RE
tification No
: K.E.R.C. /C
COS/D/07/10 D
Dated:1st Ju
uly, 2010
Amen
dment (Seco
ond) to the v
various Claus
ses of Condi
tions of Sup
pply of Electr
ricity of the
Distribution L
D
Licensees in
n the State of
f Karnataka (
(COS)
E
PREAMBLE
K.E.R.C
C., vide its or
rder No.D/07/
/4/901 dated:
2.6.2006, ha
notify the C
Conditions of S
Supply of Ele
ectricity of the ad communic
cated approva
al to ESCOM s to
e Distribution
Gazette and
d the same w
was notified in the Karnatak Licensees in the State of Karnataka in the
ka Gazette on
Section 126(5) of th
he Electricity Act, 2003 re n 17th June 20
006.
elating to ass
issues in ca
ase of unaut
thorized use of electricity sessment of charges paya
able and rela
ated
has been a
necessary t
to amend the
e Conditions of Supply of mended w.e.
.f 15.6.2007. It is there fore
Electricity of
Karnataka t
to bring the su
upply conditio
ons in conform the Distribut
tion Licensee
es in the Stat e of
mity with the a
Further , BESCOM h
has suggeste
ed amendme above amend
ded provisions
s of Law.
nts to certain
Electricity to
o make the us
se of Solar W
Water Heating n Clauses of
f the Conditio
ons of Supply
y of
Systems com
as per GoK
K notification No. EN/396/N
NCE/2006 da mpulsory for c
certain catego
ories of buildi
ings
ated: 13th Nov
Commission
n to issue an amendment t
to Clause 4.0
03. Clause 34.02 of CO S was amen ded on 20.3. v. 2007. HES
SCOM has als
so requested the
2008 by dele
charges. In
n order to br
ring other Cla
auses in line eting the prov
vision of paym
ment of minim
mum
with the pro
amendment
ts are also fo
ound necessa
ary. Hence th ovision of am
mended Claus
se 34.02, cer
rtain
he Commissio
the COS an
nd sent the d
draft to the in
nterested per on had propo
osed certain amendment
ts to
rsons / stake
objections o
on the propo
osed amendm
ments. The d holders invit
ting their view
ws / commen
nts /
draft was als
Commission
n and of the Utilities. The
e draft amen website ww
so displayed on the Notic
ce Boards of the
ndment was, in addition, posted on th
he Commissio
on's ww.kere.org t o enable the interested pe
ersons / stake
(೨ eholders to ac
ccess the sam
me and send t
their
೨೯೪೫)
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೨೯೪೬views / comments / objections on the proposed amendment to the Secretary, Karnataka Electricity Regulatory Commission, on or before 15th May 2009. The last date to receive the comments / objections was further extended up to 1.6.2009 to enable interested persons to offer their comments. Six stake holders have furnished their written comments on the draft. All the comments have been duly considered before finalizing the amendments.
Now, in exercise of powers conferred by section 16 of the Electricity Act 2003 (Central Act 36 of 2003) read with Condition 7.3 of the K.E.R. C. (Conditions of Licence for ESCOMs) Regulations, 2004 and Section 46.00 of COS, the Commission hereby makes the following amendments to the Conditions of Supply of Electricity of the Distribution Licensees in the State of Karnataka.
I. Title and commencement:
a) This may be called the Second amendment to the Conditions of Supply of Electricity of the Distribution Licensees in the State of Karnataka.
b) This shall extend to the whole of the state of Karnataka
c) This shall apply to all the Licensees engaged in the business of distribution of electricity under Section 14 of the Electricity Act, 2003 and the Consumers of electricity.
d) This shall come into force from the date of publication in the official gazette of Karnataka and will be in force unless amended otherwise.
II. Amendments are made to the following clauses of Conditions of Supply of Electricity of the Distribution
| Sl. No. | Clause No. | As existing | As Amended |
| 1 | 2 | 3 | 4 |
| 1 | 4.02 (v) | Nil | Government of Karnataka has issued the Notification No: EN 396 NCE 2006 dated: 13.11.2007 wherein the Solar water heating system is mandatory for categories of buildings mentioned below: i. Industries where hot water is required for processing or for auxiliary purposes. ii. Hospitals and Nursing homes including Government Hospitals. iii. Hotels, Restaurants, Motels, Banquet halls and Guest Houses. iv. Jail Barracks, Canteens. v. Housing Complex set up by Group housing Societies / Housing Boards / other developers. vi. All residential buildings with built-up area of 600 Sq. feet and above constructed on sites measuring |
| 1200 Sq. feet and above falling within the limits of Municipalities / Corporations and Bangalore Development Authority sectors. vii. All Government buildings / Residential schools / All Educational Institutions / Technical / Vocational Education Institutions /All Training Institutions / Hostels / Tourism Complexes Universities / Community centers / Kalyana Mantapas where facility for stay is provided. The applicant shall indicate in his application that he will install the Solar water Heater as per the above Clause and produce an undertaking on plain paper for having installed the Solar Water heater along with the agreement and CR/WD before issue of the Work order. | |||
| 2 | 4.03 | Estimate and Power Sanction i) After the point of entry of supply mains and the position of mains, cut out(s)/Load limiters and meter(s)/metering cubicle have been decided, the Licensee shall communicate power sanction indicating the amount towards the expenses in providing any electric line or electrical plant, initial security deposit, meter security deposit and other charges to be paid, in the prescribed form to the Applicant as specified under the K.E.R.C.(Recovery of Expenditure for Supply of Electricity) Regulations, 2004 and its amendments from time to time (Annex-2) and the Security Deposit as determined by the Commission. | Estimate and Power Sanction i) After the point of entry of supply mains and the position of mains, cut out(s)/Load limiters and meter(s)/metering cubicle have been decided, the Licensee shall communicate power sanction indicating the amount towards the expenses in providing any electric line or electrical plant as specified under the K.E.R.C. (Recovery of Expenditure for Supply of Electricity) Regulations, 2004 and its amendments from time to time (Annex-2) and, initial security deposit, meter security deposit as stipulated under K.E.R.C. (Security Deposit) Regulations, 2007 and other charges to be paid, in the prescribed form to the Applicant. The Licensee shall also indicate in the power sanction letter that the installation of Solar water heating system is mandatory as per the Government of Karnataka Notification No: EN 396 NCE 2006 dated: 13.11.2007 |
| d) Submit the contractor's completion-cum-test report along with the wiring diagram in duplicate. The Licensee shall acknowledge the receipt of the contractor's completion-cum-test report and issue an acknowledgement slip for having accepted the contractor's completion-cum-test report. | d) Submit the contractor's completion-cum- test report along with the wiring diagram in duplicate. The applicant shall produce an undertaking on plain paper for having installed the Solar Water heater before issue of the Work order. The Licensee shall acknowledge the receipt of the above documents and issue an acknowledgement slip for having accepted the same. The following note is added to the existing Clause. Note: If the Applicant is not desirous of availing the power supply and has not executed the agreement, he may seek refund of the amounts paid by him by making an application. The Licensee shall refund the amounts after deducting 10% of the total amount with in 60 (Sixty) days from the date of application. | ||
| 3 | 10.05 | Nil | H.T supply may be provided to the layouts and the provision as stipulated under Sections 8.00 & 9.10 of COS shall apply |
| 4 | 23.04 (b) | In respect of LT installations where Trivector Meter is fixed, the provisions under Clause 22.00 as applicable to HT installations shall be applied. | Deleted |
| 5 | 39.01 (c) | Minimum charges, if any, shall be continued to be paid till the expiry of initial guaranteed period. | Deleted |
| 6 | 39.02 (e) | This is not permitted with in the initial guaranteed period. | Deleted |
| 7 | 42.01 (ii) | IN CASE OF INSTALLATIONS WITH ELECTRONIC TRIVECTOR METER AND NOT OPTED FOR DEMAND BASED TARIFF. In the case of existing installations where an Electro Mechanical Meter is replaced by an Electronic Trivector Meter, if the M.D. recorded is in excess of the sanctioned load that is indicated in the power supply Agreement, during the very first month's meter reading immediately after fixing the Electronic Trivector Meter, then the Consumer shall on demand pay to the Licensee for such extra recorded demand at two times as per Amendment vide Notification No. K.E.R.C./COS/D/07/08 Dated: 14.3.2008 published in Karnataka Gazette dated: 20.3.2008 the Tariff applicable for such period as may be deemed justified in the circumstances of any given case subject to a maximum period of six months. | IN CASE OF INSTALLATIONS WITH ELECTRONIC TRIVECTOR METER AND NOT OPTED FOR DEMAND BASED TARIFF. In the case of existing installations where an Electro Mechanical Meter is replaced by an Electronic Trivector Meter, if the M.D. recorded is in excess of the sanctioned load that is indicated in the power supply Agreement, during the very first month's meter reading immediately after fixing the Electronic Trivector Meter, then the Consumer shall on demand pay to the Licensee for such extra recorded demand at two times the Tariff applicable for the entire period during which such unauthorized use of electricity has taken place and if, however, the period during which such unauthorized use of electricity has taken place can not be ascertained, such period shall be limited to immediately a period of 12 months preceding the date of inspection as per the Electricity (Amendment) Act, 2007 (No.26 of 2007) dated: 15.6.2007 |
| 8 | 42.01 (iii) | IN ALL OTHER CASES If at any time, the connected load of an installation is un-authorisedly increased in excess of the sanctioned load indicated in the power supply Agreement, or, if the rated load at any time is in excess of the sanctioned load, then, the Consumer shall on demand, pay to the Licensee for such excess connected load / rated load exceeding the load indicated in the Agreement (Unauthorized load) at two times as per Amendment vide Notification No.K.E.R.C./COS/D/ 07/08 Dated: 14.3.2008 published in Karnataka Gazette dated: | IN ALL OTHER CASES If at any time, the connected load of an installation is un-authorisedly increased in excess of the sanctioned load indicated in the power supply Agreement, or, if the rated load at any time is in excess of the sanctioned load, then, the Consumer shall on demand, pay to the Licensee for such excess connected load / rated load exceeding the load indicated in the Agreement (Unauthorized load) at two times the Tariff applicable for the entire period during which such unauthorized use of electricity has taken place and if, however, the period during which such unauthorized use of electricity has taken place can not be ascertained, such period shall be limited to a period of |
| 20.3.2008 the Tariff applicable for such period as may be deemed justified in the circumstances of any given case subject to a maximum period of 6 months. NOTE: - If the Assessing officer arrives at the conclusion that, unauthorized use of electricity has taken place, it shall be presumed that such unauthorized use of electricity was continuing for a period of three months immediately preceding the date of inspection in case of domestic and agricultural services and for a period of six months immediately preceding the date of inspection for all other categories of services, unless the onus is rebutted by the person, occupier or possessor of such premises or place. | 12 months immediately preceding the date of inspection as per the Electricity (Amendment) Act, 2007 (No.26 of 2007) dated: 15.6.2007 NOTE: - If the Assessing officer arrives at the conclusion that unauthorized use of electricity has taken place, the assessment shall be made for the entire period during which such unauthorized use of electricity has taken place and if, however, the period during which such unauthorized use of electricity has taken place can not be ascertained, such period shall be limited to a period of 12 months immediately preceding the date of inspection. | ||
| 9 | 42.02 | MISUSE OF ELECTRICITY (Applicable to both HT and LT. Installations) (a) If at any time, the energy supplied under one method of charging is misused for purpose for which a higher method of charging is in force, the Assessing officer shall assess the quantum of energy and difference in fixed charges for such period as may be justified in the circumstances of any given case subject to a maximum of 6 months and charge at two times as per | MISUSE OF ELECTRICITY (Applicable to both HT and LT. Installations) (a) If at any time, the energy supplied under one method of charging is misused for purpose for which a higher method of charging is in force, the Assessing officer shall assess the quantum of energy and difference in fixed charges for the entire period during which such unauthorized use of electricity has taken place and if, however, the period during which such unauthorized use of electricity has taken place can not be ascertained, such period shall be limited to a period of 12 months immediately preceding the date of inspection and charge at two times the Tariff applicable to the |
| Amendment vide Notification No. K.E.R.C./COS/D/07/08 Dated: 14.3.2008 published in Karnataka Gazette dated: 20.3.2008 the Tariff applicable to the purpose for which the energy is misused. The Consumer shall pay such amount within thirty days from the date of claim, failing which, the installation is liable for disconnection and such amount shall be deemed to be arrears of electricity charges. Note: 1) If the Assessing officer comes to the conclusion that unauthorized use of electricity has taken place, it shall be presumed that such unauthorized use of electricity was continuing for a period of three months immediately preceding the date of inspection in case of domestic and agricultural services and for a period of six months immediately preceding the date of inspection for all other categories of services, unless the onus is rebutted by the person, occupier or possessor of such premises or place. | purpose for which the energy is misused. T he Consumer shall pay such amount within thirty days from the date of claim, failing which, the installation is liable for disconnection and such amount shall be deemed to be arrears of electricity charges. Note: 1) If the Assessing officer arrives at the conclusion that unauthorized use of electricity has taken place, the assessment shall be made for the entire period during which such unauthorized use of electricity has taken place and if, however, the period during which such unauthorized use of electricity has taken place can not be ascertained, such period shall be limited to immediately a period of 12 months preceding the date of inspection. | ||
| 10 | 42.05 | UNAUTHORISED EXTENSION OF SUPPLY (Applicable to both HT and LT Installations) If at any time, energy supplied to a Consumer / premises is found extended unauthorizedly to some other person / premises, the installation shall be disconnected forthwith. The installation shall be reconnected only after unauthorized extension of supply is removed and reported by the Consumer. Further, the Assessing Officer, shall assess the quantum of energy and excess load so extended and charge for that quantum for such period as may be deemed justified in the circumstances of any given case subject to a maximum period of 6 months, at two times as per Amendment vide Notification No. K.E.R.C./COS/D/07/08 Dated: 14.3.2008 published in Karnataka Gazette dated: 20.3.2008 the Tariff applicable for the purpose for which the energy is so extended. Such amount shall be paid within thirty days from the date of final order, failing which, the installation shall be disconnected, and such amount shall be deemed to be arrears of electricity charges. Note: If the Assessing officer reaches to the conclusion that unauthorized use of electricity has taken place, the assessment shall be made for the entire period during which such unauthorized use of electricity has taken place and if, however, the period during which such unauthorized use of electricity has taken place can not be ascertained, such period shall be limited to a period of 12 months immediately preceding the date of inspection. | UNAUTHORISED EXTENSION OF SUPPLY (Applicable to both HT and LT Installations) If at any time, energy supplied to a Consumer / premises is found extended unauthorizedly to some other person / premises, the installation shall be disconnected forthwith. The installation shall be reconnected only after unauthorized extension of supply is removed and reported by the Consumer. Further, the Assessing Officer, shall assess the quantum of energy and excess load so extended and charge for that quantum for the entire period during which such unauthorized use of electricity has taken place and if, however, the period during which such unauthorized use of electricity has taken place can not be ascertained, such period shall be limited to a immediately preceding period of 12 months the date of inspection at two times the Tariff applicable for the purpose for which the energy is so extended as per the Electricity (Amendment) Act, 2007 (No.26 of 2007) dated: 15.6.2007. Such amount shall be paid within thirty days from the date of final order, failing which, the installation shall be disconnected, and such amount shall be deemed to be arrears of electricity charges. Note: If the Assessing officer arrives at the conclusion that unauthorized use of electricity has taken place, the assessment shall be made for the entire period during which such unauthorized use of electricity has taken place and if, however, the period during which such unauthorized use of electricity has taken place can not be ascertained, such period shall be limited to a period of 12 months immediately preceding the date of inspection. |
| 11 | 42.06 | THEFT OF ELECTRICITY (i) Where it is prima-facie established to the satisfaction of the officer authorized by the State Government in this behalf under Section 135 of the Electricity Act 2003 that the person / Consumer or his agent, servant etc., has committed / is committing theft of Electricity as indicated in Section 135 of the Electricity Act 2003, Authorized officer shall estimate the value of the electricity thus abstracted, used or wasted or diverted, in accordance with the calculation table: 1 as noted hereunder, for a period of 12 months preceding the date of detection of the theft of energy or the exact period of theft if determined which ever is less at two times the Tariff applicable to such category of installation and demand and collect the same by including the same in the next bill or in a separate bill pending adjudication by the Special Court. Before including the said amount in the bill, the Authorized officer shall issue a provisional assessment notice indicating the demand to the concerned person within 3 days from the date of inspection informing such person to file his objections, if any, within 7 days and due opportunity shall be given to such person of being heard. | THEFT OF ELECTRICITY (i) Where it is prima-facie established to the satisfaction of the officer authorized by the State Government in this behalf under Section 135 of the Electricity Act 2003 that the person / Consumer or his agent, servant etc., has committed / is committing theft of Electricity as indicated in Section 135 of the Electricity Act 2003, Authorized officer shall estimate the value of the electricity thus abstracted, used or wasted or diverted, in accordance with the calculation table: 1 as noted hereunder, for the entire period during which such unauthorized use of electricity has taken place and if, however, the period during which such unauthorized use of electricity has taken place can not be ascertained, such period shall be limited to a period of 12 months immediately preceding the date of inspection at two times the Tariff applicable to such category of installation and demand and collect the same by including the same in the next bill or in a separate bill pending adjudication by the Special Court. Before including the said amount in the bill, the Authorized officer shall issue a provisional assessment notice indicating the demand to the concerned person within 3 days from the date of inspection informing such person to file his objections, if any, within 7 days and due opportunity shall be given to such person of being heard. |
| 12 | 42.06 Note: (2) | In case of I.P. Sets where theft of power either by direct hooking or new connection serviced without sanction or installing of higher Horse Power Motor is noticed, the back billing charges at two times as per Amendment vide Notification No. K.E.R.C. /COS /D/07/08 Dated: 14.3.2008 published in Karnataka Gazette dated: 20.3.2008 the highest energy rate prescribed for the metered category of I.P. Sets shall be levied for a period of three months. | In case of I.P. Sets where theft of power either by direct hooking or new connection serviced without sanction or installing of higher Horse Power Motor is noticed, the back billing charges at two times the highest energy rate prescribed for the metered category of I.P. Sets for the entire period during which such unauthorized use of electricity has taken place and if, however, the period during which such unauthorized use of electricity has taken place can not be ascertained, such period shall be limited to immediately a period of 12 months preceding the date of inspection as per the Electricity (Amendment) Act, 2007 (No.26 of 2007) dated: 15.6.2007 |
| 13 | 45.00 | DECISIONS TO BE IN WRITING All decisions of the Licensee in respect of the Model Conditions of Supply shall be in writing. | DECISIONS TO BE IN WRITING All decisions of the Licensee in respect of the Conditions of Supply of Electricity of the Distribution Licensees in the State of Karnataka shall be in writing. |
| 14 | 46.00 | RESERVATION OF RIGHTS The Commission reserves the right at any time to cancel, alter or add to any of the provisions of the Model Conditions of Supply of Electricity after following due procedure. The changes so effected shall be binding on the Licensee and the Consumer automatically. | RESERVATION OF RIGHTS The Commission reserves the right at any time to cancel, alter or add to any of the provisions of the Conditions of Supply of Electricity of the Distribution Licensees in the State of Karnataka after following due procedure. The changes so effected shall be binding on the Licensee and the Consumer automatically. |
| 15 | Para 2(h) of LT Agreement | Without prejudice to the rights and liabilities of the parties in respect of any matter antecedent to termination and subject to payment of fixed/minimum charges as per applicable Tariff for the unexpired period of the initial period of this Agreement, either party to this Agreement may terminate this Agreement by giving three months prior notice in writing. | Without prejudice to the rights and liabilities of the parties in respect of any matter antecedent to termination, either party to this Agreement may terminate this Agreement by giving three months prior notice in writing. |
| 16 | Para 2(l) of LT Agreement | Where the Consumer is required to obtain a license or permit or 'No objection certificate' for running his Industrial / commercial concern or lift irrigation scheme and the License or permit is suspended or cancelled, or the validity of the 'No objection certificate' issued by the competent authority to lift water has expired, the Licensee shall have the right to discontinue power supply during the period when the Licence or permit is cancelled or suspended or the validity of the No Objection Certificate issued by the competent authority has expired, without prejudice to the obligation of the Consumer to pay the minimum charges during this period. | Where the Consumer is required to obtain a licence or permit or 'No objection certificate' for running his Industrial / commercial concern or lift irrigation scheme and the License or permit is suspended or cancelled, or the validity of the 'No objection certificate' issued by the competent authority to lift water has expired, the Licensee shall have the right to discontinue power supply during the period when the Licence or permit is cancelled or suspended or the validity of the No Objection Certificate issued by the competent authority has expired. |
| 17 | Para 2(k) of HT Agreement | Without prejudice to the rights and liabilities of the parties in respect of any matter antecedent to termination and subject to payment of demand charges as per applicable Tariff for the unexpired period of the initial period of Agreement, either party to this Agreement may terminate this Agreement by giving three months prior notice in writing. | Without prejudice to the rights and liabilities of the parties in respect of any matter antecedent to termination, either party to this Agreement may terminate this Agreement by giving three months prior notice in writing. |
| 18 | Para 2(m) of HT Agreement | Where the Consumer is required to obtain a license or permit or 'No objection certificate' for running his Industrial / commercial concern or lift irrigation scheme and the Licence or permit is suspended or cancelled, or the validity of the 'No objection certificate' issued by the competent authority to lift water has expired, the Licensee shall have the right to discontinue power supply during the period when the licence or permit is cancelled or suspended or the validity of the No Objection Certificate issued by the competent authority has expired, without prejudice to the obligation of the Consumer to pay the minimum charges during this period. | Where the Consumer is required to obtain a licence or permit or 'No objection certificate' for running his Industrial / commercial concern or lift irrigation scheme and the Licence or permit is suspended or cancelled, or the validity of the 'No objection certificate' issued by the competent authority to lift water has expired, the Licensee shall have the right to discontinue power supply during the period when the licence or permit is cancelled or suspended or the validity of the No Objection Certificate issued by the competent authority has expired. |
| 19 | 27.01 Note | Note: Arrangements for inspection / testing of the meter by a "Third Party Agency" will be put in place by the K.E.R.C. as per National Electricity Policy dated:12. 2. 2005. | Note: Arrangements for inspection / testing of the meter by a "Third Party Agency" is approved by K.E.R.C. appointing the Chief Electrical Inspector to Government of Karnataka as Third Party Agency vide notification No D/06/6 dated: 11.5.2006 and published in the Karnataka Gazette dated: 25.5.2006 in accordance with National Electricity Policy dated: 12. 2. 2005. |
| 20 | 11.00 | All street lighting installations shall be serviced with suitable energy meter. | No street lighting installation shall be serviced without a suitable energy meter and an Electronic time switch. |
| 21 | 11.01 | (d) It is not permitted to use incandescent type fittings for street lighting. ( e) The Licensee shall also erect and connect up specified type of street light fittings and accessories (other than incandescent lamp fittings) supplied by the Applicants by collecting labour and supervision charges. The Licensee reserves the right to reject the fittings supplied for installation, if these are of sub- standard quality or of un- standard types. | (d) Only energy efficient lamps shall be used for street lighting. It is not permitted to use incandescent type fittings for street lighting. (e) The Licensee shall also erect and connect specified type and street light fittings with energy efficient lamps and accessories (other than incandescent lamp fittings) supplied by the Applicants by collecting labour and supervision charges. The Licensee reserves the right to reject the fittings supplied for installation, if these are of sub-standard quality |
By order of the Commission
SHAIK AHMED
PD-88
Secretary
Karnataka Electricity Regulatory Commission.
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೨೯೫೭ಅಧಿಕೃತ ಅಧಿಕಾರಿಗಳು ಹಾಗೂ ಅಬಕಾರಿ ಉಪ ಆಯುಕ್ತರು, ಕೊಡಗು ಜಿಲ್ಲೆ, ಮಡಿಕೇರಿ ಇವರ ನ್ಯಾಯಾಲಯದಲ್ಲಿ.
ಸಂ:ಇಎಕ್ಸ್ಇ:ಕೊಜಿ:ಡಿಟಿಸಿಆರ್ಎಂ:44:2008-09, ದಿನಾಂಕ:28ನೇ ಏಪ್ರಿಲ್, 2010
ಉಪಸ್ಥಿತರು: ಸಿ.ಎಲ್.ಜಯರಾಮ್,
ಅಧಿಕೃತ ಅಧಿಕಾರಿಗಳು ಹಾಗೂ ಅಬಕಾರಿ ಉಪ ಆಯುಕ್ತರು, ಕೊಡಗು ಜಿಲ್ಲೆ, ಮಡಿಕೇರಿ.
ಪಿರ್ಯಾದುದಾರರು: ವಿರುದ್ಧ ಆರೋಪಿಗಳು
ಆರಕ್ಷಕ ಉಪ ನಿರೀಕ್ಷಕರು, ಟಿ.ಕೆ.ಭರತ್ ಕುಮಾರ್,
ಕುಶಾಲನಗರ ಠಾಣೆ, ಬಿನ್ ಟಿ.ಕೆ.ಕುಟ್ಟಪ್ಪ,
ಕುಶಾಲನಗರ. ಮುತ್ತಿನಮುಳ್ಳುಸೋಗೆ,
ಪಿರಿಯಾಪಟ್ಟಣ ತಾಲ್ಲೂಕು.
ಪ್ರಕರಣದ ಮುಖ್ಯಾಂಶಗಳು:
ದಿನಾಂಕ:14-12-2008ರಂದು ಆರಕ್ಷಕ ಉಪ ನಿರೀಕ್ಷಕರು, ಕುಶಾಲನಗರ ಠಾಣೆ ಇವರು ಕುಶಾಲನಗರ ಪೊಲೀಸ್ ಠಾಣಾ ಸರಹದ್ದಿಗೆ ಸೇರಿದ ನಂಜರಾಯಪಟ್ಟಣ ಗ್ರಾಮದ ಕಡೆ ಆಟೋ ರಿಕ್ಷಾದಲ್ಲಿ ಮದ್ಯದ ಬಾಟಲಿಯನ್ನು ತುಂಬಿಸಿಕೊಂಡು ಮಾರಾಟ ಮಾಡಲು ಅಕ್ರಮವಾಗಿ ಸಾಗಾಟ ಮಾಡುತ್ತಿರುವುದಾಗಿ ದೊರೆತ ಖಚಿತ ವರ್ತಮಾನದ ಮೇರೆಗೆ ಪೊಲೀಸ್ ಅಧಿಕಾರಿಗಳು ಠಾಣೆಗೆ ಪಂಚಾಯತುದಾರರನ್ನು ಬರಮಾಡಿಕೊಂಡು ವಿಷಯವನ್ನು ತಿಳಿಸಿ ಪಂಚಾಯತುದಾರರು ಮತ್ತು ಸಿಬ್ಬಂದಿಗಳೊಂದಿಗೆ ನಂಜರಾಯಪಟ್ಟಣದ ಸರ್ಕಾರಿ ಪ್ರಾಥಮಿಕ ಶಾಲೆಯ ಬಳಿ ಹೋಗುತ್ತಿರುವಾಗ ಎದುರುಗಡೆಯಿಂದ ಕೆ.ಎ-12-7719ರ ಆಟೋ ರಿಕ್ಷಾವು ಹೋಗುತ್ತಿದ್ದು ಸದರಿ ವಾಹನವನ್ನು ತಡೆದು ಪರಿಶೀಲಿಸಿದಾಗ ಅದರ ಸೀಟಿನ ಮೇಲ್ಭಾಗದಲ್ಲಿ 2 ರಟ್ಟಿನ ಪೆಟ್ಟಿಗೆಯಿದ್ದು ಒಂದೊಂದಾಗಿ ತೆರೆದು ನೋಡಲಾಗಿ ನಂ.1ಹೈವೇ ತ್ರಿಬಲ್ ಎಕ್ಸ್ ರಮ್ನ 180 ಮಿಲಿಯ ಒಟ್ಟು 48+48=96 ಒಂದೇ ರೀತಿಯ ಮದ್ಯದ ಬಾಟಲಿಗಳಿದ್ದು ಇವುಗಳನ್ನು ಆಟೋ ರಿಕ್ಷಾದಲ್ಲಿ ಸಾಗಿಸುವ ಬಗ್ಗೆ ಮತ್ತು ಸ್ವಾಧೀನದಲ್ಲಿಟ್ಟುಕೊಳ್ಳುವ ಬಗ್ಗೆ ಸರ್ಕಾರದ ರಹದಾರಿ ಯಾವುದಾದರೂ ಇದೆಯೇ ಎಂಬುವುದಾಗಿ ಸದರಿ ಆಟೋ ರಿಕ್ಷಾದ ಚಾಲಕನನ್ನು ಕೇಳಿದಾಗ ಯಾವುದೂ ಇಲ್ಲವೆಂದು, ಇದನ್ನು ನಾನು ವಾಲ್ನೂರಿನಲ್ಲಿ ಒಂದು ಕ್ವಾರ್ಟರ್ ಬಾಟಲಿಗೆ ತಲಾ ರೂ.40/-ನಂತೆ ಮಾರಾಟ ಮಾಡಲು ತೆಗೆದುಕೊಂಡು ಹೋಗುತ್ತಿರುವುದಾಗಿ ತಿಳಿಸಿದ ಮೇರೆಗೆ ಇದು ಪಾನನಿರೋಧ ಕಾಯಿದೆಗೆ ವಿರೋಧವಾಗಿ ಕಂಡುಬಂದಿರುವುದರಿಂದ ಸದರಿ ಆಟೋ ಚಾಲಕನ ಹೆಸರು ವಿಳಾಸ ತಿಳಿಯಲಾಗಿ ಶ್ರೀ ಟಿ.ಕೆ.ಭರತ್ ಕುಮಾರ್, ಬಿನ್ ಟಿ.ಕೆ. ಕುಟ್ಟಪ್ಪ ಮುತ್ತಿನಮುಳ್ಳುಸೋಗೆ, ಪಿರಿಯಾಪಟ್ಟಣ ತಾಲ್ಲೂಕು ಎಂದು ತಿಳಿಸಿದ ಮೇರೆಗೆ ಸದರಿ ವ್ಯಕ್ತಿಯನ್ನು ಪೊಲೀಸ್ ಅಧಿಕಾರಿಗಳು ವಶಕ್ಕೆ ತೆಗೆದುಕೊಂಡು ಸ್ಥಳದಲ್ಲಿದ್ದ ಆಟೋ ರಿಕ್ಷಾವನ್ನು ಅಜಮಾಯಿಸಲಾಗಿ ಕೆ.ಎ-12-7719, ಎಂದು ಬರೆದಿರುವ ಬಜಾಜ್ ಆಟೋ ಆಗಿದ್ದು, ಇದರ ಮುಂಭಾಗದಲ್ಲಿ ಶ್ರೀ ಅರಸೀಕಟ್ಟೆ ಅಮ್ಮ ಎಂದು ಕನ್ನಡ ಅಕ್ಷರದಲ್ಲಿ ಬರೆದಿದ್ದು ಅದರ ಕೆಳಭಾಗದಲ್ಲಿ ಹಳದಿ ಬಣ್ಣದಲ್ಲಿ ಕೂರ್ಗ್ ಎಂದು ಬರೆದಿರುತ್ತದೆ. ಮೇಲ್ಕಂಡ 2 ರಟ್ಟಿನ ಪೆಟ್ಟಿಗೆಗಳಲ್ಲಿದ್ದ ಮದ್ಯದ ಬಾಟಲಿಗಳ ಪೈಕಿ ತಲಾ ಒಂದೊಂದಾಗಿ ಮಾದರಿ ತೆಗೆದು ಬಿಳಿ ಬಟ್ಟೆಯಿಂದ ಸುತ್ತಿ ಹೊಲಿದು ಅರಗಿನಿಂದ ಕೆ.ಎನ್.ಎಂಬ ಸೀಲು ಮಾಡಲಾಗಿರುತ್ತದೆ.
ಮಾದರಿ ತೆಗೆದ ಬಾಟಲಿಗಳನ್ನು ಮತ್ತು ರಟ್ಟಿನ ಪೆಟ್ಟಿಗೆಯಲ್ಲಿ ಮದ್ಯವನ್ನು ಹಾಗೂ ಸಾಗಾಟಕ್ಕೆ ಉಪಯೋಗಿಸಿದ ಆಟೋ ರಿಕ್ಷಾ ಸಂ: ಕೆ.ಎ-12-7719ನ್ನು ಮುಂದಿನ ನಡವಳಿಕೆಯ ಬಗ್ಗೆ ಅಮಾನತ್ತು ಪಡಿಸಿಕೊಂಡು ಕುಶಾಲನಗರ ಪೊಲೀಸ್ ಉಪ ನಿರೀಕ್ಷಕರ ಪ್ರಕರಣ ಸಂ:206/2008, ದಿನಾಂಕ:14-12-2008ರಂತೆ ಪ್ರಕರಣ ದಾಖಲಿಸಿಕೊಂಡು ನ್ಯಾಯಾಲಯಕ್ಕೆ ಸಲ್ಲಿಸಿರುತ್ತಾರೆ. ತದನಂತರ ಅಧಿಕೃತ ಅಧಿಕಾರಿಗಳು ಹಾಗೂ ಡೆಪ್ಯೂಟಿ ಕಮೀಷನರ್ ಆಫ್ ಎಕ್ಸೈಸ್ ರವರ ಅನುಮತಿಯನ್ನು ಪಡೆದು ಅಬಕಾರಿ ನಿರೀಕ್ಷಕರು, ವಲಯ ಕಛೇರಿ, ಸೋಮವಾರಪೇಟೆ ಇವರಿಗೆ ವಾಹನ ಮತ್ತು ಸ್ವೊತ್ತನ್ನು ಹಸ್ತಾಂತರಿಸಿರುತ್ತಾರೆ.
ತದನಂತರ ವಾಹನದ ಅಧಿಕೃತ ಮಾಲೀಕರನ್ನು ಪತ್ತೆಹಚ್ಚುವ ಸಲುವಾಗಿ ಪ್ರಾದೇಶಿಕ ಸಾರಿಗೆ ಅಧಿಕಾರಿಗಳು, ಕೊಡಗು ಜಿಲ್ಲೆ ಮಡಿಕೇರಿ ಇವರ ಕಛೇರಿಗೆ ಇದೇ ಸಮ ಸಂಖ್ಯೆ ದಿನಾಂಕ:26-12-2008ರಂದು ಬಿ ಎಕ್ಸ್ಟ್ರಾಕ್ಟ್ ಕೋರಿ ಪತ್ರ ಬರೆಯಲಾಗಿರುತ್ತದೆ. ದಿನಾಂಕ:31-12-08ರಂದು ವಾಹನದ ಮಾಲೀಕರ ಪರ ವಕೀಲರು ಅರ್ಜಿಯನ್ನು ಸಲ್ಲಿಸಿ ವಾಹನದ ಆರ್ಸಿ ಪುಸ್ತಕದ ಜೆರಾಕ್ಸ್ ಪ್ರತಿ, ಇನ್ಸೂರೆನ್ಸ್ ಜೆರಾಕ್ಸ್ ಪ್ರತಿಯನ್ನು ಲಗತ್ತಿಸಿ, ವಾಹನದ ಅಧಿಕೃತ ಮಾಲೀಕರಾದ, ಶ್ರೀ ವಿ.
ಅರುಣ್, ತಂದೆ ವಿಠಲ್ ರಾವ್, ಹೌಸಿಂಗ್ ಬೋರ್ಡ್, ಡೋರ್ ನಂ. 4-290/1, ಕುಶಾಲನಗರ, ಕೊಡಗು ರವರಾಗಿದ್ದು ಇವರಿಂದ ಚಾಲಕರಾದ ಶ್ರೀ ಬಿ.ಕೆ.ಭರತ್ ಕುಮಾರ್, ಬಿನ್ ಮುತ್ತಪ್ಪ, ಹಾರನಹಳ್ಳಿ ಹೋಬಳಿ, ಪಿರಿಯಾಪಟ್ಟಣ ತಾಲ್ಲೂಕುಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೨೯೫೮ ಇವರಿಗೆ ಅಧಿಕಾರ ಪತ್ರ (ಪವರ್ ಆಫ್ ಅಟಾರ್ನಿ) ನೀಡಿ ವಾಹನಕ್ಕೆ ಸಂಬಂಧಿಸಿದ ಎಲ್ಲಾ ವ್ಯವಹಾರಗಳನ್ನು ನಡೆಸಿಕೊಂಡು ಹೋಗಲು ಅಧಿಕಾರ ಪತ್ರ ನೀಡಿರುವ ಪ್ರತಿಯನ್ನು ಲಗತ್ತಿಸಿ ಸಲ್ಲಿಸಿರುತ್ತಾರೆ. ಮತ್ತು ಶ್ರೀ ಭರತ್ ಕುಮಾರ್ ರವರ ಪರವಾಗಿ ವಾಹನವನ್ನು ಮಧ್ಯಂತರ ಬಿಡುಗಡೆಗೊಳಿಸಿಕೊಡಬೇಕಾಗಿ ಮತ್ತು ವಾಹನದ ಪರವಾಗಿ ಇಲಾಖೆಗೆ ಸೂಕ್ತ ಭದ್ರತೆಯನ್ನು ಒದಗಿಸುವುದಾಗಿ ಅಲ್ಲದೇ ಆಟೋ ರಿಕ್ಷಾದ ಬಾಡಿಗೆಯಿಂದ ಜೀವನ ನಿರ್ವಹಣೆಯಾಗಬೇಕಾಗಿರುವುದಾಗಿ ನಮೂದಿಸುತ್ತಾ ವಾಹನವನ್ನು ಮಧ್ಯಂತರ ಬಿಡುಗಡೆಗೊಳಿಸಿಕೊಡಬೇಕಾಗಿ ಕೋರಿರುತ್ತಾರೆ.
ದಿನಾಂಕ:26-12-08ರ ಪತ್ರಕ್ಕನುಗುಣವಾಗಿ ಪ್ರಾದೇಶಿಕ ಸಾರಿಗೆ ಅಧಿಕಾರಿಗಳು, ಕೊಡಗು ಜಿಲ್ಲೆ, ಮಡಿಕೇರಿ ರವರು ದಿನಾಂಕ:1-1-09ರ ಪತ್ರ ಸಂ:ಪ್ರಾ.ಸ.ಅ:ಮ:ಕೆ.ಎ-12-7719:2008-09ರಲ್ಲಿ ನೀಡಿರುವ ವಾಹನದ ಬಿ ಎಕ್ಸ್ಟ್ರಾಕ್ಟ್ ನಲ್ಲಿ ಶ್ರೀ ವಿ.
ಅರುಣ್, ತಂದೆ ವಿಠಲ್ ರಾವ್, ಹೌಸಿಂಗ್ ಬೋರ್ಡ್, ಡೋರ್ ನಂ.4-290/1, ಕುಶಾಲನಗರ ಇವರೇ ಅಧಿಕೃತ ಮಾಲೀಕರಾದ ಹಿನ್ನಲೆಯಲ್ಲಿ ಇವರಿಗೆ ದಿನಾಂಕ:15-1-09ರಂದು ಕರ್ನಾಟಕ ರಾಜ್ಯ ಅಬಕಾರಿ ಕಾಯ್ದೆ ಕಲಂ 43 ರನ್ವಯ ಕಾರಣ ಕೇಳಿ ನೋಟೀಸ್ ನೀಡಲಾಗಿದೆ. ಇದಕ್ಕೆ ಉತ್ತರವಾಗಿ ಅವರ ಪರ ವಕೀಲರಿಂದ ದಿನಾಂಕ:28-1-09ರಂದು ಮನವಿಯನ್ನು ಸಲ್ಲಿಸಿ ವಾಹನವನ್ನು ಬಾಡಿಗೆ ಓಡಿಸಿ ಬಂದ ಹಣದಿಂದ ಕುಟುಂಬದ ಜೀವನ ನಡೆಯುತ್ತಿದ್ದು, ವಾಹನವನ್ನು ಇಲಾಖೆಯ ಆವರಣದಲ್ಲಿ ತೆರೆದ ಪ್ರದೇಶದಲ್ಲಿ ನಿಲ್ಲಿಸಿದ್ದು, ಚಾಲನೆ ಸ್ಥಿತಿ ಇಲ್ಲದೆ ಮತ್ತು ಹವಾಮಾನದ ವೈಪರೀತ್ಯಕ್ಕೆ ವಾಹನವು ಹಾಳಾಗುವ ಸಾಧ್ಯತೆ ಇರುವುದರಿಂದ ವಾಹನವನ್ನು ಮಧ್ಯಂತರ ವಶಕ್ಕೆ ಬಿಡುಗಡೆಗೊಳಿಸಿಕೊಡಬೇಕಾಗಿ ಮತ್ತು ವಾಹನದ ಬಿಡುಗಡೆ ಸಂಬಂಧ ತಾವು ವಿಧಿಸುವ ಅಗತ್ಯ ಭದ್ರತೆಯನ್ನು ಪಡೆದು ವಾಹನವನ್ನು ತನ್ನ ಮಧ್ಯಂತರ ವಶಕ್ಕೆ ಬಿಡುಗಡೆ ಮಾಡಿಕೊಡಬೇಕಾಗಿ ಕೋರಿರುತ್ತಾರೆ.
ವಾಹನವನ್ನು ತೆರೆದ ಪ್ರದೇಶದಲ್ಲಿ ನಿಲ್ಲಿಸಲಾಗಿದ್ದು ಇನ್ನೂ ಹೆಚ್ಚು ಸಮಯ ಚಾಲನೆಯಿಲ್ಲದೆ ನಿಲ್ಲಿಸಿದಲ್ಲಿ ಬೆಲೆ ಕಳೆದುಕೊಳ್ಳುವ ಸಾಧ್ಯತೆ ಇರುವುದರಿಂದ ಸರ್ಕಾರದ ಆದಾಯದ ಹಿತದೃಷ್ಟಿಯಿಂದ ವಾಹನಕ್ಕೆ ಬೆಲೆ ನಿಗದಿಪಡಿಸಲು ದಿನಾಂಕ:30-1-09ರಂದು ಪ್ರಾದೇಶಿಕ ಸಾರಿಗೆ ಅಧಿಕಾರಿಗಳಿಗೆ ಪತ್ರ ಬರೆಯಲಾಗಿದ್ದು, ದಿನಾಂಕ:9-2-09ರ ಪತ್ರದಲ್ಲಿ ಆಟೋ ರಿಕ್ಷಾ ಸಂ: ಕೆ.ಎ-12-7719ರ ಅಂದಿನ ಸ್ಥಿತಿಗಳನ್ನು ಗಮನಿಸಿ ಹಿರಿಯ ಮೋಟಾರು ವಾಹನ ತನಿಖಾಧಿಕಾರಿಗಳು, ಪ್ರಾದೇಶಿಕ ಸಾರಿಗೆ ಅಧಿಕಾರಿಗಳ ಕಛೇರಿ, ಕೊಡಗು ಜಿಲ್ಲೆ, ಮಡಿಕೇರಿ ಇವರು ರೂ.20,000/- ಗಳನ್ನು ನಿಗಧಿಪಡಿಸಿ ದೃಡೀಕರಣ ಪತ್ರ ನೀಡಿರುತ್ತಾರೆ.
ಸದರಿ ಮಾರ್ಕೆಟ್ ಮೌಲ್ಯದ ಆಧಾರದ ಮೇಲೆ ವಾಹನದ ಮಾಲೀಕರಾದ ಶ್ರೀ ವಿ.ಅರುಣ್, ಬಿನ್ ವಿಠಲ್ರಾವ್, ಹೌಸಿಂಗ್ ಬೋರ್ಡ್, ಡೋರ್ ನಂ:4-290/1, ಕುಶಾಲನಗರ, ಸೋಮವಾರಪೇಟೆ ಇವರಿಗೆ ದಿನಾಂಕ:20-2-09ರ ಪತ್ರದಲ್ಲಿ ತಿಳಿಯಪಡಿಸಿ ಪ್ರಾದೇಶಿಕ ಸಾರಿಗೆ ಅಧಿಕಾರಿಗಳು ನಿಗದಿಪಡಿಸಿರುವ ಮೌಲ್ಯವನ್ನು ಅಧಿಕೃತ ಅಧಿಕಾರಿಗಳು ರೂ.22,000/- ಗಳಿಗೆ ನಿಗದಿಪಡಿಸಿ ಸದರಿ ಮೌಲ್ಯಕ್ಕೆ ಸಮನಾದ ಬ್ಯಾಂಕ್ ಗ್ಯಾರೆಂಟಿಯನ್ನು ಸಲ್ಲಿಸಿದಲ್ಲಿ ಮತ್ತು ಇಲಾಖಾ ಷರತ್ತುಗಳಿಗೆ ಬದ್ಧರಾದಲ್ಲಿ ವಾಹನವನ್ನು ಮಾಲೀಕರ ಮಧ್ಯಂತರ ವಶಕ್ಕೆ ಬಿಡುಗಡೆ ಮಾಡಿಕೊಡುವುದಾಗಿ ತಿಳಿಯಪಡಿಸಲಾಗಿತ್ತು. ವಾಹನದ ಮಾಲೀಕರು ಸದರಿ ಅದೇಶಕ್ಕೆ ಬದ್ಧರಾಗಿ ದಿನಾಂಕ:25-2-09ರಂದು ಇಂಡೆಮ್ನಿಟಿ ಬಾಂಡ್ ನೀಡಿ ಮತ್ತು ಷರತ್ತುಗಳಿಗೆ ಬದ್ಧರಾಗಿ ರೂ.22,000/-ಗಳ ಕ್ಯಾಷ್ ಶ್ಯೂರಿಟಿಯನ್ನು ಈ ಪ್ರಾಧಿಕಾರಕ್ಕೆ ನೀಡಿರುತ್ತಾರೆ. ಸದರಿ ಕ್ಯಾಷ್ ಶ್ಯೂರಿಟಿ ಮೊತ್ತ ರೂ. 22,000/-ಗಳನ್ನು ಇದೇ ದಿನಾಂಕದಂದು ರೆವೆನ್ಯೂ ಖಾತೆಗೆ ಜಮಾ ಮಾಡಿಕೊಂಡು ಷರತ್ತು ಬದ್ಧವಾದ ಆದೇಶವನ್ನು ನೀಡಿ ಆಟೋ ರಿಕ್ಷಾ ಸಂ: ಕೆ.ಎ-12-7719ರನ್ನು ಮಾಲೀಕರ ಮಧ್ಯಂತರ ವಶಕ್ಕೆ ನೀಡಲಾಗಿರುತ್ತದೆ.
ಸದರಿ ಪ್ರಕರಣದಲ್ಲಿ ವಶಪಡಿಸಿಕೊಂಡು ಮದ್ಯವನ್ನು ದಿನಾಂಕ:29-5-09ರಂದು ಸರ್ಕಾರದ ಆದೇಶ ಸಂ:ಎಫ್ಡಿ:2009: ಪಿಇಎಸ್:2007, ದಿನಾಂಕ:13-7-07ರನ್ವಯ ಸರ್ಕಾರಕ್ಕೆ ಮುಟ್ಟುಗೋಲು ಹಾಕಿಕೊಂಡು ನಾಶಪಡಿಸುವ ಪ್ರಕ್ರಿಯೆ ನಡೆಸಲಾಗಿರುತ್ತದೆ.
ದಿನಾಂಕ:1-4-2010ರಂದು ವಾಹನದ ಅಧಿಕೃತ ಮಾಲೀಕರಾದ ಶ್ರೀ ಅರುಣ್, ತಂದೆ ವಿಠಲ್ ರಾವ್, ಡೋರ್ ನಂ:4-290/1, ಹೌಸಿಂಗ್ ಬೋರ್ಡ್, ಕುಶಾಲನಗರ ಇವರು ಲಿಖಿತ ಮನವಿ ಸಲ್ಲಿಸಿ, ತಾನು ತುಂಬಾ ಆರ್ಥಿಕ ತೊಂದರೆಯಲ್ಲಿದ್ದು ಪ್ರಕರಣವನ್ನು ನಡೆಸಿಕೊಂಡು ಹೋಗಲು ಶಕ್ತನಲ್ಲದ ಕಾರಣ ನನ್ನ ಆಟೋ ರಿಕ್ಷಾವನ್ನು ಮಾರಾಟ ಮಾಡುವ ಸಂದರ್ಭ ಬಂದಿರುತ್ತದೆ. ಆದುದರಿಂದ ತಾನು ದಿನಾಂಕ:25-2-09ರಂದು ನೀಡಲಾದ ಭದ್ರತೆ ಕ್ಯಾಷ್ ಶ್ಯೂರಿಟಿಯನ್ನು ಸರ್ಕಾರಕ್ಕೆ ವಜಾ ಮಾಡಿಕೊಂಡು ಪ್ರಕರಣವನ್ನು ಮುಕ್ತಾಯ ಮಾಡಿಕೊಡಬೇಕಾಗಿ ಕೋರಿರುತ್ತಾರೆ.
ಸದರಿಯವರ ಲಿಖಿತ ಮನವಿ ಪತ್ರವನ್ನು ಪ್ರಕರಣದ ತನಿಖಾಧಿಕಾರಿಗಳಾದ ಅಬಕಾರಿ ನಿರೀಕ್ಷಕರು ಸೋಮವಾರಪೇಟೆ ಇವರಿಗೆ ರವಾನಿಸಿ ಪರಿಶೀಲಿಸಿ ಕ್ರಮ ಕೈಗೊಳ್ಳಲು ದಿನಾಂಕ:13-4-2010ರಂದು ಸೂಚಿಸಲಾಗಿದ್ದು ಅದರಂತೆ ಅಬಕಾರಿ ನಿರೀಕ್ಷಕರು,ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೨೯೫೯ ಸೋಮವಾರಪೇಟೆ ವಲಯ ರವರು ಪರಿಶೀಲಿಸಿ ಸದರಿ ಪತ್ರವನ್ನು ವಾಹನದ ಅಧಿಕೃತ ಮಾಲೀಕರೇ ನೀಡಿದರೇ ಎಂಬ ಬಗ್ಗೆ ಸಹಿಯನ್ನು ತಾಳೆ ಮಾಡಿ ಮತ್ತು ಸದರಿ ಮಾಲೀಕರು ಆರ್ಥಿಕವಾಗಿ ತೊಂದರೆಯಲ್ಲಿರುವುದನ್ನು ಮನವರಿಕೆ ಮಾಡಿಕೊಂಡು, ವಾಹನದ ಮಾಲೀಕರು ಪ್ರಾದೇಶಿಕ ಸಾರಿಗೆ ಅಧಿಕಾರಿಗಳು ನಿಗದಿಪಡಿಸಿರುವ ಮೌಲ್ಯಕ್ಕೆ ಸಮನಾಗಿ ಕ್ಯಾಷ್ ಶ್ಯೂರಿಟಿ ನೀಡಿರುವುದರಿಂದ ಸರ್ಕಾರದ ಆದಾಯದ ಹಿತದೃಷ್ಟಿಯಿಂದ ಸದರಿ ಹಣವನ್ನು ಸರ್ಕಾರಕ್ಕೆ ಮುಟ್ಟುಗೋಲು ಹಾಕಿಕೊಂಡು ಪ್ರಕರಣವನ್ನು ಮುಕ್ತಾಯಗೊಳಿಸಬಹುದಾಗಿ ಪ್ರಸ್ತಾವನೆಯನ್ನು ಸಲ್ಲಿಸಿರುತ್ತಾರೆ. ಅರ್ಜಿದಾರರ ಕೋರಿಕೆಯನ್ನು ಮತ್ತು ತನಿಖಾಧಿಕಾರಿಗಳ ಪ್ರಸ್ತಾವನೆಯಲ್ಲಿನ ಅಂಶಗಳನ್ನು ಪರಿಶೀಲಿಸಲಾಗಿ ವಾಹನದ ಮಾಲೀಕರೇ ತಮ್ಮ ಸ್ವ ಇಚ್ಚೆಯಿಂದ ಕ್ಯಾಷ್ ಶ್ಯೂರಿಟಿ ಭದ್ರತೆಯನ್ನು ಸರ್ಕಾರಕ್ಕೆ ವಜಾ ಮಾಡಿಕೊಂಡು ಪ್ರಕರಣವನ್ನು ಇತ್ಯರ್ಥಪಡಿಸಿಕೊಡಬೇಕಾಗಿ ಕೋರಿಕೊಂಡ ಹಿನ್ನಲೆಯಲ್ಲಿ ಪ್ರಕರಣದ ಸಾಕ್ಷಿದಾರರನ್ನು ವಿಚಾರಣೆ ನಡೆಸುವುದು ಅಗತ್ಯವಿಲ್ಲವೆಂದು ಪ್ರಾಧಿಕಾರದಲ್ಲಿ ತೀರ್ಮಾನಿಸಲಾಗಿರುತ್ತದೆ.
ಪ್ರಕರಣದ ಮುಕ್ತಾಯದ ಹಂತದವರೆಗೆ ರಿಕ್ಷಾದ ಮಾರ್ಕೆಟ್ ಮೌಲ್ಯವು ಇನ್ನೂ ಕಡಿಮೆಯಾಗುವ ಸಾಧ್ಯತೆ ಇರುವುದರಿಂದ ಪ್ರಾದೇಶಿಕ ಸಾರಿಗೆ ಅಧಿಕಾರಿಯ ಕಛೇರಿಯ ಹಿರಿಯ ಮೋಟಾರು ವಾಹನ ತನಿಖಾಧಿಕಾರಿಗಳು ಈಗಾಗಲೇ ನಿಗಧಿಪಡಿಸಿರುವ ಮೌಲ್ಯಕ್ಕೆ ತಕ್ಕ ಭದ್ರತೆ ರೂ.22,000/-ಗಳನ್ನು ಪೂರ್ತಿಯಾಗಿ ಕ್ಯಾಷ್ ಶ್ಯೂರಿಟಿ ಪಡೆದುಕೊಂಡಿರುವುದರಿಂದ ಸರ್ಕಾರದ ಆದಾಯದ ಹಿತದೃಷ್ಟಿಯಿಂದ ಸದರಿ ಹಣವನ್ನು ಹೊಂದಾಣಿಕೆ ಮಾಡಿಕೊಳ್ಳುವುದು ಸೂಕ್ತವೆಂದು ಕಂಡುಬಂದಿರುವುದರಿಂದ ಈ ಕೆಳಗಿನಂತೆ ಆದೇಶ.
ಆದೇಶ ಸಂ:ಇಎಕ್ಸ್ಇ:ಡಿಟಿಸಿಆರ್:44/08-09 ದಿನಾಂಕ:28ನೇ ಏಪ್ರಿಲ್, 2010
ಸಿ.ಎಲ್.ಜಯರಾಮ್, ಅಧಿಕೃತ ಅಧಿಕಾರಿಗಳು ಹಾಗೂ ಡೆಪ್ಯೂಟಿ ಕಮೀಷನರ್ ಆಫ್ ಎಕ್ಸೈಸ್, ಕೊಡಗು ಜಿಲ್ಲೆ, ಮಡಿಕೇರಿ ಆದ ನಾನು ಕರ್ನಾಟಕ ಅಬಕಾರಿ ಕಾಯ್ದೆ 1965ರ ಕಲಂ 43 ಬಿ ರಡಿಯಲ್ಲಿ ಅನುಸರಿಸಬೇಕಾದ ಕ್ರಮಗಳನ್ನು ಅನುಸರಿಸಿದ ನಂತರ ಕಲಂ 43 ಎ ರಡಿಯಲ್ಲಿ ಪ್ರದತ್ತವಾದ ಅಧಿಕಾರವನ್ನು ಚಲಾಯಿಸಿ ಆರಕ್ಷಕ ಉಪ ನಿರೀಕ್ಷಕರು, ಕುಶಾಲನಗರ ಠಾಣೆ, ಇವರ ಪ್ರ.ಸಂ.206/2008-04, ದಿ.14-12-08 ರಲ್ಲಿ ಜಪ್ತು ಪಡಿಸಲಾಗಿರುವ ಆಟೋ ರಿಕ್ಷಾ ಸಂ:ಕೆಎ- 12-7719ಕ್ಕೆ ಸಂಬಂಧಿಸಿದ ಕ್ಯಾಷ್ ಶ್ಯೂರಿಟಿ (ಆರ್ಡಿ ಖಾತೆಯಲ್ಲಿಡಲಾದ) ಹಣ ರೂ.22,000/-ಗಳನ್ನು ಕರ್ನಾಟಕ ಅಬಕಾರಿ ಕಾಯ್ದೆ 1965ರ ಕಲಂ 43ಎ ರನ್ವಯ ಸರ್ಕಾರಕ್ಕೆ ಮುಟ್ಟುಗೋಲು ಹಾಕಿಕೊಂಡು ಆದೇಶ ನೀಡಿರುತ್ತೇನೆ.
ಈ ಆದೇಶವನ್ನು ದಿನಾಂಕ:28-4-2010ರಂದು ಉಕ್ತಲೇಖನ ಕೊಟ್ಟು ಬೆರಳಚ್ಚು ಮಾಡಿಸಿ ತಿದ್ದಿ ಮುಕ್ತ ನ್ಯಾಯಾಲಯದಲ್ಲಿ ಘೋಷಿಸಲಾಯಿತು. ಈ ಆದೇಶವು ಇಂದಿನಿಂದ 30 ದಿವಸಗಳ ನಂತರ ಜಾರಿಯಲ್ಲಿ ಬರುತ್ತದೆ.
ಅಧಿಕೃತ ಅಧಿಕಾರಿಗಳು ಹಾಗೂ ಪಿ.ಆರ್.758
ಡೆಪ್ಯೂಟಿ ಕಮೀಷನರ್ ಆಫ್ ಎಕ್ಸೈಸ್,
ಕೊಡಗು ಜಿಲ್ಲೆ, ಮಡಿಕೇರಿ.
ಅಧಿಕೃತ ಅಧಿಕಾರಿಗಳು ಹಾಗೂ ಡೆಪ್ಯೂಟಿ ಕಮೀಷನರ್ ಆಫ್ ಎಕ್ಸೈಸ್, ಕೊಡಗು ಜಿಲ್ಲೆ,
ಮಡಿಕೇರಿ ಇವರ ನ್ಯಾಯಾಲಯದಲ್ಲಿ.
ಸಂ:ಇಎಕ್ಸ್ಇ:ಕೊಜಿ:ಡಿಟಿಸಿಆರ್ಎ0:40:2008-09, ದಿನಾಂಕ:28ನೇ ಜೂನ್, 2010
ಉಪಸ್ಥಿತರು: ಸಿ.ಎಲ್.ಜಯರಾಮ್,
ಅಧಿಕೃತ ಅಧಿಕಾರಿಗಳು ಹಾಗೂ ಅಬಕಾರಿ ಉಪ ಆಯುಕ್ತರು, ಕೊಡಗು ಜಿಲ್ಲೆ, ಮಡಿಕೇರಿ.
ಫಿರ್ಯಾದುದಾರರು ವಿರುದ್ದ ಆರೋಪಿಗಳು
ಅಬಕಾರಿ ನಿರೀಕ್ಷಕರು, ಓಡಿಹೋಗಿರುತ್ತಾರೆ.
ಉಪ ವಿಭಾಗ,
ಸೋಮವಾರಪೇಟೆ.
ಪ್ರಕರಣದ ಮುಖ್ಯಾಂಶಗಳು:
ದಿನಾಂಕ:27-11-2008ರಂದು ರಾತ್ರಿ 8.00 ಘಂಟೆಯ ಸಮಯದಲ್ಲಿ ಅಬಕಾರಿ ನಿರೀಕ್ಷಕರು, ಉಪ ವಿಭಾಗ, ಸೋಮವಾರಪೇಟೆ ಇವರು ಸೋಮವಾರಪೇಟೆ ತಾಲ್ಲೂಕಿನ ಬಾಣವಾರ ಗ್ರಾಮದಲ್ಲಿ ಅಬಕಾರಿ ಗಸ್ತು ಕಾರ್ಯದಲ್ಲಿದ್ದಾಗ ಸುಮಾರು ರಾತ್ರಿ 7.00 ಗಂಟೆಯಲ್ಲಿ ಬಾತ್ಮಿದಾರರು ಕರೆ ಮಾಡಿ ಆಟೋರಿಕ್ಷಾ ಸಂ:KA-12-5731 ರಲ್ಲಿ ಮದ್ಯವನ್ನು ಸರಬರಾಜು ಮಾಡುತ್ತಿರುವುದಾಗಿ ತಿಳಿಸಿರುತ್ತಾರೆ. ಹೀಗೆ ಬಂದ ಕರೆಯ ಮೇರೆಗೆ ಅಧಿಕಾರಿಗಳು ಸೋಮವಾರಪೇಟೆ ರಸ್ತೆ ಹಾಗೂ ಬಾಣವಾರ ರಸ್ತೆಯಿಂದ ಬರುತ್ತಿದ್ದ ವಾಹನಗಳನ್ನು ಪರಿಶೀಲಿಸುತ್ತಿದ್ದಾಗ ದೂರದಿಂದ ಒಂದು ಆಟೋರಿಕ್ಷಾ ಬರುತ್ತಿದ್ದುಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೨೯೬೦ ರಿಕ್ಷಾದಲ್ಲಿದ್ದವರು ಅಧಿಕಾರಿಗಳನ್ನು ನೋಡಿ ದಾರಿ ಮಧ್ಯದಲ್ಲಿಯೇ ನಿಲ್ಲಿಸಿ ಓಡತೊಡಗಿದನು. ಅಧಿಕಾರಿಗಳು ಆತನನ್ನು ಹಿಂಬಾಲಿಸಿದಾಗ ಅರಣ್ಯದೊಳಗೆ ಓಡಿಹೋಗಿದ್ದು, ರಾತ್ರಿ ಕತ್ತಲಾದ್ದರಿಂದ ಆರೋಪಿ ಪರಾರಿಯಾಗಿರುತ್ತಾನೆ. ಅಲ್ಲಿನ ಸುತ್ತಮುತ್ತಲಲ್ಲಿ ಸಾರ್ವಜನಿಕರು ಇಲ್ಲದಿದ್ದ ಕಾರಣ ಇಲಾಖಾ ಸಿಬ್ಬಂದಿಗಳನ್ನು ಪಂಚರನ್ನಾಗಿ ಮಾಡಿಕೊಂಡು ವಾಹನವನ್ನು ಪರಿಶೀಲಿಸಿದಾಗ ವಾಹನದ ಮುಂಭಾಗದಲ್ಲಿ ಆಂಗ್ಲ ಭಾಷೆಯಲ್ಲಿ ಹಳದಿ ಬಣ್ಣದಲ್ಲಿ ರಾಜಪ್ಪ ಹಾಗೂ ಸದರಿ ರಿಕ್ಷಾದ ಮುಂಭಾಗದ ಕನ್ನಡಿಯಲ್ಲಿ ಕನ್ನಡ ಭಾಷೆಯಲ್ಲಿ ಮಲೆ ಮಹದೇಶ್ವರ ಎಂದು ಬರೆಯಲಾಗಿತ್ತು ಹಾಗೂ ಆಟೋದ ಹಿಂಭಾಗದಲ್ಲಿ ವಾಹನ ಸಂ:KA-12-5731 ಎಂದು ನಮೂದಿಸಲಾಗಿತ್ತು.
ಆಟೋರಿಕ್ಷಾದ ಒಳಭಾಗದಲ್ಲಿ ಅಂದರೆ ಹಿಂಬದಿ ಸೀಟಿನ ಮೇಲೆ 4 ರಟ್ಟಿನ ಪೆಟ್ಟಿಗೆಗಳು ಹಾಗೂ ಕೆಳಭಾಗದಲ್ಲಿ 3 ರಟ್ಟಿನ ಪೆಟ್ಟಿಗೆಗಳಿದ್ದವು, ಒಟ್ಟಾರೆ 7 ರಟ್ಟಿನ ಪೆಟ್ಟಿಗೆಗಳು ಕಂಡು ಬಂದಿದ್ದು, ರಟ್ಟಿನ ಪೆಟ್ಟಿಗೆಯ ಮೇಲೆ ಜೆ.ಪಿ. ಡಿಸ್ಟಿಲರಿ, ನಂ-1 ಹೈವೇ ವಿಸ್ಕಿ ಎಂದು ಬರೆಯಲಾಗಿತ್ತು. ಈ ರಟ್ಟಿನ ಪೆಟ್ಟಿಗೆಗಳನ್ನು ಬಿಚ್ಚಿಸಿ ನೋಡಲಾಗಿ 180 ಎಂಎಲ್ನ 48 ಸೀಸೆಗಳಂತೆ ಒಟ್ಟು 7 ರಟ್ಟಿನ ಪೆಟ್ಟಿಗೆಗಳಲ್ಲಿ 48 X 7= 336 ಮದ್ಯ ತುಂಬಿದ ಸೀಸೆಗಳು ಕಂಡುಬಂದಿರುತ್ತದೆ. ಪ್ರತಿಯೊಂದು ರಟ್ಟಿನ ಪೆಟ್ಟಿಗೆಯಿಂದ ತಲಾ ಒಂದು ಸೀಸೆಯಂತೆ ಮಾದರಿ ತೆಗೆದು ಸೀಲುಮಾಡಿ ನಂತರ ಪಂಚರ ಸಹಿಯುಳ್ಳ ಚೀಟಿಗಳನ್ನು 7 ರಟ್ಟಿನ ಪೆಟ್ಟಿಗೆ ಮತ್ತು 7 ಮಾದರಿ ಸೀಸೆಗಳಿಗೂ ಮತ್ತು ಆಟೋರಿಕ್ಷಕ್ಕು ಅಂಟಿಸಲಾಗಿರುತ್ತದೆ. ಮದ್ಯವನ್ನು ಅಕ್ರಮವಾಗಿ ರಹದಾರಿ ಇಲ್ಲದೆಯೇ ಸಾಗಾಣಿಕೆ ಮಾಡುವುದು ಕರ್ನಾಟಕ ರಾಜ್ಯ ಅಬಕಾರಿ ಕಾಯಿದೆ 1965 ರ ಕಲಂ 32 (1) R/W 11,13,43 (a) ರಂತೆ ಶಿಕ್ಷಾರ್ಹ ಅಪರಾಧವಾಗಿರುವುದರಿಂದ ಅಬಕಾರಿ ನಿರೀಕ್ಷಕರು, ಸೋಮವಾರಪೇಟೆ ಉಪ ವಿಭಾಗ ಇವರ ಮೊ.ಸಂ.3/2008- 09 ದಿನಾಂಕ: 27-11-08 ರಂತೆ ಪ್ರಕರಣ ದಾಖಲಿಸಿಕೊಂಡು ವರದಿ ಸಲ್ಲಿಸಿರುತ್ತಾರೆ.
ಸದರಿ ವಾಹನಕ್ಕೆ ಸಂಬಂಧಿಸಿದಂತೆ ವಾಹನದ ಮಾಲೀಕರನ್ನು ತಿಳಿಯಲು ದಿನಾಂಕ:5-12-08 ರಂದು ಪ್ರಾದೇಶಿಕ ಸಾರಿಗೆ ಅಧಿಕಾರಿಗಳ ಕಛೇರಿ ಕೊಡಗು ಜಿಲ್ಲೆ, ಮಡಿಕೇರಿ ಇವರಿಗೆ ಪತ್ರ ಬರೆಯಲಾಗಿತ್ತು. ಅದರಂತೆ ದಿನಾಂಕ:5-12-2008 ರಂದು ಇವರಿಂದ ಬಂದಿರುವ ವಾಹನದ 'ಬಿ' ಎಕ್ಸ್ಟ್ರಾಕ್ಟ್ನಲ್ಲಿ ನಮೂದಿಸಿರುವಂತೆ ಶ್ರೀ.ಎ.ಟಿ.ಸ್ವಾಮಿ ತಂದೆ ತಿಮ್ಮೇಗೌಡ ಆಲೂರು ಸಿದ್ದಾಪುರ, ಕೂಡಿಗೆ ಕುಶಾಲನಗರ, ಸೋಮವಾರಪೇಟೆ ತಾಲ್ಲೂಕು ಇವರು ವಾಹನದ ಅಧಿಕೃತ ಮಾಲೀಕರಾಗಿದ್ದು, ಇವರಿಗೆ ದಿನಾಂಕ: 18-12-08 ರಂದು ಈ ಪ್ರಾಧಿಕಾರದಿಂದ ಕರ್ನಾಟಕ ರಾಜ್ಯ ಅಬಕಾರಿ ಕಾಯ್ದೆ 1965 ರ 43ಬಿ ರಲ್ಲಿ ಕಾರಣ ಕೇಳಿ ನೋಟಿಸನ್ನು ನೀಡಲಾಗಿದ್ದು ದಿನಾಂಕ:6-2-09 ರಂದು ವಕೀಲರಿಂದ ಕೋರಿಕೆಯನ್ನು ಸಲ್ಲಿಸಿ ಇಲಾಖೆ ವಿಧಿಸುವ ಎಲ್ಲಾ ಷರತ್ತುಗಳಿಗೆ ಬದ್ಧರಾಗಿರುವುದಾಗಿ ಮತ್ತು ವಾಹನವನ್ನು ಮದ್ಯಂತರ ವಶಕ್ಕೆ ಬಿಡುಗಡೆಗೊಳಿಸಿಕೊಡಬೇಕಾಗಿಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೨೯೬೧ ವಶಪಡಿಸಿಕೊಂಡ ಮದ್ಯವನ್ನು ಸರ್ಕಾರದ ಆದೇಶ ಸಂ:ಎಫ್ಡಿ:2009:ಪಿಇಎಸ್:2007, ದಿನಾಂಕ:13-7-07ರನ್ವಯ ಕಡತ ಸಂ:ಇಎಕ್ಸ್ಇ:ಸಿಆರ್ಎಂ:19:2008-09, ದಿನಾಂಕ:16-9-2009ರಂದು ಸರ್ಕಾರಕ್ಕೆ ಮುಟ್ಟುಗೋಲು ಹಾಕಿಕೊಂಡು ನಾಶಪಡಿಸುವ ಪ್ರಕ್ರಿಯೆ ನಡೆಸಲಾಗಿರುತ್ತದೆ.
ದಿನಾಂಕ:24-5-2010ರಂದು ವಾಹನದ ಅಧಿಕೃತ ಮಾಲೀಕರಾದ ಶ್ರೀ.ಎ.ಟಿ.ಸ್ವಾಮಿ ತಂದೆ ತಿಮ್ಮೇಗೌಡ, ಆಲೂರು ಸಿದ್ದಾಪುರ, ಕೂಡಿಗೆ ಕುಶಾಲನಗರ, ಸೋಮವಾರಪೇಟೆ ತಾಲ್ಲೂಕು ಇವರು ಲಿಖಿತ ಮನವಿ ಸಲ್ಲಿಸಿ, ತಾನು ತುಂಬಾ ಆರ್ಥಿಕ ತೊಂದರೆಯಲ್ಲಿದ್ದು ಪ್ರಕರಣವನ್ನು ನಡೆಸಿಕೊಂಡು ಹೋಗಲು ಶಕ್ತನಲ್ಲದ ಕಾರಣ ನನ್ನ ಆಟೋ ರಿಕ್ಷಾವನ್ನು ಮಾರಾಟ ಮಾಡುವ ಸಂದರ್ಭ ಬಂದಿರುತ್ತದೆ. ಆದುದರಿಂದ ತಾನು ದಿನಾಂಕ:15-12-09ರಂದು ನೀಡಲಾದ ಭದ್ರತೆ ಬ್ಯಾಂಕ್ ಗ್ಯಾರೆಂಟಿಯನ್ನು ಸರ್ಕಾರಕ್ಕೆ ವಜಾ ಮಾಡಿಕೊಂಡು ಪ್ರಕರಣವನ್ನು ಮುಕ್ತಾಯ ಮಾಡಿಕೊಡಬೇಕಾಗಿ ಕೋರಿರುತ್ತಾರೆ.
ಸದರಿಯವರ ಲಿಖಿತ ಮನವಿ ಪತ್ರವನ್ನು ಪ್ರಕರಣದ ತನಿಖಾಧಿಕಾರಿಗಳಾದ ಅಬಕಾರಿ ನಿರೀಕ್ಷಕರು ಉಪ ವಿಭಾಗ, ಸೋಮವಾರಪೇಟೆ ಇವರಿಗೆ ರವಾನಿಸಿ ಪರಿಶೀಲಿಸಿ ಕ್ರಮ ಕೈಗೊಳ್ಳಲು ದಿನಾಂಕ:24-5-2010ರಂದು ಸೂಚಿಸಲಾಗಿದ್ದು ಅದರಂತೆ ಅಬಕಾರಿ ನಿರೀಕ್ಷಕರು, ಉಪ ವಿಭಾಗ, ಸೋಮವಾರಪೇಟೆ ರವರು ಪರಿಶೀಲಿಸಿ ಸದರಿ ಪತ್ರವನ್ನು ವಾಹನ ಆಟೋ ರಿಕ್ಷಾ ಸಂ: ಕೆ.ಎ-12-5731ರ ಅಧಿಕೃತ ಮಾಲೀಕರೇ ನೀಡಿದರೇ ಎಂಬ ಬಗ್ಗೆ ಸಹಿಯನ್ನು ತಾಳೆ ಮಾಡಿ ಮತ್ತು ಸದರಿ ಮಾಲೀಕರು ಆರ್ಥಿಕವಾಗಿ ತೊಂದರೆಯಲ್ಲಿರುವುದನ್ನು ಮನವರಿಕೆ ಮಾಡಿಕೊಂಡು, ವಾಹನದ ಮಾಲೀಕರು ಪ್ರಾದೇಶಿಕ ಸಾರಿಗೆ ಅಧಿಕಾರಿಗಳು ನಿಗಧಿಪಡಿಸಿರುವ ಮೌಲ್ಯಕ್ಕೆ ಸಮನಾಗಿ ಬ್ಯಾಂಕ್ ಗ್ಯಾರೆಂಟಿಯನ್ನು ನೀಡಿರುವುದರಿಂದ ಸರ್ಕಾರದ ಆದಾಯದ ಹಿತದೃಷ್ಟಿಯಿಂದ ಸದರಿ ಹಣವನ್ನು ಸರ್ಕಾರಕ್ಕೆ ಮುಟ್ಟುಗೋಲು ಹಾಕಿಕೊಂಡು ಪ್ರಕರಣವನ್ನು ಮುಕ್ತಾಯಗೊಳಿಸಬಹುದಾಗಿ ಅಬಕಾರಿ ನಿರೀಕ್ಷಕರು, ಉಪ ವಿಭಾಗ, ಸೋಮವಾರಪೇಟೆ ಇವರ ಪತ್ರ ಸಂ:ಸೋಪೇಟೆ.ಉವಿ.ಕ್ರೈಂ:6/09-10, ದಿನಾಂಕ:
25-6-10ರಲ್ಲಿ ಪ್ರಸ್ತಾವನೆಯನ್ನು ಸಲ್ಲಿಸಿರುತ್ತಾರೆ. ಅರ್ಜಿದಾರರ ಕೋರಿಕೆಯನ್ನು ಮತ್ತು ತನಿಖಾಧಿಕಾರಿಗಳ ಪ್ರಸ್ತಾವನೆಯಲ್ಲಿನ ಅಂಶಗಳನ್ನು ಪರಿಶೀಲಿಸಲಾಗಿ ವಾಹನದ ಮಾಲೀಕರೇ ತಮ್ಮ ಸ್ವ ಇಚ್ಚೆಯಿಂದ ಬ್ಯಾಂಕ್ ಗ್ಯಾರೆಂಟಿ ಭದ್ರತೆಯನ್ನು ಸರ್ಕಾರಕ್ಕೆ ವಜಾ ಮಾಡಿಕೊಂಡು ಪ್ರಕರಣವನ್ನು ಇತ್ಯರ್ಥಪಡಿಸಿಕೊಡಬೇಕಾಗಿ ಕೋರಿಕೊಂಡ ಹಿನ್ನಲೆಯಲ್ಲಿ ಪ್ರಕರಣದ ಸಾಕ್ಷಿದಾರರನ್ನು ವಿಚಾರಣೆ ನಡೆಸುವುದು ಅಗತ್ಯವಿಲ್ಲವೆಂದು ಪ್ರಾಧಿಕಾರದಲ್ಲಿ ತೀರ್ಮಾನಿಸಲಾಗಿರುತ್ತದೆ. ಪ್ರಕರಣದ ಮುಕ್ತಾಯದ ಹಂತದವರೆಗೆ ರಿಕ್ಷಾದ ಮಾರ್ಕೆಟ್ ಮೌಲ್ಯವು ಇನ್ನೂ ಕಡಿಮೆಯಾಗುವ ಸಾಧ್ಯತೆ ಇರುವುದರಿಂದ ಪ್ರಾದೇಶಿಕ ಸಾರಿಗೆ ಅಧಿಕಾರಿಯ ಕಛೇರಿಯ ಹಿರಿಯ ಮೋಟಾರು ವಾಹನ ತನಿಖಾಧಿಕಾರಿಗಳು ಈಗಾಗಲೇ ನಿಗಧಿಪಡಿಸಿರುವ ಮೌಲ್ಯ ರೂ.28,000/-ಕ್ಕಿಂತ ಹೆಚ್ಚಿನ ಮೌಲ್ಯವನ್ನು ಪ್ರಾಧೀಕೃತ ಅಧಿಕಾರಿಗಳು ನಿಗಧಿಪಡಿಸಿ ತಕ್ಕ ಭದ್ರತೆ ರೂ.32,000/-ಗಳನ್ನು ಪೂರ್ತಿಯಾಗಿ ಬ್ಯಾಂಕ್ ಗ್ಯಾರೆಂಟಿಯನ್ನು ಪಡೆದುಕೊಂಡಿರುವುದರಿಂದ ಸರ್ಕಾರದ ಆದಾಯದ ಹಿತದೃಷ್ಟಿಯಿಂದ ಸದರಿ ಹಣವನ್ನು ಸರ್ಕಾರಕ್ಕೆ ಹೊಂದಾಣಿಕೆ ಮಾಡಿಕೊಳ್ಳುವುದು ಸೂಕ್ತವೆಂದು ಕಂಡುಬಂದಿರುವುದರಿಂದ ಈ ಕೆಳಕಂಡ ಆದೇಶ.
ಆದೇಶ ಸಂ:ಇಎಕ್ಸ್ಇ:ಡಿಟಿಸಿಆರ್:40/08-09 ದಿನಾಂಕ:28ನೇ ಜೂನ್, 2010
ಸಿ.ಎಲ್.ಜಯರಾಮ್, ಅಧಿಕೃತ ಅಧಿಕಾರಿಗಳು ಹಾಗೂ ಡೆಪ್ಯೂಟಿ ಕಮೀಷನರ್ ಆಫ್ ಎಕ್ಸೈಸ್, ಕೊಡಗು ಜಿಲ್ಲೆ, ಮಡಿಕೇರಿ ಆದ ನಾನು ಕರ್ನಾಟಕ ಅಬಕಾರಿ ಕಾಯ್ದೆ 1965ರ ಕಲಂ 43ಬಿ ರಡಿಯಲ್ಲಿ ಅನುಸರಿಸಬೇಕಾದ ಕ್ರಮಗಳನ್ನು ಅನುಸರಿಸಿದ ನಂತರ ಕಲಂ 43ಎ ರಡಿಯಲ್ಲಿ ಪ್ರದತ್ತವಾದ ಅಧಿಕಾರವನ್ನು ಚಲಾಯಿಸಿ ಅಬಕಾರಿ ನಿರೀಕ್ಷಕರು, ಉಪ ವಿಭಾಗ, ಸೋಮವಾರಪೇಟೆ ಇವರ ಪ್ರ.ಸಂ.3/2008-09, ದಿನಾಂಕ:27-11-08 ರಲ್ಲಿ ಜಪ್ತು ಪಡಿಸಲಾಗಿರುವ ಆಟೋ ರಿಕ್ಷಾ ಸಂ;
ಕೆ.ಎ-12-5731ಕ್ಕೆ ಸಂಬಂಧಿಸಿದ ಬ್ಯಾಂಕ್ ಗ್ಯಾರೆಂಟಿ ಹಣ ರೂ.32,000/-ಗಳನ್ನು ಕರ್ನಾಟಕ ಅಬಕಾರಿ ಕಾಯ್ದೆ 1965ರ ಕಲಂ 43ಎ ರನ್ವಯ ಸರ್ಕಾರಕ್ಕೆ ಮುಟ್ಟುಗೋಲು ಹಾಕಿಕೊಂಡು ಆದೇಶ ನೀಡಿರುತ್ತೇನೆ.
ಈ ಆದೇಶವನ್ನು ದಿನಾಂಕ:28-6-2010ರಂದು ಉಕ್ತಲೇಖನ ಕೊಟ್ಟು ಬೆರಳಚ್ಚು ಮಾಡಿಸಿ ತಿದ್ದಿ ಮುಕ್ತ ನ್ಯಾಯಾಲಯದಲ್ಲಿ ಘೋಷಿಸಲಾಯಿತು. ಈ ಆದೇಶವು ಇಂದಿನಿಂದ 30 ದಿವಸಗಳ ನಂತರ ಜಾರಿಯಲ್ಲಿ ಬರುತ್ತದೆ.
ಅಧಿಕೃತ ಅಧಿಕಾರಿಗಳು ಹಾಗೂ ಪಿ.ಆರ್.1029
ಡೆಪ್ಯೂಟಿ ಕಮೀಷನರ್ ಆಫ್ ಎಕ್ಸೈಸ್,
ಕೊಡಗು ಜಿಲ್ಲೆ, ಮಡಿಕೇರಿ.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೨೯೬೨ಅಧಿಕೃತ ಅಧಿಕಾರಿಗಳು ಹಾಗೂ ಡೆಪ್ಯುಟಿ ಕಮೀಷನರ್ ಆಫ್ ಎಕ್ಸೈಜ್ ದ.ಕ.ಜಿಲ್ಲೆ,
ಮಂಗಳೂರು ಇವರ ನ್ಯಾಯಾಲಯದಲ್ಲಿ
ನಂ: ಎಸ್ಡಿಕೆ/124/ಡಿಟಿಸಿಆರ್/2006-07, ದಿನಾಂಕ:17ನೇ ಮೇ, 2010
ಉಪಸ್ಥಿತರು: ನೂರ್ ಮಹಮ್ಮದ್ ಹುಸೇನ್
ಅಧಿಕೃತ ಅಧಿಕಾರಿ ಹಾಗೂ ಡೆಪ್ಯುಟಿ ಕಮೀಷನರ್ ಆಫ್ ಎಕ್ಸೈಜ್ ದಕ್ಷಿಣ ಕನ್ನಡ ಜಿಲ್ಲೆ, ಮಂಗಳೂರು.
ಪಿರ್ಯಾದುದಾರರು: ಆರೋಪಿ ಹಾಗೂ ವಾಹನದ ಮಾಲೀಕ
ಅಬಕಾರಿ ಉಪ ನಿರೀಕ್ಷಕರು(1) ಕ್ಲಾಡಿ ಡಿಸೋಜ,42 ವರ್ಷ,
ಮಂಗಳೂರು ಉತ್ತರ ಜಾರಿ ಮತ್ತು ತನಿಖೆ, ಬಿನ್:ಜಾನ್ ಬ್ಯಾಪಿಸ್ಟ್ ಡಿಸೋಜ,
ಮಂಗಳೂರು. ಕೂಳೂರು ರಾಯಿಕಟ್ಟೆ ಹೌಸ್, ಪಡುಕೋಡಿ ಗ್ರಾಮ, ಮಂಗಳೂರು.
ಪ್ರಕರಣದ ಮುಖ್ಯಾಂಶಗಳು:
ಅಬಕಾರಿ ಜಂಟಿ ಆಯುಕ್ತರು, ಮಂಗಳೂರು ವಿಭಾಗರವರ ನಿರ್ದೇಶನದ ಮೇರೆಗೆ ವಿಶೇಷ ತಂಡದ ಅಬಕಾರಿ ಉಪ ನಿರೀಕ್ಷಕರು,ಮಂಗಳೂರು ಉತ್ತರ ವಲಯ-1 ರವರು ದಿನಾಂಕ:3-11-2006 ರಂದು ರಾತ್ರಿ ಸುಮಾರು 9-00 ಗಂಟೆ ಸಮಯಕ್ಕೆ ರಾತ್ರಿ ಮಂಗಳೂರಿನಿಂದ ಕೂಳೂರು ಕಡೆಗೆ ಇಲಾಖಾ ವಾಹನದಲ್ಲಿ ಗಸ್ತು ತಿರುಗುತ್ತಿರುವಾಗ ರಾಷ್ಟ್ರೀಯ ಹೆದ್ದಾರಿ ಕೊಟ್ಟಾರ ಚೌಕಿಯಿಂದ, ಕೋಡಿಕಲ್ ಕಡೆಗೆ ಒಂದು ಸಿಲ್ವರ್ ಬಣ್ಣದ ಮಾರುತಿ ಒಮ್ನಿ ವ್ಯಾನ್ ವೇಗವಾಗಿ ಹೋಗುತ್ತಿರುವುದನ್ನು ಕಂಡು ಸಂಶಯದಿಂದ ಸದ್ರಿ ವ್ಯಾನನ್ನು ನಿಲ್ಲಿಸಲು ಸೂಚಿಸಿದಾಗ ವ್ಯಾನಿನ ಚಾಲಕನು ವಾಹನವನ್ನು ನಿಲ್ಲಿಸದೇ ಸುಮಾರು 50 ಗಜ ದೂರಕ್ಕೆ ಕೊಂಡೊಯ್ದು ವಾಹನವನ್ನು ನಿಲ್ಲಿಸಿ ಅದರ ಚಾಲಕನು ಓಡಲು ಪ್ರಯತ್ನಿಸಿದನು. ಕೂಡಲೇ ಸಿಬ್ಬಂದಿಗಳು ಚಾಲಕನನ್ನು ಸುತ್ತುವರಿದು ಹಿಡಿದು, ಚಾಲಕನಲ್ಲಿ ವಾಹನದಲ್ಲಿ ಏನಿದೆ ಎಂದು ಕೇಳಿದಾಗ ಆತನು ಗಾಬರಿಗೊಂಡು ಉತ್ತರಿಸಲಾಗಿ ಅನುಮಾನಗೊಂಡು, ತದನಂತರ ವಾಹನವನ್ನು ತಪಾಸಣೆ ಮಾಡಲು ಮಾನ್ಯ ನ್ಯಾಯಾಲಯದಿಂದ ಸರ್ಚ್ ವಾರೆಂಟ್ ಪಡೆಯಲು ಕಾಲವಕಾಶವಿಲ್ಲದ ಕಾರಣ ಸರ್ಚ್ ಮೆಮೋ ತಯಾರಿಸಿ, ವಾಹನದ ಬಾಗಿಲನ್ನು ತೆರೆದು ನೋಡಿದಾಗ ಸೀಟಿನ ಅಡಿಯಲ್ಲಿ ಮತ್ತು ಸೀಟಿನ ಹಿಂಭಾಗದಲ್ಲಿ ಕಪ್ಪು ಬಣ್ಣದ 9 ರಬ್ಬರ್ ಟ್ಯೂಬ್ಗಳು ಇರುವುದು ಕಂಡುಬಂತು, ಒಂದೊಂದು ರಬ್ಬರ್ ಟ್ಯೂಬ್ನಲ್ಲಿ ಸುಮಾರು 60 ಲೀನಂತೆ ಒಟ್ಟು 9 ರಬ್ಬರ್ ಟ್ಯೂಬ್ಗಳಲ್ಲಿ 540 ಲೀ ಕಳ್ಳಭಟ್ಟಿ ಸಾರಾಯಿ ಇರುವುದು ಕಂಡು ಬಂತು. ಇದನ್ನು ಹೊಂದಲು ಯಾವುದಾದರೂ ರಹದಾರಿ ಪತ್ರ ಇದೆಯೇ ಎಂದು ಕೇಳಲಾಗಿ ಅದು ಯಾವುದು ಇರುವುದಿಲ್ಲವೆಂದು ತಿಳಿಸಿದನು. ನಂತರ ವಾಹನದ ನೊಂದಣಿ ಸಂಖ್ಯೆ ಪರಿಶೀಲಿಸಿದಾಗ ಅದು KA-19-P-1680 ಆಗಿದ್ದು, ಇಂಜಿನ್ ಸಂ:F-8B-IN-2709676 ಹಾಗೂ ಚಾಸೀಸ್ ನಂ:ST-91-IN-630242 ಆಗಿರುತ್ತದೆ. ನಂತರ ಆರೋಪಿಯ ಹೆಸರು ವಿಳಾಸ ಕೇಳಲಾಗಿ ಕ್ಲಾಡಿ ಡಿಸೋಜ, 42 ವರ್ಷ ಬಿನ್:ಜಾನ್ ಬ್ಯಾಪ್ಟಿಸ್ಟ್ ಡಿಸೋಜ, ರಾಯಿಕಟ್ಟೆ ಹೌಸ್, ಪಡುಕೋಡಿ ಗ್ರಾಮ, ಕೂಳೂರು ಅಂಚೆ, ಮಂಗಳೂರು ತಾಲೂಕು ಎಂದು ತಿಳಿಸಿದನು. ವಾಹನದಲ್ಲಿ ಅಕ್ರಮವಾಗಿ 540 ಲೀಟರು ಕಳ್ಳಭಟ್ಟಿ ಸಾರಾಯಿಯನ್ನು ಸಾಗಿಸುವುದು ಕರ್ನಾಟಕ ಅಬಕಾರಿ ಕಾಯಿದೆ 1965ರ ಕಲಂ 11,13,14ರಂತೆ ಅಪರಾಧವಾಗಿದ್ದು ಹಾಗೂ 32,34 ಮತ್ತು 38(ಎ)ರ ಪ್ರಕಾರ ಶಿಕ್ಷಾರ್ಹವಾಗಿರುವುದರಿಂದ, ವಾಹನ ಮತ್ತು ಕಳ್ಳಭಟ್ಟಿ ಸಾರಾಯಿಯನ್ನು ಜಪ್ತುಪಡಿಸಿ ಕೊಂಡು, ಸ್ಧಳದಲ್ಲಿಯೇ ಮಹಜರು ತಯಾರಿಸಿ, ಆರೋಪಿಯ ವಿರುದ್ದ ತಕ್ಷೀರು ಸಂಖ್ಯೆ:9/06- 07, ದಿನಾಂಕ:3-11-2006ರಂದು ಮೊಕದ್ದಮೆಯನ್ನು ದಾಖಲಿಸಿಕೊಂಡು, ಜಪ್ತು ಪಡಿಸಿದ ಸೊತ್ತುಗಳನ್ನು ಅಂತಿಮ ವರದಿ ಸಲ್ಲಿಸುವ ತನಕ ತಮ್ಮ ವಶದಲ್ಲಿಯೇ ಇಟ್ಟುಕೊಳ್ಳಲು ಅಂದಿನ ಅದಿಕೃತ ಅಧಿಕಾರಿಗಳು ಹಾಗೂ ಅಬಕಾರಿ ಅದೀಕ್ಷಕರು, ಇಐಬಿ, ದ.ಕ.ಜಿಲ್ಲೆ, ಮಂಗಳೂರು ಇವರಲ್ಲಿ ಅನುಮತಿಯನ್ನು ಕೋರಿದ ಮೇರೆಗೆ ದಿನಾಂಕ:4-11-06ರಂದು ಅನುಮತಿಯನ್ನು ನೀಡಲಾಗಿರುತ್ತದೆ.
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೨೯೬೩(ಪ್ರತಿಯೊಂದು ರಬ್ಬರ್ ಟ್ಯೂಬ್ ನಿಂದ 750 ಮಿಲಿಯ ಸೀಸೆಯಂತೆಒಟ್ಟು 9 ಬಾಟಲಿಗಳಲ್ಲಿ ಕಳ್ಳಭಟ್ಟಿ ಸಾರಾಯಿಯನ್ನು ರಾಸಾಯನಿಕ ಪರೀಕ್ಷೆಗಾಗಿ ಮಾದರಿ ತೆಗೆಯಲಾಗಿದೆ.
ಮೊಕದ್ದಮೆಯ ತನಿಖೆಯನ್ನು ಕೈಗೊಂಡ ಅಬಕಾರಿ ಉಪ ನಿರೀಕ್ಷಕರು(1), ಮಂಗಳೂರು ಉತ್ತರ ಜಾರಿ ಮತ್ತು ತನಿಖೆ, ಮಂಗಳೂರು ಇವರು ದಿನಾಂಕ:9-12-2006ರ ವರದಿಯೊಂದಿಗೆ ಸದ್ರಿ ಮೊಕದ್ದಮೆಯಲ್ಲಿ ವಶಪಡಿಸಿಕೊಂಡ ಕಳ್ಳಭಟ್ಟಿ ಸಾರಾಯಿಯ ರಾಸಾಯನಿಕ ವಿಶ್ಲೇಷಣಾ ವರದಿ ಪ್ರತಿ ಮತ್ತು ವಾಹನದ ಬಿ ರಿಜಿಸ್ಟ್ರಾರ್ ಎಕ್ಸ್ಟ್ರಾಕ್ಟ್ ವರದಿಯ ಪ್ರತಿಯನ್ನು ಪ್ರಾಧಿಕಾರಕ್ಕೆ ಸಲ್ಲಿಸಿ ಜಪ್ತುಪಡಿಸಿಕೊಳ್ಳಲಾದ ವಾಹನದ ಮುಟ್ಟುಗೋಲು ಪ್ರಕ್ರಿಯೆಯನ್ನು ಕಾಯ್ದಿರಿಸಿ, ಉಳಿದ ಸೊತ್ತುಗಳಾದ ಕಳ್ಳಭಟ್ಟಿ ಸಾರಾಯಿಯನ್ನು ಸರ್ಕಾರಕ್ಕೆ ಮುಟ್ಟುಗೋಲು ಹಾಕಿಕೊಂಡು ನಾಶಪಡಿಸಲು ಶಿಫಾರಸ್ಸು ಮಾಡಿರುತ್ತಾರೆ.
ತನಿಖಾಧಿಕಾರಿಗಳು ಪ್ರಾದೇಶಿಕ ಸಾರಿಗೆ ಅದಿಕಾರಿಗಳಿಂದ ಪಡೆದು ಸಲ್ಲಿಸಿದ್ದ ಬಿ ಎಕ್ಸ್ಟ್ರಾಕ್ಟ್ ವರದಿಯ ಪ್ರಕಾರ ಶ್ರೀ.ಕ್ಲಾಡಿ ಡಿಸೋಜ,ಬಿನ್: ಜಾನ್ ಬ್ಯಾಪ್ಟಿಸ್ ಡಿಸೋಜ, ಕೂಳೂರು ರಾಯಿಕಟ್ಟೆ, ಪಡುಕೋಡಿ ಗ್ರಾಮ, ಕೂಳೂರು ಅಂಚೆ, ಮಂಗಳೂರು ಇವರು ದಿನಾಂಕ:7-5-2004ರಿಂದ ಅನ್ವಯವಾಗುವಂತೆ ವಶಪಡಿಸಿಕೊಳ್ಳಲಾದ KA-19-P-1680 ಮಾರುತಿ ಓಮಿನಿ ವ್ಯಾನ್ ಇದರ ನೊಂದಣಿ ಮಾಲೀಕರೆಂದು ಹಾಗೂ ICICI Bank Ltd. K.S Rao Road, Mangalore ಇವರು ವಾಹನದ ಹೆಚ್.ಪಿ.ಎದಾರರಾಗಿರುವುದಾಗಿ ದೃಡಪಟ್ಟಿರುವುದರಿಂದ, ಸದ್ರಿ ವಾಹನದ ಮಾಲೀಕ/ಪ್ರಕರಣದ ಆರೋಪಿತ ವ್ಯಕ್ತಿಗೆ ಹಾಗೂ ವಾಹನದ ಹೆಚ್.ಪಿ.ಎ ದಾರರಾದ ICICI Bank Ltd. K.S Rao Road, Mangalore ಇವರಿಗೆ ಜಪ್ತುಪಡಿಸಿದ ವಾಹನ ಮತ್ತು ಸೊತ್ತುಗಳನ್ನು ಯಾಕೆ ಸರ್ಕಾರಕ್ಕೆ ಮುಟ್ಟುಗೋಲು ಹಾಕಿಕೊಳ್ಳಬಾರದು ಎಂಬ ಬಗ್ಗೆ ಕರ್ನಾಟಕ ಅಬಕಾರಿ ಕಾಯಿದೆ 1965 ರ ಕಲಂ 43ಬಿ ರಡಿಯಲ್ಲಿ ದಿನಾಂಕ:12-1-2007ರಂದು ಕಾರಣ ಕೇಳಿ ನೋಟೀಸನ್ನು ನೀಡಲಾಗಿದ್ದು, ಸದ್ರಿ ಕಾರಣ ಕೇಳಿ ನೋಟಿಸು ದಿನಾಂಕ:19-1-2007ರಂದು ವಾಹನದ ಮಾಲೀಕರಿಗೆ ಜ್ಯಾರಿಯಾಗಿರುತ್ತದೆ. ಆದರೆ ಸದ್ರಿಯವರಿಂದ ಯಾವುದೇ ಸಮಂಜಾಯಿಷಿ ಉತ್ತರ ಈ ಪ್ರಾಧಿಕಾರದಲ್ಲಿ ಸ್ವೀಕೃತವಾಗಿರುವುದಿಲ್ಲ. ತನಿಖಾಧಿಕಾರಿಗಳ ಶಿಫಾರಸ್ಸು ವರದಿಯ ಮೇರೆಗೆ ಪ್ರಕರಣದಲ್ಲಿ ಜಪ್ತುಪಡಿಸಿಕೊಳ್ಳಲಾದ ವಾಹನದ ಮುಟ್ಟುಗೋಲು ಪ್ರಕ್ರಿಯೆಯನ್ನು ಕಾಯ್ದಿರಿಸಿ, ಉಳಿದ ಸೊತ್ತುಗಳಾದ ಕಳ್ಳಭಟ್ಟಿ ಸಾರಾಯಿಯನ್ನು ದಿನಾಂಕ:14-2-2007ರ ಆದೇಶದಲ್ಲಿ ಸರ್ಕಾರಕ್ಕೆ ಮುಟ್ಟುಗೋಲು ಹಾಕಿಕೊಂಡು ನಾಶಪಡಿಸಲು ಆದೇಶಿಸಲಾಗಿರುತ್ತದೆ.
- ಮಾರುತಿ ೋಮಿನಿ ವ್ಯಾನಿಗೆ ಪ್ರಾದೇಶಿಕ ಸಾರಿಗೆ ಅದಿಕಾರಿಗಳು, ದ.ಕ. ಜಿಲ್ಲೆ ಮಂಗಳೂರು ಇವರು ನೀಡಿದ ಮೌಲ್ಯ ಮಾಪನ ವರದಿಯಲ್ಲಿ ನಮೂದಿಸಿರುವ ಮೌಲ್ಯದಂತೆ ರೂ.1,05,000/- ಮೊತ್ತದ ಬ್ಯಾಂಕ್ ಗ್ಯಾರೆಂಟಿ ಒದಗಿಸುವ ಹಾಗೂ ಇತರೆ ಷರತ್ತುಗಳಿಗೆ ಅನುಗುಣವಾಗಿ ಮಧ್ಯಂತರ ಬಿಡುಗಡೆಗೊಳಿಸಿ ಆದೇಶಿಸಲಾಗಿರುತ್ತದೆ.ಸದ್ರಿ ಆದೇಶವನ್ನು ಅನುಸರಿಸಿ ವಾಹನವನ್ನು ದಿನಾಂಕ:23-10-2007ರಂದು ವಾಹನದ ಮಾಲೀಕರ ಸುಪದಿರ್ಗೆ ಮಧ್ಯಂತರ ಬಿಡುಗಡೆಗೊಳಿಸಲಾಗಿರುತ್ತದೆ. ವಾಹನದ ಮಾಲೀಕರು ಮಧ್ಯಂತರ ಬಿಡುಗಡೆ ಪಡೆದುಕೊಂಡ ಸಂದರ್ಭದಲ್ಲಿ ಭದ್ರತೆಯಾಗಿ ನೀಡಿರುವ ಬ್ಯಾಂಕ್ ಗ್ಯಾರೆಂಟಿಯ ಮಾನ್ಯತೆ ಅವದಿಯನ್ನು ಕಾಲಕಾಲಕ್ಕೆ ನವೀಕರಿಸಿದ್ದು, ಪ್ರಸ್ತುತ ಮಾನ್ಯತೆ ಅವದಿಯು ದಿನಾಂಕ:6-10-2010 ರವರೆಗೆ ಊರ್ಜಿತದಲ್ಲಿರುತ್ತದೆ. ನಂತರ ಪ್ರಕರಣದ ವಿಚಾರಣೆಯನ್ನು ಪ್ರಾರಂಬಿಸಿ ಪ್ರಕರಣದ ಪಿರ್ಯಾದುದಾರರು ಹಾಗೂ ತನಿಖಾದಿಕಾರಿಗಳಾದ ಶ್ರೀ ವಿನೋದ್ ಕುಮಾರ್, ಅಬಕಾರಿ ಉಪ ನಿರೀಕ್ಷಕರು ಮತ್ತು ಪಂಚ ಸಾಕ್ಷಿದಾರರಾದ ಶ್ರೀ.ಲಲಿತ ರಾವ್ ಇವರುಗಳು ಪ್ರಾಸಿಕ್ಯೂಶನ್ ಸಾಕ್ಷಿದಾರರಾಗಿ ಹಾಗೂ ಪ್ರಕರಣದಲ್ಲಿ ರಕ್ಷಣಾ ಸಾಕ್ಷಿದಾರರಾದ ಶ್ರೀ. ಕ್ಲಾಡಿ ಡಿಸೋಜಾ ಇವರು ಈ ಪ್ರಾಧಿಕಾರದ ಮುಂದೆ ಹಾಜರಾಗಿ ತಮ್ಮ ಸಾಕ್ಷ್ಯವನ್ನು ನೀಡಿರುತ್ತಾರೆ. ↩
ಅಬಿಯೋಗದ ಪರ ಸಾಕ್ಷಿ ಹಾಗೂ ರಕ್ಷಣಾ ಪರ ರಕ್ಷಣಾ ಸಾಕ್ಷಿ ವಿಚಾರಣೆಯನ್ನು ನಡೆಸಿ, ಅಬಿಯೋಗದ ಪರ ವಾದ ಆಲಿಸಿ, ಪ್ರಾಧಿಕಾರಕ್ಕೆ ಸಲ್ಲಿಸಿರುವ ದಾಖಲಾತಿಗಳು, ಪ್ರಾಸಿಕ್ಯೂಶನ್ ಪರ ನೀಡಿರುವ ಸಾಕ್ಷಿಗಳ ಹೇಳಿಕೆಗಳನ್ನು ಪರಿಶೀಲಿಸಿ ಮುಂದಿನ ಆದೇಶ ಹೊರಡಿಸುವ ಮುನ್ನ ಈ ಕೆಳಕಂಡ ವಿವಾದಾಂಶಗಳಿಗೆ ಉತ್ತರವನ್ನು ಪಡೆಯಬೇಕಾಗಿರುತ್ತದೆ.
ವಿವಾದಾಂಶಗಳು 1) ದಿನಾಂಕ:03-11-2006 ರಂದು KA-19-P-1680 ಮಾರುತಿ ಒಮಿನಿ ವ್ಯಾನ್ ಇದರಲ್ಲಿ ಅಕ್ರಮವಾಗಿ ಕಳ್ಳಭಟ್ಟಿ ಸಾರಾಯಿಯನ್ನು ಸಾಗಾಣಿಕೆಯಾಗಿದೆಯೇ? ಮತ್ತು ವಾಹನವನ್ನು ಕರ್ನಾಟಕ ಅಬಕಾರಿ ಕಾಯಿದೆ ಮತ್ತು ನಿಯಮಗಳ ರೀತ್ಯಾ ಅಪರಾಧಕ್ಕೆ ಬಳಸಲಾಗಿದೆಯೇ?
2) ವಶಪಡಿಸಿಕೊಂಡಿರುವ ವಾಹನದ ಮಾಲೀಕರು ತಾನೆಂದು, ತನಗೆ ತಿಳಿಯದೇ ಕರ್ನಾಟಕ ಅಬಕಾರಿ ಕಾಯಿದೆಯಡಿ ಅಕ್ರಮ ಸಾರಾಯಿ ಸ್ಯಾಚೇಟು ಸಾಗಾಣಿಕೆಗೆ ವಾಹನವನ್ನು ಉಪಯೋಗಿಸಲ್ಪಟ್ಟಿತ್ತು ಎಂಬುದನ್ನು ವಾಹನದ ಮಾಲೀಕರು ಸಾಬೀತು ಪಡಿಸಿದ್ದಾರೆಯೇ? ಅಥವಾ ಇಲ್ಲವೇ?
3) ಜಪ್ತು ಪಡಿಸಲಾಗಿರುವ ವಾಹನವನ್ನು ಸರ್ಕಾರಕ್ಕೆ ಮುಟ್ಟುಗೋಲು ಹಾಕಿಕೊಳ್ಳಲು ಯೋಗ್ಯವಾಗಿದೆಯೇ ಅಥವಾ ಇಲ್ಲವೇ?
ಒಂದನೇ ಅಂಶವನ್ನು ಗುಣಾತ್ಮಕವಾಗಿ, ಎರಡನೇ ಅಂಶವನ್ನು ನಕರಾತ್ಮಕವಾಗಿ ಮತ್ತು ಮೂರನೇ ಅಂಶವನ್ನು ಅಂತಿಮ ಆದೇಶದಂತೆ.
ಪ್ರಾ.ಸಾ-1:
ಶ್ರೀ ವಿನೋದ್ ಕುಮಾರ್, ಅಬಕಾರಿ ಉಪ ನಿರೀಕ್ಷಕರು, ಮಂಗಳೂರು ಉತ್ತರ ವಲಯ-1 ಇವರು ದಿನಾಂಕ:
03-12-2009ರಂದು ಈ ಪ್ರಾದಿಕಾರದ ಮುಂದೆ ಹಾಜರಾಗಿ ಸಾಕ್ಷಿ ನುಡಿದಿರುತ್ತಾರೆ. ಕಳೆದ ನಾಲ್ಕು ವರ್ಷಗಳಿಂದ ಅಬಕಾರಿ ಉಪ ನಿರೀಕ್ಷಕನಾಗಿ ಮಂಗಳೂರು ಉತ್ತರ ವಲಯ-1 ಇಲ್ಲಿ ಕೆಲಸ ನಿರ್ವಹಿಸುತ್ತಿದ್ದೆನು. ದಿನಾಂಕ:3-11-2006ರಂದು ಅಬಕಾರಿ ಜಂಟಿ ಆಯುಕ್ತರು, ಮಂಗಳೂರು ವಿಭಾಗ ಇವರ ವಿಶೇಷ ತನಿಖಾ ತಂಡದಲ್ಲಿ ಅಬಕಾರಿ ಉಪ ನಿರೀಕ್ಷಕನಾಗಿ ಕರ್ತವ್ಯ ಕೈಗೊಂಡ ಸಮಯದಲ್ಲಿ ಮಂಗಳೂರು ತಾಲೂಕಿನ ಕೂಳೂರು ಎಂಬಲ್ಲಿ ವಾಹನ ತಪಾಸಣೆ ಸಂದರ್ಭದಲ್ಲಿ ಮಂಗಳೂರಿನಿಂದ ಕೂಳೂರು ಕಡೆಗೆ ವೇಗವಾಗಿ ಬರುತ್ತಿದ್ದ ಮಾರುತಿ ಒಮ್ನಿ ಕಾರನ್ನು ನಿಲ್ಲಿಸಲಾಗಿ, ಸುಮಾರು 50 ಗಜ ದೂರದಲ್ಲಿ ಹೋಗಿ ನಿಲ್ಲಿಸಿ ಅದರಲ್ಲಿದ್ದ ಚಾಲಕನು ಓಡಿ ಹೋಗಲು ಯತ್ನಿಸಿದಾಗ ಕೂಡಲೇ ನಮ್ಮ ಸಿಬ್ಬಂದಿಗಳು ಅವನನ್ನು ಸುತ್ತುವರಿದು ಹಿಡಿದರು. ವಾಹನದಲ್ಲಿ ಆರೋಪಿ ಚಾಲಕನಾಗಿದ್ದ ವ್ಯಕ್ತಿಯಲ್ಲಿ ಅದರಲ್ಲಿ ಏನಿದೆ ಎಂದು ವಿಚಾರಿಸಿದಾಗ ಅವನು ಸಂಶಯಾಶ್ವದವಾಗಿ ವರ್ತಿಸಿದ. ನ್ಯಾಯಾಲಯದಿಂದ ಸರ್ಚ್ ವಾರೆಂಟ್ ಪಡೆಯಲು ಕಾಲಾವಕಾಶ ಇಲ್ಲದ ಕಾರಣ ಸರ್ಚ್ ಮೆಮೊವನ್ನು ತಯಾರಿಸಿ ಸ್ಥಳದಲ್ಲಿದ್ದ ಇಬ್ಬರು ವ್ಯಕ್ತಿಗಳನ್ನು ಪಂಚರನ್ನಾಗಿ ಕರೆದುಕೊಂಡು ವಾಹನವನ್ನು ತಪಾಸಣೆ ಮಾಡಲಾಗಿ ವಾಹನದ ಒಳಗಡೆ ಸೀಟಿನ ಹಿಂಬದಿಯಲ್ಲಿ 9 ರಬ್ಬರ್ ಟ್ಯೂಬ್ಗಳಲ್ಲಿ ಕಳ್ಳಭಟ್ಟಿ ಸಾರಾಯಿ ಇರುವುದು ಗೊತ್ತಾಯಿತು. ಪ್ರತಿ ರಬ್ಬರ್ ಟ್ಯೂಬ್ ಗಳಲ್ಲಿ ಕಳ್ಳಭಟ್ಟಿ ಸಾರಾಯಿ ಇರುವುದೆಂದು ಗೊತ್ತಾಯಿತು. ಪ್ರತಿ ರಬ್ಬರ್ ಟ್ಯೂಬ್ ನಲ್ಲಿ 60 ಲೀ ನಂತೆ ಒಟ್ಟುಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೨೯೬೫ ನಿಶಾನೆ ಪಿ-4 ಎಂದು ಗುರುತಿಸಲಾಯಿತು. ನಿಶಾನೆ ಪಿ-3 ರ ವರದಿಯಲ್ಲಿ ಮಾದರಿಗಳಲ್ಲಿ ಶೇಕಡಾ 28 ರಷ್ಟು ಮದ್ಯಸಾರ ಅಂಶವಿರುವುದು ಎಂದು ದೃಡೀಕರಿಸಿರುತ್ತದೆ. ದಿನಾಂಕ:9-12-2006 ರಂದು ಈ ನ್ಯಾಯಾಲಯಕ್ಕೆ ತನಿಖಾ ವರದಿಯನ್ನು ಸಲ್ಲಿಸಿರುತ್ತೇನೆ. ಅದನ್ನು ನಿಶಾನೆ ಪಿ-5 ಎಂದು, ಸಾಕ್ಷಿಯ ಸಹಿಯನ್ನು ನಿಶಾನೆ ಪಿ-5 ಎ ಎಂದು ಗುರುತಿಸಲಾಯಿತು. ಈ ಪ್ರಕರಣದಲ್ಲಿ ಅಮಾನತುಪಡಿಸಿಕೊಂಡ ವಾಹನವನ್ನು ನೋಡಿದರೆ ಗುರುತಿಸುತ್ತೇನೆ. (ಅರ್ಜಿದಾರರು ವಾಹನವನ್ನು ಮಧ್ಯಂತರ ಸುಪದಿರ್ಗೆ ಪಡೆದುಕೊಂಡಿದ್ದು ಅದನ್ನು ಈ ದಿನ ನ್ಯಾಯಾಲಯದ ಮುಂದೆ ಹಾಜರುಪಡಿಸಿರುತ್ತಾರೆ. ಅದನ್ನು ಮುದ್ದೆ ಮಾಲು-1 ಎಂದು ಗುರುತಿಸಲಾಯಿತು.
ಪಾಟೀ ಸವಾಲು: ರಕ್ಷಣಾ ಪರ ವಕೀಲರಾದ ಶ್ರೀ.ಕಾರ್ತಿಕ್ ಆರ್.ಉಡುಪ ಇವರ ಪಾಟೀ ಸವಾಲಿಗೆ ಸಾಕ್ಷಿದಾರರು ಉತ್ತರಿಸುತ್ತಾ ನಾನು ನನ್ನ ಕಛೇರಿಯಿಂದ ರಾತ್ರಿ 8-00 ಗಂಟೆಗೆ ಹೊರಟಿರುತ್ತೇನೆ. ನಾನು ಜಪ್ತು ವಾಹನವನ್ನು ಹೊರತುಪಡಿಸಿ ಸುಮಾರು 6 ರಿಂದ 7 ಇತರೆ ವಾಹನಗಳ ತಪಾಸಣೆ ಮಾಡಿರುತ್ತೇನೆ. ನಾನು ಜಪ್ತು ಪಡಿಸಿರುವ ವಾಹನವು ಆ ದಿನ ಮಂಗಳೂರು ಕಡೆಯಿಂದ ಕೂಳೂರಿನ ಕಡೆ ಹೋಗುತ್ತಿತ್ತು. ನಾನು ಆ ಸಮಯಕ್ಕೆ ಕೊಟ್ಟಾರ ಚೌಕಿ ಜಂಕ್ಷನ್ ಎಂಬಲ್ಲಿ ತಪಾಸಣೆಗೆ ನಿಂತಿದ್ದೆ. ನಾನು ವಾಹನವನ್ನು ಜಪ್ತುಪಡಿಸಿದ ಪೂರ್ವದಲ್ಲಿ ಅರ್ಧ ಗಂಟೆ ಮುಂಚಿತವಾಗಿ ಆ ಸ್ಥಳದಲ್ಲಿದ್ದೆನು. ನಾನು ತಪಾಸಣೆ ನಡೆಸಿದ ಸ್ಥಳ ಕೊಟ್ಟಾರ ಚೌಕಿ ಎಂಬುದು ರಾಷ್ಟ್ರೀಯ ಹೆದ್ದಾರಿ 17ರ ಕೊಟ್ಟಾರ ಆಗಿದ್ದು, ಸಾಕಷ್ಟು ಜನ ಸಂಚಾರ ಇದೆ. ನಾವು ಅಪರಾಧ ಸ್ಥಳಕ್ಕೆ ತಲುಪಿ ಸುಮಾರು 10-30 ಗಂಟೆವರೆಗೆ ಅಪರಾಧ ಪತ್ತೆ ಕಾರ್ಯದಲ್ಲಿ ನಿರತರಾಗಿದ್ದೆವು. ಪ್ರಥಮವಾಗಿ ನಾನು ಜಪ್ತು ವಾಹನವನ್ನು ನಿಲ್ಲಿಸಲು ಸನ್ನೆ ಮಾಡಿರುತ್ತೇನೆ. ಅಪರಾಧ ಸ್ಥಳದಲ್ಲಿ ತಯಾರಿಸಿದ ಸ್ಥಳ ಮಹಜರನ್ನು ನನ್ನೊಂದಿಗೆ ಇದ್ದ ಸಿಬ್ಬಂದಿ ಒಬ್ಬರು ತಯಾರಿಸಿರುತ್ತಾರೆ. ನಾನು ಅಪರಾಧ ಸ್ಥಳ ತಲುಪಿದ ನಂತರ ಮಹಜರಿಗೆ ಸಹಿ ಮಾಡಿರುವ ಪಂಚರು ಅಲ್ಲಿಗೆ ಬಂದಿರುತ್ತಾರೆ. ಸದ್ರಿ ಪಂಚರು ನಾನು ವಾಹನ ತಡೆದು ನಿಲ್ಲಿಸಿದ ನಂತರದಲ್ಲಿ ಬಂದಿರುತ್ತಾರೆ. ನಾವು ವಾಹನವನ್ನು ನಿಲ್ಲಿಸಿದ ಸ್ದಳದಲ್ಲಿ ಪಂಚರು ನಡೆದು ಬರುತ್ತಿದ್ದರು. ನಾವು ರಾತ್ರಿ ರಸ್ತೆಗಸ್ತುವಿನಲ್ಲಿದ್ದ ಬಗ್ಗೆ ನನ್ನ ಕಛೇರಿಯ ದಾಖಲೆಗಳಲ್ಲಿ ಮಾಹಿತಿ ಇರುತ್ತದೆ. ನಾವು ವಾಹನಗಳ ತಪಾಸಣೆಗಾಗಿ ಮಂಗಳೂರು ಕಡೆಯಿಂದ ಕೂಳೂರು ಕಡೆ ಹೋಗುವ ದಾರಿಯ ಎಡಬದಿಗೆ ನಿಂತಿದ್ದೆವು. ನನ್ನ ಕಛೇರಿಯಿಂದ ಅಪರಾಧ ಸ್ದಳವು ಸುಮಾರು 1-30 ಕಿ.ಮೀ ದೂರದಲ್ಲಿರುತ್ತದೆ.ಸದ್ರಿ ಸ್ಥಳ ಮಹಜರನ್ನು ನನ್ನೊಂದಿಗೆ ಗಸ್ತು ಕಾರ್ಯದಲ್ಲಿದ್ದ ಅಬಕಾರಿ ರಕ್ಷಕ ಆದ ಶ್ರೀ.ಶಬೀರ್ ಎಂಬವರು ಬರೆದಿರುತ್ತಾರೆ. ನಾನು ಅಪರಾಧ ಸ್ದಳದಲ್ಲಿ ವಾಹನವನ್ನು ನಿಲ್ಲಿಸಿ ಶೋಧನೆ ಮಾಡಿದ ನಂತರ ಅಕ್ರಮ ಸಾಗಾಣಿಕೆ ಪತ್ತೆ ಮಾಡಿದ ಬಗ್ಗೆ ಸುಮಾರು 9 ಗಂಟೆಯಿಂದ 10-30 ಗಂಟೆಯವರೆಗೆ ಸ್ಥಳ ಮಹಜರನ್ನು ನಮ್ಮ ಸಿಬ್ಬಂದಿಯವರಿಂದ ಬರೆಸಿರುತ್ತೇನೆ. ನಾನು ಆ ರಾತ್ರಿ ಅಪರಾಧ ಸ್ಥಳಕ್ಕೆ ಹೋದದ್ದೆ ಇಲ್ಲವೆಂಬುದು ಸರಿಯಲ್ಲ. ನಾನು ಜಪ್ತು ಮಾಡಿರುವ ವಾಹನಕ್ಕೂ ವಾಹನದ ಆರ್.ಸಿ ಮಾಲೀಕರಿಗೂ, ಅಕ್ರಮ ಸಾಗಾಣಿಕೆಗೂ ಕಳ್ಳಭಟ್ಟಿ ಸಾಗಾಣೆಿಗೂ ಯಾವುದೇ ಸಂಬಂಧವಿಲ್ಲ ಎಂಬುದು ಸರಿಯಲ್ಲ. ಮೊಕದ್ದಮೆಗೆ ಸಂಬಂದಿಸಿದ ಎಲ್ಲಾ ದಾಖಲೆಗಳನ್ನು ನನ್ನ ಕಛೇರಿಯಲ್ಲಿ ತಯಾರಿಸಿದ್ದು ಎಂಬುದು ಸರಿಯಲ್ಲ. ಇಲಾಖಾ ಪ್ರಗತಿ ಪರಿಶೀಲನಾ ಅಂಕಿಅಂಶಗಳಿಗೆ ಬೇಕಾಗಿ ನಾನು ಸುಳ್ಳು ಮೊಕದ್ದಮೆ ದಾಖಲಿಸಿದ್ದೇನೆ ಎಂಬುದು ಸರಿಯಲ್ಲ ಎಂದು ಪಾಟೀ ಸವಾಲಿಗೆ ಉತ್ತರ ನೀಡಿರುತ್ತಾರೆ.
ಪ್ರಾ.ಸಾ-2:
ಶ್ರೀ.ಲಲಿತ್ ಎಸ್.ರಾವ್, ಪ್ಲಾಟ್ ನಂ:193 ದೀಪಾ ಪಾರ್ಕ್, ಎಂ.ಜಿ.ರಸ್ತೆ, ಮಂಗಳೂರು ಇವರು ದಿನಾಂಕ:
17-6-2009 ರಂದು ಪ್ರಾದಿಕಾರದ ಮುಂದೆ ಸಾಕ್ಷಿ ನೀಡುತ್ತಾ ದಿನಾಂಕ:3-11-2006ರಂದು ಮಂಗಳೂರು ನಗರದ ಕೊಟ್ಟಾರ ಚೌಕಿ ಬಳಿ ನನ್ನ ಸ್ನೇಹಿತರ ಮನೆಗೆ ಹೋಗಿದ್ದೆನು. ನಾನು ಕೊಟ್ಟಾರ ಚೌಕಿ ಹತ್ತಿರ ನಡೆದುಕೊಂಡು ಹೋಗುತ್ತಿದ್ದಾಗ ಅಬಕಾರಿ ಉಪ ನಿರೀಕ್ಷಕರು ನನ್ನನ್ನು ನಿಲ್ಲಿಸಿದರು. ಮತ್ತು ಅಲ್ಲಿ ಅವರು ತಡೆದು ನಿಲ್ಲಿಸಿದ ಮಾರುತಿ ಸಿಲ್ವರ್ ಕಲರ್ ಒಮ್ನಿ ವ್ಯಾನನ್ನು ನನ್ನ ಸಮಕ್ಷಮ ಪರೀಕ್ಷಿಸಿ ಅದರಲ್ಲಿ 9 ಟ್ಯೂಬ್ಗಳಲ್ಲಿ ಕಳ್ಳಭಟ್ಟಿ ಸಾರಾಯಿ ಇದ್ದದ್ದು ಕಂಡು ಬಂತು. ಸದ್ರಿ ವಾಹನದ ಚಾಲಕ ಕ್ಲಾಡಿ ಡಿಸೋಜಾರವರನ್ನು ವಿಚಾರಿಸಿ ವಾಹನ ಸಂ:KA-19-P-1680 ಆಗಿರುತ್ತದೆ. ಸ್ಥಳದಲ್ಲಿ ಅಬಕಾರಿ ನಿರೀಕ್ಷಕರು ನನ್ನ ಸಮಕ್ಷಮ ಅಮಾನತ್ತು ಮಹಜರು ಬರೆದು ಕ್ಯಾನನ್ನು ಮತ್ತು ಕಳ್ಳಭಟ್ಟಿ ಸಾರಾಯಿಯನ್ನು ಅಮಾನತುಪಡಿಸಿ ಕೊಂಡಿರುತ್ತಾರೆ. ಈ ಕುರಿತು ಬರೆದ ಮಹಜರಿಗೆ ನಾನು ಸಹಿ ಮಾಡಿರುತ್ತೇನೆ. ಮಹಜರು ಬರೆಯುವಾಗ ರಾತ್ರಿ 9-30 ಗಂಟೆ ಆಗಿತ್ತು. ಮಹಜರನ್ನು ನಿಶಾನೆ ಪಿ-1 ಎಂದು, ಸಾಕ್ಷಿ ಸಹಿಯನ್ನು ನಿಶಾನೆ ಪಿ-1 ಬಿ ಎಂದು ಗುರುತಿಸಿ ಸಾಕ್ಷಿ ನೀಡಿರುತ್ತಾರೆ.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೨೯೬೬ಪಾಟೀ ಸವಾಲು:
ಶ್ರೀ ಕಾರ್ತಿಕ್ ಉಡುಪ ವಕೀಲರು ಇವರ ಪಾಟೀ ಸವಾಲಿಗೆ ಉತ್ತರಿಸುತ್ತಾ ಈ ಪ್ರಕರಣದ ಸುಮಾರು 3 ವರ್ಷಗಳ ಮೊದಲು ನನಗೆ ವಿನೋದ್ ಕುಮಾರ್ ಇವರು ಪರಿಚಯವಿರುತ್ತಾರೆ. ನನ್ನ ಮೇಲೆ ಟಿ.ವಿ ವರದಿ ಬಂದಿರುವುದು ನಿಜ, ಆ ಕೇಸಿನಲ್ಲಿ ನಾನು ಒಳಗಿದ್ದೆ, ನನ್ನನ್ನು ವಿನೋದ್ ಕುಮಾರ್ ಬಿಡಿಸಿದರು ಎಂದರೆ ಸರಿಯಲ್ಲ. ಸುಬ್ರಹ್ಮಣ್ಯ ಪುರ, ಕೊಟ್ಟಾರ ಚೌಕಿ ಮಂಗಳೂರು ವಿಳಾಸ ಡಾ: ಕೇಶವ ನಾಯಕನವರಿಗೆ ಸೇರಿದ್ದು, ನಾನು ಸುಮಾರು 9-00 ಗಂಟೆಗೆ ಆ ಸ್ಥಳಕ್ಕೆ ಹೋಗಿದ್ದೆ.
ನಮ್ಮ ಮನೆಯಿಂದ ಸುಬ್ರಹ್ಮಣ್ಯಪುರಕ್ಕೆ 8-00 ಕಿ.ಮೀ ಅಂತರವಿರುತ್ತದೆ. ಅಲ್ಲಿ ಹೋಗಲು ಏನೂ ವಿಶೇಷ ಕಾರಣ ಇರಲಿಲ್ಲ.
ವಿನೋದ್ ಕುಮಾರ್ ಕೊಟ್ಟಾರ ಚೌಕಿಯಲ್ಲಿ ಆ ದಿನ ಭೇಟಿಯಾಗಿದ್ದರು. ಅಲ್ಲಿಂದ ಅರ್ಧ ಕಿ.ಮೀ.ಅಂತರವಿತ್ತು.ನಾನು ನಡೆದುಕೊಂಡು ಹೋಗುವಾಗ ಒಬ್ಬಂಟಿಗನಾಗಿದ್ದೆ. ನಾನು ಹೋಗುವ ಸಮಯದಲ್ಲಿ ಆ ಸ್ಥಳದಲ್ಲಿ 6-8 ಜನ ಇದ್ದರು.
ಸುಬ್ರಹ್ಮಣ್ಯಪುರ ಹೈವೇಯಿಂದ 5 ಕಿ.ಮೀ ದೂರವಿದ್ದು ಆ ರಸ್ತೆ ಜೆ.ಬಿ. ಲೋಬೋ ಎಂಬ ಹೆಸರಿನಲ್ಲಿದೆ. ನಾನು ಹೋದ ಸ್ಥಳದಿಂದ ಅರ್ಧ ಗಂಟೆ ದೂರವಿರುತ್ತದೆ. ಮಹಜರನ್ನು ಯಾವ ಅದಿಕಾರಿ ಬರೆದಿರುವರು ಎಂದು ನನಗೆ ಗೊತ್ತಿಲ್ಲ. ನಾನು ಹೋಗುವಾಗ ಮಹಜರನ್ನು ಬರೆಯುತ್ತಾ ಇದ್ದರು. ಸದ್ರಿ ಸ್ಥಳದಲ್ಲಿ ಅಬಕಾರಿ ಇಲಾಖೆಯವರು ಎಷ್ಟು ಮಂದಿ ಇದ್ದರು ಎಂದು ನನಗೆ ಗೊತ್ತಿಲ್ಲ.ನಾನು ಆ ದಿವಸ ಅಲ್ಲಿಗೆ ಹೋಗಲಿಲ್ಲ ಎಂದರೆ ಸರಿಯಲ್ಲ. ವಿನೋದ್ ಕುಮಾರ್ ಅಬಕಾರಿ ಉಪ ನಿರೀಕ್ಷಕರು ನನ್ನ ಆಪ್ತ ಸ್ನೇಹಿತರು ,ದೂರವಾಣಿ ಮೂಲಕ ಕರೆ ಮಾಡಿರುವರು. ನಾನು ಯಾವುದೇ ಘಟನೆ ನೋಡಲಿಲ್ಲ ಎಂದೂ ವಿನೋದ್ ಕುಮಾರ್ ರವರ ಮುಲಾಜಿಗೆ ನಾನು ಸುಳ್ಳು ಸಾಕ್ಷಿ ಹೇಳುತ್ತಿದ್ದೇನೆ ಎಂದರೆ ಸರಿಯಲ್ಲ ಎಂದು ಪಾಟೀ ಸವಾಲಿಗೆ ಉತ್ತರಿಸಿರುತ್ತಾರೆ.
ಡಿಡಬ್ಲ್ಯೂ-1:
ಶ್ರೀ.ಕ್ಲಾಡಿ ಡಿಸೋಜ್, ಜಾನ್ ಬ್ಯಾಪ್ಟಿಸ್ಟ್ ಡಿಸೋಜ, ಪಡುಕೋಡಿ ಗ್ರಾಮ, ಮಂಗಳೂರು ಇವರು ದಿನಾಂಕ: 9-2-2010ರಂದು ಈ ಪ್ರಾದಿಕಾರದ ಮುಂದೆ ರಕ್ಷಣಾ ಸಾಕ್ಷಿ ನುಡಿಯುತ್ತಾ ನಾನು ಈ ಕೇಸಿನಲ್ಲಿ ಅರ್ಜಿದಾರ, ನಾನು KA- 19-P-1680 ಈ ಮಾರುತಿ ಒಮ್ನಿ ಕಾರಿನ ಮಾಲೀಕನಾಗಿರುತ್ತೇನೆ. ಅದರ ಬಿ ಎಕ್ಸ್ಟ್ರಾಕ್ಟ್ ಪ್ರತಿಯನ್ನು ಈ ಪ್ರಾದಿಕಾರಕ್ಕೆ ಹಾಜರುಪಡಿಸಿರುತ್ತೇನೆ. ಈಗಾಗಲೇ ಅದನ್ನು ನಿಶಾನೆ ಪಿ-4 ಎಂದು ಗುರುತಿಸಲ್ಪಟ್ಟಿದೆ. ದಿನಾಂಕ:3-11-2006ರಂದು ಪುತ್ತೂರಿಗೆ ಮದುವೆಗೆ ಹೊರಟ ನನ್ನ ಒಮಿನಿ ಕಾರಿನಲ್ಲಿ ಹೊರಟು ಪಂಪವೆಲ್ ಸರ್ಕಲ್ನಲ್ಲಿ ಅದನ್ನು ಇಟ್ಟು ಬಸ್ನಲ್ಲಿ ಹೋದೆನು. ನಾನು ಅಲ್ಲಿಂದ ತೆರಳುವಾಗ 7-30 ಗಂಟೆ ಆಗಿತ್ತು. ನಾವು ಕಾರನ್ನು ಪಂಪುವೆಲ್ ನಿಂದ ಹಿಡಿದು ಕೊಟ್ಟಾರ ಚೌಕಿ ಕಡೆ ಬರುತ್ತಿದ್ದಾಗ ರೈಟ್ ಸೈಡಿನಲ್ಲಿ ಅಬಕಾರಿ ರಕ್ಷಕರು, ಉಪ ನಿರೀಕ್ಷಕರು ನಿಲ್ಲಿಸಿದ್ದಕ್ಕೆ ನಾನು ಗಾಡಿಯನ್ನು ಇನ್ನೊಂದು ಬದಿ ನಿಲ್ಲಿಸಿ ಬಂದೆ,ಆಗ ಅಲ್ಲಿ ಎ.ಜೆ ಶೆಟ್ಟಿ ಕಂಪೆನಿಯ ಕೆಲವು ಮಂದಿ ಇದ್ದರು. ಅಲ್ಲಿ ನನ್ನನ್ನು ವಿನೋದ್ ಕುಮಾರ್ ರವರು ಜೀಪು ಹತ್ತಲು ಹೇಳಿದರು. ನಾನು ಮಾರುತಿ ಒಮಿನಿ ಕಾರಿನಲ್ಲಿ ಕಳ್ಳಭಟ್ಟಿ ಕೊಂಡುಹೋಗುತ್ತಿದ್ದೆ ಎಂದರೆ ಸುಳ್ಳು. ಎ.ಜೆ. ಶೆಟ್ಟಿ ಕಂಪೆನಿ ಮತ್ತು ನನಗೂ ನಮ್ಮ ಮನೆ ಹತ್ತಿರ ಬಂದು ಅವರು ಗಲಾಟೆ ಮಾಡಿದಕ್ಕೆ ಮಾತುಕತೆಯಾಗಿತ್ತು. ಅದಕ್ಕೆ ಬೇಕಾಗಿ ಅವರು ಇದನ್ನೆಲ್ಲಾ ಸೃಷ್ಟಿಸಿದ್ದರು. ನಾನು ಜಾಗ ವ್ಯಾಪಾರ ಮಾಡುತ್ತಿದ್ದೇನೆ, ನನಗೆ ಲಿಕ್ಕರ್ ಮಾರುವ ಅವಶ್ಯಕತೆ ಇಲ್ಲ. ನನ್ನ ಗಾಡಿಯನ್ನು ಬಿಡುಗಡೆಗೊಳಿಸಬೇಕಾಗಿ ನಾನು ಈ ಪ್ರಾದಿಕಾರದ ಮುಂದೆ ಕೇಳಿ ಕೊಳ್ಳುತ್ತಿದ್ದೇನೆ. ನಾನು ಆ ದಿವಸ ಮದುವೆಗೆ ಹೋದ ಬಗ್ಗೆ ಆಮಂತ್ರಣ ಪತ್ರಿಕೆಯನ್ನು ಈ ಪ್ರಾದಿಕಾರದ ಮುಂದೆ ಹಾಜರು ಪಡಿಸಿರುತ್ತೆನೆ ಎಂದು ರಕ್ಷಣಾ ಸಾಕ್ಷಿ ನುಡಿದಿರುತ್ತಾರೆ.
ಪಾಟೀ ಸವಾಲು:
ರಕ್ಷಣಾ ಸಾಕ್ಷಿದಾರರನ್ನು ಅಬಿಯೋಗ ನಿರ್ದೇಶಕರು ಪಾಟೀ ಸವಾಲು ನಡೆಸಲಾಗಿ ಎ.ಜೆ. ಶೆಟ್ಟಿ ಕಂಪೆನಿ ಅಧಿಕೃತ ಅಬಕಾರಿ ಗುತ್ತಿಗೆದಾರರು ಎಂದರೆ ಸರಿ. ಸದ್ರಿ ಕಂಪೆನಿ ಬಹಳ ವರ್ಷಗಳಿಂದ ಅದಿಕೃತ ಸಾರಾಯಿ ಗುತ್ತಿಗೆ ಪಡೆದಿರುತ್ತದೆ.
ಅವರು ಸರ್ಕಾರದ ಬೊಕ್ಕಸಕ್ಕೆ ತೆರಿಗೆ ತುಂಬಲು ವ್ಯವಹಾರ ಮಾಡಬೇಕಾಗಿರುತ್ತದೆ. ಅಂತಹ ಸಂದರ್ಭದಲ್ಲಿ ಯಾರಾದರೂ ಅನದಿಕೃತವಾಗಿ ಕಳ್ಳಭಟ್ಟಿ ಸಾರಾಯಿ ದಂದೆಯಲ್ಲಿ ತೊಡಗಿದರೆ ಅದಿಕೃತ ಕಂಪೆನಿಗೆ ನಷ್ಟ ಉಂಟಾಗುತ್ತದೆ ಎಂದರೆ ಸರಿ.
ಸರ್ಕಾರದ ಬೊಕ್ಕಸಕ್ಕೆ ತೊಂದರೆ ಆಗಬಾರದು ಹಾಗೂ ಸಾರ್ವಜನಿಕರು ಅನದಿಕೃತವಾಗಿ ಸಾರಾಯಿ ದಂದೆಯಲ್ಲಿ ಮುಳುಗಿ ಸಾರ್ವಜನಿಕರ ಆರೋಗ್ಯ ನೆಮ್ಮದಿಗೆ ಭಂಗ ಬರಬಾರದು ಎಂಬ ಹಿನ್ನಲೆಯಲ್ಲಿ ಅಬಕಾರಿ ಅದಿಕಾರಿಗಳು ಕರ್ತವ್ಯ ನಿರ್ವಹಿಸುತ್ತಿದ್ದಾರೆ ಎಂದರೆ ಸರಿ. ನಾನು ಈ ಘಟನೆ ನಡೆಯುವ ಹಿಂದೆಯೆ ನನ್ನ ಮುಖ್ಯ ವಿಚಾರಣೆಯಲ್ಲಿ ಹೇಳಿದಂತೆ ಎ.ಜೆ ಶೆಟ್ಟಿ ಸಂಸ್ಥೆಯ ಜನರನ್ನು ಸುಮಾರು 6 ವರ್ಷಗಳಿಂದ ನೋಡಿರುತ್ತೇನೆ. ಅವರಲ್ಲಿ ನಾನು ವೈಯಕ್ತಿಕವಾಗಿ ಮಾತನಾಡಿ ರುವುದಿಲ್ಲ. ನನಗೂ ಎ.ಜೆ. ಶೆಟ್ಟಿ ಸಂಸ್ಥೆಗೂ ಯಾವುದೇ ವ್ಯವಹಾರ ಇರಲಿಲ್ಲ. ನನಗೂ ಎ.ಜೆ. ಶೆಟ್ಟಿ ಸಂಸ್ದೆಗೂ ಯಾವುದೇಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೨೯೬೭ ರೀತಿಯ ಸಂಬಂಧವು ಇರಲಿಲ್ಲ. ನನ್ನ ಯಾವುದೇ ವ್ಯವಹಾರದಲ್ಲಿ ಎ.ಜೆ. ಶೆಟ್ಟಿ ಸಂಸ್ಥೆ ಹಸ್ತಕ್ಷೇಪ ಮಾಡಿಲ್ಲ, ಮಂಗಳೂರು ನಗರದಲ್ಲಿ ಸಾಮಾನ್ಯವಾಗಿ ಕಳ್ಳಭಟ್ಟಿ ದಂದೆಯಲ್ಲಿ ಕೆಲವರು ತೊಡಗಿರುತ್ತಾರೆ. ಕಳ್ಳಭಟ್ಟಿ ದಂದೆಯಲ್ಲಿ ತೊಡಗಿದ್ದಲ್ಲಿ ಅಬಕಾರಿ ಇಲಾಖೆಯವರಿಗೆ ನೇರವಾಗಿ ಗೌಪ್ಯವಾಗಿ ಮಾಹಿತಿ ಹೋಗಿರುತ್ತದೆ .
ನಾನು ಮೇಲೆ ಹೇಳಿದ ದಿನದಂದು ಒಬ್ಬನೇ ಪುತ್ತೂರಿಗೆ ಮದುವೆಗೆ ಹೋಗಿರುತ್ತೇನೆ. ಪಂಪ್ ವೆಲ್ನಿಂದ ಪುತ್ತೂರಿಗೆ ರಾಷ್ಟ್ರೀಯ ಹೆದ್ದಾರಿ ದುರಸ್ತಿಯಲ್ಲಿರುವ ಕಾರಣ ನನ್ನ ವಾಹನವನ್ನು ಪಂಪುವೆಲ್ನಲ್ಲಿ ಬಿಟ್ಟು ಬಸ್ಸಿನಲ್ಲಿ ಹೋಗಿರುತ್ತೇನೆ. ಆ ದಿವಸ ಬೇರೆ ಎಷ್ಟೋ ವಾಹನಗಳು ಪಂಪುವೆಲ್ನಿಂದ ಪುತ್ತೂರಿಗೆ ಪ್ರಯಾಣಿಸಿದೆ. ಸದ್ರಿ ದಿವಸ ಪುತ್ತೂರಿನಲ್ಲಿ ಮದುವೆ ಇರಲಿಲ್ಲ ಹಾಗೂ ನಾನು ಮದುವೆಗೆ ಹೋಗಲಿಲ್ಲ ಎಂದರೆ ಸರಿಯಲ್ಲ. ನಾನು ದಿನಾಂಕ:
3-11-2006ಕ್ಕೆ ಮುಂಚೆ ಮೇಲೆ ಹೇಳಿದ ಅಬಕಾರಿ ನಿರೀಕ್ಷಕರನ್ನು ನೋಡಿರುವುದಿಲ್ಲ. ನನಗೂ ಎಜೆ ಶೆಟ್ಟಿ ಸಂಸ್ಥೆ ಜನರಿಗೂ ವೈಯಕ್ತಿಕವಾಗಿ ಯಾವುದೇ ದ್ವೇಷ ಇರುವುದಿಲ್ಲ. ನನ್ನ ಹಾಗೆ ಉಳಿದವರಿಗೂ ಕೂಡ ಎಜೆ ಶೆಟ್ಟಿ ಸಂಸ್ಥೆಯವರು ಸುಳ್ಳು ಕೇಸು ಹಾಕಿಸಿರುತ್ತಾರೆ. ಅದು ಯಾವ ಕಾರಣಕ್ಕಾಗಿ ಸುಳ್ಳು ಕೇಸು ಹಾಕಿರುತ್ತಾರೆ ಎಂದು ನನಗೆ ಗೊತ್ತಿಲ್ಲ. ಕಳೆದ 15 ವರ್ಷಗಳಿಂದ ನಾನು ಭೂ ವ್ಯವಹಾರ ನಡೆಸುತ್ತಾ ಬಂದಿರುತ್ತೇನೆ. ನಾನು ದಾಖಲೆಯಲ್ಲಿ ಭೂ ವ್ಯವಹಾರ ಮಾಡುವುದಿಲ್ಲ ನನ್ನ ಹೆಸರಲ್ಲಾಗಲಿ,ನನ್ನ ಕುಟುಂಬದವರಲ್ಲಾಗಲಿ ನಾನು ಮಾಡುತ್ತಿರುವ ಭೂವ್ಯವಹಾರಕ್ಕೆ ಯಾವುದೇ ದಾಖಲೆ ಇರುವುದಿಲ್ಲ. ನನಗೆ ಭೂ ವ್ಯವಹಾರ ಬಗ್ಗೆ ಆಗಲಿ ಅಥವಾ ಇತರ ಮೂಲದಿಂದಾಗಲೀ ಎಷ್ಟು ಆದಾಯ ಇದೆ ಎಂದು ತೋರಿಸಲು ಯಾವುದೇ ದಾಖಲೆ ಇಲ್ಲ. ದಿನಾಂಕ:3-11-2006ರಂದು ರಾತ್ರಿ 9 ಗಂಟೆ ಸಮಯ ಮಂಗಳೂರು ನಗರ ಕೊಟ್ಟಾರ ಚೌಕಿಯಲ್ಲಿ ನನ್ನ ಮಾರುತಿ ವ್ಯಾನ್ ಸಂ:KA-19-P-1680 ರಲ್ಲಿ ಅಕ್ರಮವಾಗಿ 9 ರಬ್ಬರ್ ಟ್ಯೂಬ್ನಲ್ಲಿ ಕಳ್ಳಭಟ್ಟಿ ಸಾರಾಯಿಯನ್ನು ಸಾಗಾಣಿಕೆ ಮಾಡುತ್ತಿದ್ದಾಗ ಅಬಕಾರಿ ಇಲಾಖೆಯವರು ವಾಹನ ಸಮೇತ ಅದನ್ನು ಜಪ್ತು ಮಾಡಿ ನನ್ನ ವಿರುದ್ದ ಪ್ರಕರಣ ದಾಖಲಿಸಿಕೊಂಡಿರುತ್ತಾರೆ ಎಂದರೆ ಸರಿ ಅಲ್ಲ. ನಾನು ನನ್ನ ವಾಹನದ ಮುಟ್ಟುಗೋಲು ಪ್ರಕರಣದಿಂದ ತಪ್ಪಿಸಿಕೊಳ್ಳಲು ಈ ಪ್ರಾದಿಕಾರದಲ್ಲಿ ಸುಳ್ಳು ಸಾಕ್ಷಿ ಹೇಳುತ್ತಿದ್ದೇನೆ ಎಂದರೆ ಸರಿಯಲ್ಲ ಎಂದು ಅಬಿಯೋಜಕರ ಪಾಟೀ ಸವಾಲಿಗೆ ಉತ್ತರಿಸಿರುತ್ತಾರೆ.
- ಮಾರುತಿ ಒಮಿನಿ ವ್ಯಾನ್ ಇದರ ಮಾಲೀಕರೇ ಪ್ರಕರಣದಲ್ಲಿ ಮುಖ್ಯ ಅರೋಪಿತ ವ್ಯಕ್ತಿಯಾಗಿದ್ದು ಸದ್ರಿಯವರಿಗೆ ಪ್ರಾದಿಕಾರದಿಂದ ನೊಂದಣಿ ಅಂಚೆ ಮೂಲಕ ನೀಡಲಾದ ಕಾರಣ ಕೇಳಿ ನೋಟೀಸು ಜ್ಯಾರಿಯಾಗಿದ್ದರೂ ಸದ್ರಿಯವರಿಂದ ಯಾವುದೇ ಉತ್ತರ ಈ ಪ್ರಾದಿಕಾರದಲ್ಲಿ ಸ್ವೀಕೃತವಾಗಿರುವುದಿಲ್ಲ. ವಾಹನದ ಮಾಲೀಕರು ವಾಹನದ ಬಿಡುಗಡೆ ಬಗ್ಗೆ ವಕೀಲರ ಮೂಲಕ ಮಧ್ಯಂತರ ಬಿಡುಗಡೆಗೆ ಕೋರಿರುವುದು ಮಾತ್ರವಲ್ಲದೇ ಪ್ರಾದಿಕಾರದಿಂದ ನೀಡಲಾದ ಕಾರಣ ಕೇಳಿ ನೋಟಿಸಿಗೆ ಯಾವುದೇ ಸಮಂಜಸ ಉತ್ತರ ನೀಡಿ, ತನ್ನ ನಿರಪರಾದಿತ್ವವನ್ನು ಸಾಬೀತುಪಡಿಸಿಕೊಳ್ಳುವ ಯಾವುದೇ ಸಮಂಜಸ ಸಾಕ್ಷ್ಯಾಧಾರಗಳನ್ನು ಒದಗಿಸಲು ವಿಫಲರಾಗಿರುತ್ತಾರೆ. ವಾಹನದ ಮಾಲೀಕರು ರಕ್ಷಣಾ ಸಾಕ್ಷಿ ನೀಡುತ್ತಾ ಕೃತ್ಯ ನಡೆದ ದಿನದಂದು ತಾನು ಪುತ್ತೂರಿಗೆ ಮದುವೆಗೆ ಹೋಗಲು ಕಾರಿನಲ್ಲಿ ಬಂದು ಕಾರನ್ನು ಪಂಪುವೆಲ್ ಸರ್ಕಲ್ ಬಳಿ ಇಟ್ಟಿರುತ್ತೇನೆ ಎಂದು ಹೇಳಿದ್ದು, ಪ್ರಾದಿಕಾರದ ಮುಂದೆ ಈ ಬಗ್ಗೆ ತನ್ನ ವಕೀಲರ ಮೂಲಕ ಆಮಂತ್ರಣ ಪತ್ರಿಕೆಯೊಂದನ್ನು ಸಲ್ಲಿಸಿದ್ದು, ಸದ್ರಿ ಆಮಂತ್ರಣ ಪ್ರತಿಕೆಯು ದಿನಾಂಕ:27-12-2009 ರಂದು ಸ್ಟೆಂಟ್ ಪ್ರಾನ್ಸಿಸ್ ಜೇವಿಯರ್ಸ್ ಚರ್ಚ್, ಬಿಜೈ, ಮಂಗಳೂರು ಇಲ್ಲಿ ನಡೆದ ಮದುವೆಯ ಆಮಂತ್ರಣ ಪತ್ರಿಕೆಯಾಗಿದ್ದು, ಇದು ಒಂದಕ್ಕೊಂದು ತಾಳೆಕಂಡು ಬಾರದೇ ಇರುವುದರಿಂದ ವಾಹನದ ಮಾಲೀಕರು ತನ್ನ ತಪ್ಪನ್ನು ಮರೆಮಾಚಿಕೊಳ್ಳಲು ಕೃತ್ರಿಮ ದಾಖಲಾತಿಗಳನ್ನು ಒದಗಿಸಿರುವುದು ಪ್ರಾದಿಕಾರಕ್ಕೆ ↩
ಪ್ರಕರಣದ ಎಲ್ಲಾ ದಾಖಲಾತಿಗಳನ್ನು ಮತ್ತು ಪ್ರಾ.ಸಾ-1 ಮತ್ತು 2 ಹಾಗೂ ರಕ್ಷಣಾ ಸಾಕ್ಷಿ ವಿಚಾರಣೆಯನ್ನುಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೨೯೬೮ ಮನವರಿಕೆಯಾಗಿರುತ್ತದೆ. ಅಲ್ಲದೇ ವಾಹನದ ಮಾಲೀಕರು ವಾಹನದ ಮಧ್ಯಂತರ ಬಿಡುಗಡೆಗಾಗಿ ಸಲ್ಲಿಸಲಾಗಿದ್ದ ಅರ್ಜಿಯ ಜೊತೆಯಲ್ಲಿ ಲಗತ್ತಿಸಲಾದ ಆಮಂತ್ರಣ ಪತ್ರವನ್ನು ಪರಿಶೀಲಿಸಿದಾಗ ಪ್ರಕರಣ ನಡೆದ ದಿನವೇ ಮದುವೆ ಸಮಾರಂಭವು ನಡೆದಿರುವುದು ಸಾಬೀತಾಗಿದ್ದರೂ, ಮದುವೆಯ ಮಹೂರ್ತ ಸಮಯವು ಪೂರ್ವಾಹ್ನ 11-00 ಗಂಟೆಯಾಗಿದ್ದು, ಕೃತ್ಯ ನಡೆದ ಸಂದರ್ಭವು ರಾತ್ರಿ ಸುಮಾರು 9-00 ಗಂಟೆಯಾಗಿರುವುದರಿಂದ ಅಲ್ಲಿಯ ತನಕ ವಾಹನವನ್ನು ಪಂಪುವೆಲ್ ಎಂಬ ಜಾಗದಲ್ಲಿ ನಿಲ್ಲಿಸಲಾಗಿರುತ್ತದೆ ಎಂಬುದನ್ನು ಸಾಬೀತುಪಡಿಸಲು ಯಾವೊಂದು ಸಾಕ್ಷ್ಯಗಳನ್ನು ಒದಗಿಸಿರುವುದಿಲ್ಲ. ಹಾಗೂ ಸದ್ರಿ ದಾಖಲೆಗಳನ್ನು ಪ್ರಮುಖ ದಾಖಲೆಗಳೆಂದು ಪರಿಗಣಿಸಲು ಸಾಧ್ಯವಾಗುವುದಿಲ್ಲ. ಕಾರಣ ವಾಹನದ ಮಾಲೀಕರು ತನ್ನ ನಿರುಪಾದಿತ್ವವನ್ನು ಸೂಕ್ತ ದಾಖಲಾತಿಗಳೊಂದಿಗೆ ಸಾಬೀತುಪಡಿಸಲು ವಿಪಲರಾಗಿರುವುದರಿಂದ ಹಾಗೂ ವಾಹನದ ಮಾಲೀಕರು ಈ ಹಿಂದೆ ಹಲವಾರು ಕಳ್ಳಭಟ್ಟಿ ಪ್ರಕರಣಗಳಲ್ಲಿ ಪಾಲ್ಗೊಂಡಿದ್ದು ಓರ್ವ ವೃತ್ತಿಪರ ಕಳ್ಳಭಟ್ಟಿ ದಂಧೆಯಲ್ಲಿ ತೊಡಗಿರುವ ವ್ಯಕ್ತಿಯಾಗಿರುವುದರಿಂದ ಹಾಗೂ ಅಪರಾಧ ಸ್ಥಳದಲ್ಲಿ ವಾಹನವನ್ನು ನಿಲ್ಲಿಸಿ ತಪಾಸಣೆಗೆ ಒಳಪಡಿಸಿದ ಸಂದರ್ಭದಲ್ಲಿ ವಾಹನದ ಮಾಲೀಕರೇ ಆರೋಪಿಯಾಗಿ ದಸ್ತಗಿರಿಯಾಗಿದ್ದು, ಈ ಅಕ್ರಮವು ವಾಹನದ ಮಾಲೀಕರ ತಿಳುವಳಿಕೆಯಿಂದಲೇ ನಡೆದಿದೆ ಎಂಬುದು ಪ್ರಾದಿಕಾರಕ್ಕೆ ಮನದಟ್ಟಾಗಿರುವುದರಿಂದ ಎರಡನೆಯ ಅಂಶವನ್ನು ನಕಾರಾತ್ಮಕವಾಗಿ ಪರಿಗಣಿಸಿದೆ.
ಈ ಮೇಲಿನ ಎಲ್ಲಾ ಕಾರಣಗಳಿಂದ ಅಬಿಯೋಗದ ಪರ ಸಾಕ್ಷಿಗಳ ಹಾಗೂ ರಕ್ಷಣಾ ಸಾಕ್ಷಿಗಳ ವಿಚಾರಣೆ ಹಾಗೂ ಲಭ್ಯವಿರುವ ದಾಖಲಾತಿಗಳಿಂದ ಈ ಪ್ರಕರಣದಲ್ಲಿ ಜಪ್ತು ಪಡಿಸಲಾಗಿರುವ ಮಾರುತಿ ಒಮಿನಿ ವ್ಯಾನನ್ನು ಸರ್ಕಾರಕ್ಕೆ ಮುಟ್ಟುಗೋಲು ಹಾಕಿಕೊಳ್ಳಲು ಪ್ರಾದಿಕಾರದಲ್ಲಿ ನಡೆಸಲಾದ ವಿಚಾರಣೆಯ ಸಾಕ್ಷ್ಯಾಧಾರಗಳು ಯೋಗ್ಯವೆಂದು ತೀರ್ಮಾನಿಸಿ, ಈ ಪ್ರಕರಣದಲ್ಲಿ ಜಪ್ತು ಪಡಿಸಲಾಗಿರುವ KA-19-P-1680 ಮಾರುತಿ ಒಮಿನಿ ವ್ಯಾನ್ನ್ನು ಸರ್ಕಾರಕ್ಕೆ ಮುಟ್ಟುಗೋಲು ಹಾಕಿಕೊಂಡು ಈ ಕೆಳಗಿನಂತೆ ಆದೇಶ ಹೊರಡಿಸಲಾಗಿದೆ.
ಆದೇಶ
ನೂರ್ ಮಹಮ್ಮದ್ ಹುಸೇನ್, ಅದಿಕೃತ ಅದಿಕಾರಿ ಹಾಗೂ ಡೆಪ್ಯುಟಿ ಕಮೀಷನರ್ ಆಫ್ ಎಕ್ಸೈಜ್, ದ.ಕ.ಜಿಲ್ಲೆ, ಮಂಗಳೂರು ಆದ ನಾನು ಕರ್ನಾಟಕ ಅಬಕಾರಿ ಕಾಯಿದೆ 1965ರ ಕಲ0 43ಎ ಅಡಿಯಲ್ಲಿ ದತ್ತವಾದ ಅದಿಕಾರವನ್ನು ಚಲಾಯಿಸಿ,ನಿಯಮ 43 ಬಿ ರಲ್ಲಿ ಅನುಸರಿಸಬೇಕಾದ ಕ್ರಮಗಳನ್ನು ಜರುಗಿಸಿದ ನಂತರ ಅಬಕಾರಿ ಉಪ ನಿರೀಕ್ಷಕರು(1),ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೨೯೬೯
ಅನುಬಂಧ-I
ಪಿರ್ಯಾದುದಾರರ ಪರ ಮಂಡಿಸಲಾದ ಸಾಕ್ಷಿಗಳ ವಿವರ:
ಪ್ರಾ.ಸಾ-I : ಶ್ರೀ ವಿನೋದ್ ಕುಮಾರ್,ಅಬಕಾರಿ ಉಪ ನಿರೀಕ್ಷಕರು
ಮಂಗಳೂರು ಉತ್ತರ ವಲಯ-1
ಪ್ರಾ.ಸಾ-2 : ಶ್ರೀ ಲಲಿತ್ರಾವ್, ಪ್ಲಾಟ್ ಸಂ:193 ದೀಪಾ ಪಾರ್ಕ್
ಎಂ.ಜಿ.ರಸ್ತೆ, ಮಂಗಳೂರು.
ಅನುಬಂಧ-II
ಪಿರ್ಯಾದುದಾರರ ಪರ ಮಂಡಿಸಲಾದ ದಾಖಲೆಗಳು:
ನಿಶಾನೆ ಪಿ-I : ಮಹಜರು ಪ್ರತಿ
ನಿಶಾನೆ ಪಿ-Iಎ : ಅದರ ಮೇಲಿನ ಸಹಿ
ನಿಶಾನೆ ಪಿ-2 : ಪ್ರಥಮ ಮಾಹಿತಿ ವರದಿ
ನಿಶಾನೆ ಪಿ-2 ಎ : ಅದರ ಮೇಲಿನ ಸಾಕ್ಷಿ ಸಹಿ
ನಿಶಾನೆ ಪಿ-3 : ರಾಸಾಯನಿಕ ವಿಶ್ಲೇಷಣಾ ವರದಿ
ನಿಶಾನೆ ಪಿ-4 : ಬಿ ಎಕ್ಸ್ ಟ್ರಾಕ್ಟ್ ವರದಿ
ನಿಶಾನೆ ಪಿ-5 : ತನಿಖಾ ವರದಿ
ನಿಶಾನೆ ಪಿ-5 ಎ : ಅದರ ಮೇಲಿನ ಸಾಕ್ಷಿ ಸಹಿ
ಅನುಬಂಧ-III
ವಾಹನ ಮಾಲೀಕರ ಪರವಾಗಿ ವಿಚಾರಣೆ ಮಾಡಲಾದ ಸಾಕ್ಷಿದಾರರು :
ಡಿಡಬ್ಲ್ಯೂ-1: ಶ್ರೀ ಕ್ಲಾಡಿ ಡಿಸೋಜ, ಬಿನ್ ಬ್ಯಾಪ್ಟಿಸ್ಟ್ ಡಿಸೋಜಾ ಕೂಳೂರು ರಾಯಿಕಟ್ಟೆ ಹೌಸ್, ಪಡುಕೋಡಿ ಗ್ರಾಮ, ಮಂಗಳೂರು.
ಅನುಬಂಧ-IV
ವಾಹನ ಮಾಲೀಕರ ಪರವಾಗಿ ಗುರುತಿಸಲಾದ ದಾಖಲೆಗಳು: - ಇಲ್ಲ-
ನೂರ್ ಮಹಮ್ಮದ್ ಹುಸೇನ್
ಅಧಿಕೃತ ಅಧಿಕಾರಿಗಳು ಹಾಗೂ ಪಿ.ಆರ್.916
ಡೆಪ್ಯೂಟಿ ಕಮೀಷನರ್ ಆಫ್ ಎಕ್ಸೈಜ್,
ದಕ್ಷಿಣ ಕನ್ನಡ ಜಿಲ್ಲೆ, ಮಂಗಳೂರು.
ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರು, ಲೋಕೋಪಯೋಗಿ, ಬಂದರು ಮತ್ತು ಒಳನಾಡು ಜಲಸಾರಿಗೆ ಇಲಾಖೆ,
ಗುಲಬರ್ಗಾ ವೃತ್ತ, ಗುಲಬರ್ಗಾ
4 (1) (ಎ)
ಈ ಅಧಿನಿಯಮದ ಅಡಿಯಲ್ಲಿ ಮಾಹಿತಿ ಹಕ್ಕಿಗಾಗಿ ಅನುಕೂಲ ಮಾಡಿಕೊಡುವ ರೀತಿಯಲ್ಲಿ ಮತ್ತು ನಮೂನೆಯಲ್ಲಿ ಈ ವೃತ್ತ ಕಛೇರಿಯ ಎಲ್ಲಾ ಮಾಹಿತಿಯನ್ನು ಕ್ರಮಬದ್ಧ ಸೂಚಿಪಟ್ಟಿಯಲ್ಲಿ ಈಗಾಗಲೇ ಗಣಕೀಕರಿಸಲಾಗಿದೆ. ಹಾಗೂ ಸರಕಾರದ ಮಟ್ಟದಲ್ಲಿ ಅಂತಹ ದಾಖಲೆಗಳು ಸುಲಭವಾಗಿ ದೊರೆಯುವಂತೆ ಸಿಸ್ಟಂನಲ್ಲಿ ಅಳವಡಿಸಲು ಸಹ ಸಲ್ಲಿಸಲಾಗಿದೆ. ಇಲಾಖೆಯ ಗಣಕೀಕರಣ ಪದ್ಧತಿಯಡಿ ಇಲಾಖೆಯ ವಿವಿಧ ಚಟುವಟಿಕೆಗಳ ಬಗ್ಗೆ ಎಂಪಿಕ್ ಮಾದರಿಯಲ್ಲಿ ಇಲಾಖೆಯ ವೆಬ್ಸೈಟ್ಗೆ ( KPWD.Gov.in ) ಮಾಹಿತಿಗಳನ್ನು ಅಳವಡಿಸಲಾಗಿದೆ.
ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರು, ಲೋಕೋಪಯೋಗಿ, ಬಂದರು ಮತ್ತು ಒಳನಾಡು ಜಲಸಾರಿಗೆ ಇಲಾಖೆ, ಗುಲಬರ್ಗಾ ವೃತ್ತದ ಕಡತ ಮತ್ತು ರಜಿಸ್ಟರಗಳ ದಾಖಲಾತಿಗಳ 4 (1) (ಚಿ) ಪ್ರಕಾರ ಪಟ್ಟಿಯ ರಜಿಸ್ಟರ್ (2009-10 ನೇ ಸಾಲಿನ)
| ಕ್ರ. ಸಂ. | ಕಡತದ ಸಂಖ್ಯೆ | ವಿಷಯ | ಇರುವ ಸ್ವರುಾಪ | ಷರಾ | ||
| 1 | 2 | 3 | 4 | 5 | ||
| 1) | 1) | ನಿಯತಕಾಲಿಕೆ ರಜಿಸ್ಟರ್ | ಅಭಿಲೇಖಾಲಯದಲ್ಲಿ ಸುರಕ್ಷಿತವಾಗಿ ಇರಿಸಿದೆ. | |||
| 2) | 2) | ವಿಷಯ ವಹಿ | ||||
| 3) | 3) | ಕಾರ್ಯನಿರ್ವಾಹಣಾ ರಜಿಸ್ಟರ್ | ||||
| 4) | 4) | ನೌಕರರ ಸೇವಾ ಪುಸ್ತಕ | ||||
| 5) | 5) | ಮಾಹಿತಿ ಹಕ್ಕು ಅಧಿನಿಯಮ ರಜಿಸ್ಟರ್ | ||||
| 6) | 6) | ಇನ್ಕಂಬ್ರೆನ್ಸಿ ವಹಿ | ||||
| 7) | 7) | ಆಕಸ್ಮಿಕ ರಜಾ ವಹಿ | ||||
| 8) | 8) | ಸ್ಥಳೀಯ ಬಟವಾಡೆ ರಜಿಸ್ಟರ್ | ||||
| 9) | 9) | ಶುದ್ಧ ಪ್ರತಿ ವಹಿ | ||||
| 10) | 10) | ರಹಸ್ಯ ವರದಿಗಳ ದಾಖಲೆಗಳ ವಹಿ |
ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರು, ಲೋಕೋಪಯೋಗಿ, ಬಂದರು ಮತ್ತು ಒಳನಾಡು ಜಲಸಾರಿಗೆ ಇಲಾಖೆ, ಗುಲಬರ್ಗಾ
| ಕ್ರ. ಸಂ. | ಕಡತದ ಸಂಖ್ಯೆ | ವಿಷಯ | ಇರುವ ಸ್ವರುಾಪ | ಷರಾ |
| 1 | 2 | 3 | 4 | 5 |
| 11) | 11) | ಕ್ಯಾಶ್ಬುಕ್ ರಜಿಸ್ಟರ್ | ಅಭಿಲೇಖಾಲಯದಲ್ಲಿ ಸುರಕ್ಷಿತವಾಗಿ ಇರಿಸಿದೆ. | |
| 12) | 12) | ಸಂಬಳ ಪಟ್ಟಿ ರಜಿಸ್ಟರ್ | ||
| 13) | 13) | ಟಿ.ಎ.ಬಿಲ್ಲು ರಜಿಸ್ಟರ್ | ||
| 14) | 14) | ಸ್ಟಾಕ್ ರಜಿಸ್ಟರ್ | ||
| 15) | 15) | ಸಿಬ್ಬಂದಿ ಹಾಜರಿ ಪುಸ್ತಕ | ||
| 16) | 16) | ಡಿ.ಸಿ.ಬಿಲ್ಲು ರಜಿಸ್ಟರ್ | ||
| 17) | 17) | ಸ್ಟಾಂಪ್ ವಹಿ | ||
| 18) | 18) | ವಿಧಾನಪರಿಷತ್, ವಿಧಾನಸಭೆ ಸದಸ್ಯರ ಪ್ರಶ್ನೆಗಳಿಗೆ ಉತ್ತರ ಕಳುಹಿಸುವ ಚಲನ ವಲನ ವಹಿ. | ||
| 19) | 19) | 3 ನೇ ದರ್ಜೆ ಗುತ್ತಿಗೆದಾರರ ನೋಂದಣಿ : ನವೀಕರಣ ವಹಿ. | ||
| 20) | 20) | ಕಛೇರಿ ಆದೇಶ ವಹಿ. |
ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರು, ಲೋಕೋಪಯೋಗಿ, ಬಂದರು ಮತ್ತು ಒಳನಾಡು ಜಲಸಾರಿಗೆ ಇಲಾಖೆ, ಗುಲಬರ್ಗಾ
| ಕ್ರ. ಸಂ. | ಕಡತದ ಸಂಖ್ಯೆ | ವಿಷಯ | ಇರುವ ಸ್ವರುಾಪ | ಷರಾ |
| 1 | 2 | 3 | 4 | 5 |
| 21) | 21) | ತಾಂತ್ರಿಕ ಮಂಜೂರಾತಿ | ಅಭಿಲೇಖಾಲಯದಲ್ಲಿ ಸುರಕ್ಷಿತವಾಗಿ ಇರಿಸಿದೆ. | |
| 22) | 22) | ಸಿಬ್ಬಂದಿಯ ಫೈಲ್ | ||
| 23) | 23) | ಆಪೆಂಡಿಕ್ಸ್-ಇ ಪುಸ್ತಕ | ||
| 24) | 24) | ಅನುಮೋದಿತ ಟೆಂಡರ್ ರಜಿಸ್ಟರ್ | ||
| 25) | 25) | ಸ್ಟಾಂಪ್ ವಹಿ | ||
| 26) | 26) | ಶಿಸ್ತು ಪ್ರಕರಣಗಳ ನಿಗಾ ವಹಿ | ||
| 27) | 27) | ಸಾಮಾನ್ಯ ಸ್ವೀಕೃತಿ ವಹಿ | ||
| 28) | 28) | ದರಪಟ್ಟಿ ವಹಿ | ||
| 29) | 29) | ಗ್ರಂಥಾಲಯ ಪುಸ್ತಕಗಳ ವಹಿ. |
ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರು, ಲೋಕೋಪಯೋಗಿ, ಬಂದರು ಮತ್ತು
ಒಳನಾಡು ಜಲಸಾರಿಗೆ ಇಲಾಖೆ, ಗುಲಬರ್ಗಾ ವೃತ್ತ, ಗುಲಬರ್ಗಾ
(2009-10 ನೇ ಸಾಲಿನ)
ಮಾಹಿತಿ ಹಕ್ಕು ಕೈಪಿಡಿ
ಮಾಹಿತಿ ಹಕ್ಕು ಅಧಿನಿಯಮ 2005 ರ
ಸೆಕ್ಷನ್ 4 (1) (ಎ) ರನ್ವಯ
ಪ್ರಕಟಿಸಲಾಗಿರುವ ಮಾಹಿತಿ
ಮಾಹಿತಿ ಹಕ್ಕು ಕೈಪಿಡಿ
ಮಾಹಿತಿ ಹಕ್ಕು ಅಧಿನಿಯಮ 2005 ರ
ಸೆಕ್ಷನ್ 4(1) (ಬಿ) ರನ್ವಯ
ಪ್ರಕಟಿಸಲಾಗಿರುವ ಮಾಹಿತಿ
ಮಾಹಿತಿ ಹಕ್ಕು ಅಧಿನಿಯಮ 2005 ರಡಿ 4 (1) (b)
ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರು, ಲೋಕೋಪಯೋಗಿ, ಬಂದರು ಮತ್ತು ಒಳನಾಡು ಜಲಸಾರಿಗೆ ಇಲಾಖೆ,
ಗುಲಬರ್ಗಾ ವೃತ್ತ, ಗುಲಬರ್ಗಾ
(i) ರಚನೆ, ಕಾರ್ಯಗಳು ಮತ್ತು ಕರ್ತವ್ಯಗಳ ವಿವರಗಳು
ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರು, ಲೋಕೋಪಯೋಗಿ, ಬಂದರು ಮತ್ತು ಒಳನಾಡು ಜಲಸಾರಿಗೆ ಇಲಾಖೆ, ಗುಲಬರ್ಗಾ ವೃತ್ತ ಗುಲಬರ್ಗಾ ಕಛೇರಿಯು 3 ವಿಭಾಗಗಳನ್ನೊಳಗೊಂಡು 1 ವಿದ್ಯುತ್ ಉಪ-ವಿಭಾಗ, ಗುಲಬರ್ಗಾ ಮತ್ತು 18 ಉಪ- ವಿಭಾಗಗಳು ಇರುತ್ತವೆ. ವಿವರಗಳು ಈ ಕೆಳಗಿನಂತಿವೆ.
| ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರು | |||||
| ವಿದ್ಯುತ್ ಉಪ- ವಿಭಾಗ, ಗುಲಬರ್ಗಾ | ಗುಲಬರ್ಗಾ ವಿಭಾಗ | ಯಾದಗಿರ ವಿಭಾಗ | ಬೀದರ ವಿಭಾಗ | ||
| 1 | 2 | 3 | 4 | ||
| ವಿದ್ಯುತ್ ಉಪ- ವಿಭಾಗ, ಗುಲಬರ್ಗಾ | ಗುಲಬರ್ಗಾ | ಯಾದಗಿರ | ಬೀದರ | ||
| ಚಿಂಚೋಳಿ | ಸೇಡಂ | ಹುಮನಾಬಾದ | |||
| ಆಳಂದ | ಜೇವರ್ಗಿ | ಬಸವಕಲ್ಯಾಣ | |||
| ಅಫಜಲ್ಪೂರ | ಶಹಾಪೂರ | ಭಾಲ್ಕಿ | |||
| ಚಿತ್ತಾಪೂರ | ಸುರಪೂರ | ಸಂತಪೂರ (ಔರಾದ) | |||
| ಕಾಳಗಿ | ವಿಶೇಷ ಉಪ-ವಿಭಾಗ, ಬೀದರ | ||||
| ವಿಶೇಷ ಉಪ-ವಿಭಾಗ, ಗುಲಬರ್ಗಾ |
(ii) ಅಧಿಕಾರಿಗಳ ಮತ್ತು ನೌಕರರ ಅಧಿಕಾರಗಳನ್ನು ಮತ್ತು ಕರ್ತವ್ಯಗಳು.
1) ಮೇಲೆ ತಿಳಿಸಿದ 3 ವಿಭಾಗಗಳ ವ್ಯಾಪ್ತಿಯಲ್ಲಿ ಬರುವ ಸರ್ಕಾರಿ ಕಟ್ಟಡಗಳ ನಿರ್ಮಾಣ, ವಸತಿಗೃಹಗಳ ನಿರ್ಮಾಣ, ರಸ್ತೆ ಹಾಗೂ ಸೇತುವೆಗಳ ನಿರ್ಮಾಣ ಹಾಗೂ ಅವುಗಳ ಉಸ್ತುವಾರಿ ಹಾಗೂ ಜಮೀನು ಕಾಪಾಡುವಿಕೆ.
2) ನಬಾರ್ಡ್ ಸಾಲದ ಸಹಾಯದ ರಸ್ತೆಗಳ ನಿರ್ಮಾಣದ ಉಸ್ತುವಾರಿ.
3) ಹೈದ್ರಾಬಾದ ಕರ್ನಾಟಕ ಪ್ರದೇಶ ಅಭಿವೃದ್ಧಿ ಯೋಜನೆ ಕಾಮಗಾರಿಗಳ ಉಸ್ತುವಾರಿ.
4) ಗಡಿ ಪ್ರದೇಶ ಅಭಿವೃದ್ಧಿ ಯೋಜನೆ ಕಾಮಗಾರಿಗಳ ಉಸ್ತುವಾರಿ.
5) ಠೇವಣಿ ವಂತಿಗೆ ಕಾಮಗಾರಿಗಳ ಉಸ್ತುವಾರಿ.
6) ಕೇಂದ್ರ ರಸ್ತೆ ನಿಧಿ ಯೋಜನೆ ಕಾಮಗಾರಿಗಳ ಉಸ್ತುವಾರಿ.
7) ಅಧಿಕಾರಿಗಳು ಹಾಗೂ ಸಿಬ್ಬಂದಿಯವರ ಕುರಿತು ಸೇವೆ ಕುರಿತು ಪತ್ರ ವ್ಯವಹಾರ ಹಾಗೂ ಸೇವಾ ಪುಸ್ತಕಗಳ ನಿರ್ವಹಣೆ.
8) ಅಧಿಕಾರಿಗಳ ಹಾಗೂ ಸಿಬ್ಬಂದಿಯವರ ವೇತನ ಹಾಗೂ ಇತರೆ ಭತ್ಯೆ ಹಾಗೂ ಮುಂಗಡ, ಪ್ರಯಾಣ ಭತ್ಯೆ, ಹಬ್ಬದ, ಸಾಮಾನ್ಯ ಭವಿಷ್ಯನಿಧಿ ಮಂಜೂರಾತಿ ಹಾಗೂ ಬಟವಾಡೆ ಇತ್ಯಾದಿ.
9) ಸಿಬ್ಬಂದಿಯವರ ಚರಾಸ್ತಿ ಹಾಗೂ ಸ್ಥಿರಾಸ್ತಿ ಖರೀದಿಗಳಿಗೆ ಹಾಗೂ ಆಸ್ತಿ ಮತ್ತು ಖುಣಪಟ್ಟಿ, ರಹಸ್ಯ ವರದಿ ನಿರ್ವಹಣೆ.
10) ಎಲ್.ಎ.ಕ್ಯೂ , ಎಲ್.ಸಿ.ಕ್ಯೂ ಗಳ ಪತ್ರ ವ್ಯವಹಾರ.
11) ಮಾಹಿತಿ ಹಕ್ಕು ಅಧಿನಿಯಮ 2005 ಕ್ಕೆ ಸಂಬಂಧಿಸಿದಂತೆ ಪತ್ರ ವ್ಯವಹಾರಗಳು.
12) ರಿಟ್ ಪಿಟೀಷನ್, ಕೆ.ಎ.ಟಿ, ನ್ಯಾಯಾಲಯ ಪ್ರಕರಣಗಳು ಹಾಗುಾ ಇಲಾಖಾ ವಿಚಾರಣೆ ಪ್ರಕರಣಗಳು.
13) 3 ನೇ ದರ್ಜೆ ಗುತ್ತಿಗೆದಾರರ ನೋಂದಣಿ ಹಾಗೂ ನವೀಕರಣ.
14) ಭೂಸ್ವಾಧೀನ ಹಾಗೂ ಭೂಮಿ ಲೀಜ್ ಮೇಲೆ ನೀಡುವ ಪ್ರಕರಣಗಳು
15) ಅನುಕಂಪ ಆಧಾರದ ಮೇಲೆ ನೇಮಕಾತಿ ಕುರಿತು ಪತ್ರ ವ್ಯವಹಾರ.
16) ನಿವೃತ್ತಿ ವೇತನದ ಪ್ರಕರಣಗಳು
17) ಸಿಬ್ಬಂದಿ : ಕಾಮಗಾರಿ ಅನುದಾನದ ವೆಚ್ಚದ ಪಟ್ಟಿ ತಯಾರಿಸುವುದು ಹಾಗೂ ಎಫ್.ಅರ್.ಐ. ಕುರಿತು ಪತ್ರ ವ್ಯವಹಾರ.
18) ಅನುದಾನ ಬಿಡುಗಡೆ ಕುರಿತು ಪತ್ರ ವ್ಯವಹಾರ ಹಾಗೂ ಹಣ ಭರವಸೆ ಪತ್ರದ ಬೇಡಿಕೆ ಸಲ್ಲಿಸುವುದು.
19) ಡ್ರಾಫ್ಟ್ನೋಟ್, ಡ್ರಾಫ್ಟ್ಪ್ಯಾರಾ , ಸಿ.ಎಸ್.ಎಸ್.ಎ, ಎಂ.ಎ.ಎಸ್. ಸಿ.ಎ.ಜಿ. ವರದಿಗಳ ಕುರಿತು ಪತ್ರ ವ್ಯವಹಾರ.
20) ಆರ್.ಎಸ್.ಎಲ್. ಕುರಿತು ಪ್ರಸ್ತಾವನೆ ಸಲ್ಲಿಸುವುದು.
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೨೯೭೩21) ರಸ್ತೆ ಸಂಚಾರ ಮಾದರಿ ಸಮೀಕ್ಷೆಗಳು, ರಸ್ತೆ, ಸೇತುವೆಗಳ ವಾರ್ಷಿಕ ವರದಿಗಳ ಮೇಲ್ವಿಚಾರಣೆ ಹಾಗೂ ಪ್ರಸಕ್ತ ಪ್ರಕಟಣೆಗಾಗಿ ಅಂಕಿ ಅಂಶಗಳ ಸಂಗ್ರಹಣೆ ರಸ್ತೆ ಸಂಪರ್ಕ ಹೊಂದದಿರುವ ಹಳ್ಳಿಗಳ ವಿವರಗಳು, ರಾಜ್ಯ ಹೆದ್ದಾರಿ ಅಧಿನಿಯಮದಡಿ ಪತ್ರ ವ್ಯವಹಾರ.
22) ಕಟ್ಟಡಗಳ ವಾರ್ಷಿಕ ವರದಿ ಮತ್ತು ಪುಸ್ತಕ ಪ್ರಕಟಣೆಗಾಗಿ ಅಂಕಿ ಅಂಶಗಳ ಸಂಗ್ರಹಣೆ, ನ್ಯಾಷನಲ್ ಬಿಲ್ಡಿಂಗ್ ಸಂಘಟನಾ ವಾರ್ಷಿಕ ವರದಿಗಳ ಪರಿವೀಕ್ಷಣಾ, ನಿರೀಕ್ಷಣಾ ಸರ್ಕ್ಯಿಟ್ ಹೌಸ್ಗಳ ಅಂಕಿ ಅಂಶಗಳ ಸಂಗ್ರಹಣೆ, ವಾರ್ಷಿಕ ಆಡಳಿತ ವರದಿಗಳು.
23) ಗುಲಬರ್ಗ ವೃತ್ತದ ದರ ಪಟ್ಟಿ ತಯಾರಿಸುವುದು.
24) ಸೇತುವೆಗಳು, ವಾರ್ಷಿಕ ವರದಿ ಮತ್ತು ಪುಸ್ತಕ ಪ್ರಕಟಣೆಗಾಗಿ ಅಂಕಿ ಅಂಶಗಳ ಸಂಗ್ರಹಣೆ, ವಾರ್ಷಿಕ ಆಡಳಿತ ವರದಿಗಳು.
25) ಕಟ್ಟಡ ಸಾಮಾಗ್ರಿಗಳ ಮಾರುಕಟ್ಟೆ ದರಗಳ ಹಾಗೂ ಕೂಲಿ ದರಗಳ ವರದಿ, ಡಾಂಬರಿಕರಣ, ಯಂತ್ರೋಪಕರಣ ಹಾಗೂ ಗ್ಯಾಂಗ್ ಮದಜೂರ ಅಂಕಿ ಅಂಶಗಳ ವರದಿಗಳು.
26) ಅಧೀನ ಕಛೇರಿಗಳಾದ ವಿಭಾಗ ಮತ್ತು ಉಪ-ವಿಭಾಗಗಳ ವಾರ್ಷಿಕ ಆಡಳಿತಾತ್ಮಕ ತಪಾಸಣೆ ನಡೆಸುವುದು.
(iii) ಮೇಲ್ವಿಚಾರಣೆ ಮತ್ತು ಹೊಣೆಗಾರಿಕೆಯ ಮಾರ್ಗಗಳು ಸೇರಿದಂತೆ ತೀರ್ಮಾನ ತೆಗೆದುಕೊಳ್ಳುವ ಪ್ರಕ್ರಿಯೆಯಲ್ಲಿ ಅನುಸರಿಸಬೇಕಾದ
ಕಾರ್ಯವಿಧಾನಗಳು.
ಈ ವೃತ್ತ ಕಛೇರಿಯುು 3 ವಿಭಾಗಗಳ ಕಾಮಗಾರಿಗಳ ಪ್ಲಾನ್, ಎಸ್ಟಿಮೆಟ್, ಟೆಂಡರ ಅನುಮೋದಿಸುವುದು ಹಾಗೂ ಮೇಲಾಧಿಕಾರಿಗಳಿಗೆ ಕಳುಹಿಸಿ ಅನುಮೋದನೆ ಪಡೆಯುವುದು. (iv) ಕಾರ್ಯಗಳು ನಿರ್ವಹಣೆಗೆ ಅದು ರೂಪಿಸಿರುವ ಸೂತ್ರಗಳು.
ಈ ವೃತ್ತ ಕಛೇರಿಯಲ್ಲಿ ವಿಷಯ ನಿರ್ವಾಹಕರುಗಳಿಗೆ ವಿಷಯಗಳ ಹಂಚಿಕೆ ಮಾಡಿ ವ್ಯವಸ್ಥಾಪಕರ ಮತ್ತು ನಿಬಂಧಕರು ಹಾಗೂ ತಾಂತ್ರಿಕ ಸಹಾಯಕ ಉಸ್ತುವಾರಿಯಲ್ಲಿ ಕೆಲಸ ನಿರ್ವಹಿಸುವ ವ್ಯೆವಸ್ಥೆ ಮಾಡಲಾಗಿದೆ. ನಿಬಂಧಕರು, ತಾಂತ್ರಿಕ ಸಹಾಯಕರು ಕರ್ತವ್ಯ ನಿರ್ವಹಣೆಯ ಪೂರ್ಣ ಜವಾಬ್ದಾರಿಯನ್ನು ಹೊಂದಿರುತ್ತಾರೆ. ಹಾಗೂ ಕಾರ್ಯನಿರ್ವಹಣೆಯಲ್ಲಿ ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರಿಗೆ ಸಹಕರಿಸುವುದು. (v) ಕಾರ್ಯಗಳನ್ನು ನೆರವೇರಿಸುವುದಕ್ಕಾಗಿ ಅದು ಹೊಂದಿರುವ ಅಥವಾ ಅದರ ನಿಯಂತ್ರಣದಲ್ಲಿರುವ ಅಥವಾ ಅದರ ಉದ್ಯೋಗಗಳು ಬಳಸುವ ನಿಯಮಗಳು, ವಿನಿಮಯಗಳು ಅನುಸೂಚಿಗಳು, ಕೈಪಿಡಿಗಳು, ದಾಖಲಾತಿಗಳು.
ಲೋಕೋಪಯೋಗಿ ಇಲಾಖೆಯಲ್ಲಿ ರಚಿಸಿರುವ ನಿಯಮ ಕೆ.ಸಿ.ಎಸ್.ಅರ್, ಕೆ.ಎಫ್.ಸಿ, ಕೆ.ಟಿ.ಸಿ, ಬಜೇಟ್ ಮ್ಯಾನುವಲ್, ಪಿ.ಡಬ್ಲೂ ್ಯ.ಡಿ. ಅಕೌಂಟ್ಸ್ ಕೋಡ್-I ವ್ಯಾಲ್ಯೂಂ-II, ಸ್ಟೋರ್ ಮ್ಯಾನುವಲ್, ಕೆ.ಸಿ.ಎಸ್ ಕಂಡಕ್ಟ ರೂಲ್ಸ್, ಸಿ.ಸಿ.ಎ ರೂಲ್ಸ್, ಡೆಲಿಗೇಶನ್ ಆಫ್ ಫೈನಾನ್ಸಿಯಲ್ ಪವರ್, ಸರಕಾರಿ ಸುತ್ತೋಲೆಯಲ್ಲಿ ಮೇಲಿಂದ ಮೇಲೆ ತಿಳಿಸಿದಂತೆ ತಾಂತ್ರಿಕ ಶಾಖೆಯಲ್ಲಿ ಹಾಗೂ ಆಡಳಿತ ಶಾಖೆಯಲ್ಲಿ ವ್ಯವಹಾರಣೆ ಕೈಕೊಳ್ಳುವುದು.
ಕರ್ನಾಟಕ ಸಾರ್ವಜನಿಕ ಸಂಗ್ರಹಣೆಯಲ್ಲಿ ಪಾರದರ್ಶಕತೆ ಆಧ್ಯಾದೇಶ – 2000.
ಸಾದಿಲ್ವಾರು ವೆಚ್ಚದ ಕೈಪಿಡಿ ಚಾಲ್ತಿ ದರಪಟ್ಟಿ , ಹೆದ್ದಾರಿ ಕಾಯ್ದೆ 1964 ರ ನಿಯಮಗಳು.
ಕಾಮಗಾರಿಗಳ ಪರಿವೀಕ್ಷಣಾ ವರದಿ, ಪಾಲನಾ ವರದಿ, ಮತ್ತು ಸಲಹೆಗಳು.
ನಿಯತಕಾಲಿಕ ವಹಿ, ವಿಷಯ ವಹಿ, ಶುದ್ಧ ಪ್ರತಿ ವಹಿ, ರವಾನೆ ವಹಿ, ಸ್ಥಳೀಯ ಬಟವಾಡೆ ಪುಸ್ತಕ, ಆಕಸ್ಮಿಕ ರಜಾವಹಿ, ಗ್ರಂಥಾಲಯ ಪುಸ್ತಕ ನೀಡಿಕೆ ವಹಿ, ನೌಕರರ ಸೇವಾ ವಹಿ, ಇನಕಂಬೆನ್ಸಿ ವಹಿ, ಕಾರ್ಯನಿರ್ವಾಹಣಾ (ರಹಸ್ಯ) ವರದಿಗಳ ದಾಖಲೆಗಳ ವಹಿ, ನಿವೃತ್ತಿ ವೇತನ ನಿಗಾ ವಹಿ, ತಪಾಸಣೆಗಳ ಚಲನವಲನ ವಹಿ, ನಿಯತಕಾಲಿಕೆಗಳ ನಿಗಾ ವಹಿ, ನೌಕರರ ಮನೆ ವಿಳಾಸ ಮಾಹಿತಿ ವಹಿ, ಮಾಹಿತಿ ಹಕ್ಕು ಅಧಿನಿಯಮ ಪತ್ರ ವ್ಯವಹಾರಗಳ ವಹಿ, ಮಂಜೂರಾತಿ:ಕಾರ್ಯಕಾರಿ ಮತ್ತು ಖಾಲಿ ಹುದ್ದೆಗಳ ವಹಿ. (vi) ಹೊಂದಿರುವ ಅಥವಾ ಅದರ ನಿಯಂತ್ರಣದಲ್ಲಿರುವ ದಸ್ತಾವೇಜುಗಳ ಪ್ರವರ್ಗಗಳ ವಿವರ ಪಟ್ಟಿ
1) ಅಂದಾಜು ಪಟ್ಟಿ ರಜಿಸ್ಟರ್, ತಾಂತ್ರಿಕ ಶಾಖೆಯ ಅನುಮೋದಿತ ರಜಿಸ್ಟರ್
2) ವಾರ್ಷಿಕ ಆಡಳಿತ ವರದಿ ರಜಿಸ್ಟರ್ಗಳು.
3) ಹಾಜರಿ ಪುಸ್ತಕ, ಸಾಮಾನ್ಯ ಸ್ವೀಕೃತ ವಹಿ, ಸ್ಟಾಂಪ್ ವಹಿ, ದಾಖಲೂ ವಹಿ.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೨೯೭೪4) ಪೀಠೋಪಕರಣ ಹಾಗೂ ಇತರೆ ಸಾಮಗ್ರಿಗಳ ವಹಿ.
5) ಕಛೇರಿ ಆದೇಶ ವಹಿ.
6) ಶಿಸ್ತು ಪ್ರಕರಣಗಳ ನಿಗಾ ವಹಿ.
7) ವಿಧಾನಸಭೆಗೆ : ವಿಧಾನ ಪರಿಷತ್ ಸದಸ್ಯರ ಪ್ರಶ್ನೆಗಳಿಗೆ ಉತ್ತರ ಕಳುಹಿಸುವ ಚಲನವಲನ ವಹಿ.
8) ಸಿಬ್ಬಂದಿಗಳ ಕಾರ್ಯನಿರ್ವಹಣಾ ವರದಿ ವಹಿ.
9) 3 ನೇ ದರ್ಜೆ ಗುತ್ತಿಗೆದಾರರ ನೋಂದಣಿ : ನವೀಕರಣ ವಹಿಗಳು. (vii) ಅದರ ಕಾರ್ಯನೀತಿಯ ರಚನೆ ಅಥವಾ ಅದರ ಅನುಷ್ಠಾನಕ್ಕೆ ಸಂಬಂಧಿಸಿದಂತೆ ಸಾರ್ವಜನಿಕರೊಡನೆ ಸಮಾಲೋಚಿಸಲು ಅಥವಾ ಅದರ ಪ್ರಾತಿನಿಧ್ಯವಿರುವಂತೆ ಮಾಡಲು ಯಾವುದೇ ವ್ಯೆವಸ್ಥೆಯ ವಿವರಗಳು.
ಗುಲಬರ್ಗಾ ವೃತ್ತವು ಗುಲಬರ್ಗಾ , ಯಾದಗಿರ ಮತ್ತು ಬೀದರ ಜಿಲ್ಲೆಗಳನ್ನೊಳಗೊಂಡಿದುದ, ಸದರಿ ಜಿಲ್ಲೆಯಲ್ಲಿ ನಾಮ ನಿರ್ದೇಶನ ಹೊಂದಿರುವ ಎಂ.ಫಿ ಎಂ.ಎಲ್.ಎ, ಎಂ.ಎಲ್.ಸಿ ರವರಿಗೆ ಸಂಬಂಧಿಸಿದಂತೆ ಅವರ ಫಂಡ್ನಲ್ಲಿ
| ಕ್ರ. ಸಂ. | ಅಧಿಕಾರಿಯ ಹೆಸರು ಮತ್ತು ಪದನಾಮ | ಅವರು ನಿರ್ವಹಿಸುವ ವಿಷಯಗಳು | ದೂರವಾಣಿ ಸಂಖ್ಯೆ |
| 1 | 2 | 3 | 4 |
| 1) | ಶ್ರೀ ಜಿ.ಚಂದ್ರಮೌಳಿ ನಾಯಕ್. ಅ.ಅ. | ಲೋ.ಇ. ವೃತ್ತದಡಿ ಬರುವ ಎಲ್ಲಾ ವಿಭಾಗಗಳ ಕಾಮಗಾರಿಗಳ ಉಸ್ತುವಾರಿ ಹಾಗೂ ಸಿಬ್ಬಂದಿ ವಿಷಯಗಳ ನಿರ್ವಹಣೆ ಉಸ್ತುವಾರಿ. | ದುಾರವಾಣಿ ಸಂಖ್ಯೆ: 08472-220272 ದುಾ.ಸಂಖ್ಯೆ: ಫ್ಯಾಕ್ಸ್: 08472-220146 |
| 2) | ಶ್ರೀ ಕುಮಾರಸ್ವಾಮಿ ತಾಂ.ಸಹಾಯಕರು | ಈ ವೃತ್ತದಡಿ ಬರುವ ಕಟ್ಟಡ ಕಾಮಗಾರಿಗಳ ಅಂದಾಜುಗಳ ಮಂಜೂರಾತಿ ಟೆಂಡರಗಳ ಸಂಸ್ಕರಣೆ, ಅಂಗೀಕಾರ, ಮೇಲಾಧಿಕಾರಿಗಳಿಗೆ ಸಲ್ಲಿಸುವುದು ಹಾಗೂ ಪ್ರಗತಿ ಪರಿಶೀಲಿಸಿ ವಿನ್ಯಾಸ ವಿವರಗಳನ್ನು ಒದಗಿಸುವುದು. ಮೇಲಿನ ವಿಷಯಗಳಿಗೆ ಸಂಬಂಧಿಸಿದ ವರದಿ ಸಲ್ಲಿಸುವುದು ಹಾಗೂ ಪತ್ರವ್ಯವಹಾರ ನೋಡಿಕೊಂಡು ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರಿಗೆ ಸಹಕರಿಸುವುದು. ಎಲ್.ಎ.ಕ್ಶೂ, ಎಲ್.ಸಿ.ಕ್ಶೂ ಗಳಿಗೆ, ಮಾಹಿತಿ ಹಕ್ಕು ಅಧಿನಿಯಮಗಳಿಗೆ ಸಂಬಂಧಿಸಿದಂತೆ ತೀವ್ರ ಉತ್ತರಿಸಲು ಕ್ರಮ ಕೈಗೊಳ್ಳುವುದು. | ದುಾರವಾಣಿ ಸಂಖ್ಯೆ: 08472-220272 ದುಾ.ಸಂಖ್ಯೆ: ಫ್ಯಾಕ್ಸ್: 08472-220146 |
| 3) | ಶ್ರೀ ಹೆಚ್.ಎಂ. ದೊಡ್ಡಮನಿ, ನಿಬಂಧಕರು | ಈ ವೃತ್ತದ ಎಲ್ಲಾ ಅಧಿಕಾರಿಗಳು ಹಾಗುಾ ಸಿಬ್ಬಂದಿಗಳ ಸೇವೆಗಳ ಪತ್ರ ವ್ಯವಹಾರ, ಸೇವಾ ವಿವರಗಳ ಕ್ರೋಡಿಕರಣ, ಸಾಮಾನ್ಯ ಭವಿಷ್ಯ ನಿಧಿ, ಚರಾಸ್ತಿ , ಸ್ಥಿರಾಸ್ತಿ ಖರೀದಿಗೆ ಅನುಮೋದನೆ ನೀಡುವುದು. ಆಸ್ತಿ ಮತ್ತು ಖುಣಪಟ್ಟಿ , ರಹಸ್ಯ ವರದಿಗಳ ನಿರ್ವಹಣೆ ಇತರೆ ಎಲ್ಲಾ ಸಂಬಂಧಿತ ವ್ಯವಹಾರಗಳಿಗೆ ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರಿಗೆ ನೆರವಾಗುವುದು. | ದುಾರವಾಣಿ ಸಂಖ್ಯೆ: 08472-220272 ದುಾ.ಸಂಖ್ಯೆ: ಫ್ಯಾಕ್ಸ್: 08472-220146 |
(viii) ತನ್ನ ಆಧೀನಕೊಳ್ಳಪಡುವ ಸಮಿತಿಗಳ , ಮಂಡಳಿ, ಪರಿಷತ್ ಸಭೆಗಳಿಗೆ ಸಾರ್ವಜನಿಕ ಪ್ರವೇಶ ಹಾಗೂ ಸಾರ್ವಜನಿಕರಿಗೆ
ಮುಕ್ತವಾಗಿರುವ ಬಗ್ಗೆ ಸಭಾ ನಡವಳಿಗಳ ವಿವರ ನೀಡುವ ಅವಕಾಶ.
ಇಲಾಖೆಯಲ್ಲಿರುವ ನಿಗಮ, ಪರಿಷತ್ತು , ಸಮಿತಿ ಮತ್ತು ಇತರೆ ಸಂಸ್ಥೆಗಳ ವಿವರ ಮತ್ತು ಅದರ ಉದ್ದೇಶ ಮತ್ತು ಈ ಸಂಸ್ಥೆಗಳು ಮತ್ತು ಸಭೆಯ ನಡವಳಿಗಳು ಸಾರ್ವಜನಿಕರಿಗೆ ಲಭ್ಯವಿರುವ ಬಗ್ಗೆ ಏನು ಇರುವುದಿಲ್ಲ.
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೨೯೭೫(ix) ಅದರ ಅಧಿಕಾರಿಗಳ ನೌಕರರ ನಿರ್ದೇಶಿಕೆಯಲ್ಲಿ (Directory)
ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರು, ಲೋಕೋಪಯೋಗಿ, ಬಂದರು ಮತ್ತು ಒಳನಾಡು ಜಲಸಾರಿಗೆ ವೃತ್ತ, ಗುಲಬರ್ಗಾ ವೃತ್ತದ ಅಧಿಕಾರದ ಬಗ್ಗೆ ಖಂಡಿಕೆ (2) ರಲ್ಲಿ ವಿವರಿಸಲಾಗಿದೆ.
| 1) | ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರು | ಶ್ರೀ ಜಿ.ಚಂದ್ರಮೌಳಿ ನಾಯಕ್ |
| 2) | ತಾಂತ್ರಿಕ ಸಹಾಯಕರು | ಶ್ರೀ ಕುಮಾರಸ್ವಾಮಿ ಸರಾಫ್ |
| 3) | ನಿಬಂಧಕರು | ಶ್ರೀ ಹೆಚ್.ಎಂ.ದೊಡ್ಡಮನಿ |
| 4) | ಸಹಾಯಕ ಇಂಜಿನೀಯರ (ಪರಿಸರ) | ಖಾಲಿ |
| 5) | ಸಹಾಯಕ ಇಂಜಿನೀಯರ | ಶ್ರೀ ಮಹ್ಮದ್ ಅಬ್ದುಲ್ ಹಮೀದ್ |
| ಶ್ರೀ ಬಿ.ವ್ಲ್ಪಿ.ಪಾಟೀಲ್ | ||
| ಶ್ರೀ ಬಸವರಾಜ್ | ||
| ಶ್ರೀ ವಿಜಯಕುಮಾರ ಮೂಲಗೆ | ||
| 6) | ಕಿರಿಯ ಇಂಜಿನೀಯರರು | ಶ್ರೀ ಈಶ್ವರ ಜಟಿಂಗರಾವ್. |
| ಶ್ರೀ ಶಶಿಕಾಂತ ಘನಾತೆ | ||
| 7) | ಪ್ರಥಮ ದರ್ಜೆ ಸಹಾಯಕರು | ಶ್ರೀ ಶರಣಪ್ಪ |
| ಶ್ರೀ ಗೋಪಾಲರಾವ್ | ||
| 8) | ದ್ವಿತೀಯ ದರ್ಜೆ ಸಹಾಯಕರು | ಶ್ರೀ ಕೋದಂಡರಾಮಪ್ಪ |
| ಶ್ರೀ ಪಿ.ಎಸ್.ಮಾಲಿ ಪಾಟೀಲ್ | ||
| ಶ್ರೀ ಕು.ವರ್ಷಾ | ||
| ಶ್ರೀ ತಾರಾಬಾಯಿ ದೇಸಾಯಿ | ||
| 9) | ಸಹಾಯಕ ಸಾಂಖ್ಯಿಕ ಅಧಿಕಾರಿ | ಶ್ರೀ ಅಬ್ದುಲ್ ಮಜೀದ್ |
| 10) | ಗಣಕ ಯಂತ್ರ ಸಹಾಯಕ | ಶ್ರೀ ಏಜಾಜ್ ಅಲೀ, ದ್ವಿ.ದ.ಸರನ್ನು ಪರಿಗಣಿಸಿದೆ. |
| 11) ಬೆರಳಚ್ಚುಗಾರರು | ಶ್ರೀ ಮೋಹನಲಾಲ್ | |
| ಶ್ರೀ ನಾಗಪ್ಪಾ | ||
| 12) | ಶೀಘ್ರಲಿಪಿಗಾರರು | ಶ್ರೀ ಮಹಾಂತಪ್ಪ್ಠಾ. ಎಸ್. ಸಾಗನೂರ |
| 13) | ನೀಲಿ ನಕ್ಷೆಗಾರರು | ಶ್ರೀ ಪ್ರಭು |
| 14) | ವಾಹನ ಚಾಲಕರು | ಶ್ರೀ ಮಹ್ಮದ್ ಇಸ್ಮಾಯಿಲ್ |
| 15) | ಅನುಚರರು | ಶ್ರೀ ರುಕ್ಮಣ್ಣ |
| ಖಾಲಿ | ||
| 16) | ಜವಾನರು | ಶ್ರೀ ಶರಣಪ್ಪ |
| ಶ್ರೀ ಹೈದು | ||
| ಶ್ರೀ ಅಂಬಿಕಾಬಾಯಿ ಕುಲಕರ್ಣಿ | ||
| ಶ್ರೀ ರಾಜಶೇಖರ ದೊರೆ | ||
| 17) | ಕಸಗೂಡಿಸುವವರು | ಶ್ರೀ ಬಾಬುರಾವ್ |
(x) ಇಲಾಖೆಯ ವಿನಿಮಯಗಳಲ್ಲಿ ಉಪಬಂಧಿಸಿರುವಂತೆ ಪರಿಹಾರದ ವ್ಯೆವಸ್ಥೆಯೂ ಸೇರಿದಂತೆ ಅದರ ಪ್ರತಿಯೊಬ್ಬ ಅಧಿಕಾರಿ
ಮತ್ತು ನೌಕರರು ಪಡೆಯುವ ತಿಂಗಳ ಸಂಬಳವನ್ನು : ವೇತನವನ್ನು ಕರ್ನಾಟಕ ಸರಕಾರದ ಸಂಚಿತ ನಿಧಿಯಿಂದ
| ಕ್ರ.ಸಂ. | ಹುದ್ದೆ ಮತ್ತು ಹೆಸರು | ವೇತನ ಶ್ರೇಣಿ | ಮೂಲ ವೇತನ |
| 1) | ಶ್ರೀ ಜಿ.ಚಂದ್ರಮೌಳಿ ನಾಯಕ್, ಅ.ಅ. | 20025-28275 | 27600 |
| 2) | ಶ್ರೀ ಸರಾಫ್ ಕುಮಾರಸ್ವಾಮಿ, ತಾಂ.ಸ. | 14050-25050 | 25050 |
| 3) | ಶ್ರೀ ಹೆಚ್.ಎಂ.ದೊಡ್ಡಮನಿ, ನಿಬಂಧಕರು | 10800-20025 | 16000 |
| 4) | ಶ್ರೀ ವಿಜಯಕುಮಾರ ಮೂಲಗೆ, ಸ.ಇಂ. | 14050-25050 | 24450 |
| 5) | ಶ್ರೀ ಮಹ್ಮದ್ ಅಬ್ದುಲ್ ಹಮೀದ್, ಸ.ಇಂ. | 12000-22650 | 15200 |
| 6) | ಶ್ರೀ ಬಿ.ವ್ಲ್ಪಿ.ಪಾಟೀಲ್, ಸ.ಇಂ. | 11400-21600 | 14400 |
| 7) | ಶ್ರೀ ಬಸವರಾಜ್, ಸ.ಇಂ. | 11400-21600 | 13350 |
| 8) | ಶ್ರೀ ಶಶಿಕಾಂತ ಘನಾತೆ, ಕಿ.ಇಂ. | 8825-16000 | 14800 |
| 9) | ಶ್ರೀ ಈಶ್ವರ ಜಟೆಂಗ್ರಾವ್, ಕಿ.ಇಂ. | 8825-16000 | 12300 |
| 10) | ಶ್ರೀ ಗೋಪಾಲರಾವ್, ಪ್ರ.ದ.ಸ. | 7275-13350 | 11400 |
| 11) | ಶ್ರೀ ಶರಣಪ್ಪ , ಪ್ರ.ದ.ಸ | 7275-13350 | 10500 |
| 12) | ಶ್ರೀ ಪಿ.ಎಸ್.ಮಾಲಿ ಪಾಟೀಲ್, ದ್ವಿ.ದ.ಸ. | 7275-13350 | 12650 |
| 13) | ಶ್ರೀ ಕೋದಂಡರಾಮಪ್ಪ , ದ್ವಿ.ದ.ಸ. | 7275-13350 | 10250 |
| 14) | ಶ್ರೀಮತಿ ತಾರಾಬಾಯಿ ದೇಸಾಯಿ, ದ್ವಿ.ದ.ಸ. | 7275-13350 | 10000 |
| 15) | ಕು.ವರ್ಷಾ ದ್ವಿ.ದ.ಸ. | 5800-10500 | 5900 |
| 16) | ಶ್ರೀ ಏಜಾಜ್ ಅಲೀ, ದ್ವಿ.ದ.ಸ. | 5800-10500 | 6500 |
| 17) | ಶ್ರೀ ಮಹಾಂತಪ್ಪ.ಎಸ್.ಸಾಗನೂರ, ಶೀಘ್ರಲಿಪಿಗಾರ | 7275-13350 | 8600 |
| 18) | ಶ್ರೀ ಮೋಹನಲಾಲ್ ಹಿರಿಯ ಬೆರಳಚ್ಚುಗಾರ | 7275-13350 | 10800 |
| 19) | ಶ್ರೀ ನಾಗಪ್ಪಾ ಬೆರಳಚ್ಚುಗಾರ | 6250-12000 | 7800 |
| 20) | ಶ್ರೀ ಪ್ರಭು, ನೀಲಿ ನಕ್ಷೆಗಾರರು | 5800-10500 | 10000 |
| ಕ್ರ.ಸಂ. | ಹುದ್ದೆ ಮತ್ತು ಹೆಸರು | ವೇತನ ಶ್ರೇಣಿ | ಮೂಲ ವೇತನ | ||
| 21) | ಶ್ರೀ ರುಕ್ಮಣ್ಣಾ , ಅನುಚರರು | 5500-9500 | 8825 | ||
| 22) | ಶ್ರೀ ಶರಣಪ್ಪ ಜವಾನ್ | 5500-9500 | 9750 | ||
| 23) | ಶ್ರೀ ರಾಜಶೇಖರ್ ದೊರ, ಜವಾನ್ | 4800-7275 | 5200 | ||
| 24) | ಶ್ರೀ ಹೈದು | 5500-9500 | 6650 | ||
| 25) | ಶ್ರೀಮತಿ ಅಂಬಿಕಾಬಾಯಿ ಕುಲಕರ್ಣಿ | 5200-8200 | 6250 | ||
| 26) | ಶ್ರೀ ಬಾಬುರಾವ, ಕಸಗೂಡಿಸುವವರು | 4800-7275 | 6250 | ||
| 27) | ಶ್ರೀ ಮಹ್ಮದ್ ಇಸ್ಮಾಯಿಲ್, ವಾ.ಚಾ | 5800-10500 | 8000 | ||
| 28) | ಶ್ರೀ ಅಬ್ದುಲ್ ಮಜೀದ್, ಸ.ಸಾ.ಅಧಿಕಾರಿ | 10000-18150 | 18150 |
(xi) ಎಲ್ಲಾ ಯೋಜನೆಗಳ ವಿವರಗಳನ್ನು ಸೂಚಿಸುವ, ಪ್ರಸ್ತಾವಿತ ವೆಚ್ಚಗಳನ್ನು ಮಾಡಲಾದ ಬಟವಾಡೆಗಳ ವರದಿಯನ್ನು ಸೂಚಿಸಿ
ಅದರ ಪ್ರತಿಯೊಂದು ಏಜೆನ್ಸಿಗೆ ಹಂಚಿಕೆ ಮಾಡಲಾದ ಆಯವ್ಯಯವನ್ನು (2009-10 ಆಯವ್ಯಯ ತಃಖ್ತೆ)
(xii) ಹಂಚಿಕೆ ಮಾಡಲಾದ ಮೊಬಲಗುಗಳೊಳಗೊಂಡು, ಸಹಾಯಧನ, ಕಾರ್ಯಕ್ರಮಗಳ ಜಾರಿಯ ವಿಧಾನವನ್ನು ಮತ್ತು
ಅಂತಹ ಕಾರ್ಯಕ್ರಮಗಳ ಫಲಾನುಭವಿಗಳ ವಿವರಗಳನ್ನು ಈ ವೃತ್ತದಡಿ ಸಹಾಯಧನ ನೀಡುವ ಕಾರ್ಯಕ್ರಮ ಯಾವುದು
ಇರುವುದಿಲ್ಲ.
(xiii) ನೀಡಿರುವ ರಿಯಾಯ್ತಿಗಳನ್ನು ಅನುಮತಿ ಪತ್ರಗಳನ್ನು ಅಥವಾ ಅಧಿಕಾರ ಪತ್ರಗಳನ್ನು ಪಡೆಯುುವ ವಿವರ.
ಈ ವೃತ್ತದಡಿ ಯಾವುದು ಇರುವುದಿಲ್ಲ.
(xiv) ಇಲಾಖೆಯಲ್ಲಿ ಲಭ್ಯವಿರುವ ಅಥವಾ ಅದು ಹೊಂದಿರುವ ವಿದ್ಯುನ್ಮಾನ ರೂಪಕ್ಕೆ ಪರಿವರ್ತಿಸುವ ಮಾಹಿತಿಗೆ ಸಂಬಂಧಿಸಿದ
ವಿವರಗಳು.
ಇ-ಟೆಂಡರ್ ಮತ್ತು ಇ-ಮೇಲ್, ಇ-ಪ್ರಾಕ್ಯೂರಮೆಂಟ್ಗಳಲ್ಲಿ ಮಾಹಿತಿ ಅಳವಡಿಸಲಾಗಿದೆ. (xv) ಸಾರ್ವಜನಿಕ ಉಪಯೋಗಕ್ಕಾಗಿ ಗ್ರಂಥಾಲಯವನ್ನು ಅಥವಾ ವಾಚನಾಲಯವನ್ನು ನಿರ್ವಹಿಸುತ್ತಿದ್ದಲ್ಲಿ ಅದರ ವೇಳೆ ಕರ್ತವ್ಯ, ಸಾರ್ವಜನಿಕ ಸೌಲಭ್ಯಗಳ ವಿವರ.
ಸಾರ್ವಜನಿಕ ಬಳಕೆಗೆ ಗ್ರಂಥಾಲಯ ಅಥವಾ ವಾಚನಾಲಯ ಇರುವುದಿಲ್ಲ. (xvi) ಸಾರ್ವಜನಿಕ ಮಾಹಿತಿ ಅಧಿಕಾರಿಗಳ ಹೆಸರುಗಳು, ಪದನಾಮಗಳು ಮತ್ತು ಇತರೆ ವಿವರ.
| ಮೇಲ್ಮನವಿ ಪ್ರಾಧಿಕಾರಿಗಳು | ಸಾರ್ವಜನಿಕ ಮಾಹಿತಿ ಅಧಿಕಾರಿ | ಸಹಾಯಕ ಸಾರ್ವಜನಿಕ ಮಾಹಿತಿ ಅಧಿಕಾರಿ |
| ಮುಖ್ಯ ಇಂಜಿನೀಯರರು, ಸಂಪರ್ಕ ಮತ್ತು ಕಟ್ಟಡಗಳು (ಉತ್ತರ), ಧಾರವಾಡ | ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರು, ಲೋಕೋಪಯೋಗಿ, ಬಂದರು ಮತ್ತು ಒಳನಾಡು ಜಲಸಾರಿಗೆ ವೃತ್ತ , ಗುಲಬರ್ಗಾ ದೂರವಾಣಿ ಸಂಖ್ಯೆ: 08472-220272 ದೂ.ಸಂಖ್ಯೆ: ಫ್ಯಾಕ್ಸ್:08472-220146 email: [email protected] | 1) ತಾಂತ್ರಿಕ ಸಹಾಯಕರು ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರವರಿಗೆ 2) ನಿಬಂಧಕರು, ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರವರಿಗೆ ದೂರವಾಣಿ ಸಂಖ್ಯೆ: 08472-220272 ದೂರವಾಣಿ ಸಂಖ್ಯೆ: ಫ್ಯಾಕ್ಸ್:08472- 220146 email: [email protected] |
(xvii) ನಿಯಮಿಸಬಹುದಾದಂತಹ ಇತರೆ ಮಾಹಿತಿಯನ್ನು ಪ್ರಕಟಿಸತಕ್ಕದ್ದು. ಮತ್ತು ಆ ತರುವಾಯ ಪ್ರತಿ ವರ್ಷ ಈ
ಪ್ರಕಟಣೆಗಳನ್ನು ಅಂದಿನವರೆಗೆ
ಇಂದಿನವರೆಗೆ ಸಂಪೂರ್ಣ ಮಾಹಿತಿ ಇರುತ್ತದೆ.
ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರು,
ಲೋಕೋಪಯೋಗಿ, ಬಂದರು ಮತ್ತು
ಒಳನಾಡು ಜಲಸಾರಿಗೆ ವೃತ್ತ, ಗುಲಬರ್ಗಾ.
ABSTRACT (ಘೋಷ್ವಾರೆ )
2009-10 ನೇ ಸಾಲಿನ ಮಾರ್ಚ - 2010 ರ ಅಂತ್ಯಕ್ಕೆ ಅನುದಾನ ವೆಚ್ಚದ ವಿವರಣಾ ಪಟ್ಟಿ
| ಕ್ರ. ಸಂ. | ಲೆಕ್ಕ ಶೀರ್ಷಿಕೆ | ಲೆಕ್ಕ ಶೀರ್ಷಿಕೆ 2009-10 ನೇ ಸಾಲಿನ ಅನುದಾನ | 2009-10 ನೇ ಸಾಲಿನ ಒಟ್ಟು ವೆಚ್ಚ |
| 5054 - ಬಂಡವಾಳ ಮತ್ತು ವೆಚ್ಚ ರಸ್ತೆ ಮತ್ತು ಸೇತುವೆ ನಿರ್ಮಾಣ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 390.82 | 394.63 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 280.75 | 447.52 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 619.68 | 926.79 | |
| ಒಟ್ಟು | 1291.25 | 1768.94 | |
| 5054 ನಬಾರ್ಡ ರಸ್ತೆ ಕಾಮಗಾರಿಗಳು | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 835.24 | 906.28 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 496.60 | 790.77 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 741.50 | 358.29 | |
| ಒಟ್ಟು | 2073.34 | 2055.34 | |
| 5054 ನಬಾರ್ಡ ಸೇತುವೆ ಕಾಮಗಾರಿಗಳು | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 0.00 | 0.00 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 0.00 | 93.46 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 0.00 | 0.00 | |
| ಒಟ್ಟು | 0.00 | 93.46 | |
| ಒಟ್ಟು 5054 ನಬಾರ್ಡ ರಸ್ತೆ ಮತ್ತು ಸೇತುವೆ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 835.24 | 1300.91 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 496.60 | 1331.75 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 741.50 | 1285.08 | |
| ಒಟ್ಟು | 2073.34 | 3917.74 | |
| ಸಿ.ಆರ್.ಎಫ್. ಕಾಮಗಾರಿಗಳು | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 0.00 | 82.96 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 0.00 | 85.15 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 0.00 | 45.55 | |
| ಒಟ್ಟು | 0.00 | 213.66 | |
| 5054 ನಂಜುಂಡಪ್ಪ ವರದಿ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 1894.79 | 631.70 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 1963.29 | 414.18 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 1358.33 | 433.35 | |
| ಒಟ್ಟು | 5216.41 | 1479.23 | |
| ಒಟ್ಟು 5054 ಎಸ್.ಸಿ.ಎಸ್.ಪಿ. | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 497.02 | 125.75 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 385.57 | 262.24 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 362.88 | 414.46 | |
| ಒಟ್ಟು | 1245.47 | 802.45 | |
| ಒಟ್ಟು 5054 ಟಿ.ಎಸ್.ಪಿ. | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 25.63 | 66.37 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 107.13 | 75.75 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 156.91 | 127.15 | |
| ಒಟ್ಟು | 289.67 | 269.27 | |
| 5054 ಸುವರ್ಣ ರಸ್ತೆ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 364.56 | 134.98 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 312.48 | 216.58 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 312.50 | 324.51 | |
| ಒಟ್ಟು | 989.54 | 676.07 | |
| 5054 ಭೂಸ್ವಾಧೀನ ಪ್ರಕರಣಗಳು | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 150.00 | 150.00 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 0.00 | 0.00 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 0.00 | 0.00 | |
| ಒಟ್ಟು | 150.00 | 150.00 | |
| ಒಟ್ಟು 5054 ರಸ್ತೆ ಮತ್ತು ಸೇತುವೆ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 4008.06 | 2492.67 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 3545.82 | 2385.65 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 3551.80 | 2630.10 | |
| ಒಟ್ಟು | 11105.68 | 7508.42 | |
| ಒಟ್ಟು 4059 ಲೋ.ಇ ಕಾಮಗಾರಿಗಳು | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 2725.04 | 2008.89 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 701.70 | 223.83 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 562.87 | 171.63 | |
| ಒಟ್ಟು | 3989.61 | 2404.35 | |
| ಒಟ್ಟು 4216 ಗೃಹ ನಿರ್ಮಾಣ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 41.87 | 165.92 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 138.13 | 88.18 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 37.74 | 51.26 | |
| ಒಟ್ಟು | 217.74 | 305.36 | |
| ಒಟ್ಟು 4202 ಶಿಕ್ಷಣ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 176.99 | 167.40 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 157.52 | 138.46 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 31.05 | 22.70 | |
| ಒಟ್ಟು | 365.56 | 328.56 | |
| 4250 ಸಾಮಾಜಿಕ ಹಾಗೂ ಸಮುದಾಯ ಸೇವೆಗಳು | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 20.00 | 6.87 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 40.00 | 40.00 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 0.00 | 0.00 | |
| ಒಟ್ಟು | 60.00 | 46.87 | |
| ಒಟ್ಟು ಬೃಹತ ಕಟ್ಟಡಗಳು (ಯೋಜನೆ) | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 2963.90 | 2349.08 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 1037.35 | 490.47 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 631.66 | 245.59 | |
| ಒಟ್ಟು | 4632.91 | 3085.14 | |
| 3054 ರಸ್ತೆ ಮತ್ತು ಸೇತುವೆಗಳು (ಯೋಜನೆ) | |||
| ಮು.ಮಂ.ಗ್ರಾ.ರ.ಅ. ಯೋಜನೆ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 117.56 | 368.76 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 256.60 | 366.09 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 120.75 | 265.45 | |
| ಒಟ್ಟು | 494.91 | 1000.30 | |
| 3054 ರಸ್ತೆ ಮತ್ತು ಸೇತುವೆಗಳು (ಯೋಜನೇತರ) | |||
| 12ನೇ ಹಣಹಾಸು ಆಯೋಗ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 200.00 | 180.52 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 453.00 | 272.48 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 150.00 | 652.90 | |
| ಒಟ್ಟು | 803.00 | 1105.90 | |
| ರಾಜ್ಯ ಹೆದ್ದಾರಿ ನಿರ್ವಹಣೆ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 322.75 | 229.91 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 232.35 | 50.00 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 245.85 | 157.40 | |
| ಒಟ್ಟು | 800.95 | 437.31 | |
| ಸೇತುವೆಗಳ ನಿರ್ವಹಣೆ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 9.73 | 0.00 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 12.98 | 0.00 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 13.49 | 0.00 | |
| ಒಟ್ಟು | 0.00 | ||
| ಒಟ್ಟು 3054 ರಸ್ತೆ ಮತ್ತು ಸೇತುವೆಗಳು | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 650.04 | 779.19 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 954.93 | 688.57 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 530.09 | 1075.75 | |
| ಒಟ್ಟು | 2135.06 | 2543.51 | |
| ಯೋಜನೇತರ ಕಟ್ಟಡ ಶೀರ್ಷಿಕೆ | |||
| 2059 ಲೋಇ ಕಾಮಗಾರಿ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 210.68 | 111.02 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 132.66 | 65.72 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 122.66 | 69.10 | |
| ಒಟ್ಟು | 466.00 | 245.84 | |
| 2059 ಲೋಇ 12ನೇ ಹಣಕಾಸು ಆಯೋಗ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 41.50 | 100.25 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 18.80 | 18.77 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 24.60 | 50.26 | |
| ಒಟ್ಟು | 84.90 | 169.28 | |
| ಒಟ್ಟು 2059 ಲೋಇ ಕಾಮಗಾರಿ ಯೋಜನೇತರ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 252.18 | 211.27 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 151.46 | 84.49 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 147.26 | 119.36 | |
| ಒಟ್ಟು | 550.90 | 415.12 | |
| ಒಟ್ಟು 2059 ಯಂತ್ರ ಮತ್ತು ಸಾಧನ ಸಾಮಾಗ್ರಿ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 7.92 | 0.00 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 5.28 | 20.18 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 5.28 | 0.00 | |
| ಒಟ್ಟು | 18.48 | 20.18 | |
| ಒಟ್ಟು 2059 ಯೋಜನೇತರ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 260.10 | 211.27 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 156.74 | 104.67 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 152.54 | 119.36 | |
| ಒಟ್ಟು | 569.38 | 435.30 | |
| ಒಟ್ಟು 2216 ಗೃಹ ನಿರ್ಮಾಣ ಯೋಜನೇತರ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 130.50 | 86.08 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 64.00 | 23.27 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 108.20 | 44.16 | |
| ಒಟ್ಟು | 302.70 | 153.51 | |
| 2203 ತಾಂತ್ರಿಕ ಶಿಕ್ಷಣ ಯೋಜನೇತರ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 0.00 | 0.00 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 49.32 | 48.13 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 0.00 | 0.00 | |
| ಒಟ್ಟು | 49.32 | 48.13 | |
| ಒಟ್ಟು ಯೋಜನೇತರ ಕಟ್ಟಡಗಳು | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 390.60 | 297.35 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 270.06 | 176.07 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 260.74 | 163.52 | |
| ಒಟ್ಟು | 921.40 | 636.94 | |
| ಒಟ್ಟು ಸಂಪರ್ಕೆ ಮತ್ತು ಕಟ್ಟಡಗಳು | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 8012.60 | 5918.29 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 5808.16 | 3740.76 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 4974.29 | 4114.96 | |
| ಒಟ್ಟು | 18795.05 | 13774.01 | |
| ಲೆ.ಶಿ. 8443 ಕಾಮಗಾರಿಗಳು | |||
| ಠೇವಣಿ ವಂತಿಗೆ/ಮರುಪಾವತಿ ಕಾಮಗಾರಿಗಳು | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 598.43 | 598.43 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 2.98 | 2.98 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 783.18 | 625.74 | |
| ಒಟ್ಟು | 1384.59 | 1227.15 | |
| ಒಟ್ಟು ಲೋ.ಇ. ವೃತ್ತ : ಗುಲಬರ್ಗಾ | |||
| ಒಟ್ಟು ಲೋ.ಇ.ಯೋಜನೆ, ಯೋಜನೇತರ ಸೇರಿ | |||
| ಲೋ.ಇ.ವಿಭಾಗ ಗುಲಬರ್ಗಾ | 8611.03 | 6516.72 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಯಾದಗಿರ | 5811.14 | 3743.74 | |
| ಲೋ.ಇ.ವಿಭಾಗ ಬೀದರ | 5757.47 | 4740.70 | |
| ಒಟ್ಟು | 20179.64 | 15001.16 |
ಅಧೀಕ್ಷಕ ಅಭಿಯಂತರರು, ಪಿ.ಆರ್.1034
ಲೋಕೋಪಯೋಗಿ, ಬಂದರು ಮತ್ತು
ಒಳನಾಡು ಜಲಸಾರಿಗೆ ವೃತ್ತ, ಗುಲಬರ್ಗಾ.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೨೯೮೪ತೋಟಗಾರಿಕೆ ಇಲಾಖೆ
ಅಧಿಸೂಚನೆ
ಸಂಖ್ಯೆ: ತೋಇ 91 ತೋಸೇಪ 2010, ಬೆಂಗಳೂರು, ದಿನಾಂಕ:31ನೇ ಮೇ, 2010
ಮಾಹಿತಿ ಹಕ್ಕು ಅದಿನಿಯಮ 2005ರ (Central Act 22 of 2005) ಇದರ 4ನೇ ಕಲಂ ಅಡಿಯಲ್ಲಿ ಕರ್ನಾಟಕ ಸರ್ಕಾರದ ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಯ ಸಚಿವಾಲಯಕ್ಕೆ ಸಂಬಂದಿಸಿದಂತೆ ಮಾಹಿತಿಯನ್ನು ಸಾರ್ವಜನಿಕ ತಿಳುವಳಿಕೆಗಾಗಿ ಈ ಕೆಳಕಂಡಂತೆ ಪ್ರಕಟಿಸಲಾಗಿದೆ.
2005ರ ಮಾಹಿತಿ ಹಕ್ಕು ಅದಿನಿಯಮದ
ಕಲಂ 4(1) (ಬಿ) ರಡಿ ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಯ ಸಚಿವಾಲಯ ಹಂತದ ಸೂಚನಾ ಪಟ್ಟಿ
ಕಲಂ 4(1) (ಬಿ) ರಡಿ (i) ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಯ ಸಚಿವಾಲಯದ ಅಂಗ ರಚನೆ, ಕಾರ್ಯಗಳು ಮತ್ತು ಕರ್ತವ್ಯಗಳು
ಅಂಗರಚನೆ
ತೋಟಗಾರಿಕೆ ಸಚಿವರು
ಸರ್ಕಾರದ ಕಾರ್ಯದರ್ಶಿ, ತೋಟಗಾರಿಕೆ
ಸರ್ಕಾರದ ಉಪ ಕಾರ್ಯದರ್ಶಿ ಸರ್ಕಾರದ ಉಪ ಕಾರ್ಯದರ್ಶಿ (IFA) ಸರ್ಕಾರದ ಉಪ ಕಾರ್ಯದರ್ಶಿ ತೋಟಗಾರಿಕೆ ಕೃಷಿ ಮತ್ತು ತೋಟಗಾರಿಕೆ ಇಲಾಖೆ ಕೃಷಿ ಮತ್ತುತೋಟಗಾರಿಕೆ ಇಲಾಖೆ (ಕಾನೂನು ಕೋಶ) (ಕಾನೂನು ಕೋಶ) ಸರ್ಕಾರದ ಅದೀನ ಕಾರ್ಯದರ್ಶಿ ಶಾಖಾದಿಕಾರಿ (IFA:O & B) ಸರ್ಕಾರದ ಅದೀನ ಕಾರ್ಯದರ್ಶಿ ತೋಟಗಾರಿಕೆ
ಕೃಷಿ ಮತ್ತು ತೋಟಗಾರಿಕೆ (Legal Cell) ಶಾಖಾದಿಕಾರಿ ಶಾಖಾದಿಕಾರಿ ತಾಂತ್ರಿಕ ಅದಿಕಾರಿ ಶಾಖಾದಿಕಾರಿ (ತೋಟಗಾರಿಕೆ) (ಸ್ವೀಕೃತಿ ಮತ್ತು ರವಾನೆ)
ಕಾರ್ಯ ಮತ್ತು ಕರ್ತವ್ಯಗಳು
ಕರ್ನಾಟಕ ರಾಜ್ಯದಲ್ಲಿ ಪರಿಣಾಮಕಾರಿ ಮತ್ತು ಉತ್ಪನ್ನಕಾರಕ ತೋಟಗಾರಿಕೆಯನ್ನು ಸಾದಿಸುವುದೇ ಇಲಾಖೆಯ ಘನೋದ್ಧೇಶವಾಗಿದೆ. ಅದರಂತೆ ಇಲಾಖೆಯು ನಿದಿರ್ಷ್ಟ ಕಾರ್ಯಚಟುವಟಿಕೆಗಳನ್ನು ಹೊಂದಿದ್ದು, ಅವುಗಳಲ್ಲಿ ಪ್ರದೇಶ ವಿಸ್ತರಣೆ ಕಾರ್ಯಕ್ರಮ, ಅದಿಕ ಇಳುವರಿ ನೀಡುವ ತಳಿಗಳ ಪ್ರಾತ್ಯಕ್ಷತೆಗಳನ್ನು ಏರ್ಪಡಿಸುವುದು, ತೋಟಗಾರಿಕೆ ಬೆಳೆಗಳ ಉತ್ಕೃಷ್ಟ ಗುಣಮಟ್ಟದ ಕಸಿ/ಸಸಿ ಗಿಡಗಳ ಉತ್ಪಾದನೆ, ರೈತರ ಮತ್ತು ರೈತ ಮಹಿಳೆಯರಿಗೆ ತರಬೇತಿ, ಪ್ರಚಾರ ಹಾಗೂ ತಾಂತ್ರಿಕತೆ ಚಟುವಟಿಕೆಗಳಾದ ಅಂಗಾಂಶ ಕೃಷಿ, ಸಾವಯವ ಕೃಷಿ, ಅಣಬೆ ಅಬಿವೃದ್ಧಿ, ಡಿ.ಎನ್.ಎ.ಪಿಂಗರ್ ಪ್ರಿಂಟಿಂಗ್, ನೀರು ಮತ್ತು ಮಣ್ಣು ವಿಶ್ಲೇಷಣೆ, ಸುಗಂಧ ಬೆಳೆಗಳು, ಔಷದೀಯ ಹಾಗೂ ಪುಷ್ಪ ಬೆಳೆಗಳ ಉತ್ಪನ್ನಗಳು, ಸಂಸ್ಕರಣೆ ಮತ್ತು ಶೇಖರಣೆ ತರಬೇತಿ, ತೋಟಗಾರಿಕೆ ಬೆಳೆಗಳಿಗೆ ಮಾಲ್ಕಿ ಮೌಲ್ಯಮಾಪನ, ಇಲಾಖಾ ಅದಿಕಾರಿ/ ನೌಕರರ ಸೇವಾ ವಿಷಯಗಳಿಗೆ ಸಂಬಂಧಪಟ್ಟಂತೆ ನಿರ್ಣಯ ಹಾಗೂ ಕ್ರಮಕೈಗೊಳ್ಳುವುದು.
ತೋಟಗಾರಿಕೆ ವಿಷಯಕ್ಕೆ ಸಂಬಂಧಪಟ್ಟಂತೆ ಸಚಿವಾಲಯದ ಕೆಳಮಟ್ಟದಲ್ಲಿ ತೋಟಗಾರಿಕೆ ನಿರ್ದೇಶನಾಲಯವು ಕಾರ್ಯನಿರ್ವಹಿಸುತ್ತಿದ್ದು ಅದರ ಆಡಳಿತ ಕೇಂದ್ರ ಕಛೇರಿಯು ಲಾಲ್ಬಾಗ್, ಬೆಂಗಳೂರಿನಲ್ಲಿರುತ್ತದೆ. ನಿರ್ದೇಶನಾಲಯದ ಅದೀನ ತಾಲ್ಲೂಕು ಹಾಗೂ ಜಿಲ್ಲಾ ಮಟ್ಟದಲ್ಲಿ ಕಛೇರಿಗಳು ಕಾರ್ಯನಿರ್ವಹಿಸುತ್ತಿರುತ್ತವೆ.
ಹಾಪ್ಕಾಮ್ಸ್, ತೋಟಗಾರಿಕೆ ಮಹಾ ಮಂಡಳ ಹಾಗೂ ದ್ರಾಕ್ಷಿ ಸಂಸ್ಕರಣೆ ಮತ್ತು ದ್ರಾಕ್ಷರಸ ಬೋರ್ಡ್ ಇವುಗಳು ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಯ ಸ್ವಾಮ್ಯ ಸಂಸ್ಥೆಗಳಾಗಿರುತ್ತವೆ.
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೨೯೮೫ಹಾಪ್ಕಾಮ್ಸ್: ಈ ಸಂಸ್ಥೆಯಲ್ಲಿ ಸದಸ್ಯತ್ವ ಹೊಂದಿದ ತೋಟಗಾರಿಕೆ ಬೆಳೆಗಾರರಿಂದ ತೋಟಗಾರಿಕೆ ಬೆಳೆಗಳನ್ನು ಪಡೆದು ಹಾಪ್ಕಾಮ್ಸ್ ಸಂಸ್ಥೆಯ ಮಳಿಗೆಗಳಲ್ಲಿ ಮಾರಾಟ ವಹಿವಾಟು ನಿರ್ವಹಿಸುತ್ತಿದೆ.
ತೋಟಗಾರಿಕೆ ಮಹಾ ಮಂಡಳಿ: (ಜಿಲ್ಲಾವಾರು ಹಾಪ್ಕಾಮ್ಸ್ ಮಳಿಗೆಗಳು) ಈ ಮಹಾಮಂಡಳದ ಅಡಿ ವಿವಿಧ ಜಿಲ್ಲೆಗಳ ಅಡಿಯಲ್ಲಿ ತಾಲ್ಲೂಕು ಮಟ್ಟದಲ್ಲಿ ನೋಂದಾಯಿತ ತೋಟಗಾರಿಕೆ ಬೆಳೆಗಾರರಿಂದ ತೋಟಗಾರಿಕೆ ಬೆಳೆಗಳನ್ನು ಪಡೆದು ಮಾರಾಟ ವಹಿವಾಟು ನಿರ್ವಹಿಸುತ್ತಿದೆ.
ದ್ರಾಕ್ಷಿ ಸಂಸ್ಕರಣೆ ಮತ್ತು ದ್ರಾಕ್ಷರಸ ಬೋರ್ಡ್: ಕರ್ನಾಟಕ ರಾಜ್ಯದ ರೈತರ ಹಿತದೃಷ್ಟಿಯಿಂದ ವಿವಿಧ ದ್ರಾಕ್ಷಿ ಬೆಳೆ ಬೇಸಾಯ ಪ್ರೋತ್ಸಾಹಿಸುವುದು ಹಾಗೂ ದ್ರಾಕ್ಷಾರಸ ಉತ್ಪಾದನೆ ಮತ್ತು ಮಾರುಕಟ್ಟೆಯನ್ನು ಅಬಿವೃದ್ಧಿಪಡಿಸುವುದು ಈ ಸಂಸ್ಥೆಯ ಮುಖ್ಯ ಧ್ಯೇಯವಾಗಿರುತ್ತದೆ. ಈ ಮಂಡಳಿಯಡಿ:
1) ದ್ರಾಕ್ಷಿ ಬೆಳೆ ಬೇಸಾಯದ ಗುಣಮಟ್ಟ ಮತ್ತು ನಿಯಂತ್ರಣ
2) ದ್ರಾಕ್ಷಾರಸ ಬೆಳೆಯ ಗುಣಮಟ್ಟದ ಮಾಪನ ಮತ್ತು ನಿಯಮಗಳನ್ನು ರೂಪಿಸಿ ಅನುಮೋದಿಸುವುದು.
3) ಲೇಬಲ್ಗಳಿಗೆ ಅನುಮೋದನೆ ನೀಡುವುದು.
4) ಕರ್ನಾಟಕದಲ್ಲಿ ದ್ರಾಕ್ಷಾರಸ ಬೆಳೆ, ಬೇಸಾಯ ಮತ್ತು ಉದ್ಯಮಕ್ಕೆ ಅನುಕೂಲವಾಗುವಂತಹ ಕಾರ್ಯಕ್ರಮಗಳನ್ನು ಕೈಗೊಳ್ಳುವುದು, ಅವುಗಳಲ್ಲಿ ಸಂಶೋಧನೆ, ಪ್ರದರ್ಶನಗಳು, ಜಾತ್ರೆಗಳು, ಪ್ರವಾಸಗಳು ಮತ್ತು ಭೇಟಿಗಳು, ಭಾರತ ಮತ್ತು ಹೊರದೇಶಗಳಲ್ಲಿ ದ್ರಾಕ್ಷಾರಸ ಮಾರಾಟ ಮತ್ತು ಮಾರುಕಟ್ಟೆಗೆ ಯೋಜನೆಗಳನ್ನು ರೂಪಿಸುವುದು. ಕಲಂ 4(1) (ಬಿ) (ii) ರಡಿ ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಯ ಸಚಿವಾಲಯದ ಅದಿಕಾರಿಗಳು ಮತ್ತು ನೌಕರರ ವಿವರ ಹಾಗೂ
| ಕ್ರ. ಸಂ. | ಹುದ್ದೆ ಹಾಗೂ ಹೆಸರು ಕಛೇರಿ ವಿಳಾಸ | ವಹಿಸಲಾಗಿರುವ ಕರ್ತವ್ಯಗಳು |
| 1. ತೋಟಗಾರಿಕೆ ಸಚಿವರು | ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಯ ಅಬಿವೃದ್ಧಿಗೆ ಸಂಬಂಧಪಟ್ಟ ವಿಷಯಗಳು | |
| 2. ತೋಟಗಾರಿಕೆ ಸಚಿವರ ಆಪ್ತ ಕಾರ್ಯದರ್ಶಿ | ತೋಟಗಾರಿಕೆ ಸಚಿವಾಲಯದಿಂದ ಬಂದಂತಹ ಕಡತ/ವರದಿ/ಮಾಹಿತಿಗಳನ್ನು ಮುಂದಿನ ಕ್ರಮಕ್ಕಾಗಿ ಸಚಿವರ ಗಮನಕ್ಕೆ ತರುವುದು ಹಾಗೂ ನೇರವಾಗಿ ಸಚಿವರಿಂದ ಸ್ವೀಕೃತಗೊಂಡಿರುವ ಪತ್ರಗಳ ಮೇಲೆ ಕ್ರಮ ಕೈಗೊಳ್ಳುವಂತೆ ಅದೀನ ಕಛೇರಿಗಳಿಗೆ ಕಳುಹಿಸುವುದು. | |
| 3. ಸರ್ಕಾರದ ಕಾರ್ಯದರ್ಶಿ ಕೊಠಡಿ ಸಂ:405, 4ನೇ ಮಹಡಿ, 2ನೇ ಹಂತ, ಬಹುಮಹಡಿ ಕಟ್ಟಡ, ಬೆಂಗಳೂರು-560 001 | ತೋಟಗಾರಿಕೆ ಸಚಿವರಿಂದ ಸ್ವೀಕೃತಗೊಂಡಂತಹ ಟಪಾಲುಗಳು ಹಾಗೂ ಕಡತಗಳಲ್ಲಿ ನಿರ್ದೇಶಿಸಲ್ಪಟ್ಟಿರುವ ವಿಷಯಗಳನ್ನು ಕಾರ್ಯರೂಪಕ್ಕೆ ತರುವುದು, ಇಲಾಖಾ ಸಚಿವರಿಗೆ ಆರ್ಥಿಕ ಮತ್ತು ಆಡಳಿತ ವಿಷಯಕ್ಕೆ ಸಂಬಂದಿಸಿದಂತೆ ವಿಷದಪಡಿಸುವುದು, ಕಾಲಕ್ಕನುಗುಣವಾಗಿ ಇಲಾಖಾ ಅಬಿವೃದ್ಧಿಗೆ ಸಂಬಂದಿಸಿದಂತೆ ಯೋಜನೆಗಳನ್ನು ಅನುಷ್ಠಾನಗೊಳಿಸುವುದು ಹಾಗೂ CAG ವರದಿಗೆ ಸಂಬಂದಿಸಿದಂತಹ ವಿಷಯಗಳು, ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಯ ಎ ಮತ್ತು ಬಿ ಸಮೂಹದ ಅದಿಕಾರಿಗಳ ಸೇವಾ ವಿಷಯಕ್ಕೆ ಸಂಬಂಧಪಟ್ಟಂತೆ ಹಾಗೂ ಮಾಹಿತಿ ಹಕ್ಕು ಅದಿನಿಯಮ ಕಲಂ 4(1)(ಬಿ)ರಡಿ ಉಪ-ಖಂಡ (iii),(iv),(v)ರಲ್ಲಿ ಸೂಚಿಸಿರುವ ದಸ್ತಾವೇಜುಗಳನ್ನೊಳಗೊಂಡಂತೆ ಕ್ರಮ ವಹಿಸುವುದು. | |
| 4. ಸರ್ಕಾರದ | ಕಾರ್ಯದರ್ಶಿಯವರ ಆಪ್ತ ಕಛೇರಿ, ಕೊಠಡಿ ಸಂ:419, 4ನೇ ಮಹಡಿ, 2ನೇ ಹಂತ, | ಅ) ಆಪ್ತ ಕಾರ್ಯದರ್ಶಿ: ತೋಟಗಾರಿಕೆ ಸಚಿವಾಲಯದ ಅದೀನ ಬಂದಂತಹ ಕಡತ/ ವರದಿ/ ಮಾಹಿತಿಗಳನ್ನು ಮುಂದಿನ ಕ್ರಮಕ್ಕಾಗಿ ಕಾರ್ಯದರ್ಶಿಯವರ ಗಮನಕ್ಕೆ ತರುವುದು ಹಾಗೂ ನೇರವಾಗಿ ಕಾರ್ಯದರ್ಶಿಯವರಿಂದ ಸ್ವೀಕೃತಗೊಂಡಿರುವ ಪತ್ರಗಳ ಮೇಲೆ ಕ್ರಮ ಕೈಗೊಳ್ಳುವಂತೆ ಅದೀನ |
| ಕ್ರ. ಸಂ. | ಹುದ್ದೆ ಹಾಗೂ ಹೆಸರು ಕಛೇರಿ ವಿಳಾಸ | |
| ಬಹುಮಹಡಿ ಕಟ್ಟಡ, ಬೆಂಗಳೂರು-560 001 ಅ) ಆಪ್ತ ಕಾರ್ಯದರ್ಶಿ ಆ) ಶೀಘ್ರಲಿಪಿಗಾರರು ಇ) ಕಿರಿಯ ಸಹಾಯಕರು ಈ) ದಲಾಯತ್ | ||
| 5. ಸರ್ಕಾರದ | ಉಪ ಕಾರ್ಯದರ್ಶಿ, ಕೊಠಡಿ ಸಂ:427, 4ನೇ ಮಹಡಿ, 2ನೇ ಹಂತ, ಬಹುಮಹಡಿ ಕಟ್ಟಡ, ಬೆಂಗಳೂರು-560 001 | |
| 6. ಸರ್ಕಾರದ | ಉಪ ಕಾರ್ಯದರ್ಶಿ ಯವರ ಆಪ್ತ ಸಹಾಯಕರು, ಕೊಠಡಿ ಸಂ:426, 4ನೇ ಮಹಡಿ, 2ನೇ ಹಂತ, ಬಹುಮಹಡಿ ಕಟ್ಟಡ, ಬೆಂಗಳೂರು-560 001 |
| ಕ್ರ. ಸಂ. | ಹುದ್ದೆ ಹಾಗೂ ಹೆಸರು ಕಛೇರಿ ವಿಳಾಸ | ವಹಿಸಲಾಗಿರುವ ಕರ್ತವ್ಯಗಳು | ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಇನ್ನಿತರೆ | NaN | |
| ಅ ) ಆಪ್ತ ಸಹಾಯಕರು ಆ) ಕಿರಿಯ ಸಹಾಯಕರು ಇ) ದಲಾಯತ್ | ಆ) ಕಿರಿಯ ಸಹಾಯಕರು: ಕಛೇರಿಯ ಕಡತ ಮತ್ತು ಪತ್ರಗಳನ್ನು ಗಣಕಯಂತ್ರದ ಮುಖಾಂತರ ಚಲನ ವಲನ ನಿರ್ವಹಣೆ, ಕಛೇರಿ ಮುಖ್ಯಸ್ಥರು ಸೂಚಿಸುವ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು ಕೆಲಸಗಳು. ಇ) ದಲಾಯತ್: ಕಛೇರಿಯ ಮುಖ್ಯಸ್ಥರು ಸೂಚಿಸಿರುವ ಕೆಲಸಗಳು ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. | NaN | |||
| 7. ಸರ್ಕಾರದ ಅದೀನ ಕಾರ್ಯದರ್ಶಿ, ಕೊಠಡಿ ಸಂ:422, 4ನೇ ಮಹಡಿ, 2ನೇ ಹಂತ, ಬಹುಮಹಡಿ ಕಟ್ಟಡ, ಬೆಂಗಳೂರು-560 001 | ಸರ್ಕಾರದ ಕಾರ್ಯದರ್ಶಿ ಹಾಗೂ ಉಪ ಕಾರ್ಯದರ್ಶಿಗಳು ನೀಡಿದಂತಹ ನಿರ್ದೇಶನಗಳನ್ವಯ ಕ್ರಮ ಕೈಗೊಳ್ಳುವುದು. ಹಾಗೂ ತೋಟಗಾರಿಕೆ ನಿರ್ದೇಶನಾಲಯದಿಂದ ಬರುವಂತಹ ಪ್ರಸ್ತಾವನೆಗಳಿಗೆ ಮುಂದಿನ ಆದೇಶ ಕೋರಿ ಉನ್ನತ ಅದಿಕಾರಿಗಳಿಗೆ ಸಲ್ಲಿಸುವುದು. ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಕ್ರಮ ಕೈಗೊಳ್ಳುವುದು ಹಾಗೂ ಮಾಹಿತಿ ಹಕ್ಕು (iii),(iv),(v)ರಲ್ಲಿ ಅದಿನಿಯಮ ಕಲಂ 4(1)(ಬಿ)ರಡಿ ಉಪ-ಖಂಡ ಸೂಚಿಸಿರುವ ದಸ್ತಾವೇಜುಗಳನ್ನೊಳಗೊಂಡಂತೆ ಕ್ರಮ ವಹಿಸುವುದು. | NaN | |||
| 8. ಸರ್ಕಾರದ | ಅದೀನ ಕಾರ್ಯದರ್ಶಿ ಯವರ ಆಪ್ತ ಸಹಾಯಕರು, ಕೊಠಡಿ ಸಂ:422, 4ನೇ ಮಹಡಿ, 2ನೇ ಹಂತ, ಬಹುಮಹಡಿ ಕಟ್ಟಡ, ಬೆಂಗಳೂರು-560 001 | ಉಕ್ತಲೇಖನವನ್ನು ತೆಗೆದುಕೊಳ್ಳುವುದು, ಗಣಕ ಯಂತ್ರದಲ್ಲಿ ಪತ್ರ ಹಾಗೂ ಕಡತಗಳ ಚಲನವಲನ ನಿರ್ವಹಣೆ, ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಕೆಲಸಗಳು ಹಾಗೂ ಅದೀನ ಕಾರ್ಯದರ್ಶಿಯವರಿಂದ ನಿರ್ದೇಶಿಸಲ್ಪಡುವ ಇತರೆ ಕೆಲಸಗಳು. | NaN | ||
| 9. ಶಾಖಾದಿಕಾರಿ (ತೋಟಗಾರಿಕೆ) ಕೊಠಡಿ ಸಂ:422, 4ನೇ ಮಹಡಿ, 2ನೇ ಹಂತ, ಬಹುಮಹಡಿ ಕಟ್ಟಡ, ಬೆಂಗಳೂರು ಅ ) ಹಿರಿಯ ಸಹಾಯಕರು | ಸರ್ಕಾರದ ಕಾರ್ಯದರ್ಶಿ ಹಾಗೂ ಉಪ ಕಾರ್ಯದರ್ಶಿ ಹಾಗೂ ಅದೀನ ಕಾರ್ಯದರ್ಶಿಯವರು ನೀಡಿದಂತಹ ನಿರ್ದೇಶನಗಳನ್ವಯ ಕ್ರಮ ಕೈಗೊಳ್ಳುವುದು. ಹಾಗೂ ತೋಟಗಾರಿಕೆ ನಿರ್ದೇಶನಾಲಯದಿಂದ ಬರುವಂತಹ ಪ್ರಸ್ತಾವನೆಗಳಿಗೆ ಮುಂದಿನ ಆದೇಶ ಕೋರಿ ಮೇಲಾದಿಕಾರಿಗಳಿಗೆ ಸಲ್ಲಿಸುವುದು. ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಕ್ರಮ ಕೈಗೊಳ್ಳುವುದು ಹಾಗೂ ಮಾಹಿತಿ ಹಕ್ಕು ಅದಿನಿಯಮ ಕಲಂ 4(1)(ಬಿ)ರಡಿ ಉಪ-ಖಂಡ (iii),(iv),(v)ರಲ್ಲಿ ಸೂಚಿಸಿರುವ ದಸ್ತಾವೇಜುಗಳನ್ನೊಳಗೊಂಡಂತೆ ಕ್ರಮ ವಹಿಸುವುದು. ಅ) ಹಿರಿಯ ಸಹಾಯಕರು: ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಯ ಎ ವೃಂದದ ಅದಿಕಾರಿಗಳ ಸೇವಾ ವಿವರದ ನಿರ್ವಹಣೆ, ನ್ಯಾಯಾಲಯ ವಿಷಯಗಳು, ವಿಧಾನ ಪರಿಷತ್/ಸಭೆ ಪ್ರಶ್ನೆಗಳು, ಗಮನ ಸೆಳೆಯುವ ಸೂಚನೆಗಳು, ಭರವಸೆಗಳು, ಕಡತ ಚಲನವಲನ ಹಾಗೂ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಕ್ರಮ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ | NaN | |||
| ಆ) ಸಹಾಯಕರು-1 ಇ) ಸಹಾಯಕರು-2 ಈ) ಕಿರಿಯ ಸಹಾಯಕರು ಉ) ದಲಾಯತ್ | ಕಲಂ ಕಲಂ ಕೈಗೊಳ್ಳುವುದು ಹಾಗೂ ಮಾಹಿತಿ ಹಕ್ಕು ಅದಿನಿಯಮ (iii),(iv),(v)ರಲ್ಲಿ ಸೂಚಿಸಿರುವ 4(1)(ಬಿ)ರಡಿ ಉಪ-ಖಂಡ ದಸ್ತಾವೇಜುಗಳನ್ನೊಳಗೊಂಡಂತೆ ಕ್ರಮ ವಹಿಸುವುದು, ಮೇಲಾದಿಕಾರಿಗಳಿಂದ ಸೂಚಿಸಲ್ಪಡುವ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. ಆ) ಸಹಾಯಕರು-1: ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಯ ಬಿ ವೃಂದದ ಅದಿಕಾರಿಗಳ ಸೇವಾ ವಿವರದ ನಿರ್ವಹಣೆ, ನ್ಯಾಯಾಲಯ ವಿಷಯಗಳು, ಕಾರ್ಯನೀತಿ ವಿಷಯ, ಆಡಿಟ್ ವಿಷಯ, ಅರ್ಜಿ ಸಮಿತಿಯ ವಿಷಯ ಹಾಗೂ ಸಾಮಾನ್ಯ ವಿಷಯಗಳ ನಿರ್ವಹಣೆ ಮತ್ತು ಕಡತ ಚಲನವಲನ, ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಕ್ರಮ ಕೈಗೊಳ್ಳುವುದು ಹಾಗೂ ಮಾಹಿತಿ ಹಕ್ಕು ಅದಿನಿಯಮ ಕಲಂ ಕಲಂ 4(1)(ಬಿ)ರಡಿ ಉಪ-ಖಂಡ (iii),(iv),(v)ರಲ್ಲಿ ಸೂಚಿಸಿರುವ ದಸ್ತಾವೇಜುಗಳನ್ನೊಳಗೊಂಡಂತೆ ಕ್ರಮ ವಹಿಸುವುದು, ಮೇಲಾದಿಕಾರಿಗಳಿಂದ ಸೂಚಿಸಲ್ಪಡುವ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. ಆ) ಸಹಾಯಕರು-2: ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಯ ಬಿ ವೃಂದದ ಅದಿಕಾರಿಗಳು ಹಾಗೂ ಲಿಪಿಕ ವೃಂದದ ಅದಿಕಾರಿ/ನೌಕರರ ಸೇವಾ ವಿಷಯಗಳು, ನ್ಯಾಯಾಲಯ ವಿಷಯಗಳು ಕಡತ ಚಲನವಲನ, ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಕ್ರಮ ಕೈಗೊಳ್ಳುವುದು ಹಾಗೂ ಮಾಹಿತಿ ಹಕ್ಕು ಅದಿನಿಯಮ ಕಲಂ ಕಲಂ (iii),(iv),(v)ರಲ್ಲಿ ಸೂಚಿಸಿರುವ 4(1)(ಬಿ)ರಡಿ ಉಪ-ಖಂಡ ದಸ್ತಾವೇಜುಗಳನ್ನೊಳಗೊಂಡಂತೆ ಕ್ರಮ ವಹಿಸುವುದು, ಮೇಲಾದಿಕಾರಿಗಳಿಂದ ಸೂಚಿಸಲ್ಪಡುವ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. ಆ) ಕಿರಿಯ ಸಹಾಯಕರು: ಕಛೇರಿಯ ಕಡತ ಮತ್ತು ಪತ್ರಗಳನ್ನು ಗಣಕಯಂತ್ರದ ಮುಖಾಂತರ ಚಲನ ವಲನ ನಿರ್ವಹಣೆ, ಕಛೇರಿ ಮುಖ್ಯಸ್ಥರು ಸೂಚಿಸುವ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. ಇ) ದಲಾಯತ್: ಕಛೇರಿಯ ಮುಖ್ಯಸ್ಥರು ಸೂಚಿಸಿರುವ ಕೆಲಸಗಳು ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. | NaN | |||
| 10. ಶಾಖಾದಿಕಾರಿ (ಸ್ವೀಕೃತಿ ಮತ್ತು ರವಾನೆ) ಕೊಠಡಿ ಸಂ:426, 4ನೇ ಮಹಡಿ, 2ನೇ ಹಂತ, ಬಹುಮಹಡಿ ಕಟ್ಟಡ, ಬೆಂಗಳೂರು. | ಇಲಾಖೆಯ ಸ್ವೀಕೃತಿ ಮತ್ತು ರವಾನೆಗೆ ಸಂಬಂದಿಸಿದ ವಿಷಯಗಳು. ಕಛೇರಿಗೆ ಅಗತ್ಯವಿರುವ ಲೇಖನ ಸಾಮಗ್ರಿ ಮತ್ತು ಸಲಕರಣೆಗಳ ಖರೀದಿಗೆ ಸಂಬಂದಿಸಿದ ವಿಷಯಗಳು, ಇಲಾಖಾ ಸಮನ್ವಯ ವಿಷಯಗಳು. ಹಾಗೂ ಉಪ ನೀಡಿದಂತಹ ಕಾರ್ಯದರ್ಶಿ/ಅದೀನ ಕಾರ್ಯದರ್ಶಿಯವರು ನಿರ್ದೇಶನಗಳನ್ವಯ ಕ್ರಮ ಕೈಗೊಳ್ಳುವುದು. ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಕ್ರಮ ಕೈಗೊಳ್ಳುವುದು ಹಾಗೂ ಮಾಹಿತಿ ಹಕ್ಕು | NaN | |||
| ಕ್ರ. ಸಂ. | ಹುದ್ದೆ ಹಾಗೂ ಹೆಸರು ಕಛೇರಿ ವಿಳಾಸ | ವಹಿಸಲಾಗಿರುವ ಕರ್ತವ್ಯಗಳು | |||
| ಅ ) ಸಹಾಯಕರು ಆ) ಕಿರಿಯ ಸಹಾಯಕರು ಇ) ಬೆರಳಚ್ಚುಗಾರರು. ಈ) ದಲಾಯತ್ | (iii),(iv),(v) ರಲ್ಲಿ ಅದಿನಿಯಮ ಕಲಂ 4(1)(ಬಿ)ರಡಿ ಉಪ-ಖಂಡ ಸೂಚಿಸಿರುವ ದಸ್ತಾವೇಜುಗಳನ್ನೊಳಗೊಂಡಂತೆ ಕ್ರಮ ವಹಿಸುವುದು. ಅ) ಸಹಾಯಕರು: ಕಛೇರಿಗೆ ಅಗತ್ಯವಿರುವ ಲೇಖನ ಸಾಮಗ್ರಿ ಮತ್ತು ಸಲಕರಣೆಗಳ ದಾಸ್ತಾನಿಗೆ ಸಂಬಂದಿಸಿದ ವಿಷಯ ನಿರ್ವಹಣೆ, ಸಚಿವಾಲಯದ ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಯ ನೌಕರರ ರಜೆಯ ವಿಷಯಗಳು, ಇಲಾಖಾ ಸಮನ್ವಯ ವಿಷಯಗಳು. ಕಡತ ಚಲನವಲನ ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಕ್ರಮ ಕೈಗೊಳ್ಳುವುದು ಹಾಗೂ ಮಾಹಿತಿ ಹಕ್ಕು ಅದಿನಿಯಮ ಕಲಂ 4(1)(ಬಿ)ರಡಿ ಉಪ-ಖಂಡ (iii),(iv),(v)ರಲ್ಲಿ ಸೂಚಿಸಿರುವ ದಸ್ತಾವೇಜುಗಳನ್ನೊಳಗೊಂಡಂತೆ ಕ್ರಮ ವಹಿಸುವುದು, ಮೇಲಾದಿಕಾರಿಗಳಿಂದ ಸೂಚಿಸಲ್ಪಡುವ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. ಆ) ಕಿರಿಯ ಸಹಾಯಕರು: ಶಾಖೆಯಲ್ಲಿ ಸ್ವೀಕೃತವಾಗುವ ಎಲ್ಲಾ ಕಡತ ಮತ್ತು ಪತ್ರಗಳನ್ನು ಗಣಕಯಂತ್ರದ ಮುಖಾಂತರ ಚಲನ ವಲನ ನಿರ್ವಹಣೆ, ಕಛೇರಿ ಮುಖ್ಯಸ್ಥರು ಸೂಚಿಸುವ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. ಇ) ಬೆರಳಚ್ಚುಗಾರರು: ಇಲಾಖೆಯ ಪತ್ರ ವ್ಯವಹಾರಗಳನ್ನು ಗಣಕ ಯಂತ್ರದಲ್ಲಿ ಬೆರಳಚ್ಚಿಸುವುದು., ಕಛೇರಿ ಮುಖ್ಯಸ್ಥರು ಸೂಚಿಸುವ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. ಈ) ದಲಾಯತ್: ಕಛೇರಿಯ ಮುಖ್ಯಸ್ಥರು ಸೂಚಿಸಿರುವ ಕೆಲಸಗಳು ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. | ||||
| 11. ಹಿರಿಯ ಸಹಾಯಕ ತೋಟಗಾರಿಕೆ ನಿರ್ದೇಶಕರು, ಒ.ಒ.ಡಿ. ತಾಂತ್ರಿಕ ಅದಿಕಾರಿ, ತೋಟಗಾರಿಕೆ ಇಲಾಖೆ, ಕೊಠಡಿ ಸಂ:422, 4ನೇ ಮಹಡಿ, 2ನೇ ಹಂತ, ಬಹುಮಹಡಿ ಕಟ್ಟಡ, ಬೆಂಗಳೂರು ಅ) ಸಹಾಯಕ ತೋಟಗಾರಿಕೆ ಅದಿಕಾರಿ | ತಾಂತ್ರಿಕ ವಿಷಯಗಳಿಗೆ ಸಂಬಂಧಪಟ್ಟಂತೆ ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಯ ತೋಟಗಾರಿಕೆ ರಫ್ತು, ಬೆಳೆ ವಿಸ್ತರಣೆ, ರಾಷ್ಟ್ರೀಯ ತೋಟಗಾರಿಕೆ ಮಿಷನ್ ಹಾಗೂ ಇತರೆ ಯೋಜನಾ ಕಾರ್ಯಕ್ರಮಗಳಿಗೆ, ಕಾರ್ಯಸೂಚಿ ತಯಾರಿಕೆ ಹಾಗೂ ತೋಟಗಾರಿಕೆ ಕಾರ್ಯದರ್ಶಿಗಳು ನಿರ್ದೇಶಿಸಿದಂತಹ ಇತರೆ ಕೆಲಸಗಳ ನಿರ್ವಹಣೆ. ಅ) ಸಹಾಯಕ ತೋಟಗಾರಿಕೆ ಅದಿಕಾರಿ: ತಾಂತ್ರಿಕ ಅದಿಕಾರಿಗೆ ಸಹಾಯಕವಾಗಿ ಅವರು ನಿರ್ವಹಿಸುವ ವಿಷಯಗಳು ಒಳಗೊಂಡಂತೆ ಹಾಗೂ ನಿರ್ದೇಶಿಸಲ್ಪಟ್ಟ ಇತರೆ ಕೆಲಸಗಳು, ಹಾಗೂ ಕಡತಗಳ ವಿಲೇವಾರಿ ಆ) ಬೆರಳಚ್ಚುಗಾರರು: ತಾಂತ್ರಿಕ ಅದಿಕಾರಿ ತಿಳಿಸುವ ಕಡತಗಳ ಬೆರಳಚ್ಚು ಕಾರ್ಯವನ್ನು ನಿರ್ವಹಿಸುವುದು. |
| ಕ್ರ. ಸಂ. | ಹುದ್ದೆ ಹಾಗೂ ಹೆಸರು ಕಛೇರಿ ವಿಳಾಸ | ವಹಿಸಲಾಗಿರುವ ಕರ್ತವ್ಯಗಳು | |
| ಆ) ಬೆರಳಚ್ಚುಗಾರರು ಇ)ದ್ವಿತೀಯ ದರ್ಜೆ ಸಹಾಯಕರು | ಇ) ದ್ವಿತೀಯ ದರ್ಜೆ ಸಹಾಯಕರು ಕಛೇರಿಯ ಕಡತ ಮತ್ತು ಪತ್ರಗಳನ್ನು ಗಣಕಯಂತ್ರದ ಮುಖಾಂತರ ಚಲನ ವಲನ ನಿರ್ವಹಣೆ, ಕಛೇರಿ ಮುಖ್ಯಸ್ಥರು ಸೂಚಿಸುವ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು | ||
| 12. ಸರ್ಕಾರದ ಉಪ ಕಾರ್ಯದರ್ಶಿ ಆಂತರಿಕ ಆರ್ಥಿಕ ಸಲಹೆಗಾರರು ಹಾಗೂ ಆಪ್ತ ಶಾಖೆ (ತೋಟಗಾರಿಕೆ) ಕೊಠಡಿ ಸಂ:407, 4ನೇ ಮಹಡಿ, 2ನೇ ಹಂತ, ಬಹುಮಹಡಿ ಕಟ್ಟಡ, ಬೆಂಗಳೂರು-560 001 ಅ) ಆಪ್ತ ಸಹಾಯಕರು ಆ) ದಲಾಯತ್ | ತೋಟಗಾರಿಕೆ ಕಾರ್ಯದರ್ಶಿಯವರಿಂದ ಸ್ವೀಕೃತಗೊಂಡಂತಹ ಟಪಾಲುಗಳು ಹಾಗೂ ಕಡತಗಳಲ್ಲಿ ನಿರ್ದೇಶಿಸಲ್ಪಟ್ಟಿರುವ ವಿಷಯಗಳನ್ನು ಕಾರ್ಯರೂಪಕ್ಕೆ ತರುವುದು, ಆರ್ಥಿಕ ಮತ್ತು ಆಡಳಿತ, ಯೋಜನೆ ವಿಷಯಗಳಿಗೆ ಸಂಬಂದಿಸಿದಂತೆ ಅಬಿಪ್ರಾಯಕ್ಕೆ ಬಂದಂತಹ ವಿಷಯಗಳನ್ನು ಪರಿಶೀಲಿಸಿ ಅಬಿಪ್ರಾಯ ನೀಡುವುದು ಹಾಗೂ ಆರ್ಥಿಕ ಇಲಾಖೆಯು ಆಂತರಿಕ ಆರ್ಥಿಕ ಸಲಹೆಗಾರರಿಗೆ ನಿಗದಿಪಡಿಸಿರುವಂತಹ ಆರ್ಥಿಕ ಪ್ರತ್ಯಾಯೋಜನೆಯ ಪ್ರಕಾರ ಇಲಾಖೆಯ ಮುಂಗಡ ಪತ್ರಕ್ಕೆ ಸಂಬಂದಿಸಿದಂತೆ ವಿಷದಪಡಿಸುವುದು, CAG, PAC ವರದಿಗೆ ಸಂಬಂದಿಸಿದಂತಹ ವಿಷಯಗಳು, ಮಧ್ಯಾವದಿ ಆರ್ಥಿಕ ಯೋಜನೆ ಕುರಿತು ವರದಿ ತಯಾರಿಸುವುದು. ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಕ್ರಮ ಕೈಗೊಳ್ಳುವುದು ಹಾಗೂ ಮಾಹಿತಿ ಹಕ್ಕು ಅದಿನಿಯಮ ಕಲಂ 4(1)(ಬಿ)ರಡಿ ಉಪ-ಖಂಡ (iii),(iv),(v)ರಲ್ಲಿ ಸೂಚಿಸಿರುವ ದಸ್ತಾವೇಜುಗಳನ್ನೊಳಗೊಂಡಂತೆ ಕ್ರಮ ವಹಿಸುವುದು. ಅ) ಆಪ್ತ ಸಹಾಯಕರು ತೋಟಗಾರಿಕೆಗೆ ಸಂಬಂಧಪಟ್ಟಂತಹ ಕಡತ/ ವರದಿ/ಮಾಹಿತಿಗಳನ್ನು ಮುಂದಿನ ಕ್ರಮಕ್ಕಾಗಿ ಉಪ ಕಾರ್ಯದರ್ಶಿಯವರ ಗಮನಕ್ಕೆ ತರುವುದು ಹಾಗೂ ನೇರವಾಗಿ ಉಪ ಕಾರ್ಯದರ್ಶಿಯವರಿಂದ ಸ್ವೀಕೃತ ಗೊಂಡಿರುವ ಪತ್ರಗಳ ಮೇಲೆ ಕ್ರಮ ಕೈಗೊಳ್ಳುವಂತೆ ಅದೀನ ಕಛೇರಿಗಳಿಗೆ ಕಳುಹಿಸುವುದು, ಉಪ ಕಾರ್ಯದರ್ಶಿಯವರಿಂದ ಸೂಚಿಸಲ್ಪಟ್ಟ ಇತರೆ ಕಛೇರಿ ಕೆಲಸಗಳು ಹಾಗೂ ಉಖ್ತಲೇಖನವನ್ನು ತೆಗೆದುಕೊಳ್ಳುವುದು, ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. ಆ) ದಲಾಯತ್: ಕಛೇರಿಯ ಮುಖ್ಯಸ್ಥರು ಸೂಚಿಸಿರುವ ಕೆಲಸಗಳು ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. | ||
| 13. ಶಾಖಾದಿಕಾರಿ, ಆಂತರಿಕ ಆರ್ಥಿಕ ಸಲಹೆಗಾರರು (ಬಜೆಟ್ ಶಾಖೆ) ತೋಟಗಾರಿಕೆ ಇಲಾಖೆ, ಕೊಠಡಿ ಸಂ:----, 4ನೇ ಮಹಡಿ, 2ನೇ ಹಂತ, ಬಹುಮಹಡಿ ಕಟ್ಟಡ, ಬೆಂಗಳೂರು ಅ) ಸಹಾಯಕರು-1 ಆ) ಸಹಾಯಕರು-2 ಇ) ಕಿರಿಯ ಸಹಾಯಕರು | ಉಪ ಕಾರ್ಯದರ್ಶಿಯವರಿಂದ ಸ್ವೀಕೃತಗೊಂಡ ಪತ್ರಗಳು ಹಾಗೂ ಇತರೆ ಶಾಖೆಗಳಿಂದ ಬಂದಂತಹ ಕಡತಗಳನ್ನು ಪರಿಶೀಲಿಸಿ ಉನ್ನತ ಅದಿಕಾರಿಯವರ ಅಬಿಪ್ರಾಯ ಹಾಗೂ ಆದೇಶಕ್ಕೆ ಸಲ್ಲಿಸುವುದು. ಇಲಾಖೆಯ ಮುಂಗಡ ಪತ್ರ ತಯಾರಿಕೆ, ಅಪೆಂಡಿಕ್ಸ್ - ಬಿ ತಯಾರಿಸುವುದು, ಯೋಜನೆಗಳ ಪರಿಶೀಲನೆ ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಕ್ರಮವಹಿಸುವುದು. ಅ) ಸಹಾಯಕರು-1 ಮತ್ತು ಸಹಾಯಕರು-2 ಮೇಲೆ ಸೂಚಿಸಿರುವಂತೆ ಪತ್ರಗಳ ಮೇಲೆ ಕಡತ ತೆರೆಯುವುದು, ಟಿಪ್ಪಣಿ ಮಾಡುವುದು, ಪತ್ರವ್ಯವಹಾರಗಳಲ್ಲಿ ಶಾಖಾದಿಕಾರಿಗೆ ನೆರವಾಗುವುದು. ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಕ್ರಮವಹಿಸುವುದು. ಆ) ಕಿರಿಯ ಸಹಾಯಕರು: ಕಛೇರಿಯ ಕಡತ ಮತ್ತು ಪತ್ರಗಳನ್ನು ಗಣಕಯಂತ್ರದ ಮುಖಾಂತರ ಚಲನ | ||
| ಈ) ದಲಾಯತ್ | ವಲನ ನಿರ್ವಹಣೆ, ಕಛೇರಿ ಮುಖ್ಯಸ್ಥರು ಸೂಚಿಸುವ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು ಕೆಲಸಗಳು. ಇ) ದಲಾಯತ್: ಕಛೇರಿಯ ಮುಖ್ಯಸ್ಥರು ಸೂಚಿಸಿರುವ ಕೆಲಸಗಳು ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. | ||
| 14. ಶಾಖಾದಿಕಾರಿ, ಆಂತರಿಕ ಆರ್ಥಿಕ ಸಲಹೆಗಾರರು (ಅಬಿಪ್ರಾಯ) ತೋಟಗಾರಿಕೆ ಇಲಾಖೆ, ಕೊಠಡಿ ಸಂ:----, 4ನೇ ಮಹಡಿ, 2ನೇ ಹಂತ, ಬಹುಮಹಡಿ ಕಟ್ಟಡ, ಬೆಂಗಳೂರು ಅ) ಸಹಾಯಕರು-1 ಆ) ಸಹಾಯಕರು-2 ಇ) ಕಿರಿಯ ಸಹಾಯಕರು ಈ) ದಲಾಯತ್ | ಉಪ ಕಾರ್ಯದರ್ಶಿಯವರಿಂದ ಸ್ವೀಕೃತಗೊಂಡ ಪತ್ರಗಳು ಹಾಗೂ ಇತರೆ ಶಾಖೆಗಳಿಂದ ಬಂದಂತಹ ಕಡತಗಳನ್ನು ಪರಿಶೀಲಿಸಿ ಉನ್ನತ ಅದಿಕಾರಿಯವರ ಅಬಿಪ್ರಾಯ ಹಾಗೂ ಆದೇಶಕ್ಕೆ ಸಲ್ಲಿಸುವುದು. ಇಲಾಖೆಯು ಸೇವಾ ವಿಷಯಕ್ಕೆ ಸಂಬಂಧಪಟ್ಟಂತೆ ಹಾಗೂ ನಿವೃತ್ತಿ ಸೌಲಭ್ಯಗಳ ಮೇಲೆ ಕೋರಿರುವಂತಹ ಆರ್ಥಿಕ ಸವಲತ್ತುಗಳಿಗೆ ಸಂಬಂಧಪಟ್ಟಂತೆ ಪರಿಶೀಲಿಸಿ ಕ್ರಮ ಕೈಗೊಳ್ಳುವುದು ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಕ್ರಮ ವಹಿಸುವುದು. ಅ) ಸಹಾಯಕರು-1 ಮತ್ತು ಸಹಾಯಕರು-2 ಮೇಲೆ ಸೂಚಿಸಿರುವಂತೆ ಪತ್ರಗಳ ಮೇಲೆ ಕಡತ ತೆರೆಯುವುದು, ಟಿಪ್ಪಣಿ ಮಾಡುವುದು, ಪತ್ರವ್ಯವಹಾರಗಳಲ್ಲಿ ಶಾಖಾದಿಕಾರಿಗೆ ನೆರವಾಗುವುದು. ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಕ್ರಮವಹಿಸುವುದು. ಆ) ಕಿರಿಯ ಸಹಾಯಕರು: ಕಛೇರಿಯ ಕಡತ ಮತ್ತು ಪತ್ರಗಳನ್ನು ಗಣಕಯಂತ್ರದ ಮುಖಾಂತರ ಚಲನ ವಲನ ನಿರ್ವಹಣೆ, ಕಛೇರಿ ಮುಖ್ಯಸ್ಥರು ಸೂಚಿಸುವ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. ಇ) ದಲಾಯತ್: ಕಛೇರಿಯ ಮುಖ್ಯಸ್ಥರು ಸೂಚಿಸಿರುವ ಕೆಲಸಗಳು ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯಲ್ಲಿ ಈ ಹುದ್ದೆಗೆ ಸೂಚಿಸಿರುವಂತೆ ಇನ್ನಿತರೆ ಕೆಲಸಗಳು. | ||
| 15. ಕಾನೂನು ಕೋಶದ ಮುಖ್ಯಸ್ಥರು ಹಾಗೂ ಪದನಿಮಿತ್ತ ಸರ್ಕಾರದ ಉಪ ಕಾರ್ಯದರ್ಶಿ (ತೋಟಗಾರಿಕೆ) ಕೊಠಡಿ ಸಂ: ಬಹುಮಹಡಿ ಕಟ್ಟಡ, ಬೆಂಗಳೂರು-560 001 ಅ) ಅದೀನ ಕಾರ್ಯದರ್ಶಿ ಆ) ಶೀಘ್ರಲಿಪಿಗಾರರು-2ಹುದ್ದೆ ಇ) ಸಹಾಯಕರು ಆ) ದಲಾಯತ್- 2 ಹುದ್ದೆ | ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಗೆ ಸಂಬಂಧಪಟ್ಟಂತೆ ಅದಿಕಾರಿ/ನೌಕರರು ಸೇವಾ ವಿಷಯ ಹಾಗೂ ಜಮೀನು ವಿಷಯಕ್ಕೆ ಸಂಬಂಧಪಟ್ಟಂತೆ ಭಾದಿತರಾದವರಿಂದ ನ್ಯಾಯಾಲಯದಲ್ಲಿ ಹೂಡಲ್ಪಟ್ಟಂತಹ ದಾವೆಯ ಬಗ್ಗೆ ಕಾನೂನು ಸಲಹೆ, ವಕೀಲರ ನೇಮಕಾತಿ, ಕಂಡಿಕೆವಾರು ಷರಾಗಳ ಪರಿಶೀಲನೆ, ನ್ಯಾಯಾಲಯದಿಂದ ಆದೇಶಿಸಲ್ಪಟ್ಟ ಆದೇಶದ ಮೇಲೆ ಇಲಾಖೆಯು ಮೇಲ್ಮನವಿ ಸಲ್ಲಿಸಲು ಇಚ್ಚಿಸಿದಲ್ಲಿ ಮೇಲ್ಮನವಿ ಪ್ರಾದಿಕಾರದಲ್ಲಿ ದಾವೆ ದಾಖಲಿಸುವಿಕೆ ಹಾಗೂ ಇಲಾಖೆಗೆ ಸಂಬಂಧಪಟ್ಟಂತಹ ನ್ಯಾಯಾಲಯದ/ ಕಾನೂನು ಸಲಹೆಯನ್ನು ನೀಡುವುದು. |
ಕಲಂ 4(1)(ಬಿ) ರಡಿ (iii) ಮೇಲ್ವಿಚಾರಣೆ ಮತ್ತು ಹೊಣೆಗಾರಿಕೆಯ ಮಾರ್ಗಗಳು ಸೇರಿದಂತೆ ತೀರ್ಮಾನ ತೆಗೆದುಕೊಳ್ಳುವ
ಪ್ರಕ್ರಿಯೆಯಲ್ಲಿ ಅನುಸರಿಸಬೇಕಾದ ಕಾರ್ಯವಿಧಾನ.
ಅ) ಮೇಲ್ವಿಚಾರಣೆ ಮತ್ತು ಹೊಣೆಗಾರಿಕೆಯ ಮಾರ್ಗಗಳು ಸೇರಿದಂತೆ ತೀರ್ಮಾನ ತೆಗೆದುಕೊಳ್ಳುವ ಪ್ರಕ್ರಿಯೆಯು ಈ ಕೆಳಕಂಡಂತೆ
ಇರುತ್ತವೆ:-
1) ವಿಷಯ ನಿರ್ವಾಹಕರು/ಸಹಾಯಕ/ಹಿರಿಯ ಸಹಾಯಕ: ಪತ್ರಗಳ ನಿರ್ವಹಣೆ ಹಾಗೂ ಹೊಸ ಕಡತಗಳನ್ನು ತೆರೆಯುವುದು ಹಾಗೂ ಕಡತಕ್ಕೆ ಸಂಬಂದಿಸಿದಂತೆ ವ್ಯವಹರಿಸುವುದು ಮತ್ತು ಟಿಪ್ಪಣಿ ಮಾಡುವುದು.
2) ಶಾಖಾದಿಕಾರಿ: ವಿಷಯ ನಿರ್ವಾಹಕರು ಸಲ್ಲಿಸಿದಂತಹ ಕಡತಗಳು ಪರಿಶೀಲಿಸುವುದು ಮತ್ತು ಕ್ರೋಡೀಕೃತ ಟಿಪ್ಪಣಿಯೊಂದಿಗೆ ಅದೀನ ಕಾರ್ಯದರ್ಶಿ ಅಥವಾ ಸಂದರ್ಭಾನುಸಾರ ಉಪ ಕಾರ್ಯದರ್ಶಿಯವರಿಗೆ ಕಡತವನ್ನು ಅನುಮೋದನೆ, ಅಬಿಪ್ರಾಯ ಅಥವಾ ಆದೇಶಕ್ಕೆ ಸಲ್ಲಿಸುವುದು.
3) ಅದೀನ ಕಾರ್ಯದರ್ಶಿ: ಶಾಖಾದಿಕಾರಿಗಳಿಂದ ಪಡೆದಂತಹ ಕಡತಗಳ ಮೇಲೆ ನಿದಿರ್ಷ್ಟವಾದ ಅಬಿಪ್ರಾಯ ಹಾಗೂ ಚಾಲ್ತಿಯಲ್ಲಿರುವ ನಿಯಮಾನುಸಾರ ಕಡತವನ್ನು ಮೇಲಾದಿಕಾರಿಗಳಿಗೆ ಸಲ್ಲಿಸುವುದು ಹಾಗೂ ಮೇಲಾದಿಕಾರಿಗಳ ಟಿಪ್ಪಣಿಗಳ ಅನುಸಾರ ಪತ್ರ ಹೊರಡಿಸುವುದು ಮತ್ತು ಆದೇಶ ಹೊರಡಿಸುವುದು ಹಾಗೂ ಇವರಿಗೆ ನಿಗದಿ ಪಡಿಸಿದಂತಹ ಆರ್ಥಿಕ ಪ್ರತ್ಯಾಯೋಜನೆಯನ್ವಯ ಕಾರ್ಯನಿರ್ವಹಿಸುವುದು.
4) ಉಪ ಕಾರ್ಯದರ್ಶಿ:ಅದೀನ ಅದಿಕಾರಿಗಳಿಂದ ಸ್ವೀಕೃತಗೊಂಡ ಕಡತಗಳ ಸಮಗ್ರ ಪರಿಶೀಲನೆ ನಂತರ ತಾವು ಸೂಚಿಸಬಹುದಾದ ನಿದಿರ್ಷ್ಟ ಅಬಿಪ್ರಾಯದೊಂದಿಗೆ ಇಲಾಖಾ ಕಾರ್ಯದರ್ಶಿಗಳ ಅನುಮೋದನೆಗೆ ಕಡತಗಳನ್ನು ಸಲ್ಲಿಸುವುದು ಹಾಗೂ ತಮಗೆ ನಿಗದಿಪಡಿಸಿದಂತಹ ಆರ್ಥಿಕ ಪ್ರತ್ಯಾಯೋಜನೆಯನ್ವಯ ನಿದಿರ್ಷ್ಟವಾದ ಆದೇಶಗಳನ್ನು ಹೊರಡಿಸಲು ಅನುಮೋದನೆ ನೀಡುವುದು.
5) ಕಾರ್ಯದರ್ಶಿ: ಅದೀನ ಅದಿಕಾರಿಗಳಿಂದ ಸ್ವೀಕೃತಗೊಂಡ ಕಡತಗಳ ಸಮಗ್ರ ಪರಿಶೀಲನೆ ನಂತರ ತಾವು ಸೂಚಿಸಬಹುದಾದ ನಿದಿರ್ಷ್ಟ ಅಬಿಪ್ರಾಯ ಹಾಗೂ ತಮಗೆ ನಿಗದಿಪಡಿಸಿದಂತಹ ಆರ್ಥಿಕ ಪ್ರತ್ಯಾಯೋಜನೆ ರೀತ್ಯ ಕ್ರಮ ವಹಿಸುವುದು ಹಾಗೂ ಕಾರ್ಯನೀತಿ ಹಾಗೂ ಪ್ರಮುಖವಾದ ವಿಷಯಗಳ ಬಗ್ಗೆ ಕ್ರೋಡೀಕೃತ ಟಿಪ್ಪಣಿಯೊಂದಿಗೆ ಮಾನ್ಯ ತೋಟಗಾರಿಕೆ ಸಚಿವರ ಅಬಿಪ್ರಾಯ ಹಾಗೂ ಆದೇಶಕ್ಕೆ ಅಥವಾ ಸಂದರ್ಭಾನುಸಾರ ಸರ್ಕಾರದ ಅನುಮೋದನೆಗೆ ಸಲ್ಲಿಸುವುದು.
ಕಲಂ 4(1)(ಬಿ) (iv) ರಡಿ ಪ್ರಕಾರ್ಯಗಳ ಅನುಷ್ಠಾನಕ್ಕೆ ನಿಗದಿಗೊಳಿಸಿರುವ ಮಾರ್ಗಸೂಚಿಗಳು
ದಲಾಯತ್: ತಮಗೆ ನಿದಿರ್ಷ್ಟವಾದ ಕೆಲಸ ಕಾರ್ಯಗಳನ್ನು ಹಾಗೂ ಸೂಚಿಸಲಾದ ಕೆಲಸಗಳನ್ನು ಆ ದಿನದಂದೇ ಕಾರ್ಯರೂಪಕ್ಕೆ ತರುವುದು.
ಕಿರಿಯ ಸಹಾಯಕರು: ತಮಗೆ ನಿದಿರ್ಷ್ಟವಾದ ಕೆಲಸ ಕಾರ್ಯಗಳನ್ನು ಹಾಗೂ ಸೂಚಿಸಲಾದ ಕೆಲಸಗಳನ್ನು ಆ ದಿನದಂದೇ ಕಾರ್ಯರೂಪಕ್ಕೆ ತರುವುದು ಹಾಗೂ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯನ್ವಯ ಕ್ರಮವಹಿಸುವುದು.
ಸಹಾಯಕ/ಹಿರಿಯ ಸಹಾಯಕ: ತಾವು ಪಡೆದಂತಹ ಪತ್ರಗಳನ್ನು ಐದು ದಿನಗಳಿಗೂ ಮೀರದಂತಹ ಸಮಯದೊಳಗೆ ನಿರ್ವಹಿಸುವುದು ಹಾಗೂ ಹೊಸ ಕಡತಗಳನ್ನು ತೆರೆದು ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯನ್ವಯ ನಿದಿರ್ಷ್ಟಪಡಿಸಿದಂತೆ ಕ್ರಮವಹಿಸುವುದು.
ಶಾಖಾದಿಕಾರಿ, ಅದೀನ ಕಾರ್ಯದರ್ಶಿ, ಉಪ ಕಾರ್ಯದರ್ಶಿ ಮತ್ತು ಕಾರ್ಯದರ್ಶಿ ಇವರುಗಳು ಪತ್ರ/ಕಡತಗಳನ್ನು
ಆಧ್ಯತೆ ಮೇರೆಗೆ ಕಾರ್ಯನಿರ್ವಹಿಸುವುದು.
ಕಲಂ 4(1)(ಬಿ) (v) ರಡಿ ಅದರ ಕಾರ್ಯಗಳನ್ನು ನೆರವೇರಿಸುವುದಕ್ಕಾಗಿ ಅದು ಹೊಂದಿರುವ ಅಥವಾ ಅದರ ನಿಯಂತ್ರಣದಲ್ಲಿರುವ
ಅಥವಾ ಅದರ ಉದ್ಯೋಗಿಗಳು ಬಳಸುವ ನಿಯಮಗಳು, ವಿನಿ ನಿಯಮಗಳು, ಅನುಸೂಚಿಗಳು, ಕೈಪಿಡಿಗಳು ಮತ್ತು ದಾಖಲೆಗಳನ್ನು
:ಈ ಕೆಳಕಂಡಂತಿರುತ್ತದೆ
1. The Karnataka Government Parks (Preservation) Act 1975ರ 2. ಕರ್ನಾಟಕ ನಾಗರೀಕ ಸೇವಾ ನಿಯಮ (ಸಾಮಾನ್ಯ ನೇಮಕಾತಿ) ನಿಯಮಗಳು 1977 3. ಕರ್ನಾಟಕ ನಾಗರೀಕ ಸೇವಾ ನಿಯಮ (ಸೇವೆ ಮತ್ತು ಕನ್ನಡ ಭಾಷಾ ಪರೀಕ್ಷೆ) ನಿಯಮಗಳು 1974 4. ಕರ್ನಾಟಕ ನಾಗರೀಕ ಸೇವಾ ನಿಯಮ (ಪ್ರೊಭೆಷನರಿ) ನಿಯಮಗಳು 1977ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೨೯೯೩ 5. ಪರಿಶಿಷ್ಟ ಪಂಗಡ/ಪರಿಶಿಷ್ಟ ಜಾತಿ ಮತ್ತು ಹಿಂದುಳಿದ ವರ್ಗಗಳ ಮೀಸಲಾತಿ ನಿಯಮಗಳು 6. ಕರ್ನಾಟಕ ನಾಗರೀಕ ಸೇವಾ ನಿಯಮ (ಕಾರ್ಯನಿರ್ವಹಣ) ನಿಯಮಗಳು 1994 7. ಕರ್ನಾಟಕ ನಾಗರೀಕ ಸೇವಾ ನಿಯಮ (ವರ್ಗೀಕರಣ, ನಿಯಂತ್ರಣ ಮತ್ತು ಅಪೀಲು) ನಿಯಮಗಳು 1957 8. ಕರ್ನಾಟಕ ನಾಗರೀಕ ಸೇವಾ ನಿಯಮ (ನಡತೆ) ನಿಯಮಗಳು 1966 9. The Government (Allocation of Business) Rules 1977
10. Karnataka Transaction of Business Rules, 1977
11. The Karnataka Government Servants (Medical Attendance) Rules, 1963
12. The Karnataka Public Service Commission (Consultation) Regulation, 2000.
13. Appointment to the dependents of Government Servants who die while in service on compassionate grounds.
14. The Departmental Promotion Committees
15. The Karnataka Civil Service Rules.
16. The Karnataka Lokayuktha Act And
17. as per the delegation powers issued by the Finance Department to the concerned Departments.
18. ಕರ್ನಾಟಕ ಸಾರ್ವಜನಿಕ ಸಂಗ್ರಹಣೆಗಳಲ್ಲಿ ಪಾರದರ್ಶಕತೆ ಅದಿನಿಯಮ 1999.
19. ಕರ್ನಾಟಕ ಸಾರ್ವಜನಿಕ ಸಂಗ್ರಹಣೆಗಳಲ್ಲಿ ಪಾರದರ್ಶಕತೆ (ತಿದ್ದುಪಡಿ) ಅದಿನಿಯಮ 2001
20. ಕರ್ನಾಟಕ ಸರ್ಕಾರದ ಸಚಿವಾಲಯದ ಕೈಪಿಡಿಯ ಅನುಸಾರ. ಕಲಂ 4(1) ಬಿ ರಡಿ (VI) ಅಡಿ ಅದು ಹೊಂದಿರುವ ಅಥವಾ ಅದರ ನಿಯಂತ್ರಣದಲ್ಲಿರುವ ದಾಸ್ತಾವೇಜುಗಳ ಪ್ರವರ್ಗಗಳ ವಿವರ ಪಟ್ಟಿಯನ್ನು:
1) ಇದೇ ನಿಯಮದ ಉಪ ನಿಯಮ (V) ರಲ್ಲಿ ಸೂಚಿಸಿರುವ ಎಲ್ಲಾ ದಾಸ್ತಾವೇಜುಗಳು ಸರ್ಕಾರದ ಪರಿಶೀಲನೆಗೆ ಲಭ್ಯವಿರುತ್ತದೆ.
2) ಸರ್ಕಾರದಲ್ಲಿ ಕಾರ್ಯನಿರ್ವಹಿಸುತ್ತಿರುವ ಎಲ್ಲಾ ಕಡತಗಳು ಹಾಗೂ ಈ ಹಿಂದೆ ಮುಕ್ತಾಯಗೊಂಡಂತಹ ಪ್ರಮುಖ ಕಡತಗಳು ದಾಖಲಾತಿ ಶಾಖೆಯಲ್ಲಿ ಲಭ್ಯವಿರುತ್ತದೆ.
3) ಇಲಾಖೆಯ ಕೆಲವೊಂದು ವಿಷಯಕ್ಕೆ ಸಂಬಂಧಪಟ್ಟಂತೆ ನಿರ್ದೇಶನಾಲಯದ ಮಟ್ಟದಲ್ಲಿ ದಾಖಲಾತಿಗಳು. ಕಲಂ 4(1)ಬಿ ರಡಿ (VII) ಅಡಿ ಅದರ ಕಾರ್ಯನೀತಿ ರಚನೆ ಅಥವಾ ಅದರ ಅನುಷ್ಠಾನಕ್ಕೆ ಸಂಬಂದಿಸಿದಂತೆ ಸಾರ್ವಜನಿಕರೊಡನೆ ಸಮಾಲೋಚಿಸಲು ಅಥವಾ ಅವರ ಪ್ರಾತಿನಿಧ್ಯವಿರುವಂತೆ ಮಾಡಲು ಇರುವ ಯಾವುದೇ ವ್ಯವಸ್ಥೆಯ ವಿವರಗಳನ್ನು:
1) ಕಾರ್ಯನೀತಿಗೆ ಸಂಬಂದಿಸಿದಂತೆ ಸಾರ್ವಜನಿಕರೊಡನೆ ಸಮಾಲೋಚಿಸಲು ಅಗತ್ಯವಿರುವಂತಹ ಪ್ರಕರಣಗಳಲ್ಲಿ ಕಾರ್ಯನೀತಿ ಅಂತಿಮಗೊಳಿಸುವ ಮುನ್ನವೇ ಅಂತಹ ಸಮಾಲೋಚನೆಯನ್ನು ಪಡೆಯಲಾಗುವುದು.
ಕಲಂ 4(1) ಬಿ ರಡಿ (VIII) ಅಡಿ ಮಂಡಳಿಗಳು, ಪರಿಷತ್ತುಗಳು, ಸಮಿತಿಗಳು ಅಥವಾ ಇತರ ನಿಕಾಯಗಳು ಮತ್ತು
ಅದರ ಭಾಗವಾಗಿ ಅಥವಾ ಅದರ ಸಲಹೆಯ ಉದ್ದೇಶಕ್ಕಾಗಿ ರಚಿತವಾದ ಇಬ್ಬರು ಅಥವಾ ಹೆಚ್ಚು ವ್ಯಕ್ತಿಗಳನ್ನೊಳಗೊಂಡ
ಮಂಡಳಿಗಳ, ಪರಿಷತ್ತುಗಳ, ಸಮಿತಿಗಳ ಮತ್ತು ಇತರ ನಿಕಾಯಗಳ ಸಭೆಗಳು ಸಾರ್ವಜನಿಕರಿಗೆ ಮುಕ್ತವಾಗಿರುತ್ತವೆಯೇ ಅಥವಾ
| ಕ್ರ. ಸಂ. | ಮಂಡಳಿ, ಪರಿಷತ್ತು, ಸಮಿತಿ ಮತ್ತು ಇತರ ನಿಕಾಯಗಳ ವಿವರ | ಸದರಿ ಸಭೆಗೆ ಸಾರ್ವಜನಿಕರು ಮುಕ್ತವಾಗಿ ಭಾಗವಹಿಸಬಹುದೇ? / ಅಂತಹ ಸಭೆಗಳ ನಡಾವಳಿಗಳು ಸಾರ್ವಜನಿಕರಿಗೆ ದೊರೆಯುತ್ತವೆಯೇ |
| 1. | ತೋಟದ ಬೆಳೆಗಾರರ ಸಹಕಾರಿ ಮಾರಾಟ ಮತ್ತು ಸಂಸ್ಕರಣ ಸಂಘ ನಿಯಮಿತ (HOPCOMS), ಬೆಂಗಳೂರು, ಮೈಸೂರು, ಮಂಡ್ಯ, | ಆಡಳಿತ ಮಂಡಳಿಯ ಸಭೆಗಳು ಸಾರ್ವಜನಿಕರಿಗೆ ಮುಕ್ತವಾಗಿರುವುದಿಲ್ಲ, ಆದರೆ ಸಭಾ ನಡವಳಿಗಳನ್ನು ಸಮುಚಿತ ಮಾರ್ಗದ ಮುಖಾಂತರ ಕೋರಿದಲ್ಲಿ ಮಾಹಿತಿಯು ನೀಡಲಾಗುತ್ತದೆ. |
| 2. | ಕರ್ನಾಟಕ ರಾಜ್ಯ ಸಹಕಾರಿ ತೋಟಗಾರಿಕಾ ಮಹಾ ಮಂಡಳ, (KHF) | ಮಹಾಮಂಡಳದ ಅಡಿಯಲ್ಲಿ ಮೂರು ಸಭೆಗಳನ್ನು ನಡೆಸಲಾಗುತ್ತದೆ. ವಾರ್ಷಿಕ ಮಹಾ ಸಭೆ/ವಿಶೇಷ ಮಹಾ ಸಭೆ ವರ್ಷಕ್ಕೆ ಒಮ್ಮೆ ಕರೆಯಲಾಗುತ್ತದೆ. ಆಡಳಿತ ಮಂಡಳಿಯ ಸಭೆಮತ್ತು ಕಾರ್ಯಕಾರಿ ಸಮಿತಿ ಸಭೆ ಸದರಿ ಸಭೆಯಲ್ಲಿ ಈ ಮಂಡಳಿಯ ಸದಸ್ಯರಿಗೆ ಮಾತ್ರ ಭಾಗವಹಿಸಲು ಅವಕಾಶವಿರುತ್ತದೆ. ಇದರಲ್ಲಿ ಮುಕ್ತವಾಗಿ ಸಮಾಲೋಚನೆಗೆ ಆದರೆ ಸಭಾ ನಡವಳಿಗಳನ್ನು ಸಮುಚಿತ ಮಾರ್ಗದ ಮುಖಾಂತರ ಕೋರಿದಲ್ಲಿ ಮಾಹಿತಿಯು ನೀಡಲಾಗುತ್ತದೆ. |
| 3. | ಕರ್ನಾಟಕ ದ್ರಾಕ್ಷರಸ ಹಾಗೂ ಸಂಸ್ಕರಣ ಮಂಡಳಿ | ಆಡಳಿತ ಮಂಡಳಿಯ ಸಭೆಗಳು ಸಾರ್ವಜನಿಕರಿಗೆ ಮುಕ್ತವಾಗಿರುವುದಿಲ್ಲ, ಆದರೆ ನಡವಳಿಗಳನ್ನು ಸಮುಚಿತ ಮಾರ್ಗದ ಮುಖಾಂತರ ಕೋರಿದಲ್ಲಿ ಮಾಹಿತಿಯು ನೀಡಲಾಗುತ್ತದೆ. |
| 4. | ಸುವರ್ಣ ಕರ್ನಾಟಕ ಉದ್ಯಾನವನಗಳ ಪ್ರತಿಷ್ಠಾನ | ಸುವರ್ಣ ಕರ್ನಾಟಕ ಉದ್ಯಾನವನಗಳ ರಡಿ ರಾಜ್ಯದ ಅದಿಕಾರಿಯುತ ರಚಿಸಲಾಗಿರುತ್ತದೆ. ಇದರ ವ್ಯಾಪ್ತಿಯು ರಾಜ್ಯಕ್ಕೆ ಸೀಮಿತವಾಗಿರುತ್ತದೆ ಹಾಗೂ 4 ಪ್ರಾದೇಶಿಕ ಅದಿಕಾರಯುತ ಸಮಿತಿಯನ್ನು ಸ್ಥಾಪಿಸಲಾಗಿದೆ. ಅವುಗಳು ಬೆಂಗಳೂರು, ಮೈಸೂರು, ಹಾಗೂ ಗುಲ್ಬರ್ಗಾ ವಲಯಗಳಿಗೆ ಸೀಮಿತವಾಗಿದ್ದು ಇದು ರಾಜ್ಯದ ಅದಿಕಾರಿಯುತ ಸಮಿತಿಯ ಕೆಳಗೆ ಕಾರ್ಯ ನಿರ್ವಹಿಸುತ್ತಿರುತ್ತದೆ. ಈ ಸಮಿತಿಗಳ ಸಭೆಯಲ್ಲಿ ಸಾರ್ವಜನಿಕರು ಮುಖತ:ವಾಗಿ ಭಾಗವಹಿಸಲು ಅವಕಾಶವಿರುವುದಿಲ್ಲ. ಸ್ಪಷ್ಟವಾದ ಕಾರಣ ತಿಳಿಸಿದಲ್ಲಿ ನೀಡಲಾಗುತ್ತದೆ. |
ಕಲಂ 4(1) ಬಿ ರಡಿ (IX) ಮತ್ತು (X) ಅಡಿ ಅದರ ಅದಿಕಾರಿಗಳ ಮತ್ತು ನೌಕರರ ನಿರ್ದೇಶಿಕೆಯನ್ನು ಮತ್ತು ಅದರ
ನಿಯಮಗಳಲ್ಲಿ ಉಪಬಂದಿಸಿರುವಂತೆ ಪರ್ಯಾಯ ವ್ಯವಸ್ಥೆಯೂ ಸೇರಿದಂತೆ ಅದರ ಪ್ರತಿಯೊಬ್ಬ ಅದಿಕಾರಿ ಮತ್ತು ನೌಕರರು
| ಕ್ರ ಸಂ | ಹೆಸರು ಮತ್ತು ಪದನಾಮ (ನಿಯಮ IX ಮತ್ತು X) ಶ್ರೀ/ಶ್ರೀಮತಿ | ದೂರವಾಣಿ ಸಂಖ್ಯೆ (ನಿಯಮ IX) | ತಿಂಗಳ ವೇತನ (ನಿಯಮ X) |
| 1. | ಎಸ್.ಜಿ.ಹೆಗಡೆ, ಸರ್ಕಾರದ ಕಾರ್ಯದರ್ಶಿ, | 22353934 | ರೂ.97,057 |
| 2. | ಜಗದೀಶ ಜೋಯಿಸ್, ಸರ್ಕಾರದ ಉಪ ಕಾರ್ಯದರ್ಶಿ | 2353878 | ರೂ.22,650 |
| 3. | ಭಾಗ್ಯಲಕ್ಷ್ಮಿ, ಎನ್.ಆರ್. ಸರ್ಕಾರದ ಉಪ ಕಾರ್ಯದರ್ಶಿ (ಆಂತರಿಕ ಆರ್ಥಿಕ ಸಲಹೆಗಾರರು) | 22353949 | ರೂ.24,450 |
| 4. | ಮೀನಾಕ್ಷಿ ಎಂ.ಭಾವಿ. ಕಾನೂನು ಕೋಶದ ಮುಖ್ಯಸ್ಥರು. | 22353773 | |
| 5. | ಪ್ರಸಾದ್, ಹೆಚ್.ಎನ್. ಸರ್ಕಾರದ ಅದೀನ ಕಾರ್ಯದರ್ಶಿ, ಕಾನೂನು ಕೋಶ. | 22032881 | ರೂ. |
| 6. | ಎಸ್.ರಾಜು, ಸರ್ಕಾರದ ಅದೀನ ಕಾರ್ಯದರ್ಶಿ. | 22032226 | ರೂ.27,524 |
| 7. | ಎನ್.ವೆಂಕಟರಾಮರಾವ್, ತಾಂತ್ರಿಕ ಅದಿಕಾರಿ. | 22032101 | ರೂ.42,000 |
| 8. | ಎ.ಎ.ಚಪ್ಪರಬಂದ್, ಶಾಖಾದಿಕಾರಿ, ತೋಟಗಾರಿಕೆ ಶಾಖೆ. | 22032101 | ರೂ.27,524 |
| 9. | ಉಮಾ.ಕೆ., ಶಾಖಾದಿಕಾರಿ, ಸ್ವೀಕೃತಿ ಮತ್ತು ರವಾನೆ. | 22032172 | ರೂ.19,722 |
| 10. | ಡಿ.ಸುಗುಣ, ಕಾರ್ಯದರ್ಶಿಯವರ ಆಪ್ತ ಕಾರ್ಯದರ್ಶಿ | 22353934 | ರೂ.27,524 |
| 11. | ಸಿ.ಆರ್.ಜಯರಾಮ್ ಕಾರ್ಯದರ್ಶಿಯವರ ಪತ್ರಾಂಕಿತ ಆಪ್ತ ಸಹಾಯಕರು. | 22353934 | ರೂ.29,210 |
| 12. | ಶಾಖಾದಿಕಾರಿ, (ಆಂತರಿಕ ಆರ್ಥಿಕ ಸಲಹೆ ಗಾರರು) (ಬಜೆಟ್) | 22032721 | ರೂ.21,290 |
| 13. | ಶಾಖಾದಿಕಾರಿ, (ಆಂತರಿಕ ಆರ್ಥಿಕ ಸಲಹೆಗಾರರು) (ಅಬಿಪ್ರಾಯ) | 22032710 | ರೂ. - |
| 14. | ಲಕ್ಷ್ಮೀನಾರಾಯಣಹೊಳ್ಳ, ಶೀಘ್ರಲಿಪಿಗಾರರು. | 22353934 | ರೂ.21,053 |
| 15. | ಡಾ:ಜಿ.ರಮೇಶ್, ತಾಂತ್ರಿಕ ಸಹಾಯಕರು, | 22032101 | ರೂ.24,098 |
| 16. | ಸಿ.ಪರಮೇಶ, ಶ್ರೀಘಲಿಪಿಗಾರ. ಸರ್ಕಾರದ ಉಪ ಕಾರ್ಯದರ್ಶಿಯವರ ಆಪ್ತ ಶಾಖೆ. | 22353878 | ರೂ.14,035 |
| 17. | ಆರ್.ಎಸ್.ಬಿರಾದರ, ಆಪ್ತ ಸಹಾಯಕರು, ಸರ್ಕಾರದ ಅದೀನ ಕಾರ್ಯದರ್ಶಿ, | 22032101 | ರೂ.15,004 |
| 18. | ವಿ.ಪ್ರಕಾಶ್, ಹಿರಿಯ ಸಹಾಯಕರು, ತೋಟಗಾರಿಕೆ | 22032101 | ರೂ.21,500 |
| 19. | ಜಿ.ಲಕ್ಷ್ಮಣ, ಸಹಾಯಕರು, ತೋಟಗಾರಿಕೆ ಶಾಖೆ. | 22032101 | ರೂ.15,822 |
| 20. | ಬಸವರಾಜು, ಸಹಾಯಕರು ತೋಟಗಾರಿಕೆ ಶಾಖೆ. | 22032101 | ರೂ.13,500 |
| 21. | ಎಂ.ಶಾಂತಲಾ, ಸಹಾಯಕರು ಸ್ವೀಕೃತಿ ಮತ್ತು ರವಾನೆ ಶಾಖೆ. | 22032172 | ರೂ,13.962 |
| 22. | ಆರ್. ಮಾಲತಿ, ಕಿರಿಯ ಸಹಾಯಕರು, ತೋಟಗಾರಿಕೆ ಶಾಖೆ. | 22032101 | ರೂ.13,000 |
| 23. | ಶ್ರೀ ಕರಿಯಪ್ಪ, ಕಿರಿಯ ಸಹಾಯಕರು, ಸರ್ಕಾರದ ಉಪ ಕಾರ್ಯದರ್ಶಿ, ತೋಟಗಾರಿಕೆ | 22353878 | ರೂ.14,000 |
| 24. | ಕೆ.ಹರಿ, ಕಿರಿಯ ಸಹಾಯಕರು, ಸ್ವೀಕೃತಿ ಮತ್ತು ರವಾನೆ ಶಾಖೆ. | 22032172 | ರೂ.12,000 |
| 25. | ಎಸ್.ರಾಜೇಶ್ವರಿ, ಕಿರಿಯ ಸಹಾಯಕರು | 22032172 | ರೂ.9,840 |
| 26. | ಎನ್.ಉಮೇಶ್, ದ್ವಿತೀಯ ದರ್ಜೆ ಸಹಾಯಕರು, ಒಒಡಿ. ತಾಂತ್ರಿಕ ಶಾಖೆ. | 22302101 | ರೂ.10,944 |
| 27. | ಎನ್.ವಿ.ಜಾಹ್ನವಿ. ಹಿರಿಯ ಬೆರಳಚ್ಚು ಗಾರರು, ಒಒಡಿ. ತೋಟಗಾರಿಕೆ ಶಾಖೆ. | 22302101 | ರೂ.15,800 |
| 28. | ಉಷಾ, ಬೆರಳಚ್ಚುಗಾರ್ತಿ, ಒಒಡಿ.ತಾಂತ್ರಿಕ ಶಾಖೆ. | 22302101 | ರೂ,10.560 |
| 29. | ಎಂ.ಜಿ.ಲಕ್ಷ್ಮೀದೇವಮ್ಮ, ಬೆರಳಚ್ಚುಗಾರ್ತಿ, ಸ್ವೀಕೃತಿ ಮತ್ತು ರವಾನೆ ಶಾಖೆ. | 22302172 | ರೂ,13,000 |
| 30. | ಶೇಖ್ಮುನೀರ್, ಜಮೇದಾರ್, ಕಾರ್ಯದರ್ಶಿಯವರ ಆಪ್ತ ಶಾಖೆ. | 22353934 | ರೂ.12,828 |
| 31. | ಎಂ.ಶಂಕರ್, ಜಮೇದಾರ್, ಉಪ ಕಾರ್ಯದರ್ಶಿಯವರ ಆಪ್ತ ಶಾಖೆ. | 22353878 | ರೂ. |
| 32. | ನಂಜುಂಡಯ್ಯ, ಜಮೇದಾರ್, ಉಪ ಕಾರ್ಯದರ್ಶಿಯವರ ಆಪ್ತ ಶಾಖೆ. | 22353878 | ರೂ.15,000 |
| 33. | ಲಕ್ಷ್ಮಮ್ಮ, ದಲಾಯತ್, ಸ್ವೀಕೃತಿ ಮತ್ತು ರವಾನೆ ಶಾಖೆ. | 22302172 | ರೂ.9,580 |
2010-11ನೇ ಸಾಲಿನ ಆಯವ್ಯಯ - ತೋಟಗಾರಿಕೆ ಇಲಾಖೆ
- {{^{{FOOTNOTE 00}}}}) (TSP-{{^{{FOOTNOTE 417}}}}.{{^{{FOOTNOTE 00}}}}) ↩
| ಕ್ರ. ಸಂ | ಯೋಜನೆ | ಲೆಕ್ಕಶೀರ್ಷಿಕೆ | 2009-10 ಆಯವ್ಯಯ |
| ಕೇಂದ್ರ ನೆರವಿನ ಯೋಜನೆಗಳು | |||
| 1. | ಹನಿ ನೀರಾವರಿಗಾಗಿ ಕೇಂದ್ರ ವಲಯ ಯೋಜನೆ | 2401-00-108-2-30 | 1550.00 |
| 2. | ಸಾಮರ್ಥ್ಯವುಳ್ಳ ರಾಜ್ಯಗಳಲ್ಲಿ ಎಣ್ಣೆತಾಳೆಯ ವ್ಯವಸಾಯ | 2401-00-108-2-18 | 600.00 |
| 3. | ತೆಂಗು ಅಬಿವೃದ್ದಿ ಮಂಡಳಿಯ ಸಹಾಯದಲ್ಲಿ ತೆಂಗು ಉತ್ಪಾದಕತೆ/ ಅಬಿವೃದ್ಧಿಯ ಸಮಗ್ರ ಬೇಸಾಯ ಯೋಜನೆ | 2401-00-108-2-35 | 700.00 |
| 4. | ರಾಷ್ಟ್ರೀಯ ತೋಟಗಾರಿಕೆ ಮಿಷನ್ಗೆ ರಾಜ್ಯದ ಪಾಲು | 2401-00-800-2-30 | 2500.00 |
| 5. | ರಾಷ್ಟ್ರೀಯ ಕೃಷಿ ವಿಕಾಸ ಯೋಜನೆ ತೋಟಗಾರಿಕೆ (OE-1100.00) (SDP-4000.00) (SCP- 1083.00) (TSP-417.00) | 2401-00-800-2-43 | 7600.00 |
| ಉಪ ಮೊತ್ತ | 12950.00 | ||
| ರಾಜ್ಯವಲಯ ಯೋಜನೆಗಳು | |||
| 1. | ನಿರ್ದೇಶನ ಮತ್ತು ಆಡಳಿತ | 2401-00-001-2-01 | 15.00 |
| 2. | ತೋಟಗಾರಿಕೆ ಕ್ಷೇತ್ರ ಮತ್ತು ನರ್ಸರಿಗಳ ಅಬಿವೃದ್ದಿ ಮತ್ತು ನಿರ್ವಹಣೆ | 2401-00-119-4-05 | 100.00 |
| 3. | ಇಲಾಖಾ ಪ್ರಯೋಗಶಾಲೆಗಳ ಅಬಿವೃದ್ದಿ | 2401-00-119-5-01 | 200.00 |
| 4. | ತೋಟಗಾರಿಕೆ ಬೆಳೆಗಳ ಕೀಟ ಮತ್ತು ರೋಗಗಳ ಸಮಗ್ರ ನಿಯಂತ್ರಣ ಯೋಜನೆ | 2401-00-119-5-02 | 100.00 |
| 5. | ತೋಟಗಾರಿಕೆ ಕಟ್ಟಡಗಳು | 2401-00-119-6-03 | 200.00 |
| 6. | ವಿಸ್ತರಣೆ ಮತ್ತು ತರಬೇತಿ | 2401-00-800-2-27 | 200.00 |
| 7. | ಹೊಸ ತರಕಾರಿ ತಳಿಗಳನ್ನು ಪರಿಚಯಿಸುವ ಯೋಜನೆ | 2401-00-800-2-33 | 510.00 |
| 8. | ತೋಟಗಾರಿಕೆ ಉದ್ಯಾನವನಗಳ ಅಬಿವೃದ್ದಿ | 2406-02-112-0-13 | 500.00 |
| 9. | ಅಂತರ್ ರಾಷ್ಟ್ರೀಯ ಕೃಷಿ ವ್ಯಾಪಾರ ಮೇಳ | 2401-00-800-2-35 | 50.00 |
| 10. | ದ್ರಾಕ್ಷಾರಸ ನೀತಿ | 2401-00-800-2-36 | 50.00 |
| 11. | ಆಲೂಗಡ್ಡೆ ಬೆಳೆಗಾಗಿ ಕರ್ನಾಟಕ ತೋಟಗಾರಿಕಾ ಅಭಿವೃದ್ದಿ ಸಂಸ್ಥೆಯ ಮೂಲಕ ಮಧ್ಯಸ್ಥಿಕೆ ಯೋಜನೆ | 2401-00-800-2-41 | 100.00 |
| 12. | ವಿಶೇಷ ಘಟಕ ಯೋಜನೆ (SCP) | 2401-00-800-2-05 | 600.00 |
| 13. | ವಿಧಾನಸೌಧ ಉದ್ಯಾನವನ ಹಾಗೂ ಅತಿ ಗಣ್ಯರ ತೋಟಗಾರಿಕೆ ಅಬಿವೃದ್ಧಿ. | 2406-02-112-0-15 | 50.00 |
| 14. | ತೋಟಗಾರಿಕೆಯಲ್ಲಿ ಸಂಸ್ಕರಣೆ | 2401-00-800-2-28 | - |
| 15. | ದಾಳಿಂಬೆ ಬೆಳೆಯಲ್ಲಿ ಬ್ಯಾಕ್ಟೀರಿಯಾ ತೊಂದರೆ ಮೇಲೆ ಉನ್ನತ ಸಂಶೋಧನೆ | 2401-00-800-2-37 | - |
| 16. | ತೋಟಗಾರಿಕೆ ಯಾಂತ್ರೀಕರಣ | 2401-00-800-2-38 | - |
| 17. | ದೊಡ್ಡಸಾಗರೆ ತೋಟಗಾರಿಕಾ ಕ್ಷೇತ್ರದಲ್ಲಿ ಸಸ್ಯ ಸಂರಕ್ಷಣೆ ಮತ್ತು ಅಬಿವೃದ್ಧಿ ಕೇಂದ್ರ. | 2401-00-800-2-42 | - |
| ಉಪ ಮೊತ್ತ: | 2675.00 | ||
| ವಿಶ್ವವಿದ್ಯಾಲಯದ ಯೋಜನೆ | |||
| 1. | ಅಡಿಕೆ ಸಂಶೋಧನಾ ಕೇಂದ್ರ-ಶೃಂಗೇರಿ | 2401-00-108-2-45 | 50.00 |
| 2. | ಬಾಗಲಕೋಟೆಯಲ್ಲಿ ತೋಟಗಾರಿಕೆ ವಿಶ್ವವಿದ್ಯಾಲಯ | 4401-00-800-2-00 | 2100.00 |
| 3. | ತೋಟಗಾರಿಕೆ ವಿಶ್ವವಿದ್ಯಾಲಯ, ಬಾಗಲಕೋಟೆ | 2401-00-800-2-34 | - |
| 4. | ಬೀದರ್ನಲ್ಲಿ ತೋಟಗಾರಿಕೆ ಕಾಲೇಜು | 4401-00-800-3-00 | - |
| 5. | ಕೋಲಾರ ತೋಟಗಾರಿಕೆ ಕಾಲೇಜು. | 2401-00-800-2-44 | - |
| ಉಪ ಮೊತ್ತ | 2150.00 | ||
| ಹೊಸ ಯೋಜನೆಗಳು: | |||
| 1. | ಮಾವು ಅಬಿವೃದ್ಧಿ ಮಂಡಳಿ. | 2401-00-108-2-47 | 1000.00 |
| 2. | ಪಾಲಿಹೌಸ್ ಮತ್ತು ಪಾಲಿಕ್ಲಿನಿಕ್ | 2401-00-800-2-45 | 500.00 |
| 3. | ಹಣ್ಣು ಮತ್ತು ತರಕಾರಿಗಳ ಸಂಗ್ರಹಣೆ. | 2401-00-800-2-46 | 500.00 |
| 4. | ಆಹಾರ ಸಂಸ್ಕರಣಾ ಘಟಕಗಳು. | 2401-00-800-2-47 | 1000.00 |
| 5. | ಮೈಕ್ರೋ ನೀರಾವರಿ ಮಂಡಳಿ. | 4401-00-108-0-01 | 1000.00 |
| ಉಪ ಮೊತ್ತ | 4000.00 | ||
| ಸಾರಾಂಶ | |||
| 1. | ಕೇಂದ್ರ ನೆರವಿನ ಯೋಜನೆಗಳು | 12950.00 | |
| 2. | ರಾಜ್ಯವಲಯ ಯೋಜನೆಗಳು | 2675.00 | |
| 3. | ವಿಶ್ವವಿದ್ಯಾಲಯದ ಯೋಜನೆ | 2150.00 | |
| 4. | ಹೊಸ ಯೋಜನೆಗಳು: | 4000.00 | |
| ಒಟ್ಟು ಮೊತ್ತ: | 21775.00 |
ಕಲಂ 4(1) ಬಿ (XII) ರಡಿ ಹಂಚಿಕೆ ಮಾಡಲಾದ ಮೊಬಲಗನ್ನೊಳಗೊಂಡು, ಸಹಾಯಧನ ಕಾರ್ಯಕ್ರಮಗಳ ಜಾರಿಯ
ವಿಧಾನವನ್ನು ಮತ್ತು ಅಂತಹ ಕಾರ್ಯಕ್ರಮಗಳ ಫಲಾನುಭವಿಗಳ ಅನುಭವಿಗಳನ್ನು:
ಈ ಕಲಂರಡಿ ಸೂಚಿಸಿರುವ ವಿವರಗಳನ್ನು ತೋಟಗಾರಿಕೆ ನಿರ್ದೇಶನಾಲಯದ ಮಟ್ಟದಲ್ಲಿ ನೇರವಾಗಿ ನಿರ್ವಹಿಸುವುದರಿಂದ ಇವುಗಳ ವಿವರವನ್ನು ತೋಟಗಾರಿಕೆ ನಿರ್ದೇಶಕರು ತಮ್ಮ ಹಂತದಲ್ಲಿ ಹೊರಡಿಸಲು ಸೂಚಿಸಿದೆ. ಕಲಂ 4(1) ಬಿ (XIII) ರಡಿ ಅದು ನೀಡಿರುವ ವಿನಾಯಿತಿಗಳನ್ನು, ಅನುಮತಿ ಪತ್ರಗಳನ್ನು ಅಥವಾ ಅದಿಕಾರ ಪತ್ರಗಳನ್ನು ಪಡೆದವರ ವಿವರಗಳು
ಈ ಕಲಂರಡಿ ಸೂಚಿಸಿರುವ ವಿವರಗಳನ್ನು ತೋಟಗಾರಿಕೆ ನಿರ್ದೇಶನಾಲಯದ ಮಟ್ಟದಲ್ಲಿ ನೇರವಾಗಿ ನಿರ್ವಹಿಸುವುದರಿಂದ ಇವುಗಳ ವಿವರವನ್ನು ತೋಟಗಾರಿಕೆ ನಿರ್ದೇಶಕರು ತಮ್ಮ ಹಂತದಲ್ಲಿ ಹೊರಡಿಸಲು ಸೂಚಿಸಿದೆ. ಕಲಂ 4(1) ಬಿ (XIV) ರಡಿ ಅದರ ಬಳಿ ಲಭ್ಯವಿರುವ ಅಥವಾ ಅದು ಹೊಂದಿರುವ ವಿದ್ಯುನ್ಮಾನ ರೂಪಕ್ಕೆ ಪರಿವರ್ತಿಸಿರುವ ಮಾಹಿತಿಗೆ ಸಂಬಂದಿಸಿದ ವಿವರಗಳನ್ನು.
ತೋಟಗಾರಿಕೆ ಇಲಾಖಾ horticulture.kar.nic.in ವೆಬ್ಸೈಟ್ ಹೊಂದಿದ್ದು ಈ ವೆಬ್ಸೈಟ್ನಲ್ಲಿ RTI ಗೆ ಸಂಬಂಧಪಟ್ಟಂತೆ ಹಾಗೂ ಇಲಾಖೆಯ ಇತರೆ ವಿಷಯಗಳನ್ನು ಅಂದಿನವರೆಗೆ ಪರಿಷ್ಕರಿಸಲಾಗುವುದು. ಕಲಂ 4(1) ಬಿ (XV) ರಡಿ ಸಾರ್ವಜನಿಕ ಉಪಯೋಗಕ್ಕಾಗಿ ಗ್ರಂಥಾಲಯವನ್ನು ಅಥವಾ ವಾಚನಾಲಯವನ್ನು ನಿರ್ವಹಿಸುತ್ತಿದ್ದಲ್ಲಿ ಅದರ ಕೆಲಸ ಸಮಯವನ್ನೊಳಗೊಂಡಂತೆ ಮಾಹಿತಿ ಪಡೆಯಲು ಸಾರ್ವಜನಿಕರಿಗೆ ಲಭ್ಯವಿರುವ ಸೌಲಭ್ಯಗಳ ವಿವರಗಳು.
ಯಾವುದೇ ಸೌಲಭ್ಯಗಳು ಇರುವುದಿಲ್ಲ.
ಕಲಂ 4(1) ಬಿ (XVI) ರಡಿ ಸಾರ್ವಜನಿಕ ಮಾಹಿತಿ ಅದಿಕಾರಿಗಳ ಹೆಸರುಗಳು, ಪದನಾಮಗಳು ಮತ್ತು ಇತರ ವಿವರಗಳನ್ನು;
1) ಶ್ರೀ ಎಸ್.ರಾಜು,
ಸಾರ್ವಜನಿಕ ಮಾಹಿತಿ ಅದಿಕಾರಿ,
ಸರ್ಕಾರದ ಅದೀನ ಕಾರ್ಯದರ್ಶಿ, ತೋಟಗಾರಿಕೆ ಇಲಾಖೆ.
2) ಶ್ರೀ ಎ.ಎ.ಚಪ್ಪರಬಂದ್,
ಸಹಾಯಕ ಸಾರ್ವಜನಿಕ ಮಾಹಿತಿ ಅದಿಕಾರಿ,
ಶಾಖಾದಿಕಾರಿ, ತೋಟಗಾರಿಕೆ ಇಲಾಖೆ.
ಕಲಂ 4(1) ಬಿ (XVII) ರಡಿ ನಿಯಮಿಸಬಹುದಾದಂತಹ ಇತರ ಮಾಹಿತಿಗಳನ್ನು ಪ್ರಕಟಿಸತಕ್ಕದ್ದು ಮತ್ತು ಆ ತರುವಾಯ ಪ್ರತಿವರ್ಷ
ಈ ಪ್ರಕಟಣೆಗಳನ್ನು ಅಂದಿನ ವರೆಗೆ ಪರಿಷ್ಕರಿಸತಕ್ಕದ್ದು;
ಯಾವುದೇ ಇತರ ಮಾಹಿತಿಗಳನ್ನು ಪ್ರಕಟಿಸಲು ಇರುವುದಿಲ್ಲ ಮತ್ತು ಮೇ 2010ವರೆಗೆ ಪರಿಷ್ಕೃತಗೊಂಡಿದೆ.
ಎಸ್. ರಾಜು
ಪಿ.ಆರ್.1041
ಸರ್ಕಾರದ ಅದೀನ ಕಾರ್ಯದರ್ಶಿ,
ತೋಟಗಾರಿಕೆ ಇಲಾಖೆ ಜಿಲ್ಲಾ ಅಧಿಕಾರಿಗಳ ಕಛೇರಿ, ಹಿಂದುಳಿದ ವರ್ಗಗಳ ಮತ್ತು ಅಲ್ಪಸಂಖ್ಯಾತರ ಕಲ್ಯಾಣ ಇಲಾಖೆ,
ಬೆಂಗಳೂರು (ಗ್ರಾ) ಜಿಲ್ಲೆ, ಬೆಂಗಳೂರು
ಪ್ರಕಟಣೆ
ಸಂಖ್ಯೆ:ಡಿಬಿಸಿಎಂ/ಬೆಂಗ್ರಾ/ಕಾ.ತ/ಸಿಆರ್-1/2010-11, ಬೆಂಗಳೂರು, ದಿನಾಂಕ:25ನೇ ಜೂನ್, 2010
ವಿಷಯ: 2010-11ನೇ ಸಾಲಿನಲ್ಲಿ ಬೆಂಗಳೂರು ಗ್ರಾಮಾಂತರ ಜಿಲ್ಲೆಯ ಹಿಂದುಳಿದ ವರ್ಗಗಳ ಕಾನೂನು ಪದವೀಧರರನ್ನು ನ್ಯಾಯಾಂಗ ಆಡಳಿತ ಹಾಗೂ ವಕೀಲ ವೃತ್ತಿಯ ತರಬೇತಿಗೆ ಅಭ್ಯರ್ಥಿಗಳಿಂದ ಅರ್ಜಿಗಳನ್ನು ಆಹ್ವಾನಿಸುವ ಬಗ್ಗೆ.
ಉಲ್ಲೇಖ: 1) ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಎಸ್.ಡಬ್ಲ್ಯೂಎಲ್. 60 ಎಸ್.ಇ.ಡಬ್ಲ್ಯೂ 89, ದಿನಾಂಕ:02.11.1990.
2) ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಸಕಇ 116 ಬಿಎಂಎಸ್ 99, ದಿನಾಂಕ:07.10.1999.
3) ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಸಕಇ 446, ಬಿಎಂಎಸ್ 2005, ಬೆಂಗಳೂರು, ದಿನಾಂಕ:01.12.2005.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೩೦೦೦2009-10ನೇ ಸಾಲಿನಲ್ಲಿ ಬೆಂಗಳೂರು ಗ್ರಾಮಾಂತರ ಜಿಲ್ಲೆಯಲ್ಲಿ ಹಿಂದುಳಿದ ವರ್ಗಗಳಿಗೆ ಸೇರಿದ (ವರ್ಗ-1, 2ಎ, 3ಎ ಮತ್ತು 3ಬಿ) ಕಾನೂನು ಪದವೀಧರರಿಂದ ನ್ಯಾಯಾಂಗ ಆಡಳಿತದಲ್ಲಿ 4 ವರ್ಷಗಳ ಅವಧಿಗೆ ತರಬೇತಿಗೆ ಅರ್ಹ ಅಭ್ಯರ್ಥಿಗಳ ಅರ್ಜಿಗಳನ್ನು ಆಹ್ವಾನಿಸಲಾಗಿದೆ. ಅಭ್ಯರ್ಥಿಗಳು ನಿಗದಿತ ಅರ್ಜಿ ನಮೂನೆಯನ್ನು ಈ ಕಛೇರಿಯಲ್ಲಿ ನಿಗದಿತ ಅವಧಿಯೊಳಗೆ ಕಛೇರಿ ವೇಳೆಯಲ್ಲಿ ಪಡೆಯಬಹುದು. ಭರ್ತಿ ಮಾಡಲಾದ ಅರ್ಜಿಗಳನ್ನು ಸದಸ್ಯ ಕಾರ್ಯದರ್ಶಿಗಳು ಹಾಗೂ ಜಿಲ್ಲಾ ಅಧಿಕಾರಿಗಳು, ಹಿಂದುಳಿದ ವರ್ಗಗಳ ಮತ್ತು ಅಲ್ಪಸಂಖ್ಯಾತರ ಕಲ್ಯಾಣ ಇಲಾಖೆ, ಬೆಂಗಳೂರು ಗ್ರಾಮಾಂತರ ಜಿಲ್ಲೆ, 1ನೇ ಮಹಡಿ, ಪೋಡಿಯಂ ಬ್ಲಾಕ್, ವಿಶ್ವೇಶ್ವರಯ್ಯ ಗೋಪುರ, ಡಾ: ಅಂಬೇಡ್ಕರ್ ವೀದಿ, ಬೆಂಗಳೂರು, ಇಲ್ಲಿಗೆ ದಿನಾಂಕ:30.07.2010ರೊಳಗೆ ಕಛೇರಿ ವೇಳೆಯಲ್ಲಿ ಸಲ್ಲಿಸುವುದು. ನಿಬಂಧನೆಗಳು: 1) ಅಭ್ಯರ್ಥಿಯು ಕಾನೂನು ಪದವೀಧರರಾಗಿದ್ದು, ಈ ತರಬೇತಿಗೆ ಅರ್ಜಿ ಸಲ್ಲಿಸಲು ನಿಗದಿಪಡಿಸಿದ ಕೊನೆಯ ದಿನಾಂಕಕ್ಕೆ ಅಭ್ಯರ್ಥಿಯು ಕಾನೂನು ಪದವಿಯನ್ನು ಮುಗಿಸಿ 2 (ಎರಡು) ವರ್ಷಗಳು ಮೀರಿರಬಾರದು. 2) ಅಭ್ಯರ್ಥಿಗಳು ಸರ್ಕಾರದ ಆದೇಶ ಸಂಖ್ಯೆ: ಎಸ್ಡಬ್ಲ್ಯೂಡಿ 225 ಬಿಸಿಎ 2000, ದಿನಾಂಕ:30.03.2002ರ ಆದೇಶದ ಅನುಸಾರ ಹಿಂದುಳಿದ ವರ್ಗ-1, 2ಎ, 3ಎ ಮತ್ತು 3ಬಿ ವರ್ಗೀಕರಣಕ್ಕೆ ಒಳಪಟ್ಟಿರಬೇಕು. ಹಾಗೂ ಮೇಲ್ಕಂಡ ವರ್ಗಗಳಿಗೆ ನಿಗದಿಪಡಿಸಲಾದ ಜಾರಿ ಆದಾಯ ಪ್ರಮಾಣ ಪತ್ರಗಳೊಂದಿಗೆ ವಿವರಗಳನ್ನು ಭರ್ತಿ ಮಾಡಿ, ಭರ್ತಿ ಮಾಡಲಾದ ಅರ್ಜಿಯೊಂದಿಗೆ ಲಗತ್ತಿಸಿ ಸಲ್ಲಿಸಬೇಕು. 3) ಪ್ರವರ್ಗ-1ನ್ನು ಹೊರತುಪಡಿಸಿ ಇತರೆ ವರ್ಗಗಳಿಗೆ ಸೇರಿದ ಅಭ್ಯರ್ಥಿಗಳಿಗೆ ರೂ.15,000/-ಗಳ ವಾರ್ಷಿಕ ಆದಾಯ ಮಿತಿಯನ್ನು ನಿಗದಿಪಡಿಸಿದೆ. 4) ಅಭ್ಯರ್ಥಿಗಳು ಬಾರ್ ಕೌನ್ಸಿಲ್ನಲ್ಲಿ ಹೆಸರನ್ನು ನೊಂದಾಯಿಸಿರಬೇಕು. (ಪ್ರತಿ ಲಗತ್ತಿಸಬೇಕು) 5) ಭರ್ತಿ ಮಾಡಲಾದ ಅರ್ಜಿಗಳನ್ನು ಸಲ್ಲಿಸಲು ನಿಗದಿಪಡಿಸಲಾದ ಕೊನೆಯ ದಿನಾಂಕಕ್ಕೆ ಅಭ್ಯರ್ಥಿಗಳ ವಯಸ್ಸು 30 ವರ್ಷಗಳನ್ನು ಮೀರಿರಬಾರದು. ಅಂದರೆ ವರ್ಗ-1ರ ಅಭ್ಯರ್ಥಿಗಳಿಗೆ 1 ವರ್ಷ ರಿಯಾಯಿತಿ ಇದ್ದು, ಅವರ ವಯಸ್ಸು 31 ವರ್ಷಗಳು ಮೀರಿರಬಾರದು. 6) ಆಯ್ಕೆಯಾದ ಅಭ್ಯರ್ಥಿಗಳಿಗೆ 4 ವರ್ಷಗಳ ತರಬೇತಿ ಅವಧಿ ಇದ್ದು, ಈ ಅವಧಿಯೊಳಗೆ ತರಬೇತಿಯನ್ನು ಬಿಡಲು ಅವಕಾಶವಿರುವುದಿಲ್ಲ. ಹಾಗೂ ಅಭ್ಯರ್ಥಿಯು ಸುಳ್ಳು ಮಾಹಿತಿ/ ದಾಖಲಾತಿಗಳನ್ನು ನೀಡಿದ್ದಲ್ಲಿ ಅಥವಾ ತರಬೇತಿ ಅವಧಿಯ ಮಧ್ಯದಲ್ಲಿ ತರಬೇತಿಯಿಂದ ಬಿಟ್ಟುಹೋದಲ್ಲಿ ಸರ್ಕಾರ ಅವರಿಗಾಗಿ ಖರ್ಚು ಮಾಡಿದ ಹಣವನ್ನು ವರ್ಷಕ್ಕೆ ಶೇ.10ರ ಬಡ್ಡಿಯೊಂದಿಗೆ ಭೂ ಕಂದಾಯದ ಬಾಕಿ ಎಂದು ಪರಿಗಣಿಸಿ ವಸೂಲಿ ಮಾಡಲಾಗುವುದು. ಆದರೆ ಕೇಂದ್ರ ಸರ್ಕಾರ, ರಾಜ್ಯ ಸರ್ಕಾರದಲ್ಲಿ ವಿವಿಧ ಹುದ್ದೆಗಳಿಗೆ ನೇಮಕಾತಿ ಹೊಂದಿದ ಅಭ್ಯರ್ಥಿಗಳಿಗೆ ಅನ್ವಯಿಸುವುದಿಲ್ಲ. 7) ಆಯ್ಕೆಯಾದ ಅಭ್ಯರ್ಥಿಗಳಿಗೆ ತರಬೇತಿ ಅವಧಿಯಲ್ಲಿ ತಿಂಗಳಿಗೆ ರೂ.1000/-ಗಳ ತರಬೇತಿ ಭತ್ಯೆಯನ್ನು ದಿನಚರಿ ಆಧಾರದ ಮೇರೆಗೆ ನೀಡಲಾಗುವುದು. 8) ಆಯ್ಕೆಯಾದ ಅಭ್ಯರ್ಥಿಗಳಿಗೆ ಜಿಲ್ಲಾ ಪಬ್ಲಿಕ್ ಪ್ರಾಸಿಕ್ಯೂಟರ್/ ಸರ್ಕಾರಿ ವಕೀಲರು ಅಥವಾ 20 ವರ್ಷಗಳಿಗಿಂತ ಹೆಚ್ಚಿನ ವರ್ಷಗಳು ವಕೀಲ ವೃತ್ತಿಯಲ್ಲಿ ಸೇವೆ ಸಲ್ಲಿಸುತ್ತಿರುವ ಹಿರಿಯ ವಕೀಲರಲ್ಲಿ ಆಯ್ಕೆಯಾದ ಅಭ್ಯರ್ಥಿಗಳನ್ನು ಕಾನೂನು ತರಬೇತಿ ಪಡೆಯುವ ಸಲುವಾಗಿ ತರಬೇತಿಗೆ ನಿಯೋಜಿಸಲಾಗುವುದು. 9) ಆಯ್ಕೆಯಾದ ಅಭ್ಯರ್ಥಿಯು ಈ ಇಲಾಖೆಯ ನಿಬಂಧನೆಗಳು ಹಾಗೂ ಕಾಲಕಾಲಕ್ಕೆ ಹೊಂದಿರುವ ಸರ್ಕಾರದ ಆದೇಶಗಳಿಗೆ ಬದ್ದನಾಗಿರುತ್ತೇನೆಂದು ಮುಚ್ಚಳಿಕೆಯನ್ನು ಬರೆದುಕೊಡಬೇಕು. 10) ಹೆಚ್ಚಿನ ಮಾಹಿತಿಯನ್ನು ಅಭ್ಯರ್ಥಿಗಳು ಜಿಲ್ಲಾ ಅಧಿಕಾರಿಗಳು, ಹಿಂದುಳಿದ ವರ್ಗಗಳ ಮತ್ತು ಅಲ್ಪಸಂಖ್ಯಾತರ ಕಲ್ಯಾಣ ಇಲಾಖೆ, ಬೆಂಗಳೂರು ಗ್ರಾಮಾಂತರ ಜಿಲ್ಲೆ, 1ನೇ ಮಹಡಿ, ಪೋಡಿಯಂ ಬ್ಲಾಕ್, ವಿಶ್ವೇಶ್ವರಯ್ಯ ಗೋಪುರ, ಡಾ: ಅಂಬೇಡ್ಕರ್ ವೀಧಿ, ಬೆಂಗಳೂರು ಇವರ ಕಛೇರಿಯಲ್ಲಿ ಕೆಲಸದ ವೇಳೆಯಲ್ಲಿ ಪಡೆಯಬಹುದು. 11) ಅರ್ಹ ಅಭ್ಯರ್ಥಿಗಳನ್ನು ತರಬೇತಿಗೆ ಆಯ್ಕೆ ಮಾಡಲು ಸಂದರ್ಶನದ ದಿನಾಂಕ ಹಾಗೂ ಸ್ಥಳವನ್ನು ತಿಳಿಸಲಾಗುವುದು ಹಾಗೂ ಸಂದರ್ಶನಕ್ಕೆ ಅಭ್ಯರ್ಥಿಗಳು ತಮ್ಮ ಸ್ವಂತ ಖರ್ಚಿನಲ್ಲಿ ಹಾಜರಾಗತಕ್ಕದ್ದು. 12) ಅಭ್ಯರ್ಥಿಗಳು ಭರ್ತಿ ಮಾಡಲಾದ ಅರ್ಜಿಯೊಂದಿಗೆ ಅವಶ್ಯಕ ಮಾಹಿತಿಗಳಾದ ಕಾನೂನು ಪದವಿ ಪರೀಕ್ಷೆಯಲ್ಲಿ ತೇರ್ಗಡೆ ಹೊಂದಿದ ಪ್ರಮಾಣ ಪತ್ರ ಹಾಗೂ ಅಂಕಪಟ್ಟಿಗಳ ದೃಡೀಕರಣ ಪ್ರತಿ ಹಾಗೂ ಜನ್ಮ ದಿನಾಂಕದ ಆಧಾರಕ್ಕಾಗಿ ಎಸ್.ಎಸ್.ಎಲ್.ಸಿ. ಅಂಕಪಟ್ಟಿ ಅಥವಾ ಟಿ.ಸಿ. ದೃಡೀಕೃತ ಪ್ರತಿ, ವಾಸಸ್ಥಳದ ಬಗ್ಗೆ ಆಹಾರ ಪಡಿತರ ಚೀಟಿ ಅಥವಾ ತಹಶೀಲ್ದಾರ್ರವರಿಂದ ಪಡೆದ ವಾಸಸ್ಥಳದ ದೃಡೀಕರಣ ಪತ್ರ ಲಗತ್ತಿಸುವುದು. 13) ಅರ್ಜಿಗಳನ್ನು ಸ್ವೀಕರಿಸುವ ಕೊನೆಯ ದಿನಾಂಕ:30.07.2010.
ಪಿ.ಆರ್.1037
ಸದಸ್ಯ ಕಾರ್ಯದರ್ಶಿಗಳು ಹಾಗೂ ಜಿಲ್ಲಾ ಅಧಿಕಾರಿಗಳು, ಹಿಂದುಳಿದ ವರ್ಗಗಳ ಮತ್ತು ಅಲ್ಪಸಂಖ್ಯಾತರ ಕಲ್ಯಾಣ ಇಲಾಖೆ, ಬೆಂಗಳೂರು (ಗ್ರಾ) ಜಿಲ್ಲೆ, ಬೆಂಗಳೂರು.
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೩೦೦೧KARNATAKA ELECTRICITY REGULATORY COMMISSION
9/2, 6th and 7th Floors, M.G. Road, Bangalore-560 001
In continuation of the Notification No.S/03/3 Dated:9th September 2009, in respect of the Karnataka Electricity Regulatory Commission (Terms and Conditions for determination of Generation Tariff) Regulations 2009, published in Karnataka Gazette Dated:08.10.2009 (Pages 3594 to 3619) the filings shall be made in the following Tariff Filing Forms which are given separately for Thermal projects (Part I) and Hydro Projects (Part II).
Secretary.
For Karnataka Electricity Regulatory Commission.
Appendix – I
PART – I
TARIFF FILING FORMS (THERMAL)
PART – I
Checklist of Forms and other information / documents for tariff filing
for Thermal Stations
| Form No. | Title of Tariff Filing Forms (Thermal) | Tick |
| FORM- 1 | Summary Sheet | |
| FORM-2 | Plant Characteristics | |
| FORM-3 | Normative parameters considered for tariff computations | |
| FORM- 4 | Details of Foreign loans | |
| FORM- 4 A | Details of Foreign Equity | |
| FORM-5 | Abstract of Admitted Capital Cost for the existing Projects | |
| FORM-5A | Abstract of Capital Cost Estimates and Schedule of Commissioning for the New projects | |
| FORM-5B | Break-up of Capital Cost for Coal based projects | |
| FORM-5C | Break-up of Capital Cost for Gas/Liquid fuel based Projects | |
| FORM-5D | Break-up of Construction/Supply/Service packages | |
| FORM- 6 | Financial Package upto COD | |
| FORM- 7 | Details of Project Specific Loans | |
| FORM- 8 | Details of Allocation of corporate loans to various projects | |
| FORM-9 | Statement of Additional Capitalisation after COD |
| FORM- 9 A | Statement of Capital cost | |||
| FORM- 9B | Statement of Capital Woks in Progress | |||
| FORM- 10 | Financing of Additional Capitalisation | |||
| FORM- 11 | Calculation of Depreciation Rate | |||
| FORM- 12 | Statement of Depreciation | |||
| FORM- 13 | Calculation of Weighted Average Rate of Interest on Actual Loans | |||
| FORM- 13A | Calculation of Interest on Normative Loan | |||
| FORM- 13 B | Calculation of Interest on Working Capital | |||
| FORM- 14 | Draw Down Schedule for Calculation of IDC & Financing Charges | |||
| FORM- 14A | Actual cash expenditure | |||
| FORM-15 | Details/Information to be Submitted in respect of Fuel for Computation of Energy Charges | |||
| FORM- 16 | Details/Information to be Submitted in respect of Limestone for Computation of Energy Charge Rate | |||
| Other Information/ Documents | ||||
| Sl. No. | Information/Document | Tick | ||
| 1 | Certificate of incorporation, Certificate for Commencment of Business, Memorandum of Association, & Articles of Association ( For New Station setup by a company making tariff application for the first time to KERC) | |||
| 2 | Stationwise and Corporate audited Balance Sheet and Profit & Loss Accounts with all the Schedules & annexures on COD of the Station for the new station & for the relevant years. | |||
| 3 | Copies of relevant loan Agreements | |||
| 4 | Copies of the approval of Competent Authority for the Capital Cost and Financial package. | |||
| 5 | Copies of the Equity participation agreements and necessary approval for the foreign equity. | |||
| 6 | Copies of the PPA with the beneficiaries, if any | |||
| 7 | Detailed note giving reasons of time and cost over run, if applicable. | |||
| 8 | Any other relevant information, (Please specify) |
Note: 1: Elecltronic copy of the petition (in words format) and detailed calculation as per these formats (in excell format) and any other information submitted shall also be furnished in the form of CD.
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೩೦೦೩ PART - IFORM – 1
SUMMARY SHEET
Name of the Company
Name of the Power Station ------------------------------------
| Sl. No. | Particulars | Existing 2008-09 | 2009-10 2010-11 2011-12 2012-13 2013-14 | ||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| 1.1 | Depreciation | ||||||
| 1.2 | Interest on Loan | ||||||
| 1.3 | Return on Equity1 | ||||||
| 1.4 | Interest on Working Capital | ||||||
| 1.5 O & M Expenses | |||||||
| 1.6 | Secondary fuel oil cost | ||||||
| 1.7 | Compensation Allowance (If applicable) | ||||||
| 1.8 | Special allowance (If applicable) | ||||||
| Total | |||||||
| 2 | Energy Charge Rate ex-bus (Paise/kWh) 2A,2B,2C,2D |
1 Details of calculations, considering equity as per regulation, to be furnished
2A If multifuel is used simultaneously, give 2 in respect of every fuel individually
28 The rate of energy charge shall be computed for open cycle operation and combined cycle operation separately in case of gas/liquid fuel fired plants
- C The total energy charge shall be worked out based on ex-bus energy scheduled to be sent out. D The Energy Charge rate for the month shall be based on fuel cost(s) and GCV (s) for the month as per Regulation. PETITIONER PART - I FORM – 2 Plant Characteristics Name of the Company ↩
| Unit(s)/Block(s) Parameters | Unit-I | Unit-II | Unit-III | ||||
| Pressure (kg/cm2) | |||||||
| Temperature 0C | |||||||
| -At Superheater Outlet | |||||||
| -At Reheater Outlet | |||||||
| Guaranteed Design Heat rate (kCal/kWh) Conditions on which guaranteed | |||||||
| % MCR | |||||||
| % Makeup | |||||||
| Design Fuel | |||||||
| Design cooling water Temperature | |||||||
| Back Pressure | |||||||
| Note: In case guaranteed unit heat rate is not available then furnish the guaranteed turbine cycle heat rate and guaranteed boiler efficiency separately along with condition of guarantee. | |||||||
| Type of cooling Tower | |||||||
| Installed Capacity (IC) | |||||||
| Date of Commercial Operation (COD) | |||||||
| Type of cooling system1 | |||||||
| Type of Boiler Feed Pump2 | |||||||
| Fuel Details3 | |||||||
| -Primary Fuel | |||||||
| -Secondary Fuel | |||||||
| -Alternate Fuels | |||||||
| Special Features/Site Specific Features4 | |||||||
| Special Technological Features5 | |||||||
| Environmental Regulation related features6 | |||||||
| Any other special features |
1. Closed circuit cooling, once through cooling, sea cooling, natural draft cooling, induced draft cooling etc.
2. Motor driven, Steam turbine driven etc.
3. Coal or natural gas or naptha etc.
4. Any site specific feature such as Merry-Go-Round, Vicinity to sea, Intake / makeup water systems etc. scrubbers etc. Specify all such features.
5. Any Special Technological feature like Advanced class FA technology in Gas Turbines, etc.
6. Environmental regulation related features like FGD, ESP etc.
Note1: In case of deviation from specified conditions in Regulation, correction curve of manufacturer may also be submitted.
Note2: Heat Balance Diagrams has to be submitted along with above information incase of new stations.
PETITIONER
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೩೦೦೫ PART - IFORM – 3
Normative parameters considered for tariff computations
Name of the Company --------------------------------
| Particulars | Unit | As Existing | Year Ending March | ||||
| 2008-09 | 2009-10 | 2010-11 2011-12 2012-13 2013-14 | |||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) |
| Guaranteed Design heat rate | |||||||
| Base Rate of Return on Equity | % | ||||||
| Tax Rate | % | ||||||
| Target Availability | % | ||||||
| Auxiliary Energy Consumption | % | ||||||
| Gross Station Heat Rate | kCal/kWh | ||||||
| Specific Fuel Oil Consumption | ml/kWh | ||||||
| Cost of Coal for WC1 | in Months | ||||||
| Cost of Main Secondary Fuel Oil for WC1 | in Months | ||||||
| Fuel Cost for WC2 | in Months | ||||||
| Liquid Fuel Stock for WC2 | in Months | ||||||
| O & M expenses | Rs / MW | ||||||
| Maintenance Spares for WC | % of O&M | ||||||
| Recievables for WC | in Months | ||||||
| Prime lending Rate of SBI as on .3 | % |
1. For Coal based generating stations
2. For Gas Turbine/Combined Cycle generating stations duly taking into account the mode of operation on gas fuel and liquid fuel.
3. Mention relevant date.
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
೩೦೦೬
PART - I
FORM – 4
Details of Foreign Loans
(Details only in respect of loans applicable to the project under petition)
Name of the Company -----------------------------------------
Name of the Power Station -----------------------------------------
Exchange Rate at COD -----------------------------------------
Exchange Rate as on 31.03.2009 -----------------------------------------
(Amount in Rs. Lakhs)
| Sl. No. | Financial Year (Starting from COD) | Year 1 | Year 2 | Year 3 and so on | |||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | |
| Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchang e Rate | Amount (Rs.) | ||
| Currency11 | |||||||||||||
| A.1 | At the date of Drawl2 | ||||||||||||
| 2 | Scheduled repayment date of principal | ||||||||||||
| 3 | Scheduled payment date of interest | ||||||||||||
| 4 | At the end |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Sl. No. | Financial Year (Starting from COD) | Year 1 | Year 2 | Year 3 and so on | ||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | ||
| Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchang e Rate | Amount (Rs.) | |||
| of Financial year | ||||||||||||||
| B | In case of Hedging3 | |||||||||||||
| 1 | At the date of hedging | |||||||||||||
| 2 | Period of hedging | |||||||||||||
| 3 | Cost of hedging | |||||||||||||
| Currency21 | ||||||||||||||
| A.1 | At the date of Drawl2 | |||||||||||||
| 2 | Scheduled repayment date of principal | |||||||||||||
| 3 | Scheduled payment date of interest |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| Sl. No. | Financial Year (Starting from COD) | Year 1 | Year 2 | Year 3 and so on | |||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | |
| Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchang e Rate | Amount (Rs.) | ||
| 4 | At the end of Financial year | ||||||||||||
| B | In case of Hedging3 | ||||||||||||
| 1 | At the date of hedging | ||||||||||||
| 2 | Period of hedging | ||||||||||||
| 3 | Cost of hedging | ||||||||||||
| Currency31 & so on | |||||||||||||
| A.1 | At the date of Drawl2 | ||||||||||||
| 2 | Scheduled repayment date of principal |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Sl. No. | Financial Year (Starting from COD) | Year 1 | Year 2 | Year 3 and so on | ||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | ||
| Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchang e Rate | Amount (Rs.) | |||
| 3 | Scheduled payment date of interest | |||||||||||||
| 4 | At the end of Financial year | |||||||||||||
| B | In case of Hedging3 | |||||||||||||
| 1 | At the date of hedging | |||||||||||||
| 2 | Period of hedging | |||||||||||||
| 3 | Cost of hedging |
1. Name of the currency to be mentioned e.g. US $, DM, etc. etc.
2. In case of more than one drawal duringthe year, Exchange rate at the date of each drawal to be given
3. Furnish details of hedging, in case of more than one hedging during the year or part hedging, details of each hedging are to be given
4. Tax (such as withholding tax) details as applicable including change in rates, date from which change effective etc. must be clearly indicated.
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
೩೦೧೦
PART - I
FORM -4A
Details of Foreign Equity
(Details only in respect of Equity infusion if any applicable to the project under petition)
Name of the Company
---------------------------------
Name of the Power Station
---------------------------------
Exchange Rate on date/s of infusion ---------------------------------
| Sl. No. | Financial Year | Year 1 | Year 2 | Year 3 and so on | |||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | |
| Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchang e Rate | Amount (Rs.) | ||
| Currency11 | |||||||||||||
| A.1 | At the date of infusion2 | ||||||||||||
| 2 | |||||||||||||
| 3 | |||||||||||||
| 4 | |||||||||||||
| B | Currency21 | ||||||||||||
| 1 | |||||||||||||
| 2 | |||||||||||||
| 3 | |||||||||||||
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Sl. No. | Financial Year | Year 1 | Year 2 | Year 3 and so on | ||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | ||
| Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchang e Rate | Amount (Rs.) | |||
| Currency31 | ||||||||||||||
| A.1 | At the date of infusion2 | |||||||||||||
| 2 | ||||||||||||||
| 3 | ||||||||||||||
| 4 | ||||||||||||||
| B | Currency41 & so on | |||||||||||||
| 1 | At the date of infusion2 | |||||||||||||
| 2 | ||||||||||||||
| 3 |
1. Name of the currency to be mentioned e.g. US$, DM, etc. etc.
2. In case of equity infusion more than once during the year, Exchange rate at the date of each infusion to be given.
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೩೦೧೨PART - I
FORM – 5
Abstract of Admitted Capital Cost for the existing Projects
Name of the Company: ...........................................
| Capital Cost as admitted by KERC | |
| Capital cost admitted as on | |
| (Give reference of the relevant KERC Order with Petition No. & Date) | |
| Foreign Component, if any (In Million US $ or the relevant Currency) | |
| Domestic Component (Rs. Cr.) | |
| Foreign Exchange rate considered for the admitted Capital cost | |
| Hedging cost, if any, considered for the admitted Capital cost | |
| Total Capital cost admitted (Rs. Cr) |
PETITIONER
PART -I
FORM - 5A
Abstract of Capital Cost Estimates and Schedule of Commissioning for the new projects
Name of the Company ........................................
Name of the Power Station ........................................
New Projects
........................................
| Board of Director/ Agency approving the Capital cost estimates: | |||
| Date of approval of the Capital cost estimates: | |||
| Present Day Cost | Completed Cost | ||
| Price level of approved estimates | As of End of Qtr. Of the year | As on Scheduled COD of the Station | |
| Foreign Exchange rate considered for theCapital cost estimates | |||
| Capital Cost excluding IDC & FC | |||
| Foreign Component, if any (In Million US $ or the relevant Currency) Domestic Component (Rs. Cr.) | |||
| Capital cost excluding IDC, FC, FERV & Hedging Cost (Rs. Cr) | |||
| IDC, FC, FERV & Hedging Cost | |||
| Foreign Component, if any (In Million US $ or the relevant Currency) | |||
| Domestic Component (Rs. Cr.) | |||
| Total IDC, FC, FERV & Hedging Cost (Rs.Cr.) | |||
| Rate of taxes & duties considered | |||
| Capital cost Including IDC, FC, FERV & Hedging Cost | |||
| Foreign Component, if any (In Million US $ or the relevant Currency) | |||
| Domestic Component (Rs. Cr.) | |||
| Capital cost Including IDC & FC (Rs. Cr) | |||
| Schedule of Commissioning | |||
| COD of Unit-I/Block-I | |||
| COD of Unit-II/Block-II | |||
| COD of last Unit/Block |
Note: 1. Copy of approval letter should be enclosed
2. Details of Capital cost are to be furnished as per FORM - 5B or 5C as applicale
3. Details of IDC & Financing Charges are to be furnished as per FORM-14
PETITIONER
PART - I
FORM-5B
Break-up of Capital Cost for Coal based projects
Name of the Company ..............................................
Name of the Power Station: ..............................................
| Sl. No. | Break Down | As per original Estimates | Actual capital expenditure as on COD | Liabilties/ provisions | Variation (3-4-5) | Reasons for Variation |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) |
| 1.0 Cost of Land & Site Development | ||||||
| 1.1 | Land | |||||
| 1.2 | Rehabitation & Resettlement (R&R) | |||||
| 1.3 | Preliminary Investigation & Site development | |||||
| Total Land & Site Development | ||||||
| 2.0 | Plant & Equipment | |||||
| 2.1 | Steam Generator Island | |||||
| 2.2 | Turbine Generator Island | |||||
| 2.3 | BOP Mechanical | |||||
| 2.3.1 | External water supply system | |||||
| 2.3.2 | CW system | |||||
| 2.3.3 | DM water Plant | |||||
| 2.3.4 | Clarification plant | |||||
| 2.3.5 | Chlorination Plant | |||||
| 2.3.6 | Fuel Handiling & Storage system | |||||
| 2.3.7 | Ash Handling System | |||||
| 2.3.8 | Coal Handling Plant | |||||
| 2.3.9 | Rolling Stock and Locomotives | |||||
| 2.3.10 | MGR | |||||
| 2.3.11 | Air Compressor System | |||||
| 2.3.12 | Air Condition & Ventilation System | |||||
| 2.3.13 | Fire fighting System | |||||
| 2.3.14 | HP/LP Piping | |||||
| Total BOP Mechanical | ||||||
| 2.4 | BOP Electrical | |||||
| 2.4.1 | Switch Yard Package | |||||
| 2.4.2 | Transformers Package | |||||
| 2.4.3 | Switch gear Package | |||||
| 2.4.4 | Cables , Cable facilities & grounding | |||||
| 2.4.5 | Lighting | |||||
| 2.4.6 | Emergency D.G. set | |||||
| Total BOP Electrical | ||||||
| 2.5 | C & I Package | |||||
| Total Plant & Equipment excluding taxes & Duties | ||||||
| 2.60 | Taxes and Duties | |||||
| 2.6.1 | Custom Duty | |||||
| 2.6.2 | Other Taxes & Duties | |||||
| Total Taxes & Duties | ||||||
| Total Plant & Equipment | ||||||
| 3.0 | Initial spares | |||||
| 4.0 | Civil Works | |||||
| 4.1 | Main plant/Adm. Building | |||||
| 4.2 | CW system | |||||
| 4.3 | Cooling Towers | |||||
| 4.4 | DM water Plant | |||||
| 4.5 | Clarification plant | |||||
| 4.6 | chlorination plant | |||||
| 4.7 | Fuel Handiling & Storage system | |||||
| 4.8 | Coal Handling Plant | |||||
| 4.9 | MGR & Marshalling Yard | |||||
| 4.10 | Ash Handling System | |||||
| 4.11 | Ash disposal area development | |||||
| 4.12 | Fire fighting System | |||||
| 4.13 | Township & Colony | |||||
| 4.14 | Temp. construction & enabling works | |||||
| 4.15 | Road & Drainage | |||||
| Total Civil works | ||||||
| 5.0 | Construction & Pre- Commissioning Expences | |||||
| 5.1 | Erection Testing and commissioning | |||||
| 5.2 | Site supervision | |||||
| 5.3 | Operator's Training | |||||
| 5.4 | Construction Insurance | |||||
| 5.5 | Tools & Plant | |||||
| 5.6 | Start up fuel | |||||
| Total Construction & Pre-Commissioning Expences | ||||||
| 6.0 | Overheads | |||||
| 6.1 | Establishment | |||||
| 6.2 | Design & Engineering | |||||
| 6.3 | Audit & Accounts | |||||
| 6.4 | Contingency | |||||
| Total Overheads | ||||||
| 7.0 | Capital cost excluding IDC & FC | |||||
| 8.0 | IDC, FC, FERV & Hedging Cost | |||||
| 8.1 | Interest During Construction (IDC) | |||||
| 8.2 | Financing Charges (FC) | |||||
| 8.3 | Foreign Exchange Rate Variation (FERV) | |||||
| 8.4 | Hedging Cost | |||||
| 9.0 | Total of IDC, FC, FERV & Hedging Cost Capital cost including IDC, FC, FERV & Hedging Cost |
Note: 1. In case of time & cost over run, a detailed note giving reasons of such time and cost over run should be submitted clearly bringing out the agency responsible and whether such time & cost over run was beyond the control of the generating company.
PETITIONER
PART-I
FORM-5C
Break-up of Capital Cost for Gas/Liquid fuel based Projects
Name of the Company : Name of the Power Station :
Name of the Company ...........................................
Name of the Power Station ...........................................
| Sl. No. | Break Down | As per original Estimates | Actual capital expenditur | Liabilties/ provisions | Variation (3-4-5) | Reasons for Variation |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) |
| 1.0 | Cost of Land & Site Development | |||||
| 1.1 | Land | |||||
| 1.2 | Rehabilitation & Resettlement (R&R) | |||||
| 1.3 | Preliminary Investigation & Site development | |||||
| Total Land & Site Development | ||||||
| 2.0 | Plant & Equipment | |||||
| 2.1 | Steam Turbine generator Island | |||||
| 2.2 | Turbine Generator Island | |||||
| 2.3 | WHRB Island | |||||
| 2.4 | BOP Mechanical | |||||
| 2.4.1 | Fuel Handling & Storage system | |||||
| 2.4.2 | External water supply system | |||||
| 2.4.3 | CW system | |||||
| 2.4.4 | Cooling Towers | |||||
| 2.4.5 | DM water Plant | |||||
| 2.4.6 | Clarification plant | |||||
| 2.4.7 | Chlorination Plant | |||||
| 2.4.8 | Air condition & Ventilation System | |||||
| 2.4.9 | Fire Fighting system | |||||
| 2.4.10 | HP/LP Piping Total BOP Mechanical | |||||
| 2.5 | BOP Electrical | |||||
| 2.5.1 | Switch Yard Package | |||||
| 2.5.2 | Transformers package | |||||
| 2.5.3 | Switch gear Package | |||||
| 2.5.4 | Cable , Cable Facilities & grounding | |||||
| 2.5.5 | Lighting | |||||
| 2.5.6 | Emergency D.G. set | |||||
| Total BOP Electrical | ||||||
| 2.6 | C & I Package | |||||
| Total Plant & Equipment excluding taxes & Duties | ||||||
| 2.7 | Taxes and Duties | |||||
| 2.7.1 | Custom Duty | |||||
| 2.7.2 | Other Taxes & Duties | |||||
| Total Taxes & Duties | ||||||
| Total Plant & Equipment | ||||||
| 3.0 | Initial spares | |||||
| 4.0 | Civil Works | |||||
| 4.1 | Main plant/Adm. Building | |||||
| 4.2 | External water supply system | |||||
| 4.3 | CW system | |||||
| 4.4 | Cooling Towers | |||||
| 4.5 | DM water Plant | |||||
| 4.6 | Clarification plant | |||||
| 4.7 | Fuel Handling & Storage system | |||||
| 4.8 | Township & Colony | |||||
| 4.9 | Temp. construction & enabling works | |||||
| 4.10 | Road & Drainage | |||||
| 4.11 | Fire Fighting system | |||||
| Total Civil works | ||||||
| 5.0 | Construction & Pre Commissioning Expences | |||||
| 5.1 | Erection Testing and commissioning | |||||
| 5.2 | Site supervision | |||||
| 5.3 | Operator's Training | |||||
| 5.4 | Construction Insurance | |||||
| 5.5 | Tools & Plant | |||||
| 5.6 | Start up fuel | |||||
| Total Construction & Pre- Commissioning Expences | ||||||
| 6.0 | Overheads | |||||
| 6.1 | Establishment | |||||
| 6.2 | Design & Engineering | |||||
| 6.3 | Audit & Accounts | |||||
| 6.4 | Contingency | |||||
| Total Overheads | ||||||
| 7.0 | IDC, FC, FERV & Hedging Cost | |||||
| 7.1 | Interest During Construction (IDC) | |||||
| 7.2 | Financing Charges (FC) | |||||
| 7.3 | Foreign Exchange Rate Variation (FERV) | |||||
| 7.4 | Hedging Cost | |||||
| Total of IDC, FC, FERV & Hedging Cost | ||||||
| 8.0 | Capital cost including IDC, FC, FERV & Hedging Cost |
Note:
1. In case of time & Cost over run, a detailed note giving reasons of such time and cost over run should be submitted clearly bringing out the agency responsible and whether such time & cost over run was beyond the control of the generating company.
PETITIONER
PART-I
FORM-5D
Break-up of Construction / Supply/Service packages
Name of the Company ...........................................
Name of the Power Station ...........................................
| 1 | 2 | 3 | 4 | 5 | 6 | ---- | ||
| 1 | Name/No. of Construction / Supply / Service Package | |||||||
| 2 | Scope of works1 (in line with head of cost break-ups as applicable) | |||||||
| 3 | Whether awarded through ICB/DCB/ Depatmentally/ Deposit Work | |||||||
| 4 | No. of bids received | |||||||
| 5 | Date of Award | |||||||
| 6 | Date of Start of work | |||||||
| 7 | Date of Completion of Work | |||||||
| 8 | Value of Award2 in (Rs. Cr.) | |||||||
| 9 | Firm or With Escalation in prices | |||||||
| 10 | Actual capital expenditure till the completion or up to COD whichever is earlier(Rs.Cr.) | |||||||
| 11 | Taxes & Duties and IEDC | |||||||
| 12 | IDC, FC, FERV & Hedging cost | |||||||
| 13 | Sub -total (10+11+12) |
1. The scope of work in any package should be indicated in conformity of Capital cost break-up for the coal based plants in the FORM-5B to the extent possible. In case of Gas/Liquid fuel based projects, break down in the similar manner in the relevant heads as per FORM-5C
2. If there is any package, which need to be shown in Indian Rupee and foreign currency(ies), the same should be shown separately alongwith the currency, the exchange rate and the date e.g. Rs.80 Cr+US$50m=Rs.320 Cr at US$=Rs.48 as on say 01.04.09.
PETITIONER
PART - I
FORM - 6
Financial Package upto COD
Name of the Company
......................................
Name of the Power Station
......................................
Project Cost as on COD
.......................................
| Financial Package as Approved | Financial Package as on COD | As Admitted on COD | ||||
| Currency and Amount3 | Currency and Amount3 | Currency and Amount3 | ||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Loan-I | US $ | 200m | ||||
| Loan-II | ||||||
| Loan-III | ||||||
| and so on | ||||||
| Equity- | ||||||
| Foreign | ||||||
| Domestic | ||||||
| Total Equity | ||||||
| Debt:Equity Ratio |
1. Say US $ 200m + Rs.400 Cr or Rs.1360 Cr including US $ 200m at an exchange rate of 1US $ = Rs.48/-
2. Date of Commercial Operation means Commercial Operation of the last unit.
3. For example : US $, 200M etc.etc.
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೩೦೨೨PART - 1
FORM – 7
Details of Project Specific Loans
Name of the Company .....................................
Name of the Power Station .....................................
| Particulars | Package1 | Package2 | Package3 | Package4 | Package5 | Package6 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Source of Loan1 | ||||||
| Currency2 | ||||||
| Amount of Loan sanctioned | ||||||
| Amount of Gross Loan drawn upto 31.03.2009/COD 3,4,5,13,15 | ||||||
| Interest Type6 | ||||||
| Fixed Interest Rate, if applicable | ||||||
| Base Rate, if Floating Interest7 | ||||||
| Margin, if Floating Interest8 | Yes/No | Yes/No | Yes/No | Yes/No | Yes/No | Yes/No |
| Are there any Caps/Floor9 | ||||||
| If above is yes,specify caps/floor | ||||||
| Moratorium Period10 | ||||||
| Moratorium effective from | ||||||
| Repayment Period11 | ||||||
| Repayment effective from | ||||||
| Repayment Frequency12 | ||||||
| Repayment Instalment13,14 |
1. Source of loan means the agency from whom the loan hs been taken such as WB, ADB, WMB, PNB, SBI, ICICI, IFC, PFC etc.
2. Currency refers to currency of loan such as US$, DM, Yen Indian Rupee etc.
3. Details are to be submitted as on 31.03.2009 for existing assets and as on COD for the remaining assets.
4. Where the loan has been refinanced, details in the Form is to be given for the loan refinanced.
However, the details of the original loan is to be given seperately in the same form.
5. If the Tariff in the petition is claimed seperately for various units, deails in the Form is to be given seperately for all the units in the same form.
6. Interest type means whether the interest is fixed or floating
7. Base rate means the base as PLR, LIBOR etc. over which the margin is to be added. Applicable base rate on different dates from the date of drawl may also be enclosed.
8. Margin means the points over and above the floating rate.
9. At times caps/floor are put at which the floating rates are frozen. If such a condition exists, spcify the limits.
10. Moratorium period refers to the period during which loan sevicing liability is not required.
11. Repayment period means the repayment of loan such as 7 years, 10 years, 25 years etc.
12. Repayment frequency means the interval at which the debt servicing is to be done such as monthly, quarterly, half yearly, annual etc.
13. Where there is more than one drawal/repayment for a loan, the date & amount of each drawal/repayment may also be given seperately.
14. If the repayment instalment amount and repayment date can not be worked out from the data furnished above the repayment schedule to be furnished separately.
15. In case of Foreign loan, date of each drawal and repayment along with exchange rate at that date may be given.
16. Base exchange rate means the exchange rate prevailing as on 31.03.2009 for existng aseets and as on COD for the remaining assets.
17. In case of hedging, specify details like type of hedging, period of hedging, cost of hedging, etc. 18. At the time of truing up rate of interst with relevant reset date (if any) to be furnished separately.
19. At the tme of truing up provide details of refinancing of loans considered earlier. Details such as date on which refinancing done, amount of refinanced loan, terms and conditions of refinanced loan, financing and other charges incurred for refinancing etc.
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೩೦೨೪PART - 1
FORM – 8
Details of Allocation of Corporate loans to various projects
Name of the Company ....................................
Name of the Power Station ....................................
| Particulars | Package1 | Package2 | Package3 | Package4 | Package5 | Remarks |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Source of Loan1 | ||||||
| Currency2 | ||||||
| Amount of Loan sanctioned | ||||||
| Amount of Gross Loan drawn upto 31.03.2009/COD 3,4,5,13,15 | ||||||
| Interest Type6 | ||||||
| Fixed Interest Rate, if applicable | ||||||
| Base Rate, if Floating Interest7 | ||||||
| Margin, if Floating Interest8 | ||||||
| Are there any Caps/Floor9 | Yes/No | Yes/No | Yes/No | Yes/No | Yes/No | |
| If above is yes,specify caps/floor | ||||||
| Moratorium Period10 | ||||||
| Moratorium effective from | ||||||
| Repayment Period11 | ||||||
| Repayment effective from | ||||||
| Repayment Frequency12 | ||||||
| Repayment Instalment13,14 | ||||||
| Base Exchange Rate16 | ||||||
| Are foreign currency loan hedged? | ||||||
| If above is yes, specify details17 | Distribution of loan packages to various projects | |||||
| Name of the Projects | Total | |||||
| Project 1 | ||||||
| Project 2 | ||||||
| Project 3 and so on |
1. Source of loan means the agency from whom the loan hs been taken such as WB, ADB, WMB, PNB, SBI, ICICI, IFC, PFC etc.
2. Currency refers to currency of loan such as US$, DM, Yen, Indian Rupee etc.
3. Details are to be submitted as on 31.03.2009 for existing assets and as on COD for the remaining assets.
4. Where the loan has been refinanced, details in the Form is to be given for the loan refinanced.
However, the details of the original loan is to be given seperately in the same form.
5. If the Tariff in the petition is claimed seperately for various units, deails in the Form is to be given seperately for all the units in the same form.
6. Interest type means whether the interest is fixed or floating
7. Base rate means the base as PLR, LIBOR etc. over which the margin is to be added. Applicable base rate on different dates from the date of drawl may also be enclosed.
8. Margin means the points over and above the floating rate.
9. At times caps/floor are put at which the floating rates are frozen. If such a condition exists, spcify the limits.
10. Moratorium period refers to the period during which loan sevicing liability is not required.
11. Repayment period means the repayment of loan such as 7 years, 10 years, 25 years etc.
12. Repayment frequency means the interval at which the debt servicing is to be done such as monthly, quarterly, half yearly, annual etc.
13. Where there is more than one drawal/repayment for a loan, the date & amount of each drawal/repayment may also be given seperately.
14. If the repayment instalment amount and repayment date can not be worked out from the data furnished above the repayment schedule to be furnished separately.
15. In case of Foreign loan, date of each drawal and repayment along with exchange rate at that date may be given.
16. Base exchange rate means the exchange rate prevailing as on 31.03.2009 for existng aseets and as on COD for the remaining assets.
17. In case of hedging, specify details like type of hedging, period of hedging, cost of hedging, etc. 18. At the time of truing up rate of interst with relevant reset date (if any) to be furnished separately.
19. At the tme of truing up provide details of refinancing of loans considered earlier. Details such as date on which refinancing done, amount of refinanced loan, terms and conditions of refinanced loan, financing and other charges incurred for refinancing etc.
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೩೦೨೬PART - 1
FORM – 9
Statement of Additional Capitalisation after COD
Name of the Company .............................................
Name of the Power Station .............................................
COD
| Sl. No. | Head of Work/ Equipment | Actual/ projected additional expenditure claimed | Regulations under which claimed -10(1) (i), (ii), (iii), (iv) or (v) or 10(2) (i), (ii),or (iii) | Justification | ||||
| 2009-10 2010-11 2011-12 | 2012-13 2013-14 | |||||||
| 1 | ||||||||
| 2 | ||||||||
| 3 | ||||||||
| 4 | ||||||||
| 5 | ||||||||
NOTE:
1. Fill the form in chronological order year wise along with detailed justification clearly bringing out the necessity and the benefits accruing to the beneficiaries.
2. In case initial spares are purchased alongwith any equipment, then the cost of such spares should be indicated separately e.g. Rotor - Rs.50 Crs. Initial spares - Rs.5 Crs.
PETITIONER
PART - 1
FORM – 9A
Statement of Capital Cost
(To be given for relevant dates and year wise)
Name of the Company
Name of the Power Station
(Rs.in lakhs)
| As on relevant date.1 | ||
| A | a) Opening Gross Block Amount as per books | |
| b) Amount of capital liabilities in A(a) above | ||
| c) Amount of IDC, FC, FERV & Hedging cost included in A(a) above | ||
| d) Amount of IEDC (excluding IDC, FC, FERV & Hedging cost) included in A(a) ab | ||
| B | a) Addition in Gross Block Amount during the period | |
| b) Amount of capital liabilities in B(a) above | ||
| c) Amount of IDC, FC, FERV & Hedging cost included in B(a) above | ||
| d) Amount of IEDC (excluding IDC, FC, FERV & Hedging cost) included in B(a) ab | ||
| C | a) Closing Gross Block Amount as per books | |
| b) Amount of capital liabilities in C(a) above | ||
| c) Amount of IDC, FC, FERV & Hedging cost included in C(a) above | ||
| d) Amount of IEDC (excluding IDC, FC, FERV & Hedging cost) included in C(a) ab |
1. Relevant date/s means date of COD of unit/s, station and financial year start date and end date.
PETITIONER
PART - 1
FORM – 9B
Statement of Capital Works in Progress
(To be given for relevant dates and year wise)
Name of the Company
Name of the Power Station
| As on relevant date.1 | ||
| A | a) Opening CWIP Amount as per books | |
| b) Amount of capital liabilities in a above | ||
| c) Amount of IDC, FC, FERV & Hedging cost included in a above | ||
| B | a) Addition/Adjustment in CWIP Amount during the period | |
| b) Amount of capital liabilities in a above | ||
| c) Amount of IDC, FC, FERV & Hedging cost included in a above | ||
| C | a) Capitalization/Transfer to Fixed asset of CWIP Amount during the period | |
| b) Amount of capital liabilities in a above | ||
| c) Amount of IDC, FC, FERV & Hedging cost included in a above | ||
| D | a) Closing CWIP Amount as per books | |
| b) Amount of capital liabilities in a above | ||
| c) Amount of IDC, FC, FERV & Hedging cost included in a above |
1. Relevant date/s means date of COD of unit/s, station and financial year start date and end date.
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೩೦೨೮PART - 1
FORM – 10
Financing of Additional Capitalisation
Name of the Company
Name of the Power Station
..........................................
..........................................
Date of Commercial Operation
..........................................
| Actual | Admitted | |||||||||
| Financial Year (Starting from COD) | Year1 Year2 | Year3 | Year4 | Year 5 & So on | Year1 | Year2 | Year3 | Year4 Year 5 & So on | ||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
| Amount capitalised in Work/Equipment | ||||||||||
| Financing Details | ||||||||||
| Loan-1 | ||||||||||
| Loan-2 | ||||||||||
| Loan-3 and so on | ||||||||||
| Total Loan2 | ||||||||||
| Equity | ||||||||||
| Internal Resources | ||||||||||
| Others | ||||||||||
| Total |
1. Year 1 refers to Financial Year of COD and Year 2, Year 3 etc. are the subsequent financial years respectively.
2. Loan details for meeting the additional capitalisation requirement should be given as per FORM-7 or 8 whichever is relevant.
PETITIONER
PART - I
FORM-11
Calculation of Depreciation Rate
Name of the Company
Name of the Power Station
| Sl. No. | Name of the Assets1 | Gross Block as on 31.03.2009 or as on COD, whichever is later and subsequently for each year therafter upto 31.3.14 | Depreciation Rates as per CERC's Depreciation Rate Schedule | Depreciation Amount for each year up to 31.03.14 |
| 1 | 2 | 3 | 4= Col.2 X Col.3 | |
| 1 | Land | |||
| 2 | Building | |||
| 3 | and so on | |||
| 4 | ||||
| 5 | ||||
| TOTAL | ||||
| Weighted Average Rate of Depreciation (%) |
1. Name of the Assets should conform to the description of the assets mentioned in Depreciation Schedule appended to the Notification.
PETITIONER
PART - I
FORM-12
Statement of Depreciation
Name of the Company ..........................................
Name of the Power Station ..........................................
| Financial Year | Upto 2000 011 | 2001-02 | 2002-03 | 2003-04 | 2004-05 | 2005-06 | 2006-07 | 2007-08 | 2008-09 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
| Depreciation on Capital Cost | |||||||||
| Depreciation on Additional Capitalisation | |||||||||
| Amount of Additional Capitalisation | |||||||||
| Depreciation Amount | |||||||||
| Detail of FERV | |||||||||
| Amount of FERV on which depreciation charged |
1. If the tariff for the period 2004-09 was not ordred by the Commission, Depreciation recovered in Tariff upto 2004-09 to be furnished with yearwise details in the same form seperately with supporting details.
2. In case of details of FERV and AAD, give information for the applicable priod.
PETITIONER
PART - I
FORM – 13
Calculation of Weighted Average Rate of Interest on Actual Loans1
Name of the Company ..............................................
Name of the Power Station ..............................................
| Particulars | Existing 2008-09 | 2009-10 | 2010-11 | 2011-12 2012-13 2013-14 | ||
| 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| Loan-1 | ||||||
| Gross loan - Opening Add: Drawal(s) during the Year | ||||||
| Less: Repayment (s) of Loans during the year | ||||||
| Net loan - Closing | ||||||
| Average Net Loan | ||||||
| Rate of Interest on Loan on annual basis | ||||||
| Interest on loan | ||||||
| Loan-2 | ||||||
| Gross loan - Opening | ||||||
| Cumulative repayments of Loans upto previous year | ||||||
| Net loan - Opening | ||||||
| Add: Drawal(s) during the Year | ||||||
| Less: Repayment (s) of Loans during the year | ||||||
| Net loan - Closing | ||||||
| Average Net Loan | ||||||
| Rate of Interest on Loan on annual basis | ||||||
| Interest on loan | ||||||
| Loan-3 and so on | ||||||
| Gross loan - Opening | ||||||
| Cumulative repayments of Loans upto previous year | ||||||
| Net loan - Opening | ||||||
| Add: Drawal(s) during the Year | ||||||
| Less: Repayment (s) of Loans during the year | ||||||
| Net loan - Closing | ||||||
| Average Net Loan |
1. In case of Foreign Loans, the calculations in Indian Rupees is to be furnished. However, the calculations in Original currency is also to be furnished seperately in the same form.
PETITIONER
PART - 1
FORM-13A
Calculation of Interest on Normative Loan
Name of the Company
.......................................
Name of the Power Station .......................................
| Particulars | Existing 2008-09 | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Gross Normative loan - Opening | ||||||
| Cumulative repayment of Normative Loan upto previous year | ||||||
| Net Normative loan - Opening | ||||||
| Increase/Decrease due to ACE during the Year Interest on Normative loan |
PETITIONER
PART - I
FORM-13B
Calculation of Interest on Working Capital
Name of the Company ........................................
Name of the Power Station ........................................
| Sl. No. | Particulars | Existing 2008-09 | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 1 | Cost of Coal | ||||||
| 2 | Cost of Main Secondary Fuel Oil1 | ||||||
| 3 | Fuel Cost2 | ||||||
| 4 | Liquid Fuel Stock2 | ||||||
| 5 | O & M Expenses | ||||||
| 6 | Maintenance Spares | ||||||
| 7 | Recievables | ||||||
| 8 | Total Working Capital | ||||||
| 9 | Rate of Interest | ||||||
| 10 | Interest on Working Capital |
1. For Coal based generating stations
2. For Gas Turbine/Combined Cycle generating stations duly taking into account the annual mode of operation (last available) on gas fuel and liquid fuel.
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೩೦೩೪ PART - IFORM-14
Draw Down Schedule for Calculation of IDC & Financing Charges
Name of the Company
Name of the Power Station
| Sl. No. | Draw Down | Quarter 1 | Quarter 2 | Quarter n (COD) | ||||||
| Particulars Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | ||
| 1 | Loans | |||||||||
| 1.1 | Foreign Loans | |||||||||
| 1.1.1 | Foreign Loan 1 | |||||||||
| Draw down Amount | ||||||||||
| IDC | ||||||||||
| Financing charges | ||||||||||
| Foreign Exchange Rate Variation | ||||||||||
| Hedging Cost | ||||||||||
| 1.1.2 | Foreign Loan 2 | |||||||||
| Draw down Amount | ||||||||||
| IDC | ||||||||||
| Financing charges | ||||||||||
| Foreign Exchange Rate Variation | ||||||||||
| 1.1.3 | Hedging Cost Foreign Loan 3 | |||||||||
| Draw down Amount | ||||||||||
| IDC | ||||||||||
| Financing charges | ||||||||||
| Foreign Exchange Rate Variation | ||||||||||
| Hedging Cost | ||||||||||
| 1.1.4 | - - | |||||||||
| - - | ||||||||||
| - - | ||||||||||
| 1.1 | Total Foreign Loans | |||||||||
| Draw down Amount | ||||||||||
| IDC | ||||||||||
| Financing charges | ||||||||||
| Foreign Exchange Rate Variation | ||||||||||
| Hedging Cost | ||||||||||
| 1.2 | Indian Loans | |||||||||
| 1.2.1 | Indian Loan 1 | |||||||||
| Draw down Amount | -- | -- | -- | -- | -- | -- | ||||
| IDC | -- | -- | -- | -- | -- | -- | ||||
| Financing charges | -- | -- | -- | -- | -- | -- | ||||
| 1.2.2 | Indian Loan 2 | |||||||||
| Draw down Amount | -- | -- | -- | -- | -- | -- | ||||
| IDC | -- | -- | -- | -- | -- | -- | ||||
| Financing charges | -- | -- | -- | -- | -- | -- | ||||
| 1.2.3 | Indian Loan 3 | |||||||||
| Draw down Amount | -- | -- | -- | -- | -- | -- | ||||
| IDC | -- | -- | -- | -- | -- | -- | ||||
| Financing charges | -- | -- | -- | -- | -- | -- | ||||
| 1.2.4 | - - | -- | -- | -- | -- | -- | -- | |||
| - - | -- | -- | -- | -- | -- | -- | ||||
| - - | -- | -- | -- | -- | -- | -- | ||||
| 1.2 | Total Indian Loans | |||||||||
| Draw down Amount | -- | -- | -- | -- | -- | -- | ||||
| IDC | -- | -- | -- | -- | -- | -- | ||||
| Financing charges IDC | -- | -- | -- | -- | -- | -- | ||||
| Financing charges | ||||||||||
| Foreign Exchange Rate Variation | ||||||||||
| Hedging Cost | ||||||||||
| 2 | Equity | |||||||||
| 2.1 | Foreign equity drawn | |||||||||
| 2.2 | Indian equity drawn | -- | -- | -- | -- | -- | -- | |||
| Total equity deployed |
1. Drawal of debt and equity shall be on paripassu basis quarter wise to meet the commissioning schedule. Drawal of higher equity in the beginning is permissible.
2. Applicable interest rates including reset dates used for above computation may be furnished separately.
3. In case of multi unit project details of capitalisation ratio used to be furnished.
PETITIONER
PART - I
FORM - 14A
Actual Cash Expenditure
Name of the Company
Name of the Power Station
| Quarter-I | Quarter-II | Quarter-III | Quarter-n (COD) | |
| Payment to contractors/suppliers | ||||
| % of fund deployment | ||||
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೩೦೩೮PART - I
FORM -15
Details/Information to be Submitted in respect of Fuel for Computation of
Energy Charges1
Name of the Company ............................................
| Month | Unit | For preceeding 3rd Month | For preceeding 2nd Month | For preceeding 1st Month |
| Quantity of Coal supplied by Coal Company | (MMT) | |||
| Adjustment (+/-) in quantity supplied made by Coal Company | (MMT) | |||
| Coal supplied by Coal Company (1+2) | (MMT) | |||
| Normative Transit & Handling Losses (For coal based Projects) | (MMT) | |||
| Net coal Supplied (3-4) | (MMT) | |||
| Amount charged by the Coal Company | (Rs.) | |||
| Adjustment (+/-) in amount charged made by Coal Company | (Rs.) | |||
| Total amount Charged (6+7) | (Rs.) | |||
| Transportation charges by rail/ship/road transport | ( Rs.) | |||
| Adjustment (+/-) in amount charged made by Railways/Transport Company | ( Rs.) | |||
| Demurrage Charges, if any | ( Rs.) | |||
| Cost of diesel in transporting coal through MGR system, if applicable | ( Rs.) | |||
| Total Transportation Charges (9+/-10-11+12) | ( Rs.) | |||
| Total amount Charged for coal supplied including Transportation (8+13) | ( Rs.) | |||
| Weighted average GCV of coal as fired | (kCal/Kg) |
Note:
1. Similar details to be furnished for natural gas/liquid fuel for CCGT station and secondary fuel oil for coal based thermal plants.
PETITIONER
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೩೦೩೯PART - I
FORM – 16
Details/Information to be Submitted in respect of Limestone for
Computation of Energy Charge Rate
Name of the Company .................................
| Sl. No. | Month | Unit | For preceeding 3rd Month | For preceeding 2nd Month | For preceeding 1st Month |
| 1. | Quantity of Limestone supplied by Limestone supply Company | (MMT) | |||
| 2. | Adjustment (+/-) in quantity supplied made by Limestone supply Company | (MMT) | |||
| 3. | Limestone supplied by Limestone supply Company(1+2) | (MMT) | |||
| 4. | Net Limestone Supplied (3-4) | (MMT) | |||
| 5. | Amount charged by the Limestone supply Company | (Rs.) | |||
| 6. | Adjustment (+/-) in amount charged made by Limestone supply Company | (Rs.) | |||
| 7. | Total amount Charged (6+7) | (Rs.) | |||
| 8. | Transportation charges by rail/ship/road transport | ( Rs.) | |||
| 9. | Adjustment (+/-) in amount charged made by Railways/Transport Company | ( Rs.) | |||
| 10. | Demurrage Charges, if any | ( Rs.) | |||
| 11. | Total Transportation Charges (8+/-9-10) | ( Rs.) | |||
| 12. | Total amount Charged for Limestone supplied including Transportation (7+11) | ( Rs.) |
{{^{{FOOTNOTE *}}}} This format is for Thermal Stations wherever applicable.
PETITONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೩೦೪೦ APPENDIX - IPART – II
TARIFF FILING FORMS (HYDRO)
APPENDIX-I
PART – II
Checklist of Forms and other Information / documents for tariff filing
for Hydro Station
| Form No. | Title of Tariff Filing Forms (Hydro) | Tick |
| FORM- 1 | Summary Sheet | |
| FORM-2 | Details of COD, Type of hydro station, Normative Annual Plant Avaialbilty Factor(NAPAF) | |
| FORM-3 | Salient Features of Hydroelectric Project | |
| FORM-4 | Details of Foreign loans | |
| FORM- 4 A | Details of Foreign Equity | |
| FORM-5 | Abstract of Admitted Capital Cost for the existing Projects | |
| FORM-5A | Abstract of Capital Cost Estimates and Schedule of Commissioning for the New projects | |
| FORM-5B | Break up of capital Cost | |
| FORM-5C | Break up of Project Cost for Plant and Equipment | |
| FORM-5D | Break-up of Construction/Supply/Service packages | |
| FORM-6 | Financial Package upto COD | |
| FORM-7 | Details of Project Specific Loans | |
| FORM- 8 | Details of Allocation of corporate loans to various projects | |
| FORM-9 | Statement of Additional Capitalisation after COD | |
| FORM- 9 A | Statement of Capital cost | |
| FORM- 9B | Statement of Capital Woks in Progress | |
| FORM-10 | Financing of Additional Capitalisation | |
| FORM-11 | Calculation of Depreciation Rate | |
| FORM-12 | Statement of Depreciation | |
| FORM-13 | Calculation of weighted average rate of interest on actual loan | |
| FORM-13A | Calcualtion of interest on Normative loan | |
| FORM-13B | Calculation of Interest on Working Capital | |
| FORM-14 | Draw Down Schedule for Calculation of IDC & Financing Charges | |
| FORM- 14A | Actual cash expenditure | |
| FORM-15A | Calculation of Operation & Maintenance Expenses | |
| FORM-15B | Details of Operation & Maintenance Expenses | |
| FORM-16A | Deign energy and peaking capabilty (monthwise)- ROR with Pondage/Storgae type new stations | |
| FORM-16B | Deign energy and MW Continuous (monthwise)- ROR type new stations | |
| Other Information / Documents | ||
| Sl. No. | Information / Document | Tick |
| 1 | Certificate of incorporation, Certificate for Commencing Business, Memorandum of Association & Article of Association ( for new station set up by a company making tariff application for the first time to KERC) | |
| 2 | Stationwise and Corporate audited Balance Sheet and Profit & Loss Accounts with all the Schedules & annexures on COD of the station and for the relevant years. | |
| 3 | Copies of relevant loan agreements | |
| 4 | Copies of the approval of Competent Authority for the Capital Cost and Financial package. | |
| 5 | Copies of the Equity participation agreements and necessary approval for the foreign equity | |
| 6 | Copies of the PPA with the beneficiaries, if any | |
| 7 | Detailed note giving reasons of time and cost over run, if applicable. | |
| 8 | Any other relevant information (Please specify) |
Note: 1: Elecltronic copy of the petition (in words format) and detailed calculation as per these formats (in excell format) and any other information submitted shall also be furnished in the form of CD.
PART – II
FORM – 1
SUMMARY SHEET
Name of the Company
Name of the Power Station ........................................
Location of Power station ......................................
| Sl. No. | Particulars | Existing '2008-09 | 2009-10 | 2010-11 | 2011-12 | 2011-13 | 2013-14 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| 1 | Depreciation | ||||||
| 2 | Interest on Loan | ||||||
| 3 | Return on Equity1 | ||||||
| 4 | Interest on Working Capital | ||||||
| 5 | O & M Expenses | ||||||
| Total |
1. Details of calculations, considering equity as per regulation, to be furnished.
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೩೦೪೨PART - II
FORM – 2
Details of COD, Type of hydro Station, Normative Annual Plant Availability
Factor (NAPAF) & other normative parameters considered for tariff calculation
NAME OF COMPANY
| Year Ending March | |||||||
| As Existing | |||||||
| Sl. No. | Description | 2008-09 | 2009-10 | 2010-11 2011-12 2012-13 2013-14 | |||
| 1 | Installed Capacity | MW | |||||
| 2 | Date of commercial operation | ||||||
| Unit-1 | |||||||
| Unit-2 | |||||||
| Unit-3 | |||||||
| 3 | Type of Station | ||||||
| a) Surface/underground | |||||||
| b) Purely ROR/ Pondage/Storage | |||||||
| c) Peaking/non-peaking | |||||||
| d) No. of hours of peaking | |||||||
| e) Overload capacity(MW) & period | |||||||
| 4 | Type of excitation | ||||||
| a) Rotaing exciters on generator | |||||||
| b) Static excitation | |||||||
| 5 | Design Energy (Annual)1 | Gwh | |||||
| 6 | Auxiliary Consumption including Transformation losses | % | |||||
| 7 | Normative Plant Availabilty Factor (NAPAF) | ||||||
| 8.1 Maintenance Spares for WC | % of O&M | ||||||
| 8.2 | Recievables for WC | in Months | |||||
| 8.3 | Base Rate of Return on Equity | % | |||||
| 8.4 | Tax Rate2 | % | |||||
| 8.5 | Prime lending Rate of SBI as on3 | % |
1. Monthwise 10 day Design energy figures to be given separately with the petition
2. Tax rate applicable to the company for the year 2008-09 should also be furnished
3. Mention relevant date
PETITIONER
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೩೦೪೩ PART - IIFORM – 3
Salient Features of Hydroelectric Project
NAME OF COMPANY
| 1. Location | |
| District | |
| River | |
| 2. Diversion Tunnel | |
| Size, shape | |
| Length (M) | |
| 3. Dam | |
| Type | |
| Maximum dam height (M) | |
| 4. Spillway | |
| Type | |
| Crest level of spillway (M) | |
| 5. Reservoir | |
| Full Reservior Level (FRL) (M) | |
| Minimum Draw Down Level (MDDL) (M) | |
| Live storage (MCM) | |
| 6. Desilting Chamber | |
| Type | |
| Number and Size | |
| Particle size to be removed(mm) | |
| 7. Head Race Tunnel | |
| Size and type | |
| Length (M) | |
| Design discharge(Cumecs) | |
| 8. Surge Shaft | |
| Type | |
| Diameter (M) | |
| Height (M) 9. Penstock/Pressure shafts | |
| Type | |
| Diameter & Length (M) | |
| 10. Power House | |
| Installed capacity (No of units x MW) | |
| Type of turbine | |
| Rated Head(M) | |
| Rated Discharge(Cumecs) | |
| Head at Full Reservoir Level (M) | |
| Head at Minimum Draw down Level (M) | |
| MW Capability at FRL | |
| MW Capability at MDDL | |
| 11. Tail Race Tunnel/Channel | |
| Diameter (M) , shape | |
| Length (M) | |
| Minimum tail water level (M) | |
| 12. Switchyard | |
| Type of Switch gear | |
| No. of generator bays | |
| No. of Bus coupler bays | |
| No. of line bays |
Note: Specify limitation on generation during specific time period(s) on account of restrictions on water use due to irrigation, drinking water, industrial, enviromental considerations etc.
PETITIONER
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
೩೦೪೫
PART - II
FORM – 4
Details of Foreign Loans
(Details only in respect of loans applicable to the project under petition)
Name of the Company .................................
Name of the Power Station .................................
Exchange Rate at COD .................................
Exchange Rate as on 31.03.2009 .................................
(Amount in Rs.Lacs)
| Sl. No. | Financial Year (Starting from COD) | Year 1 | Year 2 | Year 3 and so on | |||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | |
| Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchang e Rate | Amount (Rs.) | ||
| Currency11 | |||||||||||||
| A.1 | At the date of Drawl2 | ||||||||||||
| 2 | Scheduled repayment date of principal | ||||||||||||
| 3 | Scheduled payment date of interest | ||||||||||||
| 4 | At the end of Financial year |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| Sl. No. | Financial Year (Starting from COD) | Year 1 | Year 2 | Year 3 and so on | ||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | ||
| Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchang e Rate | Amount (Rs.) | |||
| B | In case of Hedging3 | |||||||||||||
| 1 | At the date of hedging | |||||||||||||
| 2 | Period of hedging | |||||||||||||
| 3 | Cost of hedging | |||||||||||||
| Currency21 | ||||||||||||||
| A.1 | At the date of Drawl2 | |||||||||||||
| 2 | Scheduled repayment date of principal | |||||||||||||
| 3 | Scheduled payment date of interest | |||||||||||||
| 4 | At the end of Financial year | |||||||||||||
| B | In case of Hedging3 | |||||||||||||
| 1 | At the date of hedging | |||||||||||||
| 2 | Period of hedging | |||||||||||||
| 3 | Cost of hedging |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Sl. No. | Financial Year (Starting from COD) | Year 1 | Year 2 | Year 3 and so on | ||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | ||
| Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchang e Rate | Amount (Rs.) | |||
| Currency31 & so on | ||||||||||||||
| A.1 | At the date of Drawl2 | |||||||||||||
| 2 | Scheduled repayment date of principal | |||||||||||||
| 3 | Scheduled payment date of interest | |||||||||||||
| 4 | At the end of Financial year | |||||||||||||
| B | In case of Hedging3 | |||||||||||||
| 1 | At the date of hedging | |||||||||||||
| 2 | Period of hedging | |||||||||||||
| 3 | Cost of hedging |
1. Name of the currency to be mentioned e.g. US $, DM, etc. etc.
2. In case of more than one drawal the year, Exchange rate at the data of each drawal to be given
3. Furnish details of hedging, in case of more than one hedging during the year or part hedging, details of each hedging are to be given
4. Tax (such as withholding tax) details as applicable including change in rates, date from which change effective etc. must be clearly indicated.
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
೩೦೪೮
PART - II
FORM-4A
Details of Foreign Equity
(Details only in respect of Equity infusion if any applicable to the proejct under petition)
Name of the Company
.....................................
Name of the Power Station
.....................................
Exchange Rate at COD
.....................................
Exchange Rate on date/s of infusion ......................................
(Amount in Rs.Lacs)
| Sl. No. | Financial Year | Year 1 | Year 2 | Year 3 and so on | |||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | |
| Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchang e Rate | Amount (Rs.) | ||
| Currency11 | |||||||||||||
| A.1 | At the date of infusion2 | ||||||||||||
| 2 | |||||||||||||
| 3 | |||||||||||||
| 4 | |||||||||||||
| B | Currency21 | ||||||||||||
| 1 | |||||||||||||
| 2 | |||||||||||||
| 3 |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Sl. No. | Financial Year | Year 1 | Year 2 | Year 3 and so on | ||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | ||
| Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchange Rate | Amount (Rs.) | Date | Amount (Foreign Currency) | Exchang e Rate | Amount (Rs.) | |||
| Currency31 | ||||||||||||||
| A.1 | At the date of infusion2 | |||||||||||||
| 2 | ||||||||||||||
| 3 | ||||||||||||||
| 4 | ||||||||||||||
| B | Currency41 & so on | |||||||||||||
| 1 | At the date of infusion2 | |||||||||||||
| 2 | ||||||||||||||
| 3 |
2. In case of equity infusion more than once during the year, Exchange rate at the data of each infusion to be given
PETITONER
PART - II
FORM – 5
| Name of the Company : |
| Name of the Power Station : |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| Capital Cost as admitted by KERC | |||
| Capital cost admitted as on | |||
| (Give reference of the relevant KERC Order with Petition No. & Date) | |||
| Foreign Component, if any (In Million US $ or the relevant Currency) | |||
| Domestic Component (Rs. Cr.) | |||
| Foreign Exchange rate considered for the admitted Capital cost | |||
| Hedging cost, if any, considered for the admitted Capital cost | |||
| Total Capital cost admitted (Rs. Cr) |
PETITIONER
PART - II
FORM - 5A
Abstract of Capital Cost Estimates and Schedule of Commissioning for the New projects
Name of the Company ............................................
Name of the Power Station ...........................................
New Projects
Capital Cost Estimates
| Board of Director/ Agency approving the Capital cost estimates: | ||
| Date of approval of the Capital cost estimates: | ||
| Present Day Cost | Completed Cost | |
| Price level of approved estimates | As of End of Qtr. Of the year As on Scheduled COD of the Station | |
| Foreign Exchange rate considered forthe Capital cost estimates |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Capital Cost excluding IDC & FC | |||
| Foreign Component, if any (In Million US $ or the relevant Currency) | |||
| Domestic Component (Rs. Cr.) | |||
| Capital cost excluding IDC, FC, FERV & Hedging Cost (Rs. Cr) | |||
| IDC, FC, FERV & Hedging Cost | |||
| Foreign Component, if any (In Million US $ or the relevant Currency) | |||
| Domestic Component (Rs. Cr.) | |||
| Total IDC, FC, FERV & Hedging Cost (Rs.Cr.) | |||
| Rate of taxes & duties considered | |||
| Capital cost Including IDC, FC, FERV & Hedging Cost | |||
| Foreign Component, if any (In Million US $ or the relevant Currency) | |||
| Domestic Component (Rs. Cr.) | |||
| Capital cost Including IDC & FC (Rs. Cr) | |||
| Schedule of Commissioning | |||
| COD of Unit-I/Block-I | |||
| COD of Unit-II/Block-II | |||
| ------------------------- | |||
| --------------------------- | |||
| COD of last Unit/Block |
NOTE: 1. Copy of approval letter should be enclosed.
2. Details of Capital cost are to be furnished as per FORM - 5B or 5C as applicale.
3. Details of IDC & Financing Charges are to be furnished as per FORM-14.
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
೩೦೫೨
PART - II
FORM - 5B
Break up of Capital cost for hydro power generating station
NAME OF THE COMPANY
NAME OF POWER STATION
| Sl. No. | Head of works | Original cost as approved by Authority | Actual capital expenditure as on COD | Liabilties/pr ovisions | Variation (3 4-5) | -Reasons for Variation | Admitted cost |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| 1.0 | Infrastructure Works | ||||||
| 1.1 | Preliminary including Development | ||||||
| 1.2 | Land | ||||||
| 1.3 | Buildings | ||||||
| 1.4 | Township | ||||||
| 1.5 | Maintenance | ||||||
| 1.6 | Tools & Plants | ||||||
| 1.7 | Communication | ||||||
| 1.8 | Environment & Ecology | ||||||
| 1.9 | Losses on stock | ||||||
| 1.10 | Receipt & Recoveries | ||||||
| 1.11 | Total (Infrastructure works) | ||||||
| 2.0 | Major Civil Works | ||||||
| 2.1 | Dam, Intake & Desilting Chambers |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Sl. No. | Head of works | Original cost as approved by Authority | Actual capital expenditure as on COD | Liabilties/pr ovisions | Variation (3 4-5) | -Reasons for Variation | Admitted cost | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | ||
| 2.2 | HRT, TRT, Surge Shaft & Pressure shafts | |||||||
| 2.3 | Power Plant civil works | |||||||
| 2.4 | Other civil works (to be specified) | |||||||
| 2.5 | Total (Major Civil Works) | |||||||
| 3.0 | Hydro Mechanical equipments | |||||||
| 4.0 | Plant & Equipment | |||||||
| 4.1 | Initial spares of Plant & Equipment | |||||||
| 4.2 | Total (Plant & Equipment) | |||||||
| 5.0 | Taxes and Duties | |||||||
| 5.1 | Custom Duty | |||||||
| 5.2 | Other taxes & Duties | |||||||
| 5.3 | Total Taxes & Duties | |||||||
| 6.0 | Construction & Pre-commissioning expenses | |||||||
| 6.1 | Erection, testing & commissioning | |||||||
| 6.2 | Construction Insurance | |||||||
| 6.3 | Site supervision | |||||||
| 6.4 | Total (Const. & Pre-commissioning) | |||||||
| 7.0 | Overheads | |||||||
| 7.1 | Establishment |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| Sl. No. | Head of works | Original cost as approved by Authority | Actual capital expenditure as on COD | Liabilties/pr ovisions | Variation (3 4-5) | -Reasons for Variation | Admitted cost |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| 7.2 | Design & Engineering | ||||||
| 7.3 | Audit & Accounts | ||||||
| 7.4 | Contingency | ||||||
| 7.5 | Rehabilitation & Resettlement | ||||||
| 7.6 | Total (Overheads) | ||||||
| 8.0 | Capital Cost without IDC, FC, FERV & Hedging Cost | ||||||
| 9.0 | IDC, FC, FERV & Hedging Cost | ||||||
| 9.1 | Interest During Construction (IDC) | ||||||
| 9.2 | Financing Charges (FC) | ||||||
| 9.3 | Foreign Exchange Rate Variation (FERV) | ||||||
| 9.4 | Hedging Cost | ||||||
| 9.5 | Total of IDC, FC, FERV & Hedging Cost | ||||||
| 10.0 | Capital cost including IDC, FC, FERV & Hedging Cost |
NOTE:
1. In case of time & cost over run, a detailed note giving reasons of such time and cost over run should be submitted clearly bringing out the agency responsible and whether such time and cost over run was beyond the control of the generating company.
PETITIONER
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
೩೦೫೫
PART - II
FORM - 5C
Break up of Capital Cost for Plant &Equipment
NAME OF COMPANY
NAME OF POWER STATION:
(Rs. In Lacs)
| Sl. No. | Head of works | Original Cost as approved by Authority | Cost on COD | Variation | Reasons for variation | Admitted cost |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| 1.0 Generator, turbine & Acessories | ||||||
| 1.1 | Generator package | |||||
| 1.2 | Turbine package | |||||
| 1.3 | Unit control Board | |||||
| 1.4 | C&I package | |||||
| 1.5 | Bus Duct of GT connection | |||||
| 1.6 | Total (Generator, turbine & Acessories) | |||||
| 2.0 | Auxiliary Electrical Equipment | |||||
| 2.1 | Step up transformer | |||||
| 2.2 | Unit Auxiliary Transformer | |||||
| 2.3 | Local supply transformer | |||||
| 2.4 | Station transformer | |||||
| 2.5 | SCADA | |||||
| 2.6 | Switchgear, Batteries, DC dist. Board |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| Sl. No. | Head of works | Original Cost as approved by Authority | Cost on COD | Variation | Reasons for variation | Admitted cost |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| 2.7 | Telecommunication equipment | |||||
| 2.8 | Illumination of Dam, PH and Switchyard | |||||
| 2.9 | Cables & cable facilities, grounding | |||||
| 2.10 Diesel generating sets | ||||||
| 2.11 Total (Auxiliary Elect. Equipment) | ||||||
| 3.0 | Auxiliary equipment & services for power station | |||||
| 3.1 | EOT crane | |||||
| 3.2 | Other cranes | |||||
| 3.3 | Electric lifts & elevators | |||||
| 3.4 | Cooling water system | |||||
| 3.5 | Drainage & dewatering system | |||||
| 3.6 | Fire fighting equipment | |||||
| 3.7 | Air conditioning, ventilation and heating | |||||
| 3.8 | Water supply system | |||||
| 3.9 | Oil handling equipment | |||||
| 3.10 Workshop machines & equipment | ||||||
| 3.11 Total (Auxiliary equipt. & services for Power Station) | ||||||
| 4.0 | Switchyard package | |||||
| 5.0 | Initial spares for all above equipments |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Sl. No. | Head of works | Original Cost as approved by Authority | Cost on COD | Variation | Reasons for variation | Admitted cost | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| 6.0 | Total Cost (Plant & Equipment) excluding IDC, FC, FERV & Hedging Cost | ||||||
| 7.0 | IDC, FC, FERV & Hedging Cost | ||||||
| 7.1 | Interest During Construction (IDC) | ||||||
| 7.2 | Financing Charges (FC) | ||||||
| 7.3 | Foreign Exchange Rate Variation (FERV) | ||||||
| 7.4 | Hedging Cost | ||||||
| 7.5 | Total of IDC, FC, FERV & Hedging Cost | ||||||
| 8.0 | Total Cost (Plant & Equipment) including IDC, FC, FERV & Hedging Cost |
PETITIONER
PART - II
FORM - 5D
Break up of Construction/Supply/Service packages
NAME OF THE COMPANY ................................................
| Sl. No. | Name/No.of Construction / Supply / Service Package | Scope of works (in line with head of cost break- ups as applicable) | Whether awarded through ICB/DCB/ Depatmentally/ Deposit Work | No. of bids received | Date of Award | Date of Start of work | Date of Completion of Work | Value of Award1in (Rs. Cr.) | Firm or With Escalation in prices | Actual expenditure till the completion or up to COD whichever is earlier(Rs.Cr.) | Taxes & Duties and IEDC | IDC, FC, FERV & Hedgin g cost | Total (11+12 +13) |
| -1 | -2 | -3 | -4 | -5 | -6 | -7 | -8 | -9 | -10 | -11 | -12 | -13 | -14 |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| Sl. No. | Name/No.of Construction / Supply / Service Package | Scope of works (in line with head of cost break- ups as applicable) | Whether awarded through ICB/DCB/ Depatmentally/ Deposit Work | No. of bids received | Date of Award | Date of Start of work | Date of Completion of Work | Value of Award1in (Rs. Cr.) | Firm or With Escalation in prices | Actual expenditure till the completion or up to COD whichever is earlier(Rs.Cr.) | Taxes & Duties and IEDC | IDC, FC, FERV & Hedgin g cost | Total (11+12 +13) |
| -1 | -2 | -3 | -4 | -5 | -6 | -7 | -8 | -9 | -10 | -11 | -12 | -13 | -14 |
1. If there is any package, which need to be shown in Indian Rupee and foreign currency(ies), the same should be shown separately alongwith the currency, the exchange rate and
PETITIONER
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
೩೦೫೯
PART - II
FORM – 6
Financial Package upto COD
NAME OF THE COMPANY ...................................
NAME OF THE POWER STATION ...................................
PROJECT COST AS ON COD1 .....................................
Date of Commercial Operation of the Station2
| Financial Package as Approved | Financial Package as on COD | As Admitted on COD | ||||
| Currency and Amount3 | Currency and Amount3 | Currency and Amount3 | ||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Loan-I | US $ | 200m | ||||
| Loan-II | ||||||
| Loan-III | ||||||
| and so on | ||||||
| Equity- | ||||||
| Foreign | ||||||
| Domestic | ||||||
| Total Equity | ||||||
| Debt : Equity Ratio |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
೩೦೬೦
PART - II
FORM – 7
Details of Project Specific Loans
Name of the Company .................................
Name of the Power Station .................................
| Particulars | Package1 | Package2 | Package3 | Package4 | Package5 | Package6 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Source of Loan1 | ||||||
| Currency2 | ||||||
| Amount of Loan sanctioned | ||||||
| Amount of Gross Loan drawn upto 31.03.2009/COD 3,4,5,13,15 | ||||||
| Interest Type6 | ||||||
| Fixed Interest Rate, if applicable | ||||||
| Base Rate, if Floating Interest7 | ||||||
| Margin, if Floating Interest8 | Yes/No | Yes/No | Yes/No | Yes/No | Yes/No | Yes/No |
| Are there any Caps/Floor9 | ||||||
| If above is yes,specify caps/floor | ||||||
| Moratorium Period10 | ||||||
| Moratorium effective from | ||||||
| Repayment Period11 | ||||||
| Repayment effective from | ||||||
| Repayment Frequency12 | ||||||
| Repayment Instalment13,14 | ||||||
| Base Exchange Rate16 |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Particulars | Package1 | Package2 | Package3 | Package4 | Package5 | Package6 | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| Are foreign currency loan hedged? | |||||||
| If above is yes,specify details17 |
1. Source of loan means the agency from whom the loan hs been taken such as WB, ADB, WMB, PNB, SBI, ICICI, IFC, PFC etc.
2. Currency refers to currency of loan such as US$, DM, Yen Indian Rupee etc.
3. Details are to be submitted as on 31.03.2009 for existing assets and as on COD for the remaining assets.
4. Where the loan has been refinanced, details in the Form is to be given for the loan refinanced. However, the details of the original loan is to be given seperately in the same form.
5. If the Tariff in the petition is claimed seperately for various units, deails in the Form is to be given seperately for all the units in the same form.
6. Interest type means whether the interest is fixed or floating
7. Base rate means the base as PLR, LIBOR etc. over which the margin is to be added. Applicable base rate on different dates from the date of drawl may also be enclosed.
8. Margin means the points over and above the floating rate.
9. At times caps/floor are put at which the floating rates are frozen. If such a condition exists, spcify the limits.
10. Moratorium period refers to the period during which loan sevicing liability is not required.
11. Repayment period means the repayment of loan such as 7 years, 10 years, 25 years etc.
12. Repayment frequency means the interval at which the debt servicing is to be done such as monthly, quarterly, half yearly, annual etc. 13. Where there is more than one drawal/repayment for a loan, the date & amount of each drawal/repayment may also be given seperately.
14. If the repayment instalment amount and repayment date can not be worked out from the data furnished above the repayment schedule to be furnished separately.
15. In case of Foreign loan, date of each drawal and repayment along with exchange rate at that date may be given.
16. Base exchange rate means the exchange rate prevailing as on 31.03.2009 for existng aseets and as on COD for the remaining assets.
17. In case of hedging, specify details like type of hedging, period of hedging, cost of hedging, etc.
18. At the time of truing up rate of interst with relevant reset date (if any) to be furnished separately.
19. At the tme of truing up provide details of refinancing of loans considered earlier. Details such as date on which refinancing done, amount of refinanced loan, terms and conditions of refinanced loan, financing and other charges incurred for refinancing etc.
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
೩೦೬೨
PART - II
FORM – 8
Details of Allocation of corporate loans to various projects
Name of the Company .......................................
Name of the Power Station .......................................
| Particulars | Package1 | Package2 | Package3 | Package4 | Package5 | Remarks |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Source of Loan1 | ||||||
| Currency2 | ||||||
| Amount of Loan sanctioned | ||||||
| Amount of Gross Loan drawn upto 31.03.2009/COD 3,4,5,13,15 | ||||||
| Interest Type6 | ||||||
| Fixed Interest Rate, if applicable | ||||||
| Base Rate, if Floating Interest7 | ||||||
| Margin, if Floating Interest8 | ||||||
| Are there any Caps/Floor9 | Yes/No | Yes/No | Yes/No | Yes/No | Yes/No | |
| If above is yes,specify caps/floor | ||||||
| Moratorium Period10 | ||||||
| Moratorium effective from | ||||||
| Repayment Period11 | ||||||
| Repayment effective from |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Particulars | Package1 | Package2 | Package3 | Package4 | Package5 | Remarks |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Repayment Frequency12 | ||||||
| Repayment Instalment13,14 | ||||||
| Base Exchange Rate16 | ||||||
| Are foreign currency loan hedged? | ||||||
| If above is yes,specify details17 | ||||||
| Distribution of loan packages to various projects | ||||||
| Name of the Projects | Total | |||||
| Project 1 | ||||||
| Project 2 | ||||||
| Project 3 and so on |
1. Source of loan means the agency from whom the loan hs been taken such as WB, ADB, WMB, PNB, SBI, ICICI, IFC, PFC etc.
2. Currency refers to currency of loan such as US$, DM, Yen Indian Rupee etc.
3. Details are to be submitted as on 31.03.2009 for existing assets and as on COD for the remaining assets.
4. Where the loan has been refinanced, details in the Form is to be given for the loan refinanced. However, the details of the original loan is to be given seperately in the same form.
5. If the Tariff in the petition is claimed seperately for various units, deails in the Form is to be given seperately for all the units in the same form.
6. Interest type means whether the interest is fixed or floating
7. Base rate means the base as PLR, LIBOR etc. over which the margin is to be added. Applicable base rate on different dates from the date of drawl may also be enclosed.
8. Margin means the points over and above the floating rate.
9. At times caps/floor are put at which the floating rates are frozen. If such a condition exists, spcify the limits.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
೩೦೬೪
10. Moratorium period refers to the period during which loan sevicing liability is not required.
11. Repayment period means the repayment of loan such as 7 years, 10 years, 25 years etc.
12. Repayment frequency means the interval at which the debt servicing is to be done such as monthly, quarterly, half yearly, annual etc. 13. Where there is more than one drawal/repayment for a loan, the date & amount of each drawal/repayment may also be given seperately.
14. If the repayment instalment amount and repayment date can not be worked out from the data furnished above the repayment schedule to be furnished separately.
15. In case of Foreign loan, date of each drawal and repayment along with exchange rate at that date may be given.
16. Base exchange rate means the exchange rate prevailing as on 31.03.2009 for existng aseets and as on COD for the remaining assets.
17. In case of hedging, specify details like type of hedging, period of hedging, cost of hedging, etc.
18. At the time of truing up rate of interst with relevant reset date (if any) to be furnished separately.
19. At the tme of truing up provide details of refinancing of loans considered earlier. Details such as date on which refinancing done, amount of refinanced loan, terms and conditions of refinanced loan, financing and other charges incurred for refinancing etc.
PETITIONER
PART - II
FORM – 9
Statement of Additional Capitalisation after COD
Name of the Company ...........................................
Name of the Power Station ...........................................
| Sl. No. | Year | Work/Equipment added after COD up to Cut off Date/ Beyond Cut off Date | Work/Equipment added after COD and Beyond Cut off Date | Amount Capitalised/ Proposed to be Capitalised | Whether equipment has been insured & amount claimed from insurance proceeds | Regulation under which claimed | Justification | Admitted Cost1 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Sl. No. | Year | Work/Equipment added after COD up to Cut off Date/ Beyond Cut off Date | Work/Equipment added after COD and Beyond Cut off Date | Amount Capitalised/ Proposed to be Capitalised | Whether equipment has been insured & amount claimed from insurance proceeds | Regulation under which claimed | Justification | Admitted Cost1 | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | |
| Total |
1. In case of the project has been completed and any tariff notification(s) has alreadybeen issued in the past by Govt. of India, fill column 9 giving the cost as admitted for the purpose of tariff notification already issued by (Name of the authority) (Enclose copy of the tarif Order)
NOTE:
1. Fill the form in chronological order year wise along with detailed justification clearly bringing out the necessity and the benefits accruing to the beneficiaries.
2. In case initial spares are purchased alongwith any equipment, then the cost of such spares should be indicated separately e.g. Rotor - Rs.50 Crs. Initial spares- Rs.5 Crs.
PETITIONER
PART - II
FORM - 9A
Statement of Capital Cost
(To be given for relevant dates and year wise)
Name of the Company
Name of the Power Station
| As on relevant date.1 | ||
| A | a) Opening Gross Block Amount as per books | |
| b) Amount of capital liabilities in A(a) above | ||
| c) Amount of IDC, FC, FERV & Hedging cost included in A(a) above | ||
| d) Amount of IEDC (excluding IDC, FC, FERV & Hedging cost) included in A(a) ab |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| B | a) Addition in Gross Block Amount during the period | |
| b) Amount of capital liabilities in B(a) above | ||
| c) Amount of IDC, FC, FERV & Hedging cost included in B(a) above | ||
| d) Amount of IEDC (excluding IDC, FC, FERV & Hedging cost) included in B(a) ab | ||
| C | a) Closing Gross Block Amount as per books | |
| b) Amount of capital liabilities in C(a) above | ||
| c) Amount of IDC, FC, FERV & Hedging cost included in C(a) above | ||
| d) Amount of IEDC (excluding IDC, FC, FERV & Hedging cost) included in C(a) ab |
1. Relevant date/s means date of COD of unit/s, station and financial year start date and end date.
PETITIONER
PART - II
FORM - 9B
Statement of Capital Works in Progress
(To be given for relevant dates and year wise)
Name of the Company
Name of the Power Station
| As on relevant date.1 | ||
| A | a) Opening CWIP Amount as per books | |
| b) Amount of capital liabilities in a above | ||
| c) Amount of IDC, FC, FERV & Hedging cost included in a above | ||
| B | a) Addition/Adjustment in CWIP Amount during the period | |
| b) Amount of capital liabilities in a above |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| c) Amount of IDC, FC, FERV & Hedging cost included in a above | |||
| C | a) Capitalization/Transfer to Fixed asset of CWIP Amount during the period | ||
| b) Amount of capital liabilities in a above | |||
| c) Amount of IDC, FC, FERV & Hedging cost included in a above | |||
| D | a) Closing CWIP Amount as per books | ||
| b) Amount of capital liabilities in a above | |||
| c) Amount of IDC, FC, FERV & Hedging cost included in a above |
1. Relevant date/s means date of COD of unit/s, station and financial year start date and end date.
PETITIONER
PART - II
FORM – 10
Financing of Additional Capitalisation
Name of the Company
..........................................
Name of the Power Station ..........................................
Date of Commercial Operation ..........................................
(Amount in Rs.Lacs)
| Actual | Admitted | |||||||||
| Financial Year (Starting from COD) | Year1 | Year2 | Year3 | Year4 | Year 5 & So on | Year1 | Year2 | Year3 | Year4 | Year 5 & So on |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
| Amount capitalised in Work/Equipment | ||||||||||
| Financing Details |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| Actual | Admitted | ||||||||||
| Financial Year (Starting from COD) | Year1 | Year2 | Year3 | Year4 | Year 5 & So on | Year1 | Year2 | Year3 | Year4 | Year 5 & So on | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | |
| Loan-1 | |||||||||||
| Loan-2 | |||||||||||
| Loan-3 and so on | |||||||||||
| Total Loan2 | |||||||||||
| Equity | |||||||||||
| Internal Resources | |||||||||||
| Others | |||||||||||
| Total |
1. Year 1 refers to Financial Year of COD and Year 2, Year 3 etc. are the subsequent financial years respectively. 2. Loan details for meeting the additional capitalisation requirement should be given as per FORM-7 or 8 whichever is relevant.
PETITIONER
PART - II
FORM-11
Calculation of Depreciation Rate
Name of the Company
Name of the Power Station
| Sl. No. | Name of the Assets1 | Gross Block as on 31.03.2009 or as on COD, whichever is later and subsequently for each year therafter upto 31.3.14 | Depreciation Rates as per CERC's Depreciation Rate Schedule | Depreciation Amount for each year up to 31.03.14 |
| 1 | 2 | 3 | 4= Col.2 X Col.3 | |
| 1 | Land | |||
| 2 | Building |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Sl. No. | Name of the Assets1 | Gross Block as on 31.03.2009 or as on COD, whichever is later and subsequently for each year therafter upto 31.3.14 | Depreciation Rates as per CERC's Depreciation Rate Schedule | Depreciation Amount for each year up to 31.03.14 | |
| 1 | 2 | 3 | 4= Col.2 X Col.3 | ||
| 3 | and so on | ||||
| 4 | |||||
| 5 | |||||
| 6 | |||||
| 7 | |||||
| 8 | |||||
| 9 | |||||
| 10 | |||||
| 18 | |||||
| 19 | |||||
| 20 | |||||
| 21 | |||||
| 22 | |||||
| 23 | |||||
| 24 | |||||
| 25 | |||||
| 26 |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| Sl. No. | Name of the Assets1 | Gross Block as on 31.03.2009 or as on COD, whichever is later and subsequently for each year therafter upto 31.3.14 | Depreciation Rates as per CERC's Depreciation Rate Schedule | Depreciation Amount for each year up to 31.03.14 | |
| 1 | 2 | 3 | 4= Col.2 X Col.3 | ||
| 27 | |||||
| 28 | |||||
| 29 | |||||
| 30 | |||||
| 31 | |||||
| 32 | |||||
| TOTAL | |||||
| Weighted Average Rate of Depreciation (%) |
- Name of the Assets should conform to the description of the assets mentioned in Depreciation Schedule appended to the Notification. PETITIONER PART - II FORM-12 Statement of Depreciation Name of the Company ..................................... Name of the Power Station ..................................... ↩
| Financial Year | Upto 2000-01 | 2001-02 | 2002-03 | 2003-04 | 2004-05 | 2005-06 | 2006-07 | 2007-08 | 2008-09 | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 |
| Depreciation on Capital Cost |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Financial Year | Upto 2000-01 | 2001-02 | 2002-03 | 2003-04 | 2004-05 | 2005-06 | 2006-07 | 2007-08 | 2008-09 | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | |
| Depreciation on Additional Capitalisation | |||||||||||||||
| Amount of Additional Capitalisation | |||||||||||||||
| Depreciation Amount | |||||||||||||||
| Detail of FERV | |||||||||||||||
| Amount of FERV on which depreciation charged | |||||||||||||||
| Depreciation amount | |||||||||||||||
| Depreciation recovered during the Year | |||||||||||||||
| Advance against Depreciation recovered during the Year | |||||||||||||||
| Depreciation & Advance against Depreciation recovered during the year | |||||||||||||||
| Cumulative Depreciation & Advance against Depreciation recovered upto the year |
the same form seperately with supporting details.
2. In case of details of FERV and AAD, give information for the applicable priod.
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
೩೦೭೨
PART - I
FORM – 13
Calculation of Weighted Average Rate of Interest on Actual Loans1
Name of the Company ............................
Name of the Power Station ...........................
| Sl. No. | Particulars | Existing 2008-09 | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| Loan-1 | |||||||
| Gross loan - Opening | |||||||
| Cumulative repayments of Loans upto previous year | |||||||
| Net loan - Opening | |||||||
| Add: Drawal(s) during the Year | |||||||
| Less: Repayment (s) of Loans during the year | |||||||
| Net loan - Closing | |||||||
| Average Net Loan | |||||||
| Rate of Interest on Loan on annual basis | |||||||
| Interest on loan | |||||||
| Loan-2 | |||||||
| Gross loan - Opening | |||||||
| Cumulative repayments of Loans upto previous year | |||||||
| Net loan - Opening | |||||||
| Add: Drawal(s) during the Year |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Sl. No. | Particulars | Existing 2008-09 | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| Less: Repayment (s) of Loans during the year | |||||||
| Net loan - Closing | |||||||
| Average Net Loan | |||||||
| Rate of Interest on Loan on annual basis | |||||||
| Interest on loan | |||||||
| Loan-3 and so on | |||||||
| Gross loan - Opening | |||||||
| Cumulative repayments of Loans upto previous year | |||||||
| Net loan - Opening | |||||||
| Add: Drawal(s) during the Year | |||||||
| Less: Repayment (s) of Loans during the year | |||||||
| Net loan - Closing | |||||||
| Average Net Loan | |||||||
| Rate of Interest on Loan on annual basis | |||||||
| Interest on loan | |||||||
| Total Loan | |||||||
| Gross loan - Opening | |||||||
| Cumulative repayments of Loans upto previous year | |||||||
| Net loan - Opening |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| Sl. No. | Particulars | Existing 2008-09 | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| Add: Drawal(s) during the Year | |||||||
| Less: Repayment (s) of Loans during the year | |||||||
| Net loan - Closing | |||||||
| Average Net Loan | |||||||
| Interest on loan | |||||||
| Weighted average Rate of Interest on Loans |
1. In case of Foreign Loans, the calculations in Indian Rupees is to be furnished. However, the calculations in Original currency is also to be furnished seperately in the same form.
PETITIONER
PART - II
FORM-13A
Calculation of Interest on Normative Loan
Name of the Company .................................
Nameof the Power Station .................................
| Particulars | Existing 2008-09 | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Gross Normative loan - Opening | ||||||
| Cumulative repayment of Normative Loan upto previous year | ||||||
| Net Normative loan - Opening |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Particulars | Existing 2008-09 | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| Increase/Decrease due to ACE during the Year | |||||||
| Repayments of Normative Loan during the year | |||||||
| Net Normative loan - Closing | |||||||
| Average Normative Loan | |||||||
| Weighted average Rate of Interest of actual Loans | |||||||
| Interest on Normative loan |
PETITIONER
PART - II
FORM-13 B
Calculation of Interest on Working Capital
Name of the Company
Name of the Power Station
| Sl. No. | Particulars | Existing 2008-09 | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 1 | Maintenance Spares | ||||||
| 2 | Recievables | ||||||
| 3 | O&M Expenses | ||||||
| 4 | Total Working Capital | ||||||
| 5 | Rate of Interest | ||||||
| 6 | Interest on Working Capital |
PETITIONER
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
೩೦೭೬
PART - II
FORM-14
Draw Down Schedule for Calculation of IDC & Financing Charges
Name of the Company
Name of the Power Station
(Amount in Rs.Lacs)
| Sl. No. | Draw Down | Quarter 1 | Quarter 2 | Quarter n (COD) | ||||||
| Particulars | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | |
| 1 | Loans | |||||||||
| 1.1 | Foreign Loans | |||||||||
| 1.1.1 | Foreign Loan 1 | |||||||||
| Draw down Amount | ||||||||||
| IDC | ||||||||||
| Financing charges | ||||||||||
| Foreign Exchange Rate Variation |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Sl. No. | Draw Down | Quarter 1 | Quarter 2 | Quarter n (COD) | |||||||
| Particulars | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | ||
| Hedging Cost | |||||||||||
| 1.1.2 | Foreign Loan 2 | ||||||||||
| Draw down Amount | |||||||||||
| IDC | |||||||||||
| Financing charges | |||||||||||
| Foreign Exchange Rate Variation | |||||||||||
| Hedging Cost | |||||||||||
| 1.1.3 | Foreign Loan 3 | ||||||||||
| Draw down Amount |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| Sl. No. | Draw Down | Quarter 1 | Quarter 2 | Quarter n (COD) | ||||||
| Particulars | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | |
| IDC | ||||||||||
| Financing charges | ||||||||||
| Foreign Exchange Rate Variation | ||||||||||
| Hedging Cost | ||||||||||
| 1.1.4 | - - | |||||||||
| - - | ||||||||||
| - - | ||||||||||
| 1.1 | Total Foreign Loans | |||||||||
| Draw down Amount | ||||||||||
| IDC |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Sl. No. | Draw Down | Quarter 1 | Quarter 2 | Quarter n (COD) | |||||||
| Particulars | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | ||
| Financing charges | |||||||||||
| Foreign Exchange Rate Variation | |||||||||||
| Hedging Cost | |||||||||||
| 1.2 | Indian Loans | ||||||||||
| 1.2.1 | Indian Loan 1 | ||||||||||
| Draw down Amount | -- | -- | -- | -- | -- | -- | |||||
| IDC | -- | -- | -- | -- | -- | -- | |||||
| Financing charges | -- | -- | -- | -- | -- | -- | |||||
| 1.2.2 | Indian Loan 2 |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| Sl. No. | Draw Down | Quarter 1 | Quarter 2 | Quarter n (COD) | ||||||
| Particulars | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | |
| Draw down Amount | -- | -- | -- | -- | -- | -- | ||||
| IDC | -- | -- | -- | -- | -- | -- | ||||
| Financing charges | -- | -- | -- | -- | -- | -- | ||||
| 1.2.3 | Indian Loan 3 | |||||||||
| Draw down Amount | -- | -- | -- | -- | -- | -- | ||||
| IDC | -- | -- | -- | -- | -- | -- | ||||
| Financing charges | -- | -- | -- | -- | -- | -- | ||||
| 1.2.4 | - - | -- | -- | -- | -- | -- | -- | |||
| - - | -- | -- | -- | -- | -- | -- | ||||
| - - | -- | -- | -- | -- | -- | -- | ||||
| 1.2 | Total Indian Loans |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Sl. No. | Draw Down | Quarter 1 | Quarter 2 | Quarter n (COD) | |||||||
| Particulars | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | ||
| Draw down Amount | -- | -- | -- | -- | -- | -- | |||||
| IDC | -- | -- | -- | -- | -- | -- | |||||
| Financing charges | -- | -- | -- | -- | -- | -- | |||||
| 1 | Total of Loans drawn | ||||||||||
| IDC | |||||||||||
| Financing charges | |||||||||||
| Foreign Exchange Rate Variation | |||||||||||
| Hedging Cost | |||||||||||
| 2 | Equity |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| Sl. No. | Draw Down | Quarter 1 | Quarter 2 | Quarter n (COD) | ||||||
| Particulars | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | Quantum in Foreign currency | Exchange Rate on draw down date | Amount in Indian Rupee | |
| 2.1 | Foreign equity drawn | |||||||||
| 2.2 | Indian equity drawn | -- | -- | -- | -- | -- | -- | |||
| Total equity deployed |
Note: 1. Drawal of debt and equity shall be on paripassu basis quarter wise to meet the commissioning schedule. Drawal of higher equity in the beginning is permissible.
2. Applicable interest rates including reset dates used for above computation may be furnished separately. 3. In case of multi unit project details of capitalisation ratio used to be furnished.
PETITIONER
PART - II
FORM - 14A
Actual Cash Expenditure
Name of the Company
Name of the Power Station
| Quarter-I | Quarter-II | Quarter-III | Quarter-n (COD) | |
| Payment to contractors/suppliers (Rs.in Lacs) | ||||
| % of fund deployment | ||||
Note: If there is variation between payment and fund deployment jutification need to be furnished.
PETITIONER
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
೩೦೮೩
PART - II
FORM-15A
CALCULATION OF OPERATION AND MAINTENANCE EXPENSES
Name of the Company
Name of the Power Station
(Rs.in lacs)
| 2003-04 | 2004-05 | 2005-06 | 2006-07 | 2007-08 | 2003-04 to 2007-08 | 2008-09 | 2009-10 | 2009-10 with salary hike | 2010-11 | 2011-12 | 2012-13 | 2013-14 | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 |
| CASE I: O&M data available for 2003-04 to 2007-08 | |||||||||||||
| (Base O&M on the basis of actual data) | |||||||||||||
| A) Total O&M Expenses | |||||||||||||
| B) Abnormal O&M expenses* | |||||||||||||
| - Additional security expenses | |||||||||||||
| - Siltation | |||||||||||||
| - Over staffing | |||||||||||||
| - Any Other (Specify) | |||||||||||||
| C) (A-B) | P1 | P2 | P3 | P4 | P5 | A | P6 | P7 | P8 | P9 | P10 | P11 | P12 |
| Calculation of avg. normalized O&M at 2007-08 price level | (P1) X (Esc. )4 | (P2) X (Esc. )3 | (P3) X (Esc. )2 | (P1) X (Esc. ) | (P5) | Average (P1 --- P5) | A x (Esc) | A x (Esc)2 | [(P7x.35x.5) + P7] | P8 x (Esc) | P8 x (Esc)2 | P8 x (Esc)3 | P8 x (Esc)4 |
| Esclanation rate (Esc) % | 5.17 | 5.17 | 5.17 | 5.17 | 5.17 | 5.72 | 5.72 | 5.72 | 5.72 | 5.72 | 5.72 |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| 2003-04 | 2004-05 | 2005-06 | 2006-07 | 2007-08 | 2003-04 to 2007-08 | 2008-09 | 2009-10 | 2009-10 with salary hike | 2010-11 | 2011-12 | 2012-13 | 2013-14 | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 |
| CASE II: New stations for which O&M data for 2003-04 to 2007-08 is not available | |||||||||||||
| Year of Commissioning | |||||||||||||
| Calculation of Base O&M** | N1 | N2 | N3 | N4 | N | N5 | N6 | N7 | N8 | N9 | N10 | ||
| Assuming year of Commissioning 2004-05* | Project cost X.02 X No. DAYS / 365 | N1 x (Esc)2 | N1 x (Esc) | N4 | Average (N1 --- N4) | N x (Esc) | N x (Esc)2 | N x (Esc)3 | N x (Esc)4 | N x (Esc)5 | N x (Esc)6 |
CASE I
1 Abnormal O&M expenses such as:
- Security expenses on account of insurgency (other than normal security)
- Due to abnormal siltation
CASE II
** Escalation for new station during 2005-06 will be on pro rata basis
** P1 P2 …P5 are the acatual O&M expenses claimed in the year 2003-04, 2004-05………..2007-08 respectively
PETITIONER
PART - II
FORM -15B
DETAILS OF COPERATION AND MAINTENANCE EXPENSES
NAME OF THE COMPANY
NAME OF THE POWER STATION
(Rs.in lacs)
| ITEMS | 2003-04 | 2004-05 | 2005-06 | 2006-07 | 2007-08 | |
| 1 | 2 | 3 | 4 | 5 | 6 | |
| (A) | Breakup of O&M expenses | |||||
| 1 | Consumption of Stores and Spares |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| ITEMS | 2003-04 | 2004-05 | 2005-06 | 2006-07 | 2007-08 | ||
| 1 | 2 | 3 | 4 | 5 | 6 | ||
| 2 | Repair and Maintenance | ||||||
| 3 | Insurance | ||||||
| 4 | Security | ||||||
| 5 | Administrative Expenses | ||||||
| a | Rent | ||||||
| b | Electricity Charges | ||||||
| c | Traveling and conveyance | ||||||
| d | Communication expenses | ||||||
| e | Advertising | ||||||
| f | Foundation laying and inauguration | ||||||
| g | Donations | ||||||
| h | Entertainment | ||||||
| Sub-Total (Administrative Expenses) | |||||||
| 6 | Employee Cost | ||||||
| a | Salaries, wages and allowances | ||||||
| b | Staff welfare expenses | ||||||
| c | Productivity linked incentive | ||||||
| d | Expenditure on VRS | ||||||
| e | Ex-gratia | ||||||
| Sub-Total (Employee Cost)* | |||||||
| 7 | loss of store |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| ITEMS | 2003-04 | 2004-05 | 2005-06 | 2006-07 | 2007-08 | |
| 1 | 2 | 3 | 4 | 5 | 6 | |
| 8 | Provisions | |||||
| 9 | Corporate office expenses allocation | |||||
| 10 | Others (Specify items) | |||||
| 11 | Total (1 to 10) | |||||
| 12 | Revenue/ Recoveries, if any | |||||
| 13 | Net Expenses | |||||
| (B) | Details of number of Employees | |||||
| I) Executives | ||||||
| ii) Non-Executives | ||||||
| iii) Skilled | ||||||
| iv) Non-Skilled | ||||||
| Total |
Notes:
I.) The methodology of allocation of corporate expenses to various functional activities and allocation of Corporate expenses pertaining to power generation to each operating stations and stations under construction should be clearly specified.
II.) An annual increase in O&M expenses under a given head in excess of 20 percent should be explained with proper justification.
III.) The data should be based on audited balance sheets.
IV) Details of arrears, if any pertaining to period prior to the year 2003-04 should be mentioned separately.
V) No. of employees opting for VRS during each year should be indicated.
VI) Details of abnormal expenses, if any shall be furnished separately.
VII) The monthwise provisions made in the employee cost during 2006-07 and 2007-08 towards wage revision/ arrears shall be provided seprateley.
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
೩೦೮೭
PART - II
FORM-15C
DETAILS OF RUNNING EXPENSES (At Corporate Level)
( Rs. In Lacs)
| Sl.No. | ITEMS | 2003-04 | 2004-05 | 2005-06 | 2006-07 | 2007-08 |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| (A) | Breakup of corporate expenses (Aggregate at Comp. level) | |||||
| 1 | Employee expenses | |||||
| a | Salaries, wages and allowances | |||||
| b | Staff welfare expenses | |||||
| c | Productivity linked incentive | |||||
| d | Expenditure on VRS | |||||
| e | Ex-gratia | |||||
| 2 | Administrative Expenses | |||||
| a | Repair and maintenance | |||||
| b | Training and Recruitment | |||||
| c | Communication | |||||
| d | Traveling & Conveyance | |||||
| e | Rent | |||||
| f | Others (Specify items) | |||||
| Sub - Total (Administrative Expenses) | ||||||
| 3 | Security | |||||
| 4 | Donations | |||||
| 5 | Provisions | |||||
| 6 | Others (specify items) | |||||
| 7 | Total (1 to 6) | |||||
| 8 | Less recoveries (if any) |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
| Sl.No. | ITEMS | 2003-04 | 2004-05 | 2005-06 | 2006-07 | 2007-08 | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | |
| 9 | Net Corporate Expenses (Aggregate) | ||||||
| (B) | Allocation of Corporate Expenses to various Functional Activities like | ||||||
| 1 | Power Generation | ||||||
| 2 | Project management/Projects under Construction | ||||||
| 3 | Consultancy Business | ||||||
| 4 | Any other | ||||||
| Note: Heads indicated above are illustrative. Generating companies may furnish the allocations in different functional activities suited to their company. | |||||||
| (C) | Allocation of Corporate Expenses relating to functional activity of power Generation to various generating stations | ||||||
| 1 | Generating station 1 | ||||||
| 2 | Generating station 2. | ||||||
| 3 | Generating station 3 | ||||||
| Total | |||||||
| (D) | Details of number of Employees | ||||||
| I) Executives | |||||||
| ii) Non-Executives | |||||||
| iii) Skilled | |||||||
| iv) Non-Skilled | |||||||
| Total |
I.) An annual increase in O&M expenses under a given head in excess of 20 percent should be explained with proper justification.
II.) The data should be based on audited balance sheets.
III) Details of arrears, if any pertaining to period prior to the year 2003-04 should be mentioned separately.
IV) No. of employees opting for VRS during each year should be indicated.
V) Details of abnormal expenses, if any shall be furnished separately.
VI) The monthwise provisions made in the employee cost during 2006-07 and 2007-08 towards wage revision/arrears shall be provided seprateley.
PETITIONER
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೩೦೮೯ PART - IIFORM - 16A
Design energy and peaking capability (monthwise) - ROR with
Pondage / Storage type new stations
Generating Company……….…………………………….
Name of Hydro-electric Generating Station : ……………
Installed Capcity : No of units X .MW=
| Month | Design Energy* (MUs) | Designed Peaking Capability (MW)* | |
| April | I | ||
| II | |||
| III | |||
| May | I | ||
| II | |||
| III | |||
| June | I | ||
| II | |||
| III | |||
| July | I | ||
| II | |||
| III | |||
| August | I | ||
| II | |||
| III | |||
| September | I | ||
| II | |||
| III | |||
| October | I | ||
| II | |||
| III | |||
| November | I | ||
| II | |||
| III | |||
| December | I | ||
| II | |||
| III | |||
| January | I | ||
| II | |||
| III | |||
| February | I | ||
| II | |||
| III | |||
| March | I | ||
| II | |||
| III | |||
| Total |
*As per DPR/TEC of CEA dated………………
Note:Specify the number of peaking hours for which station has been designed.
PETITIONER
PART - II
FORM - 16B
Design energy and MW Continuous (monthwise)- ROR
type stations
Generating Company……….…………………………….
Name of Hydro-electric Generating Station : ………………
| Month | Design Energy* (MUs) | MW continuous* |
| April | I | |
| II | ||
| III | ||
| May | I | |
| II | ||
| III | ||
| June | I | |
| II | ||
| III | ||
| July | I | |
| II | ||
| III | ||
| August | I | |
| II | ||
| III | ||
| September | I | |
| II | ||
| III | ||
| October | I | |
| II | ||
| III | ||
| November | I | |
| II | ||
| III | ||
| December | I | |
| II | ||
| III | ||
| January | I | |
| II | ||
| III | ||
| February | I | |
| II | ||
| III | ||
| March | I | |
| II | ||
| III | ||
| Total |
* As per DPR/TEC of CEA dated…………..
PETITONER
Karnataka Electricity Regulatory Commission, PD-89
Bangalore-560 001.
ವೈದ್ಯಕೀಯ ಶಿಕ್ಷಣ ನಿರ್ದೇಶನಾಲಯ, ಆನಂದರಾವ್ವೃತ್ತ, ಬೆಂಗಳೂರು-9
ಅಧಿಸೂಚನೆ
ಸಂಖ್ಯೆ: ವೈಶಿನಿ/ಎನ್ಆರ್ಸಿ(1) 12/2010-11, ಬೆಂಗಳೂರು, ದಿನಾಂಕ:6ನೇ ಜುಲೈ, 2010
ವಿಷಯ: 2010-11ನೇ ಸಾಲಿನ ಶೈಕ್ಷಣಿಕ ವರ್ಷದಲ್ಲಿ ಶುಶ್ರೂಷಾ ಮಹಾ ವಿದ್ಯಾಲಯ, ಕೋಟೆ ಬೆಂಗಳೂರು ಇಲ್ಲಿಗೆ ಎರಡು ವರ್ಷಗಳ ಅವಧಿಯ ಪಿ.ಸಿ.ಬಿ.ಎಸ್ಸಿ ನರ್ಸಿಂಗ್ ವ್ಯಾಸಂಗಕ್ಕೆ ವಿದ್ಯಾರ್ಥಿಗಳನ್ನು ಆಯ್ಕೆ ಮಾಡುವ ಬಗ್ಗೆ.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೩೦೯೨ಸರ್ಕಾರಿ ಶುಶ್ರೂಷಾ ಮಹಾವಿದ್ಯಾಲಯ, ಕೋಟೆ, ಬೆಂಗಳೂರು ಇವರಲ್ಲಿ ಎರಡು ವರ್ಷಗಳ ಪಿ.ಸಿ.ಬಿಸ್ಸಿ ವ್ಯಾಸಂಗಕ್ಕೆ 2010-11ನೇ ಸಾಲಿನ ಶೈಕ್ಷಣಿಕ ವರ್ಷಕ್ಕಾಗಿ ಅರ್ಹ ಇಲಾಖಾ ಅಭ್ಯರ್ಥಿಗಳನ್ನು ಆಯ್ಕೆ ಮಾಡಲು ಅರ್ಜಿಗಳನ್ನು ಕರೆಯಲಾಗಿದೆ.
ತರಗತಿಗಳು ದಿನಾಂಕ:01.09.2010ರಿಂದ ಪ್ರಾರಂಭವಾಗಲಿದೆ.
ವ್ಯಾಸಂಗಕ್ಕೆ ಅರ್ಜಿ ಸಲ್ಲಿಸುವ ಅಭ್ಯರ್ಥಿಗಳು ಕೆಳಕಂಡ ಅರ್ಹತೆಯನ್ನು ಹೊಂದಿರತಕ್ಕದ್ದು.
1) ಅಭ್ಯರ್ಥಿಗಳು ಜನರಲ್ ನರ್ಸಿಂಗ್ ಪರೀಕ್ಷೆಯಲ್ಲಿ ಉತ್ತೀರ್ಣರಾಗಿರತಕ್ಕದ್ದು.
2) ನೋಂದಾಯಿತ ದಾದಿಯಾಗಿರತಕ್ಕದ್ದು/ ಆರೋಗ್ಯ ಸಂದರ್ಶಕಿಯಾಗಿರತಕ್ಕದ್ದು.
3) ಪ್ರೋಬೇಷನರಿ ಪೂರೈಸಿದ್ದಾರೆಂದು ಘೋಷಿಸಿದ್ದು ಕನಿಷ್ಠ 5 ವರ್ಷಗಳ ಸೇವೆ ಸಲ್ಲಿಸಿರಬೇಕು.
4) ಕರ್ನಾಟಕ ರಾಜ್ಯದ ಯಾವುದೇ ವಿಶ್ವವಿದ್ಯಾನಿಲಯದಿಂದ ಅಂಗೀಕೃತವಾದ ಕಲೆ, ವಾಣಿಜ್ಯ ಅಥವಾ ವಿಜ್ಞಾನ ವಿಭಾಗದಲ್ಲಿ ಪಿ.ಯು.ಸಿ. ಅಥವಾ ತತ್ಸಮಾನ ವಿದ್ಯಾರ್ಹತೆಯನ್ನು ಹೊಂದಿರತಕ್ಕದ್ದು.
5) 48 ವರ್ಷಗಳ ವಯಸ್ಸನ್ನು ಮೀರಿರಬಾರದು.
6) ಒಳ್ಳೆಯ ಸೇವಾವೃತ್ತಿ ಹಾಗೂ ಸೇವಾ ದಾಖಲೆಗಳನ್ನು ಹೊಂದಿರತಕ್ಕದ್ದು.
7) ಈ ಹಿಂದೆ ಇತರೆ ಯಾವುದೇ ವ್ಯಾಸಂಗಕ್ಕಾಗಿ ನಿಯೋಜಿಸಲ್ಪಟ್ಟಿದ್ದಲ್ಲಿ ಕಡೆಯ ಪಕ್ಷ ಮೂರು ವರ್ಷ ಪೂರೈಸಿರಬೇಕು.
ಸದರಿ ವ್ಯಾಸಂಗಕ್ಕೆ ಅರ್ಜಿಯನ್ನು ಸಲ್ಲಿಸಲು ಇಚ್ಚಿಸುವ ಇಲಾಖಾ ನೌಕರರು ನಿಗದಿತ ಅರ್ಜಿಯನ್ನು ಪ್ರಾಂಶುಪಾಲರ ಕಛೇರಿ, ಶುಶ್ರೂಷಾ ಮಹಾವಿದ್ಯಾಲಯ, ಬೆಂಗಳೂರು ಇವರಿಂದ ರೂ.200/- ನಗದು ಪಾವತಿ ಮಾಡಿ ಪಡೆಯಬಹುದಾಗಿದೆ.
ಸದರಿ ಅರ್ಜಿ ನಮೂನೆಯನ್ನು ದಿನಾಂಕ:24.07.2010 ರಿಂದ 09.08.2010ರವರೆಗೆ ಬೆಳಿಗ್ಗೆ 11.00 ಗಂಟೆಯಿಂದ ಮಧ್ಯಾಹ್ನ 4.00 ಗಂಟೆಯವರೆಗೆ ಎಲ್ಲಾ ಕೆಲಸದ ದಿನಗಳಲ್ಲಿ ಪಡೆಯಬಹುದಾಗಿದೆ. ಅರ್ಜಿಯೊಂದಿಗೆ ಅಭ್ಯರ್ಥಿಯು ತಮ್ಮ ವಿದ್ಯಾಭ್ಯಾಸದ ಹಾಗೂ ಸೇವಾ ಪ್ರಮಾಣ ಪತ್ರಗಳನ್ನು ಲಗತ್ತಿಸಬೇಕಾಗಿರುತ್ತದೆ. ಎಲ್ಲಾ ಮಾಹಿತಿಗಳನ್ನೊಳಗೊಂಡ ಅರ್ಜಿಗಳನ್ನು ಮೇಲಾಧಿಕಾರಿಗಳ ಮುಖಾಂತರ ಸದಸ್ಯ ಕಾರ್ಯದರ್ಶಿಗಳು ಹಾಗೂ ಪ್ರಾಂಶುಪಾಲರು, ಶುಶ್ರೂಷಾ ಮಹಾವಿದ್ಯಾಲಯ, ಕೋಟೆ, ಬೆಂಗಳೂರು ಇವರಿಗೆ ಖುದ್ದಾಗಿ ಅಥವಾ ಅಂಚೆ ಮೂಲಕವಾಗಲೀ ದಿನಾಂಕ:12.08.2010ರ ಸಂಜೆ 4.00 ಗಂಟೆಯೊಳಗಾಗಿ ತಲುಪಿಸತಕ್ಕದ್ದು.
ನಿಗದಿತ ವಾಯಿದೆಯನ್ನು ಮೀರಿ ಬರುವ ಅರ್ಜಿಗಳನ್ನು ಯಾವ ಕಾರಣವನ್ನೂ ನೀಡದೇ ಒಟ್ಟಾರೆ ತಿರಸ್ಕರಿಸಲಾಗುವುದು.
| ಅ) | ವಿಶ್ವ ಆರೋಗ್ಯ ಸಂಸ್ಥೆ, ನವದೆಹಲಿ ಇವರು ನಿಯೋಜಿಸಿರುವ ವಿದೇಶಿ ಅರ್ಜಿದಾರರಿಗೆ | 05 ಸ್ಥಾನಗಳು |
| ಆ) | ಕರ್ನಾಟಕ ರಾಜ್ಯ ಸರ್ಕಾರದ ಆರೋಗ್ಯ ಕುಟುಂಬ ಕಲ್ಯಾಣ ಇಲಾಖೆಯಲ್ಲಿ ಕಾರ್ಯ ನಿರ್ವಹಿಸುತ್ತಿರುವ ಸಾಮಾನ್ಯ ಶುಶ್ರೂಷಾ ತರಬೇತಿಯನ್ನು ಹೊಂದಿರುವ ಮಹಿಳಾ ಆರೋಗ್ಯ ಸಂದರ್ಶಕಿಯರಿಗೆ | 04 ಸ್ಥಾನಗಳು |
| ಇ) | ಉಳಿದ ಸ್ಥಾನಗಳನ್ನು ಕರ್ನಾಟಕ ರಾಜ್ಯ ಸರ್ಕಾರದ ಆರೋಗ್ಯ ಮತ್ತು ಕುಟುಂಬ ಕಲ್ಯಾಣ ಇಲಾಖೆಯಲ್ಲಿ ಹಾಗೂ ವೈದ್ಯಕೀಯ ಶಿಕ್ಷಣ ಇಲಾಖೆಯಲ್ಲಿ ಕಾರ್ಯ ನಿರ್ವಹಿಸುತ್ತಿರುವ ಶುಶ್ರೂಷಕರಿಗೆ | 31 ಸ್ಥಾನಗಳು |
| ಈ) | ಡಾ: ಎಂ.ವಿ. ಶೆಟ್ಟಿ ಮೆಮೋರಿಯಲ್ ಟ್ರಸ್ಟ್, ಮಂಗಳೂರು ಈ ಸಂಸ್ಥೆಗೆ ಸರ್ಕಾರದ ವತಿಯಿಂದ ಆಯ್ಕೆ ಮಾಡುವ ಸ್ಥಾನಗಳು | 06 ಸ್ಥಾನಗಳು |
ಮೇಲ್ಕಂಡ ಅ ಮತ್ತು ಆ ಸ್ಥಾನಗಳಿಗೆ ಅಭ್ಯರ್ಥಿಗಳು ಇಲ್ಲವಾಗಿ ಸ್ಥಾನಗಳು ಖಾಲಿ ಇದ್ದಲ್ಲಿ ಮೇಲ್ಕಂಡ (ಇ) ಅರ್ಜಿದಾರರಿಂದ ಭರ್ತಿ ಮಾಡಲಾಗುವುದು.
ಪಿಡಿ-90
ವೈದ್ಯಕೀಯ ಶಿಕ್ಷಣ ನಿರ್ದೇಶಕರು.
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
೩೦೯೩
URBAN DEVELOPMENT DEPARTMENT
NOTIFICATION
No.UDD/106/MNX/2008, Bangalore, Dated:6th April, 2010
In exercise of the powers conferred by sub-section(1) of Section-48 of the Land Acquisition Act-1894 (Central Act-1894) the Government of Karnataka hereby withdraw from acquisition the lands specified below in respect of which the Preliminary Notification was published in the Karnataka Gazette Dated:03.02.2003 in Part-III at pages from 1 to 179 vide Notification No.BDA/COMMR/ALAO/LA9/104/2002-03 Dated:03.02.2003 and Final Notification No.UDD 193 MNX 2004 Dated:23.02.2004 was published in the Karnataka Gazette Dated:23.02.2004 in Part-III under Sub-section (1) of Section-19 of BDA Act-1976 (Karnataka Act-12 of 1976) for formation of layout Called "ARKAVATHI LAYOUT".
SCHEDULE
DISTRICT:BANGALORE TALUK: BANGALORE NORTH HOBLI:KASABA VILLAGE:HEBBALA
| Sl. No. | Name of the Khatedar/Anubhavadar Sri/Smt. | Sy. No. | Dry/ Wet/ Garden | Total Extent | Kharab Remaining Extent | Assess- ment | Extent Acquired | Extent with drawn | Boundaries | ||||
| A-G | A-G | A-G | Rs.Ps. | A.G. | A-G | East Sy.No | West Sy. No | North Sy.No | South Sy.No | ||||
| 1. | K. Marisonnappa, Hebbala | 63 | Gdn. | 0-27 | - | 0-27 | 2-52 | 0-27 | 0-27 | 59 | 64 | 57 | 62 |
| Total | 0-27 |
TOTAL EXTENT WITH DRAWN 27 GUNTAS (Twenty Seven Guntas Only)
By Order and in the name of the Governor of Karnataka
M.S.PREMACHANDRA
Under Secretary to Government PR-624
Urban Development Department.
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
೩೦೯೪
URBAN DEVELOPMENT DEPARTMENT
NOTIFICATION
No.UDD/154/MNX/2010, Bangalore, Dated:6th April, 2010
In exercise of the powers conferred by sub-section(1) of Section-48 of the Land Acquisition Act-1894 (Central Act-1894) the Government of Karnataka hereby withdraw from acquisition the lands specified below in respect of which the Preliminary Notification was published in the Karnataka Gazette Dated:22-05-2008 in Part-III at pages from 1 to 75 vide Notification No.BDA/COMMR/DC(LA)/ALAO/158/2008-09, Dated:21-05-2008 and Final Notification No.UDD 51 MNX 2010 Dated:18-02-2010 was published in the Karnataka Gazette Dated:18-02-2010 in Part-III under Sub-section(1) of Section-19 of BDA Act- 1976 (Karnataka Act-12 of 1976) for formation of layout Called "NADAPRABHU KEMPEGOWDA LAYOUT".
SCHEDULE
| Sl. No. | Name of the Khatedar/ Anubhavadar Sri/Smt. | Sy. No. | Dry/Wet/ Garden | Total Extent | Kharab | Remaining Extent | Assessment | Extent Acquired | Extent with drawn | East Sy.No | West Sy. No | North Sy.No | South Sy.No |
| A-G | A-G | A-G | Rs.Ps. | A.G. | A-G | ||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 |
| 1. | Huchhappa, Parthasarathi | 3 | Dry | 5-33 | 0-13 | 5-20 | 8-88 | 3-28 | 3-28 | 93 | 1 | 1,2, 94 | Nalla |
| Total | 3-28 |
TOTAL EXTENT WITH DRAWN 03 ACRES AND 28 GUNTAS (Three Acres and Twenty Eight Guntas Only)
By Order and in the name of the Governor of Karnataka,
M.S.PREMACHANDRA
PR-625
Under Secretary to Government,
Urban Development Department.
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
೩೦೯೫
URBAN DEVELOPMENT DEPARTMENT
NOTIFICATION
No.UDD/382/MNX/2009, Bangalore, Dated:7th April, 2010
In exercise of the powers conferred by sub-section(1) of Section-48 of the Land Acquisition Act-1894 (Central Act-1894) the Government of Karnataka hereby withdraw from acquisition the lands specified below in respect of which the Preliminary Notification was published in the Karnataka Gazette Dated:22-05-2008 in Part-III at pages from 1 to 75 vide Notification No.BDA/COMMR/DC(LA)/ALAO/158/2008-09, Dated:21-05-2008 and Final Notification No.UDD 51 MNX 2010 Dated:18-02-2010 was published in the Karnataka Gazette Dated:18-02-2010 in Part-III under Sub-section(1) of Section-19 of BDA Act- 1976 (Karnataka Act-12 of 1976) for formation of layout Called "NADAPRABHU KEMPEGOWDA LAYOUT".
SCHEDULE
| Sl. No. | Name of the Khatedar/ Anubhavadar Sri/Smt. | Sy. No. | Dry/Wet/ Garden | Total Extent | Kharab | Remaining Extent | Assessment | Extent Acquired | Extent with drawn | East Sy.No | West Sy. No | North Sy.No | South Sy.No |
| A-G | A-G | A-G | Rs.Ps. | A.G. | A-G | ||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 |
| 1. | R. Puttamadaiah S/o Late Ramaiah | 22 | Dry | 2-00 | 0-02 | 1-38 | 2-46 | 2-00 | 2-00 | 24 | 21 | Kanna halli Gadi | 23 |
| Total | 2-00 |
TOTAL EXTENT WITH DRAWN 02 ACRES (Two Acres Only)
By Order and in the name of the Governor of Karnataka,
M.S.PREMACHANDRA
Under Secretary to Government, PR-626
Urban Development Department.
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
೩೦೯೬
URBAN DEVELOPMENT DEPARTMENT
NOTIFICATION
No.UDD/381/MNX/2009, Bangalore, Dated:7th April, 2010
In exercise of the powers conferred by sub-section(1) of Section-48 of the Land Acquisition Act-1894 (Central Act-1894) the Government of Karnataka hereby withdraw from acquisition the lands specified below in respect of which the Preliminary Notification was published in the Karnataka Gazette Dated:22-05-2008 in Part-III at pages from 1 to 75 vide Notification No.BDA/COMMR/DC(LA)/ALAO/158/2008-09, Dated:21-05-2008 and Final Notification No.UDD 51 MNX 2010 Dated:18-02-2010 was published in the Karnataka Gazette Dated:18-02-2010 in Part-III under Sub-section(1) of Section-19 of BDA Act- 1976 (Karnataka Act-12 of 1976) for formation of layout Called "NADAPRABHU KEMPEGOWDA LAYOUT".
SCHEDULE
| Sl. No. | Name of the Khatedar/ Anubhavadar Sri/Smt. | Sy. No. | Dry/Wet/ Garden | Total Extent | Kharab | Remaining Extent | Assessment | Extent Acquired | Extent with drawn | East Sy.No | West Sy. No | North Sy.No | South Sy.No |
| A-G | A-G | A-G | Rs.Ps. | A.G. | A-G | ||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 |
| 1. | Dr. P. Malikarjunaswamy S/o R. Puttamadaiah | 101/2 | Dry | 3-05 | 0-05 | 3-00 | 4-11 | 3-05 | 3-05 | 101/1 | 99, 100 | 103 | 86 |
| Total | 3-05 |
TOTAL EXTENT WITH DRAWN 03 ACRES AND 05 GUNTAS (Three Acres and Five Guntas Only)
By Order and in the name of the Governor of Karnataka,
M.S.PREMACHANDRA
Under Secretary to Government, PR-627
Urban Development Department.
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೩೦೯೭ಮಾನ್ಯ 8ನೇ ಅಪರ ಮುಖ್ಯ ಮಹಾನಗರ ದಂಡಾಧಿಕಾರಿಗಳ ನ್ಯಾಯಾಲಯ,
ನೃಪತುಂಗ ರಸ್ತೆ, ಬೆಂಗಳೂರು ನಗರ
ಈ ಮೂಲಕ ಸಾರ್ವಜನಿಕರಲ್ಲಿ ತಿಳಿಯಪಡಿಸುವುದೇನೆಂದರೆ, ಬೆಂಗಳೂರು ನಗರ ಕೋರಮಂಗಲ ಪೊಲೀಸ್ ಠಾಣೆಯ ಪೊಲೀಸರು ವಾಹನಗಳನ್ನು ಅಮಾನತ್ತುಪಡಿಸಿದ್ದು ಈವರೆಗೂ ಪೊಲೀಸ್ ಠಾಣೆಯಲ್ಲಿರುತ್ತದೆ. ಆದ್ದರಿಂದ ಈ ಕೆಳಕಂಡ ವಾಹನಗಳ ಮಾಲೀಕರು ಯಾರಾದರೂ ಇದ್ದಲ್ಲಿ ಈ ಪ್ರಕಟಣೆಯ ದಿನಾಂಕದಿಂದ ಒಂದು ತಿಂಗಳೊಳಗೆ ಮೇಲ್ಕಂಡ ನ್ಯಾಯಾಲಯದಲ್ಲಿ ತಮ್ಮ ಅಹವಾಲನ್ನು ಸಲ್ಲಿಸಬಹುದಾಗಿರುತ್ತದೆ.
ಬೆಂಗಳೂರು ನಗರ
8ನೇ ಅಪರ ಮುಖ್ಯ ಮಹಾನಗರ ದಂಡಾಧಿಕಾರಿಗಳ
ನ್ಯಾಯಾಲಯ, ನೃಪತುಂಗ ರಸ್ತೆ, ಬೆಂಗಳೂರು ನಗರ.
ದಿನಾಂಕ:17.07.2010
ಕೋರಮಂಗಲ ಪೊಲೀಸ್ ಠಾಣೆಯ ವಿವಿಧ ಮೊಕದ್ದಮೆಗಳಲ್ಲಿ ಅಮಾನತ್ತುಪಡಿಸಿರುವ ವಾಹನಗಳ ವಿವರ ಈ
| ಕ್ರ. ಸಂ. | ಸೀಮಿಸ್ ಮೊ.ಸಂ. | ಮಾಲು ಪಟ್ಟಿ ಸಂಖ್ಯೆ | ವಾಹನ ನೊಂದಣಿ ಸಂಖ್ಯೆ | ವಾಹನ ವರ್ಗ | ಇಂಜಿನ್ ಸಂಖ್ಯೆ ಮತ್ತು ಚಾಸೀಸ್ ಸಂಖ್ಯೆ |
| 1. | 373/09 | 125/09 | KA-05-M-3963 | Bajaj Kawasaky | Eng: 30CE034946 Ch:635120 |
| 2. | - | - | KA-05-H-2766 | Kinetic Honda | Eng:214901NIEG1 Ch:1G1217686 |
| 3. | 375/09 | 126/09 | AP-03-L-8668 | TVS Victor | Eng: 3502M39170 Ch:3302F392750 |
| 4. | - | - | KA-03-EJ9363 | Honda Activa | Eng: JF08EO29547 Ch: 085J38287336 |
| 5. | - | - | KA-07-H-8073 | TVS Heavy Duty | Eng:P1301M702925 Ch:P3301F703425 |
| 6. | - | - | No reg num | Bajaj 4S Champion | Eng: 31M96F09761 Ch:1F96F21532 |
| 7. | 344/07 | 113/07 | KA-05-EH-5556 | Hero Honda Splendar | Eng:990176EO7243 Ch:9901GF07238 |
| 8. | 37/08 | 17/08 | No Reg Num | Hero Honda CD- 100 | Eng: H1OE327036 Ch: No |
| 9. | - | 19/08 | KL-09E-4954 | Hero Honda Splendar | Eng:96417EO5424 Ch:96A19FO5323 |
| 10. | - | 20/08 | No Reg Num | TVS Victor | Eng:OF1N413007 Ch:MD625AF1242NI099 |
| 11. | 06/08 | 34/08 | No Reg Num | Hero Honda | Eng: 98M17MO2419 Ch: 98M19CO2449 |
| 12. | - | - | No Reg Num | Hero Honda | Eng: 96K2E06670 Ch: 96K19K06419 |
| 13. | - | - | No Reg Num | Hero Honda | Eng: 01J20CO7134 Ch:01J18MO4466 |
| 14. | 542/06 | 38/08 | MH12BE4322 | Hero Honda CBZ | Eng: 01J46C00913 Ch: 01A41MO1231 |
| 15. | 630/05 | 208/05 | KA-03-ED-2123 | Yamaha | Eng: No Ch: No |
| 16. | - | - | No Reg Num | Kinetic Honda | Eng: No Ch: No |
| 17. | - | - | No Reg Num | Sujuki Samurai | Eng: 10074271087 Ch: 1007R265474 |
| 18. | - | - | No Reg Num | Hero Puch | Eng: No Ch: No |
| 19. | 630/05 | 211/05 | No Reg Num | Hero Honda | Eng: No Ch: No |
| 20. | 191/09 | 51/09 | No Reg Num | Hero Honda | Eng: 00G18819 Ch: 00G20C18546 |
| 21. | - | - | No Reg Num | Hero Honda | Eng: 03E18M32011 Ch:0320C31990 |
| 22. | - | - | No Reg Num | Hero Honda | Eng: 03C18E13373 Ch: 03E20F01370 |
| 23. | 191/09 | 52/09 | No Reg Num | Hero Honda | Eng: 00B17MO9952 Ch:00B19C10089 |
| 24. | 191/09 | 53/09 | No Reg Num | Hero Honda | Eng:01J18M14875 Ch:01J20C13133 |
| 25. | - | - | No Reg Num | Hero Honda | Eng: 00D18M08388 Ch: 00D20CO8362 |
| 26. | 191/09 | 54/09 | No Reg Num | Yamaha RX | Eng: 98HIL5182894 Ch:IL5182894 |
| 27. | 410/09 | 145/09 | KA-04-S-9029 | Kinetic Honda | Eng: 682139 Ch: No |
| 28. | - | - | KA-05-V-538 | Kinetic Honda | Eng:767681NIEPC Ch:773489 |
| 29. | - | - | KA-4EU-8119 | Hero Honda | Eng:07D15M33510 Ch:07D16C34507 |
| 30. | - | - | KA-04-W-3034 | Suzuki Samurai | Eng: 7907M422740 Ch: 790F37337 |
| 31. | - | - | KA-01-V6527 | Bajaj Pulsar | Eng: DHGBN69639 Ch: MD2DHDHZZNCB32151 |
| 32. | - | - | KA-01-X-1294 | Hero Honda CD Dawn | Eng: No Ch:04G27F23420 |
| 33. | - | - | KA-21-H-759 | Hero Honda | Eng: No Ch:03G20F03874 |
| 34. | - | - | CAO4833 | Suzuki Max-100 | Eng: No Ch:3603FO50335 |
| 35. | - | - | TN23S2442 | Suzuki Fiero | Eng: M1101M052997 Ch:M1101F051735 |
| 36. | - | - | KA-06-K-9815 | Suzuki Shogan | Eng: U1806MO91279 Ch:806F044122 |
| 37. | - | - | CRU-6197 | Bajaj-KB-100 | Eng: 306059387 Ch:No |
| 38. | 559/09 | 141/09 | KA-02-EH8822 | TVS Fiero | Eng: 0E1G32012695 Ch: MD624CE`1232G07313 |
| 39. | - | 142/09 | KA-05-EH8337 | TVS Victor | Eng: 0F1E51416479 Ch:MD625AF1731E3975 |
ಬೆಂಗಳೂರು ನಗರ
8ನೇ ಅಪರ ಮುಖ್ಯ ಮಹಾನಗರ ದಿನಾಂಕ:17.07.2010
ದಂಡಾಧಿಕಾರಿಗಳ ನ್ಯಾಯಾಲಯ, ಪಿಆರ್-1080
ನೃಪತುಂಗ ರಸ್ತೆ, ಬೆಂಗಳೂರು ನಗರ.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩ ೩೧೦೦ತಹಶೀಲ್ದಾರ್, ಭದ್ರಾವತಿ ತಾಲ್ಲೂಕು
ನಮೂನೆ-27
94ನೇ ನಿಯಮದ 68(1)ನೇಯ ಪ್ರಕರಣದ ಮೇರೆಗಿನ ಘೋಷಣೆ
ಸರ್ಕಾರದ ಸ್ವತ್ತಾಗಿರುವ ಹಾಗೂ ಕೆಳಗಿನ ಅನುಸೂಚಿಯಲ್ಲಿ ನಿರ್ದಿಷ್ಟಪಡಿಸಿದ ಸಾರ್ವಜನಿಕ ರಸ್ತೆಯ ಭಾಗವು ಸಾರ್ವಜನಿಕ ಉಪಯೋಗಕ್ಕೆ ಅಗತ್ಯವಿಲ್ಲವೆಂದು ರಾಜ್ಯ ಸರ್ಕಾರಕ್ಕೆ ಕಂಡುಬಂದಿರುವುದರಿಂದ,
ಈಗ, ಕರ್ನಾಟಕ ಭೂ ಕಂದಾಯ ಅಧಿನಿಯಮದ 1964ರ 68ನೇ ಪ್ರಕರಣದ (1)ನೇ ಉಪ ಪ್ರಕರಣದಿಂದ ಪ್ರದತ್ತವಾದ ಅಧಿಕಾರಗಳನ್ನು ಚಲಾಯಿಸಿ, ಕರ್ನಾಟಕ ಸರ್ಕಾರವು ಸಾರ್ವಜನಿಕ ಪೋಟ್ ಖರಾಬ್ (ಕಟ್ಟೆ), ಭಾಗವು ಸಾರ್ವಜನಿಕರ ಉಪಯೋಗಕ್ಕೆ ಅಗತ್ಯವಿಲ್ಲವೆಂದು ಮತ್ತು ಸಾರ್ವಜನಿಕ ಪೋಟ್ ಖರಾಬ್ ಸದರಿ ಭಾಗದಲ್ಲಿ ಅಥವಾ ಅದರ ಮೇಲೆ ಸಾರ್ವಜನಿಕರ ಹಾಗೂ ಎಲ್ಲಾ ವ್ಯಕ್ತಿಗಳ ಹಕ್ಕುಗಳು ಕೊನೆಗೊಳ್ಳತಕ್ಕುದೆಂದು ಉದ್ದೇಶಿಸಿ, ಈ ಮೂಲಕ ಘೋಷಿಸುತ್ತದೆ.
2. ಸಾರ್ವಜನಿಕ ಪೋಟ್ ಖರಾಬ್ ಹಕ್ಕಿನ ಜೊತೆಗೆ ಸದರಿ ಪೋಟ್ ಖರಾಬ್ (ಕಟ್ಟೆ) ಸದರಿ ಭಾಗದಲ್ಲಿ ಅಥವಾ ಅದರ ಮೇಲೆ ಹಿತಾಸಕ್ತಿಯುಳ್ಳ ಅಥವಾ ಹಕ್ಕುಳ್ಳ ಅಥವಾ ಈ ಉದ್ದೇಶದಿಂದ ಪ್ರತಿಕೂಲ ಪರಿಣಾಮಕ್ಕೊಳಗಾಗುವ ಸಂಭವವಿರುವ ಇತರ ಯಾವುದೇ ಹಿತಾಸಕ್ತಿಯನ್ನು ಹೊಂದಿರುವ ಯಾವನೇ ಸಾರ್ವಜನಿಕನು ಅಥವಾ ಯಾವನೇ ವ್ಯಕ್ತಿಯು, ಈ ಅಧಿಸೂಚನೆಯನ್ನು ಹೊರಡಿಸಿದ ತೊಂಬತ್ತು ದಿನಗಳೊಳಗೆ ಸದರಿ ಉದ್ದೇಶದ ಬಗ್ಗೆ ತನ್ನ ಆಕ್ಷೇಪಣೆಗಳನ್ನು, ಅಂಥ ಹಿತಾಸಕ್ತಿಯ ಅಥವಾ ಹಕ್ಕಿನ ಸ್ವರೂಪವನ್ನು ಮತ್ತು ಪ್ರತಿಕೂಲ ಪರಿಣಾಮವು ಸಂಭವಿಸಿರಬಹುದಾದ ರೀತಿಯನ್ನು ಮತ್ತು ಅಂಥ ಹಿತಾಸಕ್ತಿ ಅಥವಾ ಹಕ್ಕಿನ ಬಗ್ಗೆ ನಷ್ಟ ಪರಿಹಾರಕ್ಕಾಗಿ ಕ್ಲೈಮು ಮಾಡಲಾದ ಮೊಬಲಗು ಮತ್ತು ವಿವರಗಳನ್ನು ಜಿಲ್ಲೆಯ ಡೆಪ್ಯೂಟಿ ಕಮೀಷನರಿಗೆ ಬರಹದಲ್ಲಿ ತಿಳಿಸತಕ್ಕದ್ದು. ಮತ್ತು ಸದರಿ ಆಕ್ಷೇಪಣೆಗಳನ್ನು ಮತ್ತು ಕ್ಲೈಮುಗಳನ್ನು ಸದರಿ ಪ್ರಕರಣದಲ್ಲಿ ಉಪಬಂಧಿಸಿರುವಂತೆ ಡೆಪ್ಯೂಟಿ ಕಮೀಷನರು ಪರಿಶೀಲಿಸತಕ್ಕದ್ದು.
| ಪೋಟ್ ಖರಾಬ್ ಇತ್ಯಾದಿ ಇರುವ ಗ್ರಾಮಗಳು | 4-36 ಎಕರೆ ಪೋಟ್ ಖರಾಬ್ (ಕಟ್ಟೆ) ಕೊಪ್ಪ ಗ್ರಾಮ |
| ತಾಲ್ಲೂಕು | ಭದ್ರಾವತಿ |
| ಜಿಲ್ಲೆ | ಶಿವಮೊಗ್ಗ |
| ಪೋಟ್ ಖರಾಬ್ ಭಾಗ ಅಥವಾ ಭಾಗಗಳ ವರ್ಣನೆ | ಪೋಟ್ ಖರಾಬ್ 4-36 ಎಕರೆ ಹಾಲಿ ಸ್ಥಿತಿಯಂತೆ ಕಟ್ಟೆ ಇರುವ ಪ್ರದೇಶ |
| ಪೋಟ್ ಖರಾಬ್ ಭಾಗ ಅಥವಾ ಭಾಗಗಳ ಸರಿಸುಮಾರು ವಿಸ್ತೀರ್ಣ | 4-36 ಎಕರೆ |
| ಮೇರೆ- ಚಕ್ಕುಬಂದಿ | ಪೂರ್ವಕ್ಕೆ: ಸ.ನಂ.18/1ರ ಜಮೀನು ಪಶ್ಚಿಮಕ್ಕೆ: ಸ.ನಂ.183 ಉತ್ತರಕ್ಕೆ: ಸ.ನಂ.18/1 ಮತ್ತು 183 ದಕ್ಷಿಣಕ್ಕೆ: ಸ.ನಂ.18/2ರ ಪ್ರದೇಶ |
| ಸಾರ್ವಜನಿಕ ಪೋಟ್ ಖರಾಬ್ (ಕಟ್ಟೆ) | ಪೋಟ್ ಖರಾಬ್ ಪ್ರದೇಶ |
ದಿನಾಂಕ:26.03.2010.
ತಹಶೀಲ್ದಾರ್, ಪಿಆರ್-1021
ಭದ್ರಾವತಿ ತಾಲ್ಲೂಕು.
ಬಂದರು ಕಛೇರಿ, ಕಾರವಾರ
ಅನಧಿಕೃತ ಗೈರು ಹಾಜರಿ ಬಗ್ಗೆ ಪ್ರಕಟಣೆ
ಕ್ರ.ಸಿಬ್ಬಂದಿ/ಸಿಆರ್-21/2008-09, ದಿನಾಂಕ: ಜೂನ್, 2010
ವಿಷಯ: ಸಿಬ್ಬಂದಿ ಬಂದರು ಮತ್ತು ಒಳನಾಡು ಜಲಸಾರಿಗೆ ಇಲಾಖೆ-ಬಂದರು ಕಛೇರಿ ಕಾರವಾರ ಶ್ರೀ ಪಿ.ಡಿ.ತಾರಿಬಾಗಿಲ, ಉಪ ಕಡವು ನಿರೀಕ್ಷಕ ಅವರ ಅನಧಿಕೃತ ಗೈರು ಹಾಜರಿ ಕುರಿತು.
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ ್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ೩೧೦೧ಬಂದರು ಮತ್ತು ಒಳನಾಡು ಜಲಸಾರಿಗೆ ಇಲಾಖೆಯ, ಕಾರವಾರ ಬಂದರು ಕಛೇರಿಯಲ್ಲಿ. ಉಪ ಕಡವು ನಿರೀಕ್ಷಕರಾಗಿ, ಕರ್ತವ್ಯ ನಿರ್ವಹಿಸುತ್ತಿದ್ದ ಶ್ರೀ ಪಿ.ಡಿ. ತಾರಿಬಾಗಿಲ, ಅವರು ದಿನಾಂಕ:31.05.2008 ರಿಂದ 09.06.2008ರವರೆಗೆ ಹಾಗೂ ದಿನಾಂಕ:16.06.2008 ರಿಂದ ಯಾವುದೇ ಮುನ್ಸೂಚನೆ ಇಲ್ಲದೇ/ ಯಾವುದೇ ರಜಾ ಅರ್ಜಿಯನ್ನು ಸಲ್ಲಿಸದೇ ಈವರೆಗೂ ಕರ್ತವ್ಯದಲ್ಲಿ ಅನಧಿಕೃತವಾಗಿ ಗೈರು ಹಾಜರಾಗಿ ದೈನಂದಿನ ಸರ್ಕಾರಿ ಕೆಲಸಕ್ಕೆ ಅಡಚಣೆ ಉಂಟು ಮಾಡಿ ಕರ್ನಾಟಕ ನಾಗರೀಕ ಸೇವಾ (ನಡತೆ) ನಿಯಮ 1966ರ ನಿಯಮ 3ರ ಉಪನಿಯಮ (1) ರಿಂದ (111)ನ್ನು ಉಲ್ಲಂಘಿಸಿರುತ್ತೀರಿ. ಮೇಲಿನ ವಿಷಯದ ಕುರಿತು ನಿಮಗೆ ಈ ಕಛೇರಿಯ ಸಮ ಸಂಖ್ಯೆಯ ಪತ್ರ ದಿನಾಂಕ:18.07.2008, 31.07.2008, 21.08.2008, 05.09.2008 ಹಾಗೂ 07.05.2010ರಂದು ನೋಟೀಸನ್ನು ನೀಡಿದ್ದು ಇರುತ್ತದೆ. ಅದರಂತೆ ನಿರ್ದೇಶಕರು ಬಂದರು ಮತ್ತು ಒಳನಾಡು ಜಲಸಾರಿಗೆ ಇಲಾಖೆ, ಕಾರವಾರ ಅವರು ತಮ್ಮ ಪತ್ರ ಕ್ರ.ಸಂ. ಬಂಒಜಸಾ- 75/ಸಿಬ್ಬಂದಿ-11/2009 ದಿನಾಂಕ:21.05.2010ರಲ್ಲಿ, ಕಾರಣ ಕೇಳಿ ನೋಟೀಸನ್ನು ನೀಡಿದ್ದು ಇರುತ್ತದೆ. ಈ ಮೇಲಿನ ನೋಟೀಸಿಗೆ ಸಂಬಂಧಿಸಿ ನಿಮ್ಮಿಂದ ಈವರೆಗೂ ಯಾವುದೇ ಸ್ಪಷ್ಟ ವಿವರಣೆ ಈ ಕಛೇರಿಗೆ ಪ್ರಾಪ್ತವಾಗಿದ್ದಿರುವುದಿಲ್ಲ ಹಾಗೂ ನೀವು ಕರ್ತವ್ಯಕ್ಕೂ ಹಾಜರಾಗಿದ್ದು ಇರುವುದಿಲ್ಲ.
ಆದ್ದರಿಂದ, ಈ ಪ್ರಕಟಣೆಯನ್ನು ತಿಳುವಳಿಕೆ ಪತ್ರ ಎಂದು ಪರಿಗಣಿಸಿ, ಪ್ರಕಟಣೆಯಾದ 15 ದಿನಗಳ ಒಳಗೆ ಕರ್ತವ್ಯಕ್ಕೆ ಹಾಜರಾಗಲು ಅಂತಿಮವಾಗಿ ತಿಳಿಸಿದೆ. ತಪ್ಪಿದ್ದಲ್ಲಿ ಕರ್ನಾಟಕ ನಾಗರೀಕ ಸೇವಾ (ವರ್ಗೀಕರಣ ನಿಯಂತ್ರಣ ಮತ್ತು ಅಪೀಲು) ನಿಯಮ 1957ರಂತೆ, ಕರ್ನಾಟಕ ನಾಗರೀಕ ಸೇವಾ ನಿಯಮಗಳ ನಿಯಮ 108ರ ರೀತ್ಯಾ ನಿಮ್ಮನ್ನು ಸೇವೆಯಿಂದ ವಜಾ ಮಾಡಲು ಏಕಪಕ್ಷೀಯವಾಗಿ ಮುಂದಿನ ಕ್ರಮ ಜರುಗಿಸಲಾಗುವುದು ಎಂದು ಈ ಮೂಲಕ ಅಂತಿಮವಾಗಿ ತಿಳಿಸಿ ಪ್ರಕಟಿಸಿದೆ.
ಬಂದರು ಅಧಿಕಾರಿ, ಪಿಆರ್-1022
ಕಾರವಾರ.
COMMERCIAL TAXES DEPARTMENT
PROCEEDINGS OF THE COMMISSIONER OF COMMERCIAL TAXES,
(KARNATAKA), BANGALORE-CLARIFICATION UNDER SECTION 59(4) OF
THE KARNATAKA VALUE ADDED TAX ACT, 2003
Sub: KVAT Act, 2003- Clarification under Section 59(4) regarding the rate of tax applicable on 'kerosene lamps'-reg.
Ref: Application Dated:26.03.2010 of Roshan Tin Lamps, Momin Plot, Koulpet, Hubli-580 028.
In the application cited above, Roshan Tin Lamps, Momin Plot, Koulpet, Hubli-580 028, has sought clarification regarding the rate of tax applicable on 'kerosene lamps' for the year 2010-11.
2. Section 59(4) of the Karnataka Value Added Tax Act, 2003 empowers the Commissioner of Commercial Taxes to clarify the rate of tax payable under the Act, if he considers it necessary or expedient so to do, for the purpose of maintaining uniformity in the work of assessments and collection of revenue. It is examined and found that the clarification requested by the petitioner is within the scope of the aforesaid provision and it is necessary that the clarification be issued for the purpose of maintaining uniformity in the work of assessments and collection of revenue.
3. Hence the following clarification is issued.
CLARIFICATION NO. CLR.CR.266/09-10, DATED:27TH MAY, 2010
It is clarified that 'kerosene lamps' are liable to tax at 5% with effect from 01.04.2010 under entry 54 of the Third Schedule to the Karnataka Value Added Tax Act, 2003.
PRADEEP SINGH KHAROLA
PR-1018
Commissioner of Commercial Taxes,
(Karnataka), Bangalore.
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
೩೧೦೨
URBAN DEVELOPMENT DEPARTMENT
NOTIFICATION
No.UDD/433/MNX/2010, Bangalore, Dated:19th July, 2010
In exercise of the powers conferred by sub-section(1) of Section-48 of the Land Acquisition Act-1894 (Central Act-1894) the Government of Karnataka hereby withdraw from acquisition the lands specified below in respect of which the Preliminary Notification was published in the Karnataka Gazette Dated:03.02.2003 in Part-III at pages from 1 to 179 vide Notification No.BDA/COMMR/ALAO/LA9/104/2002-03, Dated:03.02.2003 and Final Notification No.UDD 193 MNX 2004 Dated:23.02.2004 was published in the Karnataka Gazette Dated:23.02.2004 in Part-III-I under Sub-section(1) of Section-19 of BDA Act-1976 (Karnataka Act-12 of 1976) for formation of layout Called "ARKAVATHI LAYOUT".
SCHEDULE
DISTRICT:BANGALORE TALUK: BANGALORE NORTH HOBLI:YELAHANKA VILLAGE:AMRUTHAHALLI
| Sl. No. | Name of the Khatedar/ Anubhavadar Sri/Smt. | Sy. No. | Dry/Wet/ Garden | Total Extent | Kharab | Remaining Extent | Assessment | Extent Acquired | Extent with drawn | East Sy.No | West Sy. No | North Sy.No | South Sy.No |
| A-G | A-G | A-G | Rs.Ps. | A.G. | A-G | ||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 |
| 1. | Appaiah Bin Muniyappa Government Byatarayanapura | 106/2 | Garden | 1-28 | - | 1-28 | 7-89 | 1-28 | 1-28 | 106/3 | 106/1 | 108 | 106/6 |
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦
ಭಾಗ-೩ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
| Sl. No. | Name of the Khatedar/ Anubhavadar Sri/Smt. | Sy. No. | Dry/Wet/ Garden | Total Extent | Kharab | Remaining Extent | Assessment | Extent Acquired | Extent with drawn | East Sy.No | West Sy. No | North Sy.No | South Sy.No | |
| A-G | A-G | A-G | Rs.Ps. | A.G. | A-G | |||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | |
| 2. | Dodda Muniyappa Savitramma Munikrishnappa Venkatesh Pillamunishamappa | 106/3 | Garden | 0-12 | - | 0-12 | 1-41 | 0-12 | 0-12 | 106/4 | 106/2 | 108 | 106/6 | |
| 3. | Devappa Government | 106/4 | Garden | 1-10 | - | 1-10 | 5-78 | 1-10 | 1-10 | 106/5 | 106/3 | 108 | 106/6 | |
| 4. | Krishnappa M. Munishamappa Appaiahappa M. Munishamappa Muniraju M. Bin Munishamappa | 106/5 | Garden | 1-07 | - | 1-07 | 5-43 | 1-00 | 1-00 | 99 | 106/4 | 108 | 106/6 | |
| Total Extent With drawn | 4-10 |
TOTAL EXTENT WITH DRAWN 04 ACRES AND 10 GUNTAS (Four Acres and Ten Guntas Only)
By Order and in the name of the Governor of Karnataka,
M.S.PREMACHANDRA
Under Secretary to Government, PR-1092
Urban Development Department.
್ರ, ಗುರುವಾರ ಜುಲೈ ೨೨, ೨೦೧೦ ಭಾಗ-೩
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ
೩೧೦೪
ವಾಣಿಜ್ಯ ಮತ್ತು ಕೈಗಾರಿಕೆ ಇಲಾಖೆ
ಸಂಖ್ಯೆ: ಸಿಐ 150 ಎಸ್ಪಿಕ್ಯೂ 2010, ಬೆಂಗಳೂರು, ದಿನಾಂಕ:14ನೇ ಜೂನ್, 2010
ಕರ್ನಾಟಕ ಕೈಗಾರಿಕಾ ಪ್ರದೇಶಾಭಿವೃದ್ಧಿ ಕಾಯ್ದೆ 1966ರ ಕಲಂ 28(4)ರ ಅಧಿಸೂಚನೆ
ಕರ್ನಾಟಕ ಕೈಗಾರಿಕಾ ಪ್ರದೇಶಾಭಿವೃದ್ಧಿ ಕಾಯ್ದೆ, 1966ರ ವಿಧಿ 28(1) ರಡಿಯಲ್ಲಿ ದತ್ತವಾಗಿರುವ ಅಧಿಕಾರದ ಮೇರೆಗೆ ಕೈಗಾರಿಕಾ ಪ್ರದೇಶಕ್ಕಾಗಿ ತುಮಕೂರು ತಾಲ್ಲೂಕು, ಕುಪ್ಪೂರು ಗ್ರಾಮದಲ್ಲಿ 0-19 ಗುಂಟೆ ಜಮೀನನ್ನು ಸ್ವಾಧೀನಪಡಿಸಿಕೊಳ್ಳಲು ಕ್ರಮಾಂಕ ಸಿಐ 150 ಎಸ್.ಪಿ.ಕ್ಯೂ. 2010 ದಿನಾಂಕ:26.03.2010ರನ್ವಯ ಪ್ರಾಥಮಿಕ ಅಧಿಸೂಚನೆ ಹೊರಡಿಸಿದೆ.
(ದಿನಾಂಕ:30.03.2010ರ ಕರ್ನಾಟಕ ವಿಶೇಷ ರಾಜ್ಯಪತ್ರದ ಭಾಗ-III ರಲ್ಲಿ ಪ್ರಕಟವಾಗಿದೆ) ಈ ದಿಶೆಯಲ್ಲಿ ವಿಶೇಷ ಭೂಸ್ವಾಧೀನಾಧಿಕಾರಿಗಳು ಭೂಮಾಲೀಕರ ಆಕ್ಷೇಪಣೆಗಳನ್ನು ಆಲಿಸಿದ ನಂತರ ಮೇಲ್ಕಂಡ ಕಾಯ್ದೆ ವಿಧಿ 28(3)ರಡಿಯಲ್ಲಿ ತಮಗೆ ದತ್ತವಾಗಿರುವ ಅಧಿಕಾರವನ್ನು ಚಲಾಯಿಸಿ ಈ ಜಮೀನನ್ನು ಅಂತಿಮವಾಗಿ ಸ್ವಾಧೀನಪಡಿಸಿಕೊಳ್ಳಲು ದಿನಾಂಕ:03.05.2010ರಂದು ಆದೇಶ ಹೊರಡಿಸಿದ್ದಾರೆ.
ವಿಶೇಷ ಭೂಸ್ವಾಧೀನಾಧಿಕಾರಿಗಳು ವಿಧಿ 28(3)ರಡಿಯಲ್ಲಿ ಹೊರಡಿಸಿರುವ ಆದೇಶದಲ್ಲಿ ಕಾಣಿಸಿರುವ ಜಮೀನನ್ನು ಸ್ವಾಧೀನಪಡಿಸಿಕೊಳ್ಳಬೇಕೆಂದು ಸರ್ಕಾರಕ್ಕೆ ಮನವರಿಕೆಯಾಗಿದೆ.
ಆದ್ದರಿಂದ ಮೇಲ್ಕಂಡ ಕಾಯ್ದೆಯ ವಿಧಿ 28(4)ರಡಿಯಲ್ಲಿ ದತ್ತವಾದ ಅಧಿಕಾರದ ಮೇರೆಗೆ ಕರ್ನಾಟಕ ಸರ್ಕಾರವು ಈ ಕೆಳಗಿನ ಅನುಸೂಚಿಯಲ್ಲಿ ನಮೂದಿಸಿರುವ ಜಮೀನನ್ನು ಮೇಲ್ಕಂಡ ಉದ್ದೇಶಕ್ಕಾಗಿ ಅಂತಿಮವಾಗಿ ಸ್ವಾಧೀನಪಡಿಸಿಕೊಳ್ಳಲಾಗಿದೆಯೆಂದು ಘೋಷಿಸಿದೆ.
| ಕ್ರ. ಸಂ. | ಖಾತೆದಾರರ ಹೆಸರು | ಅನುಭವದಾರರ ಹೆಸರು | ಸರ್ವೆ ನಂ. | ಭೂಸ್ವಾಧೀನಪಡಿಸಿಕೊಳ್ಳಬೇಕಾದ ವಿಸ್ತೀರ್ಣ | ತರಹೆ | ಆಕಾರ (ರೂ) | ಚೆಕ್ಕು ಬಂದಿ | |||||
| ಐನ್ ಎ-ಗುಂ | ಖರಾಬು ಎ-ಗುಂ | ಬಾಕಿ ಎ-ಗುಂ | ಪೂರ್ವ ಸ.ನಂ. | ಪಶ್ಚಿಮ ಸ.ನಂ. | ಉತ್ತರ ಸ.ನಂ. | ದಕ್ಷಿಣ ಸ.ನಂ. | ||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
| 1. | ಹೆಚ್.ಎಸ್. ಷಣ್ಮುಖ ಬಿನ್ ಶಂಕರಪ್ಪ | ಹೆಚ್.ಎಸ್. ಷಣ್ಮುಖ | 21/1ರ ಪೈಕಿ | 0-19 | - | 0-19 | ಖುಷ್ಕಿ | 0-20 | ಕೆರೆ | ಉಳಿಕೆ ಜಮೀನು | ಉಳಿಕೆ ಜಮೀನು | 25 |
ಕರ್ನಾಟಕ ರಾಜ್ಯಪಾಲರ ಆದೇಶಾನುಸಾರ ಮತ್ತು ಅವರ ಹೆಸರಿನಲ್ಲಿ,
ಕೆ.ಹೆಚ್. ಶೇಷಗಿರಿ
ಪಿ.ಆರ್.999
ಸರ್ಕಾರದ ಅಧೀನ ಕಾರ್ಯದರ್ಶಿ (ಕೈಅ)
ವಾಣಿಜ್ಯ ಮತ್ತು ಕೈಗಾರಿಕೆ ಇಲಾಖೆ.