, 14806.03 1) SUDA/AMRUT/R.W.S. 1522017550--

74

,

1) 14806.03

,

DPR2 ( 2. 1) 75897 13699 Distribution Network

3.

248 MLD Water Treatment Plant (WTP) WTP 2050(162.99 MLD) 4. Distribution Network

2050 Network Design,

14(ELSRs)

5. ,

Service Level Benchmarks

24×7

6. 5 5.1

DPR Operation & Maintenance 5 7.

Model Bid Document

8.

Components Details
ESR (14 Nos) 2.45 ML – 1 No., 2.30 ML - 1 No, 2.15 ML – 1 No, 2.05 ML – 3 Nos, 2.00 ML – 2 Nos, 1.95 ML – 1 No, 1.85 ML – 1 No, 1.65 ML – 1 No, 1.55 ML – 1 No, 1.45 ML - 1 No and 1.40 ML – 1 No.
Distribution System Total Length (Existing + Proposed) - 569.07 KM (100% coverage)
SCADA Up to ESR outlet
House connection & consumer Metering 100% coverage of proposed area (75897 Connection)
( 3

9.

Sl. No. Item Description Total Amount (Rs. in Lakhs)
1 Estimate of Distribution System (23 Sub Zone) 6,819.81
2 Estimate of Elevated Service Reservoirs (14 Nos.) 1,775.47
3 Estimate of NH 23 & NH 75 Crossing 66.62
4 House Service Connection with meter (75897 nos.) 3,156.56
5 AMR meter (100 nos.) for 50 mm pipe dia. @ INR 37960 37.96
6 EMP and Environmental Monitoring 45.32
7 Centralized SCADA Center with automation equipment 964.69
8 Repair of Existing GLSR at Harmu Pahari 2.79
Total (A) 12,869.22
Detailed Project Report Phase-1
1 Labour Cess @ 1% on (A) 128.69
2 JUIDCO Charges 3201 04.11.2016 548.69
3 DPR Consultancy Charges @ 0.97% on (A) 124.83
4 PMC Charges @ 2.06% on (A) 265.11
Total (B) 1,067.32
Total CAPEX (A) + (B) 13936.54
5 years Expenditure in Operation & Maintenance
1 Operation and Maintenance for 1st Year excluding annual repair charges 72.75
2 Operation and Maintenance for 2nd Year (As per item no. 1+10% of item no. 1) including annual repair charges 132.01
3 Operation and Maintenance for 3rd Year (As per item no. 2+10% of item no. 2) 145.21
4 Operation and Maintenance for 4th Year (As per item no. 3+10% of item no. 3) 159.73
5 Operation and Maintenance for 5th Year (As per item no. 4+10% of item no. 4) 175.71
6 SCADA O&M (Lumpsum for 5 Years) 184.08
Total OPEX (C) 869.49
Total Project Cost (A) + (B) + (C) 14,806.03
4 (

10. CAPEX13936.54

OPEX869.49

(CAPEX) 5 5.1

Name of Project Approved Project Cost (CAPEX) Central Share State Share ULB Share
14th F.C. Others
Ranchi Water Supply Scheme 13936.54 4645.51 5574.62 2973.12 743.29

11. CAPEX 33.33 , 40%

SAAP 80% 14

20%

5 OPEX 12.

' '

2215-, 01-,

796- , 01-

, 06-, 79-

13. ,

SUDA

,

CAPEX 14.

OPEX( 5 15. 5 O&M Plan,

,

Water User Charges

E-mail, SMS

16.

17. 9DPR 14806.03

9201810 18.

,

,