपर्युक्तप्रपनमेंआंकड़ेपरियाजनाविस्तारकेबादपरियोजनापरलागूअनुसारहाँने। 3.गैर-प्रबालनआय(जैसेपीएमजीघरेलूबाहकोंसेब्याजमुक्तप्रतिदेयसुरक्षाजमापरब्याज)कोएरियाजनाअंतर-प्रवाहनहींमानाजाएगा।

($)वास्तविकयाअनुमान,जहांकहीलागूहो। (*)प्राकृतिकगैसपाइपलाइनमेंप्राकृतिकगैसकेपरिवहनकेबादसभीप्रल्यास,अप्रत्यक्षऔरआबंटितसामान्यसग्मतकरेछोड़कर।विन्तीयबांगतऔरविक्कीवार्चकोओड़कर।

21

असाधारण

भारत का राजपत्र

[ भाग 1] - खण्ड 3(i) ]

रुपए

वर्ष25

वर्ष4

आर्थिकआयु

वर्ष3

वर्ष2

वर्ष1

वर्ष-1

वर्ष2

निर्माणअवधि

नकदप्रवाहविवरण

संलग्नक1(छ) [देखेंविनियम5]

वर्ष-3

वितरणयोग्यलाभपरकर

प्रारंभिकनकदबकाया

आवधिकऋणऔरअल्पावधिकऋण

निधियोंकाप्रयोग

सामान्यअतिरक्तपंजीखर्च

   वर्ष        निधियोंकास्रोत इक्विटीयाअधिमानइक्विटी(*) प्रथालनीसेनकद कार्यपंजीकेलिएबैंकऋण अन्य(कृपयाउल्लेखकरें) पंजीखर्च निवलकार्यपूंजीमेंवृद्धिया(कमी) ऋणोंकीअदायगी इक्वटीधारकोंकोलाभांश अन्य(कृपयाउल्लेखकरें) नकदअधिशेषया(घाटा) अतिमनकदबकाया (*)क्षतिपूर्तिब्यौरादियाजाए।
                         1                            ग        घ                         2         क                                                                                   क
क्र.सं.

22

THE GAZETTE OF INDIA : EXTRAORDINARY

Parr 11- Sec.30) )

वर्ष25

रुपए

वर्ष4

आर्थिकआय

वर्ष3

वर्ष2

वर्ष1

वर्ष-1

तुलनपत्र($)

[देखेंविनियम5]

वर्ष2

निर्माणअवधि

वर्ष-3

परिसंपत्तियां

आस्थगितराजस्वखर्च

देनदारियां

अधिमानशेयरपूंजी(**)

सकलनिधर्धारितपरिसंपत्तियां

इक्वटीपूजी

निवलनिर्धारितपरिसंपत्तियां

निवलचालपरिसंपत्तियां

निवेशनिर्धारितपरिसंपत्तियां

विविधनिर्धारितपरिसंपत्ति

नकदऔरबैंकबकाया

टिप्पणी

निवलमूल्य

एफसीआवधिकऋण

अन्य(कृपयाउल्लेखकरें)

वर्ष

रुपयाआवधिकऋण

रिजर्व

घटा:संचितमूलयह्रास(*)

ऋण

अन्य(कृपयाउल्लेखकरें)

कार्यपूंजीकेलिएऋण

क)लेखा-परीक्षिततुलनपत्र,जहांलागूहो,संलग्नकियाजाए।

($)वास्तविकयाअनुमान,जहांकहींलागूहो। (*)परिसंपत्तिशीर्ष-वारमूल्यहासगणनादीजाए।.

(**)जिससीमातकक्षतिपूर्तिनहो,वहांक्षतिपूर्तिअधिमानपूंजीकोऋणमेंदर्शायाजाए।

[ भाग ।। - खण्ड 3(1 ) ]                                                                                                                                                                                                                                                                                                                    भारत का राजपत्र                                                                                          असाधारण
                                                                                                                                                                                                                                                                                                                                                                                                                                                                   7से11केलिएटी                                                 स्पष्टरूपसेउल्लेखकिरणजानाचाहिए।
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               प्ररसतकरतेसमय
                                                                                                                                                         वर्ष3                                                                                                                                                                                                                                                    वर्ष2सेकेलिएही2                                                                                                ऐसी
                                                                                                                                                          वर्ष2                                                                                                                                                                                                                                                                                                                                                     केलिएदेयहोताहै।
                                                                                                                                                                                                                                                                                                                                                                               टीहै:1वर्षके मिए
                                 संलग्नक1(झ)                                              (विनियम5लयाअनुसूचीककाखण्ड9और9देखें!
                                                                                                                              दिर्माणअवधि              वर्ष2
                                                                                                           जाग-1:प्राकृतिकगैसपाइपलाइनशुल्ककीगणनापरियोजनाआईआरआरपरआधारित वर्ष
                                                                                                                                              वर्ष                     क)पूंजीऔरप्रचालनलागतकहरीप्रकर(मार्जिनधनराशिसहित) वा)अंतर-प्रवाह(संतक1(घ)मेंअनुमानितलाभऔरहानिमेखाकी मद3केअनुसारमूल्यइसकाऔरआकरसेपूर्वभाभ संचयीअंतर अनुसूचीककेबजा2और3मेंविनिर्दिष्टअनुसारप्रतिलाभकीउचित दरपरअम्धारितगणनाकिएगएप्राकृतिकगैसपाइपलाइनशुल्ककी स्तरइकाई क)प्राकृतिकगैसपादपतनसुन्क(टी)कीप्रारंभिकइकाईकीअवधि ख)प्राकृतिकपहमाइनशुल्क(2)प्रारंभिकइकाईकेबाद अनुसूचीकके2मेंविनिर्दिष्टअनुसारपरियोजनाकीआंतरिक प्रतिमदरकेअनुसारउक्तिप्रतिसामदरपरआधारितगणनाकीगई प्रत्येकशुल्कसमीअवधिस्टीतथाउसकेबाद। द्वाराअंकसहितप्राकृतिकगैसपाइपलाइनशुल्ककीगणनाकोबोर्डकोप्रस्तुतकरमाहोताहैअबकभीयहनिर्धारणयासमीक्षा 1.कंपनी अनुसूचीककेखण्डकेअंतर्गतविनिर्दिष्टअनुसारपंजीलांगत.प्रथासनलागतऔरभावकेलिएडीसीएफगणनामेंअपिलतसमसमायोजनकोको 2. बहिर्षमेंगोमतकार्य-मतिकेकारणमहिप्रर्वाहशामिलहोताहै। 3.पूंजी

THE GAVDATE OF INDIA : EXTRAORDINARY

तुमक्षामें

पूर्णतुलनामेंप्रतिशत बुद्धि(100%सेबाद)

(PSA )

.दि...

एमएमबीटीयमें। महिमशुरु क्षेत्र

4

दौलेडसे उत्तरोन्तर

टीजेडर

of तुादनमें so

2

टीजनकीतुमना

%शुल्क क्षेत्र1कीतुलना प्रतिशतके लिएएकसेवना

।

संलग्नक1(ङ्गा)(जारी..)

गैसपाइपन्कइन دآید

[विनियम5तथाअन्सूधौककाखण्ड8और9देखा

पाकृतिकगैस अवधिकेलिए

भाग :प्राकृतिकगैसपाइपलाइनशुल्कक्षेत्रकीतुलनामेंप्राकृतिकगैसपाइपलाइनशुल्ककाआवंटन

टीजेडासेअपन

परारम्भिकअव

۳۱

angmafe*

प्रक्रियाकोउसीआधारपरपालनकियाजानाचाहिएजैसाकिप्रारंभिकप्राकृतिकगैसपाइपलाइनशुल्कअतधिकेलिएलागूअवधिकेलिएउल्लेख लेखकियागरमहै।

प्रत्येकशुल्कक्षेत्रसेविचारकीगईमात्रा

अवधि प्रत्येकशुल्कक्षेत्रमेंविधारकीगड़ेमात्रा

प्रत्येकशुल्कक्षेत्रमेंविद्यारकीगईभात्रा टिप्पणीः

प्रत्येकशुल्कक्षेत्रमेंविद्यारकीगईमात्रा माग।केअनुसारइकाईप्राकृतिकगैसपाइपलाइनशुल्क

आगकेअनुसारइकाईप्राकृतिकगैसपाइपलाइनशुल्क भांगकेअनुसारइकाईप्राकृतिकगैसपाइपलाइनशुल्क

मागकेअनुसारइकाईप्राकृतिकगैसपाइपलाइनशुरु

मुल्कके 1.प्राकृतिकगैसपाइपल्यइनशुल्कक्षेत्रोंकीतुलनामेंसकृतिकगैसपाइपलाइनभुल्यआनंटम मनगणनाप्रत्येकशुल्कसमीक्षाअवधिमेंप्रस्तुत उनकमीहोतीहै। 2प्रत्येक

गैसपाइपलाइनशुल्कक्षेत्रमेंमांत्रापरविश्धारकरनेकाआरआधारउपलब्धकरायाजाए(रोकेकीप्रतियांसंलग्जकीजाएंजाए। 4.उपर्युक्तकेसंबंधमेंमात्राएमएमएससीएममेंउपलब्धकराईजाएतथाप्राकृतिक लिकगैसकीमात्राकोऊर्जाकोसमरूमएमएमबीटीयूमेंपरिवर्तित परिवर्तितकरनेकेआधारकोप्रदर्शितकियाजाए।

प्राकृतिकगैसपाइपलाइनशुल्कक्षेत्रकीतुलनामेंइकाईप्राकृतिकगैसपाइपलाइनशुल्ककोविभाजितकरनेकेआधारमयउस्सेसेखकियाजाए। 3प्रत्येक प्राकृतिक 25

भारत का राजपत्र असाधारण

[ भाग II- खण्ड 3 (i ) ]

संलग्नक 1 (

(देखे विनियम 5]

अनुमान

1. पूजी लागत से निर्धारित करने के मिए प्रयुक्त विक्रिदर को भारती শূরা में বর্ণাব্য সাহা

2. कंधामी द्वारा प्रचालन जागत उपलब्ध कराने का प्रपत्र

Lalit viral Site M

उप कामका

3 मम्मत और रखरखन

उपभोग (ग)

(*) कदी भई बिजली अस्पति प्रभार और परिवर्तनीयन तथा निजी उत्पादन का ब्यौरा उपलब्ध कराया जाए।

( ४) सक्ट्रिकल, मिमिकी तुलना में सेमी और करपाक कए। (

2) और अत्यास व्यका आधार वंदन के आधार सहित उपलब्ध नाव बाए

( १५) ताम भीति, सुविधाएं नाइन जिल माता की हानि पर प्रीमियम उपलब्ध कराया जाए।

टिप्पणी

क. प्रकलन लागत की प्रत्येक मादक समय विना और संग किए ।

तो. सभकरण उप्पली सीर्ष के लिए गाजम और आबंटन का पूरा आधार उपलब्ध कराया जाए।

3 वे वर्ष के व्यथ केयर अहित परियार्यान्वयन अनुसूची दी जण

* प्रत्येक प्रकार के ऋण व्याज दर अदाकली आदि के लिए अनुसू‌ची उपकराया जाए ।

5 कंपनी अधिमियम और जायकर अधिनियम के अनुसार मून्य इस अनुसूची उपलब्ध कराई जाए ।

प्रत्येक सण्ड की लंबाई सहित प्राकृतिक गैस परसाई की खण्ड-कर अगता।

7 कंग्रेमारी की पाड़ान समता तथा दर क्षमता उपलब्ध बनाई जाए।

* प्रस्तावित क्षमता उपयोग सभासदर मतकराया जाए।

परिजनाको अवधिको वा में उपलब्ध स्नाक कए।

10 परियोजना कति आर्थक आयु।

11 आयकर अधिनियम, 1951 के अंतर्गत नागू आयकर धरै तथा छूट, बाँद उपसही को दर्शाए।

12 आर्षक आयु की तुलना में प्रकृतिक गैस पल में परिक्षण की आने की अनुम्बति प्राकृतिक स्याँरा तवा बुकिंर्ण पाहपनि शान्ता के लिए केके की प्रक्षियों की निम्मलिखित प्रपत्र में उपलब्ध कराया जाए.

4

123

MAR 26

निजी आवासका

अतिरिक्त क्षमता

(*) सामान्य वाहन मुक्त पाँच तथा विदधार पाउसको जाए।

13 प्राकृतिक राज मात्रा को उसके एमबीटीयू ऊर्जा समख्छ में परिवर्तन के आधार को उपलब्ध कराया जाता

14 पूंजी वा प्रचालन लागत के अनुम्बन के संदर्भ में सभी अनुमान तथा अप्राकृतिक गैमाइशुल्कके निर्धारण पर सामयी है उसके किस्सीचमा सो असम से दर्शाया जाना जहिए।

अनुसूची क का संलग्नक 2

[अनुसूची का खण्ड 4(3) (क) देखें]

प्राकृतिक गैस पाइपलाइन शुल्क के लिए नियोजित कुल पूंजी पर प्रतिफल के निर्धारण में स्थायी सम्पत्ति का विवेचन

नियोजित कुल पूंजी पर प्रतिफल का निर्धारण करने में प्राकृतिक गैस पाइपलाइन में स्थायी परिसम्पत्तिर्यो पर विचार करने का आधार निम्नलिखित मानदण्डों के अनुसार होगा:-

( 1 ) प्राकृतिक गैस पाइपलाइन में स्थायी परिसम्पत्ति ठोस परिसम्पत्ति होती है जिसकी एक वर्ष से अधिक की उपयोगी प्रचालन कालावधि होती है और प्राकृतिक गैस पाइपलाइन शुल्क के जरिए राजस्व सृजन का अभिन्न अंग होती है । प्रतिभूतियों में निवेश, साख , मौजूदा परिसम्पत्तियां , बहे खाते न डाली गई संचित हानि, चल रहा कार्य , आदि स्थायी परिसम्पत्तियां नहीं होतीं ।

4611 G1/08-4 26

THE GAZETTE OF INDIA : EXTRAORDINARY

[PART II-SEC. 3 ( 1)]

(2) हानियों के पुनः मूल्यांकन या पूंजीकरण के कारण स्थायी परिसम्पत्ति की ऐतिहासिक लागत में हुए किसी परिवर्तन पर ध्यान नहीं दिया जाएगा। तथापि , किसी स्थायी परिसम्पत्ति में सुधार , संशोधन, विस्तार या प्रतिस्थापन पर व्यय की गई लागल पर , भारतीय सनदी लेखाकार संस्थान के अनिवार्य लेखाकरण मानकों में निर्धारित विवेचन के अनुसार ध्यान नहीं दिया जाएगा।

(3) क्रय की गई भूमि की केवल लागत और प्राकृतिक गैस पाइपलाइन के लिए अनिवार्य सुविधाएं स्थापित करने के लिए प्रयुक्त भूमि पर विचार नहीं किया जाएगा। भावी उपयोग ( प्राकृतिक गैस पाइपलाइन में क्षमता का विस्तार करने) के लिए क्रय की गई भूमि पर तभी विचार किया जाएगा जब उसका उपयोग किया जाए।

(4) स्थायी परिसम्पत्ति के प्रारंभण पूर्व चरण के दौरान ऋण पर ब्याज (किसी विदेशी मुद्रा में लिए गए किसी ऋण के मामले में विदेशी मुद्रा में अन्तर सहित) के पूंजीकरण के कारण स्थायी परिसम्पत्ति के मूल्य में हुए किसी परिवर्तन पर विचार किया जाएगा बशर्ते कि उस ऋण का उपयोग केवल उक्त स्थायी परिसम्पत्ति का सृजन करने के लिए किया गया हो ।

(5) प्राकृतिक गैस पाइपलाइन परियोजना की मितव्ययी कालावधि की समाप्ति तक "रोलिंग आधार" पर नियोजित पूंजी पर प्रतिफल के लिए स्थायी परिसम्पत्ति पर विचार किया जाएगा बशर्ते कि प्रारम्भण बंद न कर दिया जाए । स्थायी परिसम्पत्ति का प्रारंभण बंद किए जाने पर इसकी बिक्री या स्क्रैपिंग से प्राप्त हुए मूल्य पर डीसीएफ गणनाओं में परियोजना अन्तः प्रवाह के रूप में विचार किया जाएगा। मितव्ययी कालावधि के अंतिम वर्ष में स्थायी परिसम्पत्ति का शेष भूल्य जो मूल लागल और संचित मूल्यह्रास की राशि के बीच का अन्तर होता है , को प्राकृतिक गैस पाइपलाइन शुल्क की डीसीएफ गणनाओं में परियोजना अन्तः प्रवाह के रूप में माना जाएगा।

(6) प्राकृतिक गैस पाइपलाइन में लाइन- पैक मात्रा का विवेचन नीचे दी गई कार्यविधि के अनुसार किया जाएगा-

(क) प्राकृतिक गैस पाइपलाइन में लाइन पैक के रूप में अपेक्षित प्राकृतिक गैस की मात्रा का आकलन प्रारम्भन किए जाने पर सुरक्षा मानकों सहित तकनीकी मानकों और विशिष्टियों के लिए संबद्ध विनियमों में निर्दिष्ट किए गए के अनुसार होगी।

(ख) प्राकृतिक गैस पाइपलाइन में प्राकृतिक गैस के और यूनिट प्राकृतिक गैस पाइपलाइन शुल्क के निर्धारण के लिए नियोजित कुल पूंजी में शामिल लाइन पैक मूल्य पर मूल्य हास न होने वाली स्थायी परिसम्पत्ति , के रूप में विचार किया जाएगा और यह मूल्य परियोजना की मितव्ययी कालावधि लक नियत रहेगा।

(ग) लाइन-पैक मात्रा या मूल्य प्राकृतिक गैस पाइपलाइन के प्रारम्भन के समय प्राकृतिक गैस पाइपलाइन में प्राकृतिक गैस छोड़ने के समय प्राकृतिक गैस की औसत लागत से लाइन- पैक की मात्रा को गुणा करके निकाली जाएगी।

27

भारत की राजपत्र असाधारण

[भाग - खण्ड 3 (i) ]

(घ) परियोजना की मितव्ययी कालावधि की समाप्ति पर लाइन- पैक मात्रा का निस्तारण मूल्य, उप-खण्ड (ख) के अन्तर्गत निर्दिष्ट किए गए के अनुसार इसके पूंजीकरण के समय आकलित मूल्य के बराबर होगा और इसे परियोजना अन्तः प्रवाह के रूप में माना जाएगा।

[फा०. सं. एस- प्रशा./11/ 8/2008 - खण्ड-1 ]

रतन पी. बातल , सचिव

PETROLEUM AND NATURAL GAS REGULATORY BOARD

NOTIFICATION

New Delhi , the 20th November, 2008

G.S.R. 807( E). In exercise of the powers conferred by Section 61 of the Petroleum and Natural Gas Regulatory Board Act , 2006 (19 of 2006) , the Petroleum and Natural Gas Regulatory Board hereby makes the following regulations , namely :-

1. Short title and commencement.

(1) These regulations may be called the Petroleum and Natural Gas Regulatory Board (Determination of Natural Gas Pipeline Tariff) Regulations,2008.

(2) They shall come into force on the date of their publication in the Official Gazette .

2. Definitions.

(1) In these regulations , unless the context otherwise requires, -

(a) "Act" means the Petroleum and Natural Gas Regulatory Board Act, 2006;

(b) "appointed day" means the date of October 1, 2007;

(c) "Board" means the Petroleum and Natural Gas Regulatory Board established under sub-section ( 1 ) of section 3 ofthe Act;

(d) "capacity of natural gas pipeline" means the capacity of natural gas pipeline as specified under the Petroleum and Natural Gas Regulatory Board (Authorizing 28

THE GAZETTE OF INDIA : EXTRAORDINARY

[PART 11--SEC, 3 ( 1))

Entities for Laying , Building , Operating or Expanding Natural Gas Pipelines) Regulations, 2008:

Provided that the capacity of natural gas pipeline in respect of entity authorized by the Central Government for laying , building , operating or expanding natural gas pipelines before the appointed day shall be as approvedby the Board as per the basis specified in the relevant regulations for determining the capacity ofnatural gas pipeline;

(e) " initial unit natural gas pipeline tariff means the unit natural gas pipeline tariff determined for a period commencingfrom-

(i) the date of commissioning of the natural gas pipeline in any financial year and ending on the last day of that financial year in case the natural gas pipeline is commissioned on or after the notification of these regulations ; ог

(ii) the date of coming of the natural gas pipeline within the purview of these regulations in any financial year and ending on the last day of that financial year in case the natural gas pipeline is commissioned before the notification ofthese regulations:

Provided that in case the period between the date of commissioning of the natural gas pipeline or the date of coming of the natural gas pipeline within the purview of these regulations in any financial year, as the case may be , and the last day of that financial year is less than one hundred and eighty three days , the initial unit natural gas pipeline tariff shall be for a period commencing from the date of commissioning of the natural gas pipeline or the date of coming of the natural gas pipeline within the purview of these regulations in the financial year and extend up to the last day of the immediately succeeding financial year:

Provided further that the initial unit natural gas pipeline tariff shall be fixed on a provisional basis first and then finalized as per the basis and in the time frame specified under clause 9 of ScheduleA.

29

भारत का राजपत्र असाधारण

[ भाग 1 ] - खण्ड 3 (1) ]

(f) " natural gas pipeline " means any pipeline including spur lines for transport of natural gas and includes all connected equipments and facilities , such as, compressors , storage facilities , metering units but excludes-

(1) dedicated pipeline laid to transport natural gas to a specific customer to meet his requirement and not for resale;

(ii) pipelines in a city or local natural gas distribution network which are regulated by the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build , Operate or Expand City or Local Natural Gas Distribution Networks) Regulations , 2008;

(g) "natural gas pipeline tariff means the unit rate of tariff for a natural gas pipeline (excluding statutory taxes and levies) in rupees per million British Thermal Units (Rs./MMBTU) for transport of natural gas;

(h) "tariff review" means the review of the unit natural gas pipeline tariff after every five consecutive years by the Board with the first tariff review to be done after the end of five consecutive years after the end of the initial unit natural gas pipeline tariff period as specified under sub -regulation (e) :

Provided that the unit natural gas pipeline tariff so determined at the time of any tariff review shall apply for the period up to the next tariff review;

(1) "tariff zone " means the zone-

( i) of a length of three hundred kilometers each along the route of the natural gas pipeline from the point of origin till the end point:

Provided that the last zone of the natural gas pipeline may be of a length of three hundred kilometers or less;

30

THE GAZETTE OF INDIA : EXTRAORDINARY

[PART 1 ]-SEC.3 (10)

Provided further that any natural gas pipeline of a length less than three hundred kilometers shall be counted as a zone; and

(ii) a corridor along the natural gas pipeline with a width of up to ten percent of the total length of the natural gas pipeline without including the length of the spur lines or fifty kilometers measured from the nearest point on the surface of the natural gas pipeline on both sides , and including the point of origin and the end point of the natural gas pipeline , whichever is less , and-

(a) the first tariff zone shall be counted with reference to any zone in which the point of injection of natural gas into the natural gas pipeline falls; and

(b) the subsequent tariff zone or tariff zones , as the case may be , shall be counted separately on either side along the contractual path fordelivery ofnatural gas in the natural gas pipeline:

Provided that the natural gas pipeline tariff for transport of natural gas from the same source shall be uniform for all the customers located within the zone:

Provided further that the entity shall supply natural gas to any customer located in the zone subject to the techno -commercial feasibility of laying , building, operating or expanding a new spur line from the natural gas pipeline .

Explanation.-

For the purposes of this clause, the point of origin and the end point in the natural gas pipeline as also the sequential numbering of the tariff zone or tariff zones , as the case maybe , shall be as indicated in the letter of authorization or fixation of the natural gas pipeline tariff by the Board.

(2) Words and expressions used and not defined in these regulations , but defined in the Act or in the rules or regulations made thereunder, shall have the meanings 31

भारत का राजपत्र असाधारण

[ भाग II- खण्ड 3(i) ]

respectively assigned to them in the Act or in the rules or regulations , as the casemaybe.

3. Application.

These regulations shall apply to an entity-

(1) authorizedby the Central Government under regulation 17 of the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build , Operate or Expand Natural Gas Pipelines) Regulations , 2008 for laying, building , operating or expanding a natural gas pipeline before the appointed day;

(2) laying, building , operating or expanding a natural gas pipeline before the appointed day and authorized by the Board for such activities under regulation 18 of the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand Natural Gas Pipelines) Regulations , 2008; and

(3) laying , building , operating or expanding a dedicated pipeline which is converted into a natural gas pipeline under the provisions of sub-regulation (1) or (2) of regulation 19 of Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand Natural Gas Pipelines ) Regulations , 2008.

4. Determination of natural gas pipeline tariff.

The natural gas pipeline tariff in respect of an entity covered under clause (1), clause (2) or clause (3) of regulation 3 shall be determined as per the procedure at Schedule A.

5. Form for data submission by entity for determination of natural gas pipeline tariff.

Every entity shall submit to the Board the financial costs and other data in the form at Attachment 1 of Schedule A, if, as on the day of the notification of these regulations, the natural gas pipeline- 32

THE GAZETTE OF INDIA: EXTRAORDINARY

[ PART --St.3 ( 1 )]

(1) is not in operation , then at least six months before the likely date of commissioning of the natural gas pipeline , or within ninety days of the date of notification of these regulations , whichever is later; or

(2) is already in operation , then , in relation to an entity referred to in-

(a) clause ( 1) of regulation 3 , within ninety days of the notification of these regulations;

(b) clause (2) of regulation 3 , within ninety days of the grant of authorization by the Board; or

(c) clause (3) of regulation 3, within ninety days of the date of authorization by the Board:

Provided that the entity shall charge initial unit natural gas pipeline tariff " on account basis" based on these regulations from the date of commissioning of natural gas pipeline referred to in clause (1 ) of regulation 3 or the date of authorization by the Board of natural gas pipeline referred to in clause (2) or clause (3) of regulation 3 , as the case may be , till the date the Board provisionally fixes the initial unit natural gas pipeline tariff:

Provided further that the entity shall carry out adjustments , with a retrospective effect with the customers for the difference between the initial unit natural gas pipeline tariff that the entity had so charged and that provisionally fixed by the Board

6. Miscellaneous .

If any dispute arises with regards to the interpretation of any of the provisions of these regulations , the decision of the Board shall be final .

33

भारत का राजपत्र असाधारण

[ भाग ।- खण्ड (i) ]

Schedule A

[see regulations 4 and 5] ...

Procedure for determination of natural gas pipeline tariff.

The natural gas pipeline tariff shall be determined . by considering a reasonable rate of retum on normative level of capital employed plus a normative level of operating expenses in the natural gas pipeline.

Explanation.-

The expression " normative level " shall be with reference to a level , which both reasonable and justifiable in terms of incurrence of capital and operating expenditure required for laying, building , operating or expanding an efficient natural gas pipeline over its economic life.

:

1. Financial feasibility.

The entity to which these regulations apply shall submit all technical , operating , financial and cost data of the natural gas pipeline project that may be required by the Board in determination of the natural gas pipeline tariff. :

2.Methodology for determination of natural gas pipeline tariff.

The unit rate of natural gas pipeline tariff to be charged for a period shall be the calculated based on the "Discounted Cash Flow ( DCF) methodology considering the reasonable rate of retum as specified in clause 3 to be the project's internal rate of return. The parameters relevant to the applicability of the DCF methodology have been described in detail in clauses 4 to 6 below.

1 Discounted Cash Flow methodology refers to equating the inflows from the projected revendraadiigesel natural pas pipeline tarifi with the outflows of capital and operating expenditures over the economically intendatoject by decounting these flows at the project's reasonable rate of return . The volumes and outflows are estimated over the economiclife which results in the determination of the natural gas pipeline taulif required to be samed by the project to achieve the internal rate of restum.

34

THE GAZETTE OF INDIA : EXTRAORDINARY

[PART - SEC. 3 (1 ) ] 3. Reasonable rate of return.

The rate of return on capital employed shall be the rate of return on capital employed equal to twelve percent post-tax. The rate of return on capital employed once applied to a natural gas pipeline project shall remain fixed for the entire economic life of the project.

Note:

The pre-tax rate of return on capital employed shall be computed by grossing- up twelve percent by the nominal rate of income tax applicable for corporate assesses as per the provisions of the Income Tax Act , 1961 , as amended from time to time.

4. Return on total capital employed.

(1) The reasonable rate of return shall be applied on the total capital employed to determine the return on capital employed in the project over its economic life and the authorized entity is free to leverage the financing of the project in any suitable manner.

(2) The total capital employed shall be equal to the gross fixed assets in the project less accumulated depreciation² plus normative working capital (equal to thirty days of operating costs excluding depreciation and eighteen days natural gas pipeline tariff receivables) .

(3) The gross fixed assets shall be equal to their actual historical cost of acquisition (including the cost of any subsequent replacement or improvement or modification ) or that normatively assessed by the Board, whichever is lesser and required in the natural gas pipeline project over its economic life based on the principles to create and sustain an efficient infrastructure namely:

2 Depreciation shall be calculated by applying the rates of depreciation as specified in Schedule VI to the Companies Act , 1956 on the value of gross fixed assets on a straight line basis.

3

The basis and parameters identified here are not exhaustive and may vary depending upon the specific natural gas pipeline project under consideration which the Board may apply in a transparent manner.

35

भारत का राजपत्र : असाधारण

[भाग II-खण्ड 3[i ]

(a) treatment of an investment in the fixed asset in determination of total capital employed shallbe as per the basis indicated in Attachment 2;

(b) capital costs in similar projects , if any, elsewhere in India benchmarked on a "like-to-like" basis;

(c) appropriateness of the pipeline design and the operating philosophy with regards to maximum allowable operating pressure;

(d) optimization of the equipments and facilities such as , compressors , metering systems, SCADA , fire fighting required , based on an assessment of the appropriate available technology;

(e) spur lines;

(f) design parameters for compressors; and

(g) assessment of the costs of major equipments and facilities in the natural gas pipeline, faying or building costs , project management consultancy and pre- operative expenditure.

5. Operating costs.

Operating costs required in the operation and maintenance of the natural gas pipeline over its economic life shall be computed , on an actual basis or based on a normative assessment by the Board , whichever is lower, over the following functional cost heads, namely:-

(1) consumables;

4 Operating costs are those which are necessary for a proper upkeep and maintenance of a tangible asset created for operation of the natural gas pipeline and does not include any financial cost, like, intereston loans, bad-debts , sales promotion , advertisement expenses (except for tenders ) , expenditure incurred in ralsing or servicing of capital or debenture or bond or any debt, exchange variation on revenue account , but includes normal bank charges , bank guarantee charges , LC charges and bank charges for bid and performancebonds required as per the terms of authorization, 36

THE GAZETTE OF INDIA : EXTRAORDINARY

[PART II SEC. 3(1)] (2) utilities-

(a) power;

(b) fuel ( including the cost of natural gas and the natural gas pipeline tariff not recovered on the volume of system-use natural gas consumed in the natural gas pipeline);

(c) water;

(3) salaries and wages;

(4) repairs and maintenance;

(5) insurance premia on assets ( excluding the value of loss of profit) and on line-pack volumes;

(6) administrative overheads [to the extent not classifiable under sub- clause (1) to sub- clause (5)), related and also commensurate to the level of operations in the natural gas pipeline;

(7) depreciation on fixed assets on straight line basis based on rates as per ScheduleVI to the Companies Act, 1956) ; and

(8) miscellaneous income realizable from a fixed asset included in the return on total capital employed or out of an expense considered as an operating cost, but does not include interest income , profit or loss on sale or transfer of any fixed or other asset, if any, shallbe netted from the operating cost.

6. Volumes to be considered In determination of the unit natural gas pipeline tariff.

(1) The volumes of natural gas to be considered as divisor in the determination of the unit natural gas pipeline tariff over the economic life of the project shall be computed on a normative basis as indicatedbelow: - 37

भारत का राजपत्र : असाधारण

[ भाग - खण्ड 3 (i))

(a) the divisor for each of the first five years of operations of the natural gas pipeline shall be arrivedby multiplying the applicable percentage utilization for the year , as per the basisindicated below, with the sum of the capacity requirement of the entity and the firmed-up contracted capacity with other entities as specified under the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand Natural Gas Pipelines) Regulations , 2000 денег

Year of natural gas pipeline operations

Percentage utilization First

80%

70%...

Second

80%

Third

80 %

Fourth

100%

Fifth

:

(b) the divisor for the sixth and the subsequent years of operation of the natural gas pipeline shall be equal to:

.-!

(i) one hundred percent of the sum of the capacity requirements of the entity and the firmed-up contracted capacity with other entities as specified under the Petroleum and Natural Gas Regulatory Board (Authorizing Entitie to Lay, Build, Operate or Expand Natural Gas Pipelines) Regulations , 2008; and

(ii) the actual volume of natural gas transported on common camier basis against the extra capacity as specified under the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build , Operate or Expand Natural Gas Pipelines ) Regulations , 2008 during the immediately preceding year of operation of the natural gas pipeline...

Explanation.-

The adjustment for the difference between the actual volume transported on common carrier basis in any year and that included in the divisor under sub- item (ii) to item (b) of sub -clause (1) shall be carried out on a prospective basis in the DCF calculations for unit natural gas pipeline tarifmeiste 38

THE GAZETTE OF INDIA: EXTRAORDINARY

[PART II --SEC. 3 (1)

(2) The volume of natural gas determined under sub - clause (1) shall be converted into Its energy equivalence in MMBTU terms for the purpose of-

(a) determination of the provisional unit natural gas pipeline tariff by considering the weighted average of heat value of different natural gases which are likely to be transportedby the entity during this period;

(b) determination of the final initial unit natural gas pipeline tariff by considering the weighted average heat value of the natural gas delivered to customers during the initial unit natural gas pipeline tariff period;

(c) first tariff review by considering the weighted average heat value of natural gas delivered to the customers between the period from the end of the initial unit natural gas pipeline tariff period and the due date of the first tariff review;

(d) any subsequent tariff review by considering the weighted average heat value of the natural gas delivered to the customers during the period between that tariff review and the immediate previous tariff review.

7. Economic life.

The economic life of the natural gas pipeline shall be as specified in the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build , Operate or Expand Natural Gas Pipeline) Regulations, 2008.

8. Procedure for apportioning of unit natural gas pipeline tariff over the tariff zones.

(1) The entity shall submit for the Board's approval , the calculations in respect of apportioning of the unit natural gas pipeline tariff over all the tariff zones during the economic life of the project in the form specified under regulation 5, by following the methodology as specified under sub- regulations (a), (b) and (c) of regulation 7 of the Petroleum and Natural Gas Regulatory Board (Authorizing Entities for Laying, 39

भारत का राजपत्र : असाधारण

[ भाग 11- खण्ड 3 (i) ]

Building, Operating or Expanding Natural Gas Pipelines) Regulations , 2008 except that-

(a) there shall be no requirement of bidding while following such methodology;

(b) no weightage shall apply to such apportionment of the unit natural gas pipeline tariff over different tariff zones ; and

(c) the entity shall use its own numbers in determining such apportionment.

(2) No adjustment shall be made by the entity with the customers for any over- achievement or under-achievement in the recovery of the natural gas pipeline tariff by the entity due to the volumes actually transported in different tariff zones being different than the volumes considered by the entity for apportioning the unit natural gas pipeline tariff for each of the tariff zones during-

(a) the period of initial unit natural gas pipeline tariff;

(b) the first five and consecutive years after the end of the initial unit natural gas pipeline tariff; and

(c) the periodbetween any two consecutive tariff reviews..

9. Determination of initial unit natural gas pipeline tariff and review of unit natural gas pipeline tariff.

(1) The unit natural gas pipeline tariff shall be determined for the natural gas pipeline over its economic life and levelized during-

(a) the period applicable for the initial unit natural gas pipeline tariff;

(b) the period of five consecutive years after the end of the initial unit natural gas pipeline tariff; and 40

THEGAZETTE OF INDIA : EXTRAORDINARY

[PART 1 Sec.3 (1)]

(c) the period between any two consecutive tariff reviews.

(2) The initial unit natural gas pipeline tariff including its apportioning over all tariff zones shall be determined based on provisional computations .

(3) The final computations in respect of the initial unit natural gas pipeline tariff shall be made considering the adjustments required for-

(a) the actual capital and operating costs or that normatively assessed by the Board, whichever is lower as specified under clause 4 and clause 5;

(b) volume consideration as per item (a) of sub - clause ( 1) of clause 6; and

(c) volume conversion into its energy equivalence as per item (b) of sub -clause (2) ofclause 6.

(4) The entity shall adjust with the customers , the difference between the natural gas pipeline tariff recovered based on the provisional computation under sub-clause (2) and that recoverable as per the final computation under sub -clause (3);

(5) The final unit natural gas pipeline tariff as specified under sub - clause (3) shall apply for the period upto the first tariff review until the time the same is revised by the Board;

(6) The entity shall submit for Board's approval the data for determination of the unit natural gas pipeline tariff after the notification of these regulations in the form and time frame specified under regulation 5 alongwith the provisional computations of the initial unit natural gas pipeline tariff including the apportioning of the same over alt tariff zones;

Provided that the final computations of the initial unit natural gas pipeline tariff including apportioning of the same over all tariff zones shall be submitted three months before the last date of the period applicable for the initial unit natural gas pipelinetariff.

(7) The entity shall submit computation of the unit natural gas pipeline tariff including apportioning of the same over all tariff zones in the form specified under regulation 5 at the time of each tariff review within three months of the-

(a) end of the last year of the five consecutive years after the initial unit natural gas pipeline tariff; or 41

भारत का राजपत्र असाधारण

[ भाग II- खण्ड 3 (i) ]

(b) end of the preceding tariff review period:

Provided that the computation shall consider the actual cost , financial and operational data or that normatively assessed by the Board , whichever is lesser as per clauses 4 and 5 in respect of the period specified under sub-clause (a) or (b), as the case maybe.

(8) Adjustments on account of the following variations during the five consecutive years after the initial unit natural gas pipeline tariff or any tariff review shall be made in the DCF calculations on a prospective basis by considering the remaining period of the economiclife of the project, namely:-

(a) the variations on account of the actual performance with respect to the capital and operating costs which when compared with the normative parameters identified under clauses 4 and 5;

(b) the variations in respect of the volumes under Explanation to sub- item (ii) of sub-clause ( 1) of clause 6; and

(c) the variations in the energy equivalence under sub-clause (2) to clause 6.

(9) The Board may , either on its own or on the entity's request , carry out a review of the unit natural gas pipeline tariff any time between two tariff reviews , as the case may be , considering-

(i) applicable nominal rate of income tax used for grossing - up the rate of return on capital employed;

(ii) sudden change in any parameter used in the determination of the unit natural gas pipeline tariff.

(10) The provisional and final initial unit natural gas pipeline tariff, unit natural gas pipeline tariff for the period of five consecutive financial years after the initial unit natural gas pipeline tariff and the unit natural gas pipeline tariff fixed after any tariff review thereafter shall continue to apply till the time the same is revised by the Board.

AR11 GUM86 42

THE GAZETTE OF INDIA : EXTRAORDINARY

[PA81 11--Stc . 3 (1 ) ]

Attachment 1

(see regulation 5

Project capital cost summary (Caрак outflows) .

INR

FE

Sr. No. Description

Indian rupees

Total

Foreign exchange

A Plant and machinery

Receiving terminal free attachment 1(a)]

2 Compressor stalion ( see attachment 1 (b)

3 Intermediate terminal (see attachment 1 ( c)

4 Delivery terminal jeee stichment 1 (d) ]

5 Pipeline (see attchment 1 (a) )

Subtotal (A)

B Engineering costs

1

Detailed engineering, procurement, construction , supervision and project management

2 Service Tax on above

Subtotal (B)

C Site related couts

Land

2 Any other (details to be given)

Subtotal C

D Owner's com, start- up expenses

1 Start-up and commissioning expenses

2 Owner's management opensев

Subtotal (D)

E Other Coets

1 Contingencies and escalation

2 Preliminary and pre-operative oxpenses

3 Interest during construction period and financing charges

4 Margin money for working capital

Subtotal (E

Total (A+B +C+ D+ E

INR + FE converted to INR.

Note: Detailed assumption / calculations to be given forItem E.

43

भारत का राजपत्र असाधारण

[भाग II- खण्ड 3 (i) ]

Attachment 1 (a)

[see regulation 5]

Capital cost of receiving method ,

INR

FE

Total

Sr. No. Description

Technical specificatione

Indian rupees Foreign exchange

A

1

Rated capacity as per supplier Scrapper trape and pig signeller

2 Metering system

3 Centridge fillers

4 Fire protection system

5 Power supply amnement

Compressors

Rated capacity as per supplier Any other hem ( detsis to be given)

Subtotal

B Bulk Materials

1 Piping

2

Electrical

3 Instrumentation

4 Any other bom (details to be given )

Subtotal

C Speres detalls to be pilven)

Subtotal

Erection

D

Mechanical

2 Electricals

3 Instrumentation

4 Civil works

5 Land

6 Any other bem ( datails to be given )

Subtotal

E Tastes and duties

1 Ocean freight

2 Custome duty

3 Port handling

4 Inland freight

5 Excise & CST

6 Works contract tax

7 Insurance

8 Any other applicable lan and duty (give detalle)

Subtotal

Total (Ato E

1 ) INR + FE converted toINR.

   44                                       THE GAZETTE OF INDIA : EXTRAORDINARY
                                                                                                              [PARI II- SEC. 3 (10
                                                     Attachment 1 (b)
                                                        ( see regulation 51
                                                 Capital cost of compressor .
Sr. No. Description                                     INR            FE         Total ( ")      Technical specifications
                                                    Indian rupees Foreign change
  A     Major items
   1    Compressors
                                                                                            Rated Capacity as per Supplier
   2    Scrapper Iraps and pig signaller
   3    Metering system
   4    Cartridge filters
   5     Fire protection system
   B     Power supply arrangement
   7    Any other item ( details to be given)
                                          Subtotal
  B     Bulk materials
   1    Piping
   2    Electrical
   3     Instrumentation
   4    Any other item ( details to be given)
                                           Subtotal
  C      Spares (delails to be given)
                                           Subtotal
  D      Erection
   1    Mechanical
   2    Electricais
   3     Instrumenta  1
   4    Civil Works
   5     Land
   6    Any other ten ( details to be given )
                                           Subtotal
  E     Taxes and duties
   1    Ocean freight
   2    Customs duty
   3     Port handling
   4     Inland freaght
   5    Excise & CST
   6     Works contract tax
   7     Insurance
   8    Any other applicable tax and duty (give details)
                                           Sublotai

Total (AtoE

INR + FE converted in NR .

45

भारत का राजपत्र असाधारण

[ भाग 11- खण्ड 3 (i))

Attachment 1 (c)

[see regulation 5 ]

Capital cost of intermediate terminal ,

Sr. No.  Description                                       INR          FE          Total )         Technical specifications
                                                       Indian rupees Foreign exchange
   A     Major items
         Scrapper traps and pig signaller                                                      Rated Capacity as per supplier
   2     Metering system
   3     Cartridge filters
   4      Fire protection system
   5      Power supply arrangement
         Any other item ( detalis to be given)
                                              Subtotal
   B      Bulk materials
    1    Piping
   2      Electrical
   3      Instrumentation
   4      Any other item ( details to be given)
                                              Subtotal
          Spares ( details to be given)
                                              Subtotal
   D      Erection
    1     Mechanical
    2     Electricals
   3      Instrumentation
    4     Civil Works
    5     Land
   8      Any other item ( details to be given )
                                              Subtotal
   E      Taxes and dusties
    1     Ocean freight
    2     Customs duty
    3     Port handling
    4     Inland freight
    5     Excise & CST
    6     Works contract tax
    7      Insurance
          Any other applicable tax and duty (give details)

Subtotal

Total (A 10 E)

INR + FE converted to INR.

46

THE GAZETTE OF INDIA : EXTRAORDINARY

PART 11 - Sia.3 (6) )

Attachment 1 (d)

[see regulation 5]

Capital cost of delivery terminal .

FE

INR

Tollal

Sr. No. Description

Technical apetifications

Inca

change

son

A Malor items

1 Scrapper traps and pig signallar

Rated Capacity as per supplier

Metering system

23

3 Cartridge filters

4 Fire protection system

5 Power supply arrangement

6 Any otheritem (details to be given)

Subtotal

Bulk materials

1 Piping

Electrical

Instrumentation

23.

4 Arny other item ( delalls to be given )

Subtotat

C Spares ( details to be given)

Subtotal

D Erection

1 Mechanical

2 Electricals

3 Instrumentation

4 Civil Works

5 Land

6 Any other item ( details to be given)

Subtotal

E Taxes and duties

1 Ocean freight

2 Customs duty

3 Porthandling

4 Inland freight

5 Excise & CST

6 Works contract tax

Insurance

8 Any other applicable tax and duty (give details)

Subtotal

Total (A to.E)

INR + FE converted to INR.

47

भारत का राजपत्र असाधारण

[ भाग 11 - खण्ड 3 (1)

Attachment 1 (e)

[see regulation 5]

Capital cost of pipelines.

INR

FE

Technical specifications

Total(*)

Sr. No. Description

A Major items

1 Survey and soil investigation

2 Land , ROU and crop compensation

Outer diameter and wall thickness 3 Line pipes

4 Line materials

5 Coating and pipe transportation

6 Pipeline laying

7 Cathodic protection

8 OFC, telecom and telesupervisory system

SCADA & APPS system

11 Power source

12 Any other item ( details to be given )

Subtotai

B Minor items

1 Oceanfreight

2 Customs duty

3 Porthandling

4 Inland freight

5 Excise & CST

6 Works contract tax

7 Insurance

Any other cost ( details to be given )

Subtotal

Total(A+B)

(*) INR + FE converted to INR .

48

THE GAZETTE OF INDIA: EXTRAORDINARY

[PARJ TI- SEC. 3 (1 ) ]

Rs. Year25

Year4

Year3

Year2

Year1

Attachment1(1)

[seeregulation5]

ProfitandLossAccount($)

administrativeexpanses(includingbankchargesenbidbandandperformancebondaspergrantofauthorization)

Consumablesandchemicals

DepreciationonSiMhasisandmiscellanec.isexpenseswrittenoff(givedeiadeofste

-Revenuefromnaturegaspipelinetarif

Insurance(includingonline-packvolumes)

Salaries

Utilities-Power,fuelandwater)

Interestonteimloanswithrates)

Repairandmaintenance

Interestonworkingrapitalborrowingstotheextent1.tjhsedinworkingcapitalrequirementforaboveexpersas(withrares)

Totalinflows

Totaloperatingcostoutflows

Profitbeforedepreciationinterestandtax(PBDIT)[1-2]

Anyotherexpenses(tobedelared)

Castifromoperavon(CFO)(0+7)-Tobetransferredtocashflowsheet

Gen

naturalgaspiperinetarifsshallbebasedonthesctualvolumesofnaturalgassaneportedinnaturalgaspipelineasdeterminedbyDCFmethooningyadoptedbycorsideringaPIRR,aivihich

a

2

b d

3

Forexpansionorextensionofnaturalgaspipatine-dataintheaboveformatasapplicableforprojectpostexpansionorextenstion.

6Prombeforedepreciationandlax(PBDT)(3-4-5)

4 5 A Prodibeforetax(PBT):6-7)

9 Tarprovisionprovideasperroomeextresforce)

10 Profitaftertax(PAT)(89)

Note

Sr.No.Description

ishActualsorestimates,whereverapplicable

*Excludingalldirectindirectandallocatedcommoncostbeyondtransportationofnaturalgasinnaturalgaspipeline.Financialcostsaridsellingexpersestobeexcluded

4.Modvalbenefit,davariauicistoberelectedseparatelyalongwiththecamulatiorna

1.The leveithenetinllowsequalthemaloutflow'sovertheeconomiclifeoftheproiect.

$CopyofAuditedProfitaridLessAccounttobeatlacherd,whereverapplicabie

2 3Non-operatingincoare(suchasInterestoninterestfreerefurrcablesecuritydesesifromPriadomesticcysoners)nottobeconsideredasprojectintlo भारत का राजपत्र असाधारण

[भाग 11- खण्ड 3 (i) ]

Year25

Rs.

Year4

EconomicLife

Year3

Year2

Year1

Year-1

Year-2

Attachment1(g)

Constructionperiod

Cashflowstatement.

[seeregulation5]

Year-31

Repaymentofloans

Dividendetoequityholders

Sourcesoffunds

Increaseor(decrease)innetworkingcapital

Normaladditionalcapitalexpenditure

Capitalexpenditure

Others(pleasespecify)

Others(pleasespecify)

EquityorPreferenceEquity(*)

TermLoansandshorttermloans

Year

Bankborrowingsforworkingcapital

Cashfromoperations

Usesoffunds

Taxondistribulableprofits

(*)Redemptiondetalletobegiven.

2

b

b

3Cashsurplusor(deficit)

Sr.No.

4611G1/08-7 50

THE GAZETTE OF INDIA : EXTRAORDINARY

[PART II-SEC . 3 ( i ) ]

Rs.

Year25

Year4

EconomicLife

Year3

-

Year2

Year1

Year-1

BalanceSheet($)

(seeregulation5]

Year-2

Constructionperiod

Year-3

Miscellaneousfixedassets

Investments

Preferencesharecapital(**)

Liabilities

Reserves

Deferredrevevueexpenditure

Assets

Grossfixedassets

Year

Others(pleasespecify)

Rupeetermloans

Equitycapital

Cashandbankbalance

Others(pleasespecify)

Less:Accumulateddepreciation(*)

Debt

Netfixedassets

Note

Bankborrowingsforworkingcapital

Netcurrentassets

Networth

FCtermloans

(*)Assethead-wisedepreciationcalculationstobeprovided.

a)CopyofauditedBalanceSheettobeattached,whereverapplicable.

($)Actualsorestimates,whereverapplicable.

(**)Totheextentnon-redeemable,redeemablepreferencecapitaltobeshownunderdebt.

भारत का राजपत्र अस्कृधारण

[ भाग - खण्ड (1) ]

Taferyear?toper11

YourYear7Year&YomYour10Yaar

12yur2toyear

T1

11:ForYour

Attachment1(1)

Year

Yur

Constrictionperiod

Year3

[seeregulation5andclause8andclause9ofScheduleA)

PartI:CompetationsfornaturalgaspipelinetartffbasedonprojeetIRR.

adjustmentsrequiredintheDCFcalculationsforthevariationeincapitalcost,operatingcostandvolumesasperthebasisspecilledunder5ofScheduleAshallbeclearlyspecifiedatthetimeof

submissionofsuchcomputationstotheBoard.

Cumulativeinflочневолома

Levelizedunilnaturalgaspipelnęberilcalculatedbasedonthe reasonablerateofretumasspecifiedincheuses2and3of ScheduleAfor:

Notes:

Year

Netikafloralfoutflows)

3.Capiteloutflowsincludesoutflowrsonaccountoffcapitalwork-in-progress.

c)theperiodofeachofthetariffreviewperiod(13andonwards) cakulatedbasedonreasonablerateofrelumasproject'sinternal rateofretumasspecifiedinclause2ofScheduleA.

ajtheperiodofinttialunitnalunalgaspipelinetwift(11)

1.The calculationsfornaturalgaspipelinetariffalongwiththedataarerequiredtobesubmittedbytheentitytothe.Boarnlbachtimethesameisdiumforforationorreview. 2. The

b)theperiodoffiveconsecutiveyearsaftertheinitialunitnatural gaapipelinetart(12)

b)Imflows(Profitbeforedepreciation,interestandIncometaxa perHers3ofestimatedprofitandfousaccountinAttachment1

a)Capitalandoperatingcostputllows(includingmarginmoney) 52

THE GAZETTE OF INDIA : EXTRAORDINARY

[PART II-SEC. 3 ( 1)]

ean...

lasttart zona...

(inMMBTU)

starfzoneTalki

...sundsoon...

(inRe/MMBTU)

121

Tariffzone

Ince 1-%

Tarktzonaá

Abeve

Meeremonial

очистване

Above Incremental Increвые

Tarifizone

Tanfzone3

Iпоречиеover XX%XT21

Y%[IndicateXegeIncreaseflowerthan100%con precedingtariffzone]

123-121

Above

Incremental

Inoгesasover

Tariffzone3

Tariffzone3

horseseover XTZ1

Indite

Incremental

Alave lecresseover

Tarktzone2

sowardeNage Impresesever FerillZone11

Tarifizone2

Ierareover /107

icatedforthe

Teriffzane1

Tariffzove1

Attachment1(1)(Contd..)

Perled

Initialperiod

BascadReview Period

Unitnatural pipelineMrifi

FretReview Period

LastRavipr Partond

Beceril

T

neturelgas pipelinetart

PerlednaplionMe forInitialunh naturale pipelinetarifi Reviewperiod

Portheperiod applicable10

(seeregulation5andclause8andclause9ofScheduleA]

PartII: Appertionmentofunitnaturalgaspipelinetariffovernaturalgaspipelinetariffzones.

Volumescomskleredineachtariffzone

Volumesconelideredineachtariffzone

Volumesconsideredineachteriffzone

Volumesconsideredinsachtariffzono

UnitnaturalpeepipelinebriftsaperParti

Note:

UnitnaturalgaspipelinetariffasporPart1

UniknaturalpespipelinetariffasperPart

UnitnaturalgaspipelinetariffatperPart|

pipelinetariffzonetobeprovided(includingcopiesofcontractstobeenclosed). 4.VolumesinMSCMtobeprovidedinrespectofaboveandthebaaleforconversionofvolumeofnaturalgasintoitsenergyequivalenceinMMBTUtobeindicaled.

(*)Theprocessshallbefollowedonthesamebestsesdescribedfortheperiodapplicableforinitialnaturalgaspipelinetariffperiod.

1.Thecalculationsforapportionmentofnaturalgaspipelinetariffovernaturalgaspipelinetarifizonesarerequiredtobesubmittedforeverytariffreviewperiod.

2. Thebeslefollowedinbifurcatingtheunilnaturalgaspipelinetariffovereachofthenaturalgeepipelinetariffzonetobespecified, 3.Thebasleforconsideringthevolumesinsachnaturalgas 53

भारत का राजपत्र असाधारण

[भाग II- खण्ड 3(i ) ]

Attachment 1 ()

(seeregulation 5

Assumptione.

1. Exchange rate used for determining the capitel costs in indien currency to be indicated.

2. Format for providing annual operating cost by the entity:

Description of cost elements

A. Variable cost

1 Consumables

Fuel ( quantity and rates)

2 Utiles (quantity and rates)

a) Power

b) Water

c) Any other expenses to be specified)

SuleTotal

B Ficed and semi variable cout

1 Salary and wages

12 General adminstration

13 Repairs and maintenence

(E)

4 Any other expeness (to be specified)

Sub Total

(%)

C meurance

Total (A+ B+C)

(*) Break-up of purchased power ( over fixed charge & variable charge ) & own generation to be provided .

($) Break-up over routine & tumaround as well as function-wise over electrical , civil , mechanical , etc. to be provided.

(E) Basis of direct & indirect administrative expenses ( alongwith basis of allocation to be provided).

(%)Break-up of premium on loss of profit policy, facilities & line- quantity tobe provided.

Note

a. For each items of operating cost, detailed assumptions and workings to be attached .

b. For common overheads, complete basis of apportionment and allocation of costs to be provided .

3 Project implementation schedule to be given along with break up of expenditure for sach year.

4 Loan schedule to be provided for each type of loan, interest rates , repayments elc

6 Depreciation schedule as per the Compenies Act and Income Tax Act should be provided .

6 Section-wise capacity of the natural gas pipeline alongwith length of each section .

7 Pipeline design capacity and rated capacity of compressors to be provided.

8 Capecity utilisation proposed and the basis tobe provided.

Implementation period of project in phases to be provided.

10 Economic life of the project

11 Applicable income tax rates and the exemption, if any available under the income Tax Act, 1961 to be provided.

12Detalls of volumes of natural gas estimated inbe transported in the natural gas pipeline over the economic life alongwith copies of the contracts for booking pipeline capacity to be provided in following format:

(MMSCMD)

Year 4

Year25

Year 1 Year 2 Year 3

Own Requirement Firm Contracted

Extra capacity

Total

( to be made available on common camier open access and non -discriminatory basis

13Basis for conversion of natural ges volumes into its energy equivalence in MMBTU to be provided.

14 All assumptions with reference to the estimates of capital or operating costs and any other assumption which has a material impact on the determination of the unit natural gas pipeline tariff are to be separately indicated along with the financial impact of the same.

54

THE GAZETTE OF INDIA : EXTRAORDINARY

[PART 11 --SEC . 3 ( i ) )

Attachment 2 to Schedule A [see clause 4 (3) ( a) of the Schedule]

Treatment of a fixed asset in the determination of return on total capital employed for natural gas pipeline tariff .

The basis of considering fixed assets in a natural gas pipeline in the determination of the return on total capital employed shall be as per the following norms: -

(1 ) A fixed asset in a natural gas pipeline is a tangible asset having a useful operating life of more than one year and is integral to the generation of revenues through natural gas pipeline tariff . Investment in securities , goodwill , current assets , accumulated loss not written-off, work- in -progress , etc. are not fixed assets .

(2) Any change in the historical cost of the fixed asset due to revaluation or capitalization of losses shall not be considered. However, cost incurred in improvements, modification , expansion or replacement of any fixed asset shall be considered in line with the treatment prescribed in the mandatory accounting standards of The Institute ofChartered Accountants of India.

(3) Only the cost of land purchased and used for putting the facilities essential to the natural gas pipeline shall be considered . Land purchased for any future use (such as for putting-up facilities required for expansion of capacity in natural gas pipeline or its extension) shall be considered only when used.

(4) Any change in the value of the fixed asset due to capitalization of interest on loan (including foreign exchange variation in case of any loan in any foreign currency) during the pre- commissioning phase of the fixed asset shall be considered provided such loan was utilized for creation of the said fixed asset only.

(5) A fixed asset shall be considered for return on capital employed on a " rolling basis" till the end of the economic life of the natural gas pipeline project, provided it is notde- commissioned . On de -commissioning of the fixed asset, the value realized on its sale 55

भारत का राजपत्र : असाधारण

[भाग 11-खण्ड 3 (i ) ]

or scrapping shall be considered as a project inflow in the DCF calculations . In the terminal year of the economic life , the residual value of the fixed asset , which is the difference between the original cost less the amount of accumulated depreciation shall be treated as a project inflow in the DCF calculations for natural gas pipeline tariff.

(6) Treatment of line-pack volume in natural gas pipeline shall be as per the procedure indicated below:-

(a)Assessment of the volume of natural gas required as line pack in the natural gas pipeline as and when commissioned shall be as specified in the relevant regulations for technical standards and specifications, including safety standards.

(b) The line-pack value of natural gas in natural gas pipeline and included in the total capital employed for determination of the unit natural gas pipeline tariff shall be considered as a non-depreciating fixed asset and the value to remain fixed over theeconomic life of the project.

(c) The value of the line-pack volume shall be derived by multiplying the volume of line-pack by the average cost of natural gas at the point of injection of natural gas into the natural gas pipeline at the time of commissioning of the natural gas pipeline.

(d) The salvage value of the line- pack volume at the end of the economic life of the project shall be equal to its value assessed at the time of its capitalization specified under sub-clause (b) and shall be considered as a project inflow.

[F. No. S-Admn/11 /8/2008-Vol .-1 ]

RATAN P. WATAL, Secy.

Printed by the Manager , Govt . of India Press , Ring Road, Mayspuri , New Delhi- 110064 and Published by the Controller of Publications, Delhi - 110054.

Cite this issue. Extraordinary Gazette of India, Government of India, 20 November 2008. Indian Gazettes, https://egazette.servantsofknowledge.in/details/in.gazette.central.e.2008-11-20.2733/. Archive identifier in.gazette.central.e.2008-11-20.2733.