Sewage "In situ Remediation/Treatment"
, (CSIR-NEERI) DPR
153.25
SPMG/UD&HD/NGT/0A200/Bioremediation/31/2019/578 , 100 MLD
(DPR)
, (CSIR-NEERI) , , , , , , , feasibility 56% Interception and Diversion technique , 2 (
, ,
,
2. , (CSIR-NEERI) , , in-situ remediation
Technology patent CSIR-NEERI
, Scientific Water and Waste Water Management Practice
CSIR-NEERI Highly Skilled Scientific and Technical Manpower CSIR-NEERI
BOQ Quality Assurance Operation and maintenance 3. "100% treatment of Sewage /Drain" Construction, Installation, Operation
, (CSIR-NEERI) ,
,
100MLD
| DPR | ||
| 1. | 33.54 | |
| 2. | 59.54 | |
| 3. | 36.79 | |
| 129.87 | ||
| GST 18% 23.38 | ||
| GST 153.25 |
"In-situ remediation/treatment of Drains", CSIR-NEERI
DPR (Implementation) , (CSIR-NEERI) ,
(
3 1: If JUIDCO or UD&HD Dept. carries out tender and wishes to retain CSIR-NEERI as a Project Management Consultant then the CSIR-NEERI shall charge 1.25% of the DPR cost. CSIR-NEERI will supervise; carry out periodic sampling and analysis to ensure that treatment systems are meeting the standards. Assistance to be provided by CSIR-NEERI to JUIDCO or UD&HD Dept. to draft the tender as per standard JUIDCO or UD&HD Dept. format
2: If the implementation of treatment option to be carried out by CSSR-NEERI including the tender process then the CSIR-NEERI shall charge 3.5% of the DPR cost. CSIR-NEERI will supervise; carry out periodic sampling and analysis to ensure that treatment systems are meeting the standards.
, (CSIR-NEERI) , 4.
, (CSIR- NEERI),, 235
245 , , 153.25 5. 03.02.2021 , 11
,
,
-------------