Daman 06th July, 2026 15 Ashadha, 1948 (Saka) No. : 46
Union Territory Administration of Union Territory of Dadra and
Nagar Haveli and Daman and Diu
Final Closing Balance Sheet of Electricity Department- Dadra
and Nagar Haveli and Electricity Department- Daman and Diu as
on 01/04/2025
EXTRAORDINARY No. 46 THE GAZETTE OF DNH & DD Page 2Notification No.: - DNHDDPCL/01/2022/HR&ADMIN/487 Date :- 02/07/2026
Schedule-A (Part-1)Final Closing Balance Sheet of Electricity Department- Dadra and Nagar Haveli and Electricity
Department- Daman and Diu as on 01/04/2025 In ₹
| Particulars | Note No. | ED - DNH Part | ED - DD Part | Total being transferred to DNHDDPCL | |
| ASSETS | |||||
| 1 | Non-Current Assets | ||||
| (a) | Property, Plant and Equipment (PPE) | 1 | 1,21,85,11,720 | 1,88,18,73,846 | 3,10,03,85,566 |
| (b) | Capital Work-in-Progress | 2 | 10,99,51,536 | - | 10,99,51,536 |
| (c) | Intangible Assets | 3 | - | 2,48,33,279 | 2,48,33,279 |
| Total Non-Current Assets | 1,32,84,63,256 | 1,90,67,07,125 | 3,23,51,70,382 | ||
| 2 | Current Assets | ||||
| (a) | Inventories | 4 | - | 16,96,74,638 | 16,96,74,638 |
| (b) | Financial Assets | ||||
| i) Trade Receivables | 5 | 4,01,60,635 | 4,77,77,949 | 8,79,38,583 | |
| ii) Cash and Cash Equivalents | 6 | 84,24,988 | 39,01,33,290 | 39,85,58,278 | |
| Total Current Assets | 4,85,85,623 | 60,75,85,877 | 65,61,71,500 | ||
| TOTAL ASSETS (1+2) | 1,37,70,48,879 | 2,51,42,93,002 | 3,89,13,41,882 | ||
| EQUITY AND LIABILITIES | |||||
| 1 | Other Equity (Reserve & Surplus) | 1,36,64,08,524 | 2,31,38,53,410 | 3,68,02,61,934 | |
| Total Equity | 1,36,64,08,524 | 2,31,38,53,410 | 3,68,02,61,934 | ||
| Liabilities | |||||
| 2 | Non-Current Liabilities | ||||
| (a) | Financial Liabilities | ||||
| i) Others Financial Liabilities | 7 | - | 6,52,79,089 | 6,52,79,089 | |
| - | 6,52,79,089 | 6,52,79,089 | |||
| 3 | Current liabilities | ||||
| (a) | Financial Liabilities | ||||
| i) Trade and Other Payables | 8 | ||||
| Total Amount due of Micro & Small Enterprises | 1,98,723 | - | 1,98,723 | ||
| Total Amount due other than Micro & Small Enterprises | 1,04,41,633 | 13,36,47,081 | 14,40,88,714 | ||
| (b) | Other Current Liability | 9 | - | 15,13,422 | 15,13,422 |
| Total Current Liabilities | 1,06,40,356 | 13,51,60,503 | 14,58,00,859 | ||
| TOTAL EQUITY AND TOTAL LIABILITIES (1+2+3) | 1,37,70,48,879 | 2,51,42,93,002 | 3,89,13,41,882 |
Final closing balance sheet of the departments are prepared based on audited accounts of the ED-DNH (Electricity Department, Dadra and Nagar Haveli) and ED-DD (Electricity Department, Daman and Diu) for F.Y. 2024-25 (i.e. period ending 31/03/2025).
EXTRAORDINARY No. 46 THE GAZETTE OF DNH & DD Page 3 Schedule-A (Part-2)Supporting Notes to Accounts to Final Closing Balance Sheet as on 01-04-2025
Further, Final closing balance sheet of the Departments are finalised to reflect movement up to the Transfer Date (i.e. movements from 01-04-2023 to 31-03-2025) based on audited figures as on 31-03-2025. The note wise submissions as on April 01, 2025 are as mentioned below: -
1. A- DNH Part- Property, Plant and Equipment (PPE)
| S. No. | Particulars | GROSS BLOCK | DEPRECIATION | NET BLOCK | NET BLOCK | ||||||
| Opening Bal | Additions | Ad jus tm ent | Closing Bal | Opening Bal | Additions | Adju stme nt | Closing Bal | Closing | Opening | ||
| 1 | LAND | 52100001 | 5 | 0 | 52100006 | 0 | 0 | 0 | 0 | 52100006 | 52100001 |
| 2 | BUILDINGS | 39651786 | 0 | 0 | 39651786 | 15399935 | 1324370 | 0 | 16724305 | 22927481 | 24251851 |
| 3 | FURNITURE | 2893175 | 0 | 0 | 2893175 | 2138635 | 183138 | 0 | 2321773 | 571402 | 754540 |
| 4 | IT EQUIPMENT | 772035 | 0 | 0 | 772035 | 662211 | 40942 | 0 | 703153 | 68882 | 109824 |
| 5 | OFFICE EQUIPMENT | 1624577 | 0 | 0 | 1624577 | 465655 | 102836 | 0 | 568491 | 1056086 | 1158922 |
| 6 | TRANSFORMERS | 1098275231 | 1773540 | 0 | 1100048771 | 441722940 | 56611572 | 0 | 498334512 | 601714259 | 656552291 |
| 7 | LINES & NETWORKS | 1744050059 | 0 | 0 | 1744050059 | 1162740125 | 68919843 | 0 | 1231659968 | 512390091 | 581309934 |
| 8 | OTHER EQUIPMENT | 79612800 | 7652547 | 0 | 87265347 | 56929646 | 2652187 | 0 | 59581833 | 27683514 | 22683154 |
| Total | 3018979664 | 9426092 | 0 | 3028405756 | 1680059149 | 129834887 | 0 | 1809894035 | 1218511720 | 1338920515 |
B- DD Part- Property, Plant and Equipment (PPE)
| GROSS BLOCK | DEPRECIATION | NET BLOCK | NET BLOCK | ||||||||
| S. No. | Particulars | Opening Bal | Additions | Ad jus tm ent | Closing Bal | Opening Bal | Additions | Adju stme nt | Closing Bal | Closing | Opening |
| 1 | LAND | 248380468 | 0 | 0 | 248380468 | 0 | 0 | 0 | 0 | 248380468 | 248380468 |
| 2 | BUILDINGS | 241030596 | 0 | 0 | 241030596 | 84590681 | 8050422 | 0 | 92641103 | 148389493 | 156439915 |
| 3 | FURNITURE | 29011540 | 209470 | 0 | 29221010 | 14569332 | 1742419 | 0 | 16311751 | 12909259 | 14442208 |
| 4 | IT EQUIPMENT | 28553203 | 0 | 0 | 28553203 | 24368596 | 1318841 | 0 | 25687437 | 2865766 | 4184607 |
| 5 | OFFICE EQUIPMENT 47271319 | 325018 | 0 | 47596337 | 25157730 | 2126226 | 0 | 27283956 | 20312381 | 22113589 | |
| 6 | TRANSFORMERS | 1472345404 | 60125592 | 0 | 1532470996 | 861508158 | 57916283 | 0 | 919424440 | 613046556 | 610837246 |
| 7 | LINES & NETWORKS | 1286950363 | 0 | 0 | 1286950363 | 1130024250 | 17174369 | 0 | 1147198620 | 139751743 | 156926113 |
| 8 | OTHER EQUIPMENT 66823094 | 34168872 | 0 | 100991966 | 22971897 | 3528259 | 0 | 26500156 | 74491810 | 43851197 | |
| 9 | SOLAR PROJECTS | 1007646449 | 48530748 | 0 | 1056177197 | 375753465 | 58745796 | 0 | 434499261 | 621677936 | 631892984 |
| 10 | Vehicles | 6701926 | 0 | 0 | 6701926 | 6561464 | 92029 | 0 | 6653493 | 48433 | 140460 |
| Total | 4434714362 | 143359700 | 0 | 4578074062 | 2545505572 | 150694644 | 0 | 2696200216 | 1881873846 | 1889208788 |
2. A- DNH Part- Capital Work in Progress:
| Sr. No. | Description | GROSS BLOCK | |||
| Op. Bal. | Additions | Adjustment | Cl. Bal. | ||
| 1 | Building | - | - | - | - |
| 2 | Plant & Equipment | - | 10,99,51,536 | - | 10,99,51,536 |
| 3 | Software | - | - | - | - |
| Total | 10,99,51,536 |
B- DD Part- Capital Work in Progress:
| Sr. No. | Description | GROSS BLOCK | |||
| Op. Bal. | Additions | Adjustment | Cl. Bal. | ||
| 1 | Building | - | - | - | - |
| 2 | Plant & Equipment | - | - | - | - |
| 3 | Software | - | - | - | - |
3. A- DNH Part- Intangible Assets:
| Sr. No. | Description | GROSS BLOCK | DEPRECIATION | NET BLOCK | |||||||
| Op. Bal. | Additions | Adjustment | Cl. Bal. | Op. Bal. | Additions | Adjustment | Cl. Bal. | Closing Bal. | Opening Bal. | ||
| 1 | Software | - | - | - | - | - | - | - | - | - | - |
| 2 | Other Intangible | - | - | - | - | - | - | - | - | - | - |
B- DD Part- Intangible Assets:
| In ₹ | |||||||||||
| Sr. No . | Description | GROSS BLOCK | DEPRECIATION | NET BLOCK | |||||||
| Op. Bal. | Additio ns | Adjus tment | Cl. Bal. | Op. Bal. | Additions | Adjus tment | Cl. Bal. | Closing Bal. | Opening Bal. | ||
| 1 | Software | 13,87,29,944 4,91,400 | - | 13,92,21,344 10,26,37,122 1,17,50,942 | - | 11,43,88,065 | 2,48,33,279 | 3,60,92,822 | |||
| 2 | Other Intangible | - | - | - | - | - | - | - | - | - | - |
| Total | 2,48,33,279 3,60,92,822 |
A- DNH Part- Inventories:
| Particulars | Total Qty. | Amount |
| Inventory at DNH | 200 | - |
| (Nos. of Item- 21) |
B- DD Part- Inventories:
(In ₹)
| Particulars | Total Qty. | Amount |
| Inventory at DD (Nos. of Item- 474) | 111747 | 16,96,74,638 |
| Total | 16,96,74,638 |
4. A- DNH Part- Trade Receivables:
| Sr. No. | Debtor Name | Amount |
| 1 | DNHDDPDCL | 3,94,41,458 |
| 2 | Power Grid Corporation of India Limited | 2,36,138 |
| 3 | Reliance Industries Limited | 4,83,039 |
| Total | 4,01,60,635 |
B- DD Part- Trade Receivables:
| Sr. No. | Debtor Name | Amount |
| 1 | Past Arrear | 10,86,98,879 |
| 2 | Permanent Disconnected | 48,24,86,281 |
| 3 | DNHDDPDCL | 4,52,15,412 |
| 4 | OIDC | 13,56,064 |
| 5 | Well-known Polyester Ltd. | 12,06,473 |
| 6 | DNHDDPDCL- Solar Old Dues | 19,15,501 |
| Sub-Total | 64,08,78,610 | |
| Less- Reserves for Doubtful debts | 59,31,00,661 | |
| Total | 4,77,77,949 |
5. A- DNH Part- Cash & Cash Equivalents:
| Particulars | Amount |
| Balances with Bank | 84,24,988 |
| Total | 84,24,988 |
B- DD Part- Cash & Cash Equivalents:
| Particulars | Amount |
| Balances with Bank | 39,01,33,290 |
| Total | 39,01,33,290 |
6. A- DNH Part- Other Financial Liabilities (Security Deposit Consumers and Others):
(In ₹)
| Sr. No. | Particulars | Amount |
| 1 | Consumers | - |
| 2 | Others | - |
B- DD Part- Other Financial Liabilities (Security Deposit Consumers and Others):
(In ₹)
| Sr. No. | Particulars | Amount |
| 1 | Consumers | 6,52,79,089 |
| 2 | Others | - |
| Total | 6,52,79,089 |
* Total security deposit consumers ₹6,52,79,089/- out of this ₹3,97,02,164/- is related to un-identified security deposit of consumers. The liability towards security deposit- consumers will be payable on due verification of records at the time of payment to consumers by the Corporation through Electricity Department.
EXTRAORDINARY No. 46 THE GAZETTE OF DNH & DD Page 67. A- DNH Part- Trade Payables:
| Particulars | Amount |
| i) Amount due to Micro & Small Enterprise | 1,98,723 |
| ii) Payable to Others Other Payables iii) Accrued Expenses iv) Accrued Payroll | 56,76,869 46,60,013 1,04,751 |
| Total Amount due other than Micro & Small Enterprises | 1,04,41,633 |
| Total (i + ii + iii + iv) | 1,06,40,356 |
B- DD Part- Trade Payables:
| Particulars | Amount |
| i) Amount due to Micro & Small Enterprise | - |
| ii) Payable to Others Other Payables iii) Accrued Expenses iv) Accrued Payroll | 6,92,92,283 6,41,54,466 2,00,332 |
| Total Amount due other than Micro & Small Enterprises | 13,36,47,081 |
| Total (i + ii + iii + iv) | 13,36,47,081 |
8. A- DNH Part- Other Current Liability:
| Sr. No. | Particulars | Amount |
| 1 | TDS Payable | - |
| 2 | GST TDS Payable | - |
B- DD Part- Other Current Liability:
| Sr. No. | Particulars | Amount |
| 1 | TDS Payable | 5,71,147 |
| 2 | GST TDS Payable | 9,42,275 |
| Total | 15,13,422 |
B (i)- Other Current Liabilities which could not be specifically identified and appropriately allocated at the time of preparation of the merged financial statements have not been considered in the transfer final closing balance sheet. Such liabilities have been carried forward to the Transferor entity for appropriate identification and accounting in due course.
9. DNH Part- Contingent Liability: NIL
EXTRAORDINARY No. 46 THE GAZETTE OF DNH & DD Page 710. DD Part- Contingent Liability (Read with clause of 3.4 (d) of Policy Directions of notification no. DNHDDPCL/01/2022/HR&ADMIN/136 dated 28/03/2025):
| Sr. No. | Case Matter | Financial Implication | Facts of Case |
| 1 | 6 MW Solar PV Project at Fudam Diu Petitioner- Ujaas Energy Ltd. | Principal - ₹ 189.16 Lacs Interest- ₹ 94.98 Lacs Total- ₹ 284.14 Lacs (Approx.) | ED-DD has awarded turnkey project to Ujaas Energy Limited, Indore for setting up 6MW grid connected solar PV project at Fudam, Diu at total cost of ₹35.92 crore excluding O&M charges for 5 years. ED-DD has released against the total project cost of ₹34.02 crore and pending amount kept on hold due to pending capital work. The UEL has filed an appeal at MSME Facilitation Centre, Bhopal for payment of outstanding amount along with applicable interest. MSME Facilitation Centre has rejected the application of UEL due to lack of papers and pass the order in favour of ED-DD dated 27/01/2021. In furtherance, UEL has again filed an appeal to MSME facilitation Centre and ED-DD has given a reply to same on dated 30/06/2023 & 15/02/2024. |
| 2 | Capacity Charges, RGGPL | ₹ 7,249.41 Lacs | Claim made by M/s Ratnagiri Gas & Power Private Limited (RGPPL). The RGPPL had stopped the generation and supply of power since October-2013 on account of minimum technical requirement load as the principal beneficiary (95% beneficiary of installed capacity) of the said power plant i.e. Maharashtra was not scheduling the power. Accordingly, the non-supply of the power as per the terms of Purchase Power Agreement (PPA) is solely on account of reason attributable to RGPPL, hence, the ED-DD is not liable to make any payment to RGPPL. RGPPL has also not initiated / taken any litigation in the said matter before any authority as per the agreed terms of the PPA. |
| 3- Settled | 3 MW Solar PV Project at Fudam, Diu Petition- BHEL, Bangalore. | --- | ED-DD has awarded contract to M/s BHEL for EPC and O&M of 3 MW at Fudam, Diu. The plant got damaged due to cyclone in the month of May, 2021. ED-DD has requested to carryout damage assessment survey and restoration of plant. However, BHEL has not carried out any survey nor restoration work. BHEL unilaterally closed the contract without fulfilment of closing of contract obligations as per the agreement. Accordingly, ED-DD revoked performance guarantee to partially fulfil the losses incurred due to the above damages and Net Minimum Guaranteed Generation short fall. In against of this, BHEL has filed an appeal on 13/12/2021 at Addl. City Civil and Sessions Judge Court, Bengaluru and case was dismissed on 14/02/2024 in favour of ED-DD. Therefore, the said case is not considered in the Contingent Liability. If the BHEL will take legal action in future in any way related to this matter then the same will be considered as part of Contingent Liability. |
For, Somani Shah & Associates Chartered Accountants FRN. 136844W
Sd/– (ALPESH SHAH) Partner M.N. 156053 Place: Daman Date: 28th April, 2026 UDIN: 26156053TGUIZA1790
By order and in the name of the Administration of the Union Territory of Dadra and Nagar Haveli and Daman and Diu EXTRAORDINARY No. 46 THE GAZETTE OF DNH & DD Page 8 Schedule-B
1. Consideration Adjustment
The consideration for the Net Asset Value (NAV) of the Electricity Department of Dadra and Nagar Haveli (ED- DNH) and the Electricity Department of Daman and Diu (ED-DD) shall be discharged through the issuance of Equity Shares by the DNH and DD Power Corporation Limited (the Corporation) to the Government of India (represented by the President of India).
2. Valuation and Pricing
The number of Equity Shares to be issued shall be determined based on a Valuation Report as of March 31, 2025, prepared by an IBBI Registered Valuer.
• Share Price: Shares shall be issued at Fair Market Value (FMV).
• Structure: Each share will have a Face Value of ₹100 and the excess of the FMV over the Face Value shall be credited to the Securities Premium Account.
3. Net Asset Value (NAV) Calculation
The NAV, as per Schedule-A (Part-1), is summarized below:
| Particulars | ED-DNH | ED-DD | Total |
| Total Assets (A) | 1,37,70,48,879 | 2,51,42,93,002 | 3,89,13,41,882 |
| Total Non-Current Liabilities (B) | - | 6,52,79,089 | 6,52,79,089 |
| Total Current Liabilities (C) | 1,06,40,356 | 13,51,60,503 | 14,58,00,859 |
| Net Assets Value (A - B - C) | 1,36,64,08,524 | 2,31,38,53,410 | 3,68,02,61,934 |
Total Net Asset Value: ₹3,68,02,61,934 (₹Three Hundred Sixty-Eight Crores Two Lakh Sixty-One Thousand and Nine Hundred Thirty-Four only).
4. Share Issuance Mechanics
Authorized Share Capital:
The Corporation shall ensure it has sufficient Authorized Share Capital registered with the Registrar of Companies (ROC) to facilitate this issuance. If the current authorized limit is insufficient, the Corporation shall take necessary steps to increase it prior to the allotment.
Issuance Formula: The exact number of shares to be allotted shall be calculated using the following formula:
Total Net Assets Value (NAV)
Fair Market Value per Equity Share (as per Valuation Report as on 31st March, 2025)EXTRAORDINARY No. 46 THE GAZETTE OF DNH & DD Page 9
5. Treatment of Fractional Shares:
Any fractional shares resulting from the above calculation shall be rounded down to the nearest whole number.
The residual value representing the fraction shall be adjusted against Cash.
For, Somani Shah & Associates Chartered Accountants FRN. 136844W
Sd/– (ALPESH SHAH) Partner M.N. 156053 Place: Daman Date: 28th April, 2026 UDIN: 26156053TGUIZA1790
By order and in the name of the Administration of the Union Territory of Dadra and Nagar Haveli and Daman and Diu
SD/- Executive Engineer Electricity Department Dadra and Nagar Haveli
SD/- Executive Engineer Electricity Department Daman and DiuEXTRAORDINARY No. 46 THE GAZETTE OF DNH & DD Page 10 Schedule-C
Residual Balance Sheet of Electricity Department Dadra and Nagar Haveli and Electricity Department
Daman and Diu as on 01/04/2025
| Particulars | ED - DNH Part | ED - DD Part | Total | |
| 1 (a) (b) | ASSETS Non-Current Assets Property, Plant and Equipment (PPE) Intangible Assets | - - | - - | - - |
| 2 (a) (b) (c) | Total Non-Current Assets Current Assets Inventories Financial Assets i) Trade Receivables ii) Cash and Cash Equivalents Other Current Assets i) Contra Balances for Excluded Labilities | - - - - 1,10,45,993 | - - - 6,26,31,987 6,28,35,340 | - - - 6,26,31,987 7,38,81,333 |
| Total Current Assets | 1,10,45,993 | 12,54,67,327 | 13,65,13,320 | |
| TOTAL ASSETS (1+2) | 1,10,45,993 | 12,54,67,327 | 13,65,13,320 | |
| 3 | EQUITY AND LIABILITIES Other Equity | - | - | - |
| 4 (a) | Total Equity Liabilities Non-Current Liabilities Financial Liabilities | - - | - - | - - |
| 5 (a) | Total Non-Current Liabilities Current liabilities Financial Liabilities i) Trade and Other Payables | - 1,10,45,993 | - 12,54,67,327 | - 13,65,13,320 |
| (b) | Other Current Liability | - | - | - |
| Total Current Liabilities | 1,10,45,993 | 12,54,67,327 | 13,65,13,320 | |
| TOTAL LIABILITIES (3+4+5) | 1,10,45,993 | 12,54,67,327 | 13,65,13,320 |
For, Somani Shah & Associates Chartered Accountants FRN. 136844W
Sd/– (ALPESH SHAH) Partner M.N. 156053 Place: Daman Date: 28th April, 2026 UDIN: 26156053TGUIZA1790
By order and in the name of the Administration of the Union Territory of Dadra and Nagar Haveli and Daman and Diu