REGISTERED No. D-(D)-72
The Gazette of India
EXTRAORDINARY
PART II—Section 3—Sub-section (ii)
PUBLISHED BY AUTHORITY
No. 103] NEW DELHI, SATURDAY, MARCH 15, 1975/PHALGUNA 24,1896
Separate paging is given to this Part in order that it may be filed
as a separate compilation
MINISTRY OF LABOUR NOTIFICATION New Delhi, the 15th March 1975
S.O. 141(E).—In pursuance of section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central Government hereby publishes the following award of the arbitrator in the industrial dispute between the employers in relation to the Korba Aluminium Project, Bharat Aluminium Company Limited, Korba and their workmen represented by Bharat Aluminium Mazdoor Sangh, Balco Mazdoor Congress and Sanyukta Khadan Mazdoor Sangh which was received by the Central Government on the 19th February, 1975.
REFERENCE NO. 1/I.T/1973
BETWEEN
Dr. T. B. Singh, General Manager, Korba Aluminium Project, Bharat Aluminium Co. First Party.
Ltd., Korba
AND
1. Bharat Aluminium Mazdoor Sangh, Shri Ram Bilash Shobhnath, General Secretary. 2, Balco Mazdoor Congress, Shri R. V Kurup, Secretary,
3. Sanyukta Khadan Mazdoor Sangh, Shri Ajit Singh Verma, President—Second Parties.
In the matter of a Reference u/s. 10A of the Industrial Disputes Act, 1947.
PRESENT
Shri S. P. Bhargava, Arbitrator.
( 6 4 1)
642 THE GAZETTE OF INDIA EXTRAORDINARY [PART II—APPEARANCE
Shri D. C. Duggal, Dy. General Manager & Shri B. P. Shrivastava, Personnel Manager, for the First-Party.
Shri Ram Bilash Shobhn'ath, General Secretary & Shri V S. Yadav, Secretary for the S.P. No. 1. S.P. No. 2 and 3 absent.
AWARD
This reference shall also be disposed of in accordance with the award given in Refe- rence No. 2/LT./1973, Dr. T, B. Singh, General Manager, Korba Aluminium Project, Karba Vs. Bharat Aluminium Mazdoor Sangh, Korba and two others. Evidence for both the cases was recorded in that case and the point referred to in both the cases was the same and the affected employees who are covered by that award are also the same.
CSd.) S. P. BHAHOAVA,
Arbitrator.
Indore, dated the 6th February, 1975 M. G. P.
REFERENCE N O. 1/I.T./1973
BETWEEK
Dr. T. B. Singh, General Manager, Korba Aluminium Project, Bh'arat Aluminium Co. Ltd. Korba—First Party.
AND
1. Bharat Aluminium Mawioor Sangh, Shri Ram Bilash Shobhnath, General Secretary. 2. Balco Mazdoor Congress, Shri R. V. Kurup, Secretary. 3. Sanykta Khadan Mazdoor Sangh, Shri Ajit Singh Verma, President.-—Second Parties.
REFERENCE N O. 2/I.T./1973
BETWEEN
Dr. T. B. Singh, General Manager, Korba Aluminium Project, Bharat Aluminium Co. Ltd., Korbn—First Party.
AND
1. Bharat Aluminium Mazdoor Sangh, Shri Ram Bilash Shobhnath, Genera) Secretary.
2. Balco Mazdoor Congress, Shri R. V. Kurup, Secretary.
3. Sanyukta Khadan Mazdoor Sangh, Shri Ajit Singh Verma, President—Second Parties
In flic matter of Reference u/a. 10A of the Industrial Disputes Act, 1947.
PRESENT
Shri S, P. Bhargava, Arbitrator.
APPEARANCE
Shri D. C, Duggal, Dy. General Manager, Shri B. P. Shrivastava, Personnel Manager, for the First Party.
Shri Ram Bilash Shobhnath, General Secretary & Shri V. S. Yadav, Secretary, for the Second Party No. 1.
S. P. No. 2 and 3 absent.
AWARD
This order shall govern the disposal of Reference No. 1/1.T./1973 also as the point referred to for arbitration, is common in both the references.
2, On the basis of two Agreements between the parties, dated 16-44973, the following matter has been referred to this Tribunal for arbitration under Section 10A of the Indus- trial Disputes Act. 1947 (hereinafter called tho Act), vide order of reference dated 28-fta 1973 and 10-10-1973 made by the Central Government and M.P. State Government respectively.
"Whether withdrawal of Project 'allowance in part or full with effect from 1-4-1973 is justified and proper? If not, to what relief workmen are entitled to?"
SEC. 3(ii)] THE GAZETTE OF INDIA EXTRAORDINARY 6433. The relevant facts may be briefly stated thus. The First Party, Bharat Aluminium Co Ltd., Korba (hereinafter called the -company"). Vide its Circular dated 24-11 •1967 .granted Project Allowance to its employees working at Korba and Mining Sites at PnutKa Pahar and Amarkanfak for a period of one year with effect from 7th October. 1967 at the following rates:—
Pay Range
Below Rs. 100 p.m. From its. 100 upto Rs. 300.
From Rs. 301 upto Rs. 500.
From Rs. 501 upto Rs. 600. From Rs. 601 upto Rs. 699. From Rs. 700 upto Rs. 1299. From Rs. 1300 upto Rs. 1599. Ks. 1600 and above
Rate of Project Allowance
25 per cent, of pay 20 per cent of pay
20 per cent of pay subject to a minimum of Rs, 62.50 and a tnaximum of Rs. 85
Rs. 100 Rs. 120 Ra. 125 Rs. 150 Amount by which pay falls short of Rs. 1749.
The Project Allowance was granted for lack of civil amenities such as housing, schools, markets, dispensaries, etc. The document Ex, IV1 on record states the general principle about the grant of Project Allowance. It is specifically mentioned therein that, "The allow- ance is intended primarily to compensate the siaff for lack of amenities such as housing, schools, markets, dispensaries, etc, where reasonable amenities already exist, therefore, there would be no justification for the grant of the allowance." It also states that, "The allowance will not be admissible to staff recruited locally on ad-hoc scales of pay such us daily-rated or casual labour and staff paid from contingencies." In Paragraph 4 of the letter, it is expressly stated that, "The continuance of the allowance would not be justified (or the regular staff of the project when the necessary amenities have been provided in the project area. Hence, the allowance sanctioned originally for such staff shall be reduced in stages as the necessary amenities are provided, until it is withdrawn finally." In Ex. P/2, the scales of the Project Allowance, which was ultimately made admissible as quoted above, have been mentioned. This document mentions that the said allowance will be paid On conditions laid down by Government from lime to time regulating the payment of such allowance, with the stipulation that the position will be reviewed from time to time 'and the Project Allowance progressively withdrawn with the approval of the Board as and when amenities like housing, schools, dispensaries, markets, etc. were developed at Korba/ Mining Arfa." Ex P/2-A is the resolution of the Board of the Company sanctioning the Project Allowance to the staff of the Company posted at its project. The Circular Ex. P/3 first records the scale at which the Project Allowance was to be paid. The scale mentioned therein is the same as has been slated above in Paragraph No. 3. U makes it clear that "For the purpose of calculating the ptlowance pay shall include special pay, but stall not include dearness pay, compensatory allowance, deputation pay and/or al owance or house rent allowance." Tn Paragraph 7 it has clearly been stated that The allowance is intended primarily to compensate the staff for lack of 'amenities such as housing, schools, markets, dispensaries etc. and it will gradually be withdrawn with the development of the above facilities."
4. The position with regard to the development of amenities and facilities was reviewed from time to time and the Project Allowance was continued for further period beyond the initial period of one year. On 26th September, 1972. Vide Ex. P/4, the Chief Personnel Manager of the Company informed the General Manager of Korba Aluminium Project that the Project Allowance for the employees of Korba and the Mining Sites of Phutka Pahar and Atnarkantak shall be progressively withdrawn as stated therein. According to the details mentioned in Ex. P/4, 10 per cent of the Project Allowance was to be withdrawn from 1st November, 1972, 15 per cent from 1st April, 1973, 25 per cent from 1st October, 1973 and the remaining 50 per cent from 1st April, 1974, Thus the complete abolition of Project Allowance was envisaged from 1st Anril, 1974. Tn pursuance of the decision stated in Ex. P/4, the Company gave a notice of change under Section 9-A of the Industrial Disputes Act to the Second Parties, they being—(1) Bharat Aluminium Mazdoor Sangh; 644 THE GAZBTTE OF INDIA EXTRAORDINARY [PART H—
protested against the notice of change and, therefore, attempts at conciliation were made before the Assistant labour Commissioner, Bilaspur. These attempts ended in failure oa 23rd November, 1972.
5. Eventually, at the intervention of ihe Labour Minister, Government of Madhya Pradesh the Company agreed to defer the first cut of 10 per cent from 1st November, 1972 in. the- Project Allowance of the workmen getting a monthly salary of less than Rs. 1000.
6. The Company then gave a notice of change on 10th March, 1.973. A cut of 25 per cent in the Project Allowance was proposed to be mad0 in the notice from 1st April, 1973, The said notice was given under Section 9-A of the Act. Then this notice of change was given, the workmen served a notice of strike, which was to be effective from 29th March, 1973. The industrial dispute which was raised between the parties was then seized by the Assistant Labour Commissioner, M. P. State and the Regional Labour Com- missioner (Central) and a settlement WP.S arrived at on 2Kth March, 1973, This settlement is filed as Ex, D/2 and Ex. D/3 cm record. Its important terms are,—
(1) It is agreed that fifty per cent of the amount of Project Allowance as admissible to the existing employees drawing pay of less than Rs. 1000 per month as on 31st March, 1973 shall be paid to such employees as Personal Pay with effect from 1st April, 1973,
(2) It is agreed th'at the Personal Pay referred to under Term No. 1 would be ad- justed against monetary benefit which would accrue to such employees con- sequent to their future promotion as and when it arises.
7. A section of the workmen, however, did not approve of the ssttlement reached and a strike was sponsored by Second Party No. 2, Balco Mazdoor Congress. Alter the making of the strike, a sottlcmcnt was arrived at between the Company and all the thre^ Second Parties agreed on 16th April, 1973 to refer the dispute for arbitration to the Presiding Officer of (he Industrial Tribunal.
8. The Company in its statement of claim, filed on 16th November, 1973, urged that since the Project Allowance was temporarily Sanctioned to the workmen for lack of certain amenities such as housing, school, dispensaries, markets, etc. and 'as these amenities aro now made available to them in the Balco Township at Korba, Phutka Pahar and Am'ar- kantak, there is no justification whatsoever for the continuance of the payment of the Project Allowance to the workmen hereafter. The Company enumerated the development of amenities and facilities in Paragraph 11 of the claim 'and prayed that so far as the workmen drawing a pay of less than Rs. 1000 per month were concerned, 25 per cent of the Project Allowance may be allowed to be withdrawn from 1st April, 1973. Further 25 per cent may be allowed to be withdrawn from 1st October, 1973 and the remaining 50 per cent may be allowed to be withdrawn from 1st April, 1974. It was also prayed that payments of full Project Allowance which were received by the workmen after 1st April, 1973 may be ordered to be paid back or duly adjusted.
9. The Second Party No. 1, Bharat Aluminium Mazdoor Sangh, Korba, in its statement dated 3rd November, 1973 contended that the Project Allowance was not gjven as such to workmen but was part of the sakrv and, therefore, no question of its withdrawal can arise by 'a notice under Section 9-A of the Industrial Disputes Act. It was also urged that as Bharat Aluminium Company, Korba was only at construction stage, Industrial Dis- putes Act was not applicable and notice given under that Act was not legal. It was contended that proper facilities were not available to the workmen at Korba, Phutka Pahar and Amarkantak and, therefore, no case existed for the abolition or withdrawal of the Project Allowance.
10 Second Party No. 2 Balco Ma/door Congress filed its stat-ment on 19th November, 1973. In the statement, the claim of the Company for withdrawal of the Project Allowance Was opposed and contentions similar to the contentions of Second Party No. 1 were advanced. However, the contentions of Second Party No. 2 need not be referred to in detail foT the reason that it was pointed out on behalf of Second Party No 1 that the registration of Second Party No. 2 had been' cancelled with effect from 30th October 1973 and notice of cancellation had already been published in M. P, State Gazette, dated 22nd February, 1974 and, therefore, the Second Party No. 2 no longer had a right ot representation of the workmen of the Korba Project. The factual posit.on of the f i l i a- tion was subsequently accepted by Shri R. V. Kurap, who appeared on behalf of the Second Purty No. 2 and after the admission of this fact, it was held by me ™at ™" Second Party No. 2 could not be allowed to represent the said workmen and proceedings ajjalnst it were directed to proceed ex-parte.
SEC. 3(ii)] THE GAZETTE OF INDIA EXTRAORDINARY 64511. The Second Party No. 3 contended that ihc facilities and amenities '(it the Mining Sites arc still inadequate and, therefore, the demand for withdrawal of tho Project Allowance made by the Company was not justified at all.
12. In view of the pleadings of the parties the following two issues were framed:— (1) Whether the facilities pertaining to housing, hospital, schools, shopping, re- creation and transport provided ai Korba, Anrarkantak and Phutka Pahar by the First-Parly, are adequate?
(2) Whether withdrawal of Project Allowanc; in part or full with effect from 1st April, 1973 is justified and proper? If not, to what relief the workmen are entitled to?
13. It may also be usefully pointed out at this stage that on 12th February, 1974, the following issues pertaining to preliminary objections of the Second-Parties were decided by the Arbitrator against the .Second-Parlies;—
(1) That a legal practitioner is not lo bj allowed without the consent of the Second Party as per Section 36 (4) of the Industrial Disputes Act, 1947; and
(2) Whether Industrial Disputes Act and Rules thereof arc applicable to Bharat Aluminium Co. Ltd. (Aluminium Industry) during construction stage and whether it comes under the purview of the Industrial Tribunal to decide the issue? If nol, what action an order can be issued.
1
It appears that the last sentence is incomplete due LO some typing mistake. It should have been If nol, what action should be Taken or what order can be issued.'
14. Against the said OICUT, a Writ-Petition was filed in the Hon'ble the High Court. The First-Party conceded before the High Court that it will not appear before the Tribunal through a Counsel, In view of this stand Uik-n by the Company the Second Party No. 1 did nol. press its petition, Thus the decision of ihe Arbitrator dated 1.2th February, 1974 011 the second preliminary point remained undisturbed. On Ihe second preliminary issue, it was held by me that as the dispute between the parlies had been referred under Section 10A of the Act on the basis of 'an agreement between them, they cannot subsequently wise ;.n objection that Iheri: was no industrial dispute between them. The view taken by the Patna High Court is R. I. Mills Vs. Workmen, A.T.R. 1968 Patna 66, was accepted by me as the correct view, it was also held th'at it was unnecessary to po into the question as to whether (he industry is slill at the stage of construction or that the workmen who are concerned in this dispute arc engaged for the operation of the Aluminium Industry or in connection with it.
15. The Company examined 8 witnesses and produced 11 documents, which have been marked Exs. P/l to P / l l. The Second-Party No. 1 also examined 8 witnesses and produced 30 documents. Documents exhibited as D /l to D/17 were proved by them in their evidence and documents exhibited as D /l 8 to D/50 were marked as exhibits as they were admitted by the First-Party. Second-Parly No. 3 examined two witnesses. However, the Second-Party No, 3 subsequently remained absent on the date of final hearing and the case was argued on behalf of the Company and on behalf of the Second-Party No, 1.
16. I shall now take up Issue No, 1 for consideration. The conditions prevailing at Korba and its Mine Sites have been clearly mentioned in Ex, P/2-E by the Chiof Engineer of the Company. Ex. P/2-E is dated 12-8-1967. In the opening paragraph itself it has been stated lhat "Korba Alumina Project site is located at a distance of about 8 Kms. from Korba town, near the village of Parsabhata and Risda which arc just a cluster of huts and surrounded by forest. Korba town and its surrounding area is highly infested with mos- quitos and is a 'declared bad climate area', having an acute malaria problem. As per the National Malaria F.radication Scheme, this area is slill under 'attack' stage out of the three stages of malaria eradication campaign viz., attack, consolidation and maintenance." In paragraph 2, it has been stated that "during construction stage accommodation will have to be provided to about 500—600 members of regular construction staff, besides thousands of unskilled labour. Korba and surroundinc villages cnti hardly provide iiny housing facility. The housing problem is thus likely to be very acute for the construction personnel till sufficient number of quarters a™ constructed by Bharat Aluminium Company Ltd. In the early stages, it will only be possible to supply unflltered water and electricity also very sparingly, causing inconvenience and hardships to the members of the stall and their families. Further, with the starting of construction work of the plant and inevitable increase in population, the rise in the existing prices of commodities, which arc already pretty costly, as compared to other places, is bound to arise. Compared to Korbi, these problems are expected to be much more acute in the case of construction personnel deputed to work" at mines where everything is to start from, scratch." Tn paragraph 3, the grant of
646 THE GAZETTE OF INDIA EXTRAORDINARY [PART II—project allowance to the staff working in the Korba Coal fields is suggested at rales (uven therein. Subsequently it is stated that, "The grant of project allowance in N.C.D.C. Korbtv staried in January 1956 and continued for a period of 11 years when it was stopped from 1-1-1967. The withdrawal of project allowance was progressive i.e. the scale of allowance was reduced as and when amenities such as housing, schools, dispensaries, markets etc. were provided to the members of start. The same principle could be followed in Bharat Aluminium Company Ltd. as well and a scheme for progressive withdrawal of the allowance; will be drawn up later." In paragraph 4, it is stated that, "The extent of ameni- ties presently made available to the N.C.D.C. staff as intimated by the Area General Manager in his letter dated 7th August 1967 are 'houses, electricity, filtered water supply, hospital, education up to primary standard, marketing centre and school bus1 but the extent of such facilities is just to meet tho requirements of their own staff only. The coasting facilities of this nature at Korba town proper are poor and very inadequate. There is a small dispensary at Korba town, which does not admit any indoor patients, housing problem as explained earlier, is acute. There is a school up to Higher Secondary Standard but without Science subject. Water supplied is unfiltered Prices of commedi- ties in Korba market are generally higher as compared with other places and are likely to go higher still with tho start of construction works. Korba is a very small town of about 6000—8000 population. Geographically, it is in the interior poorly connected by railway and cut off for 6 months due to river, as far as roads are concerned. And since it lacks town facilities, it is, in fact neither a town worth the name nor a Tahsil' place. Thus, Bharat Aluminium Company Limited will have to make its own arrangements to provide these very essential amenities to its staff." On the aforesaid grounds, in the last portion of this letter, a proposal was made to the Head Office of the Company for grant- ing of project allowance at the rates mentioned therein, which was ultimately sanctioned.
17, The evidence adduced on behalf of the Second-Party No. 1 and Second-Party No. 3 to the extent that it can be relied on also proves that the conditions at Korba and its Mining Sites in respect of the facilities and amenities were almost the same as described in Ex. P/2-E. The matter now required to be considered is as to whether these facilities and amenities have subsequently been provided to the workmen.
18. Housing.—So far as housing is concerned, the evidence of Shri M. S. Khan (P.N.8),. who is holding the post of Administrative Officer in the Company, proves that the first lot of quarters in the Balco Township (near Korba) were constructed in May, 1970. In that month, 176 quarters were handed over for allotment, By the end of the month of March, 1973, 1202 quarters became ready for allotment. This number included the previously constructed 176 quarters. By the end of March, 1974, the total quarters available for occupation were 1838 and only 9 employees were awaiting for allotment of quarters. He further deposed that now the total number of quarters available is 2028. He also stated that out of those employees who arc entitled to Project Allowance and have made application for allotment, there are about 20 persons who are without quarters allotted to them. There is nothing in the cross-examination of Shri M. S. Khan to show that the- statistical information given by him is incorrect in any detail.
&c. 3(ii)] THE GAZETTE OF INDIA EXTRAORDINARY 647. given housing accommodation. In paragraph 8 of his deposition, lie asserted that arrange- ments for internal electrification, water supply and sewer line were still not complete in the houses and they were still being made. However, in his cross-examination, he admit- ted that in his house, he had electricity, water supply from pipe line and sewer line also and he stated that in his statement when he stated that electricity, water line and sewer line were not there, he meant to say that there were no lights on all the streets, no drain- age line on the roads and that the sewer line had come into existence only recently. He plainly admitted that all the quarters given to the employees were electrified and that there was water supply given to the quarters though he complained that the supply was only for 2J hours in a day. His estimate that only 50 per cent of the workmen entitled to Project Allowance have been given quarters is based on a mere surmise. He admitted in cross-examination that he had no record to say that the total number of quarters made to employees was of 1400 only. He stated that he stated the number approximately on information taken from employees. The statement of Shri M. S. Khan (P.W.8), which is borne out from record, appears definitely to be a more accurate statement worthy of acceptance.
22. Shri B. P. Dewangan (D.W.2), clearly admitted that in Phulka Pahar, houses are available to all those who are entitled to Project Allowance. He also admitted that these houses are provided by the Company. The shortcomings pointed out by him arc that no false ceilings were provided in the bouses and that the water supply becomes faulty some times as they do not get water for two or three days and sometimes the electric lights also fail. He also made a grievance of the fact that no drainage had been provided near the houses at Phulka Pahar and fencing has not been provided in the quarters.
23. About the housing accommodation at Amarkantak, R. P. Dubey (D.W.7) stated that he got the quarter there after waiting for about 20 days. He also stated that when he took residence in the quarter, it was not electrified nor was the quirtcr having the facility of water supply but after a month or so, he got the electricity and water supply in that quarter. He admitted that water supply is available for 5 hours a day, although some other witnesses of the Second-Party No. 1 had tried to say that the water supply was available only for 2 hours and not more. He made a grievance that there was no arrangement provided in the quarters for storing of water and the quarter had no fan connection nor had it false-ceilings. He also made a grievance of the fact that there was no fencing provided for the quarter,
24. It is clear from the aforesaid evidence adduced by Second Party No. 1 that their real grievance is not about the shortaee of accommodation but the grievance was made about the following points:—
(1) That there was no proper arrangement of drainage. (2) That there are not false-ceilings in the quarters. (3) That quarters were not fitted with electric fans. (4) That there were no lights on some of the streets, (5) That no fencing had been provided for the quarters. (6) That water supply is available for a very short time.
Some of them also tried to say that, filtered water was not supplied in the quarters a! the aforesaid three places.
25. Tn my opinion, on the aforesaid grounds raised by the witnesses of Second-Party No. 1 the housing accommodation cannot be held to be insufficient or inadequate. In the first place, tho accommodation provided is required to be judged in reasonable manner and not from the standard of those members of society who can afford a costly or luxurious living I have not been able to understand as to what is the need of false- ceiling in the quarters. It has clearly been proved that both Phutka Pahar and Amar- kantak are situated at a height of about 3000 feet or more above the sea-level. B. P. Dewanuan (D W.2) admitted that the height of Phutka Pahar is 3600 feet and the climate Is much" that it is usually cold. Shri K. P. Singh (P.W. 5) has stated in his statement that the -altitude of Phutka. Pahar is about 1000 metres. It is tno much to expect that raise- ceilinss and fans have to be provided in the quarters of workmen at these places or in Korba township. Similarly, even if it were accepted that there were no lights on some ot the streets either in Balco township or at the other two places, it cannot be reasonably concluded that the housing accommodation provided to the workmen was inadequate rn th'at ground. With regard to the supplv of water, it. is rather sfranee that different wit- nesses have tried to mention this fact in a manner which is its^f conflicting with the testimony of the other witnesses. R. P. Dubev (D.W. 7) stated that the water WPPly for Amnrkantak was 5 hours. Yadav (P.W.n stated that the water supply at Balco rown- slup TO for 1\ hours. Other witnesses of Second-Party No. 1 have made varying state- cnonts on this point.
648 THE GAZETTE OF INDIA EXTRAORDINARY [PART II—26. In the evidence of Shn M. S. Khan (P.W.8), it has been stated that water plant came i n^ operation at Korba in September, 1972 and since then they have been supplying tfao Balco lownship at Korba with treated and filtered water. When I inspected he Balco Township on 6-J 0-1974, a point was made by the Secretary of Second Party No 1 that treated water was not supplied in temporary market in Sector V. The contention was opposed by the Company and a sample of water was seen by me and it was found that the water was quite clear. It appeared to be filtered water. The evidence to the effect that filtered water 15 supplied to the Balco Township is given by Sliri M, S Khan (P W 8) and nothing has been brought about in Ais cross-examination that his statement on ' this point was false or incorrect. Similarly, when I inspected the Water Treatment and Filte- ralion Plant at Phutka Pahar on 6-10-1974, it was contended on behalf of the Second- Party No. 1 that the Plant was not working at all. The Engineer concerned then demonstrated that the Plant was in full working order. Then it was emphasised on behalf ot the Second-Party No. 1 that the Plant had put. in order on 1-7-1974 and that it worked only foe some time satisfactorily but had gone out of order and again put in order on 1-10-1974. T stated clearly in the Inspection—note itself that these were matters ol evidence. No reliable evidence has been adduced on behalf of Second-Party No. 1 that the water Filteralion Plant was not in operation for the period alleged by it. Further, even if it were supposed for the sake of argument that for some time the Filte- ration Plant had gone out of order, it cannot result in the conclusion that ihe Company had not taken adequate steps for providing the workmen with clcnn water. Occasional disorders in the functioning of machinery are not uncommon.
27. It would also be too much to expect that the Management arranges for electric light in all the small lanes, Merely because somo lanes are presumed or found to be not electrified, it would not be a reasonable conclusion that the arrangement in respect of housing accommodation is-insufficient.
28. D. P. Pandcy (D.W.S) of Second-Party No. 1 asserted that the number of em- ployees at Korba was between 3000 and 4000. He also asserted that the allotment had already been made of about 3000 quarters. He stated that out of these 3000 quarters, no less than 700 quarters were allotted to the contractors and their labour. D, P. Pandey's statement cinnot be believed for the simplo reason that it is far in excess of the figures asserted by the First-Party itself. If D. P. Pandey is to be believed it will be required to be held that. 2300 quarters have already been allotted to the workmen in Balco Township. Shri M, S. Khan (P.W.8) has stated the number of quarters in his deposition which his been discussed above. It is obvious that the witness (D. P. Pandey) is cither asserting facts about which he has no personal knowledge or is completely mis- informed.
29. The other point emphasised with regard to the housing accommodation is that some workmen have been required to wait for about 2 months for getting the accommo- dation. There is no evidence adduced to show as to how many workmen out of the total number of workmen were required to wait in this manner. It appears to be a natural process that when quarters arc being constructed and workmen also are being recruited, there would be some delay in the allotment, However, the significant point is that there is nothing in the evidence of the Second Party No. 1 so nullify the factual and statistical position which is established by the evidence of the three wit- nesses of the First-Party discussed above. Tho provision with regard to the housing accommodation cannot be held to be inadequate on the ground of some delay in allot- ment.
30. The evidence of other witnesses of Second-Party No. 1 need not be discussed in detail as it docs not take Ihr case, nf Second Ptirtv No. 1 bevond what has already been discussed. The evidence of two witnesses of Second-Party No. 3 Is not material on the question of adequacy of housing accommodation.
31. With regard to the provision of housing accommodation in townships of public sector undertakings, the material document on record is Ex.P/10. Tt is the Memorandum issued bv the Additional Secretary to Government of India and Director General, Bureau of Public Enterprises. It is stated therein that "In most difficult and remote locations where there is neither n town nearby nor cnouph villaecs to provide loc'al labour, the percentage satisfaction should not exceed 70 per cent." The percentage satisfaction in the present case is much higher than 70 per cent, at all the three places and. therefore. the housing accommodation provided by the Company cannot be held to be insufficient or it being inadequate for the grant of Project Allowance.
32. I may now take up frir consideration the question of medical facilities existing in Balco town, Korba, Phutka Pahar and Amarkantak.
SEC. 3(ii)] THI£ G A Z E l i ii Ot . ^ ^ j. E X I K A V J R D I N A RY g49
ii. The most material evidence on behalf of the First-Party is that of Dr J P Swarnakar (P.W. 3). Shri G. S. Sharma U \ W. 4; ana Miri K P. Singh ( pV 5) Df. tmvjrnaKar's evidence establishes that when he joined Balco in the year 1970 ' the onfy arrangement was that a part time doctor used to attend the dispensary which wai then existing. He testified that after his joining another dispensary was opened in Haico lownsiiip and in that dispensary out-door paucnts were treated. In the year 1970 the total strength of medical personnel in that dispensary was only 8, but in the year 1971* Jt was raided to 15. He stated that in the year 1971, a shed, was constructed in which out-door patients were treated and a lady doctor Mrs. Vohra joined in that year He stated that in the year 1972, three more doctors, Dr. Mishra, Dr. R. S. Swarnakor' and Dr. Duua joined and in that year one more shed was built for in-door treatment in which the facility for delivery cases was also provided. He stated ihat for in-doct patients, in me year 1972, provision of 12 beds was made and thero were three beds lor maternity cases, but according to the exigencies of the situation adjustment of paiicnts used to be made. He also testified that at the end of the year 1972 X-Ray arrangement was made and a Pathological Laboratory was set up. in the year 1973, Balco recruited Dr. A, N. Chatterjee as the Chief Medical Officer. Further, a Gynaecologist, Dr. Mrs. Vcnu (Jopal also joined in that year. The number of members of nursing staff was also increased and an Ambulance car was provided ior bringing patients lo Ihe Hospital. Further in the s.imc year, another shed was built for housing the Operation room and the Recovery Room. Then according to him in the year 19/4, Dr. Theodore, Anelheiist joined the hospital and in the month of October, 1974, Dr. Bhaywat and Or Rao joined. He also deposed that in the year J974, a regular denial surgeon Dr. Talwalkar was appointed in the hospital. Before that, the arrangement with regard to aental cases was that Dr. Gulati attended the dental cases on part time basis. He also stated that in 1974, an E.C.G. Machine was purchased for the hospital and two Ambulance tarsi were added. 'This evidence clearly establishes that the hospital facilities developed considerably at Korba and a fuil assortment u' 8 doctors WJ$ working in Ihe Balco Hospital in 1974. It is also in cvid:nce that ths treatment is provided free of cost lo all the employees and their families and dependents. It is also in evidence that out of the 8 doctors, three are medical specialists in their subjects. The evidence of .Shri G. S. Sharma and Shri K. P. Singh establishes i.hat at Amarkantak and Phatka Pahar dispensaries have been provided with medical stall' including doctors, mid-wife, nurses and attenduLts. It has also been established that for meeting emergencies, iife saving drugs are siored and provided, The dispensaries hive also the benefit of the Ambulance Cars.
34. At all me places, this arrangement is made that for cases deserving extra atten- tion arrangements arc made to shift the patients from Korba \a Champa and Bilaspur. At Bilaspur District Hospital is located. From Phatka Pahar arrangements are made to shift the patients to Korba and Champa and from Amarkantak arrangements are made to shift the patients to Shahdol and Bilaspur. It is worthy of note that the number of -workmen at Phatka Pahar and Amarkantak is less than 40O. The factual position estab- lished by the testimony of the aforesaid three witnesses appears to be correct in the light of the facts which were seen by me at the time of the inspection, which have been duly recorded in the Inspection Note.
35. It was ascertained from the Chief Medical Officer, Balco Hospital that the average number of patients taking advantage of the hospital per day was about 300. He filed Ex, P/8, which shows the number of new patients and old patients for the periods from 1st August, 1974 to 7th August, 1974 and from 2nd September, 1974 to 7th September, 1974. These periods were chosen at random 'at the time of the inspection and the parties Hgreed that the information given by the Chief Medical Officer may be read as evidence without further proof. The average number of new patients on the basis of this informa- tion in 85 and the average number of old patients is 207. Similarly at Phatka Pahar, the average attendance of patients for a week chosen at random in the month of August. 1974 "works out at 40 per day and the average attendance commencing from 23-9-1974 to 29-9-1974 was 37 per day. Similarly at Amarkantak dispensary, the avcranc of patients of new cases comes to 35 per day and 64 old cases per day. Considering the total number of doctors posted in the Balco Hospital and in the dispensaries at Mining Sites it is easy to see that the number of doctors is such that they would be able to properly attend to the needs of the patients visifmp the said hospital and dispensaries. Trfcre is no evidence adduced on behalf of the Second-Party No. 1 or 3. showing that any patient suffered due to the want of attention of doctors at these places.
" 36 The evidence adduced is rebuttal consists of Shri V. S. Yadav fO.W 1) Shri B P. D a w x ^n (D.W.2). Shri Hargovind Tamrakar (D.W.3) Shri R. P. Dhusia D M, Shri D. P. Pandev (D.W. 5), Shri I. K. Jain fD.W. 6^ and Shri R. P. Dybov ( DW 7> I would briefly reter to the relevant portion of their statements Shri V S Yadav (D.W.1) stated that the construction of the main buildins of the hospital was till in nropress. This fact is not denied. However, the present Balco Hospital is run m three sheds recently
6 5° THE GAZETTE OF INDIA EXTRAORDINARY [PART 11—constiuqtod una (t is nobody s case that any difficulty is experienced in these sheds ja the work.ng ot the hospital. Shn Yadav then made a grievance of this fact in his statV menl that thousn Ins daughter was ill for 4 months and had been going to the hospital she was not aircu. No question is raised in the statement of claim by Second Party No 1 about the competency of the doctors in the hospital and the dispensaries of the First- Party. Shn Yauav admitted in his cross-examination that his daughter had been examined by three doctors of the Balco Hospital. If anything this fact indicates that doctors paid proper attention to treat the patient. Only because the patient is not completely cured after taking any particular coarse oi' treatment, it cannot be held that the only conclusion possible is that the treatment was improper. There are obstinate cases of sickness where relief or cuip may not always be possible. The grievance made by the other witnesses of the Second-Party No. 1 is that patients have to wait for some time to lake their turn with the doctor and that there is no full time attendance in the hospital at Korba In this connection, it is significant to point out that Dr. Swamakar (P.W.3) was not at all cross-examined on these points and the statements of the witnesses examined by the First-Party are that there are adequate arrangements in the hospital to receive and treat patients at any time they visit the hospital, No definite case has been cited on behalf o£ Second P,irty No. 1 establishing lhal any particular patient was taken to the hospital on any particular day and could not be given treatment because no doctor was on duty there, in fact, some of the witnesses of the Second-Party No. 1 have admitted that if no doctor is present in the hospital at the lime of the arrival of (he patient, arrangement is made to call the doctor, With regard to Phatka Pahar dispensary, Shri Dewangan (D.W.2) stated (hat lady doctor from Balco used to come there once in a fortnight. Now she is coming there once in a month. The case of the First-Party was that as the number of cases demanding the attendance of the lady doctor at Phatka Pah'ar was small, with the consent of the workmen the fortnight arrangement was changed into the arrangement of one visit per month. Shri Dewangan has plainly admitted this fact by stating that the management did this because the number of patients was small at Phatka Pahar and therefore, the lady doctor's visit was made once in a month. He has admitted that he was asked about it, The grievance made by Shri Hargovind Tamrakar (D.W.3) in his statement is that the hospital in Balco Town and the Dispensary at Phatka Pahar were not satisfactory. Flc stated that even minor cases were not treated properly in Balco Hospital. He further stated that there was no specialist there. His statement does not appear to be truthful at all, His statement that there is no specialist in the Balco Hospital is clearly false. Dr. Swarnakar's testimony establishes that at present there were three specialists on the general side in the Balco Hospital excluding the Dental Surgeon, who is; only a Graduate and not a Post-graduate. His statement that in the Balco Hospital there is temporary arrangement only for keeping patients and patients are kept only for one- day and not more also does not appear to be correct. No questions were ask-J to Dr. i. P. Swarnakar about this difficulty. Jn Paragraph 12 of his statement, Hargovind his asserted that there were only 6 doctors working in the Balco Hospital, but Dr. J. P. Swarnakar hai given detailed information which establishes that in that Hospital there were 8 doctors. It clearly appears that he has scant regard for truth. Shri R. P. Dhusia (D.W. 4) stated that though he generally did not go to the hospital, the hospital arrange- ment was not satisfactory inasmuch as his wife was required to wait, for an hour for her examination by the doctor. He also deposed that there were ques for dispensing of medicines and also for injections. He admitted that when his wife had arrived in the hospital the doctor w.is already busy in examining some other patient. Merely because at a particular time any particular patient was required to Wait for some time, cannot , by itself lead to the conclusion that the working arrangement of the hospital is not satis- ' factory. The witness has not even stated that his wife's condition was such that she needed immediate attention. As th? doctors took up the cases according to the time of the arrival of the patients, it cannot be said that they were adopting a method which needed a change. This witness has gone the length of suggesting that as there are cases when patients are referred to other places the hospital working is unsatisfactory. It is true that patients are referred go other places but this fact alone cannot lead to the conclusion that the arrangements at Balco are not satisfactory. The act of referring those cases to other doctors which require extra attention, does not. prove the inconvpetency of the doctors. It is rather an indication of the extra care that the doctors take for getting difficult cases properly treated. The witness also made a change of there being no specialist ir; the B'alco Hospital. However. ;t k clear th.it he does not understand the meaning of the word specialist properlv. To the question as to whether M.D., M.S., M.R.CP. and F.R.C.S. are specialists, his replv was that he is not well-versed and, therefore, cannot state The reply sufficiently exposes him Shri D. P. Pandcy (D.W.5) stated tfnt on 1st April, 1973 there were oniv 4 doctors in the hospital. This statement is Whollv incorrect. He made a grievance th-t in c w t c i - cv cas°s. no proper treatment m the said hospital is, given and patients were being referred to Chapa. He stated that though re-imbursement is made of the expenses incurred on the patient, it was not _ driven for Attendants whether they were parents or husband. However, in his cross-examination, he could not stick to the -tatement that there were only 4 doctors and he had to say that
'Si-.C. 3(ii)] THE OAZETTE OF INDIA EXTRAORDINARY ft5Ihe could not refute the presence of the Chief Medical Officer in hospital on 1st jApril, 1973. He also admitted th'at he did not know the provision aoout trie re- imbursement of expenses of the attendants. It is also significant to know that he or His family never went to the hospital ior any emergency and he had been there once only in his neighbour's case, it is significant that the said neighbour has not entered the wn- nsss-Dox to depose about the ditiiuilties he had in the treatment at the hospital, The next witness is ishri J. K. Jain (DW. 6) His evidence was that he suffers from tooth trouble but he did not get proper relief in the hospital. He stated that his mother was a heart patient and she aid not get specialised treatment there. As he complained about his mother being a heart patient, in cross-examination he was asked as to what E.C.G. Machine is and he demonstrate his ignorance by saying that he did not know what K.C.G. Machine was. Hns statement that there is no specialist in the hospital is effectively contradicted by Dr. J. P. Swarnakar. His evidence, in my opinion, is totally unreliable and is not worth the paper on which it was written. The last witness of Second Parly No. I for consideration oil this point is Shri R. p, Dubey (D.W. 7). His statement is that there is no in-door patient facility in the dispensary at Amarkanlak. He further stated that no lady doctor is working in the dispensary but he clearly stated that a lady doctor has been selected and she was to join the dispensary shortly. He further stated that in cases ol emergency, if the medicin s are available they arc given and if the medicines are not in stock, the patient is sent to the District Hospital at Shahdol or Bilaspur. He also stated that for emergency cases, the dispensary docs not remain open in the night. In the night, if cases are brought, the doctor is called. His statement on the whole, in my opinion, is favourable to the First-Party and goes to show that the dispensary is run in the manner alleged by the First-Party.
37. Another grievance made was that there were no larrangetmcnts in the Balco Hospital for transfusion of blood. It has, however, been established in the evidence of the First-Party that whenever transfusion of blood is necessary blood is obtained from Bilaspur or Champa. At a small placi like Balco Town having the population of 'about 10000 persons, it cannot reasonably be expected that the Company would maintain a blood bank. It is also worthy of note that no evidence has been adduced to show that the working in the Company involves any extraordinary hazard. In my opinion, the evidence adduced shows that medical facilities at the Balco Town and the Two Mining Sites are quite satisfactory.
38, Education—I may now take up Education facilities for consideration. It has been specifically shown in Ex, P/2-E thai the facilities existing in the year 1967 'at Korba were that there was a school upto Higher Secondary standard but without Science subjects. The evidence of Shri S, K. Thakur (P.W. 2), who is the Principal of the Government Higher Secondary School at Balco Township, establishes that when he joined in the year 1973, Xth and Xlth classes were started in the school. He also stated that a grant of Rs. 25,000 was made by the Company. From this amount, furniture worth Rs. 10,000 was supplied to the school by Balco and Rs. 15,000 were left at his disposal for utilising for the purposes of the school. Ho also stated that the building in which the school is run belongs to Balco, which docs not charge rent, electricity charges and water charges for its use. He 'also stated that the teachers are allotted quarters in the Balco town- ship on the same condition on which quarters are given by Balco to their workers. The school is also equipped with a Library having about 1,000 books. His evidence also establishes that Science subjects nre also taught in the school. Shri M. S. Khan (P.W, 8) deposed that in the Balco township there were 7 schools. One of the schools wai an English medium Nursery School called K'amalnil. There is another English medium Primary School which takes students upto Illrd Standard. There was one Hindi Medium Primary School also which admitted students upto THrd Standard. Then there is a Gov- ernment Primary School as also a Government Middle School. Apart from these Schoo's. there was the Government Higher Secondary School, of which Shri Thakur was the Principal. He further deposed that, some boys read outside the Balco Township in Beacon English Medium Higher Secondary School, which is at a dist'ance of about 12 Km. from Balco town. From those students who go to Beacon School for readinc conveyance at subsidised rates of Rs. 5 per month is charged. He has 'also testified that Korba Town has a Decree CoUce*. which is called Kamia Nehru Degree College. He also deposed that recently M. P. S. R. T. C. 'bus commenced running 'a bus bv which the boys pot lift upto Korba town. This evidence establishes lhat for students desirous to read in Degree College facility exists in B'aico townstvp. Shri G. S. Sharnri (PW, 4) has deposed nboul the educational facilities at Amarkantak, He nas stated that in Amarkantak town- ship there is a Middle School, which Was started by the Tribal Welfare. Society in the month of August, 1972. The Primary School was started there in September, 1971. VTlth Class, was added to that School in that year. He also deposed that for thoso students who want to read in higher classes at Am'ar'kantak High School, Company gives the benefit of conveyance to them after charging conveyance charges of Rs_ 5 per month He also deposed that for running the school the Balco Management has
• 6 52
T HE G A Z E T TE OF I N D IA E X T R A O R D I N A RY
[ P A RT H~
provided,—(.1) School building, (2) tables 'and chairs, (3) teaching aids, and (4) water supply live of charge. The Company also provides accommodationtoschool teachers after charging from them trie same rent which it charges from its employees. The evidence of Shri K. P. Singh (KVY. 5) establishes thsJ. there is 'a school in which children arc educated up to Vlh Class in Phutka Pahar township. The Company has constructed the School building and has provided furniture, electricity and leaching aids for running of the school. Ajit Singh Vtnmi ..D.VV. I) a; :SecoiKi-Parly No. 3 admitted that there was not a single student in the Vlh class, Shri V. S. Yad'av (D.W. I) made this grievance of ihe educational facilities that the building in which the High School is held was constructed as a building foi- Frim'ary School and (hat in the High School in Balco township, there was no Library nor was there any Park or play ground for children. It is not disputed that classes arc held in that school. It has not been urged that (here was any difficulty in holding" the classes in that building. At the time of inspection, f was shown 12 Class-rooms. This statement about the number of Class- rooms was not challenged by any of the Second-Parties. The nurc fact ihat the building was constructed tor housing the Primary School, does not yield ihtf conclusion that the teaching 'arrangements in the High School are inadequate, Shri S. K. Tha'kur in his deposition stated that in his School, (here was a small Library of about 11)00 books and this statement was not challenged at all in the- cross-examination. tte also staled that though there is no separate piay ground provided, but there were two oilier grounds belonging to the Balco nearby which were utilised by School students for their play. Thus, the contentions raised by Shri V. S Yadav are without substance. Shri B. P. Dewangan stated that the arrangements at Phut'kn Pahar were unsatisfactory because there was only one teacher provided there in the school. He pointed out liiat the in- convenience there was that the number of students was large but there was only one leaehcr. However, Shri K- P. Singh (P.W. 5) deposed in Paragraph 5 of his deposition that one more teacher had been posted by the authorities there, who was likely to join there soon. It is also worthy of note that Shri Dewangan has merely stated the number of students as large. He has not mentioned the number of students. In his cross- oxamin'ation, he slated that the number of students in Vlh Class was ubout 15. but then he plainly stated that he could nol denv the suggestion that there is not j single student reading at Phutka Pahar. I hjve already pointed out thnt Ajit Sin;:h Verm a 'admitted that there was not a single student in Vth CIEKS. This clearly shows that authorities in charge of education were alive to thjir responsibility of providing suitable facilities to the students at Phutka Pahar and higher clnsses were not started because there were no students for Vth Class. Another important witness of Socdnd-'^'.i^v No. 1 on the question of educational facilitis at Amarkantak is R. P. Dubey. His statement, in my opinion, supports the case of the First-Party. He has deposed that in Arrfarkantak township, education is imparted up to Vlllth Class and there are 4 te'achers. He- also stated that, those children who want to read in IXth Class h'.ivc to po to Amarkantak and they are charged Rs. 5 p;r month ;'s conveyance charges by the Company.
39. Tt is significant, that not a single case has been established '-v the Second Parties showing that any particular students was refused admission in any of ih" Schools. Educa- tion is a Government subject and, therefore, th" Company Can only reasonably be expected to assist, the cause of education by providing buildings, furniture, electricity, water, etc. These facilities are provided by the Company at all the aforssaid pl'.-tcrs free of charge. It also helps in providing the facility of conveyance by charging concessional rales from the students, who are required to go from Balco Township to Korba or from Amark.'.nink towa4iip to Amarkantak lor continuing Their studies in higher classes.
40. Shopping.—In respect, of the facility of shopping, First-Party's important witnesses for Balco township, Korba arc Shri P. N. Shukla. P.W. 6) and Shri M. S, Khan (P.W. 8). Shri Shukla in his deposition stated that he was the Vice-President of the Co-operative So- ciety at Korba. He further deposed that the Management of Balco helped the running of me Co-operative Society, (1) by making an out-right giant of Rs. 1,000; (2) by granting a subsidy of Rs. 200 per month for one year; (3) by granting 'an interest free loan of Rs. 10,000 and then by charging 6 per cent interest on loan. He also stated th'at the Company charges nominal rent of Re. 1 per month for the shop in which the goods of the Co-operative Society are sold. He further stated that in the year 1973 when there was shortage of foodgrains. the Management gave a loan of Rs. 30,000 "without interest. The Management has also provided one of its employees lo serve as the Secretary of the Society. He also stated that the Co-operative Society started with the membership of 20 but now it has the membership of 526. He further deposed that the Cooperative Society had arranged from a d'airy for the suooly of milk at the rate of Rs 2 per litre and that dairy was supplying 200 litres of milk every day. He also stated that to thn members of the Society, a rebate of ">- per cent is Riven on the sale of uncontrolled articles, The monthly sales of the Society come to about Rs. 45,000.
-SHC. 3(ii/| THE GAZETTE OF INDIA EXTRAORDINARY 653He also stated that due to the proper functioning of the Cooperative Society, iho abnor- mal rise in the commodities was controlled. In the cross-examination, an attempt was. made to show that the membership of the Society was not open to 'all workmen but from the answers given by him, it appears that the suggestion made has been completely refuted.
41, Shri M. S. Khan (P.W. 8) stated that when he had joined in the yc'ar 1971, weekly market used lo be held at Parsabhata, but now that market was held twice a week since July, 1972 in Balco Township. He further stated that in Shops, Vegetarian and. Non-Vegetarian meals, Kirana goods, 1 Grocery and general merchandise and meat etc. were sold, He also stated that when he had joined both the permanent shopping cen- tres were under construction. Tn Section 5, the permanent shopping centre came in existence in December, 1971 and in Sector 1 the Shopping Centre commenced were in.. July, 1973.
42. Shri G. S. Sharma (P.W. 4) deposed that when he joined as Mines Manager at Amarkantak Mines in the year 1970, employees of the Company were required lo go to Amarkantak Village for shopping. In 1971, a few shops had developed outside the Amarkantak Township of the Company. In August, 1972, a Cooperative Store was started in the Shopping Centre of the Company, for which Balco gave the shop premises on a nominal rent of Re. 1 per month. He has further stated that in the month of December, 1972, tho Management, allotted 4 shops in the Shopping Centre, three of which were running. In December, 1971, the Company also allotted 15 plots or there- about for tho construction of shops. 9 allottees had availed the plots and their shops were running. He also stated that the Company helped the Cooperative Society by giving a total loan of Rs. 13,000, It 'also helped by making its truck available when it . was needed for bringing supplies. He also stated that about 6 months before the date of his deposition, a fair-price shop had been started under the said Cooperative Society. He said that the total turn over of the Cooperative shop last year that is to say in the y;ar 1973, was about Rs. 1 lac. He a'so estimated that in 1974, the total turn over was expected to be about Rs. 3 lacs. He also stated that a Canteen was run by the Balco, in which meals, tea and snacks were provided. Tea was supplied at 10 Paise per cup and food was supplied at 90 Paise per Thali. These rates arc obviously much lower than the market, rates. He has not been shaken at all in his cross-examina- tion,
43. Shri K, P. Singh (P.W. 5) deposed that at Phutka Pahar, there was a cooperative store in the Township of the Company, which also worked as a fair-price shop, It was further stated that 4 shops were allotted to private persons and out of them two shops were functioning. He also stated that there were 8 other shopkeepers, who had their shops in their hutments. The Management's assistance to the Cooperative Society was that it had provided a building and given 'a capital loan of Rs. 3,000. The Com- pany was bearing 50 per cent of the expenses which were incurred in bringing material to the Cooperative Shop. He has also stated that there was a Canteen provided by the Company, in which tea was served at 10 Paise per cup. He stated that the Management had constructed a building for the Canteen and it nlso provided cooking nt-nsils, tables and chairs and had provided 5 personnel to serve the Canteen. He also staled that the Company supplied electricity, water and fuel free of cost for the Canteen. In cross-examination, he stated that 5 officers and 325 workers of the Company were there in all and 'all of them purchase their requirements from the fair-price shops and Cooperative Stores. The purchase was open to all of them.
654 T HE GAZETTE OF INDIA EXTRAORDINARY [PART II—44. All the- witnesses examined on behalf o£ the Second Party No. 1 complained of two things. Their first grievance was that all the articles 'and commodities of daily needs were not available at the various shops provided in the Balco Township, Korba and at the Mining Sites. Their second grievance was th'at uncontrolled urtfcl.es were sold in the Cooperative Shops at prices which were cv-n higher than the prices ruling in the market. In cross-examination, it has teen brought out that at Bako Township and Mining Sites wer; at a great distance from important cities and Ihe transport costs were heavy, therefore, things were sold at higher prices at these plates. It has also teen stated in cross-examination that the prices were high as the Company could not effectively control them.
45, In my opinion, on the evidence on record, the facilities of shopping available •at these places cannot be held to be unsatisfactory only on the ground that things are sold at these places at high prices. Even in Ex. P/2-E, it was noticed that the cfurrent prices at these places were higher as they were situated in the interior at great distance where the facility of railway communications and other transport was not available, It can h'ardly be disputed that the effect of Cooperative Societies would be to thwart the other shop-keepers charging heavy prices as the Cooperative Societies brought competition into existence at these places. The explanation which has been given by some of the witnesses of the Second Party No. 1 that though lh; prices of things were higher in the Cooperative Societies, they were still purchasing from there repeatedly as they thought that it will bs better to the benefit of the Cooperative Society, is h'ardly acceptable. No one suffering from financial stringency would try to purchase things at higher prices from a cooperative Shop when he gets the same articles on che^er rate from other shops. The evidence on record established that th~ Company has provided land and building for holding the weekly markets and for running the Cooperative Shops 'and other shops. It has also provided personnel and other facilities for running the cooperative stores efficiently and with economy. It has also made arrangements at Balco Township at Korba for the supply of milk at fair price. In the Balco Township permanent markets in Sector 5 and Sector 1 had developed in 1973. It " aTso worthy of notice that from Amarkantak Township, the distance of Amarkantak village is about 6 Km. Tt stands to reason that that being a place of pilgrimage and a pla"s where High School Is located, articles of daily needs would be available there and the distance can be covered in about 20 minutes, if the purchaser uses a cycle. The statement made by Naldeosingh (D.W. 2) of Second Party No. 3 to th~, effect that at
Amarkantak there are only one or two shops is not believable at all. The Cooperative Societies and fair price shops existing at Phutka Pahar and Am'arkantak have ^ P r o- perly supported financially and otherwise by the Company, The Canteens available at all the Ihree places provided extra facility as the workmen obtained tea, snacks and food at much che'aper rates.
46, T r a n s p o r t .^ the point of transport facilities, the important witnesses of the Fir.t-Party are Shri M. S. Khan (P.W. 8), Shri G. S. Sharma (P.W. 4) and K. P. S"gh (P W 5) The testimony of Shri M. S. Khan establishes that for going to and commg Z Korba to Balco Township, there is a city bus of M.P.S.RT.C. wh.ch runs every
our from 5 a.m. to 6 p.m. daily. Apart from the said bus, the other ^ ^ a j a b to there arc that there are about 8 or 10 Tempos plying between Korb,L and.Bako Town and there are two or three Auto-Rikshaws also. In cross-exam.nat.on Shn M S. Khans
ateme that M.P.S.R.T.C. bus was running every hour has not been challenged at all.
S^C. 3(ii)j THE GAZETTE OF INDIA EXTRAORDINARY 65547. With regard lo the transport facilities in the Balco Township nt Amarkmtak, Shri G. S. Sharma has testified that the Company provides conveyance for reaching Amar- kantak village to its employees on payment of charges and from Amarkantak viUnge bus. facility exists for going to Bilaspur, Shahdol and Pondra. He further stated that in the dry season buses going from Jabalpur lo Amarkanlak were also available as these buses pass through Balco Township.
48. Shri K. P. Singh stated that Phutka Pahar was at a distance of 32 Km, from Balco Township, Korba. For bringing employees from Balco Township, Korba lo Phutka Pahar and for taking them from Phutka Pahar to Balco Township, the Company was utilising its Dumpers which go to Balco Township twice a day. He admitted in his cross-examina- tion that when persons get into the Dumpers they may be making an overloading situation as there is no definite weight prescribed for being carried in the Dumpers,
49. All the witnesses produced by Second-Party No. 1 complained that the transport facilities were unsatisfactory at all the places. They tried to say that the M.P.S.R.T.C. bus service was not running every hour from Balco Township to Korba. They stressed that from Phutka Pahar, the Company gave a free lift to its workers once every week on Sundays in their bus for making their purchases in the market. This was not sufficient. Another grievance made was that the transport arrangements available at these places ware very expensive and at Phutka Pahar there was no alternative arrangement available.
50. Having considered the evidence adduced by both the parties on this point, I am of the opinion that the transport arrangement at present existing at Phutka Pahar cannot be held to be satisfactory. The distance of Phufka Pahar from Bako Township which is the nearest place available for shopping is 32 Km. There is only one bus provided every week to the workmen for making their purchases in Balco Township or Korba. It is true that for this bus service, the Company docs not charge any hire from the work- men but considering the needs of 326 workers and their families, the provision for only one trip in a week appears to be inadequate, There arc no other arrangements which could be availed of by the employees of the Company there for going to Korba or Balco Township. The arrangement of taking employees in Dumpers may serve in an emergency but cannot be considered to be a dependable provision for transport of the workmen daily. It was urged on behalf of the First-Party that the M.P.S.R.T.C. was contemplat- ing to start a bus service from Phutka Pahar to Korba and its trial was lo take place on 12th October. 1974. However, there is nolhin.e on record to confirm that the said bus service has been started.
51. With regard to the other two places, namely, Balco Township and Amarkantak, I am of the opinion that the arrangements existing there should be held lo be satisfactory. It is true that the workmen are required to pay some heavy fare for going to Korba from Balco Township and for going to Amarkantak Village from Amarkantak Township but considering the fuel stringency these high rates cannot be prevented when the prices of petrol and diescl have gone higher by 4 or 5 times. It is but natural that for transport more money is required to be spent, f, therefore, hold that the transport provision at these two places is adequate.
52. Recreation.-—The next item for consideration is the facility of recreation. This item cannot be held to be as important as the other items already discussed above. How- ever, the Company arranges some free cinema shows at all the three places for its employees. This is established by the evidence of Shri M. S. Khan (P.W.8), Shri G. S. Sharma (P.W.4) and Shri K. P. Singh (P.W.5) as also by the evidence of Shri R. P. Dubey (D.W. 7) of the Second-Party No. 1, The Company has given facilities in the Community
656 THE GAZETTE C. INDIA EXTRAORDINARY [PART H—Hall constructed by it for in-door games. The tablc-i-snnis, chess and carom. This Com- munity Hall provides for holding social functions in it. In Balco Township, facilities are also provided for out-door games like foot ball, cricket, volley-ball and hockey. Ii is not necessary to develop ihis point further.
53. For making the record complete, I have discussed the entire evidence which has been produced by the parties. I would, however, like to state that in the written argu- ment submitted on behalf of the Second-Party No. 1, no attempt at all was made to reply on the point on which cross-cxamitution was directed by it to the witnesses of the First- Party or on the points which were desired to be brought out in the examination-in-chief of theic own witnesses.
54. In my opinion, all the facilities discussed above have to be judged not from ao ideal stand point but from the practicable and feasible point of view. It has to bo appreciated that the same furili£:es ctinnot lx- expeuoi at the Mining Sites as may be expected by the workmen at B;ilco Township, Korba. Shri V. S. Yadav, Secretary of the Second-Party No. 1 rightly admitted in his statement that he did not expect the same facilities to be provided by the Company at Phutka Pahar and Amarkantak as they are provided in Balco Township, Korba.
55. Considering the entire evidence in this light, I would answer Issue No, 1 in this way that the facilities pertaining to housing, hospital, schools, shopping, recreation and transport provided at Balco Township, Korba and Amarkantak are adequate. These faci- lities at Phutka Pahar also are adequate except in respect of transport.
56. I may now take up the second issue for consideration. The question for consider- ation under this issue is as to whether the withdrawal of Project Allowance in part or full is justified and proper from 1-4-1973 and if not, to what relief the workmen am entitled 10. In the Written Statement as also in the Written Arguments submitted on behalf of Second-Party No. 1 it has been urged that the notice of change was not served legally and properly on the Second-Party No. 1. It is contended that the notice of change forms the very foundation for invoking the jurisdiction of the Tribunal and as the said notice was illegal, the reference made to the Arbitrator Cannot be entertained. It my opinion, this contention cannot be accepted. Even if it were assumed that the notice of change dated 1U-3-1973 was not served in the manner required by law, it is an admitted fact that the present reference was made on'y on the basis of an agreement between the First-Party and all thr Second Parties. The Company and all the Second-Parties agreed on 16^f-1973 to refer the dispute for arbitration to the Presiding Officer of Iho Industrial Tri- bunal. The dispute was referred under Section 10A of the Act on the basis of an agree- ment between the parties. This being the position, none of the parties can subsequently raise an objection that there was no industrial dispute between them. This was clearly held: while deciding the second preliminary issue by my order dated 12th February, 1974. 1 have referred to the decision of that issue in detail in paragraph 13 of this award. Even if the notice is held to be defective, it is clear that as subsequently there was an agreement between all the parties, none can complain about the notice and they are bound by their agreement In referring the dispute for adjudication to the Arbitrator. Tho contention of the Second-Party No. 1 'about the illegality of the notice is, therefore, rejected.
57. The second contention raised by the Second-Party No. 1 Is that the Project Allowance which was given to the employees is part of their regular salary and, therefore, cannot be withdrawn. This contention is not correct. In the first place, the documents sanctioning the Project Allowance including Ex. P/3, clearly show that the Project ATIotwance was sanctioned not as a permanent grant to the workmen but only for a
SEC. 3(11) j THE GAZETTE OF INDIA EXTRAORDINARY 657limited time. This point has already been discussed in detail and, therefore, need not be discussed in detail again. In the second place, the Advertisement No. 3/72, Ex. D/19, and the Memorandum of the offer of appointment, Ex. D/20, clearly show that pay and allowances were separately shown. The methods in which the allowance has been specified in these advertisements clearly show that Project Allowance was quite different from pay. Jjn the third place, it is worthy of note that Project Allowance was also given to the employees of N.C.D.C. Korba but that was withdrawn in 1967, in the very year in which this allowance was provided for the workmen of the First-Party, It is also worthy of note that the Project Allowance wa" also given to Officers of the Company getting more than Rs. 1000/- per mensem. That has already been withdrawn. If the Project Allow- ance could rightly be held to be part of the salary, it is obvious that the employees of N.C.D.C. Korba and the Officers of the Company would not have allowed it to be with- drawn and would have raised the contention that it was part of their salary. Though the effect of not raising the said contention is not conclusive against the second-parties, yet along with other circumstances it is a factor to be taken into account.
58. Some of the witnesses of Second-Party No. 1 have referred to the constructional activities for Smelting and Fabrication Plant. Shri M. C. Khan (P.W.8) has explained that these activities are conducted by the contractors and only supervision is done by the personnel of the Company. The fact that some constructional activities are going on does not in any manner affect the question which has to be decided in this case namely, as to whether the present employees have the benefit of such facilities that Project Allowance may be allowed to be withdrawn in a phased manner, It is plain that considering the magnitude of the work of the Company, some type of constructional activity may always be going on till the Company goes into full production. It may be necessary in future to construct more quarters for the new recruits to be employed, Similarly, other facilities also may be required to be developed for the new entrants of the Company. Merely on the ground of such developments being probable or certain, none of the present facilities can be held to be inadequate,
59. The last point which deserved consideration is as to whether the Management should be bound down to the settlement which was arrived at on 28-3-1973 and which has been referred to above in paragraph 6 of this award. According to the settlement, it was agreed that fifty per cent of the amount of Project Allowance as admissible to be existing employees drawing pay of less than Rs. 1000/- per month, as On 31-3-1973 shall be paid to such omployees as Personna] Pay with effect from 1-4-1973 and it was .further agreed that the Personal Pay referred to under the aforesaid term would be adjusted against monetary benefits which would accrue to such employees consequent to their future promotions as and when it arises, In my opinion, it would be illegal and unjust to compel the Company to stick to the aforesaid terms of their settlement. Th: first reason that I would like to state is that when both the parties agreed to throw the settlement over-board, and invited a decision from Ihe Arbitrator by referring (heir disput: to him, they cannot be allowed to fall back on the said agreement when they or any of them failed to satisfy the validity of their claim on merits. It is understandable that the Company agreed to the terms of the said settlement with the idea that they should have good industrial relations with their employees. They may have liked to ignore the merits of the claim for purchasing industrial peace. Further, it cannot be disputed that the payment of Personal Pay at the rate of 50 per cent of the Project Allowance was limited only to such employees who were employed then and this payment would hive been required to be made only for a limited period as promotions in foreseeable future were quite likely in the Company which was then in its early stages. It is also worthy of note that if the settlement had been acted upom, this would not have involved Hahiiily of
658 THE GAZETTE OF INDIA EXTRAORDINARY [PAKL I n-payment of the Project. Allowance in respect of new entrants who, in the course ui development, naturally have to be recruited in large numbers. It is further to be noted that the pay-scales of all the employees were revised upwards in the month of Novem- ber, 1973 and given retrospective ettect from 1-1-1973. The result of this revision, according to Shri K. L. Kumar (P.W.i) was Lhai. the employees got the benefit ranging from about Ks. 40/- per month to about Rs. 150/- per month. Foe all these reasons, the Company cannot be directed to stick; to the terms of settlement, Ex. D/2 and Ex.. D/3, specihed in Paragraph 6 of this award.
60. Another contention which has been strenuously raised is that it will be a great hardship for the workmen if they are deprived of the Project Allowance at this stage when ihc things and essential commodities are selling at a phenomenal rate. It is true tnat all the workers would be put to trouble and inconvenience if they are deprived of the Project Allowance at this stage. I do not doubt at all Lhat the worKers would have to sulEcr hardship if they are deprived of the Project Allowance partly or fully. However, my difficulty as an Arbitrator on the issues referred, is that as it is clear by the perusal of the material on record and the intention which was there behind granting the Project Allowance that it was granted for a defined purpose and was made admissible only for compensating the staif lor lack of particular amenities, I cannot extend by my action ihe grant, of Project Allowance for different purpose altogether than what was contem- plated. It may be that the staff of the employees of the Company may be entitled to higher dearness allowance, however, that will be a different matter altogether. The Project Allowance was given for amenities such as housing, schools, markets, dispen- saries etc. The word "etc' cannot be interpreted to cover those case which were out- aide tho original intention. At best, it can bo applied to ejusdem generis purposes. 1 would, therefore, hold that the Company has made out a. caso for a phased withdrawal of the Project Allowance in as much as the facilities which have become available to the staff by now are adequate in all respects except the facility of transport for the workmen of Phutka Pahar. 1 am of Lhc opinion that withdrawal of the Project Allowance in a retrospective manner would work extreme hardship for the workmen. The Company itself considered this aspect and decided to effect withdrawal of the said allowance in a phased manner and not with immediate effect. I am, therefore, of the opinion that the withdrawal of Project Allowance should reasonably be affected only in a phased manner.
61. The question of the withdrawal of Project Allowance came for consideration before the 3rd Pay Commission. In its report, a para of which is marked as Ex. P/6, it was observed,—
1
"It has been urged by the unions and the associations that the project allowance should not be withdrawn, but be merged with pay, as the employees ex- perience hardship when the allowance is withdrawn. Wo arc unable to accept the demand for the merger of project allowance with pay as this would go against the very rationale for the grant of this allowance. We, however, recommend that the process of withdrawal of tie project allow- ance in a phased manner should begin only after certain facilities by way of provision of schools, markets, medical facilities and reasonable housing facilities available within the project area or in its proximity. In fact the phased reduction in the quantum of project allowance or its final withdrawal should be Jinked with the progress made with the provision of the above- mentioned facilities and amenities."
I share the view expressed by the Pay Commission.
62. Tile last point for consideration is as to whether withdrawal of Project Allowance in part 011 full with effect from 1-4-1973 is justified and proper. I would not like to
SEC. 3(")] THE GAZETTE OF INDIA EXTRAORDINARY 659attach much weight to the date 1-4-1973, which is stated in this issue, as 1 have already held thaL it would not be proper to direct any withdrawal of the Project Allowance in retrospective manner. It is true that most of the facilities which 1 have held to be adequate while discussing the first issue had come into existence before 1-4-1973, The wnly important facilities which were subsequently introduced are,—(I) the addition oi two doctors, (2) trie ti.C.U. Machine, (.3) two ambulance cars in the Hospital at Baico Township and (4) me introduction of Xth and Xlth Classes in the Balco Hiuh School from iy/3. Obviously these classes must have introduced from the month of June or July, 1973.
63. I, therefore, make the following award and direct the withdrawal of the .Project Allowance in the following manner:—
(1) 30 per cent of the Project Allowance will be withdrawn one month after this award becomes effective. The first cut of 30 per cent will bo made from the salary payable to the staff of the Company getting less than Rs. 1000/- in the next month after the award has become operative.
(2) A further cut of 10 per cent in the Project Allowance would be made in the month following the cut of 30 per cent and further cuts of 10 per cent in the said allowance will be made in the subsequent following months till the Project Allowance is fully withdrawn and is reduced to zero level for the staff of the Company employed at Balco Township, Korba and Mining Site at Amarkantak.
(3) However, after withdrawing 80 per cent of the Project Allowance admissible to the workmen of Phutka Pahar drawing a salary of less than Rs. 1000/- per month in the manner specified above, the last two cuts of 10 per cent each (totalling 20 per cent of the total Project Allowance) shall not be made till,—
(1) either the Company provides bus-service for two days more in a week than what it is already providing to them on Sundays of every week. If the Company provides bus-service for two days more, it would be entitled to charge a fare which will not be more than 75 per cent of the fare charged for similar distances by M.P.S.K.T.C., or
(2) When the M.P.S.R.T.C. or any other bus service runs a regular bus service from Phutka Pahar to Korba and/or Balco Township and back at Jeast for three days in a week.
(Sd.) S. P. BHAROAVA,
,lndore, dated the 6th February, 1975. Arbitrator.
[No. L-29013/1/73-LRIV/DllI/B]
D. BANTJYOPADHYAY, Jt. Secy.
PRINTED BY THE MANAGER, GOVERNMENT OF INDIA PRHSS, MINTO ROAD, NKW DF.LH1 AND PUBLISHED BY THE CONTROLLER OF PUBLICATIONS. DELHI, 1 9 75
- in 1971 at Phutka Pahar Mines, At that time, there were only 15 Asbestos She^t Hulments for providing accommodation to the workmen. He stated that at the time he joined, construction of township was already in progress, He deposed that 28 buildings ciime up in the first stage by September, 1972 and the whole construction of biddings was completed by April, 1973. The total of such buildings is 127. He has also stated that tiioy arc all residential buildings. In Paragraph 2 of his deposition, he testified that none of the persons getting Project Allowance is without accommodation, To all of them, accommodation has been provided by the Company. 20. As regards the Mining Site at. Amarkant.ak, the material evidence is that of Shri O. S. Sharma" (P.W, 4). He joined as Mining Engineer at. Amarkantak in the month of November, 1970. He has deposed that the construction of buildings in the township at Amarkantak was begun in the year 1970. He also, stated that tho first set of quarters- vert; constructed by the close of 1970 and in 1971 January, they were made available to >h? employes and (hen up to June, 1971, the work of construction of all quarters was finished. In Paragraph 2 of his deposition, be stated that. out. of 190 persons who were ai present getting ""Project Allowance at Amarkantak, 174 have been allotted quarters. 21. IVi rebuttal, the material evidence of Second Party No. 1 is that of Shri V. !?. Yadav (D.W.I), Secretary of Bharat Aluminium Mazdoor Sangh and Shri B. P. D"wanean (D.W.2) Yadav, in paragraph 6 of his deposition asserted that in Balco Township, the position of housing was that 50 per cent of workmen getting the Project Allowance had not been provided accommodation by the Company. He stated that there •vvere 2400 persons ttt Balco who get Project Allowance and out of them, only 1400 were ↩