Har
ryana
a Go
overn
EXTRA E
nment
t Gaz
zette
AORD
DINAR
Publish RY
hed by A
© Govt. of
f Haryana
No. 195–2 022/Ext.] CH ANDIGARH , THURSDAY y Authority
Y, NOVEMB
ER 3, 2022 (K
KARTIKA 12
2, 1944 SAKA
A)
HARYA
ANA GOVER
RNMENT
INDU
USTRIES AN
ND COMMER
RCE DEPART
TMENT
n
Notification
The 3rd Novembe
No. notified in for grant o Battery Sw
. 20/01/2022-4 Gazette vide of "Incentives wapping Statio
4IB1.— In pu No. 20/01/202 s for Manufac on" as per the
ursuance to the 22-4IB-I. date cturers/Provid details provid 1 Obj
er, 2022
Electric Vehicl
of Haryana E or of Haryana ublic Charging
is pleased to n g Stations/Pri
le Policy 2022 2 notify scheme e d ivately owned nder Clause 8 e provision un 2, the Governo ed 08.07.2022 ely owned Pu ders of Private : ded hereunder
jectives of the
e Scheme
Obj by s amp
jective of the setting up of ple charging s
scheme is to m a widespread stations and ba
make usage o d and accessib attery swappin
f Electric Veh
ble charging in
ng stations to
2 Qua
hicles conveni nfrastructure, m strengthen ele
ient and addre make Haryan ectric mobility
ess range anxi a a hub for e- y ecosystem of
r, iety for buyer h -vehicles with f the state.
antum of Ass
sistance:
The sim
e following in milar approved
ncentives shall cities), if appl
l be for the ar licable in futu nounced under
r FAME II (or
r r FAME III or
reas/regions o
ure within the p
i. Battery S lakh for fi
Swapping Sta irst 100 Batter
ations: One tim ry Swapping S other than ann policy period:
0 ) up to INR 10
me subsidy of
Stations set up
ii.
CI>INR 25 l NR 5 lakh for f 20% of Fixe p with FCI of m
d Capital Inve more than INR
estment (FCI) R 50 lakh
akh): One tim
r first 200 pri
Charging (FCI) max of more th
g stations (FC ximum upto IN han INR 25 la
akh
iii. Charging up to INR Residentia than 1,000 buildings, The charg
g stations (FC R 50,000 for f al buildings, c 0 inhabitants o malls, metro ging units shal
CI
akh): One tim ivately owned uildings, insti o more than 1 others, shall h ed appropriate
The tariff as defined
charged for th d by Haryana E
he Charging S Electricity Reg me subsidy o ivately owned
of 20% of the d public charg
e Fixed Capit ging stations s
tal Investment t I etup with FCI me subsidy of 20% of Fixed
estment (FCI) ) shed in Group p e etc. with more uildings, office e a. esignated area d public charg tutional build ,000 people p have at least ely to cater to
ging stations dings, malls, m per day. Such 10 charging u public deman
d Capital Inv to be establis metro station e residential bu units in the de nd.
hall be special
s l tariff for EVs
Stations and B
gulatory Com
Battery swappi mmission (HER
ing stations sh RC).
(4137)4138 HARYANA GOVT. GAZ. (EXTRA.), NOV. 3, 2022 (KRTK. 12, 1944 SAKA)
3 Definitions:
i. Charging/Battery equipment: Equipment that is exclusively used to charge the batteries of BEV/PHEV/SHEV. This equipment can be installed at existing fuel stations or separate charging or battery swapping stations.
ii. Privately owned public charging station: A dedicated charging station owned by a private entity that is used for charging personal EV or EV fleet and can be installed at independent homes, group residential buildings, offices, public places, or dedicated parking land which can be self-operated or CPO-managed (Charged Point Managed for EV fleet charging). The charging stations shall adhere to the norms laid by Ministry of Power or any other nodal agency appointed for Charging Infrastructure approval/guidelines.
iii. Electric Vehicle Supply Equipment (EVSE) shall mean an element in Electric Vehicle Charging Infrastructure (EVCI) that supplies electrical energy for recharging the battery of electric vehicles. Public Charging Station (PCS) shall mean an EV charging station where any electric vehicle can get its battery recharged.
iv. Battery Charging Station (BCS) shall mean a station where the discharged or partially discharged electric batteries for electric vehicles are electrically recharged.
v. Battery Swapping Station (BSS) shall mean a station where any electric vehicle can get its discharged battery or partially charged battery replaced by a charged battery
vi. Electric Mobility Ecosystem: This policy addresses various components and end products of the electric mobility ecosystem. Such an ecosystem encompasses the―Electric Vehicles and components such as Lithium-Ion Batteries (or other advanced batteries with comparable energy/power densities), Super capacitors, Fuel cell systems, EV Charging equipment, Hydrogen generation, storage and refueling equipment, Battery swapping equipment, EV Motors & Controllers and other EV powertrain components, Battery management systems, EV electronics, electric harness etc. integral to the functioning of an EV.
vii. Fixed Capital Investment (FCI): Fixed Capital Investment is the cost of Land (purchased amount/long term lease value), Building and new Machinery/ new Equipment used in the unit.
4 Eligibility
i. The policy incentives will be available for early adopter enterprises setting up new charging infrastructure for public use in general and shall have to comply with the provisions as laid down by Ministry of Power or any other nodal agency appointed for Charging Infrastructure approval/guidelines.
ii. The charging infrastructure shall have verified electric connector for the purpose of charging vehicles at site.
iii. The early adopters shall be units that come into operation after the launch of the policy i.e. 10.7.2022, who apply on the portal for incentives. (First applied, First served basis). The limit has been specified in the Policy and Clause 2 of the scheme.
iv. The land proposed for setting up of charging station shall be in the name of the individual/entity in the form of ownership/lease.
v. There should not be any litigation pending against the land and the land shall be free from all the encumbrances/disputes.
vi. Charging infrastructure can also be set up at existing Petrol Pumps, Housing and Residential Societies, Malls, Parking Spaces, Offices, Colleges and University or other Public Spaces.
vii. Only equipment and machinery specifically required for EV charging / battery swapping shall be eligible.
Note: Units availing a particular incentive under this policy will not be eligible to avail similar incentive under similar head as given in any other Haryana Government policy. However, units will be eligible to claim other incentives not specified in this policy. The maximum limit of the sum of all fiscal incentives shall not exceed 100% of Fixed Capital Investment (FCI).
5 Commencement and Applicability:
The scheme shall commence with effect from 10.07.2022 and shall remain in operation till a period of 5 years or till the time Government decides to discontinue this scheme, whichever is earlier.
HARYANA GOVT. GAZ. (EXTRA.), NOV. 3, 2022 (KRTK. 12, 1944 SAKA) 41396 Procedure to apply for financial assistance under the scheme:
i. The applicant shall apply online within 90 days from date of operationalization of the Charging Station / Swapping station on the web portal of Industries & Commerce Department. The application shall be examined and processed by the officials of the Industries & Commerce Department, Haryana.
ii. The application would be processed and examined initially by the Joint Director/Deputy Director, District I&C Centre. He/She will be responsible for scrutiny and shall clearly recommend for approval/rejection of the claim after conducting the inspection of the unit.
iii. The Joint director/Deputy Director, District I&C Centre may physically visit the unit and verify the eligibility of plant & machinery as per the claim.
iv. The applicant shall have to submit documents pertaining to aligned with guidelines of Ministry of Power (or other ministry/nodal agency specified by Govt. of India) at the time of applying online.
v. The Joint Director/Deputy Director, District I&C Centre and shall recommend for approval/rejection of the claim after conducting inspection of the unit.
vi. The deficiencies, if any, would be communicated to the applicant in writing within a period of 10 working days and the applicant would be given a time period of 15 working days to rectify the deficiencies so pointed out.
vii. In case the deficiencies are not removed within prescribed period, the claim shall be rejected by the Competent Authority, under intimation to the party through an e-mail. The enterprise shall not be required to submit any additional document other than specified under Annexure-I unless required for establishing genuineness of the claim.
7 Competent Authority for Sanction:
The Director General / Director of Department of Industries & Commerce, Haryana, shall be competent authority for sanction of incentive of this scheme.
8 Time Limit
The Enterprise shall submit its claim, complete in all respects, within three months from start of commercial services (date of first sale bill). In case the unit does not apply within 03 months then its entitlement for the subsidy will be forfeited.
9 Interpretation/ Clarification
The Administrative Secretary Industries and Commerce, Haryana shall be competent to make interpretation/ clarification of provisions of this scheme.
10 Appeal
An appeal against an order passed by the Competent Authority shall lie with the Administrative Secretary, Industries & Commerce, Haryana which can be filed within a period of 30 days from the date of communication of orders appealed against. The orders passed by the Administrative Secretary, Industries & Commerce, Haryana in appeal shall be final. Appeal can be submitted in a written format at the office of the Administrative Secretary, Industries & Commerce, Haryana with subject as "Appeal for Charging and Swapping Station Subsidy scheme under the Haryana Electric VehiclePolicy - 2022"
11 Power to condone delay in submission of application & appeal
i. Director/ Director General, Industries and Commerce, Haryana shall be competent to condone the delay up to a period of 03 months after the prescribed time limit.
ii. The Administrative Secretary, Industries & Commerce, Haryana shall be competent to condone the delay up to a period of 06 months after the prescribed time limit. Provided that the competent authority is satisfied with the reasons of late submission of the application on the basis of the substantial evidence/documents/ arguments presented by the applicant.
12 Penal Action
In case, it is found at any stage that the applicant has claimed the assistance on the basis of wrong facts, the applicant shall besides refund of assistance with compound rate of interest @ 12% per annum and facing legal action, will be debarred from grant of any incentives/assistance from the State Government. If the applicant fails to refund the subsidy amount with interest, then the amount shall be recovered as arrear of land revenue. The applicant shall be debarred from public procurement as aresult of mismatch in facts and figures.
4140 HARYANA GOVT. GAZ. (EXTRA.), NOV. 3, 2022 (KRTK. 12, 1944 SAKA)13 Service Delivery Timeline
| Sr. No. | Tasks | Time limit (working days) |
| 1 | Letter of Approval | 30 days |
| 2 | Letter of Sanction | 07 days |
| 3 | Disbursement | 07 days |
ANAND MOHAN SHARAN, Additional Chief Secretary to Government of Haryana, Industries and Commerce Department.
HARYANA GOVT. GAZ. (EXTRA.), NOV. 3, 2022 (KRTK. 12, 1944 SAKA) 4141Annexure – I
Application format for claiming Charging and Battery Swapping station Scheme
| Sr. No. | Particulars | Details |
| 1 | Name of the applicant (Authorized person of the unit) | |
| 2 | Name & address of registered office with Mobile no. & Email ID | |
| 3 | Address of Charging unit with Contact No | |
| 4 | Category of the unit (Battery Swapping Stations/Charging stations (FCI>INR 25 lkh) / Charging stations (FCI | |
| 5 | Type of Charging (Slow / Fast) | |
| 6 | Haryana Udhyam Memorandum (HUM) No. & Date | |
| 7 | Udyam Registration Certificate (URC) No & Date | |
| 8 | Date of commencement of operations (As per first sale bill) | |
| 9 | Fixed Capital Investment (In Lakh) Land/Lease Infrastructure Power connection Infrastructure Equipment Total | |
| 10 | DisCom(UHBVN/DHBVN) Sanctioned Load Connected Load Consumer No Meter No | |
| 11 | Total source of funding / means of finance (as approved by Bank/FI): Promoter's contribution • Term Loan • Other resources Total • | |
| 12 | Bank Details for beneficiary account Bank Name • Beneficiary Name (Authorized person of unit) • Account Number • Account Type (Savings / Current) • IFSC • | |
| 13 | Has the unit applied for any kind of similar incentive under the Government of India Scheme/Policy? | Yes / No |
i. Copy of Udyam Registration Certificate (URC) and Haryana Udhyam Memorandum (HUM). ii. Certificate of Incorporation/ Partnership deed iii. Board resolution/ Power of attorney iv. Change of Land Use (CLU)/ NOC from competent authority, if applicable v. Declaration (As in Annexure II) on non-judicial stamp paper of INR 50/- vi. CA Certificate regarding investment in plant & machinery (Annexure-III) vii. Audited balance sheet of the unit of last year (if Applicable) viii. Copy of first electricity bill ix. Fire Safety Certificate for premises x. Compliance certificate with respect to norms of Govt. of India (Ministry of Power or any other nodal agency appointed for Charging Infrastructure approval/guidelines)
Signature of the applicant (with seal)4142 HARYANA GOVT. GAZ. (EXTRA.), NOV. 3, 2022 (KRTK. 12, 1944 SAKA)
Annexure-II
Declaration (on non-judicial stamp paper of INR 50 duly notarized)
1. I,… ......................................................... do hereby solemnly state that I am proprietor/partner /director/ of M/s……………………………….located at………………….which is engaged in the establishment of Battery Swapping station / Charging Station and I have been authorized to file the Charging Station and Battery Swapping Station Subsidy claim with the Industries & Commerce Department, Government of Haryana.
2. I do hereby affirm that the particulars given in the application are correct. In case, any of the statement/information furnished in the application/documents later found to be wrong or incorrect or misleading, I do hereby undertake to refund the entire amount of assistance of INR………………/-[INR (in words)…………………………………………..] granted to me at the compound rate of interest @12% per annum, besides facing legal action in case facts contained in this application are proved to be wrong at the time of verification/ checking or otherwise at any stage.
Dated:
Signature of the applicant
(with seal)HARYANA GOVT. GAZ. (EXTRA.), NOV. 3, 2022 (KRTK. 12, 1944 SAKA) 4143
Annexure-III
Certificate from Chartered Accountant regarding investment in plant & machinery (on a CA letter head)
To whom it may concern
The records and books of account of M/s………………………with their regd. Office at..................... and station located at………..………Block..……………………….. in respect of investment in FCI has been verified. It is certified that the investment in plant & machinery as on date.............................................. stands as INR........................(Rupees……………………….............) and turnover* for current fiscal year is INR................, whereas turnover for last fiscal year* was INR .....................
Name & signature of the Chartered Accountant (with seal) *if Applicable
UDIN ................................ with stamps
CA membership number: ………………………………..
Dated:
4144 HARYANA GOVT. GAZ. (EXTRA.), NOV. 3, 2022 (KRTK. 12, 1944 SAKA)Annexure IV
Application Form for Claiming Power Subsidy under
Claim Period: from ....................... to .............................................
| S.No | Particular | Details |
| 1 | Name and address of the unit | |
| 2 | Date of commencement of services | |
| 3 | DisCom(UHBVN/DHBVN) Sanctioned Load Connected Load Consumer No Meter No | |
| 4 | Power Consumption Statement | |
| 5 | Has the unit applied for any kind of similar incentive under other Government of India Scheme/Policy? | |
| 6 | Has the unit applied for any kind of similar incentive under other Government of Haryana Scheme/Policy? (HEEP, ESDM or any other state policy) |
Comments of the Enquiry Officer
Certified that I have personally verified particulars mentioned above with the original bills of UHBVN/DHBVN and found them to be correct. I have also personally visited the unit on date……………… and physically verified infrastructure and machinery/other assets installed for the sole purpose of EV charging / EV battery swapping of M/s…………………… and found the unit functioning.
I also certify that the details with regard to bills etc, furnished by the unit in the application, resemble with those mentioned in the original Bills/vouchers produced before me during the time of physical verification and accordingly make my recommendation to approve charging station to get special tariff for EV
Name of Officer: ……………………………….
Designation: ……………………………………
District:…………………………………………
DISCOM:………………………………………
9957—C.S.—H.G.P. Pkl.