भारत सरकार / Government of India
सरकारी राजपत्र OFFICIAL GAZETTE
संघ प्रदेश दादरा एवं नगर हवेली तथा दमण एवं दीव प्रशासन U.T. ADMINISTRATION OF DADRA AND NAGAR HAVELI AND
DAMAN AND DIU
श्रेणी - २
SERIES - II
प्राधकिरण द्वारा प्रकाधशत / PUBLISHED BY AUHTORITY
Daman 28th February, 2025 9 Phalguna, 1946 (Saka) No. : 08
संघ प्रदेश दादरा एवं नगर हवेली एवं दमन एवं दीव प्रशासन, U.T. ADMINISTRATION OF DADRA & NAGAR HAVELI AND DAMAN & DIU,
समाहताा का र्कााार्ल, दीव
OFFICE OF THE COLLECTOR, DIU
No. 65-02(Part)-LAQ-2024-25/1569 Date: - 31/01/2025
The following Notifications were issued by this office under the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 for the earlier project of the Development of Jalandhar Circuit House and infrastructure facilities in Diu for an area 43645.00 Sq. Mts. Is hereby withdrawn.
| Sr. No. | Particulars | Notification No. | Date of issuance |
| 1. | Notification U/s. 4 | 65-02-LAQ-2023-2024/1495 | 16/02/2024 |
Sd/– (Rahul Dev Boora) Collector, Diu.
***
SERIES – II No. 08 THE GAZETTE OF DNH & DD Page 2संघ प्रदेश दादरा एवं नगर हवेली एवं दमन एवं दीव प्रशासन, U.T. ADMINISTRATION OF DADRA & NAGAR HAVELI AND DAMAN & DIU,
समाहताा का र्कााार्ल, दीव
OFFICE OF THE COLLECTOR, DIU
No. 65-02(Part)-LAQ-2024-25/1570 Date: - 31/01/2025
Section 4(1) of the RFCTLARR, Act, 2013, Part-B. (Sub Rule (1) of Rule (3) of the Right to Fair
Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement (Social
Impact Assessment and Consent) Rule, 2014)
Notification of the Social Impact Assessment
The UT Administration of Dadra & Nagar Haveli and Daman & Diu intends to acquire the following lands in consultation with the concerned Diu Municipal Council, Diu in the affected area and carry out a Social Impact Assessment study for public purpose. The study shall be undertaken as per the provisions of section 4 of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013.
i. Name of project developer: Additional Director of Tourism, Diu
ii. Purpose of proposed Land Acquisition: for Development of Jallandhar Circuit House & infrastructures facilities in Diu District
iii. Land details:
| Sr. No. | Private Property Survey Nos. | Location | Owner of Property | Total Area of Property in Hectares | Area of land to be acquired in sq.mts. |
| 1 | PTS-144/1 | Adjacent to Jallandhar Circuit House, Diu | (1).(i) Mr. Navinchandra Vargidas (ii) Mr. Narendracumar Vargidas (iii) Mr. Mansing Vargidas Undivided 25% Share (2) Shri Anil Vitoldas Undivided 25% share (3) Mr. Jentilal Arrachande Undivided 25% Share (4) Mr. Pracashchandra Arrachhande Undivided 25% Share | 3.94.71 Earlier 3.77.80 (Revised area after review by EOCS, Diu) | 13500.00 |
| Total Area | 13500.00 |
iv. Objectives of Social Impact Assessment
a. To identify the process of acquiring land as per Govt. Act/ Regulation and decide the fair compensation for the concerned party.
b. Identify the potential Social and Economic changes and conduct the Impact assessment through onsite field investigations, public hearings and consultations.
c. Outline steps to mitigate or enhance negative or positive aspects of change if at all exists.
SERIES – II No. 08 THE GAZETTE OF DNH & DD Page 3v. Whether consent of Gram Sabha's and / or land owners required? – No
vi. Key Activities
a. Survey (organization to undertake the study) - Mamlatdar/Enquiry Officer, Block Development Officer, Diu, will complete survey of the proposed area under acquisition within six months from the date of publication of this Notification.
b. Consultations - With stake holders of the proposed area including Diu Municipal Council, Diu.
c. The date of commencement of SIA – From the date of publication of this notification.
1. Organization to undertake the study: Empanelled organizations/institute will be carried out SIA study after issuance of this notification
d. Public hearing - S.I.A. Unit will decide the time and place for public hearing before submitting final S.I.A. report.
vii. Deadline for completion of Final SIA report in Gujarati & English Language including Public hearing – Six months from the date of publication of Notification.
viii. Following will be the deliverables of SIA-
a. Social Impact Assessment Report in Form-II
b. Social Impact Management Plan in Form – III
ix. Deliverables will be made available in District Panchayat, Diu Municipal Council, Diu and the offices of Collector, Diu, Deputy Collector, Diu and Mamlatdar, Diu and will also upload on the official website of Diu administration.
x. Any coercion or threat during this period will render the exercise null and void.
xi. Contact details of the SIA team: Office of Deputy Collector, Collectorate, Fort Road, Diu 362520. (Phone No. 02875-252444)
By order and in the name of the Administrator of Dadra & Nagar Haveli and Daman & Diu
Sd/– (Rahul Dev Boora) Collector, Diu
***
SERIES – II No. 08 THE GAZETTE OF DNH & DD Page 4संघ प्रदेश दादरा एवं नगर हवेली और दमन एवं दीव प्रशासन, U.T. ADMINISTRATION OF DADRA & NAGAR HAVELI AND DAMAN & DIU, समाहताा का र्कााार्ल, दीव / OFFICE OF THE COLLECTOR, DIU-362520
No. 65-01-LAQ-2022-23/1630 Date: - 11/02/2025
Read:- 1) Notice No. 65-01-LAQ-2022-23/1547, dated 27/01/2025
CORRIGENDUM
In partial modification of notice referred at preamble above, it may be read as the "Market Rate @ Rs. 1500/- for Agriculture land (Per Sq. Mtrs)" in Annexure-I Col. 6 instead of "Market Rate @ Rs. 2500/- for Agriculture land (Per Sq. Mtrs)". Corrected value of Compensation for land & structure, solatium, interest rate shall be viewed accordingly. Corrected copy of Annexure-I & III is attached accordingly.
Encl: 1) Corrected copy of Annexture-I, III.
Sd/– (Rahul Dev Boora) Land Acquisition Collector, DiuSERIES – II No. 08 THE GAZETTE OF DNH & DD Page 5
Annexure – I
Details of Compensation for Land Acquisition from Bucharwada Fatak to Tad Check Post Strengthening and Widening of NH-251 from Km
11.000 to Km 22.770 at District Diu
| Sr. No. | property card Name of persons in | P.T.S. No. | Class of land | (Sq. Mtrs.) acquired in Area of land | Sq. Mtrs) Rs. 1500/- for Market Rate @ Agriculture land (Per | 2 Multiplication Factor | of land 100% on Solatium Multiplication value | and 7 days Additional amount @12% of 8 months | on land Total compensation |
| 1 | 2 | 4 | 5 | 3 | 6 | 7 | 8 | 9 | 10 |
| 1. | Shantilal Ruda | 42/4/2 | Agriculture | 134.00 | 2,01,000.00 | 4,02,000.00 | 4,02,000.00 | 57,029 | ₹ 8,61,029 |
| 2. | Dilip Ruda | 42/4/4 | Agriculture | 117.00 | 1,75,500.00 | 3,51,000.00 | 3,51,000.00 | 49,794 | ₹ 7,51,794 |
| 3. | Dhanji Ruda | 42/4 | Agriculture | 101.00 | 1,51,500.00 | 3,03,000.00 | 3,03,000.00 | 42,984 | ₹ 6,48,984 |
| 4. | Lakhmibai Bhikha Solanki Lakhman Bhikha Solanki Dhanji Bhikha Solanki | 42/5 | Agriculture | 233.00 | 3,49,500.00 | 6,99,000.00 | 6,99,000.00 | 99,162 | ₹ 14,97,162 |
| 5. | Ranjan Devji Solanki | 42/6 | Agriculture | 142.00 | 2,13,000.00 | 4,26,000.00 | 4,26,000.00 | 60,434 | ₹ 9,12,434 |
| 6. | Smt. Somibai Vira Solanki | 42/8 | Agriculture | 50.00 | 75,000.00 | 1,50,000.00 | 1,50,000.00 | 21,279 | ₹ 3,21,279 |
| 7. | Bhikha Bana Solanki | 42/9 | Agriculture | 84.00 | 1,26,000.00 | 2,52,000.00 | 2,52,000.00 | 35,749 | ₹ 5,39,749 |
| 8. | Sidi Dita Vala | 42/10 | Agriculture | 164.00 | 2,46,000.00 | 4,92,000.00 | 4,92,000.00 | 69,797 | ₹ 10,53,797 |
| 9. | Karsan Jetha Rajibai Karsan Devji Jetha Somai Devji Nagji Raja Vinod Raja Vijay Raja | 42/11 | Agriculture | 92.00 | 1,38,000.00 | 2,76,000.00 | 2,76,000.00 | 39,154 | ₹ 5,91,154 |
| 10. Rama Bhikha Vaza | 42/12 | Agriculture | 93.00 | 1,39,500.00 | 2,79,000.00 | 2,79,000.00 | 39,580 | ₹ 5,97,580 | |
| 11. | Rohit Quessou Dipesh Quessou | 42/13- A | Agriculture | 76.00 | 1,14,000.00 | 2,28,000.00 | 2,28,000.00 | 32,345 | ₹ 4,88,345 |
| 12. | China Bhagwan Chauda Nathudiben China Chauda Babu Bhagwan Chauda Jeniben Babu Chauda Devji Soma Velgi Soma Jayantilal Soma | 50/2 | Agriculture | 425.00 | 6,37,500.00 | 12,75,000.00 | 12,75,000.00 | 1,80,875 | ₹ 27,30,875 |
| 13. Bhagwan Bijal Solanki | 50/1 | Agriculture | 199.00 | 2,98,500.00 | 5,97,000.00 | 5,97,000.00 | 84,692 | ₹ 12,78,692 | |
| 14. M/s Divecha Construction, Diu | 40/14 | Agriculture | 120.00 | 1,80,000.00 | 3,60,000.00 | 3,60,000.00 | 51,071 | ₹ 7,71,071 | |
| 15. Bawa Bhagwan Chauda | 40/8 | Agriculture | 853.00 | 12,79,500.00 | 25,59,000.00 | 25,59,000.00 | 3,63,027 | ₹ 54,81,027 | |
| 16. | Bhaya Bijal Vira Bijal | 40/10 | Agriculture | 860.00 | 12,90,000.00 | 25,80,000.00 | 25,80,000.00 | 3,66,007 | ₹ 55,26,007 |
| Total: | 3743.00 | - | 1,12,29,000.00 | 1,12,29,000.00 | ₹ 15,92,980 | ₹ 2,40,50,980 |
Place: Diu Dated: 11/02/2025 Sd/–
(Rahul Dev Boora) Collector, DiuSERIES – II No. 08 THE GAZETTE OF DNH & DD Page 7
Annexure – III
Details of total compensation for Land Acquisition from Bucharwada Fatak to Tad Check Post Strengthening
and Widening of NH-251 from Km 11.000 to Km 22.770 at District Diu
| Sr. No. | Name of persons in property card | PTS No. | Area in Sq. Mtrs. | Total Compensation of land | Total Compensatio n of Assets | Grand Total |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| 1 | Shantilal Ruda | 42/4/2 | 134.00 | ₹ 8,61,029 | 0.00 | ₹ 8,61,029 |
| 2 | Dilip Ruda | 42/4/4 | 117.00 | ₹ 7,51,794 | 0.00 | ₹ 7,51,794 |
| 3 | Dhanji Ruda | 42/4 | 101.00 | ₹ 6,48,984 | 0.00 | ₹ 6,48,984 |
| 4 | Lakhmibai Bhikha Solanki Lakhman Bhikha Solanki Dhanji Bhikha Solanki | 42/5 | 233.00 | ₹ 14,97,162 | 0.00 | ₹ 14,97,162 |
| 5 | Ranjan Devji Solanki | 42/6 | 142.00 | ₹ 9,12,434 | 0.00 | ₹ 9,12,434 |
| 6 | Smt. Somibai Vira Solanki | 42/8 | 50.00 | ₹ 3,21,279 | 0.00 | ₹ 3,21,279 |
| 7 | Bhikha Bana Solanki | 42/9 | 84.00 | ₹ 5,39,749 | 0.00 | ₹ 5,39,749 |
| 8 | Sidi Dita Vala | 42/10 | 164.00 | ₹ 10,53,797 | 0.00 | ₹ 10,53,797 |
| 9 | Karsan Jetha Rajibai Karsan Devji Jetha Somai Devji Nagji Raja Vinod Raja Vijay Raja | 42/11 | 92.00 | ₹ 5,91,154 | 0.00 | ₹ 5,91,154 |
| 10 | Rama Bhikha Vaza | 42/12 | 93.00 | ₹ 5,97,580 | 0.00 | ₹ 5,97,580 |
| 11 | Rohit Quessou Dipesh Quessou | 42/13-A | 76.00 | ₹ 4,88,345 | 0.00 | ₹ 4,88,345 |
| 12 | China Bhagwan Chauda Nathudiben China Chauda Babu Bhagwan Chauda Jeniben Babu Chauda Devji Soma Velgi Soma Jayantilal Soma | 50/2 | 425.00 | ₹ 27,30,875 | 0.00 | ₹ 27,30,875 |
| 13 | Bhagwan Bijal Solanki | 50/1 | 199.00 | ₹ 12,78,692 | 0.00 | ₹ 12,78,692 |
| 14 | M/s Divecha Construction, Diu | 40/14 | 120.00 | ₹ 7,71,071 | 0.00 | ₹ 7,71,071 |
| 15 | Bawa Bhagwan Chauda | 40/8 | 853.00 | ₹ 54,81,027 | 0.00 | ₹ 54,81,027 |
| 16 | Bhaya Bijal Vira Bijal | 40/10 | 860.00 | ₹ 55,26,007 | 0.00 | ₹ 55,26,007 |
| Total | 3743.00 | ₹ 2,40,50,980 | 0.00 | ₹ 2,40,50,980 |
Place: Diu
Dated: 11/02/2025
Sd/–
(Rahul Dev Boora) Collector, Diu
***SERIES – II No. 08 THE GAZETTE OF DNH & DD Page 9
Draft Report of Administrator for Rehabilitation and Resettlement Scheme u/s 16 of The Right
to Fair Compensation and Transparency in Land Acquisition Act, 2013 of families affected with
the proposed acquisition of land for Construction of Building for New Govt ITI at Khanvel
(DNH).
Preface: -
Vide notification no. LAQ / New Govt./ITI/Khanvel/2023/14/LAO/2025, dated 13.01.2025, land of Khanvel village of Dadra and Nagar Haveli were notified u/s 11(1) of The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 for the Construction of Building for New Govt. ITI at Khanvel, Dadra & Nagar Haveli, Vide above mentioned Notification, Resident Deputy Collector, Khanvel was appointed as the Administrator under sub section (1) of Section 43 of the said act for Rehabilitation and Resettlement of affected families. As per section 16 of RFCTLARR Act 2013, Preparation of Rehabilitation and Resettlement Scheme by the Administrator should be done and the same is reproduced as below: -
Preparation of Rehabilitation and Resettlement Scheme by the Administrator
1. Upon the publication of the preliminary notification under sub-section (1) of section 11 by the collector, the Administrator for Rehabilitation and Resettlement shall conduct a survey and undertake a census of the affected families, in such manner and within such time as may be prescribed, which shall include —
(a) Particulars of lands and immovable properties being acquired of each affected family;
(b) Livelihoods lost in respect of land losers and landless whose livelihoods are primarily dependent on the lands being acquired;
(c) A list of public utilities and Government buildings which are affected or likely to be affected, where resettlement of affected families is involved;
(d) Details of the amenities and infrastructural facilities which are affected or likely to be affected, where resettlement of affected families is involved; and
(e) Details of any common property resources being acquired.
2. The Administrator shall, based on the survey and census under sub-section (1), prepare a draft Rehabilitation and Resettlement Scheme, as prescribed which shall include particulars of the rehabilitation and resettlement entitlements of each land owner and landless whose livelihoods are primarily dependent on the lands being acquired and where resettlement of affected families is involved —
(i) A list of Government buildings to be provided in the Resettlement Area;
(ii) Details of the public amenities and infrastructural facilities which are to be provided in the Resettlement Area.
3. The draft Rehabilitation and Resettlement scheme referred to in sub-section (2) shall include time limit for implementing Rehabilitation and Resettlement Scheme.
SERIES – II No. 08 THE GAZETTE OF DNH & DD Page 104. The draft Rehabilitation and Resettlement scheme referred to in sub-section (2) shall be made known locally by wide publicity in the affected area and discussed in the concerned Gram Sabhas or Municipalities.
5. A public hearing shall be conducted in such manner as may be prescribed, after giving adequate publicity about the date, time and venue for the public hearing at the affected area:
Therefore, the team visited the proposed lands and the details regarding affected families, displaced families, vulnerable person, etc. are collected.
1. Particulars of Lands and immovable properties being acquired of each affected family:
(a) List of land holdings in the affected area:
Total land proposed for acquisition in Khanvel village of Dadra & Nagar Haveli: 2913.00 Sq.mt. Nature of land: Agriculture and Non-Agriculture
(b) List of trees, building, other immovable property assets attached to the land or building
to be acquired
*Will be reflected in Final Award for Compensation.
(c) List of Affected and Displaced families (including tenants on the land):
Affected families in village of Khanvel: 00
Displaced families in village of Khanvel: 00
Name of members of the affected family
*Refer Summary of Rehabilitation and Resettlement Scheme.
2. Livelihoods lost in respect of land losers and landless whose livelihoods are primarily
dependent on the lands being acquired:
a) List of trade or business in the affected area:
*Refer Summary of Rehabilitation and Resettlement Scheme.
3. Details of amenities and infrastructural facilities which are affected or likely to be affected,
where resettlement of affected families is involved:
*Refer Summary of Rehabilitation and Resettlement Scheme.
4. Details of amenities and infrastructural facilities which are affected or likely to be affected,
where resettlement of affected families is involved:
Not Applicable as No common property resources is being acquired.
SERIES – II No. 08 THE GAZETTE OF DNH & DD Page 115. List of displaced families:
*Refer Summary of Rehabilitation and Resettlement Scheme.
Rehabilitation and Resettlement Scheme
As per chapter VI, Procedure and manner of Rehabilitation and Resettlement-Section 43 of RFCTLARR Act 2013, the undersigned has been appointed as the Administrator for drafting Rehabilitation and Resettlement scheme. This Rehabilitation and Resettlement scheme (R&R scheme) is being drafted in consonance with section 16, 17, 18, 19, 31, 41 & 42 (if applicable), 43, Second Schedule of RFCTLARR Act 2013 and Rules 7, 8, 9 (if applicable) 16, Form IV (if applicable) and Form VII of RFCTLARR (Compensation, Rehabilitation and Resettlement and Development Plan) Rules 2015.
As per the Section 3(k) of RFCTLARR Act 2013, "Displaced Family" means any family who on the account of acquisition of land has to be relocated and resettled from the affected area to the resettlement area. In the present case the land being acquired is Agriculture / Non-Agriculture land for which compensation shall be paid as and when the Collector, Dadra and Nagar Haveli announces the Award.
Therefore, it is evident that the affected family may not need relocation and resettlement because they are either not losing their complete house/ land or are left with some land after acquisition or in some cases they are having alternate Residential option. However, I am of the opinion No case for Resettlement is made out for the project displaced families.
The Rehabilitation & Resettlement Scheme is prepared based on the Second Schedule (ELEMENTS OF REHABILITATION AND RESETTLEMENT ENTITLEMENTS FORALL THE AFFECTED FAMILIES (BOTH LAND OWNERS AND THE FAMILIESWHOSE LIVELIHOOD IS PRIMARILY DEPENDENT ON LAND ACQUIRED) IN ADDITION TO THOSE PROVIDED IN THE FIRST SCHEDULE). Based on the second schedule the Rehabilitation and Resettlement Scheme is drafted and summarized in the format (enclosed) and recommended for review by Collector U/s 17 of RFCTLARR Act 2013.
No. LAQ/NEW Govt. ITI/Khanvel/2023/255
Dated: 18/02/2025
Sd/– (Piyush Kumar)
Administrator for Rehabilitation and Resettlement,
U/s RFCTLARR Act, 2013,
Dadra and Nagar Haveli,
Khanvel.
SERIES – II No. 08 THE GAZETTE OF DNH & DD Page 12Summary for Rehabilitation and Resettlement Scheme (ELEMENTS OF REHABILITATION AND RESETTLEMENT ENTITLEMENTS FOR
ALL THE AFFECTED FAMILIES)
| 1 | Name of Project: Construction of Building for New Govt. ITI at Khanvel (DNH). | ||||
| 2 | Name/ Names of person interested in the land and the nature of respective claim for rehabilitation and resettlement: As in SI. No. 4 | ||||
| 3 | Time limit for provisions of Rehabilitation and Resettlement entitlements given to the affected family: Within 18 months from date of Award u/s 23 of RFCTLARR Act 2013 | ||||
| 4 | Rehabilitation and Resettlement entitlements | ||||
| 1. Provision of housing units in case of displacement (1) If a house is lost in rural areas, a constructed house shall be provided as per the Indira Awas Yojana specifications. If a house is lost in urban areas, a constructed house shall be provided, which will be not less than 50 sq. mts. in plinth area. (2) The benefits listed above shall be extended to any affected family which is without homestead land and which has been residing in the area and which has been involuntarily displaced from such area: P rovided that any such family in urban areas which opts not to take the house offered, shall get a one-time assistance for house construction, which shall not be less than one lakh fifty thousand rupees: P rovided further that if any affected family in rural areas so prefers, the entitlement cost of the house may be offered in lieu of the constructed house: Provided also that no family affected by acquisition shall be given more than one house under the provisions of this Act. | |||||
| Recommendation- NIL | |||||
| 2. Land for land In case of Irrigation project, as far as possible and in lieu of compensation to be paid for land acquired, each affected family owning agriculture land in the affected area and whose land has been acquired or lost, or who has, as a consequence of the acquisition or loss of land, been reduced to the status of a marginal farmer or landless, shall be allotted, in the name of each person included in the records or rights with regard to the affected family, a minimum of one acre of land in the command area of the project for which the land is acquired: Provided that in every project those people losing land and belonging to the Scheduled Castes or Scheduled Tribes will be provided land equivalent to land acquired or two and a half-acre, whichever is lower. | |||||
| Recommendation- Not Applicable as it is not an irrigation project. | |||||
| Sr. No. | Name of claimants/ affected family | Village | Survey/ Plot no. | Class of Land | |
| NIL 3. Offer for developed land In case the land is acquired for urbanization purposes, twenty five percent of the developed land will be reserved and offered to land owing project affected families, in proportion to the area of their land acquired and at a price equal to the cost of acquisition and the cost of development. Provided that in case the land owing project affected family wishes to avail this offer, an equivalent amount will be deducted from the land acquisition compensation package payable to it. | |||||
| Recommendation- Not Applicable as land is not being acquired for urbanization purpose. | |||||
| Sr. No. | Name of claimants/ affected family | Village | Survey/ Plot no. | ||
| NIL | |||||
| 4. Choice of annuity or Employment The appropriate government shall ensure that the affected families are provided with following option: - (a) Job may be given to at least one member per affected family in the project or arrange for a job in such other project as may be required and providing suitable training and skill development in the required field or make provision for employment at a rate not lower than the minimum wages provided for in any other law for the time being enforced. or (b) One time grant of 5 lakh rupees per affected family. Or (c) The affected family will be provided with an annuity payment of Rupees 2000 per month per family for twenty years (this will be adjusted for inflation annually). | |||||
| Recommendation- One time grant of Rs. 5 lakhs shall be granted to each affected family amounting to Rs. 0/- affected family. | |||||
| Sr. No. | Name of claimants/ affected family | Village | New Survey/ Plot no. | Class of Land | |
| NIL | |||||
| 5. Subsistence grant for displaced families for a period of one year Each affected family which is displaced from the land acquired shall be given a monthly subsistence allowance equivalent to three thousand rupees per month for a period of one year from the date of award. In addition to this amount, the Scheduled Castes and the Scheduled Tribes displaced from Scheduled Areas shall receive an amount to fifty thousand rupees. In cases of displacement from the Scheduled Areas, as far as possible, the affected families shall be relocated in a similar ecological zone, so as to preserve the economic opportunities, language, culture and community life of the tribal communities. | |||||
| Recommendation- Family is getting displaced. | |||||
| Sr. No. | Name of claimants/ displaced family | Village | Survey/ Plot no. | ||
| NIL 6. Transportation cost for displaced families Each affected family which is displaced shall get one-time financial assistance of fifty thousand rupees as transportation cost for shifting of the family, building materials, belongings and cattle. | |||||
| Recommendation- NIL | |||||
| Sr. No. | Name of claimants/ affected family | Village | Survey/ Plot no. | Class of Land | |
| NIL | |||||
| 7. Cattle shed/ petty shops cost Each affected family having cattle or having a petty shop shall get one-time financial assistance of such amount as the appropriate Government may, by notification, specify subject to a minimum of twenty-five thousand rupees for construction of cattle shed or petty shop as the case may be. | |||||
| Recommendation- Not Applicable. | |||||
| Sr. No. | Name of claimants/ affected family | Village | New Survey/ Plot no. | ||
| NIL | |||||
| 8. One-time grant to artisan, small traders and certain others Each affected family of an artisan, small trader or self-employed person or an affected family which owned non-agricultural land or commercial, industrial or institutional structure in the affected area due to land acquisition, shall get one-time financial assistance of such amount as the appropriate Government may, by notification specify subject to a minimum of twenty-five thousand rupees. | |||||
| Recommendation- Not Applicable as there is no such displacement among affected families. | |||||
| Sr. No. | Name of claimants/ affected family | Village | Survey/ Plot no. | Class of Land | |
| NIL | |||||
| 9. Fishing Rights In cases of Irrigation or hydel projects, the affected families may be allowed fishing rights in the reservoirs, in such manner as may be prescribed by the appropriate government. | |||||
| Recommendation- Not Applicable as it is not an irrigation or hydel project. | |||||
| Sr. No. | Name of claimants/ affected family | Village | Survey/ Plot no. | Class of Land | |
| NIL | |||||
| 10. One-time Resettlement Allowance Each Affected family shall be given one time "Resettlement Allowance" of fifty thousand rupees only. | |||||
| Recommendation- NIL | |||||
| Sr. No. | Name of claimants/ affected family | Village | Survey/ Plot no. | Class of Land | |
| NIL | |||||
| 11. Stamp duty and registration fee (1) The stamp duty and other fees payable for registration of the land or house allotted to the affected families shall be borne by the Requiring Body. (2) The land for house allotted for the affected families shall be free from all encumbrances. (3) The land or house allotted may be in the joint names of wife and husband of the affected families. | |||||
| Recommendation- NIL | |||||
No. LAQ/New Govt. ITI/Khanvel/2023/255 Date: 18/02/2025 Sd/–
(Piyush Kumar)
Administrator for Rehabilitation and Resettlement,
U/s RFCTLARR Act, 2013,
Dadra and Nagar Haveli,
Khanvel.
***
SERIES – II No. 08 THE GAZETTE OF DNH & DD Page 16संघ प्रदे प्रासन / UT Administration of
दादरा और नगर हवेली और दमण एवं दीव /
Dadra & Nagar Haveli and Daman & Diu
समाहताार्ल, पहली मंजजल, जजला सधविार्ल, धसलवासा Collectorate, First Floor, District Secretariat, Silvassa
No. ADM/LAW/139/99/314 Date: 19/02/2025
ORDER U/S 163 OF THE BHARTIYA NAGRIK SAURAKSHA SANHITA, 2023
WHEREAS, the SSC and HSC Board Examination of Gujarat Board to be held from 27/02/2025 to 17/03/2025 as per the Examination Time-Table declared by the Gujarat Board.
AND WHEREAS, in view of the Public Examination a large number of students and other persons will be gathering at the places of examinations and there is likelihood of situation becoming tense which may tend to create law and order problems,
AND WHEREAS, it is considered expedient for public peace and safety to regulate movement in and around educational institutions and carrying of arms ammunition etc. where public examinations are to be held.
NOW, THEREFORE, in exercise of the powers conferred under Section 163 of the Bhartiya Nagrik Suraksha Sanhita, 2023, I, Amit Kumar, Sub-Divisional Magistrate (Silvassa), Dadra and Nagar Haveli, do hereby order as under:
1. Movement of public in general is hereby prohibited in and the around the area of 200 meters of the below mentioned Educational Institutions during the period from 27/02/2025 to 17/03/2025 both days inclusive, during examination hours i.e. 10:00AM to 06:30 PM.
1) Govt. High School, Tokarkhada, Silvassa
2) Govt. Higher Secondary School, English Medium, Silvassa
3) Govt. Higher Secondary School, Gujarati Medium, Silvassa
4) Prathmik Shala. Gujarati and Marathi Shala, Silvassa
5) Govt. Higher Secondary School, English Medium, Zanda Chowk
6) Prathmik Shala, Gujarati Medium, Zanda Chowk
7) Govt. Higher Secondary School, Rakholi
8) Prathmik Shala, Rakholi
9) Govt. Secondary School, Galonda
10) Prathmik Shala, Galonda
11) Govt. Higher Secondary School, Dapada
1. No person shall carry arms, fire arms or ammunitions and other weapons like stick or lathi, cudgels, swords, spears, bludgeons, knives or any other articles which is capable of being used for causing physical violence, in public or otherwise during the said period.
SERIES – II No. 08 THE GAZETTE OF DNH & DD Page 172. No loud speakers are used during the period between 10:00 AM to 6.30 PM from 27/02/2025 to 17/03/2025 both days inclusive, within a radius of 300 meters from the above-mentioned educational institutions.
This order shall come into force with effect from 9:30 AM of 27/02/2025 and shall remain in force till 6.30 p.m. of 17/03/2025.
The directives herein above shall not apply to:
(1) The Officers of the Administration concerned with maintenance of law and order in Dadra and Nagar Haveli Disrtict.
(2) Police personnel employed /deployed for duties.
(3) Any other persons duly authorized in writing by the District Magistrate, for the above- mentioned period.
Given under my hand and seal on this 19th day of February, 2025 with the approval of the Collector / District Magistrate, DNH.
Sd/– (Amit Kumar) Sub-Divisional Magistrate (Silvassa) Dadra & Nagar Haveli