, Pit Water
296.94
5/05/2019/-1146--74 12
,2 ( 2. 23.02.2019
(i) Pit Water 5600.51 (ii) water distribution network (ward 33 to ward 52) 5552.95 (iii) 18540.55 296.9401 3. , 417 23.02.2019
iii
5600.515552.95, 11153.46 District Mineral Foundatin Trust
iii , 18540.55 4. ,
DPR
| Preparation Of Detailed Project Report (DPR) & Project Management Consultancy (PMC) Services For The Selected Projects Under Jharkhand Minerals Area Development Authority, Dhanbad. | |||
| SL. No. | Scheme Proposed by JMADA Authority | Cost | Estimate Value |
| in Lakhs | (Rs. In Lakhs) | ||
| 1 | Putki sump and Pump House (0.70 ML) | 81.91 | 140.12 |
| Putki sump (0.70 ML) | 28.66 | ||
| Compound Wall for Putki Sump | 10.05 | ||
| Putki Electrical & Pumping Repair | 19.5 | ||
| 2 | Water Treatment Plant (12MGD) | 736.71 | 903.64 |
| Wall compound | 55.83 | ||
| WTP repair works | 111.10 | ||
| 3 | Cleaning and repairing of incoming channel of Topchanchi Lake-Lalki nala and Dholkatta nala | 62.79 | 122.55 |
| 59.76 | |||
| 4 | Topchachi Filter bed overhauling, | 8.92 | 43.48 |
| Construction of Guard Room, | 1.75 | ||
| Approach road | 32.81 | ||
| 5 | Repalcement of existing 8 inch dia Hume Pipe (Cement Pipe) up to a length of 1.5 KM at following Locations - From Jamadoba Dumri No. 02 to Bhora - From Jitpur Colliery to Jamadoba Diversion of 12" Dia pipe | 53.14 | 133.26 |
| 80.12 | |||
| 6 | Replacement of 100 years old pipe line of different diameter at Kenduadih, Karkend (approximate Length 10.0 KM)-Distribution Network at Karkend area | 380.27 | 458.75 |
| Construction of Kerkend Sump | 28.65 | ||
| Construction of Kerkend Sump A | 28.65 | ||
| Construction of Pump House at Karkend | 16.26 | ||
| Karkend Mechnical Work | 4.92 | ||
| 7 | * Replacement of 100 years old pipe line and laying of new pipe line at Katras area. * Replacement of existing 2 inch dia. GI Pipe by 6 inch dia CI pipe from Katras Main Road to Shib Mandir Mohalla. | 140.05 | 140.05 |
| 8 | Replacement and Diversion (due to land slide) of 14 inch diameter (approx 3.0 KM length) pipe line near Angarpathra Railway Siding and laying by the side of main Road. | 153.92 | 153.92 |
| 9 | Repair of Tilatand reservoir | 3.19 | 61.73 |
| Construction of guard room | 2.38 | ||
| Staff quarter | 50.68 | ||
| Electromechanical work | 5.47 | ||
| 10 | Pipe Line from DharmaBandh to Tetulia filter Plant | 107.66 | 307.98 |
| Pipe Line from Tetulia filter to Chaitudih Plant | 156.20 | ||
| Overhauling and cleaning work of Tetulia filter work | 42.42 | ||
| Electromechanical work | 1.70 | ||
| 11 | Construction of Bhuli Pump House | 16.81 | 50.11 |
| Guard Room | 2.38 | ||
| Electrical work & Shifting of Transformer | 30.92 | ||
| 12 | Jamadoba to Putki 36 inch dia. Rising Main Pipe line - 08.00 Km. | 1245.97 | 1245.97 |
| 13 | WATER DISTRIBUTION SCHEME Jamadoba to Jharia Pipe line 1000mmdia. Rising Main Pipe line - 12.30 Km. | 2702.58 | 3414.93 |
| Pipe line to Jharia to Simibahal - 03.00Km | 84.15 | ||
| Jamadoba to Phusbunglow Pipe line 600mmdia. Rising Main Pipe line - 06.00 Km. | 628.20 | ||
| 14 | WATER DISTRIBUTION SCHEMEBhuli Pumping Station to Nichitpur to Tilatand 18 inch Dia Pipe line - 08 Km, And Nichitpur Sump | 2139.98 | 2139.98 |
| 15 | Construction of intake well at Jamadoba | 90.88 | 739.07 |
| Pumping Mechinery at Intake | 344.22 | ||
| Construction of Approach bridge at Intake | 36.434 | ||
| Approach road for Jamadoba Intake | 13.16 | ||
| Electrical and Mechanical Work | 70.47 | ||
| Raw water Rising main from Intake to WTP | 183.91 | ||
| 16 | WATER DISTRIBUTION SCHEME Construction of New Pumping Station in Godhar and | 40.89 | 232.07 |
| Pumping machinery at Godhar | 191.180 | ||
| 17 | BUILDING CONSTRUCTION Construction of New Building, renovation and modification of Jharkhand Mineral Areavelopment Authority Head Office as well as the building in which DMC Dhanbad is rented | 268.57 | 268.57 |
| 18 | Construction of new Chaitudih sump 1.0 Lacs Gallon | 28.66 | 28.66 |
| 19 | Construction of New ESR at Pathardi 1.5 Lacs Gallon | 50.97 | 50.97 |
| 20 | Construction of New PCC Road at Topchanchi lake L-6km | 178.21 | 178.21 |
| 21 | Installation of Electromagnetic Water Meter at Strategic location as shown in the schematic diagram along with communication system at central control room at proposed JMADA Admin building. | 346 | 346.00 |
| 22 | Provision of infrastructure facilities- Electronic pipe locator, Leakage detection machine, Vehicle ( Bolero) - 1 nos and Pipe cutting Machine, Portable DG set | 25 | 25.00 |
| 23 | Replacement of existing pumps of various location in JMADA Area. | 165.53 | 165.53 |
| 24 | Dhansar to jharia pipe line 600mm | 380.54 | 522.17 |
| 25 | Dhansar Reservior 14 Lacs Gallon | 100.74 | |
| 26 | Pump house at Dhansar | 40.89 | |
| 27 | House service Connection in JMADA | 2835.00 | 2835.00 |
| O & M for 2 Years | 1003.85 | 1003.85 | |
| 28 | Barrari (Ward No.48) WS from Pit Water | ||
| (i) | CIVIL WORK | 143.34 | 143.34 |
| (ii) | ELECTRICAL WORK | 57.67 | 57.67 |
| (iii) | WATER WORK | 334.39 | 334.39 |
| 29 | Burragarh (Ward No. 35) WS from Pit Water | ||
| (i) | CIVIL WORK | 143.34 | 143.34 |
| (ii) | ELECTRICAL WORK | 57.67 | 57.67 |
| (iii) | WATER WORK | 248.21 | 248.21 |
| 30 | Jeenagora (Ward No.48) WS from Pit Water | ||
| (i) | CIVIL WORK | 117.18 | 117.18 |
| (ii) | ELECTRICAL WORK | 109.91 | 109.91 |
| (iii) | WATER WORK | 339.51 | 339.51 |
| 31 | Joyarampur (Ward No.48) WS from Pit Water | ||
| (i) | CIVIL WORK | 98.28 | 98.28 |
| (ii) | ELECTRICAL WORK | 57.67 | 57.67 |
| (iii) | WATER WORK | 221.61 | 221.61 |
| 32 | Lodna (Ward No.47) WS from Pit Water | ||
| (i) | CIVIL WORK | 117.18 | 117.18 |
| (ii) | ELECTRICAL WORK | 109.91 | 109.91 |
| (iii) | WATER WORK | 424.79 | 424.79 |
| 33 | Jelagora (Ward No.42) WS from Pit Water | ||
| (i) | CIVIL WORK | 172.96 | 172.96 |
| (ii) | ELECTRICAL WORK | 109.91 | 109.91 |
| (iii) | WATER WORK | 436.55 | 436.55 |
| 34 | Indranagar ws phase I (Ward No.37) from pit water | 754.54 | 754.54 |
| 35 | Indranagar ws phase II (Ward No. 36,37,38,41&43) from pit water | 514.29 | 514.29 |
| 36 | Distribution network (Ward No. 33 to 52) | 4267.93 | 4267.93 |
| 37 | Estimate of Sump cum pump house | 160.84 | 160.84 |
| 38 | Estimate of Pumping Machinery | 243.23 | 243.23 |
| 39 | O & M for 2 Years | 210.71 | 210.71 |
| Total in Lakhs | 25163.21 | ||
| Add 0.5% Contingencies Charges | 125.82 | ||
| Total in Lakhs | 25289.02 | ||
| Add for GST 12% | 3034.68 | ||
| Total in Lakhs | 28323.71 | ||
| Add 1% Labour cess | 283.24 | ||
| Grand Total Cost In Lakhs | 28606.94 | ||
| Add for DPR Consultancy Charges 1.75% | 500.62 | ||
| Add for Project Management Consultancy Charges 2.05% | 586.44 | ||
| Grand Total Cost In Lakhs | 29694.01 |