1)

14806.03 26143.02

JUIDCO Ltd./Water Supply Ranchi(Part-C)/DPR/436-2016-3620

74

, State Annual Action Plan

DPR ,

1, 2A2B DPR2 ( 2. 12ADistribution System

, Network CoverageWater Pressure

2BWTP24

3. , 14 21 35 35 Distribution System Distribution System

15 80 Rising main

4. , 1)

14806.03

24X7 Centralised SCADA Centre Rising mains SCADA

, 5. 2ADPR

1 2A

26143.02

, ,

,

6. 2B210MLDWTP

23 ESRWTP ESRs 24X7 WTP 24Rising main , 2B

2B

2B DPR( 3 7. 1) 75897

2A 207636

100701

Distribution Network

106935

8.

57 MLD, 20 MLD 285 MLD Water Treatment Plant (WTP) 362 MLD

WTP 2050(234MLD) 9. 1 Distribution Network 2050 Network Design

14(ELSRs) 2A 14

22

23

36

10. , Service Level Benchmarks 24×7 11. 5 5.1

DPR Operation & Maintenance 5 12.

Model Bid Document 13.

Components Details
ESR (14 Nos) 2.45 ML – 1 No., 2.30 ML - 1 No, 2.15 ML – 1 No, 2.05 ML – 3 Nos, 2.00 ML – 2 Nos, 1.95 ML – 1 No, 1.85 ML – 1 No, 1.65 ML – 1 No, 1.55 ML – 1 No, 1.45 ML - 1 No and 1.40 ML – 1 No.
Distribution System Total Length (Existing + Proposed) – 858.84 KM (100% coverage)
SCADA Up to ESR outlet
House connection & consumer Metering 100% coverage of proposed area (207636 Connection)
4 (

14. , ,

Sl. No. Item Description Total Amount (Rs. In Lakhs)
1 Estimate of Rising Main to Feed 15 nos. of New ESRs 3,465.34
2 Estimate of Distribution System (36 sub Zones) 12,171.19
3 Estimate of Elevated Service Reservoirs (14 Nos) 1,775.47
4 Estimate of NH-23 & NH -75 Crossing at 12 Locations 93.40
5 House Service Connection with meter (106935 nos.) 4,446.64
6 Compound Wall with Gate for 14 nos. of Prop. ESR 84.03
7 Approach Road for 14 nos. of Prop. ESR 15.09
8 AMR meter (100 nos.) for 50mm pipe dia. @ INR 37960 37.96
9 Centralized SCADA Center with automation equipment 1,326.11
10 Repair of Existing GLSR at Harmu Pahari 2.79
11 EMP and Environmental Monitoring 26.81
Total (A) 23,444.82
Detailed Project Report Phase-1
12 Labour Cess @ 1% on (A) 234.45
13 JUIDCO Charges ( 320104.11.2016 ) 630.57
14 DPR Consultancy Charges @ 0.97% on (A) 204.25
15 PMC Charges @ 2.06% on (A) 433.77
Total (B) 1,503.03
Total CAPEX (A+B) 24,947.85
5 YEARS EXPENDITURE IN OPERATION & MAINTENANCE ( O& M)
16 O& M for 1st year excluding annual repair charges. 91.52
17 O&M for 2nd year ( As per item No. 16 + 10% of item No. 16) Including annual repair charges 197.99
18 O & M for 3rd year ( As per item No. 17 + 10% of item No. 17) 217.79
19 O & M for 4th year ( As per item No. 18 + 10% of item No. 18) 239.57
20 O & M for 5th year ( As per item No. 19 + 10% of item No. 19) 263.52
21 Comprehensive 5 Year O & M cost of Centralized SCADA Centre 184.78
Total OPEX (C) 1,195.17
Total Project Cost(A)+(B)+(C) 26,143.02

15. CAPEX 24947.85 OPEX 1195.17

CAPEX

Name of Project Approved Project Cost (CAPEX) Central Share State Share ULB Share Additional State Share
14th F.C. Others
Ranchi Water Supply Scheme 24947.85 4982.62 5979.14 3188.87 797.22 10000.00
( 5

16. CAPEX 4982.62 ''

'', 5979.14'' '', 3986.098014

20 '' ''

10000.00"" 16 " " 10000.00

17.

5 OPEX 1195.17

, , , 2217-, 796- , 94-, , , , 06-, 79-

18. ,

SUDA

,

19. 38182018

,

20. 5

O&M Plan,

,

Water User Charge

E-Mail, SMS6 ( 21.

1) 14806.03 26143.02

12

Model Bid Document

15-17

22.

3 2018 04

,