Servants of Knowledge
Extraordinary Gazette of India · Government of India

Gazette notification regarding Transmission Projects tobe developed through TBCB mode, based on the recommendations of 34th meeting of NCT

Published 26 December 2025

Ministry
Ministry of Power
Department
Not Applicable
Office
Not Applicable
Gazetteid
CG-DL-E-30122025-268905
Identifier
in.gazette.central.e.2025-12-26.268905
Languages
English, Hindi
Published at
Original source ↗

click here for IIIF manifest

रजिस्ट्री सं. डी.एल.- 33004/99

REGD. No. D. L.-33004/99

सी.जी.-डी.एल.-अ.-30122025-268905

CG-DL-E-30122025-268905

xxxGIDHxxx

xxxGIDExxx

असाधारण

EXTRAORDINARY

भाग II—खण्ड 3—उप-खण्ड (ii)

PART II—Section 3—Sub-section (ii)

प्राधिकार से प्रकाशित

PUBLISHED BY AUTHORITY

सं. 5821] नई दिल्ली, शुक्रवार, दिसम्बर 26, 2025/पौष 5, 1947

No. 5821] NEW DELHI, FRIDAY, DECEMBER 26, 2025/PAUSHA 5, 1947

विद्युत मंत्रालय

आदेश

नई दिल्ली, 26 दिसम्बर, 2025

का.आ.6020(अ).— विद्युत अधिनियम, 2003 (2003 की सं. 36) की धारा 63 के अंतर्गत परिचालित दिशा-निदेशों के पैरा 3 के उप-पैरा 3.2 द्वारा प्रदत्त शक्तियों का प्रयोग करते हुए कें द्र सरकार ने निम्नानुसार राजपत्र अधिसूचना के माध्यम से, टीबीसीबी मोड के अंतर्गत निम्नलिखित स्कीम को अधिसूचित किया था: -

स्कीम का नाम राजपत्र अधिसूचना जिसके द्वारा स्कीम अधिसूचित की गई थी
एनईआरजीएस-III सियांग बेसिन का.आ 4221(अ) दिनांक 18.09.2025 [फा. सं. 15/3/2018-ट्रांस-भाग(4)]

1.1 कें द्र सरकार ने 34वीं राष्ट्रीय समिति पारेषण की सिफारिशों पर उपयु र्क्त स्कीम के कार्यक्षेत्र को संशोधित करने का निर्णय लिया है। इस प्रकार, उपयु र्क्त राजपत्र अधिसूचना में क्रम सं.- 2 पर उल्लिखित स्कीम "एनईआरजीएस-III सियांग बेसिन" के कार्यक्षेत्र को एतद्द्वारा संशोधित किया गया है और टिप्पणी संख्या 3 को निम्नानुसार जोड़ा गया है। पारेषण स्कीम के अन्य कार्यक्षेत्र और बोली प्रक्रिया समन्वयक अपरिर्वर्तत रहेंगे:

8714 GI/2025

(1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]

स् कीम का नाम स्कीम के कार्यक्षेत्र में संशोधन
एनईआरजी एस-III सियांग ब ेसिन क्रम सं. पारेषण स्कीम का कार्यक्षेत्र क्षमता (एमवीए)/लाइन की लंबाई (किमी)/संख्या
2. अरुणाचल प्रदेश के निगलोक में नए 400/220 के वी जीआईएस सबस्टेशन की स्थापना (400/220 के वी स्तर और 6000 मेगावाट एलसीसी एचवीडीसी स्टेशन के प्रावधान के साथ) ➢ भविष्य में विस्तार के लिए अतिरिक्त स्थान: 400 क े वी एचवीएसी स्विचयार्ड और सभी स ंबंधित उपकरण (फिल्टर सहित)/बस एक्सटेंशन, आदि के साथ स ंबंधित इ ंटरकनेक्शन सहित ± 800 के वी, 6000 मेगावाट, निगलोक (एचवीडीसी) [एलसीसी] टर्र्मनल स्टेशन (4x1500 मेगावाट) की स्थापना। ➢ दोनों वोल्टेज स्तरों पर संबंधित आईसीटी बे सहित 400/220 क े वी, 2x500 एमवीए आईसीटी ➢ संबंधित ब े सहित 420के वी,1x80 एमवीएआर बस रिएक्टर ➢ भविष्य की लाइनों के लिए 400 क े वी के 12 लाइन बे (स्विचेबल लाइन रिएक्टर के लिए स्थान सहित) ➢ भविष्य की लाइनों के लिए 220के वी के 6 लाइन बे ➢ 400 के वी बस सेक्शनलाइज़र बे: 1 सेट • 400/220 के वी, 500 एमवीए आईसीटी: 2 • 400 के वी जीआईएस आईसीटी ब े: 2 220 के वी जीआईएस आईसीटी • ब े: 2 • 420 के वी 80 एमवीएआर बस रिएक्टर: 2 क े वी जीआईएस बस • 400 रिएक्टर बे: 2 • 400 के वी जीआईएस लाइन बे: 4 [के इंग पीएस - निगलोक पीएस 400 के वी डी/सी (क्वाड) लाइन के लिए 2 और निगलोक पीएस - गोगामुख 400 के वी डी/सी (क्वाड) लाइन के लिए 2] • जीआईएस बे सहित 420 के वी, 50 एमवीएआर स्विचबल लाइन रिएक्टर : 2 [निगलोक पीएस- गोगामुख 400 क े वी डी/सी (क्वाड) लाइन के प्रत्येक र्सर्क ट में स एक] • 220 के वी जीआईएस बे: 2 [निगलोक (आईएसटीएस)- निगलोक (नई) (डीओपी, एपी)220 के वी डी/सी लाइन की समाप्ति हेतु]
➢ 220के वी बस सेक्शनलाइज़र बे :1 सेट ➢ 220 के वी बस कपलर बे: 2
टिप्पणी: 3. ऊपर उल्लिखित लाइन की लंबाई अनंतिम है। लाइन की सही लंबाई का पता विस्तृत सवे के बाद लगाया जाएगा।
3 [भाग II—खण्ड 3(ii)] भारत का राजपत्र : असाधारण

2. विद्युत अधिनियम, 2003 (2003 की सं. 36) की धारा 63 के अंतर्गत परिचालित दिशा-निदेशों के पैरा 3 के उप-पैरा 3.2 द्वारा प्रदत्त शक्तियों का प्रयोग करते हुए कें द्र सरकार ने निम्नानुसार राजपत्र अधिसूचना के माध्यम से, टीबीसीबी मोड के अंतर्गत निम्नलिखित स्कीम को अधिसूचित किया था: -

स् कीम का नाम राजपत्र अधिसूचना जिसके द्वारा स्कीम अधिसूचित की गई थी
क ु नू र्ल-IV - आरईजेड चरण-II (3 गीगावाट) के लिए पारेषण प्रणाली का.आ 1478(अ) दिनांक 27.03.2025 [फा. सं. 15/3/2018-ट्रांस-भाग (4)]

2.1 कें द्र सरकार ने 34वीं राष्ट्रीय समिति पारेषण की सिफारिशों पर उपयु र्क्त स्कीम के कार्यक्षेत्र को संशोधित करने का निर्णय लिया है। उपयु र्क्त राजपत्र अधिसूचना में क्रम सं 7, 8, 9 और 10 पर उल्लिखित स्कीम "कु रनूल-IV आरईजेड-चरण- II (3 गीगावाट) के लिए पारेषण प्रणाली" के कार्यक्षेत्र को एतद्द्वारा संशोधित किया गया है और टिप्पणी (i) (ii) और (iii) निम्नानुसार जोड़े गए हैं। पारेषण स्कीम के अन्य कार्यक्षेत्र और बोली प्रक्रिया समन्वयक अपरिर्वर्तत रहेंगे:

स् कीम का नाम योजना के कार्यक्षेत्र में संशोधन
क ु नू र्ल-IV - आरईजेड चरण- II (3 गीगावाट) क े लिए पारेषण प्रणाली क्र.सं . पारेषण स्कीम का कार्यक्षेत्र क्षमता/किमी निर्धारित समय
7. 220 के वी स्विचयार्ड की स्थापना क े लिए स्थान प्रावधान के साथ 2x330 एमवीएआर (765 के वी) बस रिएक्टरों सहित 4x1500 एमवीए, 765/400 के वी डोमा स्टेशन की स्थापना ➢ भविष्य में स्थान का प्रावधान: ➢ 765/400 क े वी, 1500 एमवीए, आईसीटीएस- 2 ➢ 765 के वी आईसीटी बे - 2 क े वी, • 765/400 1500 एमवीए, आईसीटीएस - 4 (1 स्पेयर यूनिट सहित 13x500 एमवीए) • 765 के वी आईसीटी बे - 4 • 400 के वी आईसीटी बे - 4 • 765 के वी लाइन बे – 30 माह
➢ 400 के वी आईसीटी बे - 2 ➢ 765 के वी लाइन बे - 8 (एसएलआर के प्रावधान के साथ) ➢ 400 के वी लाइन बे - 8 (एसएलआर के प्रावधान के साथ) ➢ 400 क े वी बस स ेक्शनलाइजर : 1 सेट 2 20 के वी स्विचयार्ड के लिए भविष्य में स्थान का प्रावधान: ➢ 400/220 क े वी, 500 एमवीए, आईसीटीएस - 10 ➢ 400 के वी आईसीटी बे - 10 ➢ 220 के वी आईसीटी बे - 10 ➢ 220 के वी लाइन बे - 16 ➢ 220के वी बस स ेक्शनलाईजर: 3 सेट ➢ 220 क े वी बस कपलर (बीसी) बे - 4 ➢ 220 क े वी ट्रांसफर बस कपलर (टीबीसी) बे - 4 4 (डोमा में कु रनूल- IV - बीदर 765 के वी डी/सी लाइन के लिलो की समाप्ति हेतु) क े वी, 330 • 765 एमवीएआर बस रिएक्टर - 2 (1 स्विचबल स्पेयर यूनिट सहित 7x110 एमवीएआर) क े वी बस • 765 रिएक्टर बे - 2 • 400 के वी लाइन बे - 4 (डोमा पर *डोमा शादनगर जीआईएस (टीजीट्रांसको) एवं *डोमा - क े थिरेडिपल्ली (टीजीट्रांसको) 400 क े वी विवन एचटीएलएस डी/सी लाइनों की समाप्ति हेतु)
8. *डोमा पर कु रनूल-IV - बीदर 765 के वी डी/सी लाइन का लिलो (लगभग 20 किमी) • ~ 20 किमी 30 माह
9. *डोमा – शादनगर जीआईएस (टीजीट्रान्सको) 400 के वी विवन एचटीएलएस डी/सी लाइन • ~ 40 किमी • 400 के वी लाइन बे - 2 30 माह
(लगभग 40 किमी) {टीजीट्रान्सको उचित समय सीमा म शादनगर (टीजीट्रान्सको) को ें 400 के वी तक अपग्रेड करेगा} (शादनगर जीआईएस पर (टीजीट्रांसको)
10. *डोमा – क े थिरेडिपल् ली (टीजीट्रांसको) 400 के वी विवन एचटीएलएस डी/सी लाइन (लगभग 50 किमी) • ~ 50 किमी • 400 के वी लाइन बे - 2 (के थिरेडिपल्ली पर (टीजीट्रांसको) 30 माह
टिप्पणी: i. क े थिरेड्डीपल्ली (टीजीट्रांसको) पर *डोमा – के थिरेड्डीपल्ली (टीजीट्रांसको) 400 के वी विवन एचटीएलएस डी/सी लाइन लाइन की समाप्ति के लिए, के थिरेड्डीपल्ली (टीजीट्रांसको) सबस्टेशन पर 220 के वी पारेषणन लाइन की रीरूटटंग की आवश्यकता है। यह कार्य टीजीट्रांसको द्वारा टीएसपी के खर्च पर किया जाएगा। ii. टीएसपी को मोनोपोल टावरों पर *डोमा-शादनगर जीआईएस (टीजीट्रांसको) 400 के वी विवन एचटीएल डी/सी लाइन के हिस्से का निर्माण करना आवश्यक है। iii. मोनोपोल टॉवर संरचनाओं को उन हिस्सों में अपनाया जाएगा जहां आरओडब्ल्यू मुद्दों की संभावना है, जबकि लैटिस टावरों का उपयोग संबंधित 400 के वी डी/सी लाइनों के लिए अन्य ख ंडों में किया जाएगा। पारेषण लाइनों के लिए कं डक्टर का प्रकार संबद्ध 400 के वी डी/सी लाइनों के लिए पूरी लाइन में एक समान रहेगा। *शादनगर आईएसटीएस सबस्टेशन का नाम और स्थान अब परिर्वर्तत ह ो कर डोमा आईएसटीएस सबस्टेशन हो गया है जिसमें डोमा के स्थान क ा भ ी बदलाव किया गया है।
4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 5 [भाग II—खण्ड 3(ii)] भारत का राजपत्र : असाधारण

[फा.सं. 15/3/2018-ट्रांस-भाग(4)]

नाओरेम इंद्रकु मार सिंह, अवर सचिव (पारेषण)6 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]

MINISTRY OF POWER

ORDER

New Delhi, 26th December, 2025

S.O. 6020(E).–– In exercise of the powers conferred by sub-para 3.2 of Para 3 of the Guidelines circulated under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), the Central Government had notified the following scheme, for implementation under TBCB mode, vide Gazette Notification mentioned below:

Name of the Scheme Gazette Notification by which Scheme was notified
NERGS-III Siang Basin S.O. 4221(E) dated 18.09.2025 [F. No. 15/3/2018-Trans-Part(4)]

1.1. The Central Government, on the recommendations of 34th National Committee on Transmission has decided to modify the scope of above mentioned scheme. The scope of scheme "NERGS-III Siang Basin" mentioned at Sl. No. 2 in the above Gazette notification is hereby modified and Note No. 3 is added as mentioned in table below. The other scopes of the Transmission Scheme and Bid Process Co-ordinator shall remain unchanged

Name of the Scheme Modification in scope of the scheme
NERGS-III Siang Basin Sl. No. Scope of the Transmission Scheme Capacity (MVA)/ Line length (km)/ Nos.
2. Establishment of new 400/220 kV GIS substation at Niglok in Arunachal Pradesh (with a provision for 400/220kV level and 6000MW LCC HVDC station) A dditional space for future expansion: ➢ Establishment of ± 800 kV, 6000 MW, Niglok(HVDC) [LCC] terminal station (4x1500 MW) along with associated interconnections with 400 kV HVAC Switchyard & all associated equipment (incl. filters)/bus extension, etc. ➢ 400/220 kV, 2x500 MVA ICTsalong with associated ICT bays at both voltage • 400/220kV, 500 MVA ICT: 2 Nos. • 400kV GIS ICT bays: 2 Nos. • 220 kV GIS ICT bays: 2 Nos. • 420 kV 80 MVAr bus reactor: 2 Nos. • 400 kV GIS Bus reactor bays: 2 Nos. • 400kV GIS line bays: 4 Nos. [2 for Kaying PS – Niglok PS 400kV D/c (Quad) line & 2 for Niglok PS – Gogamukh 400kV D/c (Quad) line] • 420kV, 50MVAr switchable line reactor with GIS bays: 2 Nos. [one in each circuit of Niglok PS – Gogamukh 400kV
levels ➢ 420kV, 1x80MVAr bus reactor along with associated bays ➢ 12 Nos. of 400kV line bays (along with space for switchable line reactor) for future lines ➢ 6 Nos. of 220kV line bays for future lines ➢ 400kV bus sectionaliser bay: 1 set ➢ 220kV bus sectionaliser bay :1 set ➢ 220 kV bus coupler bay: 2 Nos. D/c (Quad) line] • 220kV GIS line bays: 2 Nos.[for termination of Niglok (ISTS) – Niglok (new) (DoP, AP) 220kV D/c line]
Note: 3. Line lengths mentioned above are tentative. Exact line length shall be ascertained after detailed survey.
7 [भाग II—खण्ड 3(ii)] भारत का राजपत्र : असाधारण

2. In exercise of the powers conferred by sub-para 3.2 of Para 3 of the Guidelines circulated under Section 63 of the Electricity Act, 2003 (No. 36 of 2003), the Central Government had notified following scheme, for implementation under TBCB mode, vide Gazette Notification mentioned below:

Name of the Scheme Gazette Notification by which Scheme was notified
Transmission System for Kurnool-IV REZ - Phase-II (3 GW) S.O. 1478(E) dated 27.03.2025 [F. No. 15/3/2018-Trans-Part(4)]

2.1. The Central Government, on the recommendations of 34th National Committee on Transmission has decided to modify the scope of the above mentioned scheme. The scope of scheme "Transmission System for Kurnool-IV REZ - Phase-II (3 GW)" mentioned at Sl. No. 7, 8, 9 &10 in the above Gazette notification is hereby modified and Note (i) (ii) & (iii) are added as mentioned below. The other scopes of the Transmission Scheme and Bid Process Co-ordinator shall remain unchanged:

Name of the Scheme Modification in scope of the scheme
Transmission System for Sl. Scope of the Transmission Capacity/ km Schedule
Kurnool-IV REZ - Phase- II (3 GW) No. Scheme
7. Establishment of 4x1500 MVA, 765/400 kV *Doma Station with 2x330 MVAr (765 kV) bus reactors with space provision for establishment of 220 kV switchyard Future Space Provisions: ➢ 765/400kV, 1500 MVA, ICTs– 2 nos. ➢ 765kV ICT bays – 2 nos. ➢ 400kV ICT bays – 2 nos. ➢ 765kV line bays – 8 nos. (with provision for SLR) ➢ 400kV line bays – 8 nos. (with provision for SLR) ➢ 400kV Bus Sectionalizer: 1 set Future Space Provisions for 220kV switchyard: ➢ 400/220kV, 500 MVA, ICTs – 10 nos. ➢ 400kV ICT bays – 10 nos. ➢ 220kV ICT bays – 10 nos. ➢ 220kV line bays – 16 nos. ➢ 220kV Bus Sectionalizer: 3 set ➢ 220 kV Bus Coupler (BC) Bay – 4 nos. ➢ 220 kV Transfer Bus Coupler (TBC) Bay – 4 nos. • 765/400 kV, 1500 MVA, ICTs – 4 nos.(13x500 MVA incl. 1 spare unit) • 765kV ICT bay – 4 nos. • 400kV ICT bay – 4 nos. • 765kV line bays – 4 nos. (at *Doma for termination of LILO of Kurnool- IV – Bidar 765kV D/c line) • 765 kV, 330 MVAr Bus Reactors – 2 nos. (7x110 MVAr inc. 1 switchable spare unit) • 765 kV Bus Reactor bays – 2 nos. • 400kV line bays – 4 nos. (at *Doma for termination of *Doma – Shadnagar GIS (TGTRANSCO) and *Doma – Kethiredipally (TGTRANSCO) 400 kV Twin HTLS D/c lines) 30 months
8. LILO of Kurnool-IV – Bidar 765kV D/c line at *Doma (about 20 km) ~ 20 km 30 months
9. *Doma – Shadnagar GIS (TGTRANSCO) 400 kV Twin HTLS D/c line (about • ~ 40 km 30 months
Note: 40 km) {TGTRANSCO to upgrade Shadnagar (TGTRANSCO) to 400 kV in matching time frame} • 400kV line bays – 2 nos. (at Shadnagar GIS (TGTRANSCO)
10. *Doma –Kethiredipally (TGTRANSCO) 400 kV Twin HTLS D/c line (about 50 km) • ~ 50 km • 400kV line bays – 2 nos. (at Kethiredipally (TGTRANSCO) 30 months
i. For termination of *Doma – Kethireddypally (TGTRANSCO) 400 kV Twin HTLS D/c line at Kethireddypally (TGTRANSCO), rerouting of 220 kV transmission line is required at Kethireddypally (TGTRANSCO) S/s. The same will be done by TGTRANSCO at cost of TSP. ii. TSP is required to build portion of *Doma– Shadnagar GIS (TGTRANSCO) 400 kV Twin HTLS D/c line on monopole towers. iii. Monopole Tower structures shall be adopted in stretches where Right of Way (RoW) issues are anticipated, while lattice towers shall be used in other sections for the associated 400kV D/c lines. The type of conductor for transmission lines shall remain uniform throughout the entire line for the associated 400kV D/c lines. *The name and location of Shadnagar ISTS substation is now changed to Doma ISTS substation with the revised location at Doma.
8 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] 9 [भाग II—खण्ड 3(ii)] भारत का राजपत्र : असाधारण

[F.No. 15/3/2018-Trans-Part(4)]

NAOREM INDRAKUMAR SINGH,Under Secy. (Transmission) Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-110054.

Cite this issue. Extraordinary Gazette of India, Government of India, 26 December 2025. Indian Gazettes, https://egazette.servantsofknowledge.in/details/in.gazette.central.e.2025-12-26.268905/. Archive identifier in.gazette.central.e.2025-12-26.268905.