The Haryana Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2014 (2nd Amendment) Regulations, 2019.

Published 08 January 2020

Department
Haryana Electricity Regulatory Commission
Type
Ordinary
Gazette no.
2-2020
Notification no.
Regulation No. HERC/29/2014/2nd Amendment/2019
Identifier
in.gazette.haryana.2020-01-08.Ordinary_Regulation-No-HERC-29-2014-2nd-Amendment-2019
Languages
English, Hindi
Published at
Original source ↗

click here for IIIF manifest

Haryana Government Gazette

Published by Authority

© Govt. of Haryana

No. 2-2020] CHANDIGARH, TUESDAY, JANUARY 14, 2020 (PAUSA 24, 1941 SAKA) 

PART III

Notifications by High Court, Advertisement, Notices and Change of Name etc.

HARYANA ELECTRICITY REGULATROY COMMISSION

BAYS NO. 33-36, SECTOR-4, PANCHKULA-134113, HARYANA

Haryana Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2014, (2nd Amendment) Regulations, 2019

Notification

The 8th January, 2020

Regulation No. HERC/29/2014/2nd Amendment/2019.— The Haryana Electricity Regulatory Commission, in exercise of the powers conferred on it by Section 50 of Sub-section (2) of Section 181 of the Electricity Act 2003 (Act 36 of 2003) and all other powers enabling it in this behalf and after previous publication, makes the following regulations to amend the Haryana Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2014 including 1st Amendment dated 17th November, 2014 (hereinafter referred to as 'the Principal Regulations').

1. Short title, Commencement, and Interpretation

1.1 These Regulations shall be called the Haryana Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2014 (2nd Amendment) Regulations, 2019.

1.2 These Regulations shall come into force .with effect from the date of their publication in the Haryana Government Gazette.

1.3 These Regulations shall extend to the whole of the State of Haryana.

2. Amendment to the Regulation 2.3

2.1 Existing Regulation 2.3(20) shall be substituted with the following: -

(20) "consumer premises" means land, building or structure or part or combination, thereof in

respect of which a separate meter or metering arrangements have been made by the licensee for

supply of electricity and does not include the outside face of the boundary wall of the

consumer premises;

2.2 Insertion of a new Proviso in Regulation 2.3(43): A new Proviso in the Regulation 2.3 (43) shall be added as under: -

Provided that "smart meter" means an alternating current static watt hour meter with time of

use registers, internal connect and disconnect switches with two way communication capability;

(54)PART III] HARYANA GOVT. GAZ., JAN. 14, 2020 (PAUS. 24, 1941 SAKA) 55

3. Amendment to the Regulation 3.2.2

Existing Regulation 3.2.2 shall be substituted with the following:–

3.2.2 In case where supply, depending upon the technical conditions of the transmission/ distribution system

and / or the requirement of the consumer, has to be given at a voltage other than specified in

Regulation 3.2.1/ approved plan, the licensee may accept the request of the applicant with the approval

of the Commission.

Further, in case 33KV voltage level is not available in the area of supply than load above 5 MV A upto

8 MV A may be served through 11 KV feeder with appropriate type/ size of conductor. Provided, the

difference of cost of 33 KV substation at the consumer end along with its connectivity from

the distribution/ transmission licensee's substation including the bay and the actual cost of connection

of 11 KV is borne by the consumer. Provided further that, in case intermediate voltage level between

33 KV and 220 KV is not available in the area of supply of the licensee, the load upto 37.5 MVA may be

served through 33 KV feeder with appropriate type size of conductor provided the difference of

cost of substation as per Regulation 3.2.1 at the consumer end along with its connectivity from the

distribution / transmission licensee's substation including the bay and the actual cost of connection on

33KV is borne by the consumer.

4. Amendment to the Regulation 4.4

4. 1 Insertion of a new Proviso in Regulation 4.4.1 (8) (b) (i):

A new Proviso in' the Regulation 4.4.1(8) (b) (i) shall be added as under:

Provided that in case of change of ownership due to execution of sale deed/ re-al1otment letter and /or

executing fresh lease, deed or rent deed, copy of such amended document shall be submitted to the

Licensee within one month of such modification.

4.2 Existing Regulation 4.4.3 (2) (a) shall be substituted with the following:

4.4.3 Issue of demand notice

…

(2) The demand notice shall include the following details:

(a) Details of the works (including service line) from the nearest point of the Licensees' distribution

system (appropriate feeder/Substation in case of supply is to be provided through Independent

feeder) to be undertaken for providing electric supply.

4.3 Note given under Regulation 4.4.3 (2)(c) shall be substituted with the following:

Note:- In case of LT connections (other than domestic supply connections), where the transformer has

been installed by the consumer and is exclusively for his supply, the transformer if and when

required to be replaced/ repaired for any reason including theft, shall be so replaced/repaired

by sharing 20% of the cost by the consumer and 80% by the licensee except when the damage

is due to natural events including cyclone, floods, storms or other occurrences beyond

consumer's control, in which case the licensee shall bear the entire cost of repair/

replacement.

Provided that if the applicant chooses to get the work done at his cost, the licensee shall

charge only supervision charges at the rate of 1.5% of the estimated cost of such works as are

to be finally handed over to the distribution/ transmission licensee or as approved by the

Commission.

Provided further that if the applicant chooses to get the work done on his own, he shall get the

work done within the timeframe specified under Regulations 4.4.6 and 4.4.7, subject to proviso

under Regulations 4.4.4 (5) and 4.4.7, failing which the licensee may, on giving 15 days'

notice, treat the application for supply as cancelled.

5. Amendment to the Regulation 4.7

Insertion of a new clause under Regulation 4.7.3(3):

After Regulation 4.7.3(3), a new Regulation 4.7.3(4) shall be added as under:–

4.7.3

…

(4) In case, legal heir fails to process his/ her application for change of name with the distribution licensee

within a period of one year or six months from the notification of these Regulations, penalty amounting to

Rs. 100/- per month subject to maximum of Rs. 1,000/ - thereafter may be imposed for such default.

HARYANA GOVT. GAZ., JAN. 14, 2020 (PAUS. 24, 1941 SAKA) [PART III 56

6. Amendment to the Regulation 4.15

Existing Regulation 4.15.3 (4) and 4.15.3 (5) shall be substituted with the following:–

4.15.3

…

(4) The equipment including meter, meter board, service main, miniature circuit breaker (MCB)/ circuit

breaker (CB), load limiters must on no account be handled or removed by any person who is not an authorized

employee/ representative of the licensee. Seals which are fixed on the meters/ metering equipment, load

limiters and the licensee's apparatus, must on no account be tampered with, damaged or broken. It is the

consumer's responsibility to keep in safe custody the licensee's equipment and seals on the meters/ metering

equipment within the consumer's premises.

(5) In the event of any damage caused to the licensee's equipment, other than meter, within the consumer's

premises by reason of any act, neglect or default of the consumer or his employees, the cost thereof, as

claimed by the licensee, shall be payable by the consumer. If the consumer fails to do so after demand, it shall

be treated as a contravention of the terms and conditions of supply agreement and the electricity supply is

liable to be disconnected.

7. Amendment to the Regulation 5.1

Insertion of a new clause under Regulation 5.1.4:

After Regulation 5.1.4(4), a new Regulation 5.1.4(5) shall be added as under:–

(5) The distribution licensee, with the approval of the Commission, shall arrange to install smart

meters, in its area, in a phased manner within the time lines specified in the National Tariff

Policy, 2016.

8. Amendment to the Regulation 5.2

8.1 Existing Regulation 5.2.2 shall be substituted with the following:–

5.2.2 If the meter is supplied by the Licensee, the Licensee shall be entitled to charge an amount equal

to the cost of meter, as per cost data book of previous financial year, which shall be recovered

as part of the demand notice.

In case the meter is not available with the Licensee, the consumer may provide the same to the

Licensee along-with meter testing fee.

In both the cases, cost of meter shall be borne by the consumer and no Meter Security and Meter

Rental shall be payable.

8.2 Existing Regulation 5.2.3 shall be substituted with the following:–

5.2.3 The consumer meter shall be installed by the licensee either at consumer premises or outside the

premises:

Provided that where the licensee installs the consumer meter outside the consumer premises,

then the licensee on a request from consumer shall provide at the cost of the consumer a real

time display unit in the premises of the consumer to indicate the electricity consumption for his

information.

9. Amendment to the Regulation 5.3

Existing Regulation 5.3.1 (2) shall be substituted with the following:–

(2) The consumer shall be deemed to be responsible along with the licensee for proper functioning

and upkeep of the meter. In case the meter is installed inside the consumer premises and the

same is found physically damaged by human intervention, the consumer shall bear the cost of its

replacement. However, if the meter is placed outside the consumer's premises, then the cost of

replacement shall be borne by the licensee and the consumer in the ratio 80:20.

I0. Amendment to the Regulation 5.7

Existing Regulation 5.7 shall be substituted with the following:–

5.7 Cost of Replacement of Defective/Burnt/Lost Meters

5.7.1 The defective/ burnt meter will be inspected and tested by the licensee.

5.7.2 If, as a result of testing it is established that the meter, installed inside or outside of the consumer

premises became defective/ burnt due to technical reasons including voltage fluctuation, transients,

attributable to the licensee or due to natural events including heavy rain, cyclone, floods, storms,

PART III] HARYANA GOVT. GAZ., JAN. 14, 2020 (PAUS. 24, 1941 SAKA) 57

earthquakes, the cost of the meter shall be borne by the licensee i.e the meter shall be replaced by the

licensee free of cost.

5.7.3 If, as a result of testing, it is established that the meter, installed inside or outside the consumer

premises, was rendered defective/ burnt due to reasons attributable to the consumer including defect in

consumer installation, connection of unauthorized load by the cons1,.lmer, the cost of the meter shall

be borne by the consumer as specified below: -

(a) If the meter was owned by the consumer, the licensee shall inform the consumer to provide a

new meter and associated equipment for testing within 7 days, after which the licensee shall

install new meter at its own cost and shall charge the cost of meter through the bill, as per cost

data book.

(b) If the meter was owned by the licensee, the licensee shall install a new meter at its own cost and

shall recover the replacement cost of the defective meter from the consumer:

Provided that if, as a result of testing, it is established that the meter was rendered defective/

burnt due to tampering or any other deliberate act by the consumer to interfere with the meter,

action as permissible under law shall also be taken against the consumer for pilferage and

tampering.

(c) If, as a result of investigation by Police or duty magistrate, it is established that the meter,

which is installed either inside or outside the consumer premises, was rendered defective/burnt

due to reasons attributable to the public outrage, sabotage or any other similar reasons, the

cost of the meter shall be borne by the licensee.

Provided that if as a result of investigation by police or otherwise it is established that the

meter was rendered defective/ burnt due to activities instigated by a particular consumer/ third

party deliberate act to interfere with the meter, action as permissible under law shall also be

taken against the consumer/third party for pilferage, tampending and theft of meter, as the

case may be.

5.7.4 If a consumer disputes the results of testing, the meter shall be tested at a third-party facility selected

by the consumer from the list of third-party testing facility approved by the licensee/ Commission.

Provided that in case of testing on the consumer's request, the consumer shall have to pay the

prescribed testing fee

Provided further that if the meter is found to be defective/ burnt due to technical reasons attributable to

the licensee including voltage fluctuation, transients, the licensee shall refund the testing fee to the

consumer by adjustment in the subsequent bill

5.7.5 In case of theft of meter, if it was installed inside the consumer premises, the cost of new meter and

other apparatus shall be borne by the consumer. If, however, the meter was installed outside the

premises the entire cost of replacement shall be borne by the licensee.

11. Amendment to the Regulation 6.1

11.1 Existing Regulation 6.1.1 shall be substituted with the following:–

6.1.1 The periodicity of the meter reading/ billing for various categories of consumers shall be as

Consumer Category Periodicity of meter Reading/billing
Non-Domestic upto 20 kW/Domestic/Bulk Domestic Supply Bimonthly
Agriculture-whether metered or at flat rate Four Months
All other categories Monthly

Provided that periodicity of meter reading/ billing in case of pilot project may be changed in

respect of specific area of licensee with the prior approval of the Commission.

11.2 Insertion of a new clause under Regulation 6.1.4:

After Regulation 6.1.4, a new Regulation 6.1.5 shall be added as under:–

6.1.5 In case consumer opts for e-bill service i.e. sending of bills through email only by forgoing the

option of paper bill, A rebate of Rs. 5 per electricity bill or as decided by the Commission from

time to time shall be admissible

HARYANA GOVT. GAZ., JAN. 14, 2020 (PAUS. 24, 1941 SAKA) [PART III 58

12. Amendment to the Regulation 6.4

Existing Regulation 6.4.1 shall be substituted with the following: -

In case of spot billing/bills sent through e-mail: It will be 7 (seven) days where billing is monthly and 10 (ten) days where billing is bimonthly, from the date of issue of bills.
In other cases: It will be 14 (fourteen) days where billing is monthly and 17 (seventeen) days where billing is bimonthly, from the date of issue of bills.
In case of Government departments and local bodies except Domestic/Non-Domestic supply categories.: It will be 20 (twenty) days from the date of issue of bills.

13. Amendment to the Regulation 9.3

Insertion of a new clause under Regulation 9.3.6

After Regulation 9.3.6, a new Regulation 9.3.7 shall be added as under:

9.3.7 Agriculture supply (metered/un-metered)

If the connected load of a, consumer is detected to be exceeding by more than 10% of the sanctioned

load, the excess load shall be treated as unauthorized load. Wherever use of unauthorized load is

detected by the Licensee, a penalty on the excess load including 10% shall be charged at the rate Of Rs.

500/ - per BHP or part thereof per month for the preceding six months or for the period from the date

of last checking or from the date of release of connection whichever is less~ The consumer shall

maintain its sanctioned load and will have to submit fresh test report to this effect. The penalty shall

remain chargeable only up to the month of submission of requisite documents/ test report.

The consumer should either remove the additional load or get the same regularized after completing

the formalities for extension of load as per Regulation 4.12.

14. Amendment to the Regulation 15

Existing Regulation 15 shall be substituted with the following: -

15.1 Complaints redressal system

Complaints redressal system/procedure shall be as per the Haryana Electricity Regulatory Commission

(Guidelines for establishment of Forum for Redressal of Grievances of the Consumers, Electricity

Ombudsman and Consumer Advocacy) Regulations, 2019 read with subsequent amendment, or

reenactment thereof, if any.

15.2. Compensation/penalty for delay

The person/ consumer aggrieved with non-adherence of time lines specified therein in the Regulations

with respect to a particular work, may seek remedy to get the compensation/penalty from the

distribution licensee as specified under the Haryana Electricity Regulatory Commission (Standards of

Performance for the Distribution Licensee) Regulations, 2004 read with amendments or its

re-enactment thereof, if any.

By the Order of the Commission

Secretary

Haryana Electricity Regulatory Commission [9-1]

57603—C.S.—H.G.P., Chd.

Cite this issue. Haryana Gazette, Government of Haryana, 08 January 2020. Indian Gazettes, https://egazette.servantsofknowledge.in/details/in.gazette.haryana.2020-01-08.Ordinary_Regulation-No-HERC-29-2014-2nd-Amendment-2019/. Archive identifier in.gazette.haryana.2020-01-08.Ordinary_Regulation-No-HERC-29-2014-2nd-Amendment-2019.