Utility DuctStorm Water Drain , , Rotary Improvement, Pedestrian Subway, Landscaping & Beautification2
| 1 | 1, 2.5500) | 2195/ 31.03.17 | 101.01 Cr. 53.80 Cr. 47.21Cr. |
| 2 | 2, 8.8500) | 2194/ 31.03.17 | 477.77 Cr. 169.11 Cr. 302.65Cr. |
| 3 | 3, 2.8800) | 1978/ 23.03.17 | 633.88Cr.102.10Cr. 531.78Cr. |
| 4 | 4, 7.4500) | 1835/ 18.03.17 | 586.46Cr.184.33Cr. 402.13Cr. |
| 0/ | |||
| 1 | 1) | 215 ( 14.10.2017 | |
| 22.07.2019 ( | |||
| 2 | 2) | 232 ( 01.12.2017 | 000 - |
| 3 (3a) | 3) | 248 ( 24.01.2018 | |
| (3b) | 3) | 353( 30.10.2019 | |
| 4 | 4) | 313 ( 06.03.2019 | 0 |
| 1 | 1) | 151.118 | 73.01 |
| 2 | 2) | 354 | 982 |
| 3 | 3) | 582.34 | 765.94 |
| 4 | 4) | 663.42 | 1314.61 |
6.
,
, 7. ,
1
8.
59.4 "Notwithstanding the above, the Employer may terminate the contract for convenience." Termination 60.2 "If the contract is terminated at the Employer's convenience or because of a fundamental Breach of Contract by the Employer, the Engineer shall issue a certificate for the value of the work done, the cost of balance by the contractor and available at site, the reasonable cost of removal of Equipment, a repatriation of the contractor's personnel employed solely on the works, and the contractor's cost of protecting and securing the works and less advance payments received due in terms of the contract and less taxes due to be deducted at source as per applicable law." 9.
i. 1, 2.5500)
• 25.8% Chainage 0+000 1+3200 13200, Utility DuctStorm Water Drain
Authority
• 09.90 • Mobilization00 • DPR00.77 • PMCM/s NCPE Ltd.00.04 (M/s NCPE Ltd.) 0.08(M/s Rodic.)
ii. 2, 8.8500)
• 2.5% 500m, 400m 220m Clearance 523 Utility DuctUtility DuctStorm Water4 Drain 4.200 • 01.77 • Mobilization04.05 • DPR02.43 • PMCM/s NCPE Ltd.0 0.16(M/s NCPE Ltd.)
iii.
3, 2.8800)
•
| 1% | 0% | |
| 0: | 0.0009282 | 0 |
| Mobilization0: | 4.65 | 0 |
• DPR01.47 • PMCM/s NCPE Ltd.00.09 (M/s NCPE Ltd.)
4, 7.4500)
iv. • 1% 2.500 • 00 • Mobilization09.41 • DPR02.65 • PMCM/s NCPE Ltd.0:0 10. i. 1
(
(
005 ( ,
, ii. 2
(
,
, iii. 3
(
(
, DPR,
,
, iv. 4
(
,
,
v. ,
11 Terminate
PMC
12. 16.10.2020 27
,
,
--------