भारत सरकार / Government of India
सरकारी राजपत्र
OFFICIAL GAZETTE
संघ प्रदेश दादरा एवं नगर हवेली तथा दमण एवं दीव प्रशासन U.T. ADMINISTRATION OF DADRA AND NAGAR HAVELI AND
DAMAN AND DIU
श्रेणी - २
SERIES - II
प्राधिकरण द्वारा प्रकाशित / PUBLISHED BY AUHTORITY
Daman 17th October, 2025 25 Asvina, 1947 (Saka) No. : 36
U.T. ADMINISTRATION OF
DADRA AND NAGAR HAVELI AND DAMAN AND DIU
DIRECTORATE OF EDUCATION, SHIKSHA SADAN,
NEAR COLLECTORATE, DAMAN – 396 220.
No. ADE/DP/RR-Pry.Tr./2025-26/3420 Dated: - 09/10/2025.
N O T I F I C A T I O N
In exercise of the powers conferred by the provision to Article 309 of the Constitution, read with the Govt. of India, Ministry of Home Affairs Order No.7/1/65-EST (A) dated 16th February, 1965 and Department of Personnel and Training O.M. No. A-B/14017/13/2016-Estt (RR) Dated 9th August, 2016, and in compliance to the judgement Dated 11th August, 2023 of Hon'ble Supreme Court of India in Civil Appeal No. 5068 of 2023 (Arising out of SLP (Civil) No. 20743 of 2021) and in supersession to all earlier Notification, the Hon'ble Administrator of Dadra & Nagar Haveli and Daman & Diu is pleased to amend the following Recruitment Rules relating to recruitment of General Central Service Group 'B' (Non-Ministerial) posts of Primary/Upper Primary School Teacher, in the Directorate of Education, UT Administration of Dadra & Nagar Haveli and Daman & Diu namely:-
(1) Short title and Commencement:
(i) These rules may be called the Administration of Dadra & Nagar Haveli and Daman & Diu, Primary/Upper Primary School Teacher, Group 'B' (Non-Gazetted, Non- Ministerial) Recruitment Rules 2025.
(ii) These shall apply to the posts specified to the column No. 1 of the schedule to these rules.
(iii) These rules will come into effect from the date of publication of this notification in the Official Gazette and will relate to appointment to the various posts made on or after this date.
SERIES – II No. 36 THE GAZETTE OF DNH & DD Page 2(2) Number of posts, classification and Level in the Pay Matrix:
The number of posts, classification of the said posts and the Level in the Pay Matrix attached there to shall be as specified in columns 2 to 4 of the Schedule annexed to these rules.
Provided that, the Administrator of Dadra & Nagar Haveli and Daman & Diu may vary the number of posts in column 2 of the said Schedule from time to time subject to exigencies of work.
(3) Method of Recruitment, age limit and other qualification, etc.:
The method of recruitment to the said post, age limit, qualification and other matters relating therewith shall be as specified in column 5 to 13 of the aforesaid said Schedule.
(4) Disqualifications:
No person, (a) who has entered into or contracted a marriage with a person having spouse living or; (b) who having spouses living, has entered into or contracted marriage with any person shall be eligible for appointment to the service.
Provided that the Administrator of Dadra & Nagar Haveli and Daman & Diu, may, if satisfied that such marriage is permissible under the personal law applicable to such person and the other party to the marriage and that there are other grounds for so doing exempt any person from the operation of this rule.
(5) Power of relax:
Where the Administrator of Dadra & Nagar Haveli and Daman & Diu is of the opinion that it is necessary or expedient so to do, he may, by order, and for reasons to be recorded in writing, relax any of the provisions of these rules with respect to any class or category of persons.
(6) Saving:
Nothing in these rules shall affect reservations, relaxation of age-limit and other concessions required to be provided for the Schedule Castes and Schedule Tribes and the other special categories of persons in accordance with the orders issued by the Central Government from time to time in this regard.
By Order and in the name of the Administrator of Dadra and Nagar Haveli and Daman and Diu
Sd/– (Jatin Goyal) Director of EducationSERIES – II No. 36 THE GAZETTE OF DNH & DD Page 3
RECRUITMENT RULES FOR THE POST OF PRIMARY/UPPER PRIMARY SCHOOL TEACHER
DIRECTORATE OF EDUCATION UT ADMINISTRATION OF DADRA & NAGAR HAVELI AND DAMAN & DIU
SCHEDULE
| Name of Post | No. of Post | Classification | Level in Pay Matrix | Whether Selection post or non- selection post | Age limit for direct recruits |
| 1 | 2 | 3 | 4 | 5 | 6 |
| Primary/ Upper Primary School Teacher | *1254 (2025) (Subject to variation dependent on work load) | General Central Service Group 'B' Non – Gazetted, Non – Ministerial. | Level – 6 in the Pay Matrix (Rs.35,400/- to Rs.1,12,400/-) | Not applicable | Not exceeding 30 years Upper age limit relaxable as per Orders/Guidelines issued by the Central Government from time to time |
| Educational and other qualifications required for direct recruits | |||||
| 7 | |||||
| 1. For Primary School Teacher (Classes I to V): - a) Senior Secondary (Class XII pass) with at least 50% marks and 2 years Diploma in Elementary Education (by whatever name known) OR Senior Secondary (Class XII pass) with at least 45% marks and 2 years Diploma in Elementary Education (by whatever name known) in accordance with the NCTE (Recognition Norms and Procedure) Regulations 2002. OR Senior Secondary (Class XII pass) with at least 50% marks and 4 years Bachelor of Elementary Education (B.El.Ed.). OR Senior Secondary (Class XII pass) with at least 50% marks and 2 years Diploma in Education (Special Education). OR Graduation and 2 years Diploma in Elementary Education (by whatever name known). b) Should have passed CTET or Teacher Eligibility Test (TET) applicable for the post of Primary School Teacher conducted by the Central Govt. or any State Govt. in India in accordance with the Guidelines framed by the NCTE for the purpose. c) The Candidate should have studied in the concerned medium at Secondary level. | |||||
| 2. For Upper Primary School Teacher (Classes VI to VIII): - a) Graduation and 2 years Diploma in Elementary Education (by whatever name known) OR At least 50% marks either in Graduation or in Post Graduation and B.Ed. OR Graduation with at least 45% marks and Bachelor in Education (B.Ed.) in accordance with the NCTE (Recognition Norms and Procedure) Regulations issued from time to time in this regards. OR Senior Secondary (Class XII pass) with at least 50% marks and 4 years Bachelor in Elementary Education. (B.El.Ed.) OR Senior Secondary (Class XII pass) with at least 50% marks and 4 years B.A.Ed./B.Sc.Ed./B.Com.Ed. OR Graduation with at least 50% marks and B.Ed. (Special Education). b) The candidate should have passed CTET or Teacher Eligibility Test (TET) applicable for the post of Upper Primary School Teacher conducted by the Central Govt. or any State Govt. in India in accordance with the Guidelines framed by the NCTE for the purpose. P rovided that minimum percentage of marks in graduation shall not be applicable to those incumbents who had already taken admission to the Bachelor of Education or Bachelor of Elementary Education or equivalent course prior to the 29th July, 2011. c) The Candidate should have studied in the concerned medium at Secondary level. (Not Applicable for language subjects such as Gujarati, Marathi, Hindi, English, etc.) Note: - 1. For the post of Upper Primary School Teacher (Maths/Science subject), the candidate should have possessed B.Sc. degree. 2. For the post of Upper Primary School Teacher (language), the candidate should have possessed B.A. degree in respective language. 3. For the post of Upper Primary School Teacher (Social Science subject), the candidate should have possessed B.A./B.Com. degree. | |||||
| Whether age and educational qualifications prescribed for the direct recruits will apply in the case of promotees | Period of probation if any | Method of recruitment whether by direct recruitment or by promotion or by deputation/ absorption and percentage of the vacancies to be filled by various methods | In case of recruitment, by promotion/deputation/ absorption grades from which promotion/deputation/ absorption to be made | If a Departmental Promotion Committee exists what is its composition | Circumstances in which Union Public Service Commission (UPSC) to be consulted in making recruitment |
| 8 | 9 | 10 | 11 | 12 | 13 |
| Not applicable | 02 (two) Years | 100% by Direct Recruitment | Not applicable | Not applicable | Not applicable |
***
SERIES – II No. 36 THE GAZETTE OF DNH & DD Page 5संघ प्रदेश दादरा एवं नगर हवेली और दमण एवं दीव प्रशासन/ U.T. ADMINISTRATION OF DADRA & NAGAR HAVELI AND DAMAN & DIU, समाहताा का र्कााार्ल, दीव/OFFICE OF THE COLLECTOR, DIU-362520
FORM-II
[See Section 11(1) and Rule 5(1)]
PRELIMINARY NOTIFICATION
No. 65-02(Part)-LAQ-2024-25/1688 Date:- 09/10/2025
Whereas, it appears to the appropriate Government that a total of 13500 Sq. Mtrs. (standard measurement) the land is required in the Diu City, Diu District for a public purpose, namely, the Acquisition Land for the project of "Development of infrastructure facilities-hospitality, recreation, leisure, exhibition, etc. to the visiting tourists in Diu District". The details of the land/lands for the above-mentioned project in the Diu City of Diu District is enclosed herewith as Annexure – I. The Social Impact Assessment (SIA) was carried out by the SR Asia, 4-CS-25, Ansal Plaza, Vaishali, Sector-1, Ghaziabad-201010, Uttar Pradesh, an Agency appointed by the Deputy Collector, Diu vide Order No.65-02(Part)-LAQ-2024-25/1912 dated 19/03/2025 and a report submitted/ preliminary investigation was conducted by a team constituted by Collector as laid down under rule 4.
The summary of the Social Impact Assessment Report/ preliminary investigation is as follows (copy attached):
The land proposed for the project of acquisition of land for the project of Extension of Airport
at Diu of Diu District is required for regional connectivity, boosts economic growth, and improves
operational efficiency by accommodating large aircraft. It fosters job creation, tourism, and investment,
driving overall regional development. The project aligns with national infrastructure goals and
international standards, ensuring long-term benefits for public welfare and economic progress.
It will also facilitate development of the region as the major tourist spotin West Coast of India
specially to attract tourists from India as well as Foreigners as Diu has beautiful Beaches, Forts and
Churches made with Portuguese art and culture and which will boost Tourism Sector and due tothis
more livelihood options may be created and this will become morebeneficial to manage traffic and
boost economy and income sources of the U.T.
The Dy. Collector, Diu is appointed as Administrator for the purpose of Rehabilitation and Resettlement of the affected families vide Notification dated 04/05/2015 u/s 43 of the Act. Therefore, it is notified that for the above-said project in Diu District, a piece of land measuring 13500 Sq. Mtrs.
of standard measurement, whose detail description is as following, is under acquisition:
SERIES – II No. 36 THE GAZETTE OF DNH & DD Page 6| Sr. No. | Private Property Survey/ PTS Nos. | Type Of land | Area under acquisition (in Sq. mtrs.) | Name and address of person interested | Boundaries | |||
| N. | S. | E. W. | ||||||
| 1. | 144/1 | Agriculture | 13500 | M/S Nagarsheth Estates Pvt. Ltd. | North: Road South: Road East: 144/1(P) West: Road | |||
| Total | 13500 Sq.mt. |
| Trees | |
| Variety | Number |
| Hoka trees | 6 |
| Tad | 5 |
| Other trees | 10 |
| Structures | |
| Type | Nos. |
| Kutcha compound wall | 01 |
This Notification is made under provisions of Section 11 (1) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (30 Of 2013), to all whom it may concern.
A plan of the land may be inspected in the Office of the Collector, Fort Road, Diu, and the Additional Director of Tourism, Diu (Requiring Body) during the working day and working hours.
The Government is pleased to authorize Mamlatdar, Diu and his Talathi to enter upon and survey land, take levels of any land, dig or bore into the sub-soil, and do all other acts required for the proper execution of their work as provided and specified in Section-12 of the said Act.
Under Section- 11 (4) of the Act, no person shall make any transaction or cause any transaction of land i.e. Sale/purchase, etc. or create any encumbrances on such land from the date of publication of such notification without prior approval of the Collector.
Objections to the acquisition, if any, may be filed by the person interested within 60 (Sixty Days) from the date of publication of this notification as provided under Section 15 of the Act before the Collector.
Place: Diu Date: 09/10/2025
Sd/–
(Rahul Dev Boora)
Land Acquisition Collector, Diu
SERIES – II No. 36 THE GAZETTE OF DNH & DD Page 7ANNEXURE – I
No. 65-02(Part)-LAQ-2024-25/1688
Name of Project: - Land Acquisition for the project of "Development of infrastructure facilities- hospitality, recreation, leisure, exhibition, etc. to the visiting tourists in Diu District".
| Sr. No. | Village/ Taluka | Private Property Survey/P TS Nos. | Class of land | Name and address of person interested | Area under acquisition (in Sq. mtrs.) |
| 1. | Diu | 144/1 | Agriculture | M/S Nagarsheth Estates Pvt. Ltd. | 13500 |
| Total | 13500 Sq.mt. |
Sd/–
(Rahul Dev Boora)
Collector, Diu
Place: Diu
Date: 09/10/2025
***
Draft Report of the Administrator for Rehabilitation and Resettlement
Scheme u/s 16 of the Right to Fair Compensation and Transparency in Land
Acquisition of Private Land for the project of Extension of Airport at Diu.
Preface:-
Vide Preliminary Notification No. 65-03-LAQ-2024-25/249 dated 30/04/2025 (Copy attached as Annexure-A), land admeasuring total of 73678.00 Sq. mts. in Diu District was notified u/s 11(1) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, project for namely "Land Acquisition of Private Land for the project of Extension of Airport at Diu of District Diu", for public purpose as defined in Section 2(1) (vi) of the RFCTLARR Act, 2013.
Vide Notification No. 5/2/COL/Land/RFCTLARR/2015-16/2296 dated 04/08/2015, the undersigned has been appointed as the Administrator under sub section (1) of Section 43 of the said act for Rehabilitation and Resettlement of affected families due to acquisition of the said land parcels.
As per section 16 of RFCTLARR Act 2013, Preparation of Rehabilitation and Resettlement Scheme by the Administrator should be done.
Methodology:-
As per Chapter VI, procedure and manner of Rehabilitation and Resettlement Section 43 of RFCTLARR Act, 2013, the undersigned has been appointed as the Administrator to prepare the Rehabilitation and Resettlement scheme.
SERIES – II No. 36 THE GAZETTE OF DNH & DD Page 8Therefore, vide order No. 65-03-LAQ-2024-25/416 dated 29/05/2025, a committee was constituted to obtain a report on Section 16 of the RFCTLARR Act 2013 and Rule 7 of RFCTLARR (Compensation, Rehabilitation and Resettlement and Development Plan) Rules 2015, to conduct a field survey of proposed land. On 02/09/2025, with concerned Talathi of the area, Planning Assistant, Diu, BDO, Diu and Mamlatdar, Diu had visited the sites. The report dated 23/09/2025 have been received from Mamlatdar, Diu.
Details of Public Hearing
Upon issuance of the said Preliminary Notification, 8 objections were received from the owners of the acquired lands. Most of the Objections of all parties are similar in nature so all of them are clubbed under the broad objections & are considered by detail enquiry. A detailed reasoning on all objections is as below:
| Sr. No | Objector | Objection | Remarks |
| 1. | Advt. M. D. Khuti written submission on behalf of 17 objectors and 6 objectors personally attended the meeting. | By the present acquisition, MDR of Nagoa Vanakbara is getting closed & some part of the temple is also getting affected, so it's better to avail the option of sideward parallel transfer of Airstrip, and similar advantages of sideward transfers are also shown. | By the Sideward transfer option, the airstrip will likely turn into a greenfield project for which the necessary approvals/clearances are not in place. The proposal is for a brownfield extension of the airstrip, hence, the sideward parallel transfer Option is not feasible. Regarding the blocking of Nagoa-Vanakbara road, the government. It is already in the process of widening the road in front of hotels in Nagoa to accommodate the traffic load. Moreover, the Option of an underpass is also under Consideration. Also, the main structure of the temple is not at all affected by the acquisition. Also, the cost will be increased in greenfield concrete laying, and huge forest area will be lost. |
| 2. | Heirs/Occupants of 150/0 claim that their entire land shall be taken into acquisition, as there will be no access left. | Only the minimum required land area shall be taken from the survey as necessary for the Airstrip expansion. Easement rights for access shall be granted upon request under relevant laws. | |
| 3. | Some people objected to demarcation to clearly spell out the area & Clear whether their home is getting affected. | The Joint Survey team is directed to show the area to people & upon report, only one house Concrete structure, is getting affected. R & R administrator will follow the necessary process for compensation & rehabilitation. | |
| 4. | Mani Bawa objected to multiple land acquisitions. | Land acquisition is being done as & when required for the project basis & it is ensured that only the minimum area out of private land will be taken for the project. | |
| 5. | Survey No. 154/4 has objected that their land is NA | Upon the joint report, it is found that part 20 sq. mts of NA-granted land is under acquisition and 224 sq. mts. of agricultural land of Survey No. 154/4 is under acquisition. Same to be corrected accordingly. |
Other Measure:-
Based on the survey conducted by the Rehabilitation and Resettlement Committee and report vide No.4-1-LND-III-11/2025-26/922 dated 23/09/2025 received from Mamlatdar, Diu, the Rehabilitation and Resettlement Scheme is worked out, which is detailed below: -
• Criteria given in Section 16 of the RFCTLARR Act, 2013
1. Particulars of lands and immovable properties being acquired of each affected family;
As per the list attached (Annexure-I).
2. Livelihoods lost in respect of land losers and landless whose livelihoods are primarily
depends on the lands being acquired;
Not applicable.
3. A list of public utilities and Government building which are affected or likely to be
affected, where resettlement of affected families is involved;
Not applicable.
4. Detail of the amenities and infrastructural facilities which are affected or likely to be
affected, where resettlement of affected families is involved;
Not applicable.
5. Detail of any common property resources being acquired;
Not applicable.
• Criteria given in rule 7(4) of the RFCTLARR (CRRDP) Rules, 2015
(a) List of the affected families with aadhaar number of its members, if available
As per the list attached (Annexure-I).
(b) List of displaced families with Aadhar number of its members, if available:
| Sr. No. | Private Property Survey Nos. | Location | Owner of the Property | Total area of Property in Hectares | Area of land to be acquired |
| 1. | 146/8 | Dangarwadi | Vira Rama Dhondia | 00.09.25 | 550.00 |
(c) List of infrastructure in the affected area
6 nos. Compound Wall, Parking Tiles Flooring, Underground Sump, Pump room, Well, 1 nos. building.
(d) List of land holding in the affected area
As per the list attached (Annexure-I).
SERIES – II No. 36 THE GAZETTE OF DNH & DD Page 10(e) List of trees, building, other immovable property or assets attached to the land or
building which are to be acquired
Will be reflected in Final Award for Compensation on the basis of report submitted by PWD, Diu, and Agriculture office, Diu and Forest Department, Diu.
(f) List of trades or business in the affected area:
Not Applicable.
(g) List of persons belonging to the Schedule Castes or Schedule Tribes, the handicapped
or physically challenged persons in the affected area:-
Not Applicable
Rehabilitation and Resettlement Plan
As per Chapter VI, procedure and manner of Rehabilitation and Resettlement Section 43 of RFCTLARR Act, 2013, the Rehabilitation and Resettlement scheme (RR Scheme) is drafted in consonance with section 16 and Second Schedule of the RFCTLARR Act, 2013, and Rule 7 of RFCTLARR (Compensation, Rehabilitation and Resettlement and Development Plan) Rules, 2015.
Findings:-
As per section 3(k) of the RFCTLARR Act 2013, "Displaced Family" means any family who on account of the acquisition of land has to be relocated and resettled from the affected area to the resettlement area. In the present case, the land being acquired is agricultural and Residential, for which compensation shall be paid as and when the Collector, Diu, announces the Award. A list of family losing their complete residential due to proposed land acquisition is given at para 5(b) above.
The Rehabilitation and Resettlement scheme is prepared based on the Second Schedule summarised in the format (enclosed).
Dated: 30/09/2025
No. 65-03-LAQ-2024-25/1590
Submitted by
Sd/–
(Shivam Mishra)
Deputy Collector/
Administrator for Rehabilitation
and Resettlement,
U/s 43 of RFCTLARR Act, 2013, Diu.
SERIES – II No. 36 THE GAZETTE OF DNH & DD Page 11Summary for Rehabilitation and Resettlement Scheme (ELEMENTS OF REHABILITATION
AND RESETTLEMENTS ENTITLEMENTS FOR ALL THE AFFECTED FAMILIES)
| 1 | Name of Project: Land Acquisition of Private Land for the project of Extension of Airport at Diu of District Diu. | |||||||
| 2 | Name/ Names of person interested in the land and the nature of respective claim for Rehabilitation and Resettlement: As in SI. No. 4 | |||||||
| 3 | Time limit of provisions of Rehabilitation and Resettlement entitlements given to the affected family: Within 18 months from date of Award u/s 23 of REFCTLARR Act 2013 | |||||||
| 4 | Rehabilitation and Resettlement entitlements | |||||||
| 1. Provision of housing units in case of displacement (1) If a house is lost in rural areas, a constructed house shall be provided as per the Indira Awas Yojana specifications. If a house is lost in urban areas, a constructed house shall be provided, which will be not less than 50 sq. mts. in plinth area. (2) The benefits listed above shall be extended to any affected family which is without homestead land and which has been residing in the area and which has been involuntarily displaced from such area: Provided that any such family in urban areas which opts not to take the house offered, shall get one-time assistance for house construction, which shall not be less than one lakh fifty thousand rupees: Provided further that if any affected family in rural areas so prefers, the entitlement cost of the house may be offered in lieu of the constructed house: Provided also that no family affected by acquisition shall be given more than one house under the provisions of this Act. | ||||||||
| Recommendation- The land to be acquired is in rural area, so each displaced family may be granted cost of house of Rs. 1,50,000/- in lieu of the constructed house or a house under Pradhan Mantri Awas Yojana/Indira Awas Yojana i. e. Suryodaya Awas Yojana. | ||||||||
| Sr. No. | Name of Claimants/ affected family | Village | Survey/ Plot No. | Class of Land | ||||
| 1. | Vira Rama Dhondia | Dangarwadi | 146/8 | Class-II | ||||
| 2. Land for land In case of Irrigation project, as far as possible and in lieu of compensation to be paid for land acquired, each affected family owning agriculture land in the affected area and whose land has been acquired or lost, or who has, as a consequence of the acquisition or loss of land, been reduced to the status of a marginal farmer or landless, shall be allotted, in the name of each person included in the records or rights with regard to the affected family, a minimum of one acre of land in the command area of the project for which the land is acquired: Provided that in every project those people losing land and belonging to the Scheduled Castes or Scheduled Tribes will be provided land equivalent to land acquired or two and a half-acre, whichever is lower. | ||||||||
| Recommendation- Not Applicable, as it is not an irrigation project. | ||||||||
| Sr. No | Name of claimants/ affected family | village | Survey/ Plot no. | Class of Land | ||||
| NIL | ||||||||
| 3. Offer for developed land | ||||||||
| In case the land is acquired for urbanization purposes, twenty five percent of the developed land will be reserved and offered to land owing project affected families, in proportion to the area of their land acquired and at a price equal to the cost of acquisition and the cost of development. Provided that in case the land owing project affected family wishes to avail this offer, an equivalent amount will be deducted from the land acquisition compensation package payable to it. |
| Recommendation- Not Applicable, as land is not being acquired for urbanization purpose. | ||||||
| Sr. No. | Name of Claimants/ affected family | Village | Survey/ Plot No. | Class of Land | ||
| NIL | ||||||
| 4. Choice of annuity or Employment The appropriate government shall ensure that the affected families are provided with following option: - (a) Job may be given to at least one member per affected family in the project or arrange for a job in such other project as may be required and providing suitable training and skill development in the required field or make provision for employment at a rate not lower than the minimum wages provided for in any other law for the time being enforced. Or (b) One time grant of 5 lakh rupees per affected family. Or (c) The affected family will be provided with an annuity payment of Rupees 2000 per month per family for twenty years (this will be adjusted for inflation annually). | ||||||
| Recommendation- One time grant of Rs. 5 lakhs shall be granted to each affected family amounting Rs.5,00,000/- for 1 affected families, details mentioned in para 5(b) | ||||||
| Sr. No. | Name of Claimants/ affected family | Village | Survey/ Plot No. | Class of Land | ||
| 1. | Vira Rama Dhondia | Dangarwadi | 146/8 | Class-II | ||
| 5. Subsistence grant for displaced families for a period of one year. E ach affected family which is displaced from the land acquired shall be given a monthly subsistence allowance equivalent to three thousand rupees per month for a period of one year from the date of award. In addition to this amount, the Scheduled Castes and the Scheduled Tribes displaced from Scheduled Areas shall receive an amount to fifty thousand rupees. In cases of displacement from the Scheduled Areas, as far as possible, the affected families shall be relocated in a similar ecological zone, so as to preserve the economic opportunities, language, culture and community life of the tribal communities. | ||||||
| Recommendation- The territory is not a scheduled area. Therefore, five displaced families may be granted a subsistence allowance of Rs. 36,000/- (Rs. 3,000/- per month) for a period of one year from the date of award, amounting Rs. 36,000/- as mentioned in para 5(b). | ||||||
| Sr. No. | Name of Claimants/ affected family | Village | Survey/ Plot No. | Class of Land | ||
| 1. | Vira Rama Dhondia | Dangarwadi | 146/8 | Class-II | ||
| 6. Transportation cost for displaced families Each affected family which is displaced shall get one-time financial assistance of fifty thousand rupees as transportation cost for shifting of the family, building materials, belon gings and cattle. | ||||||
| Recommendation- Five displaced families should be granted one-time financial assistance of Rs. 50,000/- as transportation cost for shifting of the family building materials belongings amounting Rs. 50,000/- as per para 5(b). | ||||||
| Sr. No. | Name of Claimants/ affected family | Village | Survey/ Plot No. | Class of Land | ||
| 1. | Vira Rama Dhondia | Dangarwadi | 146/8 | Class-II | ||
| Recommendation- Not Applicable, as non of the cattle shed/petty shop is getting affected. | ||||||
| Sr. No. | Name of Claimants/ affected family | Village | Survey/ Plot No. | Class of Land | ||
| NIL | ||||||
| 8. One-time grant to artisan, small traders and certain others Each affected family of an artisan, small trader or self-employed person or an affected family which owned non-agricultural land or commercial, industrial or institutional structure in the allected area due to land acquisition, shall get one-time financial assistance of such amount as the appropriate Government may, by notification specify subject to a minimum of twenty-five thousand rupees. | ||||||
| Recommendation- Not Applicable as there is no such displacement among affected families. | ||||||
| Sr. No. | Name of Claimants/ affected family | Village | Survey/ Plot No. | Class of Land | ||
| NIL | ||||||
| 9. Fishing Rights In cases of Irrigation or hydel projects, the affected families may be allowed fishing rights in there reservoirs, in such manner as may be prescribed by the appropriate government. | ||||||
| Recommendation- Not Applicable as it is not an irrigation or hydel project. | ||||||
| Sr. No. | Name of Claimants/ affected family | Village | Survey/ Plot No. | Class of Land | ||
| NIL | ||||||
| 10. One-time Resettlement Allowance Each Affected family shall be given one time "Resettlement Allowance" of fifty thousand rupees only. | ||||||
| Recommendation- Each Affected family shall be given one time Resettlement Allowance of Rs. 50,000/- amounting to Rs. 50,000/- for 1 affected family, details as mentioned in para 5(b): | ||||||
| Sr. No. | Name of Claimants/ affected family | Village | Survey/ Plot No. | Class of Land | ||
| 1. | Vira Rama Dhondia | Dangarwadi | 146/8 | Class-II | ||
| 11. Stamp duty and registration fee | ||||||
| (1) The stamp duty and other fees payable for registration of the land or house allotted to the affected families shall be borne by the Requiring Body. (2) The land for house allotted for the affected families shall be free from all encumbrances. (3) The land or house allotted may be in the joint names of wife and husband of the affected families. | ||||||
| Recommendation: - If any, to be borne by the Requiring body i. e. Civil Aviation Department, DNH & DD, Daman. | ||||||
| Total- Rs. 6,36,000/- (Six lakh Thirty-six thousand Only.) |
Dated: 30/09/2025 No. 65-03-LAQ-2024-25/1590
Sd/–
(Shivam Mishra)
Deputy Collector/
Administrator for Rehabilitation
and Resettlement,
U/s 43 of RFCTLARR Act, 2013, Diu.
SERIES – II No. 36 THE GAZETTE OF DNH & DD Page 14Annexure-I
List of Affected families
Name of Project :- Land Acquisition of private land for the Project of Extension of Airport at Diu.
| Sr. No. | Sub-Div No./ Chalta No. and survey Nos. | Location | Name of Owner | Total Area (in Sq.mt.) | Area to be acquired |
| 1. | 176/2 | Nagoa | Shri Radhakrishna Temple | 6900 | 117 |
| 2. | 177/1 | Nagoa | Pungibai Natu Rama Natu Bamania Raji Bava Dipesh Bava Bharat Bava | 184 | 184 |
| 3. | 177/2 | Nagoa | Babu Ramji Dhanji Ramji Lalji Ramji Raji Ramji Ramnik Ramji Rasik Ramji Shanti Ramji | 114 | 114 |
| 4. | 177/3 | Nagoa | Prakash Bhika Bamania Shailesh Bhika Bamania | 184 | 184 |
| 5. | 177/4 | Nagoa | Gangabai Shamji Vaishya | 634 | 634 |
| 6. | 177/5 | Nagoa | Babu Ramji Dhanji Ramji Lalji Ramji Raji Ramji Ramnik Ramji Rasik Ramji Shanti Ramji | 284 | 284 |
| 7. | 177/6 | Nagoa | Rama Uka Bamania | 625 | 476 |
| 8. | 177/7 | Nagoa | Bhika Sidi Bamania | 475 | 475 |
| 9. | 177/8 | Nagoa | Pungibai Natu Rama Natu Bamania Raji Bava Dipesh Bava Bharat Bava | 300 | 300 |
| 10. | 177/9 | Nagoa | Ramji Punja Solanki Nanji Punja Solanki | 875 | 556 |
| 11. | 177/10 | Nagoa | Babu Ramji Dhanji Ramji Lalji Ramji Raji Ramji Ramnik Ramji Rasik Ramji Shanti Ramji | 225 | 66 |
| 12. | 177/11 | Nagoa | Bharat Bava Dipesh Bava Bamania Raji Bava Rama Natu Pungibai Natu | 275 | 35 |
| 13. | 177/15 | Nagoa | Prakash Bhika Bamania Shailesh Bhika Bamania Babu Ramji Dhanji Ramji Lalji Ramji Raji Ramji Ramnik Ramji Rasik Ramji Shanti Ramji Pungibai Natu Rama Natu Bamania Raji Bava Dipesh Bava Bharat Bava | 1200 | 1055 |
| 14. | 177/17 | Nagoa | Babu Ramji Dhanji Ramji Lalji Ramji Raji Ramji Ramnik Ramji Rasik Ramji Shanti Ramji | 150 | 101 |
| 15. | 177/18 | Nagoa | Bharat Bava Dipesh Bava Bamania Raji Bava Rama Natu Pungibai Natu | 150 | 150 |
| 16. | 177/19 | Nagoa | Pungibai Natu Rama Natu Bamania Raji Bava Dipesh Bava Bharat Bava | 275 | 69 |
| 17. | 177/20 | Nagoa | Prakash Bhika Bamania Shailesh Bhika Bamania | 200 | 62 |
| 18. | 177/21 | Nagoa | Babu Ramji Dhanji Ramji Lalji Ramji Raji Ramji Ramnik Ramji Rasik Ramji Shanti Ramji | 250 | 43 |
| 19. | 177/22 | Nagoa | Rama Uka Bamania | 125 | 105 |
| 20. | 154/1 | Nagoa | Ramji Punja Solanki Nanji Punja Solanki | 853 | 298 |
| 21. | 154/4 | Nagoa | Raja Punja Charania Dhanjibai Bica Amrutlal Bica Ratan Raja Charaniya | 1756 | 244 |
| 22. | 178/1 | Nagoa | Babu Ramji Dhanji Ramji Lalji Ramji Raji Ramji Ramnik Ramji Rasik Ramji Shanti Ramji | 7400 | 6318 |
| 23. | 178/2 | Nagoa | Prakash Bhika Bamania Shailesh Bhika Bamania | 398 | 398 |
| 24. | 178/3 | Nagoa | Bharat Bava Dipesh Bava Bamania Raji Bava Rama Natu Pungibai Natu | 666 | 666 |
| 25. | 153/1 | Nagoa | Lakhman Hira Bamania | 27 | 27 |
| 26. | 153/2 | Nagoa | Vira Sidi Bamania | 82 | 82 |
| 27. | 153/3 | Nagoa | Bhika Sidi Bamania | 219 | 219 |
| 28. | 153/4 | Nagoa | Vira Nathu Bamania | 179 | 151 |
| 29. | 153/5 | Nagoa | Lakhman Nathu Bamania | 134 | 85 |
| 30. | 153/6 | Nagoa | Vira Nathu Bamania | 206 | 53 |
| 31. | 153/7 | Nagoa | Bhika Dewa Bamania Nathu Rama Bamania Uca Lacmane Velgi Lacmane Jiva Lacmane Jenti Lakhman | 1921 | 276 |
| 32. | 153/8 | Nagoa | Lakhaman Nathu Bamania | 160 | 10 |
| 33. | 150/0 | Sar Kotda | Nalin Manikant Shah Bhavna Nalin Shah Suresh Manikant Shah Neeta Suresh Shah Dhirajben Chandrakant Shah Harkishan Chandrakant Shah Daxaben Harkishan Shah Harshad Chandrakant Shah Gitaben Harshad Shah | 136500 | 52287 |
| 34. | 149/2 | Sar Kotda | ½Mukesh Ramji ½Javarben Ramji Dhanji Ramji Suresh Ramji Shashikant Ramji | 5400 | 5046 |
| 35. | 149/3 | Sar Kotda | Nathu Bhika Bariya | 2675 | 270 |
| 36. | 146/8 | Dangarwadi | Vira Rana Dhondia | 928 | 550 |
| 37. | 147/11 | Dangarwadi | Laxmiben Kana Manvantiben Kana Rakesh Kana | 1275 | 235 |
| 38. | 147/12 | Dangarwadi | Kanji Bhika Bamania | 240 | 167 |
| 39. | 146/24 | Dangarwadi | Shantilal Rana | 425 | 90 |
| 40. | 146/23 | Dangarwadi | Lacmibai Bhika Valji Bhikha Rajendrakumar Bica Kishorkumar Bica Sanjaykumar Bica Dharmendra- kumar Bica | 400 | 25 |
| 41. | 146/25 | Dangarwadi | Manibai Bawa Pemibai Bawa | 3685 | 1171 |
| Total area of land | 73678 sq.mts. |