झारख(cid:214)ड गजट
असाधारण अंक झारख(cid:214)ड सरकार (cid:622)वारा (cid:292)का(cid:871)शत 19 अ(cid:274)हायण, 1947 (श०)
सं(cid:201)या – 538 राँची, बुधवार, 10 (cid:465)दस(cid:224)बर, 2025 (ई०)
खान एवं भूत(cid:533) कवभाग
--------
अ(cid:876)धसूचना
10 (cid:465)दस(cid:224)बर, 2025
सं(cid:421)ा-ख०कन०(नीकत)-01/2024-2887/एम०, --झारख(cid:503) रा(cid:475) ेि अ(cid:566)ग(cid:330)त झारख(cid:503) खकनज धा(cid:303)रत भूकम उपरि अकधकनयम, 2024 ीि अनुसूची एवं झारख(cid:503) गजट सं(cid:421)ा-137, कदनां-ि20.03.2025 (cid:554)ारा (cid:366)ािकत अनुसूची र्ोि, कवर्लोकपत रिते (cid:352)ए कनयमावली ेि तहत गकठत Governing Body ीि अनुसंा ेि उपरा(cid:566) The Jharkhand Mineral Bearing Land Cess Rule, 2024 ेि कनयम-8(1) ेि तहत कन(cid:635)वत अनुसूची से (cid:366)कत(cid:830)थाकपत कयिा जाता है:-
THE SCHEDULE-1
(See Section-2 and Section-3(1))
| Sl. No. | Classification of Mineral bearing land | Rate of Cess |
| 1. | Coal bearing land | Rs. 450/- per metric tonne of coal dispatch. |
| 2. | Iron Ore & Manganese bearing land | Rs. 600/- per metric tonne of Iron ore dispatch. |
| 3. | Bauxite bearing land | Non Metallurgical Grade :Rs. 180/- per metric tonne of bauxite dispatch. Metallurgical Grade : 2.0% of London Metal Exchange (Aluminium) price, chargeable on the contained Aluminium metal in ore produced for those dispatched for use in Alumina and Aluminium metal extraction . |
| 4. | Limestone bearing land | Rs. 100/- per metric tonne of limestone dispatch. |
| 5. | Gold | Primary Gold: 2.2% of London Bullion Market Association Price chargeable on the contained Gold metal in ore produced. By product Gold : 1.65% of London Bullion Market Association Price chargeable on the contained Gold metal in ore produced. |
| 6. | Copper | 4.5% of London Metal Exchange (Copper) Price chargeable on the contained Copper metal in ore produced. |
| 7. | Lead | Ore-8.5% of London Metal Exchange (Lead) Price chargeable on the contained Lead metal in ore produced. Concentrated-14.5% of London Metal Exchange (Lead) Price chargeable on the contained Lead metal in the concentrate produced. |
| 8. | Graphite | Rs. 30 Per Metric Tonne of Graphite Dispatch (with less than of 20% fixed carbon). Rs. 80 Per Metric Tonne of Graphite Dispatch (with 20% or more fixed carbon but less than 40% fixed carbon). Rs. 170 Per Metric Tonne of Graphite Dispatch (with 40% or more fixed carbon but less than 80% fixed carbon). Rs. 250 Per Metric Tonne of Graphite Dispatch (with more than of 80% fixed carbon). |
| 9. | Kyanite | Rs. 250 Per Metric Tonne of Kyanite Dispatch |
| 10. | Uranium | 1% of Annual Compensation Amount received by UCIL. |
| 11. | Any other mineral bearing land | In case of any other mineral, once excavation starts in the State, then Rate of Cess shall be equal to the rates of royalty as prescribed in Second Schedule of Mines and Minerals (Regulation and Development) Act, 1957) as amended). |
2)- यह अकधसूचना राजप(cid:361) म(cid:336) (cid:366)ािन ीि कतकथ से (cid:366)भावी र्होगा ।
झारख(cid:503) रा(cid:475)पाल ेि आदे से,