COMMERCE & INDUSTRIES SECRETARIAT
Sub: Approval to the Project Proposal of M/s. Rajvardhan Industries Pvt. Ltd. to establish "Iron Ore Beneficiation – 1.6 MTPA & Pelletisation – 1.2 MTPA Plants" at Mallikere Village, Koppal District.
Read: Proceedings of the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012.
PREAMBLE:
M/s. Rajvardhan Industries Pvt. Ltd. has proposed to establish "Iron Ore Beneficiation – 1.6 MTPA & Pelletisation – 1.2 MTPA Plants" at Mallikere Village, Koppal District, with an investment of Rs.225.00 Crores, generating employment to about 103 persons.
In the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 28th Meeting held on 23.05.2012, in all aspects.
Hence the following order.
GOVERNMENT ORDER NO: CI 179 SPI 2012, BANGALORE DATED: 25TH MAY 2012
Government is pleased to accord in principle approval to the Project Proposal of M/s Rajvardhan Industries Pvt. Ltd. to establish "Iron Ore Beneficiation – 1.6 MTPA & Pelletisation – 1.2 MTPA Plants" at Mallikere Village, Koppal District, with an investment of Rs.225.00 Crores, generating employment to about 103 persons and extend the following infrastructure facilities, incentives & concessions.
INFRASTRUCTURE FACILITIES:
1. Land: 115 acres of land to be purchased U/s. 109 of KLR Act at Mallikere Village, in Koppal District. Sy Nos to be furnished to the secretary of the committee before issue of orders.
(೨೨೦೧)
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ಭಾಗ-೧ ೨೨೦೨2. Water: The company directed to make their own arrangements for water.
3. Power: 16 MW be serviced by GESCOM.
4. Incentives &
As per applicable Industrial Policy of the State.
Concessions:
GENERAL TERMS AND CONDITIONS :
1. Environment: Promoters to obtain CFE from KSPCB. Environmental Clearance from MOEF, GOI / DFEE GOK as applicable.
2. Employment: The Company shall prepare a plan for development of Human Resources required for the project, train local people and provide employment to these trained local youth and comply with the provisions of Industrial Policy of Govt. of Karnataka (Dr. Sarojini Mahishi report). A copy of Human Resources Development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
3. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
5. Others:
a) Project proponent to give employment to the family members of the land losers, one for each family as far as possible.
b) The project proponents shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable.
c) The promoters shall take all statutory and other necessary clearances from the competent authorities including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Department.
This approval is valid for a period of two years from the date of issue.
By Order and in the name of the Governor of Karnataka,
JYOTHI R.J
P.R. 1753
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub: Approval to the Project Proposal of M/s Shiva Shankar Minerals Limited. to establish a "Cement Plant - 3.5 MMTPA (1st phase) Capacity with 50 MW Captive Power Plant" at Burigpally & Ghanapur Villages, Chincholi Taluk, Gulbarga District.
Read: Proceedings of the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012.
ಭಾಗ-೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ೨೨೦೩PREAMBLE:
M/s Shiva Shankar Minerals Limited has proposed to establish a "Cement Plant – 3.5 MMTPA (1st phase) Capacity with 50 MW Captive Power Plant" at Burigpally & Ghanapur Villages, Chincholi Taluk, Gulbarga District, with an investment of Rs.2250.00 Crores, Generating Employment to about 1050 persons.
In the 28th State High Level Clearance Committee (SHLCC) meeting held on 23-05-2012 , the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 28th Meeting held on 23-05-2012 in all aspects.
Hence the following order.
GOVERNMENT ORDER NO: CI 180 SPI 2012, BANGALORE DATED: 25TH MAY 2012
Government is pleased to accord in principle approval to the Project Proposal of M/s Shiva Shankar Minerals Limited to establish a "Cement Plant – 3.5 MMTPA (1st phase) Capacity with 50 MW Captive Power Plant" at Burigpally & Ghanapur Villages, Chincholi Taluk, Gulbarga District, with an investment of Rs.2250.00 Crores, Generating Employment to about 1050 persons and extend the following infrastructure facilities, incentives & concessions.
INFRASTRUCTURE FACILITIES:
| Land : | Revenue Department to allot, Government land at Burigpally & Ghanapur Villages, Chincholi Taluka. Private land in Sy. 1 to 193 of Burigpally (Excluding Sy.No.27) & Sy.No.1 to 126 of Ghanapur Village (Excluding Sy.No.103), in Gulbarga district, to be purchased, U/s 109 of KLR Act and Conversion of the same thereafter for Industrial use. The Government land and private land requirement together would should not exceed 1500 acres DMG to assess requirement of land for both plant area and mining lease for different phases of the project. The committee directed the project proponent to submit revised mining plan accordingly. |
| Water : | 6 MLPD, in Mullamari River. The project proponent to apply separate application to WRD. |
| Power : | 89500 KVA to be serviced by GESCOM |
| Incentives & Concessions: | As per applicable Industrial Policy of the State. The project proponent to submit a separate application for special incentives over and above the incentives available under the Industrial Policy. |
GENERAL TERMS AND CONDITIONS :
1. Environment: Promoters to obtain CFE from KSPCB. Environmental Clearance from MOEF, GOI / DFEE GOK as applicable.
2. Employment: The Company shall prepare a plan for development of Human Resources required for the project, train local people and provide employment to these trained local youth and comply with the provisions of Industrial Policy of Govt. of Karnataka (Dr. Sarojini Mahishi Report) A copy of Human Resources Development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ಭಾಗ-೧ ೨೨೦೪3. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
5. Others:
a) The Project proponent to give employment to the family members of the land losers, one for each family as far as possible.
b) The project proponents shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable.
c) The promoters shall take all statutory and other necessary clearances from the competent authorities including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Department.
This approval is valid for a period of four years from the date of issue.
By Order and in the name of the Governor of Karnataka,
JYOTHI R.J
P.R. 1754
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub: Approval to the Project Proposal of M/s Inamdar Sugars Limited to establish an "Integrated 3500 TCD Sugar & 10 MW Cogen Power Plant" at Hirekoppa Village, Parasgad (Saundatti), Belgaum District. Read: Proceedings of the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012.
PREAMBLE:
M/s. Inamdar Sugars Limited to establish an "Integrated 3500 TCD sugar & 10 MW Cogen Power Plant" at Hirekoppa Village, Parasgad (Saundatti), Belgaum District- 591119, with an investment of Rs.137.00 crores, generating employment to about 200 Persons.
In the 28th State High Level Clearance Committee (SHLCC) meeting held on 23.05.2012, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 28th Meeting held on 23-05-2012 in all aspects.
Hence the following order.
GOVERNMENT ORDER NO: CI 181 SPI 2012, BANGALORE DATED: 25TH MAY 2012
Government is pleased to accord in principle approval to the Project Proposal of M/s.Inamdar Sugars Limited to establish an "Integrated 3500 TCD sugar & 10 MW Cogen Power Plant" at Hirekoppa village, Parasgad (Saundatti), Belgaum District, with an investment of Rs.137.00 crores, generating employment to about 200 persons and extend the following infrastructure facilities, incentives & concessions.
ಭಾಗ-೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ೨೨೦೫INFRASTRUCTURE FACILITIES:
| Land : | 3500 TCD Sugar Plant and 10 MW Co gen unit in 80.45 acres of land, at Sy. Nos. 71 (36.33 acres), 72 (14 acres) 39/1A (6 acres), 39/2 & 391A (9.24 acres), 40/1 (6.12 acres) & 40/1 (8.16 acres) in Hirekoppa Village, Saundatti, Belgaum District. (50.33 acres own land). Approval also accorded to purchase 30.12 acres U/s. 109 of KLR Act. Details of Survey Numbers to be furnished to the Secretary of the Committee. |
| Water : | Quantity : 40 Lakh LPD, Source : Malaprabha River. The project proponent to submit a separate application to WRD. |
| Power : | 4.790 KVA to be serviced by HESCOM. |
| Incentives & Concessions: | As per applicable Industrial Policy of the State. |
GENERAL TERMS AND CONDITIONS :
1. Environment: Promoters to obtain CFE from KSPCB. Environmental Clearance from MOEF, GOI / DFEE GOK as applicable.
2. Employment: The Company shall prepare a plan for development of Human Resources required for the project, train local people and provide employment to these trained local youth and comply with the provisions of Industrial Policy of Govt. of Karnataka (Dr. Sarojini Mahishi Report) A copy of Human Resources Development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
3. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
5. Others:
a) Project proponent to give employment to the family members of the land losers, one for each family as far aspossible.
b) The project proponents shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable.
c) The promoters shall take all statutory and other necessary clearances from the competent authorities including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Department.
This approval is valid for a period of two years from the date of issue.
By Order and in the name of the Governor of Karnataka,
JYOTHI R.J
Desk Officer (Technical Cell)
P.R. 1755
Commerce & Industries Department.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ಭಾಗ-೧ ೨೨೦೬COMMERCE & INDUSTRIES SECRETARIAT
Sub: Approval to the Project Proposal of M/s. BMM Ispat Limited to establish a "3MTPA Gas based Integrated Steel Plant" unit at Dhanapura Village, Marriyammanahalli Hobli, Hospet Taluk, Bellary District. Read: Proceedings of the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012.
PREAMBLE:
M/s. BMM Ispat Limited has proposed to establish a "3MTPA Gas based Integrated Steel Plant" unit at Dhanapura Village, Marriyammanahalli Hobli, Hospet Taluk, Bellary District, with an investment of Rs. 16229.68 Crores, generating employment to about 3035 persons.
In the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 28th Meeting held on 23.05.2012, in all aspects.
Hence the following order.
GOVERNMENT ORDER NO: CI 182 SPI 2012, BANGALORE DATED: 25-5-2012
Government is pleased to accord in principle approval to the Project Proposal of M/s. BMM Ispat Limited to establish a "3MTPA Gas based Integrated Steel Plant" unit at Dhanapura Village, Marriyammanahalli Hobli, Hospet Taluk, Bellary District, with an investment of Rs. 16229.68 Crores, generating employment to about 3035 persons and extend the following infrastructure facilities, incentives and concessions.
INFRASTRUCTURE FACILITIES:
1. Land: Project to be established in 1134.21 acres of land at Dhanapura Village, Hospet taluk Bellary District. (446.76 acres out of the existing land for 2 MTPA plant of the company) & 687.35 acres to be acquired and allotted as SUC by KIADB. Patches of government land in the area would be allotted by revenue department.
The committee directed project proponent to obtain minimum of 70% consent from the local land owners.
2. Water: 75 MLD from Back water or Downstream of T.B. Dam / Allamatti Dam. The project proponent to submit a separate application to WRD.
3. Power: 440000 KVA to be serviced by GESCOM.
4. Incentives &
As per applicable Industrial Policy of the State.
Concessions
GENERAL TERMS AND CONDITIONS:
1. Environment: The promoters as to obtain CFE from KPSCB Environmental clearance from MOEF, GOI / DFEE GOK as applicable.
2. Employment: The Company shall prepare a plan for development of Human Resources required for the project, train local people and provide employment to these trained local youth and comply with the provisions of Industrial Policy ofಭಾಗ-೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ೨೨೦೭ Govt. of Karnataka. (Dr. Sarojini Mahishi Report). A copy of Human Resources Development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
3. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
5. Others:
a. Project proponent to give employment to the family members of the land losers, one for each family as far as possible.
b. The project proponents shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable.
c. The promoters shall take all statutory and other necessary clearances from the competent authorities including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Department.
This approval is valid for a period of two years from the date of allotment of KIADB.
By Order and in the name of the Governor of Karnataka,
JYOTHI R.J
P.R. 1756
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub: Amendment to earlier approved project proposal of M/s. Gulbarga Cement Ltd., to establish a "3.5 Million TPA Cement Plant with 100 MW Thermal Power Plant" - Reg.
Read: 1. 14th SHLCC held on 17.03.2008.
2. Government Order No. CI 79 SPI 2008, Dated: 03.05.2008
3. 28th SHLCC meeting held on 23.05.2012.
Preamble:
The project proposal of M/s. Gulbarga Cement Ltd., to establish a "3.5 Million TPA Cement Plant with 100 MW Thermal Power Plant" with an investment of Rs.1100 crores, in 2475 acres of land for the project at various Sy. Nos. of Ferozabad, Kirani, Somnathahlli Villages in Gulbarga Taluk & District, has been approved by SHLCC in its 14th meeting held on 17.03.2008. The subsequently, Government Order vide No. CI 79 SPI 2008, Dated: 03.05.2008 has been issued.
In the 23rd Meeting of SHLCC held on 19.06.2010, the committee approved for extension of time to implement the project by 2 years & accordingly, Government Order vide No. CI 79 SPI 2008; Dated: 21.07.2010 was issued to extend time limit by two years from the date of issue of this order.
The Company in its letter No.GCL/KIADB/HSR/2011/001; dt.19.12.2011 addressed to Special Deputy Commissioner, KIADB provided break-up of land usage as mining area: 1615 acres; Cement Plant: 600 acres; Residential Area: 110 acres andಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ಭಾಗ-೧ ೨೨೦೮ Railway siding: 150 acres and requested KIADB to go ahead with the acquisition of 2475 acres of land instead of current acquisition process for only 1954 acres of land without the railway siding land.
KUM vide its letter No. KUM/SHLCC/DD3/965/2007-08; dt.26.12.2011 informed the company that SHLCC in its 14th Meeting held on 17.03.2008 has accorded approval for 2475 acres of land i.e., 400 acres for establishing factory & 2075 acres for mining area to be acquired and allotted by KIADB, which differs from their request made in the letter dated: 19.12.2011 addressed to Spl.Dy.Commissioner, KIADB and marked copy to Karnataka Udyog Mitra. The company was requested to furnish the revised project cost, means of finance, with revised Master Plan, additional land details with survey map indicating the land proposed and clearances from Railways to take same by SHLCC for discussion and decision.
The company in its letter no.GCL/KUM/2012/001; Dated: 09.05.2012 has revised its project cost to Rs.1900 Crores (additional Rs.800 crores) and submitted the details requested by the KUM. The company has requested to accord approval for the following:
• Total land acquisition by the KIADB to be 2886 acres (original 2475 acres) with break-up of Mining area:1972 acres; Factory area:625 acres; Residential colony area:140 acres and Railway line from Marthur to Plant area:150 acres
• Incentives under New Industrial Policy and Sales Tax exemption on Capital investments.
The Secretary power has raised certain issues, which was discussed in detail.
The Committee approved to extend the time period to implement the project by 2 years with an additional cost for the project Rs.800 crores. However the company would also have to ensure that the area acquired by PCKL and their project for power, should not be affected by the project. The issue of overlap of PCKL should be left out; the company was also directed to obtain the consent from 70% of the farmers. The applicable industrial policy will be given effect for necessary incentives.
Government has examined the recommendations made by the State High Level Clearance Committee in the 28th Meeting held on 23.05.2012, in all aspects.
Hence the following order.
GOVERNMENT ORDER NO. CI 154 SPI 2012 BANGALORE DATED : 18.06.2012
Government is pleased to approve extension of time to implement the project of M/s. Gulbarga Cement Ltd., approved vide Government Order read at (2) above, by 2 years from the date of issue of the order with an additional investment of Rs. 800 crores. However the company would also have to ensure that the area acquired by PCKL and their project for power, should not be affected by the project. The issue of overlap of PCKL should be left out; the company was also directed to obtain the consent from 70% of the farmers. The applicable industrial policy will be given effect for necessary incentives.
Other terms and conditions remain the same as in the Government Orders read at (2) above.
By Order and in the name of the Governor of Karnataka,
JYOTHI R.J
P.R. 1757
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub: Approval to the Project Proposal of M/s. Lanco Industries Limited to establish a "BHQ Beneficiation + Pelletisation + Ductile Iron Pipe" unit at Koppal District.
Read: Proceedings of the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012.
ಭಾಗ-೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ೨೨೦೯PREAMBLE:
M/s. Lanco Industries Limited has proposed to establish a "BHQ Beneficiation + Pelletisation + Ductile Iron Pipe" unit at Koppal District, with an investment of Rs. 950 Cr., generating employment to about 5000 persons.
In the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 28th Meeting held on 23.05.2012, in all aspects.
Hence the following order.
GOVERNMENT ORDER NO: CI 167 SPI 2012, BANGALORE DATED: 25-5-2012
Government is pleased to accord in principle approval to the Project Proposal of M/s. Lanco Industries Limited to establish a unit for "BHQ Beneficiation + Pelletisation + Ductile Iron Pipe" at Koppal District, with an investment of Rs. 950.00 Crores, generating employment to about 5000 persons and extend the following infrastructure facilities, incentives and concessions.
INFRASTRUCTURE FACILITIES:
1. Land: 400 acres of land U/s 109 of KLR Act in Yalburga Taluk as there are large No. of Steel related projects in Bellary and Koppal District.
2. Water: 16,000 KLD of water from nearest source, subject to the approval of Water Resources Department. The project proponent to submit a separate application for allocation of water.
3. Power: 70 MW to be serviced by GESCOM.
4. Incentives &
As per applicable Industrial Policy of the State.
Concessions
GENERAL TERMS AND CONDITIONS:
1. Environment: The promoters as to obtain CFE from KPSCB Environmental clearance from MOEF, GOI / DFEE GOK as applicable.
2. Employment: The Company shall prepare a plan for development of Human Resources required for the project, train local people and provide employment to these trained local youth and comply with the provisions of Industrial Policy of Govt. of Karnataka. (Dr. Sarojini Mahishi Report). A copy of Human Resources Development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
3. Vendor Development : Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development : The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
5. Others:
a. Project proponent to give employment to the family members of the land losers, one for each family as far as possible.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ಭಾಗ-೧ ೨೨೧೦b. The project proponents shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable.
c. The promoters shall take all statutory and other necessary clearances from the competent authorities including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Department.
This approval is valid for a period of two years from the date of obtaining permission U/s 109 KLR Act from the Deputy Commissioner/ Government as the case may be.
By Order and in the name of the Governor of Karnataka,
JYOTHI R.J
PR - 1758
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub: Approval to the Project proposal of M/s Shree Malaprabha Sahakari Sakkare Karkhane (N) to enhance capacity from 3500 TCD to 5000 TCD and 30 MW bagasse based co-generation plant at Mugutkhan Hubli, Bailahongal Tq, Belgaum District – Reg.
Read: Proceedings of 28th SHLCC meeting held on 23.05.2012.
Preamble :
M/s Shree Malaprabha Sahakari Sakkare Karkhane (N) proposes to enhance capacity from 3500 TCD to 5000 TCD and 30 MW bagasse based co-generation plant at Mugutkhan Hubli, Bailahongal Tq, Belgaum District with an investment of Rs. 235 cr. generating employment to about 93 persons.
In the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 28th Meeting held on 23.05.2012, in all aspects.
Hence the following order.
GOVERNMENT ORDER NO. CI 169 SPI 2012, BANGALORE DATED : 25.05.2012
Government is pleased to approve in-principle the proposal of M/s Shree Malaprabha Sahakari Sakkare Karkhane (N) to enhance capacity from 3500 TCD to 5000 TCD and 30 MW bagasse based co-generation plant at Mugutkhan Hubli, Bailahongal Tq, Belgaum District with an investment of Rs. 235 cr. generating employment to about 93 persons by extending the infrastructure facilities, incentives & concessions as mentioned below:
Land : Existing land.
Water : 900 KLPD of water to be supplied by Malaprabha river under fresh quota for expansion from WRD.
The project proponent to submit a separate application to WRD.
Power : 350 KVA of initial power from HESCOM
Incentives &
As per applicable Industrial Policy of the State.
Concessions:
ಭಾಗ-೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ೨೨೧೧GENERAL TERMS AND CONDITIONS:
1. Environment: The promoters to obtain CFE and CFO from KSPCB and environmental clearance from MOEF, GOI.
2. Employment: The Company shall prepare a plan for development of Human Resources required for the project, train local people and provide employment to these trained local youth and comply with the provisions of Industrial Policy of Govt. of Karnataka (Dr. Sarojini Mahishi Report). A copy of Human Resources Development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring
3. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
5. Others:
a) Project proponent to give employment to the family members of the land losers, one for each family as far as possible.
b) The project proponents shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable
c) The promoters shall take all statutory and other necessary clearances from the competent authorities including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Department.
By Order and in the name of the Governor of Karnataka,
JYOTHI R.J
PR - 1761
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub: Approval to the Project proposal of M/s IFCI Infrastructure Development Ltd., to establish supporting Infrastructure for Financial City, at Devanahalli, Bangalore North Tq, Bangalore District – Reg
Read: Proceedings of 28th SHLCC meeting held on 23.05.2012.
Preamble:
M/s IFCI Infrastructure Development Ltd., proposes to establish supporting Infrastructure for Financial City (Facility of Residential and common amenities to the staff of Financial City) at Devanahalli, Bangalore North Tq, Bangalore District with an investment of Rs. 547 cr. generating employment to about 166 persons.
In the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012, the proposal of the Company was discussed and approved.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ಭಾಗ-೧ ೨೨೧೨Government has examined the recommendations made by the State High Level Clearance Committee in the 28th Meeting held on 23.05.2012, in all aspects.
Hence the following order.
GOVERNMENT ORDER NO. CI 170 SPI 2012, BANGALORE DATED : 25.05.212
Government is pleased to approve in-principle the proposal of M/s IFCI Infrastructure Development Ltd., to establish supporting Infrastructure for Financial City (Facility of Residential and common amenities to the staff of Financial City), at Devanahalli, Bangalore North Tq, Bangalore District with an investment of Rs. 547 cr. generating employment to about 166 persons by extending the infrastructure facilities, incentives & concessions as mentioned below:
Land : KIADB to allot 15 acres of land Near Financial City, International Airport, Devanahalli industrial Area, Bangalore North to IFCI for residential puposes. However KIADB should follow norms for allotment.
Water : Quantity: 10 KLPD to be supplied by KIADB
Power : 5000 KVA to be serviced by BESCOM
GENERAL TERMS AND CONDITIONS:
1. Environment: The promoters to obtain CFE and CFO from KSPCB and environmental clearance from MOEF, GOI.
2. Employment: The Company shall prepare a plan for development of Human Resources required for the project, train local people and provide employment to these trained local youth and comply with the provisions of Industrial Policy of Govt. of Karnataka (Dr. Sarojini Mahishi Report). A copy of Human Resources Development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
3. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
5. Others:
a) Project proponent to give employment to the family members of the land losers, one for each family as far as possible.
b) The project proponents shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable
c) The promoters shall take all statutory and other necessary clearances from the competent authorities including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Department.
The Order is valid for the period of two years from the date of allotment by KIADB.
By Order and in the name of the Governor of Karnataka,
JYOTHI R.J
P.R. 1762
Desk Officer (Technical Cell)
Commerce & Industries Department.
ಭಾಗ-೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ೨೨೧೩COMMERCE & INDUSTRIES SECRETARIAT
Sub: Approval to the Project proposal of M/s J.K.Tyres and Industries Ltd., for expansion of capacity of making of truck and bus radial tyres at KIADB Industrial area, Metagalli / Hebbal, Mysore Tq & Dist – Reg.
Read: Proceedings of 28th SHLCC meeting held on 23.05.2012.
Preamble:
M/s J.K.Tyres and Industries Ltd., proposes for expansion of capacity of making of truck and bus radial tyres at kiadb industrial area, Metagalli / Hebbal, Mysore Tq & District with an investment of Rs. 155.86 cr. generating employment to about 484 persons.
In the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 28th Meeting held on 23.05.2012, in all aspects.
Hence the following order.
GOVERNMENT ORDER NO. CI 171 SPI 2012, BANGALORE DATED : 25.05.2012
Government is pleased to approve in-principle the proposal of M/s J.K.Tyres and Industries Ltd., for expansion of capacity of making of truck and bus radial tyres at KIADB industrial area, Metagalli / Hebbal, Mysore Tq & District with an investment of Rs. 155.86 cr. generating employment to about 484 persons by extending the infrastructure facilities, incentives & concessions as mentioned below:
Land : Enhancement of the capacity of manufacture of radial tyres from 8 lakhs to 10.65 lakhs, will be done in own existing land.
Accessibility to their project through Industrial estate of KSSIDC, will be allowed by KSSIDC.
Water : Company to file a separate application to WRD.
Power : Additional power of 5021 KVA, provided by CESCOM.
Incentives &
As per applicable Industrial Policy of the State.
Concessions:
GENERAL TERMS AND CONDITIONS:
1. Environment: The promoters to obtain CFE and CFO from KSPCB and environmental clearance from MOEF, GOI.
2. Employment: The Company shall prepare a plan for development of Human Resources required for the project, train local people and provide employment to these trained local youth and comply with the provisions of Industrial Policy of Govt. of Karnataka (Dr. Sarojini Mahishi Report). A copy of Human Resources Development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
3. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ಭಾಗ-೧ ೨೨೧೪4. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
5. Others:
a) Project proponent to give employment to the family members of the land losers, one for each family as far as possible
b) The project proponents shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable
c) The promoters shall take all statutory and other necessary clearances from the competent authorities including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Department.
The Order is valid for the period of two years from the date of issue of this Order.
By Order and in the name of the Governor of Karnataka,
JYOTHI R.J
PR - 1763
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub: Approval to the Project proposal of M/s. Ramgad Minerals & Mining Limited., to establish "mining and processing of gold" at Attikatti village, Mundargi Taluk, Gadag District – Reg
Read: Proceedings of 28th SHLCC meeting held on 23.05.2012.
Preamble:
M/s. Ramgad Minerals & Mining Ltd., proposes to establish "mining and processing of gold" at Attikatti village, Mundargi Taluk, Gadag District with an investment of Rs. 288.89 cr. generating employment to about 335 persons.
In the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 22nd Meeting held on 23.05.2012, in all aspects.
Hence the following order.
GOVERNMENT ORDER NO. CI 172 SPI 2012, BANGALORE DATED : 25-5-2012
Government is pleased to approve in-principle the proposal of M/s. Ramgad Minerals & Mining Ltd., to establish "mining and processing of gold" at Attikatti village, Mundargi Taluk, Gadag District with an investment of Rs. 288.89 cr. generating employment to about 335 persons by extending the infrastructure facilities, incentives & concessions as mentioned below:
Land : The company already has procured 65 acres, and now the balance 26.22 acres of land to be acquired as SUC through KIADB. The project proponent to obtain consent 70% of the total extent of land from the land owners in the sy numbers given below;
Sy. Nos. 46/2/1, 46/2/2, 46/3A, 46/3B, 46/4, 47/1, 47/2, 47/3, 49/1, 50/1, 51/2A, 51/2B, 51/3, 49/2, 50/2/3A, 50/2/+3B, 50/4, 51/1, 46/1 at Attikatti Village, Mundargi Taluk, Gadag Districtಭಾಗ-೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ೨೨೧೫ Water : The committee directed the project proponent to make own arrangements for the required quantity of water.
Power : 3450 KVA to be serviced by HESCOM
Incentives &
As per applicable Industrial Policy of the State.
Concessions:
GENERAL TERMS AND CONDITIONS:
1. Environment: The promoters to obtain CFE and CFO from KSPCB and environmental clearance from MOEF, GOI.
2. Employment: The Company shall prepare a plan for development of Human Resources required for the project, train local people and provide employment to these trained local youth and comply with the provisions of Industrial Policy of Govt. of Karnataka (Dr. Sarojini Mahishi Report). A copy of Human Resources Development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
3. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
5. Others:
a) Project proponent to give employment to the family members of the land losers, one for each family as far as possible.
b) The project proponents shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable
c) The promoters shall take all statutory and other necessary clearances from the competent authorities including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Department.
The Order is valid for the period of two years from the date of allotment of KIADB.
By Order and in the name of the Governor of Karnataka,
JYOTHI R.J
P.R. 1764
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub: Approval to the Project proposal of M/s Shree Gluco Biotech Pvt Ltd. to establish "maize processing" unit at Gejjiganahalli, Eshwgowdrahalli, Nanjangud District – Reg.
Read: Proceedings of 28th SHLCC meeting held on 23.05.2012.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ಭಾಗ-೧ ೨೨೧೬Preamble:
M/s Shree Gluco Biotech Pvt Ltd. proposes to establish "maize processing" unit at Gejjiganahalli Eshwgowdrahalli Nanjangud District with an investment of Rs. 154.58 cr. generating employment to about 262 persons.
In the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 22th Meeting held on 23.05.2012, in all aspects.
Hence the following order.
GOVERNMENT ORDER NO. CI 173 SPI 2012, BANGALORE DATED : 25-5-2012
Government is pleased to approve in-principle the proposal of M/s Shree Gluco Biotech Pvt Ltd., to establish "maize processing" unit at Gejjiganahalli Eshwgowdrahalli Nanjangud District with an investment of Rs. 154.58 cr. generating employment to about 262 persons by extending the infrastructure facilities, incentives & concessions as mentioned below:
Land : 94 acres of land would be acquired U/s.109 of KLR Act at Gejjiganahalli, Eshwgowdrahalli, Nanjangud District, in The Company was directed to give the survey numbers separately to the commissioner within a month.
Water : The promoter was directed to apply separately to WRD for allocation of water.
Power : 3000 KVA to be serviced by CESCOM
Incentives &
As per applicable Industrial Policy of the State.
Concessions:
GENERAL TERMS AND CONDITIONS:
1. Environment: The promoters to obtain CFE and CFO from KSPCB and environmental clearance from MOEF, GOI.
2. Employment: The Company shall prepare a plan for development of Human Resources required for the project, train local people and provide employment to these trained local youth and comply with the provisions of Industrial Policy of Govt. of Karnataka (Dr. Sarojini Mahishi Report). A copy of Human Resources Development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
3. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
5. Others:
a) Project proponent to give employment to the family members of the land losers as much as possible.
b) The project proponents shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicableಭಾಗ-೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ೨೨೧೭ c) The promoters shall take all statutory and other necessary clearances from the competent authorities including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Department.
This approval is valid for a period of two years from the date of obtaining permission U/s 109 KLR from the Deputy Commissioner/ Government as the case may be.
By Order and in the name of the Governor of Karnataka,
JYOTHI R.J
P.R. 1765
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub: Approval to the Project proposal of M/s Vikram Logistic and Maritime Services Pvt Ltd., to establish "logistics services" at Maranaikanahally and Samanduru villages, Anekal, Bangalore Rural District – Reg.
Read: Proceedings of 28th SHLCC meeting held on 23.05.2012.
Preamble:
M/s Vikram Logistic and Maritime Services Pvt Ltd., proposes to establish "logistics services" at Maranaikanahally and Samanduru villages, Anekal, Bangalore Rural District with an investment of Rs. 342.59 cr. generating employment to about 675 persons.
In the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 28th Meeting held on 23.05.2012, in all aspects.
Hence the following order.
GOVERNMENT ORDER NO. CI 174 SPI 2012, BANGALORE DATED : 25.05.2012
Government is pleased to approve in-principle the proposal of M/s Vikram Logistic and Maritime Services Pvt Ltd., to establish "logistics services" at Maranaikanahally and Samanduru villages, Anekal, Bangalore Rural District with an investment of Rs. 342.59 cr. generating employment to about 675 persons by extending the infrastructure facilities, incentives & concessions as mentioned below:
Land : Project to be set up in 120 acres of land owned by one of the Directors of the Company to be purchased U/s 109 of KLR Act at Maranaikanahally and Samanduru Villages, Anekal, Bangalore Rural District.
Water : Own Borewell
Power : 500 KVA to be serviced by BESCOM
Incentives &
As per applicable Industrial Policy of the State.
Concessions:
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ಭಾಗ-೧ ೨೨೧೮GENERAL TERMS AND CONDITIONS:
1. Environment: The promoters to obtain CFE and CFO from KSPCB and environmental clearance from MOEF, GOI.
2. Employment: The Company shall prepare a plan for development of Human Resources required for the project, train local people and provide employment to these trained local youth and comply with the provisions of Industrial Policy of Govt. of Karnataka (Dr. Sarojini Mahishi Report). A copy of Human Resources Development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
3. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
5. Others:
a) Project proponent to give employment to the family members of the land losers as much as possible.
b) The project proponents shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable.
c) The promoters shall take all statutory and other necessary clearances from the competent authorities including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Department.
This approval is valid for a period of two years from the date of obtaining permission U/s 109 KLR from the Deputy Commissioner/ Government as the case may be.
By Order and in the name of the Governor of Karnataka,
JYOTHI R.J
P.R. 1766
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub: Approval to the Project Proposal of M/s. Gopalan Enterprises to establish a "Ware House" at Cheelur Village Maralvadi Hobli Near, Kanakapura Taluk, Ramanagar District.
Read: Proceedings of the 28th State High Level Clearance Committee (SHLCC) Meeting held
on 23.05.2012.
PREAMBLE:
M/s. Gopalan Enterprises has proposed to establish a "Ware House" at Cheelur Village Maralvadi Hobli Near, Kanakapura Taluk, Ramanagar District, with an investment of Rs.188 Crores, generating employment to about 5000 persons.
In the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012, the proposal of the Company was discussed and approved.
ಭಾಗ-೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ೨೨೧೯Government has examined the recommendations made by the State High Level Clearance Committee in the 28th Meeting held on 23.05.2012, in all aspects.
Hence the following order.
GOVERNMENT ORDER NO: CI 175 SPI 2012, BANGALORE DATED: 25th MAY 2012
Government is pleased to accord in principle approval to the Project Proposal of M/s Gopalan Enterprises to establish a "Ware House" at Cheelur Village Maralvadi Hobli Near, Kanakapura Taluk, Ramanagar District, with an investment of Rs.188 Crores, generating employment to about 5000 persons and extend the following infrastructure facilities, incentives & concessions.
INFRASTRUCTURE FACILITIES:
1. Land: 104.06 acres of land at Cheelur village Maralvadi Hobli near, Kanakapura Taluk, Ramnagar District to be acquired as SUC through KIADB. The project proponent to obtain consent to an extent of 70% from the land owners. The Sy. Nos. of the identified land are as follows:
Sy.Nos. 458, 464, 467, 486, 487, 488, 489, 490, 491, 492, 494, 495, 497, 499, 506, 508, 509, 510, 511, 514, 515, 516, 520, 522, 524, 526, 527, 528, 529, 369, 195D, 195P
2. Water: Project proponent to make own arrangements for requirement of water.
3. Power:
60,000 KVA from BESCOM
4. Incentives &
As per applicable Industrial Policy of the State.
Concessions:
GENERAL TERMS AND CONDITIONS :
1. Environment: Promoters to obtain CFE from KSPCB. Environmental Clearance from MOEF, GOI / DFEE GOK as applicable.
2. Employment: The Company shall prepare a plan for development of Human Resources required for the project, train local people and provide employment to these trained local youth and comply with the provisions of Industrial Policy of Govt. of Karnataka (Dr. Sarojini Mahishi report). A copy of Human Resources Development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
3. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
3. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
4. Others:
a) Project proponent to give employment to the family members of the land losers, one for each family as far as possible.
b) The project proponents shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ಭಾಗ-೧ ೨೨೨೦c) The promoters shall take all statutory and other necessary clearances from the competent authorities including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Department.
This approval is valid for a period of two years from the date of land allotment by KIADB.
By Order and in the name of the Governor of Karnataka,
JYOTHI R.J
P.R. 1767
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub: Entrusting M/s Ernst & Young Pvt. Ltd., the task of preparing K-SIP for Karnataka negotiation of best price – reg.
Read: 1. Government Order No. CI 54 SPI 2012 dated 09.02.2012 & 24.02.2012.
2. Proceedings of meeting held under Chairmanship of Secretary to Govt., Infrastructure Development Department on 13.03.2012.
PREAMBLE:
M/s Ernst & Young has submitted a K-SIP Concept Proposal that will bring a step change in transport, power and other support infrastructure, attract private investment and promote economic development. As per the proposal, the overall approach for undertaking this assignment is divided in two stages namely identification of early bird projects and preparation of Karnataka Strategic Infrastructure Plan. They have quoted a professional fees of Rs. 1,42,00,000/- + service tax for this task.
Director, PPP Cell, Infrastructure Development Department, informed that the Commerce and Industries Department, vide Government Order No. CI 54 SPI 2012 dated 09.02.2012 has constituted a Negotiation Committee under the Chairmanship of Secretary, Infrastructure Development Department, for negotiation of best price for preparation of K-SIP by M/s Ernst & Young.
A negotiation meeting was held on 10.02.2012 and the negotiated price for preparing the K-SIP document was Rs. 95.00 lakhs + service tax.
After detailed discussion, the Committee has taken decision that the final negotiation price for preparing the K-SIP document is Rs. 90.00 lakhs plus service tax.
Hence the following order.
GOVERNMENT ORDER NO: CI 54 SPI 2012, BANGALORE DATED: 20.06.2012
Under the above circumstances, the approval is accorded for entrustment of the preparation of Karnataka Strategic Infrastructure plan to M/s Ernst & Young Pvt. Ltd., as on extension of work given to the firm as Knowledge Partner for GIM 2012, Under Rule 28E of KTPP Rules on a single source selection Basis at a negotiated fee of Rs. 90.00 lakh + taxes, for this additional work as per the proposed scope of work enclosed to this order.
This issue with the concurrence of Finance Dept. vide No. FD 608 Exp-1/12 dated 8.06.2012.
By Order and in the name of the Governor of Karnataka,
K.R. CHANDRAMMA
P.R. 1768
Desk Officer (Technical Cell) (I/c),
Commerce & Industries Department.
ಭಾಗ-೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ೨೨೨೧COMMERCE & INDUSTRIES SECRETARIAT
Sub: Approval to the project proposal of M/s. Apex Auto Ltd., to establish a earth moving equipments, assembly & fabrication of machinery parts in Kolar District – Allotment of additional 4 acres of land at Narasapura Industrial Area, Kolar District - Reg.
Ref: 1. 27th SHLCC meeting held on 13.04.2012.
Preamble:
The project proposal of M/s. Apex Auto Limited is to establish 2 units for manufacturing of "Earth Moving Equipments, Assembly & Fabrication of Machinery Parts" was approved. First plant at Narasapura Industrial Area (investment of Rs.34.72 crores, in 5 acres of land – 64th SLSWCC – 7.1.2010) and the second plant at Dobbaspet 4th Phase was approved in 61st SLSWCC meeting held on 30.08.2010.
Subsequently, the Company has proposed to implement both projects together at Narasapura Industrial Area for logistical convenience and had filed a fresh project proposal and sought allotment of additional 4 acres of land in Narasapura Industrial Area, Kolar District
In the 27th State High Level Clearance Committee (SHLCC) Meeting held on 13.04.2012, the proposal of the Company was discussed and approved.
The Committee decided to approve the project.
Government has examined the recommendations made by the State High Level Clearance Committee in the 27th Meeting held on 13.04.2012, in all aspects.
Hence the following order.
GOVERNMENT ORDER NO. CI 206 SPI 2012, BANGALORE DATED : 20.06.2012
Government is pleased to accord approval for implementation of the two projects of M/s. Apex Auto Ltd., to establish a unit for manufacture Earth Moving Equipments, Assembly & Fabrication of Machinery Parts with an investment of Rs. 74.39 Cr., at Narasapura Industrial Area, Kolar District generating employment to about 232 persons and extend the following infrastructure facilities, incentives and concessions
INFRASTRUCTURE FACILITIES:
1. Land: KIADB to allot additional 4 Acres of land Narasapura Industrial Area, Kolar District adjacent to the 5 Acres of land already allotted
2. Water: 10000 LPD from KIADB
3. Power: 500 KVA from BESCOM
4. Incentives &
As per applicable Industrial Policy of the State.
Concessions
GENERAL TERMS AND CONDITIONS:
1. Environment: The promoters as to obtain CFE from KPSCB Environmental clearance from MOEF, GOI / DFEE GOK as applicable.
2. Employment: The Company shall prepare a plan for development of Human Resources required for the project, train local people and provide employment to these trained local youth and comply with the provisions of Industrial Policy ofಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ಭಾಗ-೧ ೨೨೨೨ Govt. of Karnataka. (Dr. Sarojini Mahishi Report). A copy of Human Resources Development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
3. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
5. Others:
a. The project proponents shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable.
b. The promoters shall take all statutory and other necessary clearances from the competent authorities including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Department.
This approval is valid for a period of two years from the date of issue of this Order.
By Order and in the name of the Governor of Karnataka,
K.R. CHANDRAMMA
P.R. 1769
Desk Officer (Technical Cell) (I/c),
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub: Approval to the project proposal of M/s. Reid and Taylor [India] Ltd., for "Setting up of Polyester Viscose Fabrics Manufacturing Plant" at Thandya Industrial Area, Thandavapura, Nanjanagud Taluk, Mysore District - Reg.
Ref: 1. 28th SHLCC meeting held on 23.05.2012.
Preamble:
M/s. Reid and Taylor [India] Ltd., proposes to establish "Setting up of Polyester Viscose Fabrics Manufacturing Plant", with an investment of Rs.248.60 Crores, in their 16.21 acres of KIADB land allotted earlier in Thandya Industrial Area, Thandavapura, Nanjanagud Taluk, Mysore District, generating additional employment to about 150 persons.
In the 28th State High Level Clearance Committee (SHLCC) Meeting held on 23.05.2012, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 28th Meeting held on 23.05.2012, in all aspects.
Hence the following order.
GOVERNMENT ORDER NO. CI 208 SPI 2012, BANGALORE DATED : 18-06-2012
Government is pleased to approve the proposal of M/s. Reid and Taylor [India] Ltd., for "Setting up of Polyester Viscose Fabrics Manufacturing Plant", with an investment of Rs.248.60 Crores, in Thandya Industrial Area, Thandavapura, Nanjanagud Taluk, Mysore District, generating additional employment to about 150 persons with the following infrastructure facilities, incentives and Concessions:
ಭಾಗ-೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ೨೨೨೩Infrastructure facilities:
Land :
In the existing premises of the company – 16.21 Acres of land allotted by KIADB in Thandya Industrial Area, Mysore District.
Water : Quantity: 10000 LPD the company has to make separate application to WRD Dept. for above allotment.
Power : 800 KVA Additional power to be serviced by CESCOM.
Incentives &
As per Applicable Industrial Policy of the State.
Concessions:
GENERAL TERMS AND CONDITIONS:
1. Environment: The promoters to obtain CFE and CFO from KSPCB and environmental clearance from MOEF, GOI.
2. Employment: The Company shall prepare a plan for development of Human Resources required for the project, train local people and provide employment to these trained local youth and comply with the provisions of Industrial Policy of Govt. of Karnataka (Dr. Sarojini Mahishi Report). A copy of Human Resources Development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
3. Vendor Development: Where ever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit. A copy of such projects shall be sent to the Commissioner for I.D. & Director of Industries and Commerce for monitoring.
5. Others:
a) Promoters to provide local employment in the project as per the Dr. Sarojini Mahishi report.
b) The project proponents shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable.
c) The promoters shall take all statutory and other necessary clearances from the competent authorities including GOI and shall submit milestones/progress in implementation of the project regularly, which will be monitored by the Department.
This approval is valid for a period of two years from the date of allotment of KIADB.
By Order and in the name of the Governor of Karnataka,
K.R. CHANDRAMMA
P.R. 1770
Desk Officer (Technical Cell) (I/c),
Commerce & Industries Department.
ವಾಣಿಜ್ಯ ಮತ್ತು ಕೈಗಾರಿಕೆ ಸಚಿವಾಲಯ
ವಿಷಯ: ಬೆಂಗಳೂರು ಮೆಟ್ರೋ ರೈಲು ಯೋಜನೆಗಾಗಿ ಸ್ವಾಧೀನಪಡಿಸಿಕೊಳ್ಳುವ ಜಮೀನುಗಳಿಗೆ ತಗಲುವ ಸೇವಾ ಶುಲ್ಕ ಹಾಗೂ ಆಡಳಿತಾತ್ಮಕ ವೆಚ್ಚಗಳನ್ನು ಕಡಿಮೆಗೊಳಿಸುವ ಕುರಿತು.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ಭಾಗ-೧ ೨೨೨೪ಓದಲಾಗಿದೆ: (1) ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಸಿಐ 10 ಎಸ್ಪಿಕ್ಯೂ 2010, ದಿನಾಂಕ: 24.04.2010
(2) ದಿನಾಂಕ: 20.10.2010ರಂದು ಮುಖ್ಯ ಕಾರ್ಯದರ್ಶಿಯವರ ಅಧ್ಯಕ್ಷತೆಯಲ್ಲಿ ಜರುಗಿದ ಉನ್ನತಾಧಿಕಾರ ಸಮಿತಿ ಸಭೆಯ ನಡವಳಿ.
(3) ಮುಖ್ಯ ಕಾರ್ಯ ನಿರ್ವಹಣಾಧಿಕಾರಿ ಹಾಗೂ ಕಾರ್ಯ ನಿರ್ವಾಹಕ ಸದಸ್ಯರು, ಕರ್ನಾಟಕ ಕೈಗಾರಿಕಾ ಪ್ರದೇಶಾಭಿವೃದ್ಧಿ ಮಂಡಳಿ ಇವರ ಪತ್ರ ಸಂಖ್ಯೆ: ಕೆ.ಐ.ಎ.ಡಿ.ಬಿ/ COF/ 2019/ 2012-13, ದಿನಾಂಕ: 17.05.2012
ಪ್ರಸ್ತಾವನೆ:
ಕರ್ನಾಟಕ ಕೈಗಾರಿಕಾ ಪ್ರದೇಶಾಭಿವೃದ್ಧಿ ಮಂಡಳಿಯಿಂದ ರಾಜ್ಯ ಸರ್ಕಾರದ ಇಲಾಖೆ ಹಾಗೂ ಸಂಸ್ಥೆಗಳಿಗಾಗಿ ಭೂಸ್ವಾಧೀನಪಡಿಸಿಕೊಳ್ಳುವ ಜಮೀನುಗಳಿಗೆ ಸೇವಾ ಶುಲ್ಕವನ್ನು ಶೇಕಡಾ 7.5ರಂತೆ ನಿರ್ಧರಿಸಲಾಗಿರುತ್ತದೆ. ಅಂತೆಯೇ, ಬೆಂಗಳೂರು ಮೆಟ್ರೋ ರೈಲು ಯೋಜನೆಯ ಅನುಷ್ಠಾನಕ್ಕೆ ಸಂಬಂಧಿಸಿದಂತೆ ಶೇಕಡಾ 7.5ರ ಸೇವಾ ಶುಲ್ಕವನ್ನು ಕರ್ನಾಟಕ ಕೈಗಾರಿಕಾ ಪ್ರದೇಶಾಭಿವೃದ್ಧಿ ಮಂಡಳಿಯು ವಿಧಿಸಿರುತ್ತದೆ.
ಈಗ ವಿಧಿಸುತ್ತಿರುವ ಸೇವಾ ಶುಲ್ಕವು ಹೆಚ್ಚಾಗಿದ್ದು, ಇದನ್ನು ಶೇಕಡಾ 1ಕ್ಕೆ ಅಥವಾ ನೈಜ ಭೂಸ್ವಾಧೀನ ವೆಚ್ಚಕ್ಕೆ (ಇವೆರಡರಲ್ಲಿ ಯಾವುದು ಕಡಿಮೆಯೋ ಅದಕ್ಕೆ) ನಿಗಧಿಪಡಿಸುವಂತೆ ಬಿ.ಎಂ.ಆರ್.ಸಿ.ಎಲ್.ರವರು ಸಲ್ಲಿಸಿದ ಕೋರಿಕೆಯ ಮೇರೆಗೆ ದಿನಾಂಕ: 20.10.2010ರಂದು ಮುಖ್ಯ ಕಾರ್ಯದರ್ಶಿಯವರ ಅಧ್ಯಕ್ಷತೆಯಲ್ಲಿ ನಡೆದ ಉನ್ನತಾಧಿಕಾರ ಸಮಿತಿ ಸಭೆಯಲ್ಲಿ ವಿಷಯ ಸಂಖ್ಯೆ: 9ರಲ್ಲಿ ಕೂಲಂಕುಷವಾಗಿ ಚರ್ಚಿಸಿದ್ದು, ಈ ಕೆಳಗಿನಂತೆ ತೀರ್ಮಾನಿಸಲಾಗಿರುತ್ತದೆ:
HPC decided that total charges (for service, administration, audit, etc.) payable by BMRCL to KIADB shall be 4% of the basic land cost.
ಈ ವಿಷಯವನ್ನು ಪುನರ್ಪರಿಶೀಲಿಸಿ ಅಭಿಪ್ರಾಯ ನೀಡುವಂತೆ ಕೋರಲಾಗಿ, ಬೆಂಗಳೂರು ಮೆಟ್ರೋ ರೈಲು ಯೋಜನೆಗಾಗಿ ಭೂಸ್ವಾಧೀನಪಡಿಸುತ್ತಿರುವ ಜಮೀನುಗಳಿಗೆ ಶೇಕಡಾ 4ರ ದರದಲ್ಲಿಯೇ ಸೇವಾ ಶುಲ್ಕವನ್ನು ಪಡೆಯಬೇಕಾಗಿರುತ್ತದೆ ಎಂದು (3)ರಲ್ಲಿ ಓದಲಾದ ಪ್ರಸ್ತಾವನೆಯಲ್ಲಿ ಸಿ.ಇ.ಓ. & ಇ.ಎಂ., ಕೆ.ಐ.ಎ.ಡಿ.ಬಿ.ಯವರು ಅಭಿಪ್ರಾಯ ವ್ಯಕ್ತಪಡಿಸಿರುತ್ತಾರೆ.
ಸದರಿ ಪ್ರಸ್ತಾವನೆಯನ್ನು ಕೂಲಂಕಷವಾಗಿ ಪರಿಶೀಲಿಸಿ, ಆದೇಶ ಹೊರಡಿಸಬೇಕಾಗಿರುವುದರಿಂದ ಈ ಆದೇಶ:
ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಸಿಐ 107 ಎಸ್ಪಿಕ್ಯೂ 2012, ಬೆಂಗಳೂರು, ದಿನಾಂಕ: 21.06.2012
ಬೆಂಗಳೂರು ಮೆಟ್ರೋ ರೈಲು ಯೋಜನೆಗಾಗಿ ಕರ್ನಾಟಕ ಕೈಗಾರಿಕಾ ಪ್ರದೇಶಾಭಿವೃದ್ಧಿ ಮಂಡಳಿ ವತಿಯಿಂದ ಭೂಸ್ವಾಧೀನಪಡಿಸುತ್ತಿರುವ ಜಮೀನುಗಳಿಗೆ ನೀಡುವ ಭೂ ಪರಿಹಾರಕ್ಕೆ ವಿಧಿಸುತ್ತಿರುವ ಸೇವಾ ಶುಲ್ಕವನ್ನು ಶೇಕಡಾ 7.5ರ ಬದಲಾಗಿ ಶೇಕಡಾ 4ರ ದರದಲ್ಲಿ ನಿಗಧಿಪಡಿಸಿ, ಆದೇಶಿಸಲಾಗಿದೆ.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪಾಲರ ಆದೇಶಾನುಸಾರ ಮತ್ತು ಅವರ ಹೆಸರಿನಲ್ಲಿ ಪಿ.ಆರ್. 1772
ಎ.ಪಿ. ರಾಮಕೃಷ್ಣ
ಸರ್ಕಾರದ ಅಧೀನ ಕಾರ್ಯದರ್ಶಿ (ಕೈ.ಅ)
ವಾಣಿಜ್ಯ ಮತ್ತು ಕೈಗಾರಿಕೆ ಇಲಾಖೆ
ವಾಣಿಜ್ಯ ಮತ್ತು ಕೈಗಾರಿಕೆ ಸಚಿವಾಲಯ
ಸಂಖ್ಯೆ: ಸಿಐ 323 ಎಸ್ಪಿಕ್ಯೂ 2010 ಬೆಂಗಳೂರು, ದಿನಾಂಕ: 26.06.2012
ತಿದ್ದುಪಡಿ
ದಿನಾಂಕ: 27.05.2010ರ ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಸಿಐ 323 ಎಸ್ಪಿಕ್ಯೂ 2010 ಆದೇಶ ಭಾಗದ ನಾಲ್ಕನೇ ಸಾಲಿನಲ್ಲಿ "......ರೂ.10.00 ಲಕ್ಷದ (ಹತ್ತು ಲಕ್ಷ ರೂಪಾಯಿ) ಮಿತಿಗೆ ಹೆಚ್ಚಿಸಿ ಮಂಡಳಿಯ ಮೂಲಗಳಿಂದಲೇ ಈ ಮೊತ್ತವನ್ನು ಮಂಜೂರು ಮಾಡಲು ಆದೇಶಿಸಲಾಗಿದೆ." ಎಂದಿರುವುದನ್ನು "......ರೂ.10.00 ಲಕ್ಷದ (ಹತ್ತು ಲಕ್ಷ ರೂಪಾಯಿ) ಮಿತಿಗೆ ಹೆಚ್ಚಿಸಿ ಮಂಡಳಿಯ ಮೂಲಗಳಿಂದ ಭರಿಸಿ ನಂತರ ಸರ್ಕಾರದಿಂದ ಮರುಪಾವತಿ ಪಡೆಯಲು ಆದೇಶಿಸಲಾಗಿದೆ." ಎಂದು ತಿದ್ದಿ ಓದಿಕೊಳ್ಳತಕ್ಕದ್ದು.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪಾಲರ ಆದೇಶಾನುಸಾರ ಮತ್ತು ಅವರ ಹೆಸರಿನಲ್ಲಿ ಪಿ.ಆರ್. 1771
ಎ.ಪಿ. ರಾಮಕೃಷ್ಣ
ಸರ್ಕಾರದ ಅಧೀನ ಕಾರ್ಯದರ್ಶಿ (ಕೈ.ಅ)
ವಾಣಿಜ್ಯ ಮತ್ತು ಕೈಗಾರಿಕೆ ಇಲಾಖೆಭಾಗ ೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ೨೨೨೫
ಕಾರ್ಮಿಕ ಸಚಿವಾಲಯ
ವಿಷಯ: ಉದ್ಯೋಗ ಮತ್ತು ತರಬೇತಿ ಇಲಾಖೆಯ ತರಬೇತಿ ವಿಭಾಗದ ಪ್ರಾಚಾರ್ಯರು ದರ್ಜೆ-1 / ಉಪ ನಿರ್ದೇಶಕರು, ಪ್ರಾಚಾರ್ಯರು ದರ್ಜೆ-2 / ಸಹಾಯಕ ನಿರ್ದೇಶಕರು, ತರಬೇತಿ ಅಧಿಕಾರಿಗಳು ಮತ್ತು ಆಡಳಿತಾಧಿಕಾರಿಗಳ ಹುದ್ದೆಗಳನ್ನು ಮರುವಿನ್ಯಾಸಗೊಳಿಸುವ ಬಗ್ಗೆ.
ಓದಲಾಗಿದೆ: ಆಯುಕ್ತರು, ಉದ್ಯೋಗ ಮತ್ತು ತರಬೇತಿ ಇಲಾಖೆ ಇವರ ಪತ್ರ ಸಂಖ್ಯೆ ಉತಇ/ತ/ಯೋ-1/ವಿವ-63/2007-08 ದಿನಾಂಕ: 25/05/2012.
ಪ್ರಸ್ತಾವನೆ:
ಮೇಲೆ ಓದಲಾದ ಆಯುಕ್ತರು, ಉದ್ಯೋಗ ಮತ್ತು ತರಬೇತಿ ಇಲಾಖೆ ಇವರ ಪತ್ರದಲ್ಲಿ ಇಲಾಖೆಯ ಆಡಳಿತವನ್ನು ಸುಧಾರಿಸುವ ದೃಷ್ಟಿಯಿಂದ ಪ್ರಾಚಾರ್ಯರು ದರ್ಜೆ-1 / ಉಪ ನಿರ್ದೇಶಕರು, ಪ್ರಾಚಾರ್ಯರು ದರ್ಜೆ-2 / ಸಹಾಯಕ ನಿರ್ದೇಶಕರು, ತರಬೇತಿ ಅಧಿಕಾರಿಗಳು ಮತ್ತು ಆಡಳಿತಾಧಿಕಾರಿಗಳ ಹುದ್ದೆಗಳನ್ನು ಮರುವಿನ್ಯಾಸಗೊಳಿಸುವಂತೆ ಪ್ರಸ್ತಾವನೆಯನ್ನು ಸಲ್ಲಿಸಿರುತ್ತಾರೆ. ಪ್ರಸ್ತಾವನೆಯ ಮುಖ್ಯ ಅಂಶಗಳು ಈ ಕೆಳಗಿನಂತಿವೆ:
1. ಪ್ರಸ್ತುತ ರಾಜ್ಯದಲ್ಲಿ 158 ಸರ್ಕಾರಿ ಕೈಗಾರಿಕಾ ತರಬೇತಿ ಸಂಸ್ಥೆಗಳು ಇದ್ದು, ಈ ಸಂಸ್ಥೆಗಳ ಪೈಕಿ 13 ಸಂಸ್ಥೆಗಳಲ್ಲಿ 700ಕ್ಕೂ ಹೆಚ್ಚಿನ ಪ್ರವೇಶಾವಕಾಶಗಳು ಮಂಜೂರಾಗಿರುವ ಸಂಸ್ಥೆಗಳಿಗೆ ಪ್ರಾಚಾರ್ಯರು ದರ್ಜೆ-1 ಹುದ್ದೆ ಮಂಜೂರಾಗಿದ್ದು, ಈ ಹುದ್ದೆಯ ಮೇಲೆ ಹೆಚ್ಚಿನ ಕಾರ್ಯದ ಒತ್ತಡ ಇರುವುದರಿಂದ ಇಂತಹ ಸಂಸ್ಥೆಗಳಿಗೆ ಒಂದು ಉಪ ಪ್ರಾಚಾರ್ಯರ / ಪ್ರಾಚಾರ್ಯರು ದರ್ಜೆ-2 ಹುದ್ದೆಯನ್ನು ಹೆಚ್ಚುವರಿಯಾಗಿ ಮರುವಿನ್ಯಾಸ ಮಾಡುವುದು.
2. ಈ ರೀತಿ ಪ್ರಾಚಾರ್ಯರು ದರ್ಜೆ-2ರ ಅಧಿಕಾರಿಗಳ ಹುದ್ದೆಗಳನ್ನು ಮರುವಿನ್ಯಾಸಗೊಳಿಸುವುದರಿಂದ ಸದರಿ ಸಂಸ್ಥೆಗಳಲ್ಲಿ ಕಾರ್ಯನಿರ್ವಹಿಸುತ್ತಿರುವ ಆಡಳಿತಾಧಿಕಾರಿ ಹುದ್ದೆಗಳು ಪತ್ರಾಂಕಿತ ಹುದ್ದೆಗಳಾಗಿರುವ ಕಾರಣ ಸದರಿ ಆಡಳಿತಾಧಿಕಾರಿ ಹುದ್ದೆಗಳನ್ನು ಮರುವಿನ್ಯಾಸ ಮಾಡುವುದು.
3. ಪ್ರಸ್ತುತ ರಾಜ್ಯದಲ್ಲಿ ಕಾರ್ಯನಿರ್ವಹಿಸುತ್ತಿರುವ 158 ಕೈಗಾರಿಕಾ ತರಬೇತಿ ಸಂಸ್ಥೆಗಳಲ್ಲಿ ಆರಂಭದಲ್ಲಿ ಮಂಜೂರಾಗಿದ್ದ ವೃತ್ತಿ / ಘಟಕಗಳ ಜೊತೆಗೆ ಕೆಲವು ಕೈಗಾರಿಕಾ ತರಬೇತಿ ಸಂಸ್ಥೆಗಳಲ್ಲಿ ಹೆಚ್ಚುವರಿಯಾಗಿ ಸಿ.ಒ.ಇ ಕಾರ್ಯಕ್ರಮಗಳು ಅನುಷ್ಟಾನಗೊಂಡಿದ್ದು, ಹಾಗೂ ಕೆಲವು ಸಂಸ್ಥೆಗಳಲ್ಲಿ ಬೇಡಿಕೆ ಇಲ್ಲದಿರುವ ವೃತ್ತಿ / ಘಟಕಗಳನ್ನು ಬೇಡಿಕೆ ಇರುವ ಕೈಗಾರಿಕಾ ತರಬೇತಿ ಸಂಸ್ಥೆಗಳಿಗೆ ಸ್ಥಳಾಂತರಣ ಮಾಡಿರುವ ಕಾರಣದಿಂದ ಕೆಲವು ಕೈಗಾರಿಕಾ ತರಬೇತಿ ಸಂಸ್ಥೆಗಳಲ್ಲಿ ಹಿಂದೆ ಮಂಜೂರಾಗಿದ್ದ ವೃತ್ತಿ / ಘಟಕಗಳ್ಲಿ ವ್ಯತ್ಯಾಸವಾಗಿರುವ ಕಾರಣ ಪ್ರಾಚಾರ್ಯರ ಹುದ್ದೆಗಳನ್ನು ಮರುವಿನ್ಯಾಸ ಮಾಡುವುದು.
4. ಉದ್ಯೋಗ ಮತ್ತು ತರಬೇತಿ ಇಲಾಖೆಯ ನಿರ್ದೇಶನಾಲಯದಲ್ಲಿ ಕಾರ್ಯದ ಒತ್ತಡವು ಅಧಿಕವಾಗಿರುವ ಕಾರಣ ನಿರ್ದೇಶನಾಲಯದ ಯೋಜನೆ, ಎಸ್.ಪಿ.ಐ.ಯು ಮತ್ತು ಎಂ.ಇ.ಎಸ್ ವಿಭಾಗಗಳಿಗೆ ಕೈಗಾರಿಕಾ ತರಬೇತಿ ಸಂಸ್ಥೆಗಳಿಂದ ಮೂರು ಪ್ರಾಚಾರ್ಯರು ದರ್ಜೆ-1 ಮತ್ತು ಎರಡು ಪ್ರಾಚಾರ್ಯರು ದರ್ಜೆ-2 ಹುದ್ದೆಗಳನ್ನು ಉಪ ನಿರ್ದೇಶಕರು ಮತ್ತು ಸಹಾಯಕ ನಿರ್ದೇಶಕರ ಹುದ್ದೆಗಳನ್ನಾಗಿ ಸ್ಥಳಾಂತರಿಸುವುದು.
5. ವಿಭಾಗೀಯ ಕಛೇರಿಗಳಲ್ಲೂ ಕಾರ್ಯದೊತ್ತಡವು ಅಧಿಕವಾಗಿರುವ ಕಾರಣ ಬೆಂಗಳೂರು, ಮೈಸೂರು, ಹುಬ್ಬಳ್ಳಿ ಮತ್ತು ಗುಲ್ಬರ್ಗಾ ವಿಭಾಗೀಯ ಕಛೇರಿಗಳಿಗೆ ತಲಾ ಒಂದರಂತೆ ಕೈಗಾರಿಕಾ ತರಬೇತಿ ಸಂಸ್ಥೆಗಳಿಂದ ಪ್ರಾಚಾರ್ಯರು ದರ್ಜೆ-1 ಹುದ್ದೆಯನ್ನು ನಾಲ್ಕು ಉಪ ನಿರ್ದೇಶಕರ ಹುದ್ದೆಗಳನ್ನಾಗಿ ಸ್ಥಳಾಂತರಿಸುವುದು.
6. ಈ ಎಲ್ಲಾ ಬದಲಾವಣೆಗಳ ಹಿನ್ನೆಲೆಯಲ್ಲಿ 100ಕ್ಕಿಂತ ಕಡಿಮೆ ವಿದ್ಯಾರ್ಥಿಗಳನ್ನು ಹೊಂದಿರುವ 23 ಕೈಗಾರಿಕಾ ತರಬೇತಿ ಸಂಸ್ಥೆಗಳಿಗೆ ತರಬೇತಿ ಅಧಿಕಾರಿಗಳನ್ನು ಮರುವಿನ್ಯಾಸಗೊಳಿಸುವುದು.
ಮೇಲಿನ ಪ್ರಸ್ತಾವನೆಯನ್ನು ಪರಿಶೀಲಿಸಿ ಈ ಕೆಳಗಿನಂತೆ ಆದೇಶಿಸಿದೆ.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ ಆಗಸ್ಟ್ ೯, ೨೦೧೨ ಭಾಗ ೧ ೨೨೨೬ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ ಕಾಇ 154 ಇಟಿಐ 2012 ಬೆಂಗಳೂರು, ದಿನಾಂಕ: 20/06/2012
ಉದ್ಯೋಗ ಮತ್ತು ತರಬೇತಿ ಇಲಾಖೆಯ ತರಬೇತಿ ವಿಭಾಗದಲ್ಲಿ ಕಾರ್ಯನಿರ್ವಹಿಸುತ್ತಿರುವ ಪ್ರಾಚಾರ್ಯರು ದರ್ಜೆ-1 / ಉಪ ನಿರ್ದೇಶಕರು, ಪ್ರಾಚಾರ್ಯರು ದರ್ಜೆ-2 / ಸಹಾಯಕ ನಿರ್ದೇಶಕರು, ತರಬೇತಿ ಅಧಿಕಾರಿಗಳು ಹಾಗೂ ಆಡಳಿತಾಧಿಕಾರಿಗಳ ಹುದ್ದೆಗಳನ್ನು ಆಡಳಿತಾತ್ಮಕ ದೃಷ್ಟಿಯಿಂದ ಅವಶ್ಯಕತೆಗನುಗುಣವಾಗಿ ಈ ಆದೇಶಕ್ಕೆ ಲಗತ್ತಿಸಿರುವ ಅನುಬಂಧದಂತೆ ಮರುವಿನ್ಯಾಸಗೊಳಿಸಲು ಮಂಜೂರಾತಿ ನೀಡಿದೆ.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪಾಲರ ಆದೇಶಾನುಸಾರ ಮತ್ತು ಅವರ ಹೆಸರಿನಲ್ಲಿ.
ಜೆ.ಎಸ್.ವಿಶ್ವನಾಥಪ್ಪ,
ಪೀಠಾಧಿಕಾರಿ,
ಕಾರ್ಮಿಕ ಇಲಾಖೆ.
(ಉದ್ಯೋಗ ಮತ್ತು ತರಬೇತಿ)
ಅನುಬಂಧ
ಮರುವಿನ್ಯಾಸಗೊಳಿಸಿರುವ ಹುದ್ದೆಗಳ ಪಟ್ಟಿ
| ಕ ್ರ. ಸಂ | ಕ ೖ.ತ.ಸಂಸ್ಥೆಯ/ ೆ ಕ ಛೇರಿಯ ಹೆಸರು | ವ ುಂಜೂರಾ ಗಿರುವ ಸ್ಥಾನಗಳು ವಿದ್ಯಾರ್ಥಿಗಳ ಸಂಖ್ಯೆ) | ವ ುಂಜೂರಾಗಿರುವ ಹ ುದ್ದೆಗಳು | ಅಗತ್ಯಕ್ಕೆ ತಕ್ಕಂತೆ ಮರು ವಿನ್ಯಾಸಗೊಳಿಸಿರುವ ಹುದ್ದೆಗಳು | ರಾ | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||
| ಎ | ಬಿ | ಸಿ | ಎ | ಬಿ | ಸಿ | ಡಿ | ||||
| 1 | ಹ ೂಸೂರು ರಸ್ತೆ, ೆ (ಪು) ಬೆಂ29 | 1924 | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ2 1+1 ಹುದ್ದೆಗಳು | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಪ್ರಾ.ದರ್ಜೆ2 ರ 1 ಹುದ್ದೆ | |
| 2 | ತುಮಕೂರು ರಸೆ ್ತ , ಬೆಂ29 | 1373 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಪ್ರಾ.ದರ್ಜೆ2 ರ 1 ಹುದ್ದೆ | ||
| 3 | ಮೈಸೂರು7 | 1293 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಪ್ರಾ.ದರ್ಜೆ2 ರ 1 ಹುದ್ದೆ | ||
| 4 | ಹ ುಬ್ಬಳ್ಳಿ | 1220 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಪ್ರಾ.ದರ್ಜೆ2 ರ 1 ಹುದ್ದೆ | ||
| 5 | ಕೆ.ಜಿ.ಎಫ್ | 1062 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಪ್ರಾ.ದರ್ಜೆ2 ರ 1 ಹುದ್ದೆ | ||
| 6 | ದಾವಣಗೆರೆ | 1056 | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಪ್ರಾ.ದರ್ಜೆ2 ರ 1 ಹುದ್ದೆ+ಆ.ಅ | |||
| 7 | ಬಳ್ಳಾರಿ | 1005 | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಪ್ರಾ.ದರ್ಜೆ2 ರ 1 ಹುದ್ದೆ+ಆ.ಅ | |||
| 8 | ಮಂಗಳೂರು (ಪು) | 998 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಪ್ರಾ.ದರ್ಜೆ2 ರ 1 ಹುದ್ದೆ | ||
| 9 | ಭದ್ರಾವತಿ | 958 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಪ್ರಾ.ದರ್ಜೆ2 ರ 1 ಹುದ್ದೆ | ||
| 10 | ಗ ುಲ್ಬರ್ಗಾ(ಪು) | 836 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಪ್ರಾ.ದರ್ಜೆ2 ರ 1 ಹುದ್ದೆ | ||
| 11 | ಬಿಜಾಪುರ | 830 | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಪ್ರಾ.ದರ್ಜೆ2 ರ 1 ಹುದ್ದೆ+ಆ.ಅ | |||
| 12 | ಬೆಳಗಾವಿ(ಪು) | 724 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಪ್ರಾ.ದರ್ಜೆ1 ರ 1 ಹುದ್ದೆ+ಆ.ಅ | |||
| 13 | ರಾಯಚೂರು | 720 | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಪ್ರಾ.ದರ್ಜೆ2 ರ 1 ಹುದ್ದೆ+ಆ.ಅ | |||
| 14 | ಹ ಳಿಯಾಳ | 624 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 15 | ಹ ೂನ್ನಾವರ ೆ | 618 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 16 | ಮಡಿಕೇರಿ | 610 | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 ರ ಜೊತೆ ಆ.ಅಧಿಕಾರಿ 1 ಹುದ್ದೆ | ||||
| 17 | ಹ ೂವಿನ ಹಡಗಲಿ | 561 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 18 | ಕನಕಪುರ | 540 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 19 | ಹ ೂಳೆ ನರಸೀಪುರ ೆ | 514 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 20 | ಹಾಸನ | 504 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 21 | ಮಳವಳ್ಳಿ | 482 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 22 | ಶಿವಮೊಗ್ಗ(ಮ) | 481 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 23 | ಮಂಡ್ಯ | 476 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 24 | ಚಿತ್ರದುರ್ಗ(ಮ) | 439 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 25 | ತಿಪಟೂರು(ಮ) | 439 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 26 | ಪುತ್ತೂರು(ಮ) | 434 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 27 | ಗೌರಿಬಿದನೂರು(ಮ) | 434 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 28 | ಬಿ.ಟಿ.ಸೆಂಟರ್, ಬೆಂ22 | 429 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 29 | ಕಾರವಾರ | 414 | ಪ್ರಾ.ದರ್ಜೆ1 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 ರ ಜೊತೆ ಆ.ಅಧಿಕಾರಿ ಹುದ್ದೆ | ||||
| 30 | ಬೀದರ್ | 408 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ,ದರ್ಜೆ2 ರ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ1 ರ ಹುದ್ದೆ + ಆ.ಅ ಹುದ್ದೆ | ||||
| 31 | ದೇವರಾಯಸಮುದ್ರ | 398 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಒಂದು ಆ.ಅ. ಹುದ್ದೆ | ||||
| 32 | ಕುಕನೂರು | 388 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 33 | ನಂಜನಗೂಡು | 387 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 34 | ಗ ುರುಮಿಟ್ಕ್ | 371 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 35 | ಅಂಕೋಲ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 36 | ಹ ೂಸಕೋಟೆ ೆ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 37 | ಹ ುಬ್ಬಳ್ಳಿಧಾರವಾಡ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 38 | ಸಾಗರ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 39 | ಶಿಗ್ಗಾಂವ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 40 | ಬೇಗೂರು | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 41 | ಹಿರಿಯೂರು | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 42 | ಕುಣಿಗ್ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 43 | ಮಾಗಡಿ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 44 | ಮುಳಬಾಗಿಲು | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 45 | ನ ಾಗಮಂಗಲ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 46 | ಶಿಡ್ಲಘಟ್ಟ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 47 | ಶ್ರೀರಂಗಪಟ್ಟಣ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 48 | ಅಫ್ಜಲ್ಪುರ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ ಆ.ಅ ಹುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 49 | ಆಲೂರು | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 50 | ಬಾಗೂರು | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 51 | ಬಸವಕ್ಯಾಣ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 52 | ಬೇಲೂರು | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 53 | ಭಟ್ಕಳ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 54 | ಬಿಡ್ಕ್ ಕಟ್ಟೆ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 55 | ಚಿನಕುರಳಿ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 56 | ದೇವದುರ್ಗ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 57 | ಗ ೂೕಕಾಕ ೆ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 58 | ಹ ರಿಹರಪುರ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 59 | ಹಾರೋಹಳ್ಳಿ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 60 | ಇಟಗಿ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 61 | ಜಗಳೂರು | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 62 | ಕೆಸ್ತೂರು | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 63 | ಕಿತ್ತೂರು | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 64 | ಕುಡುತಿನಿ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 65 | ಮೊಸಳೆ ಹೊಸಹಳ್ಳಿ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 66 | ನವಲಗುಂದ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 67 | ಸ ಕೇಶಪುರ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹ ುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 68 | ಸ ಖರಾಯಪಟ್ಟಣ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 69 | ಸಾಲಿಗ್ರಾಮ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 70 | ಉದಯಪುರ | 368 | ಪ್ರಾ.ದರ್ಜೆ1 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ,ದರ್ಜೆ1+ಆ.ಅ ಹುದ್ದೆ ಬದಲು ಪ್ರಾ.ದರ್ಜೆ2 ರ ಹುದ್ದೆ | ||||
| 71 | ಸ ಂಡೂರು | 368 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 72 | ಕೊಪ್ಪ | 368 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 73 | ಕೊರಟಗೆರೆ | 368 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 74 | ಗ ುಡಿಬಂಡೆ | 368 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 75 | ಸಿದ್ದಾಪುರ | 368 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 76 | ಸ ೂರಬ ೆ | 368 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 77 | ಬಾಗಲಕೋಟೆ(ಮ) | 355 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 78 | ನಾಲತ್ತವಾಡ(ಮ) | 324 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 79 | ಕೊಪ್ಪಳ | 294 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 80 | ಪಡುವಲಹಿಪ್ಪೆ | 263 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 81 | ಯಲಬುರ್ಗಾ | 252 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಪ್ರಾ.ದರ್ಜೆ2ರ ಹುದ್ದೆ | ||||
| 82 | ಔರಾದ್ | 252 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 83 | ಹಿರೇಕೆರೂರು | 252 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 84 | ಹ ೂಸಕೆರೆಹಳ್ಳಿ, ಬೆಂ85 ೆ | 252 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 85 | ತೀರ್ಥಹಳ್ಳಿ | 252 | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಪ್ರಾ.ದರ್ಜೆ2 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | |||
| 86 | ಜೇವರ್ಗಿ | 242 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 87 | ಮೈಸೂರು8 | 231 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 88 | ರಾಮನಗರ | 221 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 89 | ಮದ್ದೂರು | 215 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 90 | ವಿವೇಕನಗರಬೆಂ27 | 210 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 91 | ಆಲೂರು ಸಿದ್ದಾಪುರ | 200 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 92 | ಗ ಂಗಾವತಿ | 200 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 93 | ಮುಂಡಗೋಡು | 200 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 94 | ಬೆಳಗಾವಿ8(ಮ) | 199 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 95 | ಹ ೆಚ್.ಡಿ.ಕೋಟೆ | 194 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 96 | ಜಮಖಂಡಿ | 194 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 97 | ನ ರಗುಂದ | 194 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 98 | ಸ ದಲಗಾ | 194 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 99 | ವಿಟ್ಲ | 194 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 100 | ಬೀಳಗಿ | 184 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 101 | ಚಿಕ್ಕಮಗಳೂರು | 184 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 102 | ತರೀಕೆರೆ | 184 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 103 | ಕೆ.ಆರ್.ಪೇಟೆ | 179 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 104 | ಶಿಕಾರಿಪುರ | 179 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 105 | ಹ ೂಸೂರು ರಸ್ತೆ, ೆ (ಮ) ಬೆಂ29 | 178 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 106 | ಕೋಾರ (ಮ) | 178 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 107 | ಉಡುಪಿ | 173 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 108 | ಧಾರವಾಡ | 168 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 109 | ಕೊಳ್ಳೇಗಾಲ | 168 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 110 | ಗ ದಗಬೆಟಗೇರಿ | 157 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 111 | ಹ ೂಸಪೇಟೆ ೆ | 152 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 112 | ಪೊನ್ನಂಪೇಟೆ (ಮ) | 152 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 113 | ರಾಮದುರ್ಗ | 152 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 114 | ತುರುವೇಕೆರೆ | 152 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 115 | ಅಮ್ಮಸಂದ್ರ | 148 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 116 | ದೇವನಹಳ್ಳಿ | 148 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 117 | ಗ ುಲ್ಬರ್ಗಾ (ಮ) | 147 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 118 | ಮಂಗಳೂರು (ಮ) | 136 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 119 | ಅಕ್ಕಿ ಆಲೂರು | 126 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 120 | ಅರಸೀಕೆರೆ | 126 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 121 | ಬಬೇಶ್ವರ | 126 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 122 | ಭರಮಸಾಗರ | 126 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 123 | ಹ ನುಮಸಾಗರ | 126 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 124 | ಕಡೂರು | 126 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 125 | ಪಾವಗಡ | 126 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 126 | ಸ ವದತ್ತಿ | 126 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 127 | ಸಿರಾ | 126 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 128 | ಸ ೂಡಿ | 126 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 129 | ತಳಕ್ ಗ್ರಾಮ | 126 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 130 | ತುಮಕೂರು | 116 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 131 | ಗ ುಂಡ್ಲುಪೇಟೆ (ಮ) | 110 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 132 | ಹ ುಣಸೂರು | 110 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 133 | ಪಾಂಡವಪುರ | 110 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 134 | ಪಿರಿಯಾಪಟ್ಟಣ | 110 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 135 | ಚಳ್ಳಕೆರೆ | 100 | ಪ್ರಾ.ದರ್ಜೆ2 | ಪ್ರಾ.ದರ್ಜೆ2 | ಬದಾವಣೆ ಇಲ್ಲ | |||||
| 136 | ಚನ್ನರಾಯಪಟ್ಟಣ | 89 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 137 | ದಾಂಡೇಲಿ (ಮ) | 89 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 138 | ಅರಕಲಗೂಡು | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 139 | ಬಾಗೇಪಲ್ಲಿ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 140 | ಬೆಳ್ತಂಗಡಿ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 141 | ಚನ್ನಗಿರಿ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 142 | ಚಿಂಚೋಳಿ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 143 | ಗ ುಳೇದಗುಡ್ಡ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 144 | ಗ ುತ್ತಲ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 145 | ಹ ುಮನಾಬಾದ್ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 146 | ಕೆ.ಎಂ.ದೊಡ್ಡಿ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 147 | ಕಲಘಟಗಿ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 148 | ಕೂಡ್ಲಿಗಿ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 149 | ಲಿಂಗಸಗೂರು | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 150 | ಮಂಗಳೂರು ಗ್ರಾಮ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 151 | ಮುದಗ್ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 152 | ಮುಂಡರಗಿ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 153 | ನ ೇಸರ್ಗಿ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 154 | ನಿಪ್ಪಾಣಿ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 155 | ಪಾಳಾಗ್ರಾಮ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 156 | ಪೆರಡೂರು | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 157 | ವಿಠಾಪುರ | 84 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 158 | ವಾಡಿ | 58 | ಪ್ರಾ.ದರ್ಜೆ2 | ತ.ಅ | ||||||
| 159 | ನಿರ್ದೇಶನಾಲಯ | ಉ.ನಿ1 | ಸ .ನಿ 1 | ಆ.ಅ | ಉ.ನಿ1 | ಸ .ನಿ 1 | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿ ಉ.ನಿ 3 ಹುದ್ದೆಗಳು ಮತ್ತು ಸ.ನಿರ್ದೇಶಕರ 2 ಹುದ್ದೆಗಳು | ||
| ಉ.ನಿ2 | ಸ .ನಿ 2 | ಉ.ನಿ2 | ಸ .ನಿ 2 | |||||||
| ಉ.ನಿ3 | ಸ .ನಿ 3 | ಉ.ನಿ3 | ಸ .ನಿ 3 | |||||||
| ಸ .ನಿ 4 | ಉ.ನಿ4 | ಸ .ನಿ 4 | ||||||||
| ಸ .ನಿ 5 | ಉ.ನಿ5 | ಸ .ನಿ 5 | ||||||||
| ಉ.ನಿ6 | ಸ .ನಿ 6 | |||||||||
| ಸ .ನಿ 7 | ||||||||||
| 160 | ವಿ.ಕ.ಬೆಂಗಳೂರು | 3 ಸ.ನಿ | ಆ.ಅ | ಹ ೆ ಚ್ಚುವರಿಯಾಗಿ 1 ಉ.ನಿ | 3 ಸ.ನಿ | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿಯಾಗಿ 1 ಉ.ನಿ ಹುದ್ದೆ | |||
| 161 | ವಿ.ಕ.ಮೈಸೂರು | 2 ಸ.ನಿ | ಆ.ಅ | ಹ ೆ ಚ್ಚುವರಿಯಾಗಿ 1 ಉ.ನಿ | 2 ಸ.ನಿ | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿಯಾಗಿ 1 ಉ.ನಿ ಹುದ್ದೆ | |||
| 162 | ವಿ.ಕ.ಬೆಳಗಾವಿ | 2 ಸ.ನಿ | ಆ.ಅ | ಹ ೆ ಚ್ಚುವರಿಯಾಗಿ 1 ಉ.ನಿ | 2 ಸ.ನಿ | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿಯಾಗಿ 1 ಉ.ನಿ ಹುದ್ದೆ | |||
| 163 | ವಿ.ಕ.ಗುಲ್ಬರ್ಗಾ | 2 ಸ.ನಿ | ಆ.ಅ | ಹ ೆ ಚ್ಚುವರಿಯಾಗಿ 1 ಉ.ನಿ | 2 ಸ.ನಿ | ಆ.ಅ | ಹ ೆಚ್ಚುವರಿಯಾಗಿ 1 ಉ.ನಿ ಹುದ್ದೆ | |||
| 164 | ಐ.ಟಿ.ಡಬ್ಲ್ಯೂ, ದಾವಣಗೆರೆ | ಉ.ನಿ1 | ಸ .ನಿ 1 | ಆ.ಅ | ಉ.ನಿ1 | ಸ .ನಿ.1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | ||
| ಸ .ನಿ 2 | ಸ .ನಿ.2 | |||||||||
| 165 | ಸ್ಟಾರ್ಕ, ಮಳವಳ್ಳಿ | ಉ.ನಿ1 | ಸ .ನಿ 1 | ಆ.ಅ | ಉ.ನಿ1 | ಸ .ನಿ.1 | ಆ.ಅ | ಬದಾವಣೆ ಇಲ್ಲ | ||
| ಸ .ನಿ 2 | ಸ .ನಿ.2 | |||||||||
| ಸ .ನಿ 3 | ಸ .ನಿ.3 | |||||||||
| ಸ .ನಿ 4 | ಸ .ನಿ.4 | |||||||||
| ಒಟ್ಟು | 55 | 128 | 57 | 55 | 128 | 57 | 23 |
ಜೆ.ಎಸ್.ವಿಶ್ವನಾಥಪ್ಪ
ಪೀಠಾಧಿಕಾರಿ,
ಕಾರ್ಮಿಕ ಇಲಾಖೆ, ಪಿ.ಆರ್. 1728
(ಉದ್ಯೋಗ ಮತ್ತು ತರಬೇತಿ)