छत्तीसगढ़ राज्य विद्युत नियामक आयोग (ग्रिड इंटरैक्टिव विकेन्द्रित नवीकरणीय ऊर्जा स्त्रोत) विनियम, 2019 का प्रारूप संबंधी

Published 05 October 2019

Department
विद्युत नियामक बोर्ड
Type
Extraordinary
Gazette no.
656
Notification no.
82/सीएसईआरसी/2019
Identifier
in.gazette.chhattisgarh.eo.2019-10-05.656
Languages
English, Hindi

click here for IIIF manifest

'ffi€ fr€ + w<.fa sr+ gmt

ilTq gIIdH(Gnr cmQma)+ isor

rqi6 *.2-z:-fu tg "qra rrre / st fu. e. ftdtii, ffi-6

30-05-2001."

ffi{NrrrEt

(wgTernur)

rrRr*'R t r*'rRtd

eilkt ts, w* tcnl

pmia oso l nqgi, vftqn, frqi+ 5 srE(in 2019 -

6fuc rrq fuga fuffin sflqh'r fugd tflrffi rr+c, ffi {{^{{FOOTNOTE *}}}}lFir

s**rrrs rrq f{gd furrs sTlqtr 16 Etrfu fdtfu rffi suf utal Bftqs, 20le .hT qr6rl xeiorz/ffi rr$/zorr.-erneerrqiewrtwgWdtft mturt-qqron,sef trffi rffi +fd+.rsq{ ftar$t f fuasrftrFtqc, zoor Sys+{dqqqqswnenr{{^{{FOOTNOTE *}}}}fte{{^{{FOOTNOTE 46*1*}}}}sqdqq,wrtaurnwfrgafure-+en{{^{{FOOTNOTE *}}}}fr (vq eiltrl Ele-{h ffiflr+ rttar, s;qf *Tffiffitv

vlzorafl,*-qvwnl,q{-zozzrq,o.dqrfreQ{*frdqffitr{6 tS. crrt. {. d.)uond*ga{fua qrar lo rfunqieodurretqmiqtaqqFrrfr{dfuqrt tgsrcdrdi$agffurfu*ftq,rrqqrsrfrUtmw+lffEdrrrfrdtArffda +A#sftfr€rt{,410-eigqi+e) ft*iisqtff*tfrqrqqc Gfserq@nlqr*wrca{frq-q*.ri5e,*-61 srrd 6.fr fu s.'$ swe erq{rn t I

*evr+ntr*raenrdfrsftqsqff'{raq (gq.\'{. sili.{.1}frNnfrAit{{^{{FOOTNOTE *}}}}, qun,qrm orffiefcfferffir6rstt s-qf*.d.dfi,Fr€{+tr{+ftqqnt terfu*i{r{qltya]qtetrsqfi*fit{tiBrdftFrqc]iQA{{{tfdsfufrcflrrsft qrdc I ffi eY"e q{mr+ {{fi + fts FJs{ms{*q*qr t t

frfurr+t'aStrsidfur+*.rurg-6f+fc+fueld+ftqs{zorpte{*dqr€isTrq{fdffrqqlqrvrsqtaterql tr

6*q1s+att I

BqtffdEfrnawigeaurfrgaeTRrfuc, 2003 (2003rtlro){{^{{FOOTNOTE *}}}}srmaz, ot, eov6qBaqm tsrtsl${fqEdvffi aQrF{frfrlasQqq-mq'tierdeswqrrffidffi'ridreEq,u*m'rqrrqf{gnfurffi BTtq}r tefltrll, qc{anr, {rqi fr tfu ft u-qf qfr *wtrel+fdqtft 6fu ft itriG{d6ifr fr Hso,inSeftqfr rfu dfsfucq{rdrt:-

r. rif}rw ilc aql qrtq- t.l ifrFrqe,u*srrquwfrgafturn-*sn+r tffrsidfufr*Gai-*6{uffqsqf*dlftfuq, zotqqtdr{i I 1.2 Aftfrirq,rrq{dfla{qir*nr

1311 t3t2 Bffi{rrqvqqd, frtiis s srE({r 2ot9

1.3 gq frftTdt qr frwn Edqrg {r'q d r{T,f efd q *,TIt -

2.

2.1

(s) "srggtr" fr 3Thq-d t ft--d{"T orfgifrqrft Gf{ frtfr qk d qtq FN-Ifud 3n-$qET;

(.r) 'tqo ro GFtr r nr{o,d) qr ftro orqB F{ftirr frRtsl' t GTfi-d t snd-l em ftftffie ce erqfu, frrsd ftq fr'dwr orgf,frqrfl rrur frft-q ff d sqlnffiTqt d lfrq frqd tq-o. dqri fuqr qror t;

(q) "oTrqlT" t erftif, B oTtsft-qq d 3rfi-{ TBd Effiflird vrw ftgo fufl-Tfr e[rfr,T;

(s) "er3dfuo qirr" vr 'T{fqil qn" t 3Tfti-d t frrdHe, ffie \rfuw qr no ETd qiqq (frqqft) if GTft-qffi q-d erfuo-oq qr-,T, ffi sr[ffi fttS qri tg orJsfuqffi q6rrd d oil{ ftrS rgafuw€r 11-d swtrffir d qtq {ffid Gt-{-qr{ t Eyrfqr.rqr d, q-{E Ergqfu-dT gqn-dl (ql-{r$q qarfl q{srfuf,) d €eET q Gr-JqB-d ,ii.T lt ilsd strtro sqqt'r tg {f*rd ebTghETrsri qFd sS qk{rd {sT-{qf A rrn d qtr t d=TT t

(q) 'ffika rffiq sqf f$Fff€)" t qm. B lsa-dq frn{ ffi qrn-fr qr err*q gM l:rrrrl IrlEI tt{ Gr-J+rkd GrQ]clI rlr{d rflcnrr A rfi{ Tq qffiq Eqf riTrf,q, grur qrardl qrw rffiq rffi d er.q rcT-* gRT rsz frrdH€ qr ss€ o-q d qtdq lmr q{ fugd sunfr { e-qreo of .€ (u) 'fffiq q{" qr '"{ " t oTftfd t ci-nfr ffA"s{ qS q 1.o erfa t gs Eti fffr oen 3il-il-ft q{ + {qEtr-fi=s qrd 6t rsrrrlkr *i qre srqfu;

(q) 'Tf,IrFT fie{'t GTfufd t cs u-qf +cr, cil ve fu5 w tiwflR-d d fus q{ ;rftqxoftq 6qf srTrfr Ergr B-fllka frgil ffi ql7 wanffiT o} u-

(s) 'trs fr.q u.qf" d orF*o t td q-ffiq u-qf #t, ffii qrn H{n-n d Tfiq G ;rffiq $qf riemq, gnr furtfud wq G fttqdrcir fr gm (q) 'ffiq errflr' t oTftnd t w frMf d frfrqq rs d 31tfi-a qR+rrkd flrkil';

(e) 'tgrir ffdfqf, rffiq uqf qufl,fr' qr "err{OqR{Vfl" t erpL * frtfr qfu gru riwnfuo ce ffiko ;rMFq e;qf q-"n-fi, d fr-ili"r srjsfurift d +.q-d t rifrfu-a d sr}v rilt fr-qd mq ci-gerr d GTefi-{ f{f,iu Gr-gsfuqffi dt erer+r grq-dT d utsqq t frrfr erq qfu En ffgd Efr {{^{{FOOTNOTE *}}}}rT$ o-ror d oTelrlT sqchT E"i swttrT o-Eor d ) , effieq{qqd, fu-d s Erqqq 2o1e --- 1312 (1) (a) "q$greflv{\"H $ilrft" eE qk t dr er{-esrr-{$\'fl sq-+ or wrft t;

oTftnd BqlnffiT qRq--{ TerTfr=a o

(a)

("t)

(o)

(q)

(E)

(rT)

sefi-a et{ crJf,fuqrfr

(q)

.ri d, 'Tilqw" qE qk t d Frs t fugo or sq?nq ostn t oerT d sS ffi or sq-*q oq F;s n t666 Tffiq sqf fr eio:dfuo qtq qcrdl d,

(q)

(q)

(e)

9rllu[cl--t;

o "ffi g-qf sun#'t e6go t t{Tr sf,Tr21 Efur6 {rsnrd, ftcis s srqdR 2ot 9

(q) :'EdqR q-F fr.d. qrn#' t GTfttrd t sq,1*, d qfufl-i at ud w e-{effi-f, T5 ${ EH qtfte-qt fugd sqTfr, E\ fu sH q}fre-o, tmrdffi d urpqq t fr-gd fr €t) qqMq S ft\ W d qcrlvr m-r oqfrq o-rot d; (q) 'qmsnr{ fiqH' t eTfti-d t co erqft furd Gr-d q fuf,t r c-5funft w t'I.,gq{ d qw ie ffil o-[ q-crca.mFi. qlrtr,trcl: ci-ffi d-drsi q{ d'GTff, qt-6 d qam fr{ Q GTr$T *i qlm oen GTI-{-rfr qS A qrd d {ffid-{T dl-ft-s ol sqrw *i q1_fr erqfu w ffi +dr *

(oo) "on-ar rreT d w16" d GTfti-n t, $ffi ETft-cq ftffi-n oE e-{dqq, -1 fuft t{ft dr u-qf qMr-qqT o-r srfr t, d vs qRs{ trq qerrE-f, t, d Bq-d grgr qRsr d sr* t qr+slfuf, u-.ei w Eft .r$ d srerm eTrq +l frr${rt d q-g-qtT d orrcnv q{ slw of .T{ &

B, zs q$t

2.2 erfr erq vr< gq srtrrqfrf,qi, d gq frfrqril d u-g"m B q-qR' s€*f frfrTE uq t q-RqTfud rS t fu-g eTDfrqq q qRqTfr-d t, sr-d qS erel +n +qT fu eftftqq q BEA fd-S lrrgtPnr B I srdr rrq q.i etffi+t qi {€.f qgffi t A-g Eq frfut rn orfuftqq q fqRTE rq t qRlTlB-d rS t fu-g rreq d fr-qd sfl|q qt) aq $w< gM wfud ftffi frfu d otfiq, vfuilR--f, t; sqd qfr GTef EH ff€T fr t-C frtu g g{d 6q q-rgtRrn t t

3. frffiR aw ar.1et+

3.1 t foP'qq Flefufod oi aq 6}.fi- o) dGgqq Grstil efl-dr sfl d wrfud d fi-seTrrS\'fl | Grar qel d qqrfu.f, Erfr +ql fu srrqqeTt Erqr dq oq v€ qqfr( fu-ql qrilTT t

u) fr-nr"T 3]-J-+muTft d q-ilq d et{ t riwrTfu-d Gil{-S3Tr€\ry t Edlqrrd{lqrrd, ffi-{53rqdR20t9 -_1312 (3) 3.2 t frftqq ftffi qfu o) ffio. .r{ d qTEzt-q t ;rffiq s-of qffiqrr rarrfud +-{i t q-St rBi r

3.3 3TEfr?m of en u +z(z) d Gr$H gqq-iff oTftqrq o-{i qrA sqdffiT fr Grqi qR€-{ fr nft61utu g-qf qq-S {enfrd $-{ sd-t eqrd Ts o{rtseili{\'s d cetrq g, 4. ft{aq erqB: 4.1 g 6foq-{, qurrrr t GTq-i GrBqqq q,1 afts t u-go eti r

s. fu sIIqrRd sTrnfr shqr 5.1 gq frR={rqf S orkqa-+ of drfts fr fr-{ qra d fi-f,i frffr,rr or5*mtm. ffikd q-ffiq g-qf qqffi d fuq 3rrnfi w orffi tg q-6 a-q eir'errRd wnfr aq otn t

5.2 on-5-{rq TiEefr olTa-q-r) q;r frsroqq qr'q t'rsd q-dm anr fu-qr qfiqr I

6. ffi \rq sfuifr Sg w+wr

6.1

6.2

**'H-#u,qilr

7.

7.1

sFnq Rrqiil rffiq361Ifl*-il ffikd rffiq sqt sqr

7.2 rffiq sqt gqrurq:r il{ d ffd qnfrd di tg srzrdr ddq fugd fufrqTq-o Gnd,T (r-ffi s-of sqrcq d ffrq q-ffi'q u.-qi q=rrwI{ 6] qr{rfl. \'q qffi a-{i ig fue]-{ qq yr-tr) frfuqq, 2o1o gq sfld qrqrflq-ff qqfurqi d Ginfd f+fR-d rn-rflT qrq-fl-s d srfi-{, {rr;q d ftffi q-ffiq ctqf qun-fr griT vglft-d.s-qf fg q-Mq o-st qflqq{ qrft ftrqr qr sd-n t t3t2 (4) -- =ffi {qqd, ftqis s srEH{r 201e

il+-++t qFr6 *HT*.n.r sr*{irdql

8.

8.1

8.5

8.6

I

"TRq

"TRq

8.7

s{srTfr--d o-q sdrn' qrg q6 fu qR vurT}ffir, t.sfr d-oeiq (ryf ,+n iloorq/enRro rrn d-ow) d rneT nffiq g-qf q"rEft {rrTn=d o-{i 61 qp{R-6-dr tdT t dt td lgrft qtrdT q Frs t ffi{ffi q dri w ffi qr+r o} fr-s t q-qrtrd Eii t ffi gg EgEf, @cf{ejrT E-<-& fr +ft zTRq t t-gera err$-dvrq ffiq fr Bq?FEr cn{nn qr=n arBq r

;rffiq u-qf qun-fr, otTet+tro RrqiqTsiyn fudrrfl t qfurd +ft zrBg, t3l2 (s)

, frFi-d s srqfl 2ote

qq 16 fo nffiu u-qf q"n-fr t gq-& ol BT$rq fu-qr w v6r d d Q€ qvrT d ot-d=T i\ frrffiiq fuflE-s *qr oTHr{6 TSt +T qR qe g+& t sr

8.9 fr-dw or-Jsfrqrft S q"n-e d u-qi eio:dfro 6-{i d Td ss-t q srgqtfuqu gq e;q fo-qM ei-dt 6-ri of erqor ffi tt .1a zrBv I ed ffiq Enfrfr-n €T-M (ffi), .Trfi-q f{gd ftrs riBdr (Grr+-im-Ozen{-f,f,{ iln-fiot qn-dt fr frfrFdE fiqT S fiil{ E)-{T ilRq t

9.

9.1

9.2

9.3

9.4

9.5

fu-qr \ilrlqT t

9.6

9.7

9.8

qq{srT

tu#"-h*,

10. *gw qtf qffiq+r etqar 10.1 dqw:

e}.n ow 16 e)cgqq s-6-dr*ql t , frii"6ssrqdn2ole

1312 (6)

rq) il-gqr Eri fi-s3ll-{i\"s +n slsl-{l qE frtft 3ral ss d glfr.€ fr fi-furrigs o1 terq{r d frq ss srdl qer d qrel 3i-gqeT ffio o-q q-dJTr

I

rr) m-qqr Eq fuMt d ffn fi-ftTrrSqs rQrlfrd o-{i tg ic ffiq qTrfr

' o-t FIlq qlw o-{ q-drrl I q-q q6 fu d-agq{ fu ffiir or s.qliq o{ d qr cTfu6 sun-fr rarrfrd o-{i tg qra T€t *.n t

10.2 ffio, qffiqqr qrrdr o) fi=ftTrrSgs o1 errdr m-qq{ d dfqf, qRl$fufl ql.T, +fl .ft qmai d, t oTBn q-€t +ft r qrg ?16 fu +d ffiq qq{w d cid.fu rerrE-f, frrn qri qtq q-ffiq uqi qund o-r ;F-f,q GrtFTr r fu'.qr. or *rn t

u) m-gqr of ffi qsrq d qrq ffifufl q-ffi-q u-qf q"Trfr {arlfud 6-{i frt Grgqft fr qrhrft t

11. +e ffi.f El-q,FeII o) m-gqr flf,d{rr er-5-srfuqffi t aq,it=T tg fr q-{ fuqn t sTqi (uiqqq 61 ffgd sq+'T o\ rrqiqtfuo 6Ti tg ffifuil q-ffi'q u-qf qqt-fr renfud o-q sd{r t

ta) m-qq{ d qfr€{ n q-{enfr-d q-ffiq u-qf wrfr t s-+a+ lqfrrT s-qfu d +irq f{fl{"r 3l-+sfuwfr EI{r s-Erq q,t .T{ ffqd d d wqrq qR 6t$ ft-gd tq d, d t-S Oq f{gil ft-n{"r 3r-Jsfrqrft qi e-ilq of sr sd.ft I

rl) fr-f,{ur Grggrfrqrft, crqfu d srtTtFI w ffi ft-ftrrr$gs grgt ver-kf, slfrR-fir s-oi ss qfldq E-dlqR til{ ARw- w swffia -" sdrn, d vs ft-il{ur orjsrfrqrfr gM fu{-a frffi'q q{ t o-iTfr G qmfr EH of qfurrr Anr orfuqrq fo-qr .rfl d r qR t{Tr tRw oqd-eT q d dl qE-SfuTi ErgI fflril ffiq q'S d q"fufut ffi aft qfuqT aRI sTBqrq {q-dq tRw tS sqrd-{ tg T*q *'n t

u) ss rq-f,ren d ortfi-{ o-ot u.r A'€rrf,{ onr qrqr+q{ frfoq.q ro d qt-dqrqT d sqsrq fuqr qrhn t

12.

12.1

12.2

f{fiq €rg-$ffi fr1 Tfrol fr-il{ur or-J5fuurft GTq-i ffiyfr et t m-kn q-ffiq s-of mr s-sx nrrfr sq t .n-{i eg qiq or $EF-d-q q?i cru *iGikd lfrfrfu'd o-q lTd.n t furri d q-sR & ffd-{uT ol5sRurft Gr'tI s&T slfr 3lerqr gfuffi,r, sqT-"t{ G lrFqqfq €ffi) ad-qTq d tq q o-rd oq trd.n I

E *qlr€{rqqd, ftqis s srqfi 2o1e

t3t2 0l fdil{q sr-gAfrqTft Et{I erdt wT rsrfr qr {ffi ed-Eri d tq fr ffid o-ri a1 qqIT E B-€-+1-tfi lfrfuffi d tRH frfuqq d qroqn) d ergun fril{"T orjsfuqift d erq rffisrq oT sT{ qpal qfiq-11

13. dftgq ErrrflT:

fun{q ffi t ffifu6 *i ig sr-gsrd fr-dkd ;rffiq u.qf wrTfrr{f ot rrfi-e{ elqor r{"ifuo fuf,{.T Rrsrnrdi of qa sryen (roo qfrsrf,) fr 3Tfufr q-St +.ft, q{g q6 fu erqor t 0TBo' fi-ftrrE$\'€ of rierTqqT *i qrt Eyn t frfl"r Frswr+q erqrr e-qT{ qr},t, or-fu sq-ft1 d {{^{{FOOTNOTE *}}}}rqr q fu-fl qr sd t

14. sflilr*rfir{ ff5 14.1 fu ffirr o1 Esr if, {.Ss fu'S sqrl*, d qfusi fr ereTfd m-gqq at frt q-{errfrd e6 sv-g5 ft-c{ dqr d fu dr{q t+dt ol *i*qnq{ gq riaTd-{) frF=qq, zooo d ci-gqn sqgm d t

ls. sTrtfi 6T srlsrrr yq qB-qr 1s.1 sTrtfi ot mgfuawr

*.n t

rr) GTra-{6, otr-ff{ A uqrfto-w qq eT@ (fo-qr c) fq-a,z Hfuq u) fufl..rr Gr-JsrRilrft rrflf qq GTF6* d ftq yero. t q-6 3rfffi {FdEr e-gq-f, vr erq-d{-{) {ierTRf, ot'n t

fr-oiur Gr-Jf,fuqrfr ol gs-61 qaqT tn r 1312 (E) ed$ra{qqd, ft{i6 5 q1qfl 201 e

lTg q6 fu fr--fli"T Grjf,ftqrft tS €yilkf, GrTlEq sT Tflro-{ 6t tT st{ E-gE *i w q-$Eq q-, (gmefiq) "rrft otnrqR sq-$ffi or-dB d fin{ znm o) 6 T€i fuqr qnn dt ol-ilfi o) ftrw qrqr qr}.n t

!

15.3 rr{Qnq{ d fuq .rj+fi o) Gil-ieo. Eq frMl d ortftq fqfrtrE qrq-s)/riBdT d ergun argq)qq q-d 1q-dqi.v) of ulfu d reo Hi d ftdr q-ffiq sqf qrlrfr s{arTfuf, otnr

u) qR 3il-a-q-6, rso Hf d ft-iri g-qt qq-fr €{Q;Tqq s-{i d frs-c{ veor i. n} q6 96 eR cnqB {dri d fuq fr-d-i"T or-Jsfrqffi t ftilfi qts rrdq-r I 15.4 3rjffi rN EffiTEIT

o) gcrciq d qrft Ei-i q,1 ftfq t so H[ d .t-n{ er-ilq-6 q"n-ft Gq +fd) arvl tqn fttn gS ergou of frfu{d T{r o-{ f{.fl{rT r5wmtm d qqer Gffiq rrcgd otrn r

rq) oil-nro t ftEfld sq t d-n{ frtS rn fu fi-cftq er-geu d wfu d fi-{ fuqs d fif,r ft-fl{ur 3r-jsrfrqrft drqr ei-jqrr r*nrsR-o/ffi worerfro fo-qi ur}il r

15.5 rr)

q) 3nil{6 at tTT I l312 (e)

gdqrrE treq{, friqid. 5 srq,6R 2or 9

1s.6 o.rd of Whr dR rf,dq

sI. soo fo'.qr. t oTfuct at qunfr d erron fu

q-qf, o-t n t

(o) Gil-trq-o., fr--d-{ur GrJf,kqift oi o-rd Wfor or qfunfi e-qd o-.{q-r 3il{ 16. g,''qf fuo-q 1nf qqqenw- fu ffir

'tntfrrlqq

ftq. frf,r'r orJgrfuurfr Bq"+nffiT of q-.S-6 eq-6 ci-qB i$ sq-d +q-6 fr ffifud ETTfi1ft rfl-q s-trn:-

13r2 (10)

, Gnt-6 s erEqrt 2ote

(6) ynTE-{ fict q q-d samg e-f,rrffr; (ra) +q-o' ci-qB q qxft-6 itql oifrq tq qn qffid s-{i gq fi=semtq-s grn ft-s t eio,Sfuo frgd q,t q-il;

(rT) t{o' orqfu fr sxfu6 ofi{ GThq p}E zh) qfrryfud 6-{d gS fff,iq cr-gsrfuqffi ErqT q-(tr ft-g-o of qnl

(q) fr-qq or rE gq t-q-o, fu-fl-fiT T.rflq m-qqr ENT fu-qr qrifl; (s) q-fi-o-suftq s-of m-q Erfua (eirqftr)) d ft-dr{ fu eryfunft ait tr9ffi solrr$ sisrc;l;

(q) GTfrq t-{6 ci-qB i} si-q-+d frqn of erfrfum qrer; (u) cr.nfr eq-6 or-qB fr Grffid fugd et erfrfrm qrer t

(o) s*rq d frffi qrrr (e{.rfq trrkrf,q slqrqT GTfuo Eitrf, o-I qrEI, lll1rlrq qrpr qT 6-q Errfil 6-r srrq flR) q fr-gd A wrrt.T qi rr{q?rq ssrq d sS qrq fr frqd d sflrqq t qfrEf fu-qr rnrlqi r

\ilfg I

(q) ftqil tR$ eT-d Hqq qr.IT iT sqf, d qqT*s{ d qqqq silK"r qr$.ft t

dr.ft r

l3r2 (11)

sffisrrG irqqd, fr{i6 s srqn 20 I e

GTt-d. frratqrc q-fr€ie (dsqsq)/frrE)_fr€ qfrw q.fr€i-n 1d.d.v.va) fr qrft T{'*ro,e}Bo fr-gd ol'# frtalqrc uftero7fttffie qfuqi gno=rer t qTfr G ft-gd A sqo d tg fr Bq-qt r ti arqr Glrd-'lr off-t ES fuilqq gnr B-{Tkd fuq qfi q-r& frffi er< gffif efl-q qr qqxf of qfrt$ tg Bqu},T t =rSI arqr qrlrn t

fr. qR oTr+T i aq,1*, tRw or ftEri{"T frffirce qfuqr sfrqdr S entm trq fu-fl d d\ silrq=r flen B-wfffit fr-c{ frfuT o't fr frrcffie qfuq1 q.Rtidr fr fr fuq q[},lT 3il{ scf cFI arcRellqq rft n-qjql-{ fo-qr qr}.n't (s. fttS eq-o. ei-qfr d dF$q m--gw d qm BqG-eI ffgd d eTrB.fl rn'eq;q kS f{qT, gq}+-ffiT, {{rnf, erq q',Trti +S fu nq-aZqiT q'rTnt, ailT-+tq a-€ enR or Urrdrq ffidr o-sor vttn t

ffdwr oefl tfuq qrlti Gfl-{ Hrr€r GTfur+rtf t gm qsr qr}'n t

17. +fi d vtre frfi7dE fri qQrEr qd qri w trqf or Moq- 1r.1 frffi +-{ d qsrq d qri,zeq *i ererqr qa qri et frqfu q, fi-agq{, frfrffie qr6q fr fuf,iq erEsmqm oi Errfit q++ t n t

fic{ o} sfu{enfuf, tntqT I

17.3 ficr o1 s{rfr d +{H q-fio-suflq g-qf erlrfr am s-cqrko ft-gf, 6r Tflrs-{ +c{

ffifr ffSfuf, rffiq uuf s'nfr

18. rrrrdr \nf qffisil ffitrr 18.1 gErflI

, frrii-ossrqrt2ote

t3t2 ltz)

q-tE tsr 3n{-sgrTq-$\'fl, *gq Fimf, silrffT Em d ffiq-{ S ftq dE-fim1 11116) ftft'qq, 2013 d q-rqErqi d ergw ei t

1a.z qfrfrs{r frr}q et trTf,r

(g) oTrfftili-$\'s d grfr o) ffii ?ismq HBd ftdkf, qffiq wqf q,nfr rerrfua o-{i Bl Grgqfr dfr | qrg qE fu Grrg-ftiTq{qq t Frs il u-qi ol eclrg, .rfr .ft Gtri&rrrfi's d furfRn erqor t oTfu6 TSI +{T qlES r

qsr-s-ftl-q qfu-qr sTWd otrn t

q-.+6 fuff{"r g.q €srq,/qts{ il qq-trf, e} wd'.n

'

1s.2 frqd 3TfuRqq zoos d 3Tefi-{ E-flq rrq frMI fi A-q e"rqtrdf A 5fd gq .fi Et{ orTtserT{ggs q-q-fo. futr{ur srgFifrqffi t €q}.qonr tg ftqtRfl ffi tc-q t yflf{d gv fru orq e-d ergw rifu{r .[,r q]"il"o-{ sfrJTT

'1e.3 fudqq Gr-gsfrqffi oTBfrqq of srTqT oe d Gr$-{ oil-ffuR-$\'s lrzra e fugrr wq .nq gdrn t q{g qE fu u-qf {ar-d'q, qrrf, rff6-N i so tg wgfufl ffi ffi or frqrT-ft{yr qrfr foqT t r

otrn r


  1. s.{{^{{FOOTNOTE 4}}}} fud{uT Grj-gtfuqrft, fu-rT fuft WfuE d ffiFnd rffiq g-qi q.q-fr rerrRd a-{i fr E-qo frffi qRf, o-r Gl-ilfi ss qFrA d U"i-dq d oTrqn qr ffifiR ↩

s*sr, 6{q{d, fuis s srqdn 2oI9 rrrr (rr) qrg qE fu W q.qrfr & eqfsu qk g{ tRw, onq}q HRr qr d ro-sq ({ q.D{ur orsrqT ;rffiq s-df tg qts gq ms A elffi6 fud-{q gnr d fr errf dr, fuTfR-f, fuqr qrtfl I

t oTftf-d g-qi ht cTfuftqq qft erm

, 1e.s fr-.dR r GrgErfrqrft arur Gilg-ftili-ggs ""ri 86(1) (s) d Greft{ 3rFfd e;of qrqr qfur |

20. srdq rffrs{ ff€ 20.1 fr"ft olT{=fuTq-igs d qT{A q 3iil{ q+s{ f{5 d artrrd, f{f,{q or5ufurfr d ffi d a.6q or tflqqrd qBo ss fr-S t drr ffi fu-S Gil-i&TTrtq-s d-{ fr--f,{rT q.ryfr d +nq eiili €q)-s{ rsnn-a fuq1 qN ofl-{ s6r fudwT s.qrfr q eio:dfro fr-qd o) {sq irq S qrqr qr s-fi-dr d t .Rg w fu efa-trnmo frE, fiSq m-ifi ?il zqtNwq{ Gn-{ riqrd-{), ftftqq, 2666 onr s-s-d ryq1ffiff i+yilu_df d erEmv *,n r

21. u.qf dfur 21.1 q.ft rft u.-qf qRqr'q-qrcif of enq s-dr6 of ffi s-ffi qfi qd.ft qeriq qlq g-qi

21.2 u-qi tE ,T of gFdw qffiqqT 6 gq*ft fr-fi ora d ftq srd-eT *ql t 21.3 rg-rrffi dfuq \d Eqqdr d sq'.trffircTt & ie'r d qqqq tE Tfr s-qf S faq * 21.s tfurr q',TR d uq t riFda (t-o. t vs T$) sqf +t z qfuard s-qf sftqr-g tq dfrr

21.6 dfuq sqdr,TZE-fiq qel fumq fu rrd-q-{ qfi mfts fr grrvm (Gnqq \-ds) 3r-dmEq of ftiq n-o Frs it eio,dfuo u.-qf of tifr-f, u.-qt d sq ii qrq fu-{ir qr+fl I sq qrrrqr{ d e*{il-{ tg qd-s{ a1 dr0-s o} qr+qrfuo gild{ et drfi-s (fut$) q-4 qlrnl

I


  1. qMqqrcit t eio:Sfuo rrrrw g-qi o\ W frErfRd ryay q;Srn q{ tfuT €i-jst-d of qrhft r 21.4 tfuq q$, Gri-d t qrd oo e}.n I €fud g-qf of qrx qi rsqd d trnoilq qffi t (er.rfq 25 qq $ zs gar$. ro fucfcn t ro errpq crer 15 qrd t rs eiila) oqn q{ qt rqqd d qwoq Erd t (vm o qS t vrB rr cd iro) sqqi.q q q-€l EII-qT qT sdqr srarff vS q)fuo r€t fuqT qrt n t 21.7 T6 €fud u-qfZeTfrtE g-cf fus-mT Bq-qY,T q fu-ql .rqr d, qR oN E), at ffiq qd A {{^{{FOOTNOTE 31}}}}-d t, fff,{"r or-gAkqrfr ENr ss qa_dq E-dm S-{ tRw w oq o1 cT+rft, 6 M fr"fi-q uS fr r5ofuirfr Ergr qfrwEff BH d qrqq t ergaro ot G d t qR tsr oi{ m.n Bq?rq q d d sq qr-f,q ({ rN .il gst$eil$ ilT M ffiq q.S d qftwtff ffi am oEf,rd tfrs o) {n t-g T'rd-q E-dm d{ 2Bq S sq fr qrq fu-ql iilrSrr I fudi"T erEsmqrtr 6t fucrq tU qdrq-q ovi of drfts t qr+sfu-o €ard-{ qx:i o-G afi dffi-s ffiori-S) n-o Frs d f-d-{ ero:Sfuo u-qf 6} f{iRur e-5ofrwft am ss qRzilq"Tr d qam'qd d tRw q{ ss fiftq S qTqqT-fi d ergqT{, d ss ft-dl r GrJsrkuffi d lrrq fr;ur .rqr dt, mq fuqr qrnqT ↩

t3t2 (t4l

, fus 5 tsrqtn 2019

qrq-g. sTkffi TiEr;tT, $Rnrril 6fqr, IBE rrI fiE sffgrfucq

22. kdtrnqrf fi -Ifro.r 22.1 frilwr srdsffi at 1frol

(9 fud{q e-gmnrt, gq frffit d oia-rfn relT&--d mkd qffiq s-qi s.q-rfr d u-o-n Sr e+ror d qFryft-f, orn gv ffikd c-ffiq s-qt qqffi qrrEft oTffis r&n sil-i slqtT oi es-or ffio. sfrn-({ ffi ffi d sqrq{ t .rqe fu{s d .fidT tTr qq gffit ET{qrrfr vr-q ot +sn q-d-S o) ,ft tqr t

GrJvrRturft ilo-fiat Grtqw ot n t

fr-fl{"T Gt-g5fuqffi ,Tf,ffi oiezrqq otrn t

(q) gt ftMt d o{kqq-dT d sn tr-6 d ftili, fr'nwr or5afrqrft ftAkn (u) fuilrq Grg_drfrftrrfr, orq-i GrT[ffi d-, q ffiftn ;rffiq u-qi of aq-qren ei ftrTr{ ti tg lsgfud B-r+.q sri riqlfuf, qrqn effi +S qirT gofroquT, 3tal sfl lglfr, gffi STIR s-r 3i-qqur ot'n t

2s. OffiT{ qeTrarlr sfrfr 23.1 3n$T, gt ftffif d or$-{ furr{ o1 q-}q-qT o) ftqrfuo ori ig ftrt{ qnTrE,o.n qfrft oTBqFd o-'{q-r I

23.2 erTrEE-R qfrfr sS sti TA tr.rqi A ftdr{ fu er t oq fi-q q-6 t g6 qR t.d6 o-tft ogn {€-+1 onfiuRzil o-r froqq or-q}'{ d sqa e-qd otft r

23.3 qfrfr, ffifud q-q-{qt t fr-f,-qrq .-+ft-

1312 (ls)

' fu-{.5srqfi2019

(0 qlw A +sd \-S-S (\'nq-{q) t qfrftB; (s) f+go ft€rero o-rqldq * qfrftB; (q) fqftq fl-{-+tq fuTrif t d scra qrqq rrflq; (u) Bqqt-ffiTdt oTatat qtq q-qeTfr-6 osn GMFr6' M d sq'lnffircrT A ffii or qfrftfun o-{i qrd BqtnffiT ffi o1 qt-{ t fi-q qfrF.B

(c) vt+r{q t q',il-fr qfuf,- eEreET qfrh tnr r{*qo I

23.4 seri{ HqTrsrR qfrfr d old

(o) B-qqiffiT E*ft qfu-qm}, +{16 s."rffi oITR d fuo-rs + ftr$ fufl{rr Gr-JEftqTM[ qi rrare t+ r

€i=EFT znrm I

ts*Elq o-rql I

ffiflo-rql

(q) srrkr fr--fl{'T oljskqTMi of qr$ o-rd-f,q} d t+oro t q-6+T o-r+ I (u) vRrerorTmror qdq ig sl+ oTffi qtl B*rfi o-{fl I (s) ur* ffi oerl RfrEq $i-drT aeTr telis d er5ta"r d Bfl{ & 24.2 fur€ ta gq frffi d oTB-q-a-rT qfi dr0q * g6 qra d fi-f,{ {Fed fuql qr$.n t

24.s seil€ ta or iEe vo qRE GTffi Er*r fu-fl qrt n r 24.4 gt frft+di A orefi-{ fr-n{ur orJsfuqffi o} q}i ,rd flqT A ftqrc-{ iS SqT€ t-d et Gilclrq-rn qlBo-rq qq riqrm BqErq q;-ili Edf{t r

(o) ilier{ Hq}c-{ srfrcNur Grt.{ q.fuqrcfi of uqt*, e"Tr+r I (u) ser€ oTr-nq-fr d erq-s{"r S ftfS A-E orqrfud ornfi q"irfr 6't gfrtrdd tnf+ gq Be-.nT udeT tfi;If I

ig a-a or fu+-rs o-r'rr \'q qfa o-sqr t

1312 (16) gdqlr€rrqqd, Qcisssrqfi2olg';

(q) fi-qrro er5d== qq er=IT I (s) sr'q fr fur€ sqr-fi rarlBd o-{i f-g E-qo. qEilqi mr qrrHq o-fiI I (q) furr{ d eeq q ela or d qRrer"r of ara{{^{{FOOTNOTE *}}}}erl s-$IT I (E) GrrNRur qd sfuurcn t qMq d olt t et erffii o] or-q.ro oqFTT I (q) ga frMI d nqer-ii d qfr sorofi +4q Rfrm fr ufuw7q""n-ft { r3un gfrtra-o o-rqt I

(s) Eq lqMt d s$-{ qer qfWn ffi oil-r ffiEq or

(e) qR fuiliuT or-5omtm qft-wtfi ffi 1+sffi) d qrqq d u-qf qrw .F-{i E-r trq a-ar t, ai q-{fi ffinnq ftqR s-Eqr, +S frdf qil sTffi, oTr-{qs-ft, s-of ;nq g{ GEf f{mq ol-J-dtr, fuftq q-d-dtr {cqrR I

(a) furri ffi t u-qi of urfu tg drsrT <=Tr=rl (s) furr{ qrnfi t s'rFdd t-er or fffAEUI o-ri or Erfud A{I I

qrrT-tl frfrq

2s. Ynk ur affi 2s.1 fl frMt d srfi-{ fr.Ba qEq-fiqr n o-rS WI 6-{i q Grswd *i of cil fi, fr.d{rT Grgsfrqrft e fuE d e-ri-fi f

2s.2 gq frMi d orEfr{ fr"fr q{ d drurl mqr1d aTrfu q,t fl*fi fr.il{q srgvrkur0 of ss d ht orPlq-fi * qfr qr$.ft t

26. ftftr ti frt trfuil

qrfq-srrr qr erdrq gnT Q-G ft{€r q entw qrfr fuq qT sd-i ffi gq frF=qri d fuuqfi tg sgfud qqsr qr$ t

27. fuArfrowr a1 qlk

-'-r'-- Erffqprdrrdrrd, ffi{s€rqrt2ole :. lr,t2ltTl 28. ffitr{ o-ri at qrfu

eTrfrrT rnqq-qqq w, sq frMt d frrfi qFurq t, GTrdqrfi *i.n) o1{ q}s., Errdrq, qMq, ft?re-{, Bqid-{ur, risilsrq. olarfl ft-{s{ ov e-o-f,r tt

, 2s. qrtrTr{dt oi qt 6-{i a1 qrFffi

gq frMt A qrqETnT *t qrnfi q{ri fr qR ot{ sffi s-{fd +ft t d o{rq-hT, eTrtgl anT, te srtxETH ftFh o-q sd.n, d fu oTBfuqq 6 gqtieit derr EE fqffi t oT$rrd q d oi'r o\ qr 6ri tg *T q-fi-d d I

30. ftrs{ ga ergfu

rrffisqq vrw ftgo ft'qrrfi offihT ({rq + fuf,rq or-jsrfuqffi grr Effi ft.d. qtt s-qf qRqMqT t ffgd d sqrf{ tg tRs- .FT 3rqErrur) frftqq, 2013 HNr ynfuil frBqH qtr trffi qffiqqr sS rsq t ffid uq t yrfud +ft TF.ft dslr Es frMt E1gr qnfud q-St +.ft t qrg ?16 fu W €f{ Bffi qRqrwn gq frMI d orfr{ qn *i or fa-o-s d ofift'

snrtrftsna*gs* ,

, E€n/- \' (w. {. gwtl

qfus.

,:]I

1312 (18) B'6ftrr6{qq{, fr{i-{ 5 srqdR 2ol9

Raipur, the 4th October 2019

CHHATTISGARH STAIE ELECTRICITY REGULATORYCOMMISSION (GRID INTERAC- TIVE DISTRIBUTED RENEWABLE ENERGY SOURCES) REGULATIONS, 2019

No. 82/CSERC/2019. - Govt. of India is giving thrust to develop renewable source of energy being environment friendly in nature. Also the Electricity Act 2003 provides for policy formulation by the Central Government and mandates State Electricity Regulatory Commissions (SERCs) to take steps to promote renewable sources of energy within their area ofjurisdiction.

In20l4, the Government of India (GoI) set an ambitious target to achieve 40 GW of cumulative installed capacrty from Grid-Connected Rooftop Photovoltaic (GRPV) systems by 2022. In order to achieve this ambitious target, a strategic combination of Top- Down impetus and Bottom-Up execution approach were initiated, in which GoI, in partnership with the State Governments and Regulators, adopted a number of measures to promote the rooftop solar sector.

As per MNRE, GoI guidelines, minimum capacity of 01 KWp solar power PV plant is eligible for gdd connectivity. Most of the States have net metering provision and connectivity of solar power plant for 1 KW capacity under their solar roof top power plant regulations.

Forum of Regulators (FOR) has also came out with draft model regulations for Grid Interactive Distributed Renewable Energy Sources in the Month of April 2019.

Further, power procured by distribution licensee from such projects can also quali$ for their renewable purchase obligation.

Keeping the above in view and in exercise of powers vested under Section 42,61,66, 86 read with Section 181 of the Electricity Act 2003 (36 of 2003) and all other powers enabling it in this behalf, the Chhattisgarh State Electricity Regulatory Commission (the Commission) hereby makes the following Regulations specifiring the terms and conditions for distributed solar power projects in the State.

1. Short Title and Commencement 1.1 These Regulations may be called the "Chhattisgarh State Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2019.

1.2 These Regulations shall come into force from the date of publication in the Oflicial Gazette.

1.3 These Regulations shall extend to the whole of the State of Chhattisgarh. ,

Bifurq rrqqd, fuifi s tsrqtn 2ot e

1312 (le) 2. Definitions and interpretations

2.1 In these Regulations, unless the contexl otherwise requires:

subsequent a) "Act" means the Electricity Act, 2003. (36 of 2003) and

amendments thereof;

b) "Agreement" means an agreement entered into by the distribution licensee with the person;

c) "Billing Cycle or Billing P.eriod" means the period for which regular electricity bills are prepared for different categories of consumers by the distribution licensee, as specified by the Commission;

d) "Commission" means the Chhattisgarh State Electricity Regulatory Commission constituted under the Act;

e) "Contract Demand" or "Sanctioned Load" means the maximum demand in kW, kVA or BHP agreed to be supplied by the licensee and indicated in the agreement executed between the licensee and the consumer;

Provided that in case of multi-storied buildings (residential as well as commercial), contract demand shall mean aggregate load of common arealfacilities and individual units.

0 "Distributed Renewable Energy (DRE)" means the electricity fed into the electric system at a voltage level of 132 KV and below using solar PV system or such other forms of renewable sources as may be approved by the Commission from time to time or as recognized by the Ministry of New and Renewable Energy, Government of India;

g) "Financial Year" or "Year" means the period beginning from first of April in an English calendar year and ending with the thirty first of the March ofthe next year;

h) "Generation Meter" means an energy meter installed at the point at which electricity generated by the renewable energy system is delivered to the eligible consumer;

D "Grid Quality enerry" for the purpose of these regulations means electrici:ty generated from renewable energy sources by use of equipments for which standards and specifications are recognised by MNRE

j) "Hosting capacit5r" means capacity defined under Regulation 13 of these Regulations;

k) "Independent Distributed Renewable Energy System" or "IDRES" means a distributed renewable energy system set up by any person, connected to the licensee's network or network of other person, selling electricity to the distribution licensee under a Power Purchase Agreement or selling electricity to any person under open access or having captive use;

D IDRES owner is a person who owns the IDRES plant;

t3t2 (2ol

m) "Interconnection point" means the interface of the renewable energy system with tha oulgoing terminals of the meter/distribution licensee's cut- outs/switchgear fixed in the premises of the Eligible Consumer;

Provided that, in case of an Eligible Consumer connected at the High Tension ('Hf) level, the "inter-connection point" shall mean the interface of the renewable energy system with the outgoing terminals of the distribution licensee's metering cubicle placed before such consumer's apparatus;

n) "Invoice" means either a monthly bill/supplementary bill or a monthly invoice/supplementary invoice raised by the distribution licensee;

o) "k'Wp" means kilo Watt peak;

p) "Net meter" or "bidirectional meter" means an energy meter which is capable of recording both import and export of electricity;

q) "Net metering" means an arrangement under which renewable energy system installed at eligible consumer premises delivers surplus electricity, if any, to the distribution licensee after offsetting the electricity supplied by distribution licensee during the applicable billing period.

r) "Obligated entity" means the entity mandated under Section 86(1)(e) of the Act and identified under Chhattisgarh State Electricity Regulatory Commission (Renewable Purchase Obligation and REC framework Implementation) Regulations, 201 6;

s) "Premises" means rooftops orland elevated areas on the land, building or infrastructure or part or combination thereof in respect of which a separate meter or metering arrangements have been made by the licensee for supply of electricity;

0 "Prosumer" is a person who consumes electricity from the grid and can also inject distributed renewable energy into the grid using the same network;

u) "Prosumer Distributed Renewable Energr System" or "PDRES" means a distributed renewable energy system set up by the prosumer under net metering;

v) "Renewable enerry" means the grid quality electricity generated from renewable energy sources, including a combination of such sources;

w) "Renewable Energy Certificate (REC)" means the certificate issued in accordance with the Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010;

x) "Renewable Enerry System" means the generating station that generates electricity from renewable energy source(s) or combination thereof;

v) "Rooftop Solar PV System" means the solar photo voltaic power system installed on the rooftops of consumer premises that uses sunlight for direct conversion into electricity through photo voltaic technology;

z) "Settlement Period" means the period at the end of which net-metering settlement between the distribution licensee and the prosumer takes place,

ttrz (ztl generqlly beginning from first of April in an English calendar year and ending with the thirty first of March of the next year.

aa) "State Nodal Agency" or "SN"A" means an entity in the State, designated by the State Government to act as the agency to deal with issues related to coordinated development of renewable energy, subsidy approval' and disbursement to persons developing distributed energy projects, etc.;

bb) "Third Party Owned" means ownership in which a developer owns a Solar Power Project that is installed on the premise for which a commercial lease or revenue share agreement with the owner has been entered into by the Solar Power Developer. 'oThird Party Owner" may be construed accordingly.

cc) ooUseful life" in relation to a roof top PV Solar generating station shall be 25 years.

2.2 All other words and expressions used in these Regulations, although not specifically defined herein above, but defined in the Act, shall have the meaning assigned to them in the Act. Other words and expressions used herein but not specifically defined in these Regulations or in the Act but defined under any law passed by the Parliament applicable to the electricity industry in the State shall have the meaning assigned to them in such law.

3. Scope and applicability

3.1 These Regulations would apply to:-

a) PDRES owned by prosumer or Third Party Owned. In the third party owned Solar Power Project, the following will apply:

i. A Rooftop or Land Owner may lease out / rent the premise to a Solar Project Developer on a mutual commercial arrangement. Under this arrangement, the owner of the premise engages a tumkey installer to design and install the project. The Commercial arrangement between the project developer and the premise owner will be submitted to the Distribution Licensee for records.

ii. The billing will be with one of the two parties that is decided and informed to the Distribution Licensee as a party authorized to bill.

b) IDRES installed in the area of supply of the distribution licensee.

3.2 These Regulations do not preclude the right of any person to undertake renewable energy projects through alternative mechanism.

3.3 The consumer availing open access under Section 42(2) of the Act may establish renewable energy systems in its premises only if it is under the IDRES.

4. Control period:

4.1 These Regulations shall come into force from the date of notification in the Official Gazette.

t3t2 (22) udft€rr€ttq[d, fr{ifi s srqdn 201e -.]'- '-- -.- 5. Web based application processing system 5.1 The distribution licensee shall implement a web-based application processing system for processing the applications" for distributed renewable energy systems within three months from the date of notification of these Regulations.

5.2 Matters related to subsidy application shall be dealt by the State Nodal Agency. ' 6. Monitoring and reporting framework 6.1 The distribution licensee shall quarterly publish on its website information related to DRE capacity added during the quarter and cumulative capacity on each element of the distribution system.

6.2 The distribution licensee shall every year submit information related to the capacity added and energy procured from DRE systems within one month from the end of financial year.

Part - A

Renewable Purchase Obligation

7. General principles

7.1 Renewable Purchase Obligation

The quantum of distributed renewable energy generation as recorded by the generation meter shall be accounted by the distribution licensee towards compliance of its Renewable Purchase Obligation (RPO) as stipulated in these Regulations.

Provided that in case the renewable energy system is set up by an obligated entity, entire renewable energy generated by these renewable energy systems shall be accounted for RPO compliance by the obligated entity.

7.2 Eligibility to participate under Renewable EnergSr Certificate mechanism The issuance of Renewable Energy Certificate shall be as per the eligibility criteria specified under Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 and subsequent amendments thereof.

Part - B

Technical Standards and Safety, Metering Infrastructure

8. Interconnection with the grid: technical standards and safety

8.1

the

the The voltage level for interconnection with the grid shall be as specified in Chhattisgarh State Electricity Supply Code 20tl or the voltage level at which prosumer has been given supply by the distribution licensee.

Provided that the HT consumer executing the renewable energy project under net meteiing framework may connect th))eqewable energy system at its LT bus bar, The

sffiere{qqd, ffi-d 5 3pqfi 2ore

t3t2 (231 8.2

metering shall be done at HT level bus bar at the same voltage the consumer is ,presently connected with the distribution licensee. The interconnection of the renewaUe energy system with the network of the distribution licensee shall be as per the CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2013 and subsequent amendrnents thereof.

8.3 The interconnection of the renewable energy system with the distribution system of the licensee shall conform to the relevant provisions of the CEA (Measures Relating to Safety and Electric Supply), Regulations, 2010 and subsequent amendments thereof.

8.4 The prosumer shall be responsible for safe operation, maintenance and rectification of any defect of the renewable energy system up to the point of net meter, beyond which the responsibility of safe operation, maintenance and rectification of any defect in the system, including the net meter, shall be that of the distribution licensee.

8.5 The distribution licensee shall have the right to disconnect the renewable energy system at any time in the event of threat/damage from such renewable energy system to its distribution system to prevent any accident or damage, without any notice. The distribution licensee may call upon the prosumer to rectify the defect within a reasonable time.

The renewable energy system must be capable of detecting an unintended islanding condition. The system must have anti-islanding protection to prevent any feeding into the grid in case of failure of supply or grid. Applicable IEC/IEEE technical standards shall be followed to test islanding prevention measure for grid connected inverters.

8.7 The prosumer may install grid interactive renewable energy system with or without battery backup.

Provided that if the consumer prefers setting up renewable energy system with battery backup (full load backup/partial load backup), in all such cases the inverter shall have appropriate arrangement to prevent the battery power to flow into the grid in the absence of grid supply and manual isolation switch shall also be provided.

8.8 Every renewable energy system shall be equipped with an automatic synchronization device.

Provided that the renewable energy system using inverter shall not be required to have separate synchronizing device if it is inherently built into the inverter.

8.9 The inverter shall have the features of filtering out harmonics and other distortions before injecting the energy into the system of the distribution licensee. The Total Voltage Harmonic Distortion (VTHD) shall be within the limits specified in the Indian Electricity Grid code (IEGC)/IEEE technical standards.

9. Metering infrastructure

9.1 All meters installed at the renewable energy system shall comply with the CEA (Installation and Operation of Meters) Regulation s, 2006 and subsequent amendments thereof.

t3t2 (241

, frqi6ssrqw2ote

9.2 All meters. shall have Advanced Metering Infrastructure (AMI) facility with RS 485 (or higher) communication port.

9.3 The generation and net meter(s) shall be procured, installed and maintained by the distribution licensee. However, if the prosumer wishes to procure the meter(s), he may procure and present them to the distribution licensee for testing and installation and shall be maintained by the distribution licensee.

9.4 The distribution licensee shall undertake meter testing before installation to ensure accuracy of the meter. Testing shall be undertaken at the concerned division offrce of the licensee and completed within 15 days from the receipt of meter.

9.5 The meter shall be jointly inspected by both the prosumer or the third party owner, as the case may be, and the distribution licensee, and shall be sealed by the distribution licensee.

9.6

9.7

The meter shall be tested or checked only in the presence of the representatives of the prosumer or the third party owner, as the case may be, and the distribution licensee and as per the procedure specified in the Electricity Supply Code. If the eligible consumer is under the ambit of time of day tariff; both generation and net meter shall be capable of recording time of day consumption/generation.

9.8 The distribution licensee, within three months of the date of notification of these Regulations, shall modify its existing billing infrastructure to facilitate the metering arrangements as envisaged under these Regulations.

Part - C

Net Metering Arrangement

10. Prosumer and project capacity

10.1 Prosumer

a) Any consumer in the area of the distribution licensee shall be eligible to establish distributed renewable energy systems under net metering arrangement on a first-come-first-serve basis, subject to the technical limitations as outlined in these Regulations and shall be called Prosumer.

b) The prosumer may own the PDRES or may enter into a contract with the Third Party Owner for establishment of the PDRES.

c) The prosumer may avail net metering mechanism to set up prosumer distributed renewable energy system under these Regulations.

Provided that, the prosumer shall not be eligible to establish two or more systems using net- metering.

10.2 Individual project capacity a) The capacity of PDRES shall not exceed the sanctioned load or contract demand of the prosumer, as the case may be.

Provided that minimum size of renewable energy system that can be set up

tttz (2s\

E*qrrd {rslwt, fu-fi 5 erqtR 2or 9

under net metering iurangement would be lkW.

b) The prosumer is allowed to set up distributed renewable energy system with battery storage.

11' -tH:"rffiffi1,

up distributed renewabre energy system to offset the ;-

prosumer's electricity consumption from the distribution licensee.

b) The renewable energy system installed at the prosumer's premises may deliver excess electricity, if any, to the distribution licensee after offsetting ths electricity supplied by the distribution licensee during the applicable billing period.

c) The distribution licensee shall procure any excess energy generated by PDRES at the end of the settlement period at lowest rooftop solar tariff discovered through competitive bidding undertaken by distribution licensee in the last financial year. If such tariff is not available, lowest tariff through competitive bidding undertaken by SECI in last financial year shall be considered.

d) The energy accounting and settlement under this arrangement shall be in accordance with Regulation 16.

12. Role of the distribution licensee l2.l The distribution licensee may undertake demand aggregation and other related activities to effectively deploy distributed renewable energy in its area of supply.

12.2 The distribution licensee may act as Third Party Owner or Engineering, Procurement, and Construction (EPC) contractor to undertake the deployment of the DRE.

In case the distribution licensee acts as a Third Party Owner or EPC contractor, such activity of the distribution licensee shall be considered as part of its other business as per the provisions of the Tariff Regulations.

13. Hosting capacity:

The cumulative capacity of distributed renewable energy systems allowed to be interconnected with the distribution network shall not exceed 100% of the respective distribution transformer capacity.

Provided that in case of excess installation, distribution transformer capacity shall be increased to avoid denial of permission for setting up PDRES.

14. Interconnection point l4.l ln case of net metering, the interface point shall be the appropriate meter as per CEA (Installation and Operation of Meters) Regulations,2006, installed at consumer's premises i.e., prosumer side of the meter.

t3t2 (26) Bdiqrra{rsilrd, ffi{ s srqn 2ol e

15. Applicatiop process and procedure 15.1 Filing of application

a) The prosumer (applicant) shall-apply online on the distribution licensee website. Distribution licensee/ State nodal agency must ensure that processing of the application should be done entirely through the online system without any human interface whatsoever.

b) In case the applicant is a Trust/Commiuee/Flousing Society and other societies/Partnership Firm/Company etc., it shall submit the Application Form along with an Authorization Certificate.

c) The applicant shall receive an acknowledgement email/short message service (SMS) on submission of the application.

d) The distribution licensee shall maintain a separate Application Register (manual or online) for reference and records.

15.2 Applicationprocessing

a) The application, if filled online, shall be processed online i.e. the technical feasibility along with the letter of approval shall be generated by web portal and communicated to the applicant through email / SMS.

b) In case of any deficiencies found in the application filed offline, the same shall be intimated by the distribution licensee within 15 days from the date of issuance of acknowledgement of the application.

c) The applicant shall remove all identified deficiencies within a period of 15 days from the receipt of intimation and intimate the distribution licensee about the resolution of deficiencies.

Provided that the distribution licensee shall assess the updated application and issue LoA upon satisfaction. In case deficiencies are not removed in the said period, the application shall stand rejected.

15.3 Approval for installation

a) The applicant shall install the renewable energy system within 180 days of receiving the LoA, as per the Standards/Codes specified under these Regulations.

b) In case the applicant fails to install the system within 180 days, the applicant may apply for one-time extension to the distribution licensee.

15.4 Signing of agreement

a) The applicant shall submit, a duly filled system (web portal) generated agreement, online to the distribution licensee within 30 days ofthe date of issuance of LoA.

b) The agreement shall be then signed/digitally signed by the distribution licensee within three days of receipt of duly filled net metering agreement from the applicant.

, frqisssrqdn2otg tttz (zt) 15.5 Procure4ent of meters

a) In case the applicant intends to procure meter from the distribution licensee, the applicant shall . submit the Intimation Form along with an appropriate procurement fee to the distribution licensee. This shall be intimated to the distribugion licensee at least 30 days prior to the expected date of submission of Work Completion Report.

b) In case the applicant intends to procure meter on its own, the applicant shall submit the procured meter along with a safety certificate and request form for testing of meter to the distribution licensee/test centres approved by the distribution licensee, at least 30 days prior to the expected date of submission of Work Completion Report.

Provided that the meter procured by the applicant should comply with the appropriate technical standards of the CEA and specifications of the distribution licensee.

Provided fuither that the distribution licensee shall notify meter specification(s) within one month from the date of notification of these Regulations

c) Distribution licensee shall provide meter testing facilities at all its Sub- transmission and Maintenance division offices across the State.

d) The distribution licensee/test centres shall intimate the applicant regarding the completion of the meter testing.

f5.6 Work completion and commissioning

A. For system size greater than 500 kW:

a) The applicant shall submit the Work Completion Report to the Office of the Chief Electrical Inspector with a copy to the distribution licensee. A copy of work completion report shall also be shared with the State Nodal Agency.

b) ,The appropriate authority, as specified above, shall undertake system inspection and safety checks, as per the applicable practices, within fifteen days of submission of Work Completion Report and issue safety certificate. Failing to this timeline shall mean deemed to be issuance of certificate.

Provided that in case the work completion Report is not satisfactory, the applicant shall resolve the discrepancies within seven days of receiving the intimation from the appropriate authority, and resubmit the Work Completion Report.

c) The distribution licensee, within seven days of receiving the safety certificate, shall synchronize the system with the distribution grid post verification of the Work Completion Report, install meters and issue letter of synchronization and Date of Commissioning (COD) to the applicant.

sffiqIT61Tqqd;-frqis s arqiR 2o1e

1312 (28)

B. For system size less than 500 kW:

a) The applicant shatl submit the Work Completion Report to the distribution licensee with copy to State Nodal Agency.

b) The distribution lieensee shall undertake system inspection and safety checks, as per the applicable practices, within seven days of submission of the Work Completion Report and undertake system synchronization.

Provided that in case the Work Completion Report is not satisfactory, the applicant shall resolve the discrepancies within seven days of receiving the intimation from the appropriate authority, and resubmit the Work Completion Report.

c) The distribution licensee shall synchronize the system with the distribution grid post verification of the Work Completion Report, install meters and issue letter of synchronization and Date of Commissioning (COD) to the applicant.

16. Enerry accounting and settlement - Net metering

i. The distribution licensee shall undertake meter reading of all PDRES according to the regular billing cycle.

ii. The distribution licensee shall record readings of both generation meter and bidirectional consumer meter.

iii. For each billing period, the distribution licensee shall make the following information available on its bill to consumer: a) DRE generation recorded in the generation meter; b) Electricity injected by PDRES in the grid in the billing period, including opening and closing balance;

c) Electricity supplied by the distribution licensee in the billing period, including opening and closing balance;

d) Net billed electricity, for which payment is to be made by the prosumer;

e) DRE generation used by it for RPO compliance;

0 Excess electricity carried forward from the last billing period; g) Excess electricity carried forward to the next billing period.

iv. In case the electricity injected by the renewable energy system exceeds the electricity consumed during the billing period, such excess injected electricity shall be calried forward to the next billing period as excess electricity and may be utilized in the following billing periods but within the same settlement period;

t3t2 (2el

gffiqrrd {qrd, ftci-d 5 srqdn 20 I 9

v. In case the electricity supplied by the distribution licensee during any billing period exceeds the electricity injected in the grid by the PDRES, the distribution licensee shall raise a bill for the net electricity consumption after taking into account any excesS electricity carried forward from the previous billing period;

vi. In case the prorr-., i, under the ambit of time of day tariff, as determined by the Commission from time to time, the following process shall be followed; a) Electricity consumption in.any time block (e.g., peak hours, off-peak hours, etc.) shall be first compensated with the electricity generation in the same time block.

b) Any excess generation over consumption in any time block in a billing cycle shall be accounted as if the excess generation occurred during the immediately lower tariff time block.

c) This process will continue till all consumption in lower tariff blocks is set off against PDRES generation.

d) Any excess generation after setting off consumption in lower tariff time blocks would be carried forward to the next billing cycle. e) Same process would be used to set off consumption in the subsequent billing cycle.

vii. The excess electricity at the end of settlement period shall be settled by the distribution licensee as per Regulation 11(c).

Provided that at the beginning of each settlement period, i.e., April, carried forward electricity shall be zero.

viii. The injected electricity measured in kilowatt hour (kWhykvAh shall only be utilized to offset the consumption measured in kWh/kVAh and shall not be utilized to compensate any other fee and charges levied by the distribution licensee;

ix. In case, the consumer tariffs have been determined by the Commission on . kVAh basis, the generation and consumer meter readings shall also be taken in kVAh and settlement of energy done accordingly

x. Regardless of availability of excess electricity with the prosumer during any billing period, the consumer will continue to pay all other charges such as fixed/demand charges, Govemment levy, etc.

xi. The distribution licensee shall accept the power as per the useful life of the PDRES unless the prosumer ceases to be a consumer of the licensee or the PDRES is abandoned earlier.

xii. In case the prosumer leaves the system, excess electricity shall be considered as inadvertent injection and shall not be paid for by the distribution licensee.

1312 (30) E*irrc rrqrd, ftqifi s sri[H{r 20 I 9

xiii. Thg PDRES installed under these Regulations shall be exempted from all wheeling, cross subsidy, transmission and distribution and banking charges and surcharges.

17. Energ;raccountingduringmeterdefect/failure/burnt l7.l In case of defective/failure/burni condition of any meter, the prosumer shall report the failure, to the distribution licensee in the specified format of distribution licensee.

17.2 The distribution licensee shall replace the meter as per provisions specified in the Chhattisgarh State Electricity Supply Code 2011.

17.3 The electricity generated by the renewable energy system during the period in which the meter is defective shall be assessed on the basis of average of last seven days of the meter reading.

17.4 In case of IDRES plant, energy recorded in check meter would be considered by IDRES owner for the purpose of billing the distribution licensee.

Part-D

Independent Distributed Renewable Energy Systems

18. Etigibility and project capacity 18.1 Eligibility

Any person shall be eligible to establish and interconnect IDRES with the network of distribution licensee on a first-come-first-serve basis.

Provided that the IDRES conforms to the provisions under the CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations,2013.

18.2 Individual project capacity

a) The maximum IDRES capacity, to be installed by a person at a particular location, shall be based on the capacity and configuration of the electricity system, and in the power flows that distributed generation resource may cause.

Provided that the minimum size of distributed renewable energy system that can be set up under this arrangement shall be 500 kW.

Provided further that any person may set up IDRES on the premises of a prosumer and the individual project capacity limit as applicable as per IDRES guidelines.

b) The IDRES owner is allowed to set up distributed renewable energy system with battery storage.

Provided that the flow of energy'from IDRES to the grid is never more than the rated capacity of the IDRES.

EffiiflE {snrd, ftiis s srqdn 2ol e

1312 (31) 19. Role of lhe Distribution Licensee 19.1 In order to facilitate procurement of power from IDRES plants, the Commission shall notify feed-in tariff under Section 62 of the Act. a) The distribution licensee shall enter into an agreement for procurement of distributed renewable energy from IDRES plant on first-cum-first-serve bbsis.

b) The distribution licensee shall prepile technical guidelines for connecting IDRES plants to distribution network and seek approval of the Commission for the same.

c) The distribution licensee shall notifr administrative procedures within three months of the date of notification of these Regulations.

d) The distribution licensee shall am.ounce the quantum of renewable energy it can absorb at each distribution substation/feeder.

19.2 Notwithstanding anything contained in any regulation framed under the Electricity Act 2003, for IDRES plants, IDRES developer may seek contract demand, from the distribution licensee, as per its requirement irrespective of the voltage level of the connectivity.

19.3 The distribution licensee may undertake procurement of power from IDRES plants under Section 63 of the Act.

Provided that the Ministry of Power, Government of India, has issued appropriate bidding guidelines for the same.

19.4 The distribution licensee shall accept application from any person interested in setting up a distributed renewable energy system on case to case basis without any prejudice.

- Provided that the applicable feed in tariff for such systems shall be determined by the Commission either on case-by-case basis or during the annual feed in tariff determination for renewable energy, as applicable.

19.5 Energy procured by the distribution licensee under IDRES plants shall be considered as a part of procurement under Section 86(1Xb) of the Act.

20. Interconnection point 20.1 [n case of IDRES, the Interconnection Point shall mean a point on the network of the distribution licensee, including a sub-station or a switchyard, where the interconnection is established between the IDRES and the distribution system and where electricity injected into the distribution system can be measured unambiguously.

Provided that, the interface point shall be as per CEA (Installation and Operation of Meters), Regulations, 2006 and subsequent amendments thereof.

21. Banking of Enerry 2l.l All solar power projects shall be awarded must-run status i.e. injection from the solar power p.rojects shall be considered as deemed to be scheduled.

t3t2 (32)

, ffi{5sril1q2ol9

212 Banking facjhty will be available for usefirl life period of the project. 213 Banking of 100%of energy after netting shall be permitted for all captive and open access consumers.

21.4 The banking year shall be from April to March. Banked units cannot be For Sale to distribution licensee, energy injected into the grid from date of synchronization to Commercial Operation Date (COD) will be purchased by the distribution licensee at the first year tariff of the project, as per the provisions of the PPA with distribution licensee.

Part - E

b) The distribution licensee shall maintain a record of DRE systems set up under these Regulations with details including the type and capacity of renewable energy system and submit quarterly report within fifteen days of the previous quarter to the Commission with intimation to the State Nodal Agency.

c) The distribution licensee shall adopt and notify the procedures and formats including standard "Agreement" form as specified under these Regulations and upload the same on its website for information of stakeholders within . one month of the notification of these Regulations.

' fus s wqdR 2o1e i 1312 (33) d) The distribution licensee shall undertake technical studies to assess the impact of penetration of DRE systems on the distribution system

e) The distribution licensee shall undertake technical studies to assess the impact of different types of storage systems on the distribution system.

0 The distribution licensee shall set up a Distribute Renewable Energy CeI (DRE Cell) within one months of the notification of these Regulations. g) The distribution licensee may explore appropriate utility driven business models such as demand aggregation, Third Party Owner, EPC, etc. to promote installations of distributed renewable energy in its area of supply.

23. DRE Advisory Committee 23.1 The Commission shall notifr DRE Advisory Committee to facilitate DRE program implementation under these Regulations.

23.2 The Advisory Committee shall meet at least once every quarter to take up the functions assigned to it and submit its proceedings to the Commission.

23.3 The Committee shall consist of the following members:

a) Any officer nominated by the Commission - Chairman b) Representative from the State Power Department; c) Representative of each distribution licensee in the State (In-Charge of DRE cell);

d) Representative from SNA; e) Representative from the Office of Electrical lnspector;

0 Two independent external members from different Govemment departments g) Three representatives from consumer or consumer associations representing interests of domestic, commercial, and industrial category consumers.

h) Person in charge at SNA - Convener of the Advisory Commiuee;

23.4 Functions of DRE Advisory Committee

a) Advise the distribution licensee(s) to develop consumer friendly procedures, billing systems, etc.

b) Develop technical standards for DRE impact assessment, load flow studies, etc.

c) Develop reporting requirements for the distribution licensees d) Develop standards for data exchange between DRE system and the distribution licensee

e) Promote cross-learning among the distribution licensees and other stakeholders

0 . Assist in developing common programs across the distribution licensees 1312 (34)

g) Deyelop common programs for training/capacity building h) Advise the distribution licensee(s) in developing common monitoring & reporting framework and maintenance of database i) Assist the Commission orr issue that may be referred to it

' 24. Distributed Renewable Enerry @RE) Celt 24.1 Each distribution licensee shall constitute an in-house DRE Cell, to promote DRE deplo5rment in its area of suppty.

24.2 DRE Cell shall be constituted within one month from the date of notification of these Regulations.

24.3 DRE Cell shall be headed by a senior officer. 24.4 DRE Cell shall be provided with necessary authority and resources so as to execute the functions assigned to the distribution licensee under these Regulations.

24.5 Functions of DRE Cell

a) Design interconnection processes and procedures b) Ensure and manage web based application system for processing DRE applications

c) Develop and monitor mechanism for online monitoring of DRE systems by the distribution licensee control center

d) Obtain regulatory approvals e) Guide persons desirous of setting up DRE systems in the State

0 Facilitate training of field officers on DRE g) Appraise f,reld officials about the changes in processes and procedures h) Ensure modifications to the billing procedures/systems to account for provisions in these Regulations

Undertake monitoring and reporting as envisaged under these Regulations i) " j) Coordinate with DRE Advisory Committee and attend meetings of the same k) Prepare standard documents, such as expression of interest, RFP, energy purchase and energy sale agreement, tripartite agreement, etc. if the distribution licensee decides to procure power through competitive bidding l) Prepare plan for procurement of energy from DRE sources m) Undertake analysis of data collected from DRE systems "rl

fu{rqtr{, fuifi s srqR 2ole . t3t2 (3s)

Miscellaneous

--

25. Penalty or compensation 25.1 In case of failure to meet timglines prescribed under these Regulations, penalty of Rs.1000 per day for each day of delay shall be levied on the distribution licensee. 25.2 The penalty accrued during the year under these Regulations will be deducted from the Return on Equity to the distribution licensee for that year.

26. Power to give directions

The Commission may from time to time issue such directions and orders as considered appropriate for implementation of these Regulations.

27, Power to relax

The Commission may by general or special order, for reasons to be recorded in writing, and after giving an opportunity of hearing to the parties likely to be affected, may relax any of the provisions of these Regulations on its own motion or on an application made before it by an interested person.

28. Power to amend

The Commission may from time to time add, vary, alter, suspend, modify, amend or repeal any provisions of these Regulations.

29. Power to remove difficulties

If any difficulty arises in giving effect to the provisions of these Regulations, the Commission may, by an order, make such provisions, not inconsistent to the provision of the Act and these Regulations, as may appear to be necessary for removing the difficulty.

30. Repeal and savings

Existing Solar rooftop projects govemed by Chhattisgarh State Electricity Regulatory Commission (Determination of tarifffor procurement of power from Rooftop PV Solar Power Projects by distribution licensees of State) Regulations, 2013 , shall continr+e to be govemed by the same and shall not be governed by these Regulations.

Provided that such solar rooftop project may opt to become eligible under these Regulations.

By the order of the Commission

sd/-

(S. P. Shukla)

Secretary.

€arc*,guaurtwqm*,u*slqanrvmffogauna,TErrrqgrsgirrTmQgfraawr6ka - zorr.

Cite this issue. Chattisgarh Gazette - Extraordinary, Government of Chattisgarh, 05 October 2019. Indian Gazettes, https://egazette.servantsofknowledge.in/details/in.gazette.chhattisgarh.eo.2019-10-05.656/. Archive identifier in.gazette.chhattisgarh.eo.2019-10-05.656.