No. UD-F(10)-2/2019.—In exercise of the power conferred by clause (1) of Rule 9 of the Construction and Demolition Waste Management Rules, 2016, the Governor, Himachal Pradesh is pleased to notify " Himachal Pradesh State Construction and Demolition Waste Policy and Strateg" as per enclosed Annexure –"A" with immediate effect.
By order, PRABODH SAXENA, Pr. Secretary(UD). 94-राजपत्र/2019-30-07-2019 (4211)4212 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 ANNEXURE-A
HIMACHAL PRADESH STATE POLICY AND STRATEGY ON MANAGEMENT OF
CONSTRUCTION AND DEMOLITION WASTE
1. INTRODUCTION
With rapid urbanization in the State of Himachal Pradesh, one of the fastest growing Industry is tourism which will involve development of infrastructure in both private & Govt. Sector and it is expected to continue growing expontentially with the increase in urban population. The increase in the number of buildings, expansion of urban infrastructure (such as roads, bridges, flyovers, dams etc. ) and demolition of old buildings has also resulted in immense amount of waste being generated in the form of debris, building materials etc. In addition, with increased urbanisation and infrastructure creation, there is a shortage of conventional building materials such as aggregates, sand and significant increase in the price of building materials such as concrete and bricks. Therefore, to deal with the issue of rising C&D Waste generation in India, the challenge of C&D Waste is recycling and sustainable use of natural resources. The Government of India issued the Construction and Demolition Waste Management Rules, 2016 ("C&D Rules") in March 2016. These Rules apply to every waste resulting from construction, remodeling, repair and demolition of any civil structure of individual or organization or governmental authority that generates construction and demolition waste.
Currently in India, C&D Waste management is in a nascent stage, where a portion of C& D waste is used for filling and leveling low-lying areas and some resources are recovered from C&D Waste. However, a majority of C&D Waste is dumped in landfills or is illegally disposed of in water bodies, rivers and mangroves. It is also common to see C&D Waste littered on pavements and in open plots (this practice is known as fly-tipping) or along the hill slopes along the road sides. Many times, such waste is often mixed with municipal solid waste making the municipal waste heavy and unsuitable for further processing such as composting, recycling or energy recovery. Given that material costs comprise nearly 40 to 60 percent of the Project cost in the construction industry, sustainable management of C&D Waste can result in significant cost savings for industry and other stakeholders. Therefore, the dumping practices are not only unsustainable but also lead to a loss of resources as C&D Waste can be recycled into reusable products which greatly reduce the stress on the mining of virgin materials. The processing of the C&D Waste also reduces the total amount of inert wastes that are disposed of in landfills.
The issue of C&D Waste has entered the public discourse relatively recently and therefore, there have been historically very little efforts to keep records of its generation and composition. In addition, C&D Waste is often clubbed with solid waste and thus, the magnitude of the problem is underestimated by all stakeholders involved. This has resulted in no formal system for prevention, reduction, management, reuse and recycling of C&D Waste. The Technology, Information, Forecasting and Assessment Council (TIFAC) considers approximately 25% of all solid waste to be C&D Waste and therefore, using this metric, it can be estimated that a large quantity of C&D waste is generated in the State of Himachal Pradesh too.
However, these numbers cannot be considered as comprehensive and reliable data on C&D Waste and therefore, it is necessary for a complete and credible assessment to be carried out by the ULBs on the actual C&D Waste that is generated within their jurisdictional limits and such data to be compiled by the State Pollution Control Board. This is in line with the requirement under C&D Rules where ULBs are required to keep track of the generation of construction and demolition waste within its jurisdiction and establish a database and update it once in a year. The ULB and the HPSPCB should recognize C&D Waste as a separate stream of waste and begin the enumeration of its quantities of generation, collection and disposal in the statutory reports.
421 13 राजपत्र, 941 2. S SOURCES OF CONS हिमाचल प्रदे TRUCTIO देश, 30 जुला ON & DEM ाई, 2019/0 MOLITION 08 श्रावण, 19 WASTE2.1 C Constructio C&D Rules C c onstruction mainly gene m xisting buil ex ro oads (v) in pipelines) (v p
on and Dem as the wast , remodelin erate C&D ldings (iii) d nstallation vi) construct
molition W te comprisin ng, repair a Waste are demolition o and service tion/renovat
aste (also r ng of buildi and demolit e (i) constr of old build e of public tion of publ
referred to ing material tion of any ruction of dings (iv) ex c utilities ( lic infrastru
as C&D W ls, debris an civil struct new buildi xcavation/la (telephone/w cture (bridg
Waste) is de nd rubble re ture. The a ings, (ii) re aying of asp water/electr ges/flyovers
he efined by th esulting from m activities th at of enovation o te halt/concret ge ricity/sewag s).
D Waste is nisation, the also varies y, however sment Coun
city-specif e pace of de according t as per the s ncil (TIFAC
fic as well a evelopment to the proje study carrie C), the typic
as al ct ed al Component 2.2 C project-speci p ctivity and a an nd depends out by Techn o omposition c
ts of C&D ific and diff re-developm s on the age nology, Info of C&D W
Waste: Th ffers accordi ment of the e and type formation, F Waste in Indi
he composit ing to the ra city. The co of building Forecasting ia is shown
tion of C&D ate of urban omposition g. Generally and Assess in figure-1 below:
2%
% 2%
1% %
5%
Bitumen
Wood
36%
Metal
Others
Brick & Ma
asonary
% 31%
Soil, Sand &
& Gravel
Typ
pical compos
sition of C&D
D Waste in I
ndia
VES
OBJECTIV Rule 9 (1) of the C& e State Go ment of cons Rules. Pursu tate of Him generated. akeholders t
&D Rules, 2 overnment i struction an uant to this machal Pra This policy to prepare t
2016 envis is required nd demolitio provision, desh to su y is aimed the plan and
ages that t to prepare on of waste this policy stainably m at relevant d procedure
the Secretar e the State e in accorda document o manage the authorities es for mana
ry In-Charg Policy Do ance with th on C&D W C&D Wa s, other fun agement of
ge of Urba cument wit he provision Waste is bein ste which nctionaries o C&D Wast
an th ns ng is of te 3. O R Developm respect t contained prepared increasin ULBs an within th
ment in the o managem d in C&D R d for the St ngly being g nd other sta heir jurisdict
tions.
onstruction and Demol
lition Waste
e Managem
ment Policy d
document fo
or T Himacha
The objectiv al Pradesh S
ves of the Co State are:
(a
a) Avoid,
reuse, recyc
cle and disp
ose off C&D
D Waste.
minimize, r
(b
b) Avoid a
and minimiz
ze construct
tion waste t
through des ign and con
nstruction m
management
t.
4214 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 (c) To ensure collection, storage and processing of C & D waste.(d) To ensure that no C & D waste is dumped in the open spaces.
(e)
(f) To ensure that all Urban Local Bodies effectively implement the C & D Waste Management.
(g) Plan to avoid the environmental problems that arise owing to open dumping of these wastes.
(h) To identify suitable lands for dumping of C & D waste and further its processing through Private Operators/ Agencies or by ULB itself.
(i) To ensure involvement of different stakeholders in the successful implementation of C & D Waste Management Policy.
(j) To effectively comply with the provisions of C&D Rules.
4. PRINCIPLES FOR MANAGEMENT OF C&D WASTE
The Concept of "3R" Principle has been proposed for reducing, reusing and also recycling wastes of the construction industry. The different processes involved in construction projects namely designing, production and manufacturing at the construction sites directly lead to waste creation, therefore it is essential for a green economy to follow the "3R" principle in the construction projects.
(a) Reduce
Potential wastes can be identified early in the design process itself and measures should be taken during design stage to minimize the waste that is likely to be generated. Waste reduction can be achieved by designing with standard sizes for all building materials, planning for flexible spaces and ensuring that designs are adaptable to changing uses and are amenable for deconstruction and reconstruction.
(b) Reuse
This involves identification of waste that can be salvaged for reuse in the current Project or another Project or that can be donated. A comparison of the value of the materials "as it is" for salvage or to its value as materials for recycling may be considered prior to reuse in many cases. Some of these materials may be valuable to reuse on-site; others may be sold to be used as building material in another site or donated to a charitable organization.
(c) Recycle
After exploring all the options to prevent waste and salvaging and reusing materials, the next step is to recycle as much of the remaining debris as possible. Recycling saves money by minimizing disposal costs.
4.1 C&D WASTE MANAGEMENT
The involvement of all stakeholders and adoption of suitable management practices is key to successfully achieving efficient C & D Waste Management.
4215 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 No Littering ZonesForest land, water bodies, drains, flood plains, road side etc. be declared as no littering zones and littering in this zone be made a cognizable offence.
Designated Dumping Site
I. The name and capacities of the designated dumping sites should be available on a web platform.
II. The dedicated website/link should be available in public domain to apply for the permit for transportation of the C&D waste, to remit the fee and to obtain the permit for transportation.
Waste Reception Facilities
i. Stock pilling area—Area located for temporary stockpile of waste for later use ii. Recycling area
iii. Reclamation sites-designated part of a development project that excepts C&D waste for reclamation purpose.
iv. On site collection of waste through MC dumpers
"Waste Generator" is defined by the C&D Rules as any person or association of persons or institution, residential and commercial establishments including Indian railways, airport, port and harbour and defence establishments who undertakes construction or demolition of any civil structure which generate C&D Waste.
"Bulk Waste Generators" Waste generators who generate more than 20 tons or more in one day or 300 tons per project in a month have been identified separately in the C&D Rules and have additional obligations attached to them. For the purposes of the Himachal Pradesh State C&D Policy, this category of these waste generators will be considered as "bulk waste generators".
"Service Providers" The third category of waste generators identified in the C&D Rules is the "Service Providers" and are defined as authorities who provide services like water, sewerage, electricity, telephone, roads, drainage etc. who often generate C&D Waste during their activities, which includes excavation, demolition and civil work.
The Rural area and Semi-Urban area also needs to frame guidelines for proper disposal of C&D waste and also supposed to work in harmony with urban areas.
4.2 The Management of C & D waste from Generation to Disposal can be illustrated as
below:
Waste Management Plan
Every builder and Govt./private executing agency like HPPWD, HIMUDA, BSNL etc. while constructing roads or any other project should submit a Waste Management Plan which4216 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 should include key waste types, arrangements for onsite sorting and proposal disposal of surplus earth. Copy of each award letter should be submitted to Municipal Corporation/concerned ULB for information.
Collection and transportation of
C& D Waste
Receiving of C&D waste
Removal of Iron, Al, Wood, Plastics etc.
The Recycled material can
be processed through MSW
Recycling/Processing &
disposal facility
Processing of C&D Waste "[Hammering,
Crushing, Washing, size Separation &
Physicochemical Processes]
Recycled products recovery
4.3 Procedure for application and grant of permission
(i) Applicant or the person concerned, intending to commence construction within the area of the ULB, shall in writing submit detailed estimate of muck to be generated from the plot/construction site to the Corporation on the prescribed proforma annexed with these bye-laws as Appendix-I at the time of submission of his/her building map/plan for sanction. However, in the case of repair of building or in the case where no planning permission is required, the permission for dumping debris shall be obtained from the ULB authorities by moving an application mentioning therein full particulars of the applicant, location of the building and the estimate/quantity of muck to be generated.
(ii) The estimate submitted by the applicant shall be verified by the technical wing of ULB after spot inspection and thereafter shall be sent to the concerned branch for raising the bill and for according necessary permission in favour of the applicant.
(iii) The permission for dumping of debris shall be accorded only after obtaining receipt of the amount to be deposited by the applicant in the ULB on this account.
(iv) The place for dumping of muck shall be communicated to the applicant by the ULB in writing and the name of the place/site for dumping of debris by the applicant shall also be mentioned in their building sanction letter. Further, intimation of the same shall also be given to the concerned branch of ULB or to the concerned agency or the contractor hired or engaged by the ULB for managing the dumping site.
4217 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941(v) During transportation of the muck, a person shall have to carry the original permission, a copy of which shall be affixed on the windscreen of the vehicle and the same shall have to be shown to the authorized officer/official of the ULB at the time of inspection. However, in case of manual transportation of debris the person carrying the same shall have to show the original sanction to the inspecting staff/authorized officer/official at the time of inspection.
(vi) There shall be a restriction on movement of the vehicles carrying muck after the sun set and before the sun rise. The normal timings for dumping muck at the dumping site will be between 9.00 A.M. to 5.00 P.M. However, in case of exigencies and in view of traffic regulations in the area the ULB may in writing relax such timings.
(vii) No one shall be permitted to carry the digging and excavation of plot or land after sun set and before sun rise but the ULB, in the larger public interest or in the case of emergent circumstances may relax such imposition/restrictions, on receiving written request from the applicant or the concerned agency or the authority interested in this regard.
(viii) The person, after obtaining the sanction of building map from the competent authority or before raising the construction at site, is required to install a painted board of the size of 3' x 2' indicating therein the number and date of the sanction, commencement of construction and hours during which construction can be carried out, time when excavation can be done, name of dumping site allotted to the applicant for the purpose of dumping muck, nature of sanction, the area of construction sanctioned on each floor and the telephone number of the Control Room set up by the ULB for entertainment of complaints etc.
(ix) The authorized officer/official of ULB shall prescribe the conditions relating to the application of muck generation from the plot, grant of sanction for muck disposal and condition relating to affixing of board at site giving therein the detail as mentioned in clause at the time of grant of building sanction.
(x) Each vehicle carrying the C&D waste should be entered on the respective dumping site and its entry with its load should be made against the concerned dumping site simultaneously so that the capacities of the dumping sites are updated regularly on the web platform.
(xi) At the end of the year cross checking of the permits issued and permits entered on the dumping sites should be checked and in case of discrepancies (e.g. the person has deposited the permit fee but has not dumped the material on the designated site) the violator should be penalized.
(xii) It may be better to include the transportation charges in the permit fee and provide the transportation to the C&D waste generators.
5. ROLES & RESPONSIBILIES
5.1. Role of Waste Generators
C&D Waste Management Rules, 2016 provides that every Waste Generator is responsible for collection, segregation and storage of C&D Waste used to be generated by the generators. The Generator is required to ensure that other waste (such as Municipal Solid Waste and Hazardous4218 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 Waste) does not get mixed with the C&D Waste and that the C&D Waste is stored and disposed of separately. Every waste generator is mandated to keep the C&D Waste within the premises or get the waste deposited at the collection centre made available by the Urban Local Body or handed over it to the authorised processing facilities of C&D Waste and to ensure that there is no littering of such waste.
Waste generators who generate more than 20 tons or more in one day or 300 tons per Project in a month shall segregate the waste viz. concrete; soil; steel; wood & plastics; bricks & mortar and shall submit Waste Management Plan. The Waste Generator should get prior approval from the local authority before starting construction or demolition or remodeling work and keep the concerned Urban Local Body informed regarding the relevant activities from the planning stage to the implementation stage and this shall be done by Project Proponent on project to project basis.
5.2. Role of Urban Local Bodies
The Urban Local Bodies, in coordination with the concerned District Administration, shall identify suitable land for setting up of storage, processing and recycling facilities for Management of Construction and Demolition Waste. ULBs can also set up these facilities in clusters by executing an agreement with other ULBs which will interalia include operation & maintenance, sharing of sum received out of collection of C&D waste & other conditions as deemed fit etc. The processing or recycling site shall be away from habitation clusters, forest areas, water bodies, monuments, National Parks, Wetlands and places of important cultural, historical or religious interest.
The time frame for suitable site selection and implementation of C & D Waste Management facility is as per Schedule-I.
6. COLLECTION AND TRANSPORTATION OF C & D WASTE
Collection and Transportation of Construction and Demolition Waste shall be done by the Urban Local Bodies (ULBs) or by authorised private agency within two days of receiving information or any complaint regarding generation of C & D waste. The following considerations shall be kept in mind while planning for Collection and Transportation activity.
• For small generators of C&D Waste (such as waste emanating from petty construction, repair or maintenance works), ULB shall consider two options (a) deposit of C&D Waste by the small generators at collection centres/earmarked areas; or (b) removal of the C&D Waste by the ULBs through itself and/or authorised private party on payment basis. The fees for collection of C & D Waste by ULBs/authorised agency is defined in terms of Schedule-I.
• Waste generators who generate 20 tons or more in one day or 300 tons per Project in a month shall be responsible to segregate the C & D waste in different streams at their sites and shall recycle and reuse the waste to the maximum extent possible. The fees for collection of C&D Waste by ULBs/ authorised agency is in terms of Schedule-II.
• The Waste Generators shall inform the Urban Local Body or the authorised agency in writing/or online within three days before generation of C & D waste for collection of such waste by paying the charges as mentioned in Schedule-II. The Urban Local Body or its authorized agency shall collect the C & D Waste within two days of receiving the information or complaint about the C&D waste generation. If information about the4219 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 generation of waste is not given to the concerned ULB and the charges for collection are not deposited within 3 days of the generation of waste, any complaint received about C&D generator unauthorized dumping a penalty of Rs. 20,000/- per event shall be charged to the Waste Generators as per Rule-7 (xii) Schedule-II (Item No.8) of Solid Waste Management Bye-laws of respective Urban Local Body.
• In order to create awareness about management of C & D Waste, the Urban Local Body shall carry out massive awareness campaigns and will also release public notices in at least two local news papers. The sample reference copy for releasing the Public Notice is annexed as Annexure-1.
• All ULBs shall publicize the rates for collection, transportation and storage of C&D Waste and shall publish such rates on their websites, offices, local newspapers and public places.
• The Standard Operating Procedure (SOP) for the entire collection and transportation process is given below:—
Waste Generator informs the
ULB in writing/online (within 2
days of generation of waste).
Any complaint received about
C&D Generator or its
unauthorised disposal.
The ULB registered the information / complaint in the format given in
Annexure-2
Violators is to be
penalized as per the
provisions of policy.
Collection charges can
be submitted by the
Generator at the ULB
to the authorized
agency as decided by
the ULB.
Upon registering the
information, the ULB
gets disposed the C&D
Waste within 2 days
through its own
resources or through
agency and ensures
maintenance of trip sheet
as per Annexure-3.
Recycling of C&D Waste is essentially required, because it reduces the dependence on natural resources and eliminates adverse environmental impacts such as mining of virgin materials. Recycling of C&D wastes also reduces the quantum of C&D waste ending up at landfills and open spaces. It is mandated under the C&D Rules for the ULBs to make arrangements for the processing and disposal of C&D Waste, either themselves or by appointing authorised agencies.
4220 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 Construction and Demolition Waste can be used in the following manner:—• Reuse (at site) of bricks, stone slabs, timber, conduits, piping railings etc. to the extent possible and depending upon their condition.
• Sale/auction of material which cannot be used at the site due to design constraint or change in design.
• Plastics, broken glass, scrap metal etc. can be used by recycling industries.
• Rubble, brick bats, broken plaster/concrete pieces etc. can be used for building activity, such as, levelling, under coat of lanes where the traffic does not constitute heavy moving loads.
• Larger unusable pieces can be sent for filling up low-lying areas.
• Fine material, such as, sand, dust etc. can be used as cover material over sanitary landfill.
• Use as a granular sub-base (the layer above compacted earthen sub-grade) in road construction.
• Processed C&D waste (after sizing and sieving) can be used in road pavement for sub- base construction.
7. PROCESSING OF C&D WASTE
7.1 Utilizations of C & D Waste Streams
Reusing of C& D Waste: It does not require any further processing to convert into a useful product. The items which are usable directly are screened out from the debris and put into the possible use without further processing.
Recycling of C&D Waste: Once the waste generated from construction and demolition activities has been segregated and reusable items are taken out, the leftover is available for further processing i.e. recycling into next useful stage.
7.2 Machinery for Recycling
Once the structure is demolished as per the plan in an Engineering manner, use of appropriate equipment and machinery is essential in the recycling process. Such equipment may be jaw crushers, magnetic separators, vibratory screens, washing equipment etc.
The recycling plant consists of the following technologies:—
1. Feed hopper
2. Pre Screening
3. Washing & aggregate cleaning
4. Trash Screen for removal of light weights4221 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 5. Sizing Screen for washed Aggregate 6. Hydro cyclone system for Sand washing
7. Water Management system for recycling of process water
Among the major & minor components of C&D Waste, the most unpredictable and difficult materials are clay (soil) and all types of floating materials like plastic carry bags, sachets, thermocol etc. Recycling Technology has provided the solutions to tackle these difficult materials and make C&D Waste an acceptable quality product for re-use.
The following products can be recovered from recycling:—
1. Recovery of washed sand for construction
2. Recovery of 2-3 sizes of mixed Aggregates
3. RMC made with recovered material
4. Value-added products like Kerb Stones, Pavement Blocks and Concrete Bricks etc.
8. GOVERNMENT INITIATIVES TO PROMOTE USE OF C & D WASTE
To promote effective use of C & D Waste and recycled products in different construction activities the following initiatives/activities should be taken by Urban Local Bodies and by the State Government:—
8.1. Duties of Urban Local Bodies
The following initiatives/activities shall be undertaken by Urban Local Bodies to ensure effective management of C & D Waste:
• Shall keep track of the generation of construction and demolition waste within their jurisdiction, establish a data base and update once in a year.
• Shall make provision for giving incentives for use of materials made out of C&D Waste in construction activities including in non-structural concrete, paving blocks, lower layers of road pavements, colony and rural roads.
• Shall examine and sanction the waste management plan of the generators within a period of two months or from the date of approval of building plan, whichever is earlier, from the date of its submission.
• Shall create a sustained system of information, education and communication for construction and demolition waste through collaboration with expert institutions, civil societies and also disseminate through their own website.
• Shall coordinate with the concerned organizations for giving necessary approvals and clearances to the operators.
• That the Residues from construction and demolition waste processing and recycling industries shall be land filled in the sanitary landfills of solid waste.
4222 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941• The Project of processing or recycling shall be large enough to last for 20-25 years (project based on-site recycling facilities).
• Shall identify land for processing or recycling site which is away from habitation clusters, forest areas, water bodies, monuments, National Parks, Wetlands and places of important cultural, historical or religious interest.
• The Urban Local Bodies, in consultation with the State Pollution Control Board, shall ensure that a buffer zone is maintained around solid waste processing and disposal facilities exceeding five tonnes per day of installed capacity.
• Shall ensure that processing or recycling sites are fenced or hedged and provided with proper gate to monitor incoming vehicles or other modes of transportation and facility of CCTV may also be explored.
• Shall ensure that the approach and internal roads are concreted or paved so as to avoid generation of dust particles due to vehicular movement and should be designed so as to ensure free movement of vehicles and other machinery.
• Shall establish provisions of weigh bridge to measure quantity of waste brought at processing site. Fire protection equipment and other facilities as may be required shall also be provided.
8.2. Duties of State Government
The following initiatives shall be taken by the State Government to ensure effective management of C & D Waste:—
• State Government departments and officers dealing with land shall be made responsible for providing suitable sites for setting up of the storage, processing and recycling facilities for construction and demolition waste.
• The Town and Country Planning Department shall incorporate the site in the approved land use plan so that there is no disturbance to the processing facility on a long term basis.
• Provisions should be made for making procurement of materials made from construction and demolition waste mandatory upto a certain percentage (say 10-20%) in Municipal and Government contracts subject to strict quality control.
• Incentive should be given to ULBs for efficient management of C&D waste by devising a cretarion.
8.3 Duties of the Secretary–in-charge, Urban Development in the State
(i) State policies and strategies should acknowledge the primary role played by the informal sector of waste pickers, waste collectors and recycling industry in reducing waste and provide broad guidelines regarding integration of waste picker or informal waste collectors in the Waste Management System.
(ii) ensure implementation of provisions of these Rules by all local authorities;
4223 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941(iii) direct the Town & Country Planning Department of the State to ensure that master plan of every ULB in the State provisions for setting up of C&D waste processing and disposal facilities;
(iv) ensure identification and allocation of suitable land to the local bodies within one year for setting up of processing and disposal facilities for C&D wastes and incorporate them in the master plans (land use plan) of the State or as the case may be, cities through ULBs and district planning committees or Town and Country Planning Department;
(v) direct the Town Planning Department of the State and local bodies to ensure that a separate space for segregation, storage, decentralized processing of C&D waste is demarcated in the development plan for group housing or commercial, institutional or any other non-residential complex producing 20 tons per day or 300 tons per project in a month;
(vi) direct the developers of Special Economic Zone, Industrial Estate, Industrial Park to earmark at adequate land for recovery and recycling of C&D waste;
(vii) facilitate establishment of C&D waste processing facility for a group of ULBs and towns on a cost sharing basis and ensure professional management of such facility;
(viii)arrange for capacity building of local bodies in managing C&D Waste, segregation and transportation or processing of such waste at source; and
(ix) notify buffer zone for the C&D waste processing and disposal facilities in consultation with the State Pollution Control Board.
8.4 Duties of Deputy Commissioner
The Deputy Commissioner shall,
(i) facilitate identification and allocation of suitable land for setting up of C&D waste processing and disposal facilities to local authorities in his district in close coordination with the Secretary-in-charge of State Urban Development Department within one year from the date of notification of these rules;
(ii) review the performance of local bodies, at least once in a quarter on waste segregation, processing, treatment and disposal and take corrective measures in consultation with the Commissioner or Director of Municipal Administration or Director of local bodies and secretary-in-charge of the State Urban Development.
9. ENVIRONMENT MANAGEMENT PLAN DURING PROCESSING OR
RECYCLING OPERATIONS OF C&D FACILITY
In order to prevent pollution from processing or recycling operations, the following provisions shall be made:—
(a) Provision of storm water drains to prevent stagnation of surface water.
(b) Provision of paved or concreted surface in selected areas in the processing or recycling facility for minimizing dust and damage to the site.
4224 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 (c) Prevention of noise pollution from processing and recycling plant.(d) Provision for treatment of effluents, if any, to meet the discharge norms as per Environment (Protection) Rules, 1986.
(e) Provision of air pollution control measures such as dust suppression, dust extraction, Bag filters, Electro Static Precipitators, Scrubbing and Green belt development as per requirement can be done to meet the prescribed standards laid down by Central Pollution Control Board & State Pollution Control Board.
(f) Work Zone air quality at the Processing or Recycling site and ambient air quality at the vicinity shall be monitored.
(g) The measurement of ambient noise shall be done at the interface of the facility with the surrounding area, i.e. at plant boundary.
(h) A vegetative boundary shall be made around Processing or Recycling plant or site to strengthen the buffer zone.
(i) Every possible measures shall be taken to recycle the water and use in different activity as far as possible and try to reduce the demand on fresh water.
(j) An environment cell shall be established to implement the environment standards and to meet the environmental norms as prescribed by the authority.
10. FINANCIAL SUSTAINABILITY
The ULB should follow the principles of financial budgeting and costing for the management of C&D Waste.
In addition, as set out in the said policy, the main sources of revenue for the ULB for C & D Waste management are:
(i) User fees which could be collected separately or while sanctioning of the building plan (ii) Revenue from sale of by-products from C&D Waste
(iii) Fines and penalties. A list of illustrative user fees which the ULB could consider levying is set out in Annexure I.
11. PENALTIES
1. Historically, there have been no and/or marginal fines/penalties for non-compliance of provisions pertaining to management of any stream of municipal solid waste including C&D Waste. Even in cases where there were penalties prescribed, they were rarely enforced by the governmental authorities leading to a lackadaisical attitude among generators, ULB staff, private players and operators of waste processing facilities with respect to compliance with applicable regulations. Whoever is guilty of dumping of muck at a place other than the place(s) specified/notified by the ULB, the penalty shall be imposed in terms of provisions contained in Bye-Laws. Flying Squad consisting of SDM, EO, RO (Representative of Environment Deptt.) & PWD should be constituted be make supervise visits & also to address complaints of illegal & unauthorized dumping.
4225 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 19412. In the above context, in order to ensure compliance with C&D Rules. ULBS should frame bye-laws for management of C&D Waste and these bye-laws should include significant penalties to serve as a deterrent against non-compliance. A list of recommended fines is included as Annexure II to the Himachal Pradesh State C&D Policy. Further, it is recommended that the penalties be structured as a waterfall arrangement where penalties increase proportionately for consecutive and repeated non-compliance(s) by the same person. An example of such waterfall mechanism could be twice the fine amount for the second offence and thrice the penalty amount for the third offence and finally, in case of fourth contravention, the ULB should have the power to stop the construction, demolition and/or renovation activity and/or the license issued by it to the person for carrying on business. The ULBs could also structure the penalties as a percentage of the Project value and/or quantity of C&D Waste dumped in contravention of the C&D Rules. The penalty amounts should be escalated every year by a specified percentage to take into account the inflation and other costs of recovery for the ULB.
In case of repeated violation, in addition to penalty as specified above, the owner at whose instance the construction/excavation work is carried out and is found dumping the muck illegally or without the permission of the competent authority, as the case may be, shall also be liable for disconnection of water, electricity and others civic amenities and the Executive Head of ULB may request the competent authority for withdrawal of recognition and registration if any granted in his/her favour including withdrawal of building sanction granted in favour of the owner concerned. In addition to the above, the dumped material shall be lifted & disposed by the ULB at the cost of the violator.
3. ULBs should also be empowered to recover the penalty amounts as per the different modes set out in Himachal Pradesh Municipal Corporation Act, 1994 and HP Municipal Council Act, 1994. In addition, the ULB should have the liberty to initiate appropriate proceedings under any other applicable law such as Municipal Corporation Act, 1994/ HP Municipal Council Act, 1994, Environment (Protection) Act, 1986, the Indian Penal code, 1860, the Water (Prevention and Control of Pollution) Act, 1974, the Air (Prevention and Control of Pollution) Act, 1981 for violation of the SWM Rules 2016 and bye-laws framed by the ULB.
4. All amounts collected as penalties by and on behalf of the ULB under the bye-laws should be transferred to a separate bank account maintained for funds for solid waste management. These amounts shall be used towards the ULB's operation and maintenance costs for providing C&D Waste management services, salaries of personnel, incentives, grants and other uses as may be considered appropriate by the ULB from time to time.
5. Impounding of vehicle.—(i) Any officer of the Flying Squad or the police establishment either on the information received by himself or through any other source immediately on receiving such information, may stop and inspect the vehicle carrying muck for the purpose of ascertaining the required permission at any point of time and impound the same if found violating the provisions of these Bye-laws.
6. The vehicle shall only be released in case the registered owner of the vehicle applies for compounding of offence(s) under these Bye-laws.
7. The official impounding the vehicle shall immediately report to this effect in writing either to the Commissioner/Joint Commissioner of the Corporation or Executive4226 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 Officer of ULB and keep the same in custody at the place designated by the ULB till it is not released to the registered owner. The halt charges of the vehicle at such designated place shall be levied at the rate of ` 1000/- per day payable by registered owner to the ULB in cash or through demand draft.
8. Compounding of offences.—All the offences punishable under these Bye-laws may, before, the institution of prosecution, be compounded by such officer as may be authorized by the ULB in this behalf, on payment of such sum as may be specified by such officer under these Bye-laws.
9. Offences to be tried summarily.—The offences which are not compounded shall be tried in a summary manner by the Special Judicial Magistrate First Class of the Corporation under section 383 of the Himachal Pradesh Municipal Corporation Act, 1994 read with Section 260 of the Code of Criminal Procedure, 1973 or before the Special Judicial Magistrate 1st Class in the concerned court at the place of ULB.
12. CAPACITY BUILDING AND INFORMATION, EDUCATION AND
COMMUNICATION :
The ULBs should arrange training on the C&D Rules, bye-laws, HPSPCB guidelines and any other relevant material to all relevant State Government officials to ensure they are aware of the literature around C&D Waste management. Different training and awareness modules should be prepared for various levels of government officials bearing in mind the nature of responsibilities and inherent powers under relevant law. This would ensure maximum productivity and efficient use of resources available with the State. The State Government should earmark adequate amounts for training and capacity building of all levels of staff at regular intervals. This would depend on the number of staff, length of training, external agencies involved in the training, location and frequency of the training among other factors
Currently, there exists a lack of awareness among potential market players regarding utilisation of C&D Waste products. The ULB should disseminate information regarding the use and benefits of recycled C&D products among different stakeholders including members of the general public. State agencies and private associations must devise strategies to improve awareness and generate demand for C&D Waste based building material via white-papers, workshops, targeted incentives for first-time users, etc. The ULB should widely publicize the sources from where the recycled products can be procured.
There should be a separate section on management C&D Waste on the ULB website where the information about C&D Waste including rules, policies, user fees, penalties, details of collection centers/transit sites and processing facilities etc. are available, alongwith a list of suggestions for waste minimization and an interactive section where useful ideas or experiences can be uploaded and discussed. Incentives for use of recycled material should be publicized through the website.
The ULB should use print and audio/visual media to sensitize the citizens especially RWA's about the issues arising out of C&D Waste being dumped at empty sites or along with other types of waste. The numbers around per day generation and the magnitude of the problem should be publicised and co-operation solicited from the citizens in handling the C&D Waste responsibly. The fact that C&D Waste is a separate waste stream and the available disposal options should be widely publicised using all the modes of mass communication available to the ULB. The ULB shall collaborate with technical experts, non-governmental organisations and builder/developer associations to build the IEC content and disseminate the information.
4227 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 13. GRIEVANCE REDRESSAL MECHANISMFor effective functioning of C&D Waste management systems, a robust complaint redressal system is imperative. This system creates a platform for various stakeholders to voice their complaints regarding C&D Waste management and is an additional monitoring mechanism for the ULB. This system could be enabled through walk-in complaints, phone calls, SMS, online complaints, through postal service and/or any other mechanism which the ULB may consider appropriate keeping in mind the population, per capita income, available technologies and quantity of C&D Waste generated. The ULB shall ensure that each grievance is redressed in a timely and efficient manner bearing in mind the type of grievance, inconvenience caused to public and the remedial action proposed to be taken. The ULB officials should make an area-wise periodic (daily, weekly or monthly) report of the number and type of complaints received, action taken including time taken, feedback of the complainant and pending complaints. This should be submitted to the chief executive officer or commissioner of the ULB for review and necessary action. The details of complaints received and action taken should also be available on the ULB website and its office during working hours.
A toll free number may be set up for this purpose.
SCHEDULE—I: ILLUSTRATIVE RATES FOR USER FEES
PART—I –User Fees payable by Waste Generators except Bulk Waste Generators
| Sl.No Type of Waste Generator | (excluding Bulk Waste Generators) | User Fee per month from each Waste Generator to be not less than | ||
| Population > 1.0 lakh | Population >= 0.5 lakhs and < 1.0 lakh | Population < 0.5 lakhs | ||
| 1. | For collection and transportation of C&D Waste. | Rs. 30 per ton per kilometre. | Rs. 30 per ton per kilometre. | Rs. 20 per ton per Kilometer. |
| 2. | For processing/Land Filling of C&D Waste at the Sanitary Landfill. | Rs. 200 per ton | Rs. 200 per ton | Rs. 200 per ton |
PART II – User Fees payable by Bulk Waste Generators
For Bulk Waste Generators who do not transport their own C&D Waste, User Fee shall be
| Sl.No Type of service | User Fee per month from each Bulk Waste Generator to be not less than | |||
| Population > 1.0 lakh | Population >= 0.5 lakhs and < 10 lakhs | Population < 0.5 lakhs | ||
| 1. | For collection and transportation of C&D Waste. | Rs. 50 per ton per kilometre. | Rs. 40 per ton per kilometre. | Rs. 30 per ton per kilometre. |
| 2. | For processing/Land Filling of C&D Waste at the Sanitary Landfill. | Rs. 200 per ton | Rs. 200 per ton | Rs. 200 per ton |
| Sl. No. | Offence | Bulk Waste Generator/ Service Provider (in INR) | Small Waste Generator (in INR) | Transporter (in INR) |
| 1. | Dumping of construction and demolition waste in storm water drains, open spaces and other non- designated areas. | Rs. 5,000 per ton of C&D Waste dumped Minimum: Rs. 10,000/-. | Rs. 3,000 per ton of C&D Waste dumped. | 3,000 per ton of C&D Waste dumped. |
| 2. | Mixing of C&D Waste with any other waste steam. | 4,000 per ton of C&D Waste mixed. | 3,000 per ton of C&D Waste mixed. | 3,000 per ton of C&D Waste mixed. |
| 3. | Failure to start construction, demolition or renovation works without submission and approval of the waste management plan. | (i) 50,000 if the proposed built up area of the construction/infra- structure is 3000 square feet or less. ( ii) For constructions having built up area of 3000 square feet or more, INR 5,000 for every 100 square feet of built up area. | N.A. | N.A. |
| 4. | Deviations and/or non- compliance of the conditions of the waste management plan. | (i) 50,000 if the proposed built up area of the construction/ infrastructure is 3000 square feet or less. ( ii) For constructions having built up area of 3000 square feet or more, INR 5,000 for every 100 square feet of built up area. | N.A. | N.A. |
Note.— 1. In case the C&D Waste is less than 1.0 ton, the charges shall be levied proportionally.
2. The above charges shall be enhanced @ 10% every year on the base price.
3. The fee will be settled as per actual weight of C&D Waste at the plant site.
4229 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 ANNEXURE-1PUBLIC NOTICE
MANAGEMENT OF CONSTRUCTION AND DEMOLITION WASTE
NAME OF ULB......................
This is bring to the notice of the public residing in the jurisdiction of (Name of ULB........................................................................................................... ) that Construction and Demolition Waste should not be thrown or littered on the roads/public places. In case of generation of Construction and Demolition Waste, the generator should contact online or in writing at the office of (Name of ULB........... ) within three days of generation of waste for collection of waste by giving such collection charges as notified by (Name of ULB................. ). After receiving information in writing from the Generator, the ULB shall arrange to lift the C & D waste and dispose it at a designated site by using its own resources or will deploy an agency for the same and shall fill the trip sheet.
It is also brought to the notice of the public that every waste generator shall keep the Construction and Demolition waste within their premises or get the waste deposited at collection centre notified by (Name of ULB...........) or handed over it to the authorized agency and also ensure that there is no littering or deposition of Construction and Demolition waste so as to prevent obstruction to the traffic or the public or drains. This notice is published in compliance of the provisions of the Construction and Demolition Waste Management Rules, 2016.
_____________
ANNEXURE-2/3 (Name of ULB........................................................)
Format for Registering the Information/Compliance on C&D Waste Generation
Information No. & Date: ______________________________
Complaint No. & Date : ______________________________
Name of the Person: ______________________________
Address & Contact No. ______________________________
Approximate quantity of C & D Waste: _____________________
Approximate no. of trips required to collect the Waste: ________
Collection Charges in Rs. ______________________________
Any other Information: ______________________________
Signature Signature
C&D Waste Generator ULBs Authority
4230 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 ANNEXURE-4(Name of ULB...................................................................................)
TRIP SHEET
(Filled in triplicate) SI. No _____________ Date:_________________
Complaint No. & Date:
Name of the Person:
Address & Contact No.:
Ward No.:
Vehicle No:
Vehicle Type:
Equipment used (Bob CAT/JCB):
No. of trips made:
Collection Charges in Rs. (paid earlier)
Balance Charges in Rs. (If any, to be paid)
Signature of Authorized Person Signature of Authorised person
of Generator of C&D Waste. of ULB/Agency.
Trip Sheet to be made in triplicate.
" One Copy to be retained by ULBs authorized person/agency.
" One Copy to be retained by the Generator of C & D Waste.
" One Copy to be submitted by the agency at ULB after lifting the C& D Waste duly signed
by the agency and the generators.
___________
TRANSPORT DEPARTMENT
NOTIFICATION
Shimla-2, the 26th July, 2019
No. TPT-C (9)-05/2003.—The Governor, Himachal Pradesh in exercise of the powers conferred by sub-section (6) of Section-41 of the Motor Vehicles Act, 1988 (No. 59 of 1988) and all other powers enabling him in this behalf is pleased to allot/release registration marks/number from Serial No. 0001 to 9999 under the Registration marks HP 87A to Registering & Licensing4231 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 Authority Thunag District Mandi, Himachal Pradesh for registration of motor vehicles with effect from the publication in the H. P. Rajpatra (Extra Ordinary) in the public interest.
By order,
JAGDISH CHANDER SHARMA, Principal Secretary (Transport).
________
TRANSPORT DEPARTMENT
NOTIFICATION
Shimla-2, the 24th July, 2019
No. TPT-C (9)-1/2016-I.—The Governor, Himachal Pradesh in exercise of the powers conferred by sub-section 14(3) of the Himachal Pradesh Motor Vehicle Taxation Act, 1972 (Act No. 4 of 1973) and all other powers enabling him in this behalf is pleased to exempt the vehicle No. HP 71-5635 which is registered in the name of Sh. Ranveer Singh s/o Sh. Jagat Ram, r/o Village Dhagand, P. O. Chakli, Tehsil Nahan, District Sirmaur, Himachal Pradesh from the payment of Special Road Tax levied under section-3 of the Himachal Pradesh Motor Vehicle Taxation Act, 1972 w.e.f. 07-01-2011 to 31-08-2017 in public interest.
By order,
JAGDISH CHANDER SHARMA, Principal Secretary (Transport).
____________
TRANSPORT DEPARTMENT
NOTIFICATION
Shimla-2, the 26th July, 2019
No. TPT-F (6)-1/2013-II-Loose.—The Governor, Himachal Pradesh in exercise of the powers conferred by sub-section (6) of Section-41 of the Motor Vehicles Act, 1988 (No. 59 of 1988) and all other powers enabling him in this behalf is pleased to allot/release registration marks/number from Serial No. 0001 to 9999 under the Registration marks HP63-E to Regional Transport Officer Shimla, District Shimla, Himachal Pradesh for registration of motor vehicles with effect from the publication in the H. P. Rajpatra (Extra Ordinary) in the public interest.
By order,
Sd/- (JAGDISH CHANDER SHARMA), Principal Secretary (Transport).
4232 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941ब अदालत श्री कृष्ण चन्द यादव, सहायक समाहर्ता द्वितीय श्रेणी, पधर, तहसील पधर, जिला मण्डी (हि0 प्र0)
उनवान मुकद्दमा : 37(2)
तारीख पेशी : 13-08-2019 संजय कुमार पुत्र श्री इन्द्र, निवासी लोहडा, डाकघर कुफरी, तहसील पधर, जिला मण्डी, हि0 प्र0
. . प्रार्थी।
बनाम
. . प्रत्यार्थी। आम जनता
इश्तहार राजपत्र
आवेदन-पत्र जेर धारा 37(2) के अन्तर्गत नाम दरूस्त करने बारा।
आवेदक संजय कुमार पुत्र श्री इन्द्र, निवासी लोहडा, डाकघर कुफरी, तहसील पधर, जिला मण्डी, हि0 प्र0 ने इस अदालत में आवेदन-पत्र गुजारा है कि उसका नाम ग्राम पंचायत रिकार्ड, स्कूल प्रमाण-पत्र व आधार कार्ड में संजू नाम दर्ज है। जबकि महाल लोहड़ा/545 के तमाम भू0 राजस्व अभिलेख में उसका नाम संजय कुमार दर्ज है। आवेदक ने इस अदालत से प्रार्थना की है कि उसका नाम संजय कुमार उर्फ संजू नाम दर्ज करने के लिखित आदेश दिये जावें।
अतः इस इश्तहार द्वारा आम जनता को सूचित किया जाता है कि यदि किसी व्यक्ति को उक्त नाम दर्ज करने बारा कोई उजर/एतराज हो तो वह असालतन या वकालतन तारीख पेशी 13-08-2019 को सुबह 10.00 बजे हाजिर होकर अपना उजर पेश कर सकता है। बसूरत गैरहाजिर एकतरफा कार्यवाही अमल में लाई जाकर उचित आदेश पारित कर दिए जाएंगे।
यह इश्तहार आज दिनांक 17-07-2019 को मेरे हस्ताक्षर व मोहर अदालत से जारी हुआ। मोहर।
कृष्ण चन्द यादव, सहायक समाहर्ता द्वितीय श्रेणी, तहसील पधर, जिला मण्डी (हि0 प्र0)।
-----------
ब अदालत श्री कृष्ण चन्द यादव, सहायक समाहर्ता द्वितीय श्रेणी, पधर, तहसील पधर, जिला मण्डी (हि0 प्र0)
उनवान मुकद्दमा : 37(2)
तारीख पेशी : 13-08-2019 देवी चन्द पुत्र श्री गुरदास, निवासी चैहड़, डाकघर पाली, तहसील पधर, जिला मण्डी, हि0 प्र0
. . प्रार्थी।
बनाम
. . प्रत्यार्थी। आम जनता
इश्तहार राजपत्र4233 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 आवेदन-पत्र जेर धारा 37(2) के अन्तर्गत नाम दरूस्त करने बारा। आवेदक देवी चन्द पुत्र श्री गुरदास, निवासी चैहड़, डाकघर पाली, तहसील पधर, जिला मण्डी, हि0 प्र0 ने इस अदालत में आवेदन-पत्र गुजारा है कि उसका नाम ग्राम पंचायत रिकार्ड में देवी चन्द नाम दर्ज है। जबकि महाल चैहड़/594 के तमाम भू0 राजस्व अभिलेख में उसका नाम चन्द्रमणी दर्ज है जो गलत दर्ज हुआ है। आवेदक ने इस अदालत से प्रार्थना की है कि उसका नाम चन्द्रमणी के स्थान पर देवी चन्द उर्फ चन्द्रमणी नाम दर्ज करने के लिखित आदेश दिये जावें।
अतः इस इश्तहार द्वारा आम जनता को सूचित किया जाता है कि यदि किसी व्यक्ति को उक्त नाम दर्ज करने बारा कोई उजर/एतराज हो तो वह असालतन या वकालतन तारीख पेशी 13-08-2019 को सुबह 10.00 बजे हाजिर होकर अपना उजर पेश कर सकता है। बसूरत गैरहाजिर एकतरफा कार्यवाही अमल में लाई जाकर उचित आदेश पारित कर दिए जाएंगे।
यह इश्तहार आज दिनांक 17-07-2019 को मेरे हस्ताक्षर व मोहर अदालत से जारी हुआ। मोहर।
कृष्ण चन्द यादव, सहायक समाहर्ता द्वितीय श्रेणी, तहसील पधर, जिला मण्डी (हि0 प्र0)।
-----------
ब अदालत श्री कृष्ण चन्द यादव, सहायक समाहर्ता द्वितीय श्रेणी, पधर, तहसील पधर, जिला मण्डी (हि0 प्र0)
उनवान मुकद्दमा : 37(2)
तारीख पेशी : 13-08-2019 कली राम पुत्र स्व0 श्री गुहतलू, निवासी हुरंग, डाकघर कथोग, तहसील पधर, जिला मण्डी, हि0 प्र0
. . प्रार्थी।
बनाम
. . प्रत्यार्थी। आम जनता
इश्तहार राजपत्र
आवेदन-पत्र जेर धारा 37(2) के अन्तर्गत नाम दरूस्त करने बारा।
आवेदक कली राम पुत्र स्व0 श्री गुहतलू, निवासी हुरंग, डाकघर कथोग, तहसील पधर, जिला मण्डी, हि0 प्र0 ने इस अदालत में आवेदन-पत्र गुजारा है कि उसके मृतक पिता का नाम महाल हुरंग/488 व आलंग/478 के तमाम भू0 राजस्व अभिलेख में मसतू दर्ज है जो गलत दर्ज हुआ है। जबकि उसके मृतक पिता का नाम ग्राम पंचायत कथोग के रिकार्ड में गुहतलू दर्ज है जो सही दर्ज है। आवेदक ने इस अदालत से प्रार्थना की है कि उसके मृतक पिता का नाम मसतू के स्थान पर गुहतलू दर्ज करने के लिखित आदेश दिये जावें।
अतः इस इश्तहार द्वारा आम जनता को सूचित किया जाता है कि यदि किसी व्यक्ति को उक्त नाम दर्ज करने बारा कोई उजर/एतराज हो तो वह असालतन या वकालतन तारीख पेशी 13-08-2019 को सुबह 10.00 बजे हाजिर होकर अपना उजर पेश कर सकता है। बसूरत गैरहाजिर एकतरफा कार्यवाही अमल में लाई जाकर उचित आदेश पारित कर दिए जाएंगे।4234 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 यह इश्तहार आज दिनांक 17-07-2019 को मेरे हस्ताक्षर व मोहर अदालत से जारी हुआ। मोहर।
कृष्ण चन्द यादव, सहायक समाहर्ता द्वितीय श्रेणी, तहसील पधर, जिला मण्डी (हि0 प्र0)।
---------
ब अदालत सहायक समाहर्ता प्रथम श्रेणी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0) मिसल नम्बर : 01/05-01-2019
श्री नोता राम पुत्र श्री शेतु, निवासी गांव बाड़ी, डाकघर शिवावदार, तहसील सदर, जिला मण्डी (हि0 प्र0)।
बनाम
आम जनता
विषय.--राजस्व रिकार्ड में नाम दरुस्ती बारे आवेदन-पत्र।
श्री नोता राम पुत्र श्री शेतु, निवासी गांव बाड़ी, डाकघर शिवावदार, तहसील सदर, जिला मण्डी (हि0 प्र0) ने एक आवेदन-पत्र मय शपथ-पत्र इस आशय के साथ गुजारा है कि उसका नाम ग्राम पंचायत नागधार, विकास खण्ड सदर, जिला मण्डी के रिकार्ड में नोता राम दर्ज है, लेकिन राजस्व विभाग के रिकार्ड महाल डोभा/587, जमाबन्दी साल 2017-2018 में गलती से आवेदक का नाम युधिष्टर दर्ज हुआ है। प्रार्थी अब राजस्व रिकार्ड में ग्राम पंचायत नागधार के रिकार्ड के आधार पर अपना नाम नोता राम दर्ज करवाना चाहता है।
अतः इस इश्तहार द्वारा सर्वसाधारण जनता व हितबद्ध व्यक्तियों को सूचित किया जाता है कि उपरोक्त नाम को दरुस्त करने बारे किसी भी व्यक्ति को कोई आपाि हो तो वह दिनांक 19-08-2019 को या इससे पूर्व अधोहस्ताक्षरी के समक्ष असालतन या वकालतन उपस्थित होकर अपनी आपाि दर्ज कर सकता है। इसके पश्चात् कोई भी एतराज काबिले समायत नहीं होगा तथा आवेदन-पत्र पर नियमानुसार कार्यवाही अमल में लाई जाएगी।
आज दिनांक 11-07-2019 को मेरे हस्ताक्षर व मोहर अदालत द्वारा जारी हुआ।
मोहर।
हस्ताक्षरित/- सहायक समाहर्ता प्रथम श्रेणी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0)।
-------
ब अदालत सहायक समाहर्ता प्रथम श्रेणी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0) मिसल नम्बर : 26/05-11-2018
श्री भोले राम पुत्र श्री नरायण सिंह, निवासी गांव छमार, डाकघर महोगी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0)।
बनाम4235 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 आम जनता विषय.--राजस्व रिकार्ड में नाम दरुस्ती बारे आवेदन-पत्र।
श्री भोले राम पुत्र श्री नरायण सिंह, निवासी गांव छमार, डाकघर महोगी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0) ने एक आवेदन-पत्र मय शपथ-पत्र इस आशय के साथ गुजारा है कि उसके पिता के दादा का नाम ग्राम पंचायत खोलानाल के रिकार्ड में फागणू दर्ज है लेकिन राजस्व विभाग के रिकार्ड महाल शैहनू/551, जमाबन्दी साल 2011-2012 में गलती से आवेदक के पिता के दादा का नाम माघू दर्ज हुआ है। प्रार्थी अब राजस्व रिकार्ड में ग्राम पंचायत खोलानाल के रिकार्ड के आधार पर अपने पिता के दादा का नाम फागणू दर्ज करवाना चाहता है।
अतः इस इश्तहार द्वारा सर्वसाधारण जनता व हितबद्ध व्यक्तियों को सूचित किया जाता है कि उपरोक्त नाम को दरुस्त करने बारे किसी भी व्यक्ति को कोई आपाि हो तो वह दिनांक 19-08-2019 को या इससे पूर्व अधोहस्ताक्षरी के समक्ष असालतन या वकालतन उपस्थित होकर अपनी आपाि दर्ज कर सकता है। इसके पश्चात् कोई भी एतराज काबिले समायत नहीं होगा तथा आवेदन-पत्र पर नियमानुसार कार्यवाही अमल में लाई जाएगी।
आज दिनांक 11-07-2019 को मेरे हस्ताक्षर व मोहर अदालत द्वारा जारी हुआ।
मोहर।
हस्ताक्षरित/- सहायक समाहर्ता प्रथम श्रेणी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0)।
-------
ब अदालत सहायक समाहर्ता प्रथम श्रेणी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0) मिसल नम्बर : 06/05-03-2019
श्रीमती दिनेश्वरी पत्नी श्री मीर चन्द, निवासी गांव घाट मुहाथ, डाकघर पंजाई़, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0)।
बनाम
आम जनता
विषय.--राजस्व रिकार्ड में नाम दरुस्ती बारे आवेदन-पत्र ।
श्रीमती दिनेश्वरी पत्नी श्री मीर चन्द, निवासी गांव घाट मुहाथ, डाकघर पंजाई़, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0) ने एक आवेदन-पत्र मय शपथ-पत्र इस आशय के साथ गुजारा है कि उसका नाम ग्राम पंचायत देवधार के रिकार्ड में श्रीमती दिनेश्वरी दर्ज है लेकिन राजस्व विभाग के रिकार्ड महाल ददवास/576, पटवार वृत्त थाची में आवेदिका का नाम गलती से श्रीमती धनेश्वरी दर्ज हुआ है। अब प्रार्थिनी राजस्व रिकार्ड में ग्राम पंचायत देवधार के रिकार्ड के आधार पर अपना नाम श्रीमती दिनेश्वरी दर्ज करवाना चाहती है।
अतः इस इश्तहार द्वारा सर्वसाधारण जनता व हितबद्ध व्यक्तियों को सूचित किया जाता है कि उपरोक्त नाम को दरुस्त करने बारे किसी भी व्यक्ति को कोई आपाि हो तो वह दिनांक 19-08-2019 को या इससे पूर्व अधोहस्ताक्षरी के समक्ष असालतन या वकालतन उपस्थित होकर अपनी आपाि दर्ज कर सकता है। इसके पश्चात् कोई भी एतराज काबिले समायत नहीं होगा तथा आवेदन-पत्र पर नियमानुसार कार्यवाही अमल में लाई जाएगी।4236 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 आज दिनांक 11-07-2019 को मेरे हस्ताक्षर व मोहर अदालत द्वारा जारी हुआ। मोहर।
हस्ताक्षरित/- सहायक समाहर्ता प्रथम श्रेणी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0)।
-------
ब अदालत सहायक समाहर्ता प्रथम श्रेणी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0) मिसल नम्बर : 08/15-03-2019
श्री डोले राम पुत्र श्री भगत राम, निवासी गांव पनाली, डाकघर लारजी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0)।
बनाम
आम जनता
विषय.--राजस्व रिकार्ड में नाम दरुस्ती बारे आवेदन-पत्र।
श्री डोले राम पुत्र श्री भगत राम, निवासी गांव पनाली, डाकघर लारजी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0) ने एक आवेदन-पत्र मय शपथ-पत्र इस आशय के साथ गुजारा है कि उसका नाम ग्राम पंचायत काउ के रिकार्ड में डोले राम दर्ज है लेकिन राजस्व विभाग के रिकार्ड महाल मुहलू खमराधा/596, जमाबन्दी साल 2015-2016 में गलती से आवेदक का नाम डोला राम दर्ज हुआ है। प्रार्थी अब राजस्व रिकार्ड में ग्राम पंचायत काउ के रिकार्ड के आधार पर अपना नाम डोले राम दर्ज करवाना चाहता है।
अतः इस इश्तहार द्वारा सर्वसाधारण जनता व हितबद्ध व्यक्तियों को सूचित किया जाता है कि उपरोक्त नाम को दरुस्त करने बारे किसी भी व्यक्ति को कोई आपाि हो तो वह दिनांक 19-08-2019 को या इससे पूर्व अधोहस्ताक्षरी के समक्ष असालतन या वकालतन उपस्थित होकर अपनी आपाि दर्ज कर सकता है। इसके पश्चात् कोई भी एतराज काबिले समायत नहीं होगा तथा आवेदन-पत्र पर नियमानुसार कार्यवाही अमल में लाई जाएगी।
आज दिनांक 11-07-2019 को मेरे हस्ताक्षर व मोहर अदालत द्वारा जारी हुआ।
मोहर।
हस्ताक्षरित/- सहायक समाहर्ता प्रथम श्रेणी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0)।
-------
ब अदालत सहायक समाहर्ता प्रथम श्रेणी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0) मिसल नम्बर : 07/15-03-2019
श्री यवराज पुत्र श्री मोहन लाल, निवासी गांव शालागाड़, डाकघर थाची, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0)।
बनाम
आम जनता
विषय.--राजस्व रिकार्ड में नाम दरुस्ती बारे आवेदन-पत्र।4237 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 श्री यवराज पुत्र श्री मोहन लाल, निवासी गांव शालागाड़, डाकघर थाची, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0) ने एक आवेदन-पत्र मय शपथ-पत्र इस आशय के साथ गुजारा है कि उसका नाम ग्राम पंचायत थाची के रिकार्ड में यवराज दर्ज है लेकिन राजस्व विभाग के रिकार्ड महाल बिझर/580, जमाबन्दी साल 2017-2018 में गलती से आवेदक का नाम राजू दर्ज हुआ है। प्रार्थी अब राजस्व रिकार्ड में ग्राम पंचायत थाची के रिकार्ड के आधार पर अपना नाम यवराज दर्ज करवाना चाहता है।
अतः इस इश्तहार द्वारा सर्वसाधारण जनता व हितबद्ध व्यक्तियों को सूचित किया जाता है कि उपरोक्त नाम को दरुस्त करने बारे किसी भी व्यक्ति को कोई आपाि हो तो वह दिनांक 19-08-2019 को या इससे पूर्व अधोहस्ताक्षरी के समक्ष असालतन या वकालतन उपस्थित होकर अपनी आपाि दर्ज कर सकता है। इसके पश्चात् कोई भी एतराज काबिले समायत नहीं होगा तथा आवेदन-पत्र पर नियमानुसार कार्यवाही अमल में लाई जाएगी।
आज दिनांक 11-07-2019 को मेरे हस्ताक्षर व मोहर अदालत द्वारा जारी हुआ।
मोहर।
हस्ताक्षरित/- सहायक समाहर्ता प्रथम श्रेणी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0)।
-------
ब अदालत कार्यकारी दण्डाधिकारी, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0)
मिसल नम्बर : 16/06-07-2019
श्री मोहन लाल पुत्र श्री डिणू राम, निवासी गांव वसूट, डाकघर थाची, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0)।
बनाम
आम जनता
विषय.--प्रार्थना-पत्र जेर धारा 13(3) जन्म एवं मृत्यु पंजीकरण अधिनियम, 1969 व हिमाचल प्रदेश जन्म एवं मृत्यु अधिनियम, 1978.
श्री मोहन लाल पुत्र श्री डिणू राम, निवासी गांव वसूट, डाकघर थाची, तहसील बालीचौकी, जिला मण्डी (हि0 प्र0) नेे एक आवेदन-पत्र मय शपथ-पत्र इस आशय के साथ गुजारा है कि उसकी दादी श्रीमती शुकरी देवी की मृत्यु दिनांक 27-08-1986 को हुई है, परन्तु अज्ञानतावश उसकी मृत्यु को ग्राम पंचायत थाची में दर्ज न करवाया जा सका है। अब वह अपनी दादी की मृत्यु का पंजीकरण ग्राम पंचायत थाची के रिकार्ड में दर्ज करवाना चाहता है।
अतः इस इश्तहार द्वारा सर्वसाधारण जनता व हितबद्ध व्यक्तियों को सूचित किया जाता है कि प्रार्थी की दादी श्रीमती शुकरी देवी की मृत्यु के पंजीकरण को सम्बन्धित ग्राम पंचायत के रिकार्ड में दर्ज करने बारे यदि किसी को कोई एतराज हो तो वह दिनांक 19-08-2019 तक इस अदालत में असालतन या वकालतन हाजिर होकर अपनी आपत्ति दर्ज करवा सकता हैै। इसके पश्चात् कोई भी एतराज काबिले समायत नहीं होगा तथा आवेदन-पत्र पर नियमानुसार कार्यवाही अमल में लाई जाएगी।
आज दिनांक 11-07-2019 को मेरे हस्ताक्षर व मोहर सहित अदालत द्वारा जारी हुआ।
मोहर।
हस्ताक्षरित/-
कार्यकारी दण्डाधिकारी,
तहसील बालीचौकी, जिला मण्डी (हि0 प्र0)।4238 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 समक्ष श्री प्रवीन कुमार, तहसीलदार एवम् कार्यकारी दण्डाधिकारी, लडभड़ोल, जिला मण्डी (हि0 प्र0) तारीख पेशी : 27-08-2019
. . प्रार्थी। श्री ध्रर्मन्द्र सिंह पुत्र स्वामी राम, निवासी गांव गवैला, डाकघर व तहसील लडभड़ोल, जिला मण्डी (हि0 प्र0)
बनाम
आम जनता
. . फरीकदोयम। प्रार्थना-पत्र जेर धारा 13(3) जन्म एवं मृत्यु पंजीकरण अधिनियम, 1969 बराए दर्ज करने जन्म/मृत्यु तिथि।
श्री ध्रर्मन्द्र सिंह पुत्र स्वामी राम, निवासी गांव गवैला, डाकघर व तहसील लडभड़ोल, जिला मण्डी (हि0 प्र0) नेे शपथ-पत्र सहित आवेदन किया है कि प्रार्थी के पुत्र विशाल कुमार की वास्तविक जन्म तिथि 15-04-2014 है, परन्तु प्रार्थी के पुत्र विशाल कुमार की जन्म तिथि 15-04-2014 ग्राम पंचायत भडोल के जन्म अभिलेख में दर्ज नहीं हुई है। अब प्रार्थी ने अपने पुत्र की जन्म तिथि को दर्ज करने हेतु आवेदन किया है।
अतः इस इश्तहार के माध्यम से सर्वसाधारण को सूचित किया जाता है कि यदि किसी व्यक्ति को उक्त जन्म तिथि 15-04-2014 को दर्ज करने बारा कोई उजर/एतराज हो तो वह दिनांक 27-08-2019 को असालतन या वकालतन इस न्यायालय में उपस्थित होकर अपना उजर/एतराज पेश करें, अन्यथा गैरहाजिर की सूरत में एकतरफा कार्यवाही अमल में लाई जाएगी।
यह इश्तहार आज दिनांक 16-07-2019 को मेरे हस्ताक्षर व मोहर सहित अदालत से जारी हुआ। मोहर।
हस्ताक्षरित/-
तहसीलदार एवम् कार्यकारी दण्डाधिकारी,
लडभड़ोल, जिला मण्डी (हि0 प्र0)।
-------
समक्ष श्री प्रवीन कुमार, तहसीलदार एवम् कार्यकारी दण्डाधिकारी, लडभड़ोल, जिला मण्डी (हि0 प्र0)
तारीख पेशी : 20-08-2019 श्रीमती सैना देवी पत्नी स्व0 श्री प्रेम सिंह, निवासी गांव गवैला, डाकघर व तहसील लडभड़ोल, जिला . . प्रार्थिन। मण्डी (हि0 प्र0)
बनाम
आम जनता
. . फरीकदोयम। प्रार्थना-पत्र जेर धारा 13(3) जन्म एवं मृत्यु पंजीकरण अधिनियम, 1969 बराए दर्ज करने जन्म/मृत्यु तिथि।
श्रीमती सैना देवी पत्नी स्व0 श्री प्रेम सिंह, निवासी गांव गवैला, डाकघर व तहसील लडभड़ोल, जिला मण्डी (हि0 प्र0) नेे शपथ-पत्र सहित आवेदन किया है कि प्रार्थिन के पति की मृत्यु दिनांक 09-09-2002 को हो चुकी है, परन्तु प्रार्थिन के पति की मृत्यु तिथि 09-09-2002 ग्राम पंचायत भडोल के मृत्यु अभिलेख में दर्ज नहीं हुई है। अब प्रार्थिन ने अपने पति की मृत्यु तिथि को दर्ज करने हेतु आवेदन किया है।4239 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 अतः इस इश्तहार के माध्यम से सर्वसाधारण को सूचित किया जाता है कि यदि किसी व्यक्ति को उक्त मृत्यु तिथि को दर्ज करने बारा कोई उजर/एतराज हो तो वह दिनांक 20-08-2019 को असालतन या वकालतन इस न्यायालय में उपस्थित होकर अपना उजर/एतराज पेश करें, अन्यथा गैरहाजिर की सूरत में एकतरफा कार्यवाही अमल में लाई जाएगी।
यह इश्तहार आज दिनांक 16-07-2019 को मेरे हस्ताक्षर व मोहर सहित अदालत से जारी हुआ। मोहर।
हस्ताक्षरित/-
तहसीलदार एवम् कार्यकारी दण्डाधिकारी,
लडभड़ोल, जिला मण्डी (हि0 प्र0)।
-------
समक्ष श्री प्रवीन कुमार, तहसीलदार एवम् सहायक समाहर्ता प्रथम श्रेणी, लडभड़ोल, जिला मण्डी (हि0 प्र0)
तारीख पेशी : 27-08-2019 श्री सुभाष चन्द भलारिया पुत्र श्री धर्म सिंह, निवासी सौं रोपडू, डाकघर बसौना, तहसील लडभड़ोल, . . प्रार्थी। जिला मण्डी (हि0 प्र0)
बनाम
. . फरीकदोयम। आम जनता
श्री सुभाष चन्द भलारिया पुत्र श्री धर्म सिंह, निवासी सौं रोपडू, डाकघर बसौना, तहसील लडभड़ोल, जिला मण्डी (हि0 प्र0) नेे शपथ-पत्र सहित आवेदन किया है कि प्रार्थी का वास्तविक नाम सुभाष चन्द भलारिया है, परन्तु प्रार्थी का नाम राजस्व अभिलेख महाल सौं में सुभाष चन्द दर्ज हो चुका है जोकि गलत है। अब प्रार्थी ने अपने नाम की दरुस्ती के आदेश चाहे हैं।
अतः इस इश्तहार द्वारा आम जनता को सूचित किया जाता है कि यदि किसी व्यक्ति को उक्त नाम दरुस्ती करने बारा कोई उजर/एतराज हो तो वह असालतन या वकालतन तारीख पेशी 27-08-2019 को 10.00 बजे इस अदालत में हाजिर होकर अपना उजर/एतराज पेश कर सकता है। बसूरत गैरहाजिर एकतरफा कार्यवाही अमल में लाई जाकर नाम दरुस्ती करने के आदेश पारित कर दिए जाएंगे।
यह इश्तहार आज दिनांक 16-07-2019 को मेरे हस्ताक्षर व मोहर सहित अदालत से जारी हुआ। मोहर।
हस्ताक्षरित/- सहायक समाहर्ता प्रथम श्रेणी, लडभड़ोल, जिला मण्डी (हि0 प्र0)।
-------
समक्ष श्री प्रवीन कुमार, तहसीलदार एवम् सहायक समाहर्ता प्रथम श्रेणी, लडभड़ोल, जिला मण्डी (हि0 प्र0)
तारीख पेशी : 20-08-2019 श्री त्रिलोक नाथ पुत्र श्री रिखी, निवासी गांव काला अम्ब, तहसील लडभड़ोल, जिला मण्डी (हि0प्र0)
. . प्रार्थी।4240 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 बनाम
. . फरीकदोयम। आम जनता
श्री त्रिलोक नाथ पुत्र श्री रिखी, निवासी गांव काला अम्ब, तहसील लडभड़ोल, जिला मण्डी (हि0 प्र0) नेे शपथ-पत्र सहित आवेदन किया है कि प्रार्थी का वास्तविक नाम त्रिलोक नाथ है, परन्तु प्रार्थी का नाम राजस्व अभिलेख महाल काला अम्ब में त्रिलोक चन्द दर्ज हो चुका है जोकि गलत है। अब प्रार्थी ने अपने नाम की दरुस्ती के आदेश चाहे हैं।
अतः इस इश्तहार द्वारा आम जनता को सूचित किया जाता है कि यदि किसी व्यक्ति को उक्त नाम दरुस्ती करने बारा कोई उजर/एतराज हो तो वह असालतन या वकालतन तारीख पेशी 20-08-2019 को 10.00 बजे इस अदालत में हाजिर होकर अपना उजर/एतराज पेश कर सकता है। बसूरत गैरहाजिर एकतरफा कार्यवाही अमल में लाई जाकर नाम दरुस्ती दर्ज करने के आदेश पारित कर दिए जाएंगे। यह इश्तहार आज दिनांक 16-07-2019 को मेरे हस्ताक्षर व मोहर सहित अदालत से जारी हुआ। मोहर।
हस्ताक्षरित/- सहायक समाहर्ता प्रथम श्रेणी, लडभड़ोल, जिला मण्डी (हि0 प्र0)।
-------
समक्ष श्री प्रवीन कुमार, तहसीलदार एवम् सहायक समाहर्ता प्रथम श्रेणी, लडभड़ोल, जिला मण्डी (हि0 प्र0)
तारीख पेशी : 20-08-2019 श्री मस्त राम पुत्र श्री प्रभू राम, निवासी गांव पनीरू, तहसील लडभड़ोल, जिला मण्डी (हि0प्र0)
. . प्रार्थी।
बनाम
. . फरीकदोयम। आम जनता
श्री मस्त राम पुत्र श्री प्रभू राम, निवासी गांव पनीरू, तहसील लडभड़ोल, जिला मण्डी (हि0प्र0) नेे शपथ-पत्र सहित आवेदन किया है कि प्रार्थी का वास्तविक नाम मस्त राम है, परन्तु प्रार्थी का नाम राजस्व अभिलेख महाल पनीरू में मस्तो दर्ज हो चुका है जोकि गलत है। अब प्रार्थी ने अपने नाम की दरुस्ती के आदेश चाहे हैं।
अतः इस इश्तहार द्वारा आम जनता को सूचित किया जाता है कि यदि किसी व्यक्ति को उक्त नाम दरुस्ती करने बारा कोई उजर/एतराज हो तो वह असालतन या वकालतन तारीख पेशी 20-08-2019 को 10.00 बजे इस अदालत में हाजिर होकर अपना उजर/एतराज पेश कर सकता है। बसूरत गैरहाजिर एकतरफा कार्यवाही अमल में लाई जाकर नाम दरुस्ती दर्ज करने के आदेश पारित कर दिए जाएंगे। यह इश्तहार आज दिनांक 16-07-2019 को मेरे हस्ताक्षर व मोहर सहित अदालत से जारी हुआ। मोहर।
हस्ताक्षरित/- सहायक समाहर्ता प्रथम श्रेणी, लडभड़ोल, जिला मण्डी (हि0 प्र0)।4241 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 समक्ष श्री प्रवीन कुमार, तहसीलदार एवम् सहायक समाहर्ता प्रथम श्रेणी, लडभड़ोल, जिला मण्डी (हि0 प्र0)
तारीख पेशी : 20-08-2019 श्रीमती सावित्री देवी पत्नी स्व0 श्री सुरजन सिंह, निवासी महाल चिम्हनू, गांव नागन, तहसील . . प्रार्थिन। जोगिन्दरनगर, जिला मण्डी (हि0प्र0)
बनाम
आम जनता
. . फरीकदोयम। श्रीमती सावित्री देवी पत्नी स्व0 श्री सुरजन सिंह, निवासी महाल चिम्हनू, गांव नागन, तहसील जोगिन्दरनगर, जिला मण्डी (हि0प्र0) नेे शपथ-पत्र सहित आवेदन किया है कि प्रार्थिन का वास्तविक नाम सावित्री देवी है, परन्तु प्रार्थिन के मायके तहसील लडभडोल के राजस्व अभिलेख महाल कोठी व महाल पट्टा में प्रार्थिन का नाम गुड्डी देवी दर्ज हो चुका है जोकि गलत है। अब प्रार्थिन ने अपने नाम की दरुस्ती के आदेश चाहे हैं।
अतः इस इश्तहार द्वारा आम जनता को सूचित किया जाता है कि यदि किसी व्यक्ति को उक्त नाम दरुस्ती करने बारा कोई उजर/एतराज हो तो वह असालतन या वकालतन तारीख पेशी 20-08-2019 को 10.00 बजे इस अदालत में हाजिर होकर अपना उजर/एतराज पेश कर सकता है। बसूरत गैरहाजिर एकतरफा कार्यवाही अमल में लाई जाकर नाम दरुस्ती करने के आदेश पारित कर दिए जाएंगे।
यह इश्तहार आज दिनांक 16-07-2019 को मेरे हस्ताक्षर व मोहर सहित अदालत से जारी हुआ। मोहर।
हस्ताक्षरित/- सहायक समाहर्ता प्रथम श्रेणी, लडभड़ोल, जिला मण्डी (हि0 प्र0)।
-------
समक्ष श्री प्रवीन कुमार, तहसीलदार एवम् सहायक समाहर्ता प्रथम श्रेणी, लडभड़ोल, जिला मण्डी (हि0 प्र0)
श्रीमती शकुन्तला देवी पुत्री दीपा उपनाम देवा, निवासी बल्ह-1, डाकघर बल्ह क्वार, तहसील . . प्रार्थिन। लडभडोल, जिला मण्डी (हि0प्र0)
बनाम
आम जनता
. . फरीकदोयम। श्रीमती शकुन्तला देवी पुत्री दीपा उपनाम देवा, निवासी बल्ह-1, डाकघर बल्ह क्वार, तहसील लडभडोल, जिला मण्डी (हि0प्र0) नेे शपथ-पत्र सहित आवेदन किया है कि प्रार्थिन का वास्तविक नाम शकुन्तला देवी है, परन्तु प्रार्थिन का नाम राजस्व अभिलेख महाल बल्ह-1 में बबली देवी दर्ज हो चुका है जोकि गलत है। अब प्रार्थिन ने अपने नाम की दरुस्ती के आदेश चाहे हैं।
अतः इस इश्तहार द्वारा आम जनता को सूचित किया जाता है कि यदि किसी व्यक्ति को उक्त नाम दरुस्ती करने बारा कोई उजर/एतराज हो तो वह असालतन या वकालतन तारीख पेशी 27-08-2019 को 10.00 बजे इस अदालत में हाजिर होकर अपना उजर/एतराज पेश कर सकता है। बसूरत गैरहाजिर एकतरफा कार्यवाही अमल में लाई जाकर नाम दरुस्ती करने का आदेश पारित कर दिया जाएगा। यह इश्तहार आज दिनांक 16-07-2019 को मेरे हस्ताक्षर व मोहर सहित अदालत से जारी हुआ। मोहर।
हस्ताक्षरित/- सहायक समाहर्ता प्रथम श्रेणी, लडभड़ोल, जिला मण्डी (हि0 प्र0)।4242 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941
ब अदालत कार्यकारी दण्डाधिकारी, जुब्बल, जिला शिमला, हिमाचल प्रदेश
श्री मोती लाल पुत्र श्री गंगा दत्त, निवासी ग्राम बटाड़, डाकघर कठासू, तहसील जुब्बल, जिला शिमला, . . प्रार्थी। हि0 प्र0
बनाम
आम जनता
उनवान मुकद्दमा.--दरख्वास्त जेर धारा 13(3) जन्म एवं मृत्यु पंजीकरण अधिनियम, 1969 के अन्तर्गत। इस कार्यालय में श्री मोती लाल पुत्र श्री गंगा दत्त, निवासी ग्राम बटाड़, डाकघर कठासू, तहसील जुब्बल, जिला शिमला, हि0 प्र0 का प्रार्थना-पत्र जो अतिरिक्त जिला रजिस्ट्रार जन्म एवं मृत्यु शिमला, जिला शिमला के माध्यम से इस कार्यालय मेें प्राप्त हुआ है जिसमें आग्रह किया गया है कि प्रार्थी की पुत्री का नाम प्रिया व जन्म तिथि 09-02-2005 है जो अभी तक किसी भी पंचायत में पंजीकृत नहीं है। जिसके कारण प्रार्थी को अपनी पुत्री का आयु प्रमाण-पत्र जारी करवाने में कठिनाई आ रही है। प्रार्थी अपनी पुत्री का पंजीकरण ग्राम पंचायत कठासू में दर्ज करवाना चाहता है।
अतः इस इश्तहार के माध्यम से सर्वसाधारण को सूचित किया जाता है कि यदि किसी को भी उपर्युक्त प्रार्थी की पुत्री का नाम व जन्म तिथि का इन्द्राज ग्राम पंचायत कठासू में दर्ज करने बारे कोई भी उजर व एतराज हो तो वह दिनांक 21-08-2019 को या इससे पूर्व अदालत हजा में हाजिर होकर लिखित व मौखिक एतराज प्रस्तुत करें। यदि उक्त तारीख तक कोई भी उजर व एतराज प्रस्तुत न हुआ तो यह समझा जाएगा कि प्रार्थी की पुत्री प्रिया के नाम व जन्म तिथि पंजीकरण हेतु किसी को कोई आपत्ति नहीं है तथा ग्राम पंचायत कठासू को जन्म तिथि दर्ज करने के आदेश पारित किए जावेंगे।
आज दिनांक 23-07-2019 को हमारे हस्ताक्षर व मोहर अदालत से जारी हुआ।
मोहर।
हस्ताक्षरित/- कार्यकारी दण्डाधिकारी, जुब्बल, जिला शिमला (हि0 प्र0)।
--------
ब अदालत कार्यकारी दण्डाधिकारी, जुब्बल, जिला शिमला, हिमाचल प्रदेश
श्रीमती सुचैता पुत्री श्री प्राग राम, निवासी गांव व डाकघर धार, तहसील जुब्बल, जिला शिमला, हि0 प्र0
. . प्रार्थिनी।
बनाम
आम जनता
उनवान मुकद्दमा.--दरख्वास्त बराए दरुस्त किए जाने प्रार्थिनी का नाम भू-राजस्व रिकार्ड महाल धार व शड़हाना, पटवार सर्कल पौटा व मिहाना, तहसील जुब्बल बारे।
यह कि श्रीमती सुचैता पुत्री श्री प्राग राम, निवासी गांव व डाकघर धार, तहसील जुब्बल, जिला शिमला, हि0 प्र0 ने अधोहस्ताक्षरी की अदालत में एक प्रार्थना-पत्र प्रस्तुत किया है जिसमें आग्रह किया गया है कि उसका नाम सुचैता पुत्री श्री प्राग राम है परन्तु पटवार वृत्त मिहाना, महाल शड़हाना में सुनिता पुत्री प्राग राम तथा पटवार वृत्त पौटा, महाल धार में सुमित्रा देवी पुत्री प्राग राम गलत दर्ज है। जिसे वह दरुस्त करवाना चाहती है जिसकी छानबीन गिरदावर हल्का जुब्बल व पटवारी मिहाना व पौटा से करवाई जा चुकी है मुताबिक छानबीन रिपोर्ट से भी पाया गया है कि प्रार्थिनी का सही व वास्तविक नाम सुचैता पुत्री प्राग राम है जिसे4243 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 दरुस्ती बारे आग्रह सही है। जिस बारे प्रार्थिनी का पैन कार्ड, आधार कार्ड, ग्राम पंचायत धार का प्रमाण-पत्र व वाशिन्दगान के ब्यानात कलमबद्ध करके संलग्न किये गये हैं।
प्रार्थना-पत्र में आगामी उचित कार्यवाही करने से पूर्व इस इश्तहार के माध्यम से सर्वसाधारण को सूचित किया जाता है कि यदि किसी व्यक्ति को भी उपरोक्त प्रार्थिनी के नाम को पटवार सर्कल मिहाना, चक शड़हाना व पटवार वृत्त पौटा, चक धार में सुनिता व सुमित्रा देवी पुत्री प्राग राम के स्थान पर सुचैता पुत्री प्राग राम दरुस्त करने पर कोई उजर व एतराज हो तो वह दिनांक 09-08-2019 को या इससे पूर्व अधोहस्ताक्षरी की अदालत में हाजिर होकर अपना लिखित व मौखिक एतराज प्रस्तुत करें, दीगर सूरत में यह समझा जाएगा कि प्रार्थिनी के नाम को दरुस्त करने पर किसी को कोई आपत्ति नहीं है तथा पटवार सर्कल मिहाना चक शड़हाना व पटवार वृत्त पौटा, चक धार में प्रार्थिनी के नाम की दरुस्ती के आदेश पारित कर दिये जावेंगे। आज दिनांक 09-07-2019 को हमारे हस्ताक्षर व मोहर अदालत से जारी हुआ।
मोहर।
हस्ताक्षरित/- कार्यकारी दण्डाधिकारी, जुब्बल, जिला शिमला (हि0 प्र0)।
--------
ब अदालत कार्यकारी दण्डाधिकारी, सरस्वती नगर, जिला शिमला, हिमाचल प्रदेश
लोकिन्दर पुत्र श्री प्रभु, निवासी गांव क्वाल्टा, डाकघर गिल्टाडी, उप-तहसील सरस्वती नगर, जिला शिमला, हिमाचल प्रदेश।
बनाम
आम जनता
प्रार्थना-पत्र जेर धारा 1969(3) जन्म तिथि दर्ज करने बारे।
लोकिन्दर पुत्र श्री प्रभु, निवासी गांव क्वाल्टा, डाकघर गिल्टाडी, उप-तहसील सरस्वती नगर, जिला शिमला, हिमाचल प्रदेश ने इस कार्यालय में निवेदन किया है कि उसके पुत्र सुजल कुमार की जन्म तिथि 09-04-2008 है जोकि अज्ञानतावश अभी तक सम्बन्धित ग्राम पंचायत के जन्म पंजीकरण रजिस्टर में दर्ज नहीं होना पाया गया। आवेदक अब ग्राम पंचायत गिल्टाडी के अभिलेख/जन्म पंजीकरण रजिस्टर में उपरोक्त सुजल कुमार की जन्म तिथि को दर्ज करवाना चाहता है।
अतः इस अदालती इश्तहार द्वारा सर्वसाधारण को सूचित किया जाता है कि यदि इस बारे किसी व्यक्ति या आम जनता को कोई उजर व एतराज हो तो वह दिनांक 19-08-2019 तक प्रातः 10.00 बजे अधोहस्ताक्षरी के कार्यालय में उपस्थित होकर अपनी आपत्ति जाहिर कर सकता है।
आज दिनांक 17-07-2019 को मेरे हस्ताक्षर एवं मोहर कार्यालय/न्यायालय से जारी हुआ। मोहर। हस्ताक्षरित/-
कार्यकारी दण्डाधिकारी, सरस्वती नगर, जिला शिमला (हि0 प्र0)।4244 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941
In the Court of Niraj Chandla (H.P.A.S), Sub-Divisional Magistrate, Shimla (Urban),
District Shimla, Himachal Pradesh
Smt. Tsering Paldon wife of Sh. Nawang Rinchen, resident of House No. 43, Tibetan Colony Krishna Nagar, Shimla-1, Tehsil and District Shimla, Himachal Pradesh . . Applicant.
Versus
General Public
.. Respondent.
Application under section 13(3) of Birth and Death Registration Act, 1969.
Whereas Smt. Tsering Paldon wife of Sh. Nawang Rinchen, resident of House No. 43, Tibetan Colony, Krishna Nagar, Shimla-1, Tehsil and District Shimla, Himachal Pradesh has preferred an application to the undersigned for registration of date of birth of herself TSERING PALDON, (DOB 15-06-1964) at above address in the record of Municipal Corporation, Shimla.
Therefore, this proclamation, the general public is hereby informed that any person having any objection for entry as to date of birth mentioned above, may submit his objection in writing in this court on or before 23-08-2019 failing which no objection will be entertained after expiry of date and will be decided accordingly.
Given under my hand and seal of the Court on this 24th day of July, 2019.
Seal.
NIRAJ CHANDLA (HPAS), Sub-Divisional Magistrate, Shimla (Urban), District Shimla (H.P.).
__________
In the Court of Shri Arun Kumar, Executive Magistrate, Tehsil Nerwa,
District Shimla, Himachal Pradesh
Sh. Vikram Sharma s/o Late Sh. Lachhi Ram, r/o Vill. Sanog, P.O. Madhana, Tehsil Nerwa, District Shimla, H.P. ..Applicant.
Versus
General Public
.. Respondent.
Application under section 13(3) of Birth and Death Registration Act, 1969.
Whereas Sh. Vikram Sharma s/o Late Sh. Lachhi Ram, r/o Vill. Sanog, P.O. Madhana, Tehsil Nerwa, District Shimla, H.P. has preferred an application to the undersigned for registration of name of his father name Late Shri Lachhi Ram whose date of death 04-04-2013 Gram Panchayat Madhana, Tehsil Nerwa, District Shimla, H.P.
Therefore by this proclamation, the General Public is hereby informed that any person having any objection for entry as to date of death mentioned above, may submit his objection in writing in this court on or before 25-8-2019 failing which no objection will be entertained after expiry of date and will be decided accordingly.
4245 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 Given under my hand and seal of the Court on this 22-07-2019.Seal.
ARUN KUMAR, Executive Magistrate, Tehsil Nerwa, District Shimla, H.P.
__________
In the Court of Shri Arun Kumar, Executive Magistrate, Tehsil Nerwa,
District Shimla, Himachal Pradesh
Sh. Joginder Singh s/o Sh. Devi Ram, r/o Vill. Kharchali, P.O. Ruslah, Tehsil Nerwa, District Shimla, H.P. ..Applicant.
Versus
General Public
.. Respondent.
Application under section 13(3) of Birth and Death Registration Act, 1969.
Whereas Sh. Joginder Singh s/o Sh. Devi Ram, r/o Vill. Kharchali, P.O. Ruslah, Tehsil Nerwa, District Shimla, H.P. has preferred an application to the undersigned for registration of name of his son namely Mr. Naveen whose date of birth (24-12-2005) in the Gram Panchayat Pujarli, Tehsil Nerwa, District Shimla, H.P.
Therefore by this proclamation, the General Public is hereby informed that any person having any objection for entry as to date of birth mentioned above, may submit his objection in writing in this court on or before 25-8-2019 failing which no objection will be entertained after expiry of date and will be decided accordingly.
Given under my hand and seal of the Court on this 22-07-2019.
Seal.
ARUN KUMAR, Executive Magistrate, Tehsil Nerwa, District Shimla, H.P.
__________
In the Court of Shri Arun Kumar, Executive Magistrate, Tehsil Nerwa,
District Shimla, Himachal Pradesh
Sh. Santosh s/o Sh. Daulat Ram, r/o Village Navi, P.O. Bharanu, Tehsil Nerwa, District Shimla, H.P. ..Applicant.
Versus
General Public
.. Respondent.
Application under section 13(3) of Birth and Death Registration Act, 1969.
Whereas Sh. Santosh s/o Sh. Daulat Ram, r/o Village Navi, P.O. Bharanu, Tehsil Nerwa, District Shimla, H.P. has preferred an application to the undersigned for registration of name of her4246 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 daughter namely Miss. Rejil whose date of birth (11-01-2018) in the Gram Panchayat Mundli, Tehsil Nerwa, District Shimla, H.P.
Therefore by this proclamation, the General Public is hereby informed that any person having any objection for entry as to date of birth mentioned above, may submit his/her objection in writing in this court on or before 25-8-2019 failing which no objection will be entertained after expiry of date and will be decided accordingly.
Given under my hand and seal of the Court on this 22-07-2019.
Seal.
ARUN KUMAR, Executive Magistrate, Tehsil Nerwa, District Shimla, H.P.
__________
In the Court of Shri Neeraj Gupta, Sub-Divisional Magistrate, Shimla (R),
District Shimla (H. P.)
Sh. Ram Lal Thakur s/o Late Shri Chandu Ram, r/o Village Chharah, P.O. Ghanahatti, Tehsil & District Shimla, Himachal Pradesh.
Versus
General Public
. . Respondent.
Whereas Sh. Ram Lal Thakur s/o Late Shri Chandu Ram, r/o Village Chharah, P.O. Ghanahatti, Tehsil & District Shimla, Himachal Pradesh has filed an application alongwith affidavit in the court of undersigned under section 13(3) of the Birth & Death Registration Act, 1969 to enter the Name/date of birth of his son named Bhupender Thakur s/o Sh. Ram Lal Thakur s/o Late Shri Chandu Ram, r/o Village Chharah, P.O. Ghanahatti, Tehsil & District Shimla, Himachal Pradesh in the record of Secy., Birth and Death, Gram Panchayat Bhaloh, Tehsil & District Shimla.
| Sl. No. | Name of the family member | Relation | Date of Birth |
| 1. | Bhupender Thakur | Son | 07-05-2007 |
Hence, this proclamation is issued to the general public if they have any objection/claim regarding to enter the name/date of birth of above named in the record of Gram Panchayat Bhaloh, Tehsil & District Shimla may file their claims/objections on or before one month of publication of this notice in Govt. Gazette in this court, failing which necessary orders will be passed.
Issued today 22-07-2019 under my signature and seal of the court.
Seal.
Sd/-
Sub-Divisional Magistrate,
Shimla (R), District Shimla.
4247 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 न्यायालय सहायक समाहर्ता प्रथम वर्ग सुन्नी, जिला शिमला, हिमाचल प्रदेशतारीख मरजुआ : 24-07-2019 वाद संख्या : 1/XIII-A-1/2019
श्रीमती विद्या देवी बनाम आम जनता प्रार्थना-पत्र बराये दरुस्ती नाम।
हरगाह खास व आम को बजरिया नोटिस सूचित किया जाता है कि श्रीमती विद्या देवी पुत्री श्री सन्त राम, निवासी महाल चौकी, परगना सराज, तहसील सुन्नी, जिला शिमला (हि0 प्र0) ने इस न्यायालय में प्रार्थना-पत्र प्रस्तुत कर अभिव्यक्त किया है कि प्रार्थिन का नाम राजस्व रिकार्ड में नीलम पुत्री श्री सन्तराम दर्ज है जो कि गलत है परन्तु पंचायत रिकार्ड व अन्य प्रमाण-पत्र में नाम विद्या देवी पुत्री श्री सन्तराम दर्ज है जो कि सही व सत्य है। उन्होंने उसे ठीक करने के लिए प्रार्थना-पत्र प्रस्तुत किया है।
अतः इस प्रार्थना-पत्र बारे आम जनता को सूचित किया जाता है कि यदि किसी व्यक्ति को नाम दरुस्त करने में आपत्ति हो तो वह अपनी आपत्ति लिखित रूप में दिनांक 23-08-2019 अथवा इससे पूर्व इस न्यायालय को प्रस्तुत करें। तदोपरान्त कोई आपत्ति मान्य नहीं होगी।
हमारे हस्ताक्षर व मोहर अदालत से आज दिनांक 24-07-2019 को जारी हुआ।
मोहर।
हस्ताक्षरित/- सहायक समाहर्ता प्रथम वर्ग, सुन्नी, जिला शिमला, हि0 प्र0।
---------
ब अदालत सहायक समाहर्ता द्वितीय श्रेणी, उप-तहसील धामी, तहसील व जिला शिमला, हि0 प्र0 दरख्वास्त संख्या : 04/2019 तारीख मजरूआ : 11-07-2019 तारीख पेशी : 29-07-2019 श्री युगल किशोर पुत्र श्री हेम दत्त, निवासी शरोग, डाकघर थाची, सब-तहसील धामी, तहसील व जिला शिमला, हि0 प्र0
बनाम
(1) आम जनता
(2) प्रधान ग्राम पंचायत थाची
विषय.--प्रार्थी की पुत्री की जन्म तिथि ग्राम पंचायत थाची के जन्म व मृत्यु पंजीकरण रजिस्टर में दर्ज करवाये जाने बारे, कि अधिनियम, 1969 की धारा 13(3) जन्म एवम् मृत्यु पंजीकरण नियम 9(3) के अन्तर्गत जन्म पंजीकरण करवाने बारे।
हर खास व आम जनता को बजरिया इश्तहार सूचित किया जाता है कि प्रार्थी श्री युगल किशोर पुत्र श्री हेम दत्त ने अधोहस्ताक्षरी के न्यायालय में एक आवेदन-पत्र प्रस्तुत किया है कि उसकी पुत्री का नाम व जन्म तिथि ग्राम पंचायत कोटला के जन्म पंजीकरण रजिस्टर में दर्ज नहीं करवाया है, अब प्रार्थी अपनी पुत्री का नाम व जन्म तिथि ग्राम पंचायत कोटला के जन्म पंजीकरण रजिस्टर में दर्ज करवाना चाहता है, जो कि इस प्रकार से है :-
| क्रम संख्या | नाम | सम्बन्ध | जन्म तिथि |
| 1. | रीया | पुत्री | 24-04-2007 |
4248 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 अतः ग्राम पंचायत कोटला, उप-तहसील धामी की जनता को बजरिया इश्तहार सूचित किया जाता है कि यदि किसी व्यक्ति को उपरोक्त नाम व जन्म पंजीकरण बारे कोई आपत्ति हो तो दिनांक 28-08-2019 को या इससे पूर्व असालतन या वकालतन हाजिर अदालत आकर अपनी आपत्ति प्रस्तुत करें अन्यथा आवेदन-पत्र पर जन्म पंजीकरण के आदेश पारित करके सचिव ग्राम पंचायत कोटला को आगामी कार्यान्वयन हेतु भेज दिया जायेगा।
आज दिनांक 29-07-2019 को मेरे हस्ताक्षर व मोहर सहित अदालत से जारी किया गया। मोहर। हस्ताक्षरित/- सहायक समाहर्ता द्वितीय श्रेणी, उप-तहसील धामी, जिला शिमला (हि0 प्र0)।
-------
ब अदालत उप-मण्डल दण्डाधिकारी, चौपाल, जिला शिमला, हि0 प्र0
प्रार्थना-पत्र कुमारी मनोरमा पुत्री स्व0 श्री आत्मा राम, निवासी भरटों, तहसील नेरवा, जिला शिमला, हि0 प्र0।
विषयः-ग्राम पंचायत बिजमल के परिवार रजिस्टर में दादा का नाम दरुस्त करने बारे।
नोटिस बनाम आम जनता।
कुमारी मनोरमा पुत्री स्व0 श्री आत्मा राम, निवासी भरटों, तहसील नेरवा, जिला शिमला, हि0 प्र0 ने एक आवेदन-पत्र इस कार्यालय में प्रस्तुत किया है कि उसमें दादा स्व0 श्री लच्छी राम के स्थान पर पंचायत अभिलेख/परिवार रजिस्टर ग्राम पंचायत बिजमल में कलिया लिखा गया है जोकि गलत है। स्व0 कलिया, स्व0 लच्छी राम का भाई था, दोनों के अपने-अपने परिवार व औलाद थी। जबकि राजस्व अभिलेख में उक्त मनोरमा के दादा के नाम का इन्द्राज दरुस्त है कुमारी मनोरमा के पिता श्री आत्मा राम का निधन हो चुका है, ग्राम पंचायत बिजमल मृतक आत्मा राम पुत्र लच्छी राम का मृत्यु प्रमाण-पत्र जारी नहीं कर रही है जिसके कारण मृतक पिता की भूमि का इंतकाल तस्दीक करवाने में उसे कठिनाई आ रही है। राजस्व अभिलेख चक भरटों के अनुसार लच्छी राम व कलिया, तमनिया के पुत्र थे। लच्छी राम का पुत्र आत्मा राम है तथा प्रार्थिया के मृतक पिता आत्मा राम चक भरटों में मालिक अराजी है। प्रार्थिया चाहती है कि उसके मृतक दादा का नाम ग्राम पंचायत बिजमल के परिवार रजिस्टर में कालिया के स्थान पर लच्छी राम दरुस्त किया जाये। पुष्टि हेतु नकल जमाबन्दी व शजरा नस्ब संलग्न की है। मृतक आत्मा राम के पिता का नाम लच्छी राम सही व दरुस्त है और गलती से कलिया राम लिखा गया है क्योंकि कलिया की अपनी पत्नी व औलाद है और लच्छी राम की भी अपनी औलाद व पत्नी है।
अतः हर आम व खास को इस इश्तहार के माध्यम से सूचित किया जाता है कि यदि किसी को प्रार्थिया के दादा का नाम ग्राम पंचायत बिजमल के परिवार रजिस्टर में कलिया के स्थान पर लच्छी राम दरुस्त करने बारे कोई एतराज हो तो वह अपनी आपत्ति इस न्यायालय में दिनांक 28-08-2019 से पूर्व असालतन या वकालतन प्रस्तुत करें। दीगर सूरत में दिनांक 28-08-2019 को ग्राम पंचायत बिजमल के पंचायत अभिलेख में आत्मा राम पुत्र लच्छी राम की दरुस्ती के आदेश पारित किये जायेंगे।
आज दिनांक 17-07-2019 को मेरे हस्ताक्षर व मोहर न्यायालय से जारी हुआ।
मोहर। हस्ताक्षरित/- उप-मण्डल दण्डाधिकारी (ना0), चौपाल, जिला शिमला (हि0 प्र0)।4249 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941 CHANGE OF NAME I, Shakuntla w/o Shri Jit Ram, r/o & V.P.O. Kaithlighat, Tehsil Kandaghat, Distt. Solan, Himachal Pradesh do hereby solemnly affirm and declare on affidavit dated 22-07-2019 that I have changed my name as Shakuntla Devi instead of Shakuntla. So in future I may be known as Shakuntla Devi for all purposes and necessary records.
SHAKUNTLA ,
w/o Shri Jit Ram, r/o & V.P.O. Kaithlighat,
Tehsil Kandaghat, Distt. Solan, Himachal Pradesh.
__________
CHANGE OF NAME
I, Goldi Negi s/o Sh. Manohar Lal Negi, r/o Village Dhirar, P.O. Nagrota Gazain, Tehsil Bhoranj, Distt. Hamirpur, Himachal Pradesh have changed my name from Goldi Negi to Gaurav Negi vide affidavit dated 29-06-2019.
GOLDI NEGI
s/o Sh. Manohar Lal Negi, r/o Village Dhirar,
P.O. Nagrota Gazain, Tehsil Bhoranj, Distt. Hamirpur,
Himachal Pradesh.
4250 राजपत्र, हिमाचल प्रदेश, 30 जुलाई, 2019/08 श्रावण, 1941नियन्त्रक, मुद्रण तथा लेखन सामग्री, हिमाचल प्रदेश, शिमला-5 द्वारा मुद्रित तथा प्रकाशित इलेक्ट्रॉनिक हस्ताक्षरित राजपत्र, वैबसाइट http://rajpatrahimachal.nic.in पर उपलब्ध है एवम् ऑनलाइन सत्यापित किया जा सकता है