राजपत्र, हिमाचल प्रदेश हिमाचल प्रदेश राज्य शासन द्वारा प्रकाशित शुक्रवार, 21 जनवरी, 2022/1 माघ, 1943
हिमाचल प्रदेश सरकार
HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA
NOTIFICATION
Shimla, the 14th January, 2022
No. HPERC/Secy/438.—The Himachal Pradesh Electricity Regulatory Commission, in exercise of the powers conferred by Section 50 and clause (x) of sub-section (2) of Section 181 of the Electricity Act, 2003 (36 of 2003), read with Section 21 of the General Clauses Act, 1897 196—राजपत्र/2022-21-01-2022 (6953)6954 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 (10 of 1897), and all other powers enabling it in this behalf, after previous publication, hereby makes the following Regulations, to amend the Himachal Pradesh Electricity Supply Code, 2009, read with its previous amendments thereof, as published in the Rajpatra of Himachal Pradesh on 29th May, 2009. The aforesaid Code has hereinafter been jointly referred to as "the said Code").
REGULATIONS
1. Short title and commencement.—(1) These Regulations may be called the Himachal Pradesh Electricity Supply Code (Fifth Amendment) Regulations, 2021.
(2) These Regulations shall come into force from the date of their publication in the Rajpatra, Himachal Pradesh.
2. Amendment of para 1.2 under 'CHAPTER-I' of the said Code.—
In para 1.2 —
(i) for sub-para (1.2.4), containing the definition of "applicant", the following shall be substituted, namely:—
"1.2.4 "applicant" means an owner or occupier of any premises who files an application form with a licensee for supply of electricity, increase or decrease in sanctioned load or contract demand, change in title or mutation of name, change in consumer category, disconnection or restoration of supply, or termination of agreement, shifting of connection, if permissible or other services as the case may be, in accordance with the provisions of the Act, Rules and Regulations made thereunder;";
(ii) for sub-para (1.2.6), containing the definition of "billing cycle", the following shall be substituted, namely:—
"1.2.6 "billing cycle" or "billing period" means the period, as specified by the Commission, for which regular electricity bills are issued by the licensee for different categories of consumers in different areas of the State;" ;
(iii) after sub-para (1.2.17), containing the definition of "demand charges", the following new sub-para (1.2.17A) and (1.2.17B) shall be inserted, namely:—
"1.2.17A "disconnection" means the physical separation or remote disconnection of a consumer from the distribution system of the distribution licensee;
1.2.17B "distribution main" means the portion of any main with which a service line is, or is intended to be, immediately connected;" ; and (iv) for sub-para (1.2.38), containing the definition of "occupier", the following shall be substituted, namely :—
"1.2.38 "occupier" means the owner, tenant or person in occupation of the premises where electricity is used or proposed to be used;".
3. Amendment of CHAPTER–II of the said Code i.e. 'SYSTEM OF SUPPLY,
CONDITIONS OF SUPPLY AND CLASSIFICATION OF CONSUMERS'.—
In item (a) of clause (2.1.6.1A) of sub-para (2.1.6)—
6955 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 a. in the table, for the figure and word "415 volts", the figure and word "400 volts"shall be substituted; and
b. in third proviso, for the figure and word "415 volts", the figure and word "400 volts" shall be substituted.
4. Amendment of CHAPTER–III of the said Code i.e. 'MATTERS RELATED TO
SUPPLY OF ELECTRICITY'.—
(I) In para 3.1 —
(i) for sub-para (3.1.1), the following shall be substituted, namely:—
"3.1.1 Save as otherwise provided in the Act, Rules and this Code, the licensee shall, on an application by the owner or occupier of any premises, give supply of electricity to such premises within the timelines specified in this Code." ;
(ii) in sub-para 3.1.2 —
(a) for the sub-para (3.1.2), the following shall be substituted, namely :—
"3.1.2 The licensee shall standardise the Application and Agreement form and test report, to be submitted by the applicant under clause (3.1.2.1) of this sub-para and the Commission shall specify the list of documents, to be submitted by the applicant alongwith the Application and Agreement form under clause (3.1.2.2) of this sub-para." ;
(b) the existing clause "(3.1.2.1)" shall be re-numbered as (3.1.2.3) and before this re-numbered clause (3.1.2.3), following clauses shall be inserted, namely:—
"3.1.2.1 For the new connections covered under single part tariff, the Application and Agreement form shall be required to be accompanied, apart from the test report, with only two mandatory documents, namely — (1) identity proof (i.e. Passport, Aadhar Card, voter card etc.) of the applicant; and (2) proof of 3 applicant's ownership or occupancy over the premises for which new connection is being sought or in the absence of any proof of ownership or occupancy, any other address proof not given as part of identity proof under (1) above.
3.1.2.2 For the new connections covered under two part tariff, the Commission shall specify the list of documents as per sub-para 3.1.2:
Provided that till such time the Commission specifies such list of documents, the licensee shall continue to entertain the Applications alongwith the documents as per the prevailing practice being followed by it:
Provided further that any other agreement required for supply of electricity, in addition to the normal agreement on Application form, shall also become the part of the Application and Agreement form and there shall not be any requirement of a separate agreement form." ;
6956 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943(c) in the re-numbered clause (3.1.2.3), for the words "where an applicant", the words and sign "where an applicant, covered under two part tariff," shall be substituted; and
(d) after the re-numbered clause (3.1.2.3), the following clauses shall be inserted, namely:—
"3.1.2.4 The licensee shall prominently display on its website and on the notice board in all its offices, the following, namely:—
(a) detailed procedure for grant of new connection, temporary connection, shifting of meter or, service line, change of consumer category, enhancement of load, reduction of load or change in name, transfer of ownership and shifting of domestic connection to other premises subject to fulfillment of the specified conditions etc.;
(b) address and telephone numbers of offices where filled-up application forms can be submitted;
(c) address of website for online submission of application form;
(d) complete list of copies of the documents required to be attached
with the application; and
(e) all applicable charges to be deposited by the applicant.
3.1.2.5 Application and Agreement forms for all type of connections as well as modification in existing connection shall be available at all the local offices of the licensee free of cost as well as on its website for free download.
3.1.2.6 The licensee shall create a web portal and a mobile app for submission of online application forms.
3.1.2.7 The applicant shall have an option to submit an application form in hard copy or an electronic means such as through web portal or mobile app of licensee.
3.1.2.8 In case hard copy of the application form is submitted, the same shall be scanned and uploaded on the website within six working hours from its receipt in the licensee's office.
3.1.2.9 In case of online application form submitted through web portal or mobile app of licensee, or where the same is uploaded on the website as sub- para (3.1.2.8), the acknowledgement with the registration number shall be generated on submission of application.
3.1.2.10 An application, complete with all the required information, shall be deemed to be received on the date of generation of acknowledgement with registration number.
3.1.2.11 The application tracking mechanism based on the unique registration number shall be provided by the licensee through web-based6957 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 application, mobile app and through SMS or by any other mode to monitor the status of processing of the application like receipt of application, site inspection, issuance of demand note, external connection, meter installation and electricity flow." ;
(e) for the existing sub-para (3.1.4) alongwith its Clause (3.1.4.1), the following shall be substituted, namely :—
"3.1.4 On the receipt of an Application and Agreement form from the applicant, licensee shall, within the time lines tabulated in the following Table, issue, by a registered post/speed post or through any faster and latest electronic mode and intimation has also been sent through SMS, a demand notice to the applicant, clearly indicating —
(a) all deficiencies to be made good and the codal formalities to be
completed by the applicant; and
(b) the exact amount of charges and security to be deposited by the
applicant.
Timelines for issuance of the Demand Notice (ref. sub-para 3.1.4)
| Type of service connection requested | Period from date of receipt of application within which demand notice should be issued. |
| Low Tension (LT) supply | (10) days |
| 11KV supply | (15) days |
| 22 KV supply | (15) days |
| 33KV supply | (30) days |
| Extra High Tension (EHT) supply | (60) days |
3.1.4.1 The applicant shall have the option to make the payment against demand notice issued to him, as per sub-para (3.1.4), through online or offline mode. In case of online mode, the payment may be made through licensee's website or mobile app and for offline mode of payment, the payment shall be made at the concerned sub-division of the licensee or through any other facilities as provided by it, on any working day during hours allocated for the purpose.
(f) for the existing sub-para (3.1.6), the following shall be substituted, namely:—
"3.1.6 Every licensee shall, upon the applicant making good the deficiencies and completion of codal formalities and payment of charges and security, as indicated in the demand notice under sub-para 3.1.4, give supply of electricity to the premises within the following timelines, namely:—
(a) where no extension of distribution mains or commissioning of new sub-station is required for effecting such supply— (i) within fifteen days in urban areas, (ii) within twenty days in rural areas, (iii) thirty days in remote areas ;
6958 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943(b) in cases where such extension of distribution mains or commissioning of new sub-station is required but there is no requirement of erecting and commissioning a new 33/11kV sub- station, within the timelines tabulated below :—
| Type of service connection requested | Period from date of completion of codal formalities required vide demand notice, within which supply of electricity should be provided |
| Low Tension (LT) supply | (40) days |
| 11KV supply | (30) days |
| 22 KV supply | (30) days |
| 33KV supply | (60) days |
| Extra High Tension (EHT) supply. | (120) days |
(c) in the case of application for new connection, where extension of supply requires erection and commissioning of new 33/11 KV sub- station, the licensee shall, within fifteen days of receipt of application, submit to the Commission a proposal for erection of 33/11 KV sub-station together with the time required for commissioning the sub-station. The Commission shall, after hearing the licensee and the applicant concerned, decide on the proposal and the time frame for erection of the sub-station. The licensee shall erect and commission the sub-station and commence power supply to the applicant within the period approved by the Commission:
Provided that, where such sub-station is covered in the investment plan approved by the Commission, the licensee shall complete the erection of such sub-station within the time period specified in such investment plan; and
(d) the licensee may approach the Commission for extension of the timelines as mentioned in clauses (a), (b) and (c) above, in specific and exceptional cases where the magnitude of extension is such that the licensee will require more time, duly furnishing the details in support of such claim for extension and if satisfied with the justification given by the licensee, the Commission may extend the time for commencing the supply.
3.1.6.1 The licensee shall not be responsible for the delay, if any, in extending the supply, if the same is on account of problems relating to right of way, acquisition of land, or the delay in consumer's obligation to obtain approval of the Chief Electrical Inspector for his High Tension or Extra High Tension installation, or for any other similar reasons beyond the reasonable control of the licensee:
Provided that if any dispute arises whether the delay in extending the supply is attributable to the reasons beyond the control of the licensee or6959 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 not, it shall be decided by the Commission and the decision of the Commission shall be final and binding:
Provided further that the applicant/consumer has reasons to believe and it is within the reasonable control of the licensee to release the connection and that the licensee is deliberately delaying the same, he may approach the Consumer Grievances Redressal Forum, as per the provisions of Himachal Pradesh Electricity Regulatory Commission (Consumer Grievances Redressal Forum and Ombudsman) Regulations, 2013, for redressal of his grievance.
3.1.6.2 The licensee shall adhere to the timelines provided under item (a), (b) and (c) of sub-para (3.1.6) failing which the licensee shall be liable to pay compensation to the applicant as per the provisions of the Himachal Pradesh Electricity Regulatory Commission (Distribution Performance Standards) Regulations, 2010." ; and
(g) after sub-para (3.1.6), the following new sub-para (3.1.7) and sub-para (3.1.8) shall be inserted, namely :—
"3.1.7 The licensee shall also provide suitable arrangements like separate queue, sufficient seating arrangement etc. for those senior citizens 7 and physically challenged citizens who may visit the licensee's office.
3.1.8 The distribution licensee shall provide all services such as application submission, payment of bills etc. to the senior citizens and physically challenged citizens, covered under single part tariff, at their door-steps. The licensee shall depute its officials to visit the premises of such citizen within two days in case of urban area and within five days in case of rural area, after ascertaining the convenience of such citizen about the time of visit to his / her premises."
(II) For sub-para (3.3.1) of para 3.3, the following shall be substituted, namely:—
"3.3.1 The applicant requiring supply of electricity from a licensee on a temporary basis will be provided such supply on receipt of Application & Agreement Form, complete in all respect as mentioned in para 3.1, within the timelines specified hereunder:—
(i) where no extension of distribution mains or commissioning of a new sub- station is involved, within three (3) working days reckoned from the completion of all the codal formalities and the payment of charges and security amount stated in the demand notice issued as mentioned in sub-para (3.1.4) of this Code; and
(ii) where extension of distribution mains or commissioning of a new sub-station is involved, within the timelines as specified in clause (b) of sub-para (3.1.6) of this Code."
(III) In sub-para (3.4.1), for the words, figure and brackets "the Himachal Pradesh Electricity Regulatory Commission (Licensee's Duty for Supply of Electricity on Request ) Regulations, 2004", the words, figures and brackets "sub-para (3.1.6) of this Code" shall be substituted.
6960 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 (IV) In para 3.5—(i) in sub-para (3.5.1), for the words and brackets "The licensee(s) will standardise the application form(s) for transfer of title, change of category, conversion between various voltage classes and the standardised list of supporting documents to be submitted by the applicants for different services", the following shall be substituted, namely:—
"The licensee(s) shall standardise the application form(s) for transfer of title, change of category, conversion between various voltage classes. The licensee(s) shall also standardise, duly taking into account the list of documents as per sub- para 3.1.2.1 and 3.1.2.2 of para 3.1, the supporting documents required to be submitted by the applicant for each of such services." ;
(ii) in sub-para (3.5.3), for the words, figures and brackets "Regulation 3 of the Himachal Pradesh Electricity Regulatory Commission (Licensee's Duty for Supply of Electricity on Request) Regulations, 2004", the words and figures "sub-para (3.1.4) and sub-para (3.1.6) of this Code" shall be substituted;
(iii) for the sign "." appearing in sub-para (3.5.4), the sign ":" shall be substituted and thereafter the following proviso shall be inserted, namely :—
"Provided that the distribution licensee may in case of domestic consumers also entertain the applications for shifting of service connection to other premises subject to the fulfillment of following conditions, namely :—
(a) the new premise to which the connection is to be shifted is owned by the same person in whose name the original connection has been provided;
(b) the connected load of the connection at the new premise shall not exceed the load as sanctioned for original connection. The test report shall however, in any case, has to be provided;
(c) the Applicant also submits a new agreement form for the new connection;
(d) the new premise is to be fed from the same LT feeder and from the same Distribution Transformer under the same sub-division/section from which the original connection is being fed;
(e) the applicant has cleared all the dues billed to him in respect of the connection at the old premise and also agrees to pay the arrears, if any, pertaining to the connection at the old premise for the period upto the date of shifting of the connection;
(f) the original connection has been sanctioned for domestic supply and the same at the new premise is also required for domestic purpose only;
(g) the applicant agrees to pay, in addition to security deposit and IDC etc., the cost of service line as well as cost of shifting of connection for which the licensee shall provide the estimate to the applicant;
(h) the length of service line at the new premise does not exceed 30 mtrs;
6961 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 (i) the applicant agrees to arrange/provide the Right of Way;(j) the applicant agrees to update the security amount to that worked out as per the prevailing rates (i.e. after adjustment of the security already deposited); and (k) the applicant agrees for disconnection of supply at the original premise at the time of shifting."
(iv) for sub-para (3.5.6), the following shall be substituted, namely :—
"3.5.6 Where the applicant requests for shifting of a meter and/or service connection for feeding the same premises, or in case of domestic consumers for feeding the other premise subject to the fulfillment of conditions as per the proviso to sub-para (3.5.4), or for diversion of existing lines and has, if required under sub-para (3.5.5) or any other provisions of this Code or any other Regulations, deposited the charges/cost thereof, as the case may be, the licensee shall adhere to the timelines specified in the Himachal Pradesh Electricity Regulatory Commission (Distribution Performance Standards), Regulations, 2010."
(V) In para 3.6—
(i) in sub-para (3.6.1), for the figure "2005", the figure "2012" shall be substituted; and (ii) in sub-para (3.6.2), for the words, figures and brackets "regulation 7 of the Himachal Pradesh Electricity Regulatory Commission (Distribution Licensee's Standards of Performance) Regulations, 2012", the words, figure and brackets "the provisions of the Himachal Pradesh Electricity Regulatory Commission (Distribution Performance Standards) Regulations, 2010" shall be substituted.
(VI) In para 3.8—
(i) in sub-para (3.8.1), for the words and brackets "(Recovery of Expenditure)", the words and brackets "(Recovery of Expenditure for Supply of Electricity)" shall be substituted;
(ii) in item (ii) of sub-para (3.8.1), for the words and brackets "(Recovery of Expenditure)", the words and brackets " (Recovery of Expenditure for Supply of Electricity)" shall be substituted ; and
(iii) in sub-para 3.8.2, for the words "one month of the date of termination of the agreement as per", the words "timelines as specified in" shall be substituted.
5. Amendment of CHAPTER-IV of the said Code i.e. 'METER & METERING
EQUIPMENTS'.—
(I) In para 4.1, after sub-para (4.1.1), the following new sub-para (4.1.2) shall be
inserted, namely :—
"4.1.2 The licensee shall submit, to the Commission, a comprehensive road map for providing smart pre-payment meter or prepaid meters, separately for new6962 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 connection and 10 for replacement of existing meters, in a phased manner by taking into account the timeliness/targets, priorities fixed by the Central/State Government. Such road map shall also contain the mode of recovery from the consumers by taking into account the financial assistance available for such purpose from the Central/State Government.
4.1.2.1 In case the existing meters are to be replaced by any new technology meters, the licensee shall take adequate measures to create consumer awareness regarding the advantages of such replacement. The Licensee shall issue a public notice in at least four daily newspapers. Such information shall also be displayed in conspicuous manner on the licensee's website and the licensee shall indicate the area wise schedule of dates for replacement of such meter."
(II) In para 4.2 —
(i) after sub-para (4.2.1), following new sub-para (4.2.1.1), shall be inserted, namely :—
"4.2.1.1 The licensee shall make available on its website, the list of meter manufacturers and their authorized venders from whom the consumers can purchase the tested and sealed meters." ; and
(ii) in sub-para (4.2.3), for the words and figure "IP class 55 and the consumer will not be responsible for the protection of the meter from theft or damage.", the following words, signs and figure shall be substituted, namely:—
"IP class 55. If the meter is installed outside the consumer's premises, licensee shall be responsible for safe custody of the meter, and if the same is installed within the consumer's premises, the consumer shall be responsible for the safe custody of meter."
(III) The sub-para (4.3.5) of para 4.3 shall be omitted.
(IV) In para 4.4 —
(i) for existing sub-para (4.4.2), the following shall be substituted, namely:—
"4.4.2 (a) on receipt of the complaint from the consumer about their meter readings not being commensurate with his consumption of electricity, stoppage of meter, damage to the seal, burning or damage of the meter, etc., the licensee shall test the meter at site within the timelines as specified in the schedule to the Himachal Pradesh Electricity Regulatory Commission (Distribution Performance Standards) Regulations, 2010 ; and
(b) no fee for testing shall be initially charged from the consumer. However, if on testing, the meter is found to be defective or burnt due to the reasons attributable to the consumer, including but not limited to, overloading, short circuit in consumer's wiring, physical damage, the consumer shall bear the cost of new meter and test fee shall be charged from the consumer through subsequent bills.";
6963 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 (ii) for the existing sub-para (4.4.3), the following shall be substituted, namely:—"4.4.3 (a) in case of testing of meter, removed from the consumer premises for the purpose of testing in the licensee's laboratory, the consumer would be informed, through e-mail or SMS or any other electronic mode, of the date and time to be present at the site for testing, at least seven days in advance;
(b) after testing the meters, the signature of the consumer, or his authorized representative, if present, would be obtained on the Test Result Sheet and a copy thereof shall be supplied to the consumer; and
(c) the licensee shall give a copy of the meter test report to the consumer duly signed by both the licensee or their authorised representative(s) and the consumer, and retain one such copy as acknowledgment. However, if the consumer chooses not to be present at the site for testing, the licensee will carry out such testing and shall give the copy of the meter test report to the consumer for signing." ;
(iii) for the existing sub-para (4.4.4), the following shall be substituted, namely:—
"4.4.4 If a consumer disputes the results of testing carried out by the licensee, the meter shall be got tested at a third party testing facility selected by the consumer from the list of third party testing agencies approved by the Commission. If it is successfully established that the results of this test are contrary to the results of the test performed by the licensee, then the cost of undertaking such test shall be borne by the licensee. However, in case it is established that the results of this test are the same as the results of the test performed by the licensee, then the cost of undertaking such test shall be borne by the Consumer. The meter test results and the meter data shall be issued by the third party to the licensee as well as to the consumer after such test has been completed. The results so issued shall be final and binding on both the parties i.e. the consumer and the licensee.
4.4.4.1 The list of third party agencies approved by the Commission shall be available on the website of the licensee as well as in its various offices.";
(iv) for the existing sub-para (4.4.5), the following shall be substituted, namely:—
"4.4.5 Replacement of defective or burnt or stolen meters shall be done—
(a) either on consumer's complaint or upon inspection by the licensee, if the meter is prima facie found to be defective or burnt or stolen not due to the reasons attributable to the consumer, the licensee shall restore supply through a new meter at its own cost within the timelines as specified in the schedule to the Himachal Pradesh Electricity Regulatory Commission (Distribution Performance Standards) Regulations, 2010 ;
6964 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943(b) if, after investigation, it is found that the meter has become defective or burnt or stolen due to causes attributable to the consumer, the estimated cost of new meter, alongwith the cost of replacing the same, shall be recovered from the consumer; and (c) within a time period, to be specified in the schedule to the Himachal Pradesh Electricity Regulatory Commission (Distribution Performance Standards) Regulations, 2010; and (v) in sub-para (4.4.7), the existing provision shall be numbered as '(a)' and for the sign ".", appearing at the end, the sign and word ";and" shall be substituted and thereafter, the following new item '(b)' shall be inserted, namely:—
"(b) non-availability of meter shall not be a reason for delay in restoration of supply. The licensee shall ensure the adequate availability of stock of meters for the purpose."
6. Amendment of CHAPTER-V of the said Code i.e. 'BILLING'.—
(I) In item (a) of sub-para 5.1.1 under para 5.1, for the figure "2005", the figure "2012" shall be substituted.
(II) In para 5.2 —
(i) the sub-para (5.2.1) shall be substituted with the following, namely :—
"5.2.1 The licensee shall issue bills to the consumers based on actual meter reading for the electricity supplied or for services rendered for every billing cycle and all the consumers will effect payments to the licensee within the time specified in para 5.3 :
Provided that in exceptional case, for the consumers covered under single part tariff, the licensee may issue the bills on the average consumption for maximum of two consecutive cycles. In case, the average bills are issued on average consumption basis for more than two consecutive cycles, the consumer shall not be responsible for making payments:
Provided further that in force majeure condition or any other extraordinary situation beyond the control of the distribution licensee, the licensee may issue the bills on average basis beyond the period of two consecutives cycles." ; and
(ii) after sub-para (5.2.1.2), following sub-para (5.2.1.3), sub-para (5.2.1.4) and sub- para (5.2.1.5), shall be inserted, namely :—
"5.2.1.3 Tariff for each category of consumers shall be displayed on licensee's website and consumers shall be notified the changes in tariff(s) and other charges through licensee's website, within seven days from the date of such tariff order(s) of the Commission. Such changes shall subsequently also be reflected in the energy bills.
6965 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 19435.2.1.4 In case of smart meters, the meters shall be read remotely atleast once in every month and in case of other pre-payment meters, the meters shall be read by an authorized representative of the licensee atleast once in every three months. The data regarding energy consumption shall be made available to the consumer, through website or mobile App or SMS, etc. Consumers having smart pre-payment meters may also be given the data access for checking their consumption on real time basis.
5.2.1.5 For post payment meters, in case of connection covered under single part tariff, if the meter is inaccessible to the meter reader on two consecutive meter reading dates, the consumer shall have the option to send the picture of the meter indicating the meter reading and date of meter reading through registered mobile number or through E-mail. In such a case, licensee may not send any notice or provisional bill to the consumer. In such cases, the licensee shall also take steps to shift the meter to a suitable place so that it remains accessible for taking the meter reading and the consumer shall also cooperate with the licensee in this regard. " ;
(iii) in the existing sub-para (5.2.8), for the words "twenty one days", the words "ten days" shall be substituted ;
(iv) for the existing sub-para (5.2.9), the following shall be substituted, namely :—
"5.2.9 The licensee shall, for delivery of bills adopt fastest, cost effective, reliable and assured mode including the electronic mode like E-mail. Soon after sending the bill, intimation in this regard shall also be sent through SMS etc.
5.2.9.1 In case of single part tariff, where the bills are generated through spot billing, the bills shall be delivered by hand and subsequently, the intimation shall also be given to the consumer through SMS or E-mail or both. In cases where spot billing is not done, the bills shall be delivered by hand or by post. In case of hand delivery, record of delivery of the bill will be maintained at the designated office of the licensee.
5.2.9.2 In case of consumers covered under single part tariff and where the billing is carried out through spot billing system, the bills for such consumers shall be uploaded on the website of licensee immediately, but not later than three days from the date of spot billing.
5.2.9.3 In case consumers covered under two part tariff, the bills shall be sent through E-mail and intimation in this regard shall also be sent through SMS or any other electronic mode. The bills sent through E-mail, for which the intimation has also been sent through SMS, to such consumers shall be considered as delivered.
5.2.9.4 In case of pre-payment metering, the licensee shall issue the bill to the consumer on his or her request and the licensee shall make available on its website, the bill showing the deposits made.
5.2.9.5 The billing details of one year for all categories of consumers shall be made available on the licensee's website.";
6966 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 (v) for the existing sub-para (5.2.10), the following shall be substituted, namely:—"5.2.10 In case a consumer covered under single part tariff does not receive bill, he may make provisional payment on the basis of self assessment. In such a case, the licensee shall not issue notice for disconnection on account of non-payment and the late payment surcharges shall be applicable only for the deficit amount:
Provided that the licensee shall, within 90 days of notification of these Regulations, develop a procedure for self assessment billing by the consumer and shall submit the same to the Commission for its approval:
Provided further that for the excess or deficit payment made in case of self assessment by the consumer, the licensee shall effect the adjustment of the excess or deficit amount, as the case may be, in the electricity bills of the immediately succeeding months.";
(vi) in sub-para (5.2.11), for the words "within ten days", the words, figure and brackets "within the timelines as specified in the Himachal Pradesh Electricity regulatory Commission (Distribution Performance Standards) Regulations, 2010." shall be substituted ; and
(vii) for sub-para (5.2.12), the sign "xxxx" shall be substituted;
(III) In para 5.3 –
(i) in sub-para (5.3.1)-
(a) for the sign "." appearing at the end in item (ii), the sign ":" shall be substituted and thereafter the following proviso shall be inserted, namely :—
"Provided that the bill shall be delivered to the consumer atleast 10 days prior to the due date of payment.";
(b) after this sub-para, the following new sub-para (5.3.1A) shall be inserted, namely:—
"5.3.1A The licensee shall establish online portal as well as sufficient number of collection centres at suitable locations with necessary facilities where consumer can deposit the billed amount with ease. In addition, the licensee shall also provide drop boxes at suitable locations separately for each sub- division where the consumers having bills upto Rupees five thousand, can drop Cheques / Bank Drafts towards payment of their bills.";
(c) in sub-para (5.3.2), for the words "The payments of the bills", the words and sign "The consumer shall have the option to pay the bill through online or offline mode. In case of online mode, the payment may be made through licensee's website or mobile app and for offline mode of payment, the payments of the bills" shall be substituted ; and6967 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 (d) for existing sub-para (5.3.5), the following shall be substituted, namely:— "5.3.5 The licensee shall ensure adequate publicity of the addresses/ locations and working hours of the collection centers including those of the banks where consumers can make payments." 5.3.5.1 The bills amounting to more than Rupees five thousand shall be paid online or in case of domestic consumers, by depositing local cheque at the collection centres. However, in exceptional cases for rural areas, the in-charge of concerned sub-division may accept the payment in cash upto an amount of Rupees seven thousand.
5.3.5.2 For payment of bills not exceeding Rupees five thousand in case of single part tariff, the cheque may be dropped in the drop boxes provided at different locations/centres of the respective sub- division. Even though the licensee shall take every care to collect the cheques deposited in the drop boxes on every working day, it shall not be responsible for any loss due to any delay/misplacement in case the cheque of more than Rupees five thousand are dropped in the drop boxes. The cheque dropped in the drop boxes in areas of respective sub-division only will be entertained and in case any cheque is dropped in a drop box not pertaining to that sub-division, the same shall not be entertained."
(IV) In para 5.4, the existing provision shall be numbered as '(5.4.1)' and for the sign ".", appearing at the end, the sign ":" shall be substituted and thereafter, the following shall be inserted, namely :—
"Provided that in case of post payment meters, when a domestic consumer gives prior information to call centre or concerned sub-division of the licensee, either in writing or through other means about his continued absence from residence, the licensee shall not send, during the period for which the fixed charges (apart from his current dues) have been paid in advance by such consumer, any notice of disconnection for non-payment of dues:
Provided further that the licensee shall consider the receipt issued by it for the advance payment of fixed charges by the consumer, as the acknowledgement for the receipt of such intimation from the consumer in respect of the period for which the fixed charges have been received in addition to the current dues, if any.
5.4.2 The rebate shall be provided by the licensee to the consumers in case of advance payment, at the following rates—
(i) where the advance payment, after adjusting the dues already billed to him, exceeds Rupees two thousand but does not exceed Rupees three thousand, the rebate shall be allowed at a flat rate of Rupees twenty ;
(ii) where the advance payment, after adjusting the dues already billed to him, exceeds Rupees three thousand, the rebate shall be allowed at the rate of Rupees ten for every amount of rupees one thousand, or part thereof, subject to the condition that the total amount of rebate for any such advance payment shall not exceed Rupees fifty; and6968 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 (iii) the rebate for an advance payment shall be allowed at the above rates only once and not on recurring basis. However, if the consumer makes another advance payment, the rebate on such other advance payment shall also be allowed at the above rates subject to the condition that the total amount of such rebate in a year shall not exceeds rupees three hundred."
(V) In para 5.7-
In sub-para (5.7.5), for the words, figure and brackets, "the Himachal Pradesh Electricity Regulatory Commission (Guidelines for Establishment of Forum for Redressal of Grievances of the Consumers) Regulations , 2003", the words, figure and brackets "the Himachal Pradesh Electricity Regulatory Commission (Consumer Grievances Redressal Forum and Ombudsman) Regulations, 2013" shall be substituted.
7. Amendment of CHAPTER-VII of the said Code i.e. 'DISCONNECTION AND
RECONNECTION OF POWER SUPPLY'.—
(I) For sub-para (7.1.6) of para (7.1), the following shall be substituted, namely:—
"7.1.6 In case the consumer desires his connection to be disconnected permanently, he shall apply for the same on plain paper giving full details or the format specified in Annexure-C of this Code either through hard copy or electronic mode. The licensee shall carry out special reading and prepare final bill, including all arrears up to the date of such billing, within five days from such request. The disconnection shall be done immediately after payment of the final bill and the amount accrued due to the consumption between the date of final reading and the permanent disconnection, if any, may be adjusted against the security amount deposited with the licensee. The balance security deposit shall be refunded to the consumer within such period as specified in the Himachal Pradesh Electricity Regulatory Commission (Security Deposit) Regulations, 2005. The No Dues Certificate shall be issued to the consumer within seven days after adjustment/payment of the security deposit and payment of balance dues, if any, in case the amount of dues exceeds the amount of security deposit." ; and
(II) In sub-para 7.2.1 of para 7.2 –
(i) for the words and sign "twenty-four hours", the words, figure and brackets "the timelines as specified in the Himachal Pradesh Electricity Regulatory Commission (Distribution Performance Standards) Regulations, 2010," shall be substituted; and
(ii) in the "Note." under sub-para (7.2.1), for the words and figure "24 hours", the words, figure and brackets "the timelines as specified in the Himachal Pradesh Electricity Regulatory Commission (Distribution Performance Standards) Regulations, 2010," shall be substituted.
8. Amendment of CHAPTER-IX of the said Code i.e. 'MISCELLANEOUS'.—
After para (9.7), the following new para "9.8 Repeal and Savings" shall be inserted, namely:—
6969 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943"9.8 Repeal and Savings.—(1) The Himachal Pradesh Electricity Regulatory Commission (Licensee's Duty for Supply of Electricity on Request) Regulations, 2004, are hereby repealed.
(2) Notwithstanding such repeal –
(a) anything done or any action taken or purported to have been done or taken including any appointment made, or any document or instrument executed or any direction given under the repealed Regulations, shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done, taken, made or given under the corresponding provisions of these Regulations ; and
(b) all appointments made and documents executed, before the commencement of these Regulations, shall continue to have effect till the expiry of the period for which such appointment has been made or the document has been executed.
By order of the Commission , Sd/- (CHHAVI NANTA) HPAS, Secretary.
__________
HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION Vidyut Aayog Bhawan, SDA Complex, Block-37, Kasumpti, Shimla-171009 Tel No. 0177-2621003, 2627978, 2627907 Fax. No.0177-2627162 E-mail: [email protected] Website: http://www.hperc.org
NOTIFICATION
Dated, the17th January, 2022
No. HPERC/392-Vol(III)-2022.—In partial modification of Notification No. HPERC/392- Vol (II) dated 15th February, 2013 and in exercise of the powers conferred under clause 2.2 of the Himachal Pradesh Electricity Distribution Code, 2009, the Himachal Pradesh Electricity Regulatory Commission hereby reconstitutes the "Distribution Code Review Panel" comprising of the following:—
| Sl. No. | Name & Designation | Representing | |
| 1. | The Director (Operation), HPSEBL, Vidyut Bhawan Shimla-171004 (H.P.). | Distribution Licensee | Chairman |
| 2. | The Executive Director (Technical), HPERC, Kasumpti, Shimla-171009 (H.P.). | Himachal Pradesh Electricity Regulatory Commission (HPERC) | Convener |
| 3. | The Chief Engineer (Commercial), HPSEBL, Vidyut Bhawan Shimla-171004 (H.P.). | Distribution Licensee | Member |
| 4. | The General Manager (Projects), Himachal Pradesh Power Transmission Corporation Ltd., Himfed Bhawan, Below Old MLA's Quarter, Panjari, Shimla-171005 (H.P.). | State Transmission Utility (STU) | Member |
| 5. | The Superintending Engineer (P&I), Unit-II, Jal Shakti Vibhag, Jal Shakti Bhawan, Shimla-171005 (H.P.). | Non-Domestic/Non- Commercial/ Water & Irrigation Consumers | Member |
| 6. | The Superintending Engineer, Electrical Circle, HPPWD, Kasumpti, Shimla-171009 (H.P.). | Non-Domestic/Non Commercial Consumers | Member |
| 7. | The Consumer's Representative | Domestic Consumers | Member |
| 8. | The Convener, Power Panel, CIL Himachal Pradesh State Council Confederation of Indian Industry (CII), Sector-31-A, Chandigarh-160030. | Bulk Consumers | Member |
| 9. | The Senior Vice President, Himalayan Power Producers Association, B-7, Sector-1, Phase-1, Main Road, New Shimla-171009 (H.P.). | Generators | Member |
| 10. | The Vice President and the Chairman, Power Committee of BBN Industries Association, c/o Single Window Clearing Agency, Industrial Area, Baddi, District Solan-173205 (H.P.). | Industrial Consumers | Member |
| 11. | The Chief Manager (E&I), c/o ACC Limited, PO Barmana, District Bilaspur- 174013 (H.P.). | Open Access Consumers/Bulk Consumers | Member |
| 12. | The President, Shimla Hotel & Restaurant Association, Hotel Devicos, 5, The Mall, Shimla-1 | Commercial Consumers | Member |
| 13. | The DGM (Projects), M/s Vardhman Textiles Ltd., Sai Road, Baddi-173205 (H.P.) | Industrial Consumers | Member |
| 14. | The General Manager(Electrical), Ambuja Cements Ltd., PO Darlaghat, Teh. Arki, Distt Solan-171102 (H.P.) | Industrial Consumers | Member |
1. The Chairman of the Distribution Code Review Panel shall hold office as such for a period of two years and its all other members shall hold office by the virtue of position held by them in their respective organization until changed/replaced by the respective organization/ consumers group.
2. A member of the Distribution Code Review Panel, who is a Government Officer or an employee/officer of any Government instrumentality or of any Public Sector Undertaking, shall draw Travelling Allowance and Daily Allowance from his/her parent department or organization.
3. A member of Distribution Code Review Panel, other than those referred to under sub- para (2), shall be paid sitting fee and TA and DA at the rates admissible, in the State Government to its Grade-I Officers.
6971 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 19434. The Distribution Code Review Panel shall review the provisions of the Himachal Pradesh Electricity Distribution Code, 2009 and shall, within 3 months from the date of notification, submit its recommendations, if any, to the Commission.
By order of the Commission, Sd/- (CHHAVI NANTA), HPAS Secretary.
__________
राजस्व विभाग
अधिसूचना
शिमला-02, 13 जनवरी, 2022
संख्या राजस्व-घ/(एफ)4-6/2020-(मण्डी).--हिमाचल प्रदेश के राज्यपाल की यह राय है कि लोक हित में ऐसा करना अवाश्यक और समीचीन है कि जिला मण्डी, हिमाचल प्रदेश में एक नई उप-तहसील ढलवाण सृजित की जाए, ताकि नजदीक के गावों के लोगों को बेहतर सेवाएं उपलब्ध करवाई जा सके और जिससे उनको होने वाली किसी असुविधा से निवारित किया जा सके तथा बेहतर प्रशासनिक नियंत्रण हो सके;
अतः हिमाचल प्रदेश के राज्यपाल, हिमाचल प्रदेश भू-राजस्व अधिनियम, 1954 (1954 का अधिनियम संख्यांक 6) की धारा 6 और रजिस्ट्रीकरण अधिनियम, 1908 (1908 का अधिनियम संख्यांक 16) की धारा 5 द्वारा प्रदत्त शक्तियों का प्रयोग करते हुए, जिला मण्ड़ी, हिमाचल प्रदेश, तहसील बलद्वाड़ा के प्रशासनिक नियंत्रण के अधीन निम्न स्तम्भ संख्या 6 में दर्शाए गए पांच पटवार वृत्तों से गठित एक नई उप-तहसील ढलवाण, जिसका मुख्यालय ढलवाण में होगा, का तुरन्त प्रभाव से सृजन करते हैं :-
मुख्यालय वर्तमान तहसील
जिला नई उप-तहसील में उप-तहसील का नाम
उप-मण्ड़ल का नाम
बलद्वाडा में सम्मिलित पटवार वृत्तों के नाम
सम्मिलित किए जाने वाले पटवार वृत्त 1 2 3 4 5 6 ढलवाण ढलवाण बलद्वाड़ा सरकाघाट मण्डी पटडीघाट नगरोटा मझवाण चौक ढलवाण धनालग भरनाल खनोट हरन खुड़ला कलथर भाम्बला टिक्करी समैला नवाणी कोट6972 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 नरोला कशमैला मटयारा जैहमत पटडीघाट मझवाण ढलवाण भरनाल हरन
आदेश द्वारा,
ओंकार चन्द शर्मा, प्रधान सचिव एवं वित्तायुक्त (राजस्व)।
------
[Authoritative English text of this Department Notification No. Rev-D(F)4-6/2020-(Mandi), dated
13-01-2022 as required under clause (3) of Article 348 of the Constitution of India].
REVENUE DEPARTMENT
NOTIFICATION
Shimla-02, the 13th January, 2022
No. Rev-D(F) 4-6/2020-(Mandi).—WHEREAS, the Governor of Himachal Pradesh is of the opinion that it is necessary and expedient in the public interest to create a new Sub-Tehsil Dhalwan in District Mandi, Himachal Pradesh, so as to provide better services to the concerned people of nearby villages and to avoid any inconvenience being faced by them and to have better administrative control;
NOW, THEREFORE, in exercise of the powers conferred by Section 6 of the Himachal Pradesh Land Revenue Act, 1954 (Act No. 6 of 1954) and Section 5 of the Registration Act, 1908 (Act No. 16 of 1908), the Governor of Himachal Pradesh is pleased to create a new Sub-Tehsil Dhalwan in District Mandi, Himachal Pradesh, consisting of 5 Patwar Circles shown in column No.6 below, with immediate effect:—
District Patwar Circle to Name of the Sub-Tehsil
Head Quarter
Name of Sub- Division
be included in new Sub-Tehsil
Name of Patwar Circles presently included in Baldwara
1 2 3 4 5 6 Dhalwan Dhalwan Baldwara Sarkaghat Mandi Patrighat Nagrota Majhwan6973 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 Chowk Dhalwan Dhanalag Bharnal Khanot Haran Khudla
Kalther
Bhambla
Tikkri
Smaila
Nawani
Kot
Narola
Kashmaila
Matyara
Jehmat
Patrighat
Majhwan
Dhalwan
Bharnal
Haran
By order,
ONKAR CHAND SHARMA,
Principal Secretary-cum-FC (Revenue).
__________
INDUSTRIES DEPARTMENT
NOTIFICATION
Dated, the 13th January 2022
No. Ind-B(F)6-14/2014-I.—Whereas, in the year 2001, keeping in view the techonology which was being used earlier in the stone crusher industry, it was decided by the Government that the royalty from all the stone crusher units, established in the State of Himachal Pradesh, shall be charged on the basis of their actual production and the same shall be computed on the basis of Electricity consumption as well as other Measures.
Whereas, in pursuance to the above decision, the Directorate of Industries issued an Office Order No. Udyog-Bhu(Khani-4)333/2001-7502 to 7505 dated 02-01-2002 and thereby constituted a committee for assessment of Electricity consumption for the said purpose.
Whereas, the said committee submitted a detailed report to the Directorate of Industries, vide letter dated 18-9-2002, wherein different parameters were taken into account for calculation of6974 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 production by co-relating the consumption of electricity unit and finally, it has been concluded that on an average 7(seven) units of electricity are consumed in producing of one tonne of grit/bajri.
Whereas, in order to bring the uniformity in the rates of royalty from all the stone crushers established in the Himahcal Pradesh, the Government has decided that royalty from all the stone crusher units shall be charged on the basis of their actual production and the same shall be computed on the basis of the consumption of Electricity and other Measures. As such, the directions were issued to all the field officers to take the factor of 7 units of electricity consumption for production of one tonne of grit/bajri in order to calculate the royalty and the said factor of 7 units per tonne is in place for the last two decades till date for calculation of royalty.
Whereas, keeping in view the advancement in techonology and modernization of devices being used presently in the stone crusher industry in terms of production and less electricity/power consumption, the Government has decided to re-assess the formula for charging of royalty, on the basis of production, computed on the consumption of electricity unit.
Whereas, in order to re-assess the electricity consumption in co-relation with the production in the stone crusher units, the Government is pleased to constitute a committee, as under:
1. Sh. Anil Kumar Singh Rana (Geologist, Geological Wing, Department
Chairman
of Industries).
2. Sh. Raujiff Seikh (Supt. Engineer, National Highway) Nigam Vihar
Member
Shimla-2.
3. Sh. Amit Sharma, Mechanical Engineer o/o Enginer in Chief, HPPWD,
Member
Nigam Vihar, Shimla-2.
4. Sh. Anup Kumar, Supt. Engineer (Commercial) HPSEBL, Kumar
Member
House, Vidyut Bhawan, Shimla-4, H.P.
5. Sh. Atul Sharma (Asstt. Geologist, Geological Wing, Department of
Member
Industries).
All the concerned Mining Officers and Executive Engineers (HPSEBL) shall extend full assistance to the said committee while doing the afore excercise.
The terms and references of Committee:—
1. The committee for the said purpose shall visit the stone crushers established/located in the different prominent zones of Himachal Pradesh and having different source of minerals e.g.
(a) Stone crushers which are running on the basis of river beds/terrace minerals.
(b) Stone crushers which are running on the basis of Hill slope minerals.
(c) Stone crushers which are running on the basis of minerals generated during the development activities i.e. construction of Hydro Projects, National Highways/ State Highway/roads/railway tracks and de-silting of reservoir, development of plots, excavation of fisheries ponds etc.
2. The committee may take into account the earlier report dated 18-9-2002 referred above before or while the afore exercise in order to arrive at a logical conclusion. A copy of report dated 18-9-2002 is enclosed herewith.
3. If the committee after the afore exercise comes to the conclusion that the Electricity consumption mineral wise i.e. river beds/terrace, Hill slope, muck of development6975 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 activities in respect of studied area of different zones of Himachal Pradesh, is different, in that eventuality, the committee after the complete study, shall arrive at an average electricity consumption per tonne for these three catogaries of mineral source.
4. The committee shall submit a detailed conclusive report within one month from the date of issuance of this Notification.
By order, R.D. DHIMAN Addl. Chief Secretary (Inds.).
_________
अदालत सहायक समाहर्ता द्वितीय श्रेणी, कल्पा, जिला किन्नौर (हि0 प्र0)
मुकद्दमा नं0 : 24/2021 तारीख रजुआ : 22-12-2021 Sh. Krishan Chand s/o Sh. Pyare Lal, r/o Village Kashmir, P.O. Duni, Tehsil Kalpa, District Kinnaur, (H.P.).
बनाम
1. आम जनता ग्राम कश्मीर 2. प्रधान, ग्राम पंचायत कोठी, तहसील कल्पा, जिला किन्नौर (हि0 प्र0)
विषय.--प्रार्थी की पुत्री की जन्म तिथि ग्राम पंचायत कोठी के जन्म पंजीकरण रजिस्टर में दर्ज करवाये जाने बारे अधीन धारा 13(3) जन्म एवं मृत्यु पंजीकरण अधिनियम, 1969 के अन्तर्गत जन्म पंजीकरण करने बारे।
हर खास व आम जनता को बजरिया इश्तहार के माध्यम से सूचित किया जाता है कि Sh. Krishan Chand ने अधोहस्ताक्षरी के न्यायालय में एक आवेदन-पत्र मय शपथ-पत्र प्रस्तुत किया है कि उनकी पुत्री Mamta Devi का जन्म दिनांक 05-12-1990 को हुआ है तथा अज्ञानतावश प्रार्थी ने उसका पंजीकरण ग्राम पंचायत कोठी के जन्म पंजीकरण रजिस्टर में दर्ज नहीं करवाया है। अब प्रार्थी उपरोक्त नाम व जन्म तिथि ग्राम पंचायत कोठी के जन्म पंजीकरण रजिस्टर में दर्ज करवाना चाहता है। इस बारे आदेश जारी करने का अनुरोध किया है।
अतः ग्राम पंचायत कोठी, तहसील कल्पा, जिला किन्नौर व गांव कश्मीर की आम जनता को बजरिया इश्तहार के माध्यम से सूचित किया जाता है कि यदि Sh. Krishan Chand की पुत्री Mamta Devi का जन्म दिनांक 05-12-1990 का पंजीकरण ग्राम पंचायत कोठी के जन्म पंजीकरण रजिस्टर में दर्ज करने बारे कोई आपत्ति हो तो वह दिनांक 22-01-2022 या इससे पूर्व अदालत में हाजिर आकर अपना एतराज पेश कर सकता है अन्यथा आवेदन-पत्र पर जन्म पंजीकरण आदेश पारित कर सचिव ग्राम पंचायत कोठी को आगामी कार्यवाही हेतु भेज दिया जायेगा।
आज दिनांक 14-01-2022 को मेरे हस्ताक्षर व मोहर अदालत से जारी किया गया।
मोहर।
हस्ताक्षरित/- सहायक समाहर्ता द्वितीय श्रेणी, कल्पा, जिला किन्नौर (हि0 प्र0)।6976 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 ब अदालत सहायक समाहर्ता द्वितीय श्रेणी, पांवटा साहिब, जिला सिरमौर (हि0 प्र0) मिसल नं0 : 69/21
तारीख पेशी : 27-01-2022 श्री सुन्दर सिंह पुत्र चन्दन सिंह
बनाम
श्री थिरत सिंह पुत्र सुन्दर सिंह, निवासी काण्डो च्योग, तहसील कमरऊ, जिला सिरमौर (हि0प्र0) मिसल दुरुस्ती : जेर धारा 123 हि0 प्र0 भू0 रा0 अ0 नि0, 1954 वाका मौजा उपसम्पदा देवीनगर, तहसील पांवटा साहिब, जिला सिरमौर (हि0प्र0)।
मुकद्दमा उपरोक्त में प्रतिवादीगण की तलवी आसान तरीके से न हो पा रही है। अतः प्रतिवादीगण उपरोक्त को इस नोटिस/इश्तहार द्वारा सूचित किया जाता है कि वह उपरोक्त मुकद्दमें की पैरवी हेतु 27-01-2022 को दोपहर 2.00 बजे असालतन या वकालतन हाजिर अदालत होवें अन्यथा गैरहाजिरी की सूरत में कार्यवाही एकतरफा अमल में लाई जाएगी।
आज दिनांक 29-12-2021 को हमारे हस्ताक्षर व मोहर अदालत से जारी हुआ।
मोहर।
हस्ताक्षरित/- सहायक समाहर्ता द्वितीय श्रेणी, पांवटा साहिब, जिला सिरमौर (हि0 प्र0)।
----------
समक्ष श्री राजेश कुमार, सहायक समाहर्ता (द्वितीय वर्ग), तहसील ददाहू, जिला सिरमौर, हिमाचल प्रदेश
ब मुकद्दमा श्रीमती दुर्गा देवी पत्नी श्री किशन, निवासी माडत, तहसील ददाहू, जिला सिरमौर (हि0 प्र0)।
बनाम
आम जनता
विषय.-प्रार्थना-पत्र दुरुस्ती नाम ।
श्रीमती दुर्गा देवी पत्नी श्री किशन, निवासी माडत, तहसील ददाहू, जिला सिरमौर (हि0 प्र0) ने इस अदालत में एक आवेदन-प़त्र प्रस्तुत किया है कि प्रार्थिया का नाम राजस्व अभिलेख मौजा जन्दर बनूना में करेशनी देवी दर्ज है जो गलत है जबकि प्रार्थिया का नाम दुर्गा देवी है, जिसकी पुष्टि हेतु प्रार्थिया ने अपने आवेदन-पत्र के साथ परिवार नकल, आधार कार्ड अपना तथा श्री मस्त राम व श्रीमती भगवंती देवी का सत्यापित हल्फिया ब्यान संलग्न किया है, जिसकी दुरुस्ती हेतु राजस्व अभिलेख मौजा जन्दर बनूना में अपना नाम दुर्गा देवी दर्ज करवाना चाहती है।
अतः इस नोटिस द्वारा समस्त जनता ग्राम जन्दर बनूना हर आम व खास को सूचित किया जाता है कि यदि किसी को उक्त नाम की दुरुस्ती राजस्व अभिलेख में दर्ज करने बारे कोई उजर व एतराज हो तो वह दिनांक 29-01-2022 को असालतन या वकालतन हाजिर होकर अपना एतराज पेश कर सकता है। उसके पश्चात् कोई उजर व एतराज न सुना जाएगा और नियमानुसार प्रार्थना-पत्र का निपटारा कर दिया जाएगा।6977 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 आज दिनांक 29-12-2021 को मेरे हस्ताक्षर व कार्यालय मोहर द्वारा जारी किया गया। मोहर।
हस्ताक्षरित/- सहायक समाहर्ता द्वितीय वर्ग, तहसील ददाहू, जिला सिरमौर (हि0 प्र0)।
----------
समक्ष श्री कर्म चन्द, कार्यकारी दण्डाधिकारी, तहसील ददाहू, जिला सिरमौर, हिमाचल प्रदेश
मिसल नं0 : 05/13(3) of 2021 तारीख पेशी : 29-01-2022 श्री सुनील कुमार पुत्र श्री टीका राम, निवासी जन्दर बनूना, तहसील ददाहू, जिला सिरमौर, (हि0 प्र0)।
बनाम
आम जनता
विषय..-जन्म एवं मृत्यु पंजीकरण दर्ज करने बारे प्रार्थना-पत्र।
उपरोक्त प्रार्थना-पत्र श्री सुनील कुमार पुत्र श्री टीका राम, निवासी जन्दर बनूना, तहसील ददाहू, जिला सिरमौर, (हि0 प्र0) ने अधीन धारा 13(3) जन्म एवं मृत्यु पंजीकरण अधिनियम, 1969 के अन्तर्गत प्रस्तुत करके प्रार्थना की है कि वह अपनी पुत्री हेमा का नाम व जन्म तिथि 24-09-1978 जो ग्राम पंचायत महीपुर के रिकार्ड में दर्ज नही है जिसे प्रार्थी अब दर्ज करवाना चाहता है।
अतः सर्वसाधारण को इस इश्तहार के माध्यम से सूचित किया जाता है कि यदि इस सम्बंध में किसी व्यक्ति को कोई उजर/एतराज हो तो वह स्वयं अथवा अपने प्रतिनिधि द्वारा मिति 29-01-2022 को प्रातः 10 बजे हमारी अदालत में उपस्थित होकर उजर/एतराज प्रस्तुत कर सकता है। बाद गुजरने मियाद कोई उजर काबिले गौर न होगा तथा सायल की जन्म तिथि 24-09-1978 व नाम को दर्ज करने के आदेश जारी कर दिये जायेंगे।
आज दिनांक 28-12-2021 को हमारे हस्ताक्षर व मोहर अदालत से जारी किया।
मोहर।
हस्ताक्षरित/- (कर्म चन्द),
कार्यकारी दण्डाधिकारी,
तहसील ददाहू, जिला सिरमौर (हि0 प्र0)।
-------
समक्ष श्री कर्म चन्द, कार्यकारी दण्डाधिकारी, तहसील ददाहू, जिला सिरमौर, हिमाचल प्रदेश
मिसल नं0 : 09/13(3) of 2021 तारीख पेशी : 29-01-2022 श्री राजेन्दर सिंह पुत्र श्री लाल सिंह, निवासी छोउ, तहसील ददाहू, जिला सिरमौर, (हि0 प्र0)।
बनाम
आम जनता
6978 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 विषय.-जन्म एवं मृत्यु पंजीकरण दर्ज करने बारे प्रार्थना-पत्र।उपरोक्त प्रार्थना-पत्र श्री राजेन्दर सिंह पुत्र श्री लाल सिंह, निवासी छोउ, तहसील ददाहू, जिला सिरमौर, (हि0 प्र0) ने अधीन धारा 13(3) जन्म एवं मृत्यु पंजीकरण अधिनियम, 1969 के अन्तर्गत प्रस्तुत करके प्रार्थना की है कि वह अपने पुत्र आयुष का नाम व जन्म तिथि 04-03-2016 जो ग्राम पंचायत कोटी धमान के रिकार्ड में दर्ज नहीं है जिसे प्रार्थी अब दर्ज करवाना चाहता है।
अतः सर्वसाधारण को इस इश्तहार के माध्यम से सूचित किया जाता है कि यदि इस सम्बंध में किसी व्यक्ति को कोई उजर/एतराज हो तो वह स्वयं अथवा अपने प्रतिनिधि द्वारा मिति 29-01-2022 को प्रातः 10 बजे हमारी अदालत में उपस्थित होकर उजर/एतराज प्रस्तुत कर सकता है। बाद गुजरने मियाद कोई उजर काबिले गौर न होगा तथा सायल की जन्म तिथि 04-03-2016 व नाम को दर्ज करने के आदेश जारी कर दिये जायेंगे।
आज दिनांक 28-12-2021 को हमारे हस्ताक्षर व मोहर अदालत से जारी किया।
मोहर।
हस्ताक्षरित/- (कर्म चन्द),
कार्यकारी दण्डाधिकारी,
तहसील ददाहू, जिला सिरमौर (हि0 प्र0)।
--------
समक्ष श्री कर्म चन्द, कार्यकारी दण्डाधिकारी, तहसील ददाहू, जिला सिरमौर, हिमाचल प्रदेश
मिसल नं0 : 08/13(3) of 2021 तारीख पेशी : 29-01-2022 श्रीमती चम्पा देवी पत्नी श्री बहादूर सिंह, निवासी मेहन्दो पटारंग, तहसील ददाहू, जिला सिरमौर, (हि0 प्र0)।
बनाम
आम जनता
विषय.-जन्म एवं मृत्यु पंजीकरण दर्ज करने बारे प्रार्थना-पत्र।
उपरोक्त प्रार्थना-पत्र श्रीमती चम्पा देवी पत्नी श्री बहादूर सिंह, निवासी मेहन्दो पटारंग, तहसील ददाहू, जिला सिरमौर (हि0 प्र0) ने अधीन धारा 13(3) जन्म एवं मृत्यु पंजीकरण अधिनियम, 1969 के अन्तर्गत प्रस्तुत करके प्रार्थना की है कि वह अपनी पुत्री सीमा देवी का नाम व जन्म तिथि 12-05-1983 जो ग्राम पंचायत पराडा के रिकार्ड में दर्ज नहीं है जिसे प्रार्थिया अब दर्ज करवाना चाहती है।
अतः सर्वसाधारण को इस इश्तहार के माध्यम से सूचित किया जाता है कि यदि इस सम्बंध में किसी व्यक्ति को कोई उजर/एतराज हो तो वह स्वयं अथवा अपने प्रतिनिधि द्वारा मिति 29-01-2022 को प्रातः 10 बजे हमारी अदालत में उपस्थित होकर उजर/एतराज प्रस्तुत कर सकता है। बाद गुजरने मियाद कोई उजर काबिले गौर न होगा तथा सायल की जन्म तिथि 12-05-1983 व नाम को दर्ज करने के आदेश जारी कर दिये जायेंगे।6979 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 आज दिनांक 28-12-2021 को हमारे हस्ताक्षर व मोहर अदालत से जारी किया।
मोहर।
हस्ताक्षरित/- (कर्म चन्द),
कार्यकारी दण्डाधिकारी,
तहसील ददाहू, जिला सिरमौर (हि0 प्र0)।
--------
ब अदालत सहायक समाहर्ता प्रथम श्रेणी (तहसीलदार), नाहन, जिला सिरमौर (हि0 प्र0) श्री राजेश कुमार पुत्र श्री हंस राज, निवासी म0 नं0 108/1, मोहल्ला चारजान, कच्चा टैक नाहन, . . प्रार्थी। तहसील नाहन, जिला सिरमौर, हिमाचल प्रदेश
बनाम
आम जनता
. . प्रतिवादीगण। आवेदन-पत्र बाबत नाम दुरुस्ती मौजा ढाबों, तहसील नाहन बारे।
प्रार्थी श्री राजेश कुमार पुत्र श्री हंस राज, निवासी म0 नं0 108/1, मोहल्ला चारजान, कच्चा टैक नाहन, तहसील नाहन, जिला सिरमौर, हिमाचल प्रदेश ने इस अदालत में दरख्वास्त पेश की है कि राजस्व रिकार्ड मौजा ढाबों, तहसील नाहन, जिला सिरमौर में उनका नाम राकेश कुमार दर्ज चला आ रहा है जबकी उसका सही नाम राजेश कुमार है जिसे राजस्व रिकार्ड मौजा ढाबों में सही किया जावे।
अतः इस इश्तहार द्वारा आम जनता को सूचित किया जाता है कि यदि किसी भी व्यक्ति को प्रार्थी का नाम राकेश कुमार के स्थान पर राजेश कुमार राजस्व रिकार्ड मोहाल ढाबों में दुरुस्त करने बारे कोई उजर/एतराज हो तो वह अपना एतराज दिनांक 08-02-2022 को प्रातः 10.00 बजे तक इस अदालत हजा में असालतन/वकालतन हाजिर आकर पेश कर सकते है। हाजिर न आने की सूरत में एकतरफा कार्यवाही अमल में लाई जावेगी। उसके बाद किसी का कोई भी उजर/एतराज जेर समायत न होगा।
आज दिनांक 06-01-2022 को हमारे हस्ताक्षर व मोहर सहित अदालत से जारी हुआ।
मोहर। हस्ताक्षरित/- सहायक समाहर्ता प्रथम श्रेणी, तहसीलदार,
नाहन, जिला सिरमौर (हि0 प्र0)।
--------
ब अदालत सहायक समाहर्ता प्रथम श्रेणी (तहसीलदार), नाहन, जिला सिरमौर (हि0 प्र0) श्री विवेक कुमार कौशिक पुत्र स्व0 श्री मदन लाल शर्मा, निवासी म0 नं0 320/2, रानी का बाग, . . प्रार्थी। शिमला रोड़ नाहन, जिला सिरमौर, हिमाचल प्रदेश
बनाम
आम जनता
. . प्रतिवादीगण। आवेदन-पत्र बाबत जाति दुरुस्ती मौजा हरिपुर, तहसील नाहन बारे। 6980 राजपत्र, हिमाचल प्रदेश, 21 जनवरी, 2022/1 माघ, 1943 प्रार्थी श्री विवेक कुमार कौशिक पुत्र स्व0 श्री मदन लाल शर्मा, निवासी म0 नं0 320/2, रानी का बाग, शिमला रोड़ नाहन, जिला सिरमौर, हिमाचल प्रदेश ने इस अदालत में दरख्वास्त पेश की है कि राजस्व रिकार्ड मोहाल हरिपुर, तहसील नाहन, जिला सिरमौर में उनके परिवार की जाति दर्ज न है, जबकि उनके परिवार की जाति कौशिक ब्राह्मण है जिन्हें राजस्व रिकार्ड मौजा हरिपुर में दर्ज किया जावे।
अतः इस इश्तहार द्वारा आम जनता को सूचित किया जाता है कि यदि किसी भी व्यक्ति को प्रार्थी के परिवार की जाति कौशिक ब्राह्मण, राजस्व रिकार्ड मौजा हरिपुर में दर्ज करने बारे कोई उजर/एतराज हो तो वह अपना एतराज दिनांक 08-02-2022 को प्रातः 10.00 बजे तक इस अदालत हजा में असालतन/वकालतन हाजिर आकर पेश कर सकते हैं। हाजिर न आने की सूरत में एकतरफा कार्यवाही अमल में लाई जावेगी। उसके बाद किसी का कोई भी उजर/एतराज जेर समायत न होगा।
आज दिनांक 06-01-2022 को हमारे हस्ताक्षर व मोहर सहित अदालत से जारी हुआ।
मोहर। हस्ताक्षरित/- सहायक समाहर्ता प्रथम श्रेणी, तहसीलदार, नाहन, जिला सिरमौर (हि0 प्र0)।
--------
ब अदालत नायब तहसीलदार एवं सहायक समाहर्ता द्वितीय वर्ग, हरोली, जिला ऊना (हि0प्र0) इश्तहार मुश्त्री मुनादी जेर धारा-23 भू-राजस्व अधिनियम, 1954
दरख्वास्त बमुराद दुरुस्ती राजस्व रिकार्ड महाल रोेडा वालीवाल की जमाबन्दी साल 2017-2018 में जंग सिंह पुत्र अजीत सिंह उपनाम जगजीत सिंह की बजाये जवरजंग सिंह पुत्र अजीत सिंह उपनाम जगजीत सिंह दर्ज करने बारे।
बनाम
आम जनता
उपरोक्त मुकद्दमा उनवान वाला में प्रार्थी जवरजंग सिंह पुत्र अजीत सिंह उपनाम जगजीत सिंह, वासी रोेडा वालीवाल, तहसील हरोली, जिला ऊना ने प्रार्थना-पत्र प्रस्तुत करके निवेदन किया है कि उसका नाम जमाबन्दी साल 2017-2018 में जंग सिंह पुत्र अजीत सिंह उपनाम जगजीत सिंह गलत चला आ रहा है। जबकि उसका सही नाम जवरजंग सिंह पुत्र अजीत सिंह उपनाम जगजीत सिंह है। अतः सर्वसाधारण को इस इश्तहार द्वारा सूचित किया जाता है कि अगर किसी भी व्यक्ति को उक्त नाम की दुरुस्ती बारे कोई एतराज हो तो वह मुकद्दमा की पैरवी हेतु असालतन या वकालतन इस न्यायालय में दिनांक 24-01-2022 को प्रातः 10.00 बजे हाजिर आये, न आने की सूरत में उनके खिलाफ एकतरफा कार्यवाही अमल में लाई जाकर मुकद्दमा का निपटारा/फैसला कर दिया जायेगा ।
आज दिनांक 04-01-2022 को मेरे हस्ताक्षर व मोहर अदालत द्वारा जारी हुआ।
मोहर।
हस्ताक्षरित/- नायब तहसीलदार एवं सहायक समाहर्ता द्वितीय वर्ग, हरोली, जिला ऊना, हि0 प्र0। नियन्त्रक, मुद्रण तथा लेखन सामग्री, हिमाचल प्रदेश, शिमला-5 द्वारा मुद्रित तथा प्रकाशित इलेक्ट्रॉनिक हस्ताक्षरित राजपत्र, वैबसाइट http://rajpatrahimachal.nic.in पर उपलब्ध है एवम् ऑनलाइन सत्यापित किया जा सकता है।