JHARKHAND STATE ELECTRICITY REGULATORY

COMMISSION

--------

NOTIFICATION

16th October, 2025

(Terms and Conditions for Determination of Distribution Tariff) Regulations, 2025

Notification No. 115--In exercise of powers conferred by sub-section (1) of Section 181 and clauses (zd), (ze) and (zf) of sub-section (2) of Section 181, read with Sections 61, 62, and 86, of the Electricity Act, 2003 (36 of 2003) and all other powers enabling it in that behalf, the Jharkhand State Electricity Regulatory Commission here by makes the following Regulations.

The Regulation is guided by the principles contained in Sections 61 and 62 of the Act to encourage competition, efficiency, economical use of resources, good performance and optimum investments by the Distribution Licensees within the State of Jharkhand and for determination of Multi-Year Tariff to be recovered by the Distribution Licensees for the prudent expenses incurred towards providing quality supply of power to consumers within the State of Jharkhand.

2 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

CHAPTERI:

SCOPE, EXTENT AND DEFINITIONS

A1. Short Title and Commencement

1.1 These Regulations shall be called the Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2025.

1.2 These Regulations shall extend to the whole of the State of Jharkhand.

1.3 These Regulations shall come into force for the period from April 01, 2026 to March 31, 2031, after its publication in the Official Gazette of the Government of Jharkhand and unless reviewed earlier or extended by the Commission, shall remain in force upto March 31, 2031.

1.4 These Regulations shall supersede the Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Determination of Distribution Tariff) (First Amendment) Regulations, 2023, the Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020, the Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2015, Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2010, Jharkhand State Electricity Regulatory Commission (Terms and Conditions of Tariff determination, Multi-Year Tariff Framework) Regulations, 2007, and Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Distribution Tariff) Regulations, 2004, read with all amendments thereto, as the case may be:

Explanation: For all purposes, including review matters pertaining to the period till March 31, 2026, the issues relating to determination of Aggregate Revenue Requirement and Tariff shall be governed by the provisions of the Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Determination of Distribution Tariff) (First Amendment) Regulations, 2023 or the Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 or the Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2015 or Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2010 or Jharkhand State Electricity Regulatory Commission (Terms and Conditions of Tariff determination, Multi-Year Tariff Framework) Regulations, 2007 or Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Distribution Tariff) Regulations, 2004, read with all amendments thereto, as may be applicable.

A2. Scope of Regulations and Extent of Application

2.1 These Regulations shall be applicable for determination of ARR and Tariff to be billed by the Distribution Licensees for Wheeling and Retail Supply Businesses to the different categories of consumers including other Distribution Licensees within the State of Jharkhand.

3 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

2.2 In accordance with the principles laid out in these Regulations, the Commission shall determine tariff for:

a) Wheeling of electricity, i.e., wheeling tariff for the Control Period, and;

b) RetailSupplyofelectricity,i.e.,retailsupplytarifffortheControlPeriod;

Provided that in case of distribution of electricity in the same area by two or more Licensees, the Commission may, for promoting competition among Licensees, fix only a maximum ceiling of tariff for retail supply of electricity;

Provided further that where any category of consumer has been permitted open access under Section 42 of the Act, the Commission shall determine the wheeling tariff, cross-subsidy surcharge, additional surcharge and other open access related charges in accordance with these Regulations and Jharkhand State Electricity Regulatory Commission(Intra State Open Access)Regulations, 2016, as amended from time to time.

2.3 The ARR determined for the Wheeling Business shall be used to fix the wheeling tariff for the wheeling of electricity.

2.4 The ARR determined for the Retail Supply Business shall be used to fix the retail supply tariff for the retail sale of electricity.

2.5 These Regulations shall extend to the entire State of Jharkhand and to all matters within the jurisdiction of the Commission.

A3. Definitions and Interpretation

3.1 In these Regulations, unless the context other wise requires-

1. 'Accounting Statement' means for each Financial Year:

i. The Balance Sheet, prepared in accordance with the form contained in the Companies Act, 2013 and its predecessors, as applicable;

ii. CashFlowStatement,preparedinaccordancewiththeapplicableAccounting Standards of the Institute of Chartered Accountants of India;

iii. Cost Accounting Records prescribed by the Central Government under Section 148 of the Companies Act, 2013 and its predecessors, as applicable;

iv. Notes on accounts thereto, and such other supporting statements and information forming part of financial statements or as the Commission may direct from time to time;

v. Profit and Loss Account, complying with the requirements contained in The Companies Act, 2013 and its predecessors, as applicable;

vi. Report of the Statutory Auditors, including any annexure and appendix thereto, as applicable;

vii. Any or all the formats as notified by the Commission under these Regulations for Tariff Regulation, including Multi Year Tariff Regulations pertinent to the relevant year;

4 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

viii. Reconciliation Statement, duly certified by the Statutory Auditors, showing the reconciliation between the total expenses, revenue, assets and liabilities, of the entity as a Company and the expenses, revenue, assets and liabilities, separately for each Business regulated by the Commission and unregulated business operations.

2. 'Act' means the Electricity Act, 2003 (36 of 2003) and subsequent amendments thereof;

3. 'Additional Capitalisation' means the capital expenditure incurred and capitalised or projected to be capitalised, after the date of commercial operation of the scheme and admitted by the Commission after a prudence check, subject to provisions of Clause 10.13of these Regulations;

4. 'Aggregate Revenue Requirement'(ARR) means application for each financial year, the costs pertaining to the Licensed business which are admissible, in accordance with these Regulations, to be recovered in the form of tariffs and charges determined by the Commission;

5. 'Allocation Statement' means for each financial year, a statement in respect of each of the businesses (Wheeling, Retail Supply, Other Business) of the Licensee, showing the amounts of any revenue, cost, asset, liability, reserve or provision, etc., which has been either:

Determined by apportionment or allocation between different businesses of the Licensee, including the Licensed Business, together with a description on the basis of the apportionment or allocation;

or

Charged from or to each such Other Business together with a description on the basis of that charge;

6. 'Auditor' means an auditor appointed by the Distribution Licensee, in accordance with the provisions of sections 224, 233B and 619 of the Companies Act, 1956 (1 of 1956), as amended from time to time or Chapter X of the Companies Act, 2013 (18 of 2013) or any other law for the time being in force;

7. 'Bank Rate' means the one-year Marginal Cost of Lending Rate (MCLR) of the State Bank of India applicable as on April 01of the respective year or any replacement thereof for the time being in effect;

8. 'Base Year' means the Financial Year 2025-26 and is used for the purposes of these Regulations;

9. 'Carrying Cost' means the interest amount on gap/surplus;

10. 'Collection Efficiency' shall mean the ratio of total revenue realised to total revenue billed for the same financial year;

11. 'Commission' means the Jharkhand State Electricity Regulatory Commission5 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 (JSERC);

12. 'Conduct of Business Regulations' means the Jharkhand State Electricity Regulatory Commission(Conduct of Business) Regulations,2024, as amended from time to time;

13. 'Control Period' means a multi-year period fixed by the Commission, from April 01, 2026 and up to March 31, 2031;

14. 'Deemed Distribution Licensee' means a person/entity deemed to be a Distribution Licensee under Section 14 of the Act;

15. 'Distribution Licensee' means a Licensee authorised to operate and maintain a distribution system for supplying electricity to consumers in its area of supply under Section 14 of the Act;

16. 'Financial Year' means a period commencing on April 01 of a calendar year and ending on March 31 of the subsequent calendar year;

17. 'Force Majeure Event' means, with respect to any party, any event or circumstance, or combination of events or circumstances, which is not within the reasonable control of, and is not due to an act of omission or Commission ofthatpartyandwhich,bytheexerciseofreasonablecareanddiligence,couldnotha vebeenprevented;and,withoutlimitingthegeneralityofthe foregoing, shall include the following events or circumstances:

(i) acts of God, including but not limited to lightning, storm, action of

the elements, earthquakes, flood, torrential rains, drought and

natural disaster or any act of God beyond the control of any party

or due to any restraint of the State Government or Central

Government or any other Statutory Authority;

(ii) strikes and industrial disturbances having a State-wide or extensive

impact in the area of supply of a Licensee, but excluding strikes and

industrial disturbances in the Distribution Licensee's own

organization;

(iii) acts of war, invasion, armed conflict or act of foreign enemy,

insurrections, riots, revolution, terrorist or military action;

(iv) unavoidable accident, including but not limited to fire, explosion,

radioactive contamination and toxic chemical contamination;

(v) any shutdown or interruption of the grid, which is required or

directed by the concerned Load Dispatch Centre;

18. 'Income from Other Business' is the income received by the Distribution Licensee other than from Tariff towards usage of assets and/or manpower relating to regulated Business and shall exclude Non-Tariff Income;

19. 'License'meansaDistributionLicensegrantedunderSection14oftheAct;

20. 'Licensed Business' shall mean the functions and activities, which the Licensee6 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 is required to undertake in terms of the License granted or being a deemed Licensee under the Act;

21. 'Non-Tariff Income' means the net income relating to the regulated Business other than from Tariff as defined in Clause no 10.53,excludinganyincomefromOtherBusiness;

22. 'Open Access Consumer' means any Licensee or Consumer or buyer or a person engaged in generation who has been granted Open Access in accordance with the Jharkhand State Electricity Regulatory Commission(Terms and Conditions for Intra-State Open Access) Regulations, 2016 as amended from time to time;

23. 'Other Business' means any other business of the Distribution Licensee for optimum utilisation of its assets within the meaning of Section 51 of the Act; 24. 'Prudence Check' means scrutiny of reasonableness of any cost or expenditure incurred or proposed to be incurred in accordance with these Regulations by the Distribution Licensee;

25. 'Retail Supply Business' means the business of sale of electricity by a Licensee to the category of consumers within the area of supply in accordance with the terms of the Licensee for distribution and retail supply of electricity;

26. 'Retail Supply Tariff' is the rate charged by the Licensee for supply to non- open access consumers, which includes charges for Wheeling and Retail Supply;

27. 'Trading Business' means the business of purchase of electricity by the Licensee for resale to another Licensee or consumers or category of consumers outside the area of supply of the Licensee;

28. 'Tariff Period' shall mean the period from April 01,2026andupto March31,2031,forwhichTariffisdeterminedbytheCommissionunderthese Regulations;

29. 'Wheeling' means the operation whereby the distribution system and associated facilities of a Licensee are used by another person for the conveyance of electricity on payment of charges to be determined under Section 62 of the Act;

30. 'Wheeling Business' means the business of operating and maintaining a distribution system for conveyance of electricity in the area of supply of the Licensee;

31. 'Average Cost of Supply' (ACoS) shall mean average cost price of supply of one unit of electricity;

32. 'Fuel and Power Purchase Adjustment Surcharge'(FPPAS) shall mean the increase in cost of power supplied to consumers due to a change in Fuel cost, power purchase cost and transmission charges with reference to the cost of supply approved by the Commission.

7 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

3.2 Words and expressions used in these Regulations and not defined herein but defined in the Act shall have the meanings respectively assigned to them in the Act.

3.3 Reference to any Act, Rules and Regulations shall include amendment or consolidation or re-enactment thereof.

3.4 All proceedings under these Regulations shall be governed by the Jharkhand State Electricity Regulatory Commission (Conduct of Business) Regulations, 2024 as amended or re-enacted from time to time.

A4. Tariff Approved to be Ceiling Tariff

4.1 For removal of doubts, it is clarified that the Tariffs determined under the provisions of these Regulations are the ceiling values and this shall not preclude the Distribution Licensee from proposing reduced Tariffs for any consumer.

However, in such case the reduced Tariffs shall not be considered for the determination of Revenue as the same is the liability of the Distribution Licensee.

8 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

CHAPTERII:

TARIFFFRAMEWORKANDGUIDINGPRINCIPLES

A5. Multi–Year Tariff (MYT)Framework

5.1 The MYT Framework shall commence from April 01, 2026, and unless reviewed earlier or extended by the Commission, shall be applicable till March 31, 2031. The ARR filings for the Control Period shall be done in accordance with the MYT framework contained in these Regulations.

5.2 The Distribution Licensees shall file the MYT Application along with supporting documents before the Commission as per the timelines specified in Section A 24 of these Regulations.

5.3 The MYT Application shall include statements containing ARR along with its break up for the Years of the previous Control Period based on Audited Accounts for FY 2020-21 to FY 2024-25, revised estimates for Base Year FY 2025-26, and the projections for each year of the Control Period.

5.4 The Guiding Principles for the MYT Framework are described in Section A6of these Regulations.

5.5 The principles for the determination of ARR for the Control Period are described in Chapter III of these Regulations, and the procedure for Annual Filing during the Control Period is described in Chapter IV of these Regulations.

A6. Guiding Principles for Multi-Year Tariff (MYT)Framework

6.1 The Commission shall adopt a Multi-Year Tariff Framework for approval of ARR and expected revenue from Wheeling and Retail Supply Tariff Business. The ARR shall be determined for each year of the Control Period.

6.2 The Multi-Year Tariff framework shall be based on the following:

a) Business Plan for the Wheeling and the Retail Supply Business of the Licensees for the entire Control Period to be filed before the Commission for approval, along with MYT Petition prior to the start of the Control Period or within such period as the Commission may direct;

b) Licensees' forecast of expected ARR for each year of the Control Period, wheeling tariff and retail supply tariff for the first year of the ensuing Control Period,basedonreasonableassumptionsoftheunderlyingfinancialandoperationa l principles/parameters laid down under these Regulations, and on the basis of the Business Plan;

c) Trajectory for specific parameters shall be prescribed by the Commission for improvement of Licensee's performance through incentives and disincentives;

d) Annual review of performance, which shall be conducted vis-à-vis the approved forecast and categorization of variations in performance into controllable and uncontrollable factors; and

e) Mechanism for sharing approved gains or losses on account of controllable9 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 and uncontrollable factors.

Determination of Baseline

6.3 The values for the Base Year of the Control Period shall be determined on the basis of the audited accounts available for FY 2020-21 to FY 2024-25. In the absence of audited accounts of any such year, the Commission may consider best estimate for such year after carrying out due prudence check and after taking into account other factors as considered relevant by the Commission.

6.4 The Commission shall normally not revise the performance targets during the Control Period, unless the Commission is of the view that there is a major variation in approved numbers vis-à-vis actuals.

Segregation of Retail Supply and Wheeling Business

6.5 The Licensee shall segregate the accounts of the Licensed Business into Wheeling Business and Retail Supply Business.

6.6 The ARR for Wheeling Business shall be used to determine Wheeling Tariff and the ARR for Retail Supply Business shall be used to determine Retail Supply Tariff.

6.7 For such period until accounts are segregated, the Licensee shall prepare an Allocation Statement to apportion costs and revenues to respective business. The Allocation Statement, approved by the Board of Directors of the Licensee, shall be accompanied with an explanation of the basis and methodology used for segregation, which should be consistent over the Control Period.

6.8 In case clear and reasoned methodology for allocation is not submitted by the Distribution Licensee, the Commission may consider the segregation as approved for the previous Control Period as specified below or may decide on the manner in which such allocation can be done:

Particulars Shareof Supply Business Shareof Wires Business
O&M Cost
Employee cost 40% 60%
A&G Expense 50% 50%
R&M Cost 10% 90%
Power purchase(Including PGCIL & RLDC Charges) 100% 0%
Interest on security deposit 100% 0%
Interest Cost 10% 90%
Interest on working capital 90% 10%
Taxes on Income 10% 90%
Depreciation 10% 90%
Return on Equity 10% 90%
Less:Non-Tariff/Other Income 90% 10%
10 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

Business Plan

6.9 Each Licensee shall file for the Commission's approval a Business Plan approved by an authorized signatory, as per the timelines specified in Section A 24of these Regulations.

6.10 The Business Plan shall be filed separately for the Retail Supply and Wheeling Business. As specified in Clause 6.7of these Regulations, in the absence of segregated accounts for the two Businesses, the Licensee shall prepare an allocation statement and submit the same with the Business Plan.

6.11 TheBusinessPlanshallbefortheentireControlPeriodandshallinter-aliacontain:

a) Capital Investment Plan for the entire Control Period commensurate with load growth, distribution loss reduction trajectory and quality improvement measures proposed in the Business Plan. The Capital Investment Plan should also include corresponding capitalisation schedule and financing plan;

The Distribution Licensee shall also submit scheme-wise capital structure and cost of financing(interest on debt) and return on equity, Grant, Deposit Works, along with terms of the existing loan agreements, etc., as a part of the Capital Investment Plan;

b) Sales/Demand Forecast for each consumer category and sub-categories for each year of the Control Period;

c) Power Procurement Plan based on the sales forecast and distribution loss trajectoryforeachyearoftheControlPeriod.ThePowerProcurementPlanshall also include energy efficiency, RPO fulfilment, and demand side management measures;

d) A set of targets proposed for other controllable items such as distribution losses, Billing efficiency, Collection efficiency, working capital requirement, quality of supply targets (viz., SAIFI, SAIDI and MAIFI as per the Jharkhand State Electricity Regulatory Commission( Distribution Licensees' Standards of Performance) Regulations, 2015, and subsequent amendments), etc. The targets shall be consistent with the capital investment plan proposed by the Licensee.

e) Human Resource Plan with manpower planning including details of the estimated year wise manpower addition and retirements for the Control Period to meet the growth in demand/consumers;

f) Proposals for Non-Tariff Income with item-wise description and details;

11 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

g) Proposals in respect of income from Other Business.

Business Plan shall also contain the requisite information for the preceding Control Period:

Provided that requisite information for the preceding Control Period shall include year-wise audited data on Scheme-wise capital investment, distribution loss trajectory, quality improvement measures undertaken, category-wise number of consumers, connected load and sales, source-wise power procurement quantum and cost, Employee, R&M and A&G Expenses along with detailed break up and any other information used for preparing projections of various performance parameters and other components during the Control Period. In case of a new Licensee, such information is required to be submitted for the period of operations up to the start of the Control Period.

Capital Investment Plan

6.12 The Licensee shall file for the Commission's approval a Capital Investment Plan for the entire Control Period along with the Business Plan. The Capital Investment Plan shall be prepared scheme-wise, and each scheme shall include:

a) Purpose of investment (e.g., replacement of existing assets, meeting load growth, technical and distribution loss reduction, non-technical loss reduction, meeting reactive energy requirements, customer service improvement, improvement in quality and reliability of supply, etc.);

b) Approval of Competent Authority;

c) Capital Structure;

d) Detailed Project Report;

e) Capitalisation Schedule;

f) Implementation schedule including timelines;

g) Cost-benefit analysis and Rate reasonability;

h) Improvement in operational efficiency envisaged in the Control Period;

i) Ongoing schemes that will spill over in to the year under review, along with justification;

j) New schemes that will commence during the Control Period but may be completed within or beyond the Control Period.

6.13 During the Annual Performance Review (APR), the Commission shall monitor the year- wise progress of the actual capital expenditure incurred by the Licensee vis-à-vis the approvedcapitalexpenditure.TheLicenseeshallsubmittheactualcapitalexpenditure incurred along with the Annual Performance Review Filing.

6.14 The Commission shall review the actual capitalisation at the end of each year of the Control Period vis-à-vis the approved capitalisation schedule and shall true up the ARR12 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 based on actual capitalisation for the year for which True up has been filed and also revise the ARR components for the year for which APR and Tariff have been sought.

6.15 In case the capital expenditure is required for emergency work, which has not been approved in the Capital Investment Plan, the Licensee shall submit an application containing all relevant information along with reasons justifying the emergency nature of the proposed work, seeking approval of the Commission wherever possible:

Provided that in case the capital expenditure is required for emergency work or unforeseen situation to mitigate threat to life and property and if prior intimation there o f to the Commission shall cause any irreparable loss or injury, the Licensee may undertake such capital expenditure and submit the details for post-facto approval of the Commission along with next Tariff Petition with all relevant details.

Sales/Demand Forecast

6.16 The Licensee, in its Business Plan filings, shall forecast sales for each consumer category, sub-category and for each tariff slab, at different voltage levels, for each year of the Control Period based on recent trends and historical growth for the Commission's review and approval along with the requisite details of category-wise and voltage-wise sales, contracted load, number of consumers, etc.

6.17 The Commission shall examine the forecasts for reasonableness and consistency on the basis of expected growth in the number of consumers, changes in pattern of consumption, seasonal variations, target distribution losses, demand for electricity in previous years and anticipated growth in the next year, and any other factor considered relevant by the Commission, and accordingly approve sales forecast with such modifications as deemed fit for each year of the Control Period.

6.18 Sales of electricity, if any, to electricity traders or another Licensee shall be separately indicated.

6.19 The Licensee shall also indicate category-wise open access consumers along with open access sales. The energy wheeled for them shall be shown separately for:

a) Supply with in its area of supply; and

b) Supply outside its area of supply.

Power Procurement Guidelines

6.20 The Distribution Licensee shall undertake its Power procurement during the year in accordance with the Power Procurement Plan for the Control Period, which may include long-term, medium-term and short-term power procurement, approved by the Commission in accordance with these Regulations.

6.21 The Distribution Licensee shall follow the Guidelines contained in this Part with respect to:

a) Procurement of power under any arrangement or agreement with a term or duration exceeding twelve (12) years and up to twenty-five (25) years (i.e., long-term power procurement);

13 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

b) Procurement of power under any arrangement or agreement with a term or duration exceeding 3 months but not exceeding three (3) years (i.e., medium- term power procurement); and

c) Procurement of power under any arrangement or agreement with a term or duration less than or equal to one (1) month (i.e., short-term power procurement).

Power Procurement Plan

6.22 The Distribution Licensee shall prepare a plan for procurement of power to serve the demand for electricity in its area of supply and submit such plan to the Commission for approval:

Provided that such power procurement plan shall be submitted for the Control Period from FY 2026-27 to FY 2030-31:

Provided further that the power procurement plan proposed as a part of the Business Plan, shall be submitted along with the application for determination of tariff:

ProvidedalsothatthepowerprocurementplansubmittedbytheDistribution Licensee may include purchase from long-term, medium- term and short-term sources of power, in accordance with these Regulations. However, the Distribution Licensee should, as far as possible, not plan for short-term purchases except for conditions specified in Clause 6.31 to Clause 6.36 and should endeavor to meet its requirement from long-term and medium-term power procurement and make a plan accordingly.

6.23 The power procurement plan of the Distribution Licensee shall comprise the following:

a) A quantitative forecast of the unrestricted demand for electricity for each tariff category, within its area of supply over the Control Period;

b) An estimate of the quantities of electricity supply from the identified sources of generation and power purchase;

c) An estimate of availability of power to meet the Base Load and Peak Load requirement:

Provided that such estimate shall be monthly estimation of demand and supply expressed both in Mega-Watt (MW) as well as in Million Units (MU);

d) Standards to be maintained with regard to quality and reliability of supply, in accordance with the Jharkhand State Electricity Regulatory Commission (Distribution Licensees' Standards of Performance) Regulations, 2015, as amended from time to time;

e) Measures proposed to be implemented as regards energy conservation and energy efficiency;

f) The requirement for new sources of power generation and/or procurement, including augmentation of generation capacity and identified new sources of supply, based on (a) to (e) above;

14 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

g) The plan for procurement of power including quantities and cost estimates for such procurement:

Provided that the forecast/estimate contained in the long-term procurement plan shall be separately stated for peak and off-peak periods, in terms of quantities of power to be procured (in MU) and maximum demand (in MW / MVA):

Provided further that the forecasts/ estimates shall be prepared for each month of the Control Period:

Provided also that the long-term procurement plan shall be a cost-effective plan based on available information regarding costs of various sources of supply.

6.24 The forecasts estimates shall be prepared using forecasting techniques based on past data and reasonable assumptions regarding the future:

Provided that the forecasts/estimates shall take into account factors such as overall economic growth, consumption growth of electricity-intensive sectors, advent of competition in the electricity industry, trends in captive power, impact of loss reduction initiatives, improvement in Generating Station Plant Load Factors and other relevant factors.

The concerned licensee will endevour to implementan application-based automated tool, incorporating advanced technologies such as Artificial Intelligence and Machine Learning, for managing the power procurement portfolio and enabling accurate demand–supply forecasting. A detailed feasibility report covering the technical framework, operational modalities, cost–benefit analysis, and implementation schedule shall be submitted to the Commission. The tool shall be designed to optimise key performance indicators of power procurement, including, but not limited to, reduction in total power purchase cost, reduction in Deviation Settlement Mechanism charges, optimisation of bilateral and power exchange transactions, and enhancement of forecasting accuracy.

6.25 Where the Commission has stipulated a percentage of the total consumption of electricity in the area of a Distribution Licensee to be purchased from cogeneration/ renewable sources of energy, the power procurement plan of such Distribution Licensee shall include the plan for procurement from such sources at least up to the stipulated level.

6.26 The Distribution Licensee shall be required to forward a copy of the power procurement plan to the State Transmission Utility for verification of its consistency with the transmission system plan for the intra-State transmission system:

Provided that the Distribution Licensee may also consult the State Transmission Utility at the time of preparation of the power procurement plan to ensure consistency of such plan with the transmission system plan.

15 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

6.27 The Distribution Licensee may, as a result of additional information not previously known or available at the time of submission of the power procurement plan, apply for a modification in the power procurement plan for the remainder of the Control Period, as part of the application for Annual Performance Review.

6.28 The Commission may, as a result of additional information not previously known or available to the Commission at the time of submission of the power procurement plan, if it so deems, either on suo-motu basis or on an application made by any interested or affected party, modify the power procurement plan of the Distribution Licensee for the remainder of the Control Period, as part of the Annual Performance Review.

Approval of power purchase agreement/arrangement

6.29 Every agreement or arrangement for power procurement by a Distribution Licensee from a Generating Company or Licensee or from other source of supply entered into shall come into effect only with the prior approval of the Commission:

Provided that the prior approval of the Commission shall be required in respect of any agreement or arrangement for power procurement by the Distribution Licensee from a Generating Company or Licensee or from any other source of supply on a standby basis:

Provided further that the prior approval of the Commission shall be required for any change to an existing arrangement or agreement for power procurement, whether or not such existing arrangement or agreement was approved by the Commission.

6.30 The Commission shall review an application for approval of power procurement agreement/arrangement having regard to the approved power procurement plan of the Distribution Licensee and the following factors:

a) Requirement for power procurement under the approved power procurement plan;

b) Adherence to a transparent process of bidding in accordance with guidelines issued by the Central Government;

c) Adherence to the terms and conditions for determination of tariff specified under these Regulations where the process specified in (b) above has not been adopted;

d) Availability (or expected availability) of capacity in the intra-State transmission system for evacuation and supply of power procured under the agreement/ arrangement;

e) Need to promote co-generation and generation of electricity from renewable sources of energy.

Additional Short-term power procurement

6.31 The Distribution Licensee may undertake additional short-term power procurement during the year, over and above the power procurement plan for the Control Period approved by the Commission, in accordance with this Regulation.

16 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

6.32 Where there has been a shortfall or failure in the supply of electricity from any approved source of supply during the Financial Year, the Distribution Licensee may enter into additional short-term arrangement or agreement for procurement of power:

Provided that if the total power purchase cost or quantum for any block of six months including such short-term power procurement exceeds the power purchase cost or quantum approved by the Commission for the respective block of six months by more than ten percent (10%), the Distribution Licensee shall have to obtain post-facto approval of the Commission.

6.33 Where the Distribution Licensee has identified a new short-term source of supply from which power can be procured at a tariff that reduces its approved total power procurement cost, the Distribution Licensee may enter into a short-term power procurement agreement or arrangement with such supplier without the prior approval of the Commission.

6.34 The Distribution Licensee may enter into a short-term arrangement or agreement for procurement of power or procure power from Power Exchanges without the prior approval of the Commission when faced with emergency conditions that threaten the stability of the distribution system or when directed to do so by the State Load Dispatch Centre to prevent grid failure.

6.35 Within fifteen (15) days from the date of entering into an agreement or arrangement for short-term power procurement for which prior approval is not required, the Distribution Licensee shall provide the Commission, full details of such agreement or arrangement, including quantum, tariff calculations, duration, supplier details, method for supplier selection and such other details as the Commission may require with regard to such agreement/arrangement to assess that the conditions specified in this Regulation have been complied with:

Provided that where the Commission has reasonable grounds to believe that the arrangement or agreement entered into by the Distribution Licensee does not meet the criteria specified in Clause 6.32 to Clause 6.34, the Commission may disallow any increase in the total cost of power procurement (net of additional revenue) over the approved level arising there from or any loss incurred by the Distribution Licensee as a result, from being passed through to consumers.

6.36 Subject to the cases specified in Clause 6.32 to Clause 6.34, where the Distribution Licensee enters into any agreement or arrangement for short-term power procurement without the approval of the Commission, any increase in the total cost of power procurement (net of additional revenue) over the approved level arising there from shall be deemed to be a variation in performance attributable entirely to controllable factors.

6.37 In addition, the Licensee may also sell any surplus power in the open market provided that such sale of power shall lead to recovery of tariff higher than the variable cost of such power.

17 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

Targets for Distribution Losses and Collection Efficiency

6.38 The Licensee shall file the distribution loss trajectory for the entire Control Period in the Business Plan commensurate with the Capital Investment Plan for each year of the Control Period for approval of the Commission.

6.39 The minimum collection efficiency targets to be met during the Tariff Period by various Licensees are as follows:

Collection Efficiency Targets
Utility 2026-27 2027-28 2028-29 2029-30 2030-31
JBVNL 99.00% 99.00% 99.00% 99.00% 99.00%
TSUISL 99.50% 99.50% 99.50% 99.50% 99.50%
SAIL-Bokaro 99.50% 99.50% 99.50% 99.50% 99.50%
TSL 99.50% 99.50% 99.50% 99.50% 99.50%
DVC 99.50% 99.50% 99.50% 99.50% 99.50%

Providedthatincasetheactualcollectionefficiencyisgreaterthanthetarget,the actual collection efficiency shall be considered for Tariff Determination purposes.

Quality of Supply and Services

6.40 The quality of supply and the customer service parameters shall be monitored as per the norms specified by the Commission from time to time.

6.41 The Licensees shall propose the baseline and performance trajectory for all quality parameters as specified in the Jharkhand State Electricity Regulatory Commission (Distribution Licensees' Standards of Performance) Regulations, 2015, as amended from time to time as per the formats specified in the said Regulations. For the Control Period, the proposed baseline and performance trajectory shall be submitted along with the Business Plan.

6.42 The Commission shall make an assessment of reliability of baseline data and may prescribe the performance trajectory for each identified parameter for the Control Period.

In this regard a benchmarking study shall be undertaken for operational, technical, financial, and standards of performance parameters, taking into account prevailing market dynamics and best practices within the power sector. A detailed report of the benchmarking exercise shall be submitted to the Commission within six months from the date of notification of these Regulations and in turn the commission may by doing proper assessment of the report of the benchmark study submitted by the respective utilities, may further take the initiative for determining the best practices in power sector independently by engaging any expert in this field.

6.43 The performance framework to encourage Licensees to improve quality of supply and services shall be as per the Jharkhand State Electricity Regulatory Commission (Distribution Licensees' Standards of Performance) Regulations, 2015, as amended18 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 from time to time.

Controllable and Uncontrollable elements of ARR

6.44 For the purpose of the MYT Framework contained in these Regulations, the elements of ARR shall be identified as "controllable" and "uncontrollable", as follows:

ARRElement Controllable/Uncontrollable
Variation in Sales Uncontrollable
Power Purchase Cost (excluding short-term power) Uncontrollable
Short-Term Power Purchase Cost Controllable(CeilingValue)
Transmission & Load Dispatch Charges Uncontrollable
O&M Expenses(excluding terminal liabilities of employees) Controllable
Terminal liabilities of employees Uncontrollable
Return on Equity Controllable
Interest on Loan Controllable
Interest on Working Capital Controllable
Depreciation Controllable
Taxes on Income Uncontrollable
Foreign Exchange Rate Variation Uncontrollable
Non-Tariff Income Uncontrollable
Income from Other Businesses Uncontrollable
Interest on Consumer Security Deposit Uncontrollable
Distribution Loss and Collection Efficiency Controllable
Quality of Supply Controllable
Capital Expenditure Controllable
Capitalisation Controllable
Variation in Wires Availability and Supply Availability Controllable

6.45 The variation on account of uncontrollable elements shall be treated as a pass-through to be ultimately charged to the consumers, subject to a prudence check and approval by the Commission.

6.46 The Commission shall also permit pass-through of variations in controllable items on account of Force Majeure events and due to a Change in Law in the ARR for the ensuing year, based on the submission of actual values by the Licensee and subsequent validation and approval by the Commission.

6.47 The variation from targets specified by the Commission on account of controllable elements shall be subject to an incentive and penalty framework, as detailed in the subsequent section.

19 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

Incentive and PenaltyFramework

6.48 Various elements of the Aggregate Revenue Requirement (ARR) of the Licensee shall be subject to an incentive and penalty framework, as per the terms specified in this section. The overall aim is to incentivise better performance and penalise underperformance, based on performance norms/benchmarks specified by the Commission.

6.49 The gains/losses shall be computed on aggregate basis for controllable items such as Operation & Maintenance Expenses (excluding Terminal Liabilities), Distribution Losses and Collection Efficiency considered collectively on annual basis. The computations shall be based on the data submitted by the Licensee in the Annual Performance Review and audited annual accounts and shall be subject to prudence check by the Commission.

6.50 In case of aggregate gains, the aggregate gain shall be shared between the Licensee and the consumers in the ratio of fifty:fifty (50:50) respectively.

6.51 The gains to be shared shall be passed on to the consumers through Tariff during the Annual Performance Review for each year of the Control Period.

6.52 In case of any loss on account of underperformance with respect to the controllable parameters, the Licensee shall bear the entire losses and no proportion of losses shall be passed on to the consumers.

6.53 In addition, the net savings due to refinancing of Loans by the Distribution Licensee shall be shared between the Users and the Licensee, as the case may be, in the ratio of fifty:fifty (50:50).

A7. Truing-up

7.1 The Licensee shall submit along with the application for truing up, category-wise and voltage-wise sales, contracted demand and number of consumers, source-wise power purchase quantum and cost, details of capital expenditure, additional capitalization, sources of financing, operation and maintenance expenditure, actual loan portfolio with the interest paid along with other components of ARR, for each year of the Control Period, on the basis of annual Audited Accounts as per the Timelines stipulated in Section A 24.

7.2 Where after the truing up, the revenue recovered exceeds the trued up value approved by the Commission under these Regulations, the surplus amount shall be treated as specified in Clause 7.4 of these Regulations.

7.3 Where after the truing up, the revenue recovered is less than the trued up value approved by the Commission under these Regulations, the gap amount shall be treated as specified in Clause 7.4 of these Regulations.

7.4 The amount under-recovered or over-recovered, along with simple interest at the rate equal to Bank Rate as on April01 of the respective year plus two hundred (200)basis points, shall be carried forward to the Tariff approved for the subsequent years:

20 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

Provided that no carrying cost on the duration of delay shall be allowed on unrecovered gap if the Licensee fails to submit the Petitions as per the timelines stipulated in Section A 24:

Provided further that if such gap is large, and it is not feasible to recover the same in one year alone, the Commission may take a view to create a regulatory asset, as per the guidelines provided in Clause 8.2.2 of the Tariff Policy, 2016.

Provided further that any adverse financial impact on account of variation in uncontrollable items due to lapse on part of the Licensee or its suppliers/contractors shall not be allowed in truing up.

7.5 The Commission, to ensure tariff stability, may include the trued-up costs in the subsequent Control Period's ARR instead of including in the year succeeding the relevant year of the Control Period.

A8. Annual Performance Review

8.1 The Licensee shall submit along with the application for Annual Performance Review, details of category-wise and voltage-wise sales, contracted demand and number of consumers, source-wise power purchase quantum and cost, details of capital expenditure, additional capitalization, sources of financing, operation and maintenance expenditure, actual loan portfolio with the interest paid along with other components of ARR incurred/projected to be incurred for the year under review, as per the timelines stipulated in Section A 24.

8.2 Along with Annual Performance Review Filing, the Licensee shall also claim revised ARR for the following year based on the truing up and annual performance review of previous year/s.

8.3 The Scope of the Annual Performance Review shall be comparison of the approved expenses vis-à-vis revised estimates for the year(s)and shall comprise the following:

a) Comparison of Approved Capital Expenditure and Capitalisation vis-à-vis revised estimates by the Licensee based on the latest actual data available;

b) Comparison of Sales and Power Purchase required to meet the requisite Sales approved by the Commission vis-à-vis the revised estimates by the Licensee based on the latest actual data available;

c) Comparison of Other Expenses such as Interest on Loan, Interest on Working Capital, Return on Equity, Depreciation and O&M Expenses approved by the Commission vis-à-vis the revised estimates by the Licensee based on the latest actual data available;

d) Computation of the sharing of gains and losses on account of controllable factors for the previous year;

e) Approved Revenue vis-à-vis revised estimates based on the latest actual data available.

f) Any other Expenses/ Revenues impacting ARR.

8.4 Distribution Licensees may, as a result of additional information not previously known21 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 or available to them at the time the forecast was developed, apply for a modification in the approved forecast of ARR and expected revenue from tariff and charges for the remainder of the Control Period, as part of the Annual Performance Review.

8.5 The Commission if, as a result of additional information not previously known or available to it at the time the forecast was developed, is of the view that the same may result in significant over/under recovery, either suo-motu or on an application made by any interested or affected party, modify the approved forecast of ARR and expected revenue from tariff and charges for the remainder of the Control Period, as part of the Annual Performance Review.

8.6 Based on the analysis of Annual Performance Review and Truing up, the Commission, may revise the ARR and Tariff for the ensuing year of the Control Period.

22 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

CHAPTER III: DETERMINATION OF ARR

A9. Details for True-up, APR and determination of ARR & Tariff

9.1 The Distribution Licensee shall submit the details for True-up for the previous year, Annual Performance Review for the current year and Tariff Determination for the ensuing year as per the principles discussed in the subsequent Sections.

A10.PrinciplesforDeterminationofARR

Calculation of ARR for Wheeling Business during the Control Period

10.1 The Aggregate Revenue Requirement for the Wheeling Business of the Licensees for each year of the Control Period, shall comprise the following items:

a) Operation and Maintenance Expenses;

b) Return on Equity;

c) Interest on Working Capital;

d) Interest on Loans;

e) Depreciation;

f) Income Tax;

g) Lease Charges;

h) Foreign Exchange Rate Variation;

i) Less: Non-Tariff Income;

j) Less: Income from Other Business; and

k) Less: Income from wheeling of electricity(refer Clause 10.50)

Calculation of ARR for Retail Supply Business during the Control Period

10.2 The Aggregate Revenue Requirement for the Retail Supply Business of the Licensees for each year of the Control Period, shall comprise the following items:

a) Cost of power procurement;

b) Transmission & Load Dispatch charges;

c) Operation and Maintenance Expenses;

d) Return on Equity;

e) Interest on Working Capital;

f) Interest on Loans;

g) Interest on Consumer Security Deposit;

h) Depreciation;

i) Income Tax;

j) Lease Charges;

23 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

k) Foreign Exchange Rate Variation;

l) Bank Charges subject to the prudent check

m) Less: Non-Tariff Income;

n) Less: Income from Other Business; and

o) Less: Receipts on account of Cross Subsidy Surcharge and Additional Surcharge from Open Access Consumers.

OperationandMaintenanceExpenses

10.3 Operation and Maintenance(O&M)Expenses shall include:

a) Salaries, wages, pension contribution and other employee costs;

b) Administrative and General Expenses;

c) Repairs and Maintenance Expenses.

10.4 The O&M Expenses for the Base Year of the Control Period shall be approved by the Commission taking into account the audited accounts of FY 2020-21 to FY 2024-25, Business Plan filed by the Licensee, estimates of the actual for the Base Year, prudence check and any other factor considered appropriate by the Commission.

10.5 The O&M expenses permissible towards ARR of each year of the Control Period shall be approved based on the formula shown below:

O&Mn=(R&Mn+EMPn+A&Gn)+Terminal Liabilities

Where,

R&Mn–Repair and Maintenance Costs of the Licensee for thenth year;

EMPn– Employee Costs of the Licensee for thenthyear, excluding term inalliabilities;

A&Gn–Administrative and General Costs of the Licensee for thenth year.

10.6 The above components shall be computed in the manner specified below:

a) R&Mn=K*GFA*(INDXn/INDX0)

Where,

'K' is a constant (expressed in percentage(%)) governing the relationship between R&M costs and Gross Fixed Assets (GFA) and shall be calculated based on the percentage (%) of R&M to GFA of the preceding year of the Base Year in the MYT Order after normalising any abnormal expenses;

'GFA'is the opening value of the gross fixed asset of thenthyear;

INDXn is the indexation for nth year of control period;

INDXo is the indexation for the base year of the control period;

b) EMPn+A&Gn=[(EMPn-1)*(1+Gn)+(A&Gn-1)]*(INDXn/INDXn-1)+ provision for A&G (if any)24 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 Where,

EMPn-1– Employee Costs of the Licensee for the (n-1)th year excluding terminal liabilities;

A&Gn-1– Administrative and General Costs of the Licensee for the (n-1)th year excluding legal/litigation expenses;

INDXn– Inflation factor to be used for indexing the employee cost and A&G cost. This will be a combination of the Consumer Price Index (CPI) and the Wholesale Price Index (WPI) for immediately preceding year before the base year;

Gn – is a growth factor for the nth year and it can be greater than or lesser than zero based on the actual performance. Value of Gn shall be determined by the Commission in the MYT Order for meeting the additional manpower requirement based on the Distribution Licensee's Filing, benchmarking and any other factor that the Commission feels appropriate;

Provision: Cost or initiatives or other one-time expenses as proposed by the Distribution Licensee subject to the prudence check and is validated by the Commission.

c) INDXn=0.55*CPIn+0.45*WPIn;

Note 1: For the purpose of estimation, the same INDXn/INDXn-1value shall be used for all years of the Control Period. However, the Commission will consider the actual values in the INDXn/INDXn-1at the end of each year during the Annual Performance Review exercise and true up the employee cost and A&G expenses on account of this variation, for the Control Period;

Note 2: Any variation due to changes recommended by the Pay Commission, wage revision agreement, etc., will be considered separately by the Commission;

Note 3: Terminal Liabilities will be approved as per actual submitted by the Licensee along with documentary evidence such as actuarial studies.

10.7 The Distribution Licensee shall submit a detailed break-up of Legal/Litigation Expenses incurred during the Control Period (FY 2026-27 to FY 2030-31), along with necessary documentary evidence such as invoices, fee receipts, case references, and proof of payment. The Commission shall assess the admissibility of such expenses based on the provisions of the Jharkhand State Litigation Policy and allow recovery of expenses subject to prudence check at the time of truing-up.

Provided that the legal expenses shall be considered on a case-by-case basis, subject to prudence check at the time of True-up, and only upon production of valid proof of payment for the actual amount claimed.

Capital Cost

10.8 The capital cost of the Licensee shall include the following:

25 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

a) Expenditure incurred or projected to be incurred on original scope of work, including the interest during construction and financing charges, any gain or loss on account of Foreign Exchange Risk Variation during construction, on the actual loan up to the date of commercial operation of the scheme, as admitted by the Commission after prudence check, shall form the basis for determination of Tariff;

b) Capitalised initial spares subject to the ceiling norm of 1.5% of the original project cost.

10.9 The capital cost admitted by the Commission after prudence check shall form the basis for determination of tariff:

ProvidedthatwheretheCommissionhasgiven'inprinciple'approvaltotheestimates of scheme capital cost and financing plan, the same shall be the guiding factor for applying prudence check on the actual capital expenditure:

Provided further that in case of the existing schemes, the capital cost admitted by the Commission prior to April 01, 2026andthe additional capital expenditure projected to be incurred for respective year of the Control Period during FY 2026-27 to FY 2030-31 as may be admitted by the Commission, shall form the basis for determination of capital cost:

Provided also that any increase in Capital Cost due to time/cost over-run shall only be allowed in case the Licensee establishes with the support of appropriate documents and facts to the satisfaction of the Commission that the delay was on account of uncontrollable factors and not attributable to the Licensee.

10.10 Capital cost to be allowed by the Commission for the purpose of determination of tariff will be based on the capital investment plan prepared by the Licensee and approved by the Commission.

10.11 The amount funded through Consumer Contribution, Grants or Deposit Works for connection to the distribution system of the Licensee shall be deducted from the original cost of the scheme for the purpose of calculating the amount under debt and equity under these Regulations.

10.12 Further, in case such cost has been incurred towards replacement or upgradation of any existing assets, the original cost of the replaced asset shall be reduced and de- capitalised from the Capital Cost.

Additional Capitalization

10.13 The capitalisation of capital expenses incurred or projected to be incurred, on the following counts within the original scope of work, after the asset has been put to use may be admitted by the Commission, subject to prudence check:

a) Deferred liabilities;

b) Works deferred for execution;

c) Liabilities to meet award of arbitration or for compliance of the order or directions of any statutory authority or order or decree of any court of law;

26 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

d) On account of change in law;

e) Any additional works/services, which have become necessary for efficient and successful operation of the scheme, but not included in the original scheme cost;

f) Capital Expenses incurred due to Force Majeure conditions;

g) Less: De-Capitalisation of replaced/upgraded assets, if any; and

h) Less: Assets not put to use;

Provided that the details of work included in the original scope of work, along with estimates of expenditure, undischarged liabilities and works deferred for execution, shall be submitted along with the application for determination of tariff after the date of commercial operation of the scheme.

10.14 In case of de-capitalisation of assets of a Distribution Licensee, the original cost of such asset as on the date of decapitalization duly certified by its Statutory Auditor shall be deducted from the value of gross fixed asset and corresponding outstanding loan on such assets as well as equity shall be deducted from loan and the equity balances respectively. Such deductions shall be carried out in the year such de- capitalisation takes place with corresponding adjustments in cumulative depreciation and cumulative repayment of loan shall be carried out duly taking into consideration the year in which it was capitalised.

10.15 Impact of additional capitalisation within the approved scheme cost on tariff shall be considered by the Commission during the Annual Performance Review:

Provided that avenues for monetisation of the asset base may be explored as part of the overall scheme planning, and a detailed study identifying such avenues shall be undertaken and submitted to the Commission for approval, through a Petition, prior to implementation. Such monetisation measures shall, under no circumstances, compromise grid security, grid safety, or the integrity and reliability of the distribution system.

Provided that the Commission may consider any new scheme proposed on merits subject to prudence check as per this Tariff Regulation.

Debt-EquityRatio

10.16 Existing Schemes - In case of capital expenditure schemes capitalised prior to April 01, 2026, the debt-equity ratio as allowed by the Commission for determination of tariff for the period ending March 31, 2026, shall be considered.

10.17 New Schemes–For capital expenditure schemes to be capitalizedafterApril01,2026:

a) A normative debt-equity ratio of swenty : thirty (70:30) shall be considered for the purpose of determining of Tariff;

b) In case the actual equity employed is in excess of thirty percent (30%), the amount of equity for the purpose of tariff determination shall be limited to thirty percent (30%), and the balance amount shall be considered as a27 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 normative loan;

c) In case the actual equity employed is less than thirty percent (30%),the actual debt-equity ratio shall be considered;

d) The premium, if any raised by the Licensee while issuing share capital and investment of internal accruals created out of free reserve, shall also be reckoned as paid up capital for the purpose of computing return on equity, provided such premium amount and internal accruals are actually utilized for meeting capital expenditure.

Note 1: Any expenditure admitted on account of committed liabilities within the original scope of work and the expenditure deferred on techno-economic grounds but falling within the original scope of work shall be serviced in the normative debt- equity ratio specified in these Regulations;

Note 2: Any expenditure on replacement of old assets or on renovation and modernization or life extension shall be considered on normative debt-equity ratio specified in these Regulations after writing off the entire book value of the original assets from the capital cost of the new asset;

Note 3: Any expenditure admitted by the Commission for determination of tariff on account of new works not in the original scope of work shall be serviced in the normative debt-equity ratio specified in these Regulations.

10.18 The Licensee shall submit the resolution of the Board of the Company or approval of the competent authority in other cases regarding infusion of funds from internal resourcesinsupportoftheutilizationmadeorproposedtobemadetomeetthecapital expenditure of the Distribution Licensee.

Return on Equity

10.19 The base rate of Return on Equity (RoE) shall be 14.50% (post-tax) for assets capitalised prior to April 01, 2026

and

15.00% (post-tax) for assets capitalized from April 01, 2026, provided that in addition to the base RoE, the Commission may allow an additional 0.50% RoE for assets capitalized from April 01, 2026,to the Distribution Licensee that demonstrably ensures uninterrupted supply of electricity to Universal Supply Obligated Entities, including, but not limited to, Religious Institutions, Government Hospitals, Educational Establishments, Public Water Supply and Sanitation Services, Street Lighting Systems, critical infrastructure facilities, and renewable energy integration projects, eligibility for such additional RoE shall be linked to specific, measurable Key Performance Indicators (KPIs), including but not limited to SAIDI, SAIFI, outage duration, and supply reliability percentage to the above categories, asverified through independent certification by the State Load Despatch Centre (SLDC) and/or a Statutory Auditor or any third-party agency as approved by the Commission.

10.20 The Licensee to provide Return on equity for each year shall be allowed on equity employed in assets in use considering the following:

28 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

a) EquityemployedinaccordancewithClause10.16oftheseRegulationson assets (in use) capitalised as on the beginning of the year; and

b) Fifty Percent (50%)of the equity projected to be employed in accordance with Clause 10.17of these Regulations on assets (in use) Commissioned during the year.

The Distribution Licensee shall furnish all requisite data, information, and supporting documents pertaining to the respective Financial Year by 30thNovember of the year in which the Petition is to be filed. Non-submission of the complete data within the stipulated timeline shall render the Licensee ineligible to claim carrying cost for the corresponding period, unless condoned by the Commission with recorded reasons.

Interest on Loan Capital

10.21 The loans arrived at in the manner indicated in Clauses10.16 and 10.17 shall be considered as gross normative loan for calculation of interest on loan.

10.22 The normative loan outstanding as on April 01, 2026 shall be worked out as the gross loan by deducting the cumulative repayment as admitted by the Commission up to March 31, 2025 from the gross normative loan.

10.23 The repayment for each year of the Control Period shall be deemed to be equal to the depreciation allowed for that year.

10.24 In case of de-capitalization of assets, the repayment shall be adjusted by taking into account cumulative repayment on pro-rata basis and the adjustment should not exceed cumulative depreciation recovered up to the date of de-capitalization of such assets.

10.25 Notwithstanding any moratorium period availed by the Licensee, the repayment of loan shall be considered from the first year of operation of the scheme/asset.

10.26 The rate of interest shall be the weighted average rate of interest calculated on the basis of the actual loan portfolio at the beginning of each year applicable to the Licensee:

Provided that Rate of Interest shall not exceed Bank Rate as on April 01 of the respective year of the Control Period plus two hundred (200) basis points.

Provided that if there is no actual loan for a particular year but normative loan is still outstanding, then the rate of interest shall be considered on normative basis and shall be equal to the Bank Rate as on April 01of the respective year of the Control Period plus two hundred (200) basis points.

10.27 The interest on loan shall be calculated on the normative average loan of the year by applying the weighted average rate of interest.

10.28 The above interest computation shall exclude interest on loan amount, normative or otherwise, to the extent of capital cost funded by Consumer Contribution, Grants or Deposit Works carried out by Distribution Licensee.

10.29 The Licensee shall make every effort to re-finance the loan as long as it results in net savings on interest and in that event the costs associated with such re-29 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 financing shall be borne by the users and the net savings shall be shared between the users and the Licensee, as the case may be, in the ratio of fifty:fifty (50:50).

Interest on Working Capital

10.30 Working capital for the Wheeling Business for the Control Period shall comprise:

a) Maintenance spares at one percent (1%) of Opening GFA of Wheeling Business; plus

b) Two months equivalent of the expected revenue from wheeling charges at the prevailing tariffs; minus

c) Amount, if any, held as security deposits.

10.31 Working capital for the Retail Supply of Electricity for the Control Period shall comprise:

a) Maintenance spares at one percent (1%) of Opening GFA for Retail Supply Business;

plus

b) Two months equivalent of the expected revenue from sale of electricity at the prevailing tariffs;

minus

c) Amount held as security deposits under Clause (a) and Clause (b) of subsection (1) of Section 47 of the Act from consumers and Distribution System Users net of any security held for Wheeling Business;

minus

d) One-month equivalent of cost of power purchased including the Inter-State and Intra-State Transmission Charges and Load Despatch Charges, based on the annual power procurement plan.

10.32 Rate of interest on working capital shall be equal to the Bank Rates on September 30 of the financial year in which the MYT Petition is filed plus three hundred and fifty (350) basis points. At the time of true-up, the interest rate shall be adjusted as per the actual rate prevailing on April 01 of the financial year for which truing up exercise has been undertaken.

Interest on Consumer Security Deposits

10.33 The interest payable on consumer security deposits shall be governed by the provisions of the Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015, as amended by the First Amendment Regulations, 2018, and the Second Amendment Regulations, 2024, or as may be further amended or substituted by the Commission from time to time.

Depreciation

10.34 Depreciation shall be calculated for each year of the control period on the original cost of the fixed assets of the corresponding year as admitted by the Commission:

30 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

Provided that depreciation shall not be allowed on assets funded by Consumer Contribution and Capital Subsidies/Grants. Provision for replacement of such assets shall be made in the Capital Investment Plan.

10.35 Depreciation for each year shall be determined based on the methodology as specified in these Regulations along with the rates and other terms specified.

10.36 Depreciation shall be calculated annually, based on the straight-line method at the rates specified at Appendix-I. The base value for the purpose of depreciation shall be original cost of the asset:

Provided that the Distribution Licensee shall ensure that once the individual asset is depreciated to the extent of seventy (70) percent of the Book Value of that asset, remaining depreciable value as on March 31 of the year closing shall be spread over the balance useful life of the asset.

10.37 Depreciation shall be charged from the first year of commercial operation of the asset.

In case, the operation of the asset is for a part of the year, depreciation shall be charged on a pro-rata basis.

10.38 The residual value of assets shall be considered as ten percent (10%) and depreciation shall be allowed to a maximum of ninety percent (90%) of the original cost of the asset. Land is not a depreciable asset and its cost shall be excluded while computing ninety percent (90%) of the original cost of the asset.

Provided that the salvage value for IT equipment and software shall be considered as NIL and hundred percent (100%) value of the assets shall be considered depreciable;

10.39 The Commission may, in the absence of the Fixed Assets Register, calculate Depreciation in percentage(%) arrived by dividing the Depreciation and the Average Gross Fixed Assets as per the latest available Audited Accounts of the Distribution Licensee. The Depreciation (%) so arrived shall be multiplied by the Average GFA approved by the Commission for the relevant Financial Year to arrive at the Depreciation for that Financial Year.

10.40 In case of de-capitalization of assets, the cumulative depreciation shall be adjusted by taking into account the depreciation recovered through tariff corresponding to the decapitalised asset during its useful services.

Cost of Power Procurement

10.41 Quantum of Power Purchase: The Commission approved category-wise sales forecast shall be used along with the distribution loss trajectory for estimating the Licensees' power procurement requirement for each year.

10.42 The Licensee shall be allowed to recover the net cost of power it procures from sources approved by the Commission, viz,intra-State and inter-State Trading Licensees, Bilateral Purchases, Bulk Suppliers, State Generating Stations, Independent Power Producers, Central Generating Stations, non-conventional energy generators, generation business of the Licensee and others, assuming maximum normative rebate available from each source for payment of bills:

31 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

Provided that the Licensee shall propose the cost of power procurement taking into account the latest available Energy Charge Rate incurred in the ongoing year consideringthe Fuel Price Adjustment formula specified for the generating stations in the Jharkhand State Electricity Regulatory Commission(Terms and Conditions for Determination of Generation Tariff) Regulations, 2025 and any amendments thereof and net revenues earned by sales of surplus power through bilateral exchanges and Unscheduled Interchange (UI) transactions:

Provided further that where the Licensee utilises a part of the approved power purchaseorbulksupplyallocatedorcontractedfortheRetailSupplyBusinessforitsTrading Business, the Licensee shall provide an Allocation Statement clearly specifying the source wise cost of power purchase that is attributable to such trading activity ensuring that only the unscheduled power after following merit order Dispatch available during that time period has been traded as surplus power.

10.43 While approving the cost of power purchase, the Commission shall determine the quantum of power to be purchased from various sources in accordance with the principles of merit order Dispatch based on a ranking of all approved sources of supply in the order of their variable cost of power purchase. All power purchase costs will be considered legitimate unless it is established that the merit order principle has been violated or power has been purchased at unreasonable rates.

10.44 The estimated revenue from the sale of surplus power, if any, shall be reduced from the gross power purchase cost for estimating the net power purchase cost in the ARR.

10.45 The Licensee shall be obligated to comply with the Renewable Purchase Obligation in accordance with the provisions of the Jharkhand State Electricity Regulatory Commission (Renewable Energy Purchase Obligation and its Compliance) Regulations, 2016, as amended by the First Amendment Regulations, 2021, and the Second Amendment Regulations, 2024, or as may be further amended or, substituted by the Commission from time to time.

10.46 Any variation in cost of power, supplied to consumers, due to change in Fuel cost, power purchase cost and transmission charges with reference to cost of supply approved by the Commission, for reasons beyond the control of the Licensee, shall be allowed to be recovered by way of FPPAS as per the mechanism specified from Clause 10.67 to Clause 10.74Eof these Regulations.

Distribution Losses

10.47 The Licensee shall file the distribution loss trajectory for the entire Control Period in the Business Plan, commensurate with the Capital Investment Plan for each year of the Control Period,for approval of the Commission after verification and evaluation of the same.

10.48 The Licensee shall also propose voltage-wise losses for each year of the Control Period for the determination of voltage-wise cost of supply and determination of voltage- wise Wheeling Tariff.

32 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

Transmission, Load Dispatch & Wheeling Charges

10.49 The Licensee shall be allowed to recover net transmission and load Dispatch charges payable to the Transmission Licensees(inter-State Transmission Licensee, State Transmission Licensee, etc.) and System Operators (Regional Load Dispatch Centre, State Load Dispatch Centre, etc.) for access to and use of the inter-State transmission system, intra-State transmission system and availing load Dispatch services assuming maximum normative rebate available from each source for payment of bills on presentation of bills in accordance with the tariffs approved from time to time by Central Electricity Regulatory Commission and the appropriate State Commission, as the case may be.

10.50 The Licensee shall also be allowed to recover the Wheeling Charges during the Control Period, in case the distribution network of other Licensee is used for procurement of power for the Retail Supply Business.

Income Tax

10.51 Tax on income, if any, on the Licensed business of the Licensee shall be limited to tax on the allowed return on equity.

10.52 The income tax actually payable or paid limited to the tax on allowed return on equity shall be included in the ARR while truing up. The actual assessment of income tax should take into account benefits of tax holiday, and the credit for carry forward losses applicable as per the provisions of the Income Tax Act, 1961 and its amendments thereof shall be passed on to the consumers. Tax on the other income streams of the Distribution Licensee shall not be recovered from the Beneficiaries.

Non-TariffIncome

10.53 The amount of Non-Tariff Income relating to the Distribution Business as approved by the Commission shall be deducted from the ARR in determining the Retail Supply Tariff and Wheeling Charges of the Distribution Business:

Provided that the Distribution Licensee shall submit full details of its forecast of Non- Tariff Income to the Commission in such form as may be stipulated by the Commission.

10.54 The Non-Tariff Income shall include:

a) Income from rent of land or buildings;

b) Income from sale of scrap;

c) Income from investments;

d) Interest accrued on advances to suppliers/contractors;

e) Interest income on loans/advances to employees;

f) Income from rental of staff quarters;

g) Income by rental from contractors;

h) Income by hire charges from contactors and others;

33 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

i) Income from delayed payment surcharge, supervision charges,etc.;

j) Supervision charges for capital works;

k) Income from recovery against the ft and/or pilferage of electricity;

l) Income from advertisements;

m) Income from sale of tender documents;

n) Profit from sale of Assets(i.e.difference of Sale value and Book valueofAsset);

o) Any other Non-Tariff Income:

Provided that the interest earned from investments made out of Return on Equity corresponding to the regulated Business of the Distribution Licensee shall not be included in Non-Tariff Income.

Provided that the onus to substantiate, to the satisfaction of the Commission, that such investments have been out of Return on Equity shall be on the Licensee.

Income from Other Business

10.55 Where the Licensee is engaged in any Other Business under Section 51 of the Act for optimum utilisation of its assets and/or manpower of its Regulated Business, the income from such business will be calculated considering the following conditions:

1. The Licensee shall not in any manner utilize the assets and facilities of the Licensed Business or otherwise directly or indirectly allow the activities to be undertaken in a manner that it results in the Licensed Business subsidising the Other Business in any manner;

2. The Licensee shall not in any manner, directly or indirectly, encumber the assets and facilities of the Licensed Business for the other Business or for any activities other than the Licensed Business;

3. The Licensee shall duly pay for all costs accounted for in the Licensed Business, which have been incurred for Other Business and in the event of such cost being incurred commonly for both the Licensed Business and Other Business, apportion such cost and ensure due payment of apportioned costs to the Licensed Business from the Other Business;

4. The revenue derived from the Other Business shall be commensurate with prevailing market conditions for such similar business activities;

5. In addition to the sharing of costs undersub-clause3 above, the Licensee shall account for and ensure due payment to the Licensed Business a certain proportion of revenues from the other Business. As a general principle, the Licensee shall retain fifty percent (50%) of the revenues arising on account of Other Business and pass on the remaining fifty percent (50%) of the revenues to the Consumers.

10.56 The revenue from Other Business shall be deducted from the ARR in calculating the revenue requirement of the Licensee:

34 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

Provided that the Licensee shall follow a reasonable basis for allocation of all joint and common costs between the Distribution Business and the Other Business and shall submit the Allocation Statement as approved by the Board of Directors to the Commission along with his application for determination of tariff:

Provided further that where the sum total of the direct and indirect costs of such Other Business exceeds the revenues from such Other Business, no amount shall be allowed to be added to the ARR of the Licensee on account of such Other Business.

Lease charges

10.57 Lease charges for assets taken on lease by the Licensee shall be considered as per the lease agreement, provided they are considered reasonable by the Commission.

Foreign Exchange Rate Variation

10.58 The Licensee shall hedge foreign exchange exposure in respect of the interest on foreign currency loan and repayment of foreign loan acquired by the Licensee.

10.59 The Licensee shall recover the cost of hedging of foreign exchange rate variation corresponding to the normative foreign debt,in the relevant year on year-to-year basis as expense in the period in which it arises and extra rupee liability corresponding to such foreign exchange rate variation shall not be allowed against the hedged foreign debt.

10.60 The Licensee shall recover the cost of hedging and foreign exchange rate variation on a year-to-year basis as income or expense in the period in which it arises.

Recovery of ARR

10.61 The Recovery of Fixed Charges approved in the Tariff Order shall be based on the actual hours of supply as recorded in the Consumer's Meter. The Commission, in its MYT/Tariff Orders shall stipulate the minimum hours of supply for HT and LT Consumers for complete recovery of Fixed Charges from such Consumers. The recovery of Fixed Charges shall be in proportion to the stipulated minimum hours of supply:

Provided that the reduction in Fixed Charges to be recovered so calculated shall be treated as disallowance due to reduced hours of supply and the same shall not be allowed to be recovered in the ARR of the Distribution Licensee:

Provided further that if the actual hours of supply are equal to or higher than the minimum hours of supply for HT and LT Consumers for complete recovery of Fixed Charges, then the Distribution Licensee shall recover the complete Fixed Charges.

Illustration: If the Commission has approved the minimum hours of supply of 23 hours, and Fixed Charges of Rs. 350/ kVA/ Month for any HT Consumer, and the actual average hours of supply is 22 hours per day for such consumer in any month, the Fixed Charges recoverable by the Distribution Licensee for such Consumer shall be calculated as below:

35 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

Fixed Charges Recoverable=22/23*350=Rs.334.78/kVA/Month

Cross-Subsidy Surcharge

10.62 The surcharge payable by consumers opting for open access on the network of the Licensee will be determined by the Commission as per the following formula:

S=T-[C/(1–(L/100))+D+R]

Where,

S is the surcharge;

T is the Tariff payable by the relevant category of consumers, including reflecting the Renewable Purchase Obligation;

C is the per unit weighted average cost of power purchase by the Licensee, including meeting the Renewable Purchase Obligation;

D is the aggregate of transmission, distribution and wheeling charge applicable to the relevant voltage level;

L is the aggregate of transmission, distribution and commercial losses, expressed as a percentage applicable to the relevant voltage level;

Risthe per unit cost of carrying regulatory assets:

Provided that the surcharge, determined by the Commission under clause (a) of sub- section (1) of the section 86 of the Electricity Act, 2003 shall not exceed twenty percent (20%)of the Average Cost of Supply (ACoS).

Additiona lSurcharge on Charges of Wheeling

10.63 Additional Surcharge shall be determined on a 'case to case' basis and shall be payable only if the Licensee is able to conclusively demonstrate the incidence of any stranded costs.

10.64 Cross-Subsidy Surcharge and Additional Surcharge shall be shown as revenue from tariff from the consumer categories, which are permitted open access, and such amount shall be utilized to meet the cross-subsidy requirements of subsidised categories and fixed costs of the Licensee arising out of his obligation to supply. The Licensee shall provide the details in its MYT filings based on the actuals during the previous Control Period and submit annual filings during the Control Period.

Fuel Price and Power Purchase Adjustment(FPPPA)

10.65 The Fuel and power purchase adjustment surcharge (FPPAS) formula has been provided as specified under sub-section (4) of section 62 of the Act, for recovery/adjustment of increase or decrease in power purchase cost on monthly basis.

10.66 Fuel and power purchase adjustment surcharge shall be calculated and billed by the Distribution Licensee to consumers, automatically, without going through regulatory approval process, on a monthly basis, according to the formula, prescribed by the36 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 Commission, subject to true up, on an annual basis:

Provided that the automatic pass through shall be adjusted for monthly billing in accordance with these Regulations.

10.67 Fuel and Power Purchase Adjustment Surcharge shall be computed and charged by the distribution Licensee, in the (n + 2)th month, on the basis of actual variation, in the cost of fuel and power purchase and Interstate Transmission Charges for the power procured during the nth month. For example, the fuel and power purchase adjustment surcharge on account of changes in tariff for power supplied during the month of April of any year shall be computed and billed in the month of June of the same financial year:

Provided that in case the distribution Licensee fails to compute and charge fuel and power purchase adjustment surcharge within this time line, except in case of any force majeure condition, its right for recovery of costs on account of fuel and power purchase adjustment surcharge shall be forfeited and in such cases, the right to recover the fuel and power purchase adjustment surcharge determined during true-up shall also be forfeited.

10.68 The distribution Licensee may decide, fuel and power purchase adjustment surcharge or a part thereof, to be carried forward to the subsequent month in order to avoid any tariff shock to consumers, but the carry forward of fuel and power purchase adjustment surcharge shall not exceed a maximum duration of two months and such carry forward shall only be applicable, if the total fuel and power purchase adjustment surcharge for a Billing Month, including any carry forward of fuel and power purchase adjustment surcharge over the previous month exceeds twenty per cent of variable component of approved tariff.

10.69 The carry forward shall be recovered within one year or before the next tariff cycle whichever is earlier and the money recovered through fuel and power purchase adjustment surcharge shall first be accounted towards the oldest carry forward portion of the fuel and power purchase adjustment surcharge followed by the subsequent month.

10.70 In case of carry forward of fuel and power purchase adjustment surcharge, the carrying cost at the Bank Rate plus one hundred fifty (150)basis points shall be allowed till the same is recovered through tariff and this carrying cost shall be trued up in the year under consideration.

10.71 Depending upon the quantum of fuel and power purchase adjustment surcharge, the automatic pass through shall be adjusted in such a manner that,

i. If fuel and power purchase adjustment surcharge is up tofive percent (5%), hundred percent(100%) cost recoverable of computed fuel and power purchase adjustment surcharge by Distribution Licensee shall be levied automatically using the formula.

ii. If fuel and power purchase adjustment surcharge is more than five percent (5%), five percent (5%) fuel and power purchase adjustment surcharge shall be recoverable automatically as per Sub-Regulation (i) above ninety percent (90%) of the balance fuel and power purchase adjustment surcharge shall be recoverable37 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 automatically using the formula, and the differential claim shall be recoverable after approval by the Commission during true-up.

10.72 The revenue recovered on account of pass-through fuel and power purchase adjustment surcharge by the Distribution Licensee, shall be trued up later for the year under consideration and the true up for any financial Year shall be completed within one twenty days (120) days after date of acceptance of Petition by the Commission.

10.73 In case of excess revenue recovered for the year against the fuel and power purchase adjustment surcharge, the same shall be recovered from the Distribution Licensee at the time of true up along with its carrying cost to be charged at 1.20 times of the carrying cost rate approved by the Commission and the under recovery of fuel and power purchase adjustment surcharge shall be allowed during true up, to be billed along with the automatic Fuel and Power Purchase Adjustment Surcharge amount.

Explanation: For example, in the month of July, the automatic pass through component for the power supplied in May and additional Fuel and Power Purchase Adjustment Surcharge, if any, recoverable after true up for the month of April in the previous year, shall be billed.

10.74 A)Distribution Licensee shall submit such details, in the stipulated formats, of the variation between expenses incurred and the fuel and power purchase adjustment surcharge recovered, and the detailed computations and supporting documents, as required by the Commission, during true up of the normal tariff.

B)To ensure smooth implementation of the fuel and power purchase adjustment surcharge mechanism and its recovery, the Distribution Licensee shall ensure that its billing system is updated to take this into account and a unified billing system shall be implemented to ensure that there is a uniform billing system irrespective of the billing and metering vendor through interoperability or use of open source software as available

The Distribution Licensee shall publish all details including the fuel and power purchase adjustment surcharge formula, calculation of monthly fuel and power purchase adjustment surcharge and recovery of fuel and power purchase adjustment surcharge (separately for automatic and approved portions) on its website and archive the same through a dedicated web address.

C)Computation of Fuel and Power Purchase Adjustment Surcharge: The formula for Computation of Fuel and Power Purchase Adjustment Surcharge (FPPAS) in percentage (%) for

nth month is as follows:

Monthly FPPAS for nth Month in percentage (%) =

((cid:1827) − (cid:1828)) × (cid:1829) + ((cid:1830) − (cid:1831))

(cid:1839)(cid:1867)(cid:1866)(cid:1872)ℎ(cid:1864)(cid:1877) (cid:1832)(cid:1842)(cid:1842)(cid:1827)(cid:1845) (cid:1858)(cid:1867)(cid:1870) (cid:1872)ℎ(cid:1857) (cid:1866)(cid:1872)ℎ (cid:1839)(cid:1867)(cid:1866)(cid:1872)ℎ (%) =

(cid:1852) × (cid:4672)1 −

(cid:4673) × (cid:1827)(cid:1828)(cid:1844)

(cid:1830)(cid:1861)(cid:1871)(cid:1872)(cid:1870)(cid:1861)(cid:1854)(cid:1873)(cid:1872)(cid:1861)(cid:1867)(cid:1866) (cid:1864)(cid:1867)(cid:1871)(cid:1871)(cid:1857)(cid:1871) (cid:1861)(cid:1866) % 10038 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 'nth' month means the month in which billing of fuel and power purchase adjustment surcharge component is done. This fuel and power purchase adjustment surcharge is due to changes in tariff for the power supplied in (n-2)th month; 'A' is Total units procured in (n − 2)th Month (in kWh) from all Sources including Long-term, Medium–term and Short-term Power purchases (To be taken from the bills issued to Distribution Licensee); 'B' is bulk sale of power in (n − 2)th Month (in kWh)= (to be taken from provisional accounts to be issued by State Load Dispatch Centre by the 10thday of each month);

'C' is incremental Average Power Purchase Cost= Actual average Power Purchase Cost (PPC) from all Sources in (n − 2)th month (₹/kWh) (computed) - Projected average Power Purchase Cost (PPC) from all Sources (₹/kWh)(from tariff order); 'D' is the Actual inter-state and intra-state Transmission Charges in the (n − 2)thMonth, (From the bills by Transmission Licensees to Distribution Licensee) (in ₹); 'E' is the Base Cost of Transmission Charges for (n − 2)th Month = (Approved Transmission Charges/12) (in ₹); 'Z' = [{Actual Power purchased from all the sources outside the State in (n − 2)th Month(in kWh) * (1 – Inter-state transmission losses in % /100) + Power purchased from all the sources within the State (in kWh)}*(1 – Intra-state losses in % /100) – B] in kWh;

'ABR' is the Average Billing Rate for the year (to be taken from the Tariff Order in ₹/kWh);

'Distribution Loss (in %)' is the Target Distribution Losses (from Tariff Order);

'Inter-state transmission Losses (in %)'is the approved Inter-state transmission Losses as per Tariff Order;

'Intra-state transmission Losses (in%)' is the approved Intra-state transmission Losses as per Tariff Order;

D)The Power Purchase Cost shall exclude any charges on account of Deviation Settlement Mechanism.

E)Other charges which include Ancillary Services and Security Constrained Economic Dispatch shall not be included in Fuel and Power Purchase Adjustment Surcharge and shall be adjusted though the true-up approved by the Commission.

Late Payment Surcharge

10.75 In the event of delayed payment or non-payment of any bill raised by the Distribution Licensee towards the retail supply of electricity, the consumer shall be liable to pay Late Payment Surcharge (LPS) on the outstanding billed amount, including applicable taxes, cess, duties, and statutory levies, beyond the following due dates:

i. High Tension (HT) and Extra High Tension (EHT) consumers – 15 (fifteen) days from the date of billing.

ii. Low Tension (LT) consumers – 21 (twenty-one) days from the date of billing.

10.76 The rate of Late Payment Surcharge shall be:

i. For Delay beyond the respective due date till sixty days (60 days)– LPS shall be levied at twelve percent (12%) per annum on the outstanding amount, calculated on a simple interest basis.

ii. For delay beyond sixty days (60) days and up to ninety (90) days – interest on39 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 delayed payment shall be levied at fourteen percent (14%) per annum over and above the escalated cost as per Clause 10.76(i)for days beyond 60 days, on a simple interest basis, on the cumulative outstanding, including accrued LPS and statutory charges.

iii. For delay exceeding ninety (90) days – interest shall be levied at sixteen percent (16%) per annum over and above the escalated cost as per Clause 10.76(ii) for days beyond ninety (90)days, on a simple interest basis, on the total outstanding, including accrued LPS and statutory charges.

10.77 LPS and interest shall accrue until full and final settlement of dues. The charges shall be non-compounding unless otherwise specified by the Commission in specific circumstances.

10.78 These provisions shall override any contrary terms in existing Power Supply Agreements or bilateral arrangements. However, where a lower LPS is contractually agreed upon, the same shall prevail, subject to prior approval of the Commission.

10.79 Payments received from consumers shall be time-stamped and appropriated in the following order:

i. First, against accrued Late Payment Surcharge;

ii. Thereafter, against the oldest outstanding principal billed amount, starting from the longest overdue bill.

Illustrative Example:

A consumer is billed an amount of Rs. 1,00,000 on 1 July. In accordance with the provisions of Clause 10.75, the applicable due date shall be 15 July for an EHT consumer and 21 July for an LT consumer, during which no Late Payment Surcharge (LPS) shall accrue. In the event the consumer effects payment on 20 October, the computation of LPS shall be as follows:

For a HT & EHT consumer, the first slab of LPS at 12% per annum shall apply after the expiry of the 15‑day grace period, i.e., from 16 July to 29 August (45 days within the 60-day slab), resulting in an LPS of approximately Rs. 1,479.

Thereafter, for the subsequent 30‑day period from 30 August to 28 September, LPS shall be levied at 14% per annum on the cumulative outstanding (i.e., principal plus accrued LPS from the previous slab), resulting in an additional LPS of approximately Rs. 1,168.

For the delay beyond 90 days from the bill date, i.e., from 29 September to 20 October (22 days), interest at 16% per annum shall be levied on the cumulative amount (i.e., principal plus LPS from slabs 1 and 2), resulting in an LPS of approximately Rs. 964.

Accordingly, the total amount payable on 20 October shall be Rs. 1,03,611, which shall first be appropriated towards LPS and thereafter towards the principal billed amount in accordance with Clause 10.79.

40 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

For a LT consumer, the applicable due date is 21 July. Accordingly, the first slab of LPS at 12% per annum shall apply post the expiry of the 21-day grace period, i.e., from 22 July to 29 August (39 days), resulting in an LPS of approximately Rs. 1,282.

For the subsequent 30‑day period, i.e., from 30 August to 28 September, LPS shall be levied at 14% per annum on the cumulative outstanding (i.e., principal plus accrued LPS from the first slab), resulting in an additional LPS of approximately Rs. 1,165.

For the delay beyond 90 days, i.e., from 29 September to 20 October (22 days), LPS shall be levied at 16% per annum on the cumulative amount (i.e., principal plus LPS from the previous two slabs), resulting in an additional LPS of approximately Rs. 964.

Accordingly, the total amount payable on 20 October shall be Rs. 1,03,412, which shall first be appropriated towards LPS and thereafter towards the principal billed amount in accordance with Clause 10.79.

Prompt Payment Rebate

10.80 For payment of bills by the Consumers (Capacity Charge and Energy Charges) within five (5) days of presentation of bills by the Distribution Licensee, a rebate of two percent (2.00%) shall be allowed.

Note: In case of computation of five (5) days, the number of days shall be counted consecutively without considering any holiday. However, in case the last day or 5th day is official holiday, the 5th day for the purpose of Rebate shall be construed as the immediate succeeding working day (as per the official State Government's calendar, where the Office of the Authorized Signatory or Representative of the Beneficiary, for the purpose of receipt or acknowledgement of Bill is situated).

Treatment of Load Factor for Load Factor Rebate

10.81 The Commission may direct certain class of consumers to maintain load factor at a stipulated level, as may be decided by the Commission, and allow incentive or impose penalty through rebate or surcharge for maintaining load factor above or below the stipulated level, as the case may be.

10.82 For the purpose of calculation of load factor rebate, the load factor of a consumer shall be determined in accordance with the following formula:

(cid:2889)(cid:2924)(cid:2915)(cid:2928)(cid:2917)(cid:2935) (cid:2887)(cid:2925)(cid:2924)(cid:2929)(cid:2931)(cid:2923)(cid:2915)(cid:2914) (cid:2919)(cid:2924) (cid:2921)(cid:2907)(cid:2918)/(cid:2921)(cid:2906)(cid:2885)(cid:2918) (cid:2916)(cid:2925)(cid:2928) (cid:2930)(cid:2918)(cid:2915) (cid:2912)(cid:2919)(cid:2922)(cid:2922)(cid:2919)(cid:2924)(cid:2917) (cid:2926)(cid:2915)(cid:2928)(cid:2919)(cid:2925)(cid:2914) (cid:2934) (cid:2869)(cid:2868)(cid:2868)

Load Factor (%) =

((cid:2892)(cid:2879) ∑(cid:2892)(cid:2919)) ×(cid:2897)(cid:2888)(cid:2878) ∑((cid:2892)(cid:2919) (cid:2934) (cid:2902)(cid:2888)(cid:2919))

Where,

H = Total Hours in the billing period

MD = Maximum Demand (in kW or kVA) for Load Factor Calculation

= Recorded maximum demand in the billing period or eighty-five (85%) of the contract demand whichever is higher41 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 Hi = The duration involved for ith incidence of interruption / total shed/ partial restriction onload in supplying power to the consumer by the licensee as specified under10.83of these regulations RDi= Restricted load imposed on the consumer corresponding to ith incidence or actual drawlduring the period of such restriction whichever is higher.

10.83 The computation of load factor shall exclude that period which is a part of the concerned billing period and when load of the consumer is interrupted/ totally shed / partially restricted because of any fault of the licensee in its system or for non- availability of power with the licensee due to lower supply of electricity from its own generating source or its other suppliers of power or due to imposition of restriction on load by the licensee on drawl of power by its consumer. Such interruption shall also include the interruption caused by the grid failure or automatic under frequency relay tripping or any force majeure event not related to licensee.

10.84 For the purpose of load factor calculation as provided in regulation 10.82 of these regulations, the following principles shall be followed:

i. If Maximum Demand (MD) is in KVA, it shall be converted into KW by using the formula: KW = KVA X PF, where PF is the power factor.

ii. If RDi is in KVA, it shall be converted into KW by using the formula: KW = KVA X PF, where PF is the power factor.

iii. PF shall be considered as average power factor of the month when 85% or less of the contract demand is recorded maximum demand.

iv. When maximum demand (MD) represents actual recorded maximum demand, which is higher than 85% of contract demand, PF will be the actual average power factor of the time block corresponding to the period of recording the maximum demand.

v. For total shedding or interruption, RDi shall be considered as zero.

Voltage Rebate

10.85 All Consumer shall be eligible for a rebate on energy charges, based on the voltage level at which they are actually connected irrespective of the voltage level prescribed in the clause 4.3 of Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015 as well as voltage rebate/surcharge as per clause 4.5 of JSERC (Electricity Supply Code) Regulations, 2015.

10.86 The applicable rates will be as follows

(i) Consumers connected at 33 kV will be eligible for a voltage rebate of three percent (3%) at energy charge.

(ii) Consumers connected at 132 kV and above will be eligible for a voltage rebate of three percent (4%) at energy charge.

10.87 The above rebate will be available only on monthly basis and consumer with arrears shall not be eligible for the above rebate. However, the applicable rebate shall be allowed to consumers with outstanding dues, wherein such dues have been stayed by42 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 the appropriate Courts.

Other Rebates and Surcharges

10.88 Any other Rebate or Surcharge applicable to the consumers, including but not limited to Voltage Rebate/Surcharge, Power Factor Rebate/Surcharge, etc., shall be applicable as specified in the Multi Year Tariff (MYT) / Annual Tariff Orders issued by the Commission or under the provisions of the Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2015, as amended by the First Amendment Regulations, 2018, and the Second Amendment Regulations, 2024, or as may be further amended or re-enacted from time to time.

43 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

CHAPTERIV:

PROCEDUREFORFILINGOFARRANDTARIFF

A11.Multi-YearTariffFilingProcedure

11.1 The Multi Year Tariff filing shall be submitted as per the provisions in these Regulation and in the manner as per the provisions of JSERC (Conduct of Business) Regulations, 2024, as amended or re-enacted from time to time.

11.2 TheMultiYearTariffframeworkshallbebasedonthefollowing:

a) Business Plan for the Wheeling and the Retail Supply Businessof the Licensees for the entire Control Period as submitted before the Commission for approval, prior to the start of the Control Period;

b) Multi Year Petition on Licensees' forecast of expected ARR for each year of the Control Period, wheeling tariff and retail supply tariff for the first year of the ensuing Control Period, based on reasonable assumptions of the underlying financial and operational principles/parameters laid down under these Regulations, and on the basis of the Business Plan;

c) The Trajectory for specific parameters, which shall be stipulated by the Commission for the improvement of the Licensee's performance through incentives and disincentives;

d) Annual review of performance which shall be conducted vis-à-vis the approved forecast and categorization of variations in performance into controllable and uncontrollable factors.

11.3 The Licensee shall also submit the MYT filing in electronic format to the Commission.

11.4 The LicenseeshallfiletheMYTPetitionandrelateddocumentsforapprovalofRetail SupplyBusinessandWheelingBusinessfortheControlPeriodinaccordancewiththe MYT framework and the timelines specified in Section A 24of these Regulations, failing which the Commission may issue the MYT order suo motu;

11.5 The Licensee shall file the MYT Petition for the Retail Supply Business and the Wheeling Business together with the requisite information of the expenses and revenue attributable to the respective businesses.

Before the Start of the Control Period

11.6 The Licensee shall file for the Commission's approval, as per the Timelines specified in Section A 24, a Business Plan and MYT Petition in accordance with Clauses6.9 to6.15oftheseRegulations.

Annual Tariff Filings for the Control Period

11.7 The Licensee shall file an application for approval of Retail Supply Tariff and Wheeling Tariff for each year of the Control Period, as per the timelines specified in Section A 24of these Regulations, before the commencement of each year of the Control Period.

11.8 The Licensee shall propose a capacity-based wheeling tariff. The Licensee shall also44 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 specify the distribution losses voltage-wise to provide for adjustment of losses in the system.

11.9 The filings for wheeling tariff shall contain the following:

a) The distribution system or network usage forecast for each year of the Control Period consistent with the Business Plan, trued up values and annual performance;

b) Revenue Gap or Surplus for each year of the Control Period and tariff proposal for meeting/adjusting the Revenue Gap or Surplus for each year;

c) The Operation and Maintenance(O&M)Expenses estimated for the Base Year and the actuals for the previous Control Period as per the Audited Accounts, together with forecasts for each year of the Control Period in accordance with Clauses10.3 to 10.6 of these Regulations;

d) Proposalforcomputationoftariffsforvoltage-wiseWheelingofelectricityfor each year of the Control Period, including the losses and the procedure thereof;

e) Proposal for Non-Tariff Income with item-wise description and details;

f) Proposal in respect of income from Other Businesses like Consultancy Services, Convergence, Training Facilities, etc;

g) Expected Revenue from the proposed Wheeling Tariff including Additional Surcharge, Cross-Subsidy Surcharge, etc.

11.10 The filings for retail supply tariff shall contain the following:

a) Licensee shall submit proposal for retail sale of electricity for the consumers pertaining to Retail Supply Business, which shall include tariffs for each consumer category including green tariff - slab-wise and voltage-wise- as applicable. The proposed tariff may also be based on energy charges, demand charges, minimum charges, etc., along with the tariff rationalization measures;

b) Revenue Gap/Surplus for each year of the Control Period and tariff proposal for meeting/adjusting the Revenue Gap/Surplus for each year. This should be based on the cost of supply for various consumer categories and cross-subsidy reduction road map;

c) The Operation and Maintenance(O&M)Expenses estimated for the Base Year and the actuals for the previous Control Period as per the Audited Accounts, together with forecasts for each year of the Control Period in accordance with Clauses10.3to 10.6 of these Regulations;

d) Proposals for Non-Tariff Income with item-wise description and details;

e) Each tariff proposal submitted by the Licensee shall be supported with a cost- of- service model allocating the costs of the Licensed business to each category of consumers based on voltage-wise costs and losses;

f) The proposals of the Licensee should demonstrate that the tariffs are progressively reflecting the cost of supply;

45 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

g) Expected revenue from the proposed retail supply tariff, and other matters considered appropriate by the Licensee, including incentive schemes to consumers, cross subsidy surcharge, etc;

h) TheapplicableFPPPAchargecalculatedaspertheformulamentionedinClause10.74ofthese Regulations.

A12.DisposalofApplication

12.1 The Commission shall process the filings made by the Licensee in accordance with these Regulations and Jharkhand State Electricity Regulatory Commission (Conduct of Business) Regulations, 2024 and its amendments thereof.

12.2 Based on the Licensee's filings, objections/suggestions from public and other stakeholders, the Commission may accept the application with such modifications and/or such conditions as may be deemed just and appropriate and issue, within one twenty (120) days of the receipt of the application and after considering all suggestions and objections from public and other stakeholders, an order containing, inter alia, trued up revenue and cost components for the year preceding the Base Year, estimation of parameters for the Base Year and determination of ARR and tariff for retail supply and wheeling business for each year of the Control Period. The Order shall also contain the approved Business Plan, targets for controllable items and performance targets for quality of supply for the Control Period.

A13.Periodic Reviews

Review during the Control Period

13.1 To ensure smooth implementation of the Multi-Year Tariff (MYT) Framework, the Commission may undertake periodic reviews of Licensee's performance during the Control Period, to address any practical issues, concerns or unexpected outcomes that may arise.

13.2 The Licensee shall submit the Annual Performance Review report as part of annual review on actual performance as per the timelines specified in the Section A 24of these Regulations to assess the performance vis-à-vis the targets approved by the Commission at the beginning of the Control Period. This shall include annual statements of its performance and accounts including audited/authenticated accounts and the tariff worked out in accordance with these Regulations.

13.3 The Licensee shall also submit the True up of ARR and corresponding tariff adjustments as per the timelines specified in the Section A 24of these Regulations. The revised estimates shall be required to true-up the costs on account of uncontrollable variations, profit sharing mechanism for exceeding the targets, and implementation of performance framework for quality of supply targets.

13.4 The Commission may also specify any modifications to the forecast of the Licensee for the remainder of the Control Period, with detailed reasons for the same.

Review at the end of the Control Period

13.5 Towards the end of the Control Period, the Commission shall seek to review whether46 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025 theimplementationoftheprincipleslaiddownintheseRegulationshasachievedtheir intended objectives. While doing this, the Commission shall take into account, among other things, the industry structure, sector requirements, consumer and other stakeholder expectations and Licensee's requirements at that point in time. Depending on the requirements of the sector to meet the objective of the Act, the Commission may revise the principles for the next Control Period.

13.6 The commission may conduct comprehensive Regulatory Impact Assessment for the regulation with the assistance of stakeholders from Jharkhand and other experts of the sector.

13.7 The end of the Control Period shall be the beginning of the next Control Period and the Licensee shall follow the same procedure unless specified otherwise by the Commission.

13.8 The Commission may analyse the performance of the Licensee every year with respect to the targets set out at the beginning of the Control Period and based on the actual performance, expected efficiency improvements and other factors prevalent, determine the initial values for the next Control Period.

47 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

CHAPTER V:MISCELLANEOUS PROVISIONS

A14.IssueofOrdersandPracticeDirections

14.1 Subject to the provisions of the Act and these Regulations, the Commission may, from time to time, issue Orders and Practice Directions in regard to the implementationoftheseRegulationsandproceduretobefollowedonvariousmatters, which the Commission has been empowered by these Regulations to direct, and matters incidental or ancillary thereto.

14.2 Notwithstanding anything contained in these Regulations, the Commission shall have the authority, either suo-motu or on a Petition filed by any interested or affected party, to determine the tariff of any Applicant.

A15.Non-ComplianceofDirections

15.1 State Load Dispatch Centre may give such directions and exercise such supervision and control as may be required for ensuring integrated operation of the power system for achieving maximum economy and efficiency and every Licensee, generating company, sub-station and any other person connected with the operation of the power system shall comply with such directions.

15.2 If any Distribution Licensee fails to comply with the directions issued, it shall be liable to a penalty as per Section 146 of the Electricity Act, 2003.

A16.DisputeResolution

16.1 In case of dispute, any of the parties may make an application in accordance with the Jharkhand State Electricity Regulatory Commission (Conduct of Business) Regulations, 2024, as amended from time to time, including statutory re-enactment thereof, for settlement of the dispute.

A17.Powertoremovedifficulties

17.1 In case of any difficulty in giving effect to any of the provisions of this Regulation, the Commission may by general or special order, issue appropriate directions to Distribution Licensee(s) etc., to take suitable action, not being inconsistent with the provisions of the Act, which appear to the Commission to be necessary or expedient for the purpose of removing the difficulty.

17.2 The Licensees may make an application to the Commission and seek suitable orders to remove any difficulties that may arise in implementation of these Regulations A18.Powerof Relaxation

18.1 The Commission may in public interest and for reasons to be recorded in writing, relax any of the provision of these Regulations.

A19.Interpretation

19.1 If a question arises relating to the interpretation of any provision of these Regulations, the decision of the Commission shall be final.

48 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

A20.SavingofInherentPowersofthe Commission

20.1 Nothing contained in these Regulations shall limit or otherwise affect the inherent powers of the Commission from adopting a procedure, which is at variance with any of the provisions of these Regulations, if the Commission, in view of the special circumstances of the matter or class of matters and for reasons to be recorded in writing, deems it necessary or expedient to depart from the procedure specified in these Regulations.

A21.Enquiryand Investigation

21.1 All enquiries, investigations and adjudications under these Regulations shall be done by the Commission through the proceedings in accordance with the provisions of the Jharkhand State Electricity Regulatory Commission (Conduct of Business) Regulations, 2024, as amended from time to time.

A22.Powertoamend

22.1 The Commission may from time to time add, vary, alter, suspend, modify, amend or repeal any provisions of this Regulation.

A23.Savings

23.1 Nothing in these Regulations shall be deemed to limit or otherwise affect the inherent power of the Commission to make such orders as may be necessary to meet the ends of justice or to prevent abuse of the process of the Commission.

23.2 Nothing in these Regulations shall bar the Commission from adopting in conformity with the provisions of the Act a procedure, which is at variance with any of the provisions of these Regulations, if the Commission, in view of the special circumstances of a matter or class of matters and for reasons to be recorded in writing, deems it necessary or expedient for dealing with such a matter or class of matters.

23.3 Nothing in these Regulations shall, expressly or impliedly, bar the Commission dealing with any matter or exercising any power under the Act for which no Regulations or Regulations have been framed, and the Commission may deal with such matters, powers and functions in a manner it thinks fit.

49 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

A24.Summary of Timelines

S.No Description Filing of the Petition along with all necessary document by Furnishing additional information/document as sought by the Commission Disposal of the Petition
1. Business Plan for the Control Period and MYT Petition for the Control Period for FY 2026-27 to FY 2030-31 with Retail and Wheeling Tariffs for first year of the Control Period November30, 2025 Within fifteen (15) days of issue of the letter seeking information by the Commission Within one hundred and twenty (120)days of acceptance of the filing
2. True-Up for the previous year, Annual Performance Review for the current year and ARR & Tariff Determination for the next year of the Control Period November 30 of the financial year for which APR has been sought Within fifteen (15) days of issue of the letter seeking information by the Commission Within one hundred and twenty (120) days of acceptance of the filing
50 Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

APPENDIXI: DEPRECIATION SCHEDULE

Asset Description Straight Line Depreciation(%)
Land owned under full title 0.00
Land held under lease 2.67
a)for investment in the land 2.67
b)forcost of clearing site 2.67
Assets Purchased New:
Building & civil engineering works
i)Offices & showrooms 2.67
ii)Temporary erection such as wooden structures 100
iii)Roads other than kutcha roads 2.67
iv)Others 2.67
Transformers, transformer (Kiosk)sub-station equipment & other fixed apparatus(including plant foundations)
i)Transformers(including foundations)havingaratingof100kVA&above 4.22
ii)Others 4.22
Switch gear including cable connections 4.22
Lightning arrestors 4.22
Batteries 12.77
Cables and Duct System 4.22
Over head lines including supports
i)Linesonfabricatedsteeloperatingatvoltageshigherthan66kV 4.22
ii)Linesonsteelsupportsoperatingatvoltageshigherthan13.2kVbutnot exceeding66kV 4.22
iii)Linesonsteelorreinforcedconcretesupports 4.22
iv)Linesontreatedwoodsupports 4.22
Meters 12.77
Self-propelled vehicles 12.77
Air conditioning plants
i)Static 4.22
ii)Portable 7.60
Office Equipment, Furniture, Internal Wiring and Street Light Fittings 6.33
Apparatus leton hire
i)Other than motors 7.60
ii)Motors 4.22
Communication equipment 6.33
IT Equipment and Software 15.00
Any Other Asset not covered above 4.22(or as approved by the Commission considering asset life and residual value)
51 Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025

By Order of the Commission,

R.P.Nayak, Secretary Jharkhand State Electricity Regulatory Commission

-----------

Printed & Published by the Superintendent of Jharkhand Government Press, Doranda, Ranchi. Jharkhand Gazette (Extraordinary) 474-- 50.