Sub : Proposal of M/s. Leadage Metals Ltd., - to establish ``Smelting & Refining of
Lead Unit'' at Vemgal Industrial Area, Kolar District – Reg.
Ref : Proceedings of the 33rd State High Level Clearance Committee (SHLCC)
meeting held on 19.11.2013.
PREAMBLE:
M/s. Leadage Metals Ltd., has proposed to establish ``Smelting & Refining of Lead Unit'', with an investment of Rs. 80.52 crore, generating employment to about 205 persons at Vemgal Industrial Area, Kolar District.
The proposal was examined in the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013.Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 9 SPI 2014, BANGALORE, DATED: 03.01.2014
Government is pleased to accord in principle approval to the investment proposal of M/s. Leadage Metals Ltd., to establish ``Smelting & Refining of Lead Unit'', with an investment of Rs. 80.52 crore at Vemgal Industrial Area, Kolar District, generating
| Land : | KIADB to allot 12 acres of land at Vemagal Industrial Area, Kolar District |
| Power: | 4187 KVA from BESCOM. |
| Water: | 85000 LPD form KIADB/Rain water harvesting/Own source/Recycled water |
| Incentives & Concessions: | The unit is eligible to avail incentives and concessions as per the applicable Industrial Policy of the state. |
Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:
1. Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if applicable.
2. Employment : The Company shall comply with the provisions of Industrial Policy of Govt. of Karnataka and Dr. Sarojini Mahishi Report,. Prepare a plan for development of Human Resources required for the project, train local people. A copy of Human Resources Development plan shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
(೬೪೧)
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ಭಾಗ ೧ ೬೪೨ 3. Vendor Development : Wherever there is scope for vendor development for the project, the company shall prepare avendor development plan, develop local vendors and procure the required inputs, components and sub-assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development : The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit and comply with the stipulation of Company Act 2013. A copy of such projects shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
5. Others :
a) The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable.
b) The company shall take all statutory and other necessary clearances from the competent authorities including Govt. of India and shall submit milestones/progress in the implementation of the project regularly, which will be monitored by the Department.
This approval is valid for a period of two years from the date of issue of this Government Order.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
PR 257
COMMERCE AND INDUSTRIES SECRETARIAT
Sub : Proposal of M/s. TMEIC Industrial Systems India Pvt. Ltd., - to establish
``Rotating Motors and Power Electrical equipments Manufacturing Unit'' at
Vasantha Narasapur Industrial Area, Tumkur Taluk, Tumkur District- Reg.
Ref : Proceedings of the 33rd State High Level Clearance Committee (SHLCC)
meeting held on 19.11.2013.
PREAMBLE:
M/s. TMEIC Industrial Systems India Pvt. Ltd., - has proposed to establish a ``Rotating Motors and Power Electrical equipments Manufacturing Unit'' with an investment of Rs. 250.00 crore, generating employment to about 548 persons at Vasantha Narasapur Industrial Area, Tumkur Taluk, Tumkur District
The proposal was examined in the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013.Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 10 SPI 2014, BANGALORE, DATED: 03.01.2014
Government is pleased to accord in principle approval to the investment proposal of M/s. TMEIC Industrial Systems India Pvt. Ltd., to establish a ``Rotating Motors and Power Electrical Equipments Manufacturing Unit'' with an investment of Rs. 250.00 crore, at Vasantha Narasapur Industrial Area, Tumkur Taluk, Tumkur District generating employment to about 548 persons with the following
| Land : | KIADB to allot 15 acres of land at Vasantha Narasapur Industrial Area, Tumkur District |
| Power: | 4000 KVA from BESCOM. |
| Water: | 60 KLPD form KIADB |
| Incentives & Concessions: | The unit is eligible to avail incentives and concessions as per the applicable Industrial Policy of the state. |
Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:
1. Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if applicable.
2. Employment : The Company shall comply with the provisions of Industrial Policy of Govt. of Karnataka and Dr. Sarojini Mahishi Report,. Prepare a plan for development of Human Resources required for the project, train local people. A copyಭಾಗ ೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ೬೪೩ of Human Resources Development plan shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
3. Vendor Development : Wherever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub-assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development : The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the units. A copy of such projects shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
5. Others :
a) The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable.
b) The company shall take all statutory and other necessary clearances from the competent authorities including Govt. of India and shall submit milestones/progress in the implementation of the project regularly, which will be monitored by the Department.
This approval is valid for a period of two years from the date of issue of this Government Order.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
PR 258
COMMERCE AND INDUSTRIES SECRETARIAT
Sub : Proposal of M/s. Volvo India Pvt. Ltd., - to establish ``Commercial Vehicles
Manufacturing Unit'' at Sonnenyakanahalli, Malur Taluk, Kolar District- Reg.
Ref : Proceedings of the 33rd State High Level Clearance Committee (SHLCC)
meeting held on 19.11.2013.
PREAMBLE:
M/s.Volvo India Pvt. Ltd., has proposed to establish a ``Commercial Vehicles (Truckas & Buses) Manufacturing Unit'' with an investment of Rs. 974.00 crore, generating employment to about 2125 persons at Sonnenyakanahalli, Malur Taluk, Kolar District. The proposal was examined in the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013.Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 11 SPI 2014, BANGALORE, DATED: 03.01.2014
Government is pleased to accord in principle approval to the investment proposal of M/s Volvo India Pvt. Ltd., to establish a ``Commercial Vehicles (Trucks & Buses) Manufacturing Unit'', with an investment of Rs. 974.00 crore at Sonnenyakanahalli, Malur Taluk, Kolar District, generating employment to about 2125 persons with the following infrastructure facilities, incentives and
| Land : | 90 acres of land in the following Sy. Nos. to be acquired and allotted through KIADB as SUC (80% consent) or to be purchased U/s 109 of KLR Act and conversion of the same, subject to the approval of Hosakote Planning Authority wherever applicable. Sonnenayakanahalli, Malur Taluk - 69 acres in various Sy.Nos. 33/P 1, 33/P2, 33/P3, 33/P4, 33/P5, 33/P6, 33/P7, 33/P8, 33/P9, 33/P10, 33/P11, 33/P12, 33/P13, 33/P14,33/P15, 33/P16, 33/P17, 33/P18, 33/P19, 57, 58, 59, 62, 63, 64, 65, 66 and Manchappanahalli, Hoskote Taluk - 21 acres in various Sy.Nos. 114/Pl, 114/P2, 114/P2/P1, 114/P3, 114/P4, 114/P5, 114/P6, 114/P7, 114/P8, 114/P9, 114/P10, 114/P11, 114/P12, 114/P13, 114/P14, 114/P15, 114/P16. |
| Power: | 1200 KVA from BESCOM. |
| Water: | 12 Lakhs LPD from own source |
| Incentives & Concessions: | The unit is eligible to avail incentives and concessions as per the applicable Industrial Policy of the state. |
Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:
1. Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if applicable.
2. Employment : The Company shall comply with the provisions of Industrial Policy of Govt. of Karnataka and Dr. Sarojini Mahishi Report,. Prepare a plan for development of Human Resources required for the project, train local people. A copy of Human Resources Development plan shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
3. Vendor Development : Wherever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub-assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development : The Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit and comply with the stipulation of Company Act 2013. A copy of such projects shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
5. Others :
a) The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable.
b) The company shall take all statutory and other necessary clearances from the competent authorities including Govt. of India and shall submit milestones/progress in the implementation of the project regularly, which will be monitored by the Department.
This approval is valid for a period of two years from the date of issue of this Government Order.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
PR 259
ಆರೋಗ್ಯ ಮತ್ತು ಕುಟುಂಬ ಕಲ್ಯಾಣ ಸಚಿವಾಲಯ
ವಿಷಯ: ಸರ್ಕಾರಿ ಆಯುರ್ವೇದ ವೈದ್ಯಕೀಯ ಮಹಾವಿದ್ಯಾಲಯ, ಮೈಸೂರು ಇಲ್ಲಿನ ಉಪನ್ಯಾಸಕರುಗಳ
ಪರಿವೀಕ್ಷಣಾ ಅವಧಿಯನ್ನು ಘೋಷಿಸುವ ಬಗ್ಗೆ.
ಓದಲಾಗಿದೆ:
1. ಆಯುಷ್ ನಿರ್ದೇಶಕರ ಪತ್ರ ಸಂಖ್ಯೆ/63/ಸಿಬ್ಬಂದಿ (1)/2013-14, ದಿನಾಂಕ 24-01-2014. 2. ಅಧಿಸೂಚನೆ ಸಂಖ್ಯೆ : ಆಕುಕ 110 ಪಿಟಿಡಿ 2009, ದಿನಾಂಕ 22-07-2011.
ಪ್ರಸ್ತಾವನೆ:
ಮೇಲೆ ಓದಲಾದ ಪತ್ರದಲ್ಲಿ, ನಿರ್ದೇಶಕರು, ಆಯುಷ್ ಇಲಾಖೆ ಇವರು ಆಯುಷ್ನ ವಿವಿಧ ಸರ್ಕಾರಿ ವೈದ್ಯಕೀಯ ಮಹಾವಿದ್ಯಾಲಯಗಳಲ್ಲಿ ಗುತ್ತಿಗೆ ಆಧಾರದ ಮೇಲೆ ಕರ್ತವ್ಯ ನಿರ್ವಹಿಸುತ್ತಿದ್ದ 56 ಜನ ಉಪನ್ಯಾಸಕರುಗಳ ಸೇವೆಯನ್ನು ಸರ್ಕಾರದ ಅಧಿಸೂಚನೆ ಸಂಖ್ಯೆ : ಆಕುಕ 110 ಪಿಟಿಡಿ 2009, ದಿನಾಂಕ 22-07-2011 ರನ್ವಯ ಸಕ್ರಮಗೊಳಿಸಲಾಗಿದ್ದು, ಇದರಲ್ಲಿ ಮೈಸೂರಿನ ಸರ್ಕಾರಿ ಆಯುರ್ವೇದ ವೈದ್ಯಕೀಯ ಮಹಾವಿದ್ಯಾಲಯದಲ್ಲಿ ಕರ್ತವ್ಯ ನಿರ್ವಹಿಸುತ್ತಿರುವ 13 ಜನ ಉಪನ್ಯಾಸಕರುಗಳಾದ ಡಾ|| ಸುಮನ್, ಡಾ|| ಮಮತಾಶ್ರೀ ಎಸ್, ಡಾ|| ವಿಜಯಲಕ್ಷ್ಮಿ ಜೆ.ಹೆಚ್, ಡಾ|| ಆದರ್ಶ ಎಸ್.ಜಿ., ಡಾ|| ಸಂಜಯ ಕುಮಾರ್ ಎಂ.ಡಿ., ಡಾ|| ವಾಸುದೇವ ಆನಂದರಾವ್ ಚಾಟೆ, ಡಾ|| ರಾಜು ಜಿ. ಕುರಣಿ, ಡಾ|| ನಳಿನಿ ಎನ್., ಡಾ|| ನಾಗೇಶ್ ಹೆಚ್.ಡಿ., ಡಾ|| ಅರವಿಂದ್ ಯಾದವ್. ಎಸ್., ಡಾ|| ಮುಸ್ತಕ್ ಅಹಮದ್ ನೆಗಳೂರು, ಡಾ|| ಆನಂದ ಕಟ್ಟಿ ಮತ್ತು ಡಾ|| ಅನುರೂಪ ಹೆಚ್.ಕೆ. ಇವರುಗಳು ದಿನಾಂಕ 26-07-2011 ರಂದು ಅವರುಗಳು ಆಯ್ಕೆಯಾಗಿರುವ ಉಪನ್ಯಾಸಕರ ಹುದ್ದೆಯ ಸೇವೆಗೆ ಹಾಜರಾಗಿದ್ದು, ಅವರ ಪರೀಕ್ಷಾರ್ಥ ಅವಧಿಯು ದಿನಾಂಕ 25.07.2013 ರಂದು ಅಪರಾಹ್ನ ಮುಕ್ತಾಯವಾಗಿರುತ್ತದೆಂದು, ಈ ಎಲ್ಲಾ ಉಪನ್ಯಾಸಕರುಗಳು ಹುದ್ದೆಗೆ ನಿಗದಿಪಡಿಸಿರುವ ಇಲಾಖಾ ಪರೀಕ್ಷೆಗಳನ್ನು ಪಾಸು ಮಾಡಿದ್ದು, ಇವರುಗಳ ಎರಡು ವರ್ಷಗಳ ಕಾರ್ಯನಿರ್ವಹಣಾ ವರದಿಗಳಲ್ಲಿ ಯಾವುದೇ ಪ್ರತಿಕೂಲ ಷರಾಗಳು ಇಲ್ಲವೆಂದು ಹಾಗೂ ಯಾವುದೇ ಇಲಾಖಾ ವಿಚಾರಣೆ ಇರುವುದಿಲ್ಲವೆಂಬುದನ್ನು ದೃಡೀಕರಿಸುತ್ತಾ, ಸದರಿ ಉಪನ್ಯಾಸಕರುಗಳ ಖಾಯಂಪೂರ್ವ ಅವಧಿಯನ್ನು ತೃಪ್ತಿಕರವೆಂದು ಘೋಷಿಸುವ ಬಗ್ಗೆ ಸರ್ಕಾರದ ಹಂತದಲ್ಲಿ ನಿರ್ಣಯ ತೆಗೆದುಕೊಳ್ಳುವಂತೆ ಕೋರಿ ಪ್ರಸ್ತಾವನೆಯನ್ನು ಸಲ್ಲಿಸಿರುತ್ತಾರೆ.
ಮೇಲೆ ಕ್ರಮಸಂಖ್ಯೆ (2) ರಲ್ಲಿ ಓದಲಾದ ಅಧಿಸೂಚನೆಯಲ್ಲಿ ಆಯುಷ್ನ ವಿವಿಧ ಸರ್ಕಾರಿ ವೈದ್ಯಕೀಯ ಮಹಾವಿದ್ಯಾಲಯಗಳಲ್ಲಿ ಗುತ್ತಿಗೆ ಆಧಾರದ ಮೇಲೆ ಕಾರ್ಯ ನಿರ್ವಹಿಸುತ್ತಿದ್ದ 56 ಜನ ಉಪನ್ಯಾಸಕರುಗಳ ಸೇವೆಯನ್ನು ಸರ್ಕಾರಿ ಸೇವೆಯಲ್ಲಿ ವಿಲೀನಗೊಳಿಸಲಾಗಿರುತ್ತದೆ.
ಭಾಗ ೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ೬೪೫ಪ್ರಸ್ತಾವನೆಯನ್ನು ಕೂಲಂಕಷವಾಗಿ ಪರಿಶೀಲಿಸಿರುವ ಸರ್ಕಾರವು, ಗುತ್ತಿಗೆ ಆಧಾರದ ನೇಮಕಾತಿಯಿಂದ ಸೇವಾ ಸಕ್ರಮಗೊಂಡು ಮೈಸೂರಿನ ಸರ್ಕಾರಿ ಆಯುರ್ವೇದ ವೈದ್ಯಕೀಯ ಮಹಾವಿದ್ಯಾಲಯದಲ್ಲಿ ಕರ್ತವ್ಯ ನಿರ್ವಹಿಸುತ್ತಿರುವ ಈ ಕೆಳಕಂಡ 13 ಜನ ಉಪನ್ಯಾಸಕರುಗಳು ಅವರುಗಳ ಪರಿವೀಕ್ಷಣಾ ಅವಧಿಯನ್ನು ತೃಪ್ತಿಕರವಾಗಿ ಪೂರೈಸಿರುತ್ತಾರೆಂದು ಘೋಷಿಸಲು ನಿರ್ಧರಿಸಿದೆ. ಆದುದರಿಂದ ಈ ಕೆಳಕಂಡ ಆದೇಶ.
ಸರ್ಕಾರದ ಆದೇಶ ಸಂಖ್ಯೆ: ಆಕುಕ 62 ಪಿಟಿಡಿ 2014, ಬೆಂಗಳೂರು, ದಿನಾಂಕ: 22-02-2014
ಪ್ರಸ್ತಾವನೆಯಲ್ಲಿ ವಿವರಿಸಿರುವ ಅಂಶಗಳ ಹಿನ್ನೆಲೆಯಲ್ಲಿ, ಕರ್ನಾಟಕ ಸರ್ಕಾರಿ ಸೇವಾ (ಪರಿವೀಕ್ಷಣೆ) ನಿಯಮಗಳು, 1977ರ ನಿಯಮ 5(1)(ಎ) ರನ್ವಯ ಮೈಸೂರಿನ ಸರ್ಕಾರಿ ಆಯುರ್ವೇದ ವೈದ್ಯಕೀಯ ಮಹಾವಿದ್ಯಾಲಯದಲ್ಲಿ ಕರ್ತವ್ಯ ನಿರ್ವಹಿಸುತ್ತಿರುವ ಈ ಕೆಳಕಂಡ 13 ಜನ ಉಪನ್ಯಾಸಕರುಗಳು ಅವರುಗಳ ಹೆಸರುಗಳ ಮುಂದೆ ನಮೂದಿಸಿದ ದಿನಾಂಕದಂದು ಪರಿವೀಕ್ಷಣಾ ಅವಧಿಯನ್ನು ತೃಪ್ತಿಕರವಾಗಿ ಪೂರೈಸಿರುತ್ತಾರೆಂದು ಘೋಷಿಸಲಾಗಿದೆ.
| ; | <-/ | /='' / | / | - >(?@ಂ !'/ಃ ಅ2,-ಆ" / |
| 6 | 1 | ಇ | 7 | ಈ |
| , | ಖಖಖ. | ,,<ಂಃಅ;<<ಆ $ ;;=<ಇ=;<,, | ;5=<ಇ=;<,, | ;ಒ=<ಇ=;<,6 #& |
| ; | ಖಖಖ1ಖಿ2ಗ. | ,,<ಂಃಅ;<<ಆ $ ;;=<ಇ=;<,, | ;5=<ಇ=;<,, | ;ಒ=<ಇ=;<,6 #& |
| 6 | ಖಖಖಓ !ಗಿಘಙ+ ?.+ | ,,<ಂಃಅ;<<ಆ $ ;;=<ಇ=;<,, | ;5=<ಇ=;<,, | ;ಒ=<ಇ=;<,6 #& |
| > | ಖಖಖ0ಗ.+ಙ+ | ,,<ಂಃಅ;<<ಆ $ ;;=<ಇ=;<,, | ;5=<ಇ=;<,, | ;ಒ=<ಇ=;<,6 #& |
| ಒ | ಖಖಖ ಓ .ಗ +ಅ+ | ,,<ಂಃಅ;<<ಆ $ ;;=<ಇ=;<,, | ;5=<ಇ=;<,, | ;ಒ=<ಇ=;<,6 #& |
| 5 | ಖಖಖ .?ಚ | ,,<ಂಃಅ;<<ಆ $ ;;=<ಇ=;<,, | ;5=<ಇ=;<,, | ;ಒ=<ಇ=;<,6 #& |
| ಇ | ಖಖಖಓಙ+[\ | ,,<ಂಃಅ;<<ಆ $ ;;=<ಇ=;<,, | ;5=<ಇ=;<,, | ;ಒ=<ಇ=;<,6 #& |
| ಜಿ | ಖಖಖಕ/ಗ.+ | ,,<ಂಃಅ;<<ಆ $ ;;=<ಇ=;<,, | ;5=<ಇ=;<,, | ;ಒ=<ಇ=;<,6 #& |
| ಆ | ಖಖಖ 0. ?.+ಅ+ | ,,<ಂಃಅ;<<ಆ $ ;;=<ಇ=;<,, | ;5=<ಇ=;<,, | ;ಒ=<ಇ=;<,6 #& |
| ,< | ಖಖಖ# .+ಗ.+ | ,,<ಂಃಅ;<<ಆ $ ;;=<ಇ=;<,, | ;5=<ಇ=;<,, | ;ಒ=<ಇ=;<,6 #& |
| ,, | ಖಖಖಎ.#. | ,,<ಂಃಅ;<<ಆ $ ;;=<ಇ=;<,, | ;5=<ಇ=;<,, | ;ಒ=<ಇ=;<,6 #& |
| ,; | ಖಖಖ ಃ] | ,,<ಂಃಅ;<<ಆ $ ;;=<ಇ=;<,, | ;5=<ಇ=;<,, | ;ಒ=<ಇ=;<,6 #& |
| ,6 | ಖಖಖ# ?.+ + | ,,<ಂಃಅ;<<ಆ $ ;;=<ಇ=;<,, | ;5=<ಇ=;<,, | ;ಒ=<ಇ=;<,6 #& |
ಷರತ್ತು : ಈ ಆದೇಶವು ಕೆ.ಎ.ಟಿ. ಅರ್ಜಿ ಸಂಖ್ಯೆ : 5161-5260/2012 ಹಾಗೂ ಕೆ.ಎ.ಟಿ. ಅರ್ಜಿ ಸಂಖ್ಯೆ 4353-06/2013 ಘನ ಕರ್ನಾಟಕ ಆಡಳಿತ
ನ್ಯಾಯಮಂಡಳಿಯು ನೀಡುವ ಅಂತಿಮ ತೀರ್ಪಿಗೆ ಒಳಪಟ್ಟಿರುತ್ತದೆ.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪಾಲರ ಆಜ್ಞಾನುಸಾರ ಮತ್ತು ಅವರ ಹೆಸರಿನಲ್ಲಿ,
ಟಿ.ಎನ್. ನರಸಿಂಹರಾಜು,
ಸರ್ಕಾರದ ಅಧೀನ ಕಾರ್ಯದರ್ಶಿ (ಪ್ರ),
ಆರೋಗ್ಯ ಮತ್ತು ಕುಟುಂಬ ಕಲ್ಯಾಣ ಇಲಾಖೆ.
PR. 268
(ಭಾ.ವೈ. ಪದ್ಧತಿ ಮತ್ತು ಸಮನ್ವಯ)ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ಭಾಗ ೧ ೬೪೬
ತೋಟಗಾರಿಕೆ ಸಚಿವಾಲಯ
ವಿಷಯ: ``ತೆಂಗು ಉತ್ಪನ್ನ ಉದ್ಯಾನಗಳು'' ಎಂಬ ಹೊಸ ಯೋಜನೆಯಡಿ 2013-14ನೇ ಸಾಲಿನಲ್ಲಿ ತುಮಕೂರು
ಜಿಲ್ಲೆಯ ಶಿರಾದಲ್ಲಿ ತೆಂಗು ಪಾರ್ಕ್ ಹಾಗೂ ಉದ್ಯಾನವನ ಸ್ಥಾಪಿಸಲು ಆಡಳಿತಾತ್ಮಕ ಮಂಜೂರಾತಿ
ಹಾಗೂ Grant-in-Aid ಮೂಲಕ ಅನುದಾನವನ್ನು ಪಡೆಯಲು ಅನುಮತಿ ನೀಡುವ ಬಗ್ಗೆ.
ಓದಲಾಗಿದೆ:
1. ಸರ್ಕಾರದ ಆದೇಶ ಸಂಖ್ಯೆ : ತೋಇ 87 ತೊಯೋಕಾ 2013, ದಿನಾಂಕ 31-08-2013 2. ಸರ್ಕಾರದ ಆದೇಶ ಸಂಖ್ಯೆ : ತೋಇ 87 ತೊಯೋಕಾ 2013, ದಿನಾಂಕ 21-09-2013 3. ತೋಟಗಾರಿಕೆ ನಿರ್ದೇಶನಾಲಯದ ಪತ್ರ ಸಂಖ್ಯೆ : ತೋಇ/ತೋಜಂನಿ/ತೋಬೆ/ವಿನಿ1/60/
2013-14/2482, ದಿನಾಂಕ 15-03-2014.
ಪ್ರಸ್ತಾವನೆ:
ಮೇಲೆ ಓದಲಾದ (1) ರಲ್ಲಿ 2013-14ನೇ ಸಾಲಿನಲ್ಲಿ ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಯ ವತಿಯಿಂದ ``ತೆಂಗು ಉತ್ಪನ್ನ ಉದ್ಯಾನಗಳು'' ಎಂಬ ಹೊಸ ಯೋಜನೆಯನ್ನು ಅನುಷ್ಠಾನಗೊಳಿಸಲು ಲೆಕ್ಕ ಶೀರ್ಷಿಕೆ 2401-00-108-2-54 ರಡಿ 100.00 ಲಕ್ಷಗಳನ್ನು ವಿನಿಯೋಗಿಸಲು ತೋಟಗಾರಿಕೆ ಇಲಾಖೆಯ ನಿರ್ದೇಶಕರಿಗೆ ಅನುಮತಿ ನೀಡಲಾಗಿದೆ.
ಮೇಲೆ ಓದಲಾದ (2) ರಲ್ಲಿ ಈ ಉದ್ದೇಶಕ್ಕಾಗಿ ಮೊದಲೆರಡು ತ್ರೈಮಾಸಿಕ ಅನುದಾನ ರೂ. 50.00 ಲಕ್ಷಗಳನ್ನು ಬಿಡುಗಡೆ ಮಾಡಲಾಗಿದೆ.
ಮೇಲೆ ಓದಲಾದ (3) ರ ತೋಟಗಾರಿಕೆ ನಿರ್ದೇಶಕರ ಪತ್ರದಲ್ಲಿ ತುಮಕೂರು ಜಿಲ್ಲೆಯ, ಶಿರಾ ತಾಲ್ಲೂಕಿನಲ್ಲಿ ತೆಂಗು ಪಾರ್ಕ್ ಸ್ಥಾಪಿಸಲು ನಿರ್ಮಿತಿ ಕೇಂದ್ರ, ತುಮಕೂರು, ಇವರಿಂದ ಒಟ್ಟು 7 ಕಾಮಗಾರಿಗಳಿಗೆ ರೂ. 263.70 ಲಕ್ಷಗಳ ಅಂದಾಜು ಪಟ್ಟಿಯನ್ನು ಪಡೆದು ಆಡಳಿತಾತ್ಮಕ ಮಂಜೂರಾತಿಗಾಗಿ ಹಾಗೂ Grant-in-Aid ಬಿಲ್ ಮೂಲಕ ಬಿಡುಗಡೆಯಾದ ಅನುದಾನವನ್ನು ನಿರ್ಮಿತಿ ಕೇಂದ್ರ ತುಮಕೂರುರವರಿಗೆ ಸಂದಾಯ ಮಾಡಲು ಕೋರಿ ಪ್ರಸ್ತಾವನೆಯನ್ನು ಸಲ್ಲಿಸಿರುತ್ತಾರೆ.
ಸದರಿ ಪ್ರಸ್ತಾವನೆಯನ್ನು ಸರ್ಕಾರವು ಕೂಲಂಕಷವಾಗಿ ಪರಿಶೀಲಿಸಿ, ಈ ಕೆಳಗಿನಂತೆ ಆದೇಶಿಸಿದೆ.
ಸರ್ಕಾರದ ಆದೇಶ ಸಂಖ್ಯೆ: ತೋಇ 52 ತೋಸವಿ 2014, ಬೆಂಗಳೂರು, ದಿನಾಂಕ: 18-03-2014
ಪ್ರಸ್ತಾವನೆಯಲ್ಲಿ ವಿವರಿಸಿರುವ ಅಂಶಗಳ ಹಿನ್ನೆಲೆಯಲ್ಲಿ ತುಮಕೂರು ಜಿಲ್ಲೆಯ ಶಿರಾದಲ್ಲಿ ತೆಂಗು ಪಾರ್ಕ್ ನಿರ್ಮಿಸಲು ತುಮಕೂರು ನಿರ್ಮಿತಿ ಕೇಂದ್ರವು ಸಲ್ಲಿಸಿರುವ ರೂ. 263.70 ಲಕ್ಷ (ರೂಪಾಯಿ ಇನ್ನೂರ ಅರವತ್ತ ಮೂರು ಲಕ್ಷದ ಎಪ್ಪತ್ತು ಸಾವಿರಗಳು ಮಾತ್ರ)ಗಳ ಅಂದಾಜಿಗೆ ಈ ಮೂಲಕ ಆಡಳಿತಾತ್ಮಕ ಅನುಮತಿಯನ್ನು ನೀಡಲಾಗಿದೆ. ತೋಟಗಾರಿಕೆ ನಿರ್ದೇಶಕರಿಗೆ ಈಗಾಗಲೇ ಬಿಡುಗಡೆಯಾದ ಅನುದಾನದಲ್ಲಿ ರೂ.25.00 ಲಕ್ಷ (ರೂಪಾಯಿ ಇಪ್ಪತ್ತೈದು ಲಕ್ಷಗಳು ಮಾತ್ರ)ಗಳನ್ನು Grant-in-Aid ಬಿಲ್ ಮೂಲಕ ತುಮಕೂರು ನಿರ್ಮಿತಿ ಕೇಂದ್ರಕ್ಕೆ ಸಂದಾಯ ಮಾಡಲು ತೋಟಗಾರಿಕೆ ನಿರ್ದೇಶಕರಿಗೆ ಅನುಮತಿ ನೀಡಲಾಗಿದೆ.
ಈ ಆದೇಶವನ್ನು ಸರ್ಕಾರದ ಆದೇಶ ಸಂಖ್ಯೆ : ಎಫ್ಡಿ 1 ಟಿಎಫ್ಪಿ 2008, ದಿನಾಂಕ 16-05-2008 ರನ್ವಯ ಮತ್ತು ಆದೇಶ ಸಂಖ್ಯೆ :
ಎಫ್ಡಿ 1 ಟಿಎಫ್ಪಿ 2002, ದಿನಾಂಕ 20-01-2003 ರಲ್ಲಿ ಇಲಾಖೆಯ ಪ್ರಧಾನ ಕಾರ್ಯದರ್ಶಿಯವರಿಗೆ ದತ್ತವಾಗಿರುವ ವಿತ್ತಾಧಿಕಾರದನ್ವಯ ಹಾಗೂ ಆಂತರಿಕ ಆರ್ಥಿಕ ಸಲಹೆಗಾರರ ಟಿಪ್ಪಣಿ ಸಂಖ್ಯೆ : ತೋಇ 24 ಆಂಆಸ 2014 ದಿನಾಂಕ 12-03-2014 ರನ್ವಯ ಹೊರಡಿಸಲಾಗಿದೆ.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪಾಲರ ಆಜ್ಞಾನುಸಾರ ಮತ್ತು ಅವರ ಹೆಸರಿನಲ್ಲಿ,
ಬಿ.ವಿ. ರಾಮಲಿಂಗಯ್ಯ,
PR. 339
ಸರ್ಕಾರದ ಅಧೀನ ಕಾರ್ಯದರ್ಶಿ,
S.C. 20
ತೋಟಗಾರಿಕೆ ಇಲಾಖೆ.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub : Project Proposal of M/s Prem Sugars & Chemicals Corporation Ltd., to establish a "2500 TCD to 5000 TCD, Co-gen Capacity from 22 to 32 MW and Establishment of 45000 KLPD Ethanol Plant" at Bellur Village, Nagamangala Taluk, Mandya District - Enhancement of Crushing Capacity - Reg.
Ref : 1) Proceeding of the 158th State Level Single Window Clearance Committee meeting held on 17.09.1996.
2) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting held on 19.11.2013.
PREAMBLE:
M/s. Prem Sugars & Chemicals Corporation Ltd., had obtained approval from the Government in ·1996 for establishment of a White Cristal Sugar manufacturing unit with 2500 TCD capacity and 22 MW Co-gen capacity plant in 98.27 acres of land in Mandya District.
ಭಾಗ ೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ೬೪೭ Subsequently M/s Prem Sugars & Chemicals Corporation Ltd.. submitted a proposal for enhancing the crushing capacityfrom "2500 TCD. to 5000 TCD Co-gen capacity from 22 to 32 MW and establishment of 45000 KLPD Ethanol Plant". with an investment of Rs. 450.00 crores in 98.27 acres of land. near Bellur Village, Nagamangala Taluk, Mandya District was discussed in the 174th Screening. Committee meeting held on 21.12.2012.
The Committee directed the company, to obtain Distance Certificate - from Cane Commissioner: hence the subject was deferred in the 174th Screening Committee meeting held on 21.12.2012.
The Company in its letter dated: 02.05.2013 have submitted the copy of the Distance Certificate No. DSK/DEV/110/2011-12 (Prem Sugars) dated 05.11.2012 issued by the Cane Commissioner for Cane Development and Director of Sugar. The company has also filed a necessary application for obtaining IEM, the company has received an acknowledgement from Ministry of Commerce & Industry, New Delhi vide Ref. No. 2538/SIA/IMO/2012, 2539/SIA/IMO/2012 and 2540/SIA/IMO/2012, dated 12.11.2012 the Company has also furnished the acknowledgement copy of IEM obtained by Ministry of Commerce & Industries New Delhi.
Agriculture Department vide their letter dated: 09.10.2013 have submitted opinion on the location of the proposed project. It is opined that the land identified for the project is fit for cultivation and the lands are Kushki farmers are growing single crop in a year.
(cid:1) M/s Prem Sugars & Chemicals Corporation Ltd has been approved in 158th SLSWCC held on 17th September 1996.
(cid:1) The promoter Dr. K.S. Thirumalaswamy has taken license from Government of India to implement the project, during the implementation process the promoter passed. away during 2004.
(cid:1) The new Directors Mr. Jayadev, Mr. Vishal Jayadev and. Mr. Hari Mohan Naidu joined the Company in 2010 and stated the process of irnplementation. Subsequently, issues regarding the compensation to land losers was solved and company took extension of time from KIADB twice in 02.07.2011 & 25.08.2012.
(cid:1) KIADB has approved the building plan on 29.08.2012 valid upto 24.08.2013.
(cid:1) Company has obtained IEM from Ministry of Commerce & Industries, New Delhi vide No. 2538/SIA/IMO 2012 dated:
12.11.2012.
(cid:1) Company also obtained consent for establishment from Karnataka State Pollution Control Board Vide their letter No. PCB/264/HP 1/2011/887 dated: 20.11.2012.
(cid:1) The company has completed Fencing after taking the possession of land and .approached Corporation Bank for Financial assistance Bank has given in principle approval for sanctioning. of term loan of Rs. 150.00 crores and insisted for extension of time.
(cid:1) Company has applied to Karnataka Udyog Mitra for extension of time on 25.05.2012. It is processed in KUM after taking IEM and placed before SHLSC and it is cleared in 176th Screening Committee meeting held on 13.03.2013 and recommended to SHLCC to approve the increase in capacity, extension of time and acquire the additional land of 71.8 acres of adjacent land.
The company in its letter dated 14.12.2012 has informed that the Railway Track between Bangalore to Hassan will run through the existing land due to which the company will not be able to utilise 40 acres of allotted land, accordingly they have requested to acquire and allot land to an extent of 33.8 acres.
The Company has requested the committee to consider the following:
1. Increase in crushing capacity 2500 TCD to 5000 TCD.
2. Increase Co-Gen Capacity from 22 to 32 MW.
3. Establishment of 45000 LPD Ethanol Plant.
4. To grant extension of time to implement the earlier approved project by two years.
5. Acquire and allotment of additional land of 71.8 acres.
Commissioner, Sugar in their letter informed that the factory has obtained IEM from Govt. of India vide· No. 2538/SIA/IMO/2012, dated: 02.11.2012. The said factory has been taken on records as New Sugar Factory vide Govt. of India order dated: 21.01.2013. Further the applicant is yet to obtain in-principle approval and cane area allocation from Govt. of Karnataka.
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the' State High Level Clearance Committee in the 33rd Meeting held on 19.11.2013, in all aspects.
Hence the following order:
GOVERNMENT ORDER No. CI 27 SPI 2014, BANGALORE, DATED: 30.01.2014
Government is pleased to approve the investment proposal, of M/s Prem Sugars & Chemicals Corporation Ltd., to establish a White Cristal Sugar Manufacturing facility at Kalinganahalli Village, Bellur Hobli. Nagamangala Taluk, Mandya District with a Cane Crushing Capacity of 5000 TCD, Co-gen Power Plant of 32 MW and 45000 LPD Ethanol Plant with an investment of Rs. 450 crores generating an employment to about 175 persons.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ಭಾಗ ೧ ೬೪೮| Land : | Existing 98.27 acres of land approved as per the 158th State Level Single Window Agency meeting in 1996, acquired and in possession of the Company at Kalinganahalli and Hatni, Villages, Nagamangala Taluk, Mandya District. |
| Water : | 1.2 Million LPD of Water with the approval of WRD. |
| Power : | 500 KVA from CESC. |
| Incentives & Concessions : | As per applicable Industrial Policy of the State. |
1. Environment: The company to obtain Consent for Establishment and Consent for Operation from KSPCB and environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if applicable.
2. Employment : The Company shall comply with the provisions of industrial Policy of Govt. of Karnataka and Dr. Sorojini Mahishi Report. Prepare a plan for development of Human. Resources required for the project, train local people. A copy of Human Resources Development plan shall be sent to. the Commissioner 'for Industrial Development & Director of industries.
and Commerce for monitoring.
3. Vendor Development: Wherever there is scope for vendor development for the project, the company shall prepare a vendor development plan, develop local vendors and procure the required inputs, components and 'sub-assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
4. Social infrastructure Development: .. The. Company is advised to take up social infrastructure development projects in the vicinity of the proposed location of the unit and comply with the stipulation of Company Act 2013. A copy of such projects shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
5. Others:
a) The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge facility should be adopted wherever applicable.
b) The company shall take all statutory and other necessary clearances from the competent authorities including Govt. of India and shall submit milestones/progress in the implementation of the project regularly, which will be monitored by the Department.
This approval is valid for a period of two years from the date of issue of this Government Order.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
PR 312
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub : Project Proposal of M/s BMM Ispat Ltd., - to establish a unit for manufacture of "2 MTPA Integrated Steel Plant and Slag Based Cement with 300 MW Power Plant". at Dahapur, Nagalapura, D.N. Kere and Garage Villages, Marriyammanahalli Hobli. Hospet Taluk, Bellary District - Extension of time - Reg.
Ref : 1) Proceedings of the 15th State High Level Clearance Committee (SHLCC) meeting held on 21.08.2008.
2) Government Order No. CI 312 SPI 2008, dated: 21.10.2008.
3) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting held on 19.11.2013.
PREAMBLE:
The Proposal of M/s BMM Ispat Ltd., to establish a unit for manufacture of "2 MTPA Integrated Steel Plant and Slag Based Cement Plant with 300 MW Power Plant" at Dahapur, Nagalapura, D.N. Kere and Garaga Villages, Marriyammanahalli Hobli, Hospet Taluk, Bellary District with an investment of Rs. 6151.00 crore, was approved 15th SHLCC meeting held on 21.08.2008. The Government Order was issued vide Government Order No. CI 312 SPI 2008, dated: 21.10.2008 read at (2) above.
ಭಾಗ ೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ೬೪೯ The company has informed that due to the following constraints they were not able to complete the entire 2 MTPA integratedsteel plant within scheduled time.
(cid:1) Environment Clearance (EC) from MOEF, New Delhi was granted in 2010, dated: 18.05.2010.
(cid:1) Consent for establishment (CFE) for 2 MTPA from KSPCB, Bangalore, dated: 02.02.2011.
(cid:1) NOC from Airports Authority of India for the Chimneys dated: 21.07.2011.
(cid:1) Patta Lands were allotted, taken Possession from KIADB in July, 2012, dated: 06~07.2012.
(cid:1) Government Land Government Order was issued by Revenue Dept only in December, 2012; letter no. CI 186 SPQ 2010, dated: 03.04.2010.
The delay in handing over the land has increased the project cost from Rs. 6151.00 crores to Rs. 7000.00 crores. It is informed that the company has invested already Rs. 1710.00 crores and the unit is under implementation stage. It may be noted that the project has been given extension for a period of two years from 24.02.2011 earlier.
Therefore the company has requested the Committee to extend the Government Order for a further period of three years from 24.02.2013.
In the 33rd state High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 27 SPI 2011, BANGALORE, DATED: 13.01.2014
The Government is pleased to grant extension of time to M/s BMM Ispat Ltd., to implement the project approved vide Government Order No. CI 312 SPI 2008, dated: 21.10.2008 for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 21.10.2008 read at (2) above, remain unaltered.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
PR 313
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub : Project Proposal of M/s Amrutha Constructions Pvt. Ltd., to establish a "2 MMTPA Cement Plant with 50 MW Coal Based Captive Power Plant" near Maralbhavi Village, Surpura Taluk, Yadgir District - Extension of time - Reg.
Ref : 1) Proceedings of the 24th State High Level Clearance Committee (SHLCC) meeting held on 21.01.2011.
2) Government Order No. CI 91 SPI 2011, dated: 26.02.2011.
3) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting held on 19.11.2013.
PREAMBLE:
The Proposal of M/s Amrutha Constructions Pvt. Ltd., to establish "2 MMTPA Cement Plant with 50 MW Coal Based Captive Power Plant" near Maralbhavi Village, Surpura Taluk, Yadgir District with an investment of Rs. 960.00 crore, was approved in the 24th SHLCC meeting held on 24.01.2011. The Government Order was issued vide Government Order No. 91 SPI 2011, dated: 26.02.2011 read at (2) above.
Now, the company in their letter dated: 25.2.2013 has requested to issue an amended Government Order for transfer of approval from M/s Amrutha Constructions (P) Ltd., to M/s Amrutha Bose Cement Industries Pvt. Ltd. and inclusion of Salvadgi Village, Bijapur District in additional to Maralbhavi Village of Yadgir District. The following documents have been submitted by the company.
(cid:1) Memorandum & Articles of Association of the new company.
(cid:1) Board resolution dated: 09.02.2013 of M/s Amrutha Constructions Pvt. Ltd.. to incorporate the new company i.e. M/s Amrutha Bose Cement Industries Pvt. Ltd. with 51 & equity shares.
(cid:1) Board resolution dated: 23.02.2013 of M/s Amrutha Constructions Pvt. Ltd., subscribing 255000 equity shares of Rs. 10/- in the new company.
(cid:1) Certificate of incorporation of the new company has been furnished.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ಭಾಗ ೧ ೬೫೦In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State. High Level Clearance Committee in the 33rd Meeting held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 91 SPI 2011, BANGALORE, DATED: 09.01.2014
The Government is pleased to approve the change the name of the company of M/s Amrutha Constructions Pvt. Ltd., to M/s Amrutha Bose Cement Industries Pvt. Ltd., for the project approved vide Government Order No. CI 91 SPI 2011, dated: 26.02.2011 as per the norms of KIADB and grant extension of time to the company to implement the project for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 26.02.2011 read at (2) above, remain unaltered.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
PR 314
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub : Project Proposal of M/s Mukund Ltd., - for "Expansion of Integrated Steel Plant Capacity from 0.41 MTPA to 0.70 MTPA" at Koppal District - Extension of time - Reg.
Ref : 1) Proceedings of the 23rd State High Level Clearance Committee (SHLCC) meeting held on 19.06.2010.
2) Government Order No. CI 372 SPI 2010, dated: 15.07.2010.
3) Corrigendum No. CI 372 SPI 2010, dated: 01.03.2011.
4) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting held on 19.11.2013.
PREAMBLE:
The Proposal of M/s Mukund Ltd., to increase the "Integrated Steel Plant Capacity by 0.70 MTPA" at Koppal District with an investment of Rs. 2892.00 crore. was approved 23rd SHLCC meeting held on 19.06.2010. The Government 'Order was issued vide Government Order No. CI 372 SPI 2010, dated: 15.07.2010 read at (2) above.
A Corrigendum read at (3) above was issued to correct the increased capacity as 1.11 MMTPA.
The company in their letter dated: 27.02.2013 informed that they have purchased the 53 acres of land and the remaining land is under the process of purchasing. The company has made an application to Water Resource Dept. for allotment of 18 MLPD of water and has requested to grant extension of time further for a period.
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 372 SPI 2010, BANGALORE, DATED: 04.01.2014
The Government is pleased to grant extension of time to M/s Mukund Ltd., to implement the project approved vide Government Order No. CI 372 SPI 2010, dated: 15.07.2010 for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 15.07.2010 read at (2) above, remain unaltered.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
PR 315
Commerce and Industries Department.
ಭಾಗ ೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ೬೫೧COMMERCE AND INDUSTRIES SECRETARIAT
Sub : Project Proposal of M/s Tata Elxsi Ltd., - to establish "Hardware Design and Development Centre" at KIADB Hardware Industrial Park, Bangalore Rural District Extension of time - Reg.
Ref : 1) Proceedings of the 20th State High Level Clearance Committee (SHLCC) meeting held on 05.01.2010.
2) Government Order No. CI 77 SPI 2010, dated: 01.03.2010.
3) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting held on 19.11.2013.
PREAMBLE:
The Proposal of M/s Tata Elxsi Ltd., to establish the "Hardware Design and Development Centre" at KIADB Hardware Industrial Park, Bangalore Rural District with an investment of Rs. 486.00 crores in 20 acres of KIADB land was approved 20th SHLCC meeting held on 05.01.2010. The Government Order .was issued vide Government Order No. CI 77 SPI 2010, dated: 01.03.2010 read at (2) above.
The company has informed that there was a delay in implementation of the project because of delay by KIADB in developing the said industrial Area. Therefore the company has not paid the initial deposit. The company vide its letters dated: 31.07.2012, 11.12.2012 and e-mail dated: 06.06.2013 requested to grant extension of time further for a period of two years.
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 77 SPI 2010, BANGALORE, DATED: 13.01.2014
The Government is pleased to grant extension of time to M/s Tata Elxsi Ltd., to implement the project approved vide Government Order No. CI 77 SPI 2010, dated: 01.03.2010 for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 01.03.2010 read at (2) above, remain unaltered.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
PR 316
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub : Project Proposal of M/s. Narth Karnataka Power Pvt. Ltd.,(formerly known as M/s Jewargi Power Pvt. Ltd.,) - to establish "2 X 660 MW Coal Based Power Plant" at Killenkere, Neelhalli, Kalebelgondi Villages, Yadgir District - Reg.
Ref : 1) Proceedings of the 13th State High Level Clearance Committee (SHLCC) meeting held on 13.03.2008.
2) Government Order No. CI 175 SPI 2008, dated: 19.05.2008.
3) Amendment No. CI 175 SPI 2008, dated: 20.12.2010.
4) Government Order No. CI 175 SPI 2008, dated: 20.12.2010.
5) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting held on 19.11.2013.
PREAMBLE:
The Proposal of M/s Narth Karnataka Power Pvt. Ltd., (formerly known as M/s Jewargi Power Pvt. Ltd.,) to establish "2 X 660 MW Coal Based Power Plant" with an investment of Rs: 6757.84 crores in 1800 acres of land to be acquired and allotted by KIADB at Kattisangavi and Madri Villages, Jewargi Taluk, Gulbarga District was approved 13th SHLCC meeting held on 13.03.2008. The Government Order was issued vide Government Order No. CI 175 SPI 2008, dated: 19.05.2008 read at (2) above.
As per request of company an Amendment Order read at (3) above was issued to change of name of company from M/s Jewargi Power Pvt. Ltd., in favour of "M/s Narth Karnataka Power Pvt. Ltd."
Subsequently, the company has requested for change of location of the project of M/s Narth Karnataka Power Pvt. Ltd., from Kattisangavi and Madri villages of Jewargi Taluk, Gulbarga District to Killenkere, Neelhalli, Kalebelgondi villages of Yedgir District was approved and vide Government Order No. CI 175 SPl 2008, dated: 20.12.2010 read at (4) above.-ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ಭಾಗ ೧ ೬೫೨ The company in its letter has requested for change of name of the company from M/s Narth Karnataka Power Pvt. Ltd., to North Karnataka Powergen Pvt. Ltd. The certificate of Incorporation dated: 27.11.2012 is furnished. Further the company secretary has also submitted a certificate giving the names of the 5 Directors as per the Register of Director of the Company and the forms filed with MCA. It is informed that, the Directors of Narth Karnataka Power Pvt. Ltd., and North Karnataka Powergen Pvt. Ltd., (if approved for change of name) are the same Directors.
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 20 SPl 2014 , BANGALORE, DATED: 13.01.2014
The Government is pleased to approve the change of name of the company from M/s Narth Karnataka Power Pvt. Ltd., to "M/s North Karnataka Powergen Pvt. Ltd.." and to grant extension of time to implement the project approved vide Government Order No. CI 175 SPI 2008, dated: 19.05.2008 for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 19.05.2008 read at (2) above, remain unaltered.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
PR 317
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub : Project Proposal of M/s N K Utilities Ltd., to establish "300 M W Coal Based Power Plant" at Achanur Village, Bagalkot District - Extension of time - Reg.
Ref : 1) Proceedings of the 16th and 20th State High Level Clearance Committee (SHLCC) meeting held on 19.11.2008 and 05.01.2010.
2) Government Order No. CI 261 SPI 2010, dated: 18.06.2010.
3) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting held on 19.11.2013.
PREAMBLE:
The Proposal of M/s. N K Utilities Ltd., to establish "300 MW Coal Based Power Plant" at Kagalagomba Village, Bagalkot District with an investment of Rs. 1740.00 crore. was approved in the 16th SHLCC meeting held on 19.11.2008. Subsequently in the 20th SHLCC meeting held on 05.01.2010 the committee approved to establish unit in 500 acres of land (225 acres u/s 109 of KLR Act and 275 acres from KIADB as SUC) and also approved for change of location to Achanur Village, Bagalkot District. The Government Order was issued vide Government Order No. CI 261 SPI 2010, dated: 18.06.2010 read at (2) above.
Now, The Company in their letter dated: 15.07.2013 informed that, they have started civil works at the project site after obtaining the water allocation as per the conditions stipulated by Department of Ecology and Environment that ''the project authorities shall commence the construction activity only after obtaining required approval from competent authority of supply of water for the project". The company has granted water allocation of 0.52 TMC from Ghataprabha River vide Government Order dated: 14.03.2013.
The company is requesting the committee to approve for extension of 3 more years of time to implement the project.
The company has informed that the following effective steps were initiated to implement the project.
1. LAND: 243 acres of private lands in Achanur village have been acquired U/s 109 of KLR Act and through KIADB.
2. Environmental Clearance: State Level Environment Impact Assessment Authority, Karnataka State (SEIAA) has issued the Environment Clearance vide letter dated: 18.01.2011
3. Consent of Establishment: Karnataka State Pollution Control Board has issued Consent for Establishment (CFE) vide letter dt: 21.05.2011
4. COAL: Coal has been tied up for M/s Fajar Bumi Sakti Ltd, Indonesia and contract agreement has been signed. Coal will reach site from Goa Port and by rail via Gadag. The railway line is just 5 KM from the site.
5. WATER: Granted water allocation order from the government on 14.03.2013 for 0.52 TMC from Ghataprabha River.
6. SURVEY: Railway survey, Contour survey, water line survey and, power evacuation line survey have been completed by the notified agencies.
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was discussed and approved.
ಭಾಗ ೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ೬೫೩ Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meetingheld on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 261 SPl 2010, BANGALORE, DATED: 06.01.2014
The Government is pleased to grant extension of time to Mi/s N K Utilities Ltd., to implement the project approved vide Government Order No. CI 261 SPI 2010, dated: 18.06.2010 for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 18.06.2010 read at (2) above, remain unaltered.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
PR 318
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub : Project Proposal of M/s Trans India Shipping Services Pvt. Ltd., to establish" 1.0 MTPA Integrated Steel Plant and 150 MW Captive Power Plant" at Elladakere, Hiriyur, Chitradurga District - Extension of time - Reg.
Ref : 1) Proceedings of the 23rd State High Level Clearance Committee (SHLCC) meeting held on 19.06.2010.
2) Government Order No. CI 373 SPI 2010, dated: 15.07.2010.
3) Government Order No. CI 373 SPI 2010, dated: 28.02.2011 .
4) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting held on 19.11.2013.
PREAMBLE:
The Proposal of M/s Trans India Shipping Services Pvt. Ltd., to establish "1.0 MTPA - Enhancement of Integrated Steel Plant and 150 M W Captive Power Plant" at Elladakere, Hiriyur, Chitradurga District with an investment of Rs. 1975.00 crore, was approved 23rd SHLCC meeting held on 19.06.2010. The Government Order was issued vide Government Order No. CI 373 SPI 2010, dated: 15.07.2010 read at (2) above.
The Government Order read at (3) above was issued to approve the enhancement of Integrated Steel Plant capacity from 0.5 MMTPA to 1.00 MMTPA and the Captive Power Plant Capacity from 72 MW to 150 MW with allotment of additional land of 210 acres and 2800 KLPD Water.
Now, the company in their letter dated: 27.09.2013 has requested for extension of time by five years to implement the project since the Government order No. CI 373 SPI 2010, dated: 15.07.2010 was expired on 14.07.2012. The company has taken following effective steps to implement the project.
a) The company has obtained allotment of 440.05 acres of land from KIADB and possession certificate was also obtained.
b) Applied to WRD for allotment of water
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 16 SPI 2014, BANGALORE, DATED: 06.01.2014
The Government is pleased to grant extension of time to M/s Trans India Shipping Services Pvt. Ltd., to implement the project approved vide Government Order No. CI 373 SPI 2010, doted: 15.07.2010 for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 15.07.2010 read at (2) above, remain unaltered.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
PR 319
Commerce and Industries Department.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ಭಾಗ ೧ ೬೫೪COMMERCE AND INDUSTRIES SECRETARIAT
Sub : Project Proposal of M/s Dhruvdesh Metasteel Pvt. Ltd., - to establish an unit for manufacture of "Mini Integrated Steel Plant with 10 MW Captive Power Plant" at Hirebaganal Village, Ginegera Post, Koppal District - Extension of time - Reg.
Ref : 1) Proceedings of the 13th State High Level Clearance Committee (SHLCC) meeting held on 13.03.2008.
2) Government Order No. CI 72 SPI 2008, dated: 29.04.2008.
3) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting held on 19.11.2013.
PREAMBLE:
The Proposal of M/s Dhruvdesh Metasteel Pvt. Ltd., to establish an "Mini Integrated Steel Plant with 10 MW Captive Power Plant" at Hirebaganal Village, Ginegera Post, Koppal District with an investment of Rs. 145.78 crores in 46.07 acres of land was approved 13th SHLCC meeting held on 13.03.2008. The Government Order was issued vide Government Order No. CI 72 SPI 2008, dated: 29.04.2008 read at (2) above .
Now, the company vide its letter dated: 23.10.2013 has submitted that, they have already commissioned the "Second Unit 100 TPD Sponge Iron Plant and 10 MW Captive Power Plant'' with a capital investment of Rs. 120.00 Crores and created employment for about 300 persons. But however all the facilities are not implemented due to the following reasons:
a) Mining Lease - The allotted ore reserve in Chikanayakanahalli of about 1 Million TPD is in sufficient.
b) On absence of the sufficient ore, company is compelled to purchase iron ore from the open market at very high rates which have affected the margins under these circumstances bankers have advised the company to implement the project in phases.
c) The procedural delays in taking physical possession of land.
d) Now, bankers are seeking extension of time for implementation of the project for further funding .
In view of the above, company has requested for extension of time for 2 1/2 years to implement the project.
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11 .2013, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 36 SPl 2010, BANGALORE, DATED: 13.01.2014
The Government is pleased to grant extension of time to M/s Dhruvdesh Metasteel Pvt. Ltd., to implement the project approved vide Government Order No. CI 72 SPI 2008, dated: 29.04.2008 for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 29.04.2008 read at (2) above, remain unaltered.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
PR 320
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
CORRIGENDUM
No. CI 162 SPI 2013, Bangalore, Dated: 17th January, 2014
Sub : Project Proposal of M/s Dhruvdesh Metasteel Pvt. Ltd., - to establish an unit for
manufacture of "Iron Ore Pellets" at Hirebaganal Village, Koppal District - Reg.
Ref : Government Order No. CI 162 SPI 2013, dated: 27.09.2013.
In the order portion of the Government Order No: CI 162 SPI 2013, dated: 27.09..2013, the paragraph .
"Land : The Company is permitted to purchase 28 acre 08 gunta land (excluding Government
and Forest lands) at Hirebanganal Village, Koppal District under Section 109 of
Karnataka Land Reforms Act,1961 and for conversion of the land use".
ಭಾಗ ೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ೬೫೫ shall be read as;"land : The Company is permitted to purchase and convert for lndustrial use land in Sy. Nos.
86, 87, 89/1,89/2,90/2 & 91/2 of Chickabagnal Village, Koppel Taluk and District
measurlng 15 acres 10 guntas and Sy.· Nos. 85/G, 85/D, 85/E, 85/F of Kunikere Village,
Koppal Taluk and District measuring 13 acres 38 guntas (totaling. 29 acres and 8
guntas) U/s 109 of KLR Act, 1961".
The other terms and conditions remain the same as in the G.O read at above.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
PR 321
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub : Project Proposal of M/s Orient Cement Ltd., - to establish "Cement Plant for Manufacture of 4 MTPA Cement and 3 MTPA Clinker with 50 MW Captive Power Plant" at Itagi, Mogla, Digaon Villages, Chittapur Taluk, Gulbarga District Reg.
Ref : 1) Proceedings of the 17th State High Level Clearance Committee (SHLCC) meeting held on 28.01.2009.
2) Government Order No. CI 60 SPI 2009, dated: 11.08.2009.
3) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting held on 19.11.2013
PREAMBLE:
The Proposal of M/s Orient Cement Ltd., to establish "Cement Plant for Manufacture of 4 MTPA Cement and 3 MTPA Clinker with 50 MW Captive Power Plant" at Itagi, Mogla, Digaon Villages, Chittapur Taluk, Gulbarga District with an investment of Rs. 1294.00 crore, was approved 17th SHLCC meeting held on 28.01.2009. The Government Order was issued vide Government Order No. CI 60 SPI 2009, dated: 11.08.2009 read at (2) above.
The company in their letter dated: 21.09.2012 informed that they have already purchased 1323 acres of land out of 1750 acres U/s 109 of KLR Act and requested for granting permission for replacement of 275 acres of Gomala & Government land which are out of their required area, with lands which are within their mining and factory area to make it contigious one.
Accordingly, company in their letter dated: 27.09.2012 have submitted list of revised sy. nos indicating the area required to the extent of 1750 acres for mining and cement factory including power plant and requested for approval to purchase these lands U/s 109 of KLR Act.
There is no change in the extent of the land and also the villages. In view of this, the subject was placed in the 174th State High Level Screening Committee held on 21.12.2012.
The proposal of the company was discussed in detail and the committee directed the company to furnish details of effective steps taken to implement the project and deferred. The company in its letter No: ORCEM:PROJ:0458, dated: 20.12.2012 has submitted the status of implementation of the project.
Further the company in its letter No:OREC:PROJ:4406 dated: 20.12.2012 has requested the additional land which is necessitated due to following facts as stated in the referred letter.
1. Government of India, Ministry of Environment & Forests (MOEF) directive for Green belt development in 33% of project area.
2. Construction of water tanks for storing water requirement for five months operation Cement Plant, Power plant, Limestone mining, Residential colony etc. as Government of Karnataka likely to allow us water pumping for the river for only seven months in a year and for balance five months, the requirement has to be met from storage.
3. Construction of railway line form Chittapur railway station to railway siding within our cement plant area.
4. Providing land to KPTCL for switch yard etc, outside the factory area.
5. Construction of Staff Colony, Dispensary, School & other civic amenities etc.,
Hence the company has requested the committee to consider and approve the following:
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ಭಾಗ ೧ ೬೫೬"Revised sy. nos indicating the area required to the extent of 1750 acres for mining and cement factory including power plant".
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11 .2013, the proposal of the Company was discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 60 SPl 2009, BANGALORE, DATED: 09.01.2014
The Government is pleased to approve acquisition of 275 acres of land in Sy. Nos. as per the Annexure out of the 1750 acres already acquired for the project and grant extension of time to M/s Orient Cement Ltd., to implement the project approved vide Government Order No. CI 60 SPI 2009, dated: 11.08.2009 for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 11.08.2009 read at (2) above, remain unaltered.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
PR 322
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub : Proposal of M/s Manyata Developers Pvt. Ltd., - to Unit-II for "IT/BT/BPO Park with Hotel, Serviced Apartments, Residential Condominium and Other Common Facilities" at Kotnatevaru, Kondanahalli and Gollahalli Villages, Devanahalli Taluk, Bangalore Rural District - Extension of time - Reg.
Ref : 1) Proceedings of the 22nd State High Level Clearance Committee (SHLCC) meeting held on 24.05.2010.
2) Government Order No. CI 190 SPI 2010, dated: 02.06.2010.
3) Government Order No. CI 158 SPI 2012, dated: 15.03.2013.
4) Proceedings of the 33rd state High Level Clearance Committee (SHLCC) meeting held on 19.11.2013.
PREAMBLE:
The Proposal of M/s Manyata Developers Pvt. Ltd., to establish a "IT/BT/BPO Park with Hotel, Serviced Apartments, Residential Condominium and Other Common Facilities" at Kotnatevaru, Kondanahalli and Collcholli Villages, Devanahalli Taluk, Bangalore Rural District with an investment of Rs. 1880.27 crore, was approved 22nd SHLCC meeting held on 24.05.2010. The Government Order was issued vide Government Order No. CI 190 SPI 2010, dated: 02.06.2010 read at (2) above.
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, The State High Level Clearance Committee noted the opinion given by the Advocate General of Karnataka in his letter dated: 06.11.2013 regarding M/s Manyata Developers Pvt. Ltd.. as per the decision of 32nd SHLCC. Committee noted the Advocate General of Karnataka's opinion which is as under:
"Even without resorting to the process of securing change of land use under Section 14 A of the KT & CP Act, it is open to issue a declaration under Section 3 of the KIAD Act if the following steps are adhered to before doing so:
1) The Government should balance the requirements of both enactments to so as to provide an harmonious construction of both the statutes.
2) Before a Notification under Section 3( 1) of the KIAD Act, the Government should consider the fact that such a declaration would result in change of land use.
3) There should be a clear indication of the application of mind to all aspects of the matter relating to change of land use where the land is to be declared as an industrial area as against the earlier earmarking for a different purpose.
4) There should be a clear finding that development of such industry is possible only in that area and that area alone is suitable for the purpose and that there is no other alternative,
If these steps precede the decision to notify under Section 3 (1), then the Notification under Section 3 (1) of the Act would be legal and valid.
ಭಾಗ ೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ೬೫೭Further Advocate General has mentioned that pursuant to the resolution of the State High Level Clearance Committee dated:
24.05.2010, a Government Order was issued on 04.06.2010. A perusal of the said G.O indicates that the G.O is valid only for a period of two years. In other words, the Government Order approving the project in question has lapsed on the expiry of two years from the said date. In this view of the matter, if the Government is still interested in considering the project, the entire exercise will have to be undertaken afresh in the light of the law set out in the earlier paragraphs.
The committee noted the opinion of the Advocate General along with the fallowing salient features in the present case. A conjoint reading of both the facts at hand herein and the opinion of the learned Advocate General would summate as under:
The Karnataka Industrial Area Development Act, 1966 is an enactment not only with an intent and purport of developing industrial area in the state but also to have a planned approach of industrial lands. The initiatives of planning in terms of the KT & CP Act and the KIAD Act, 1966 are to be in consonance with one another. In view of the aforementioned the following facts were discussed:
1) The lands in question form a part of a contiguous block with the lands notified for IT Park Industrial Area in terms of an earlier notification, dated 25.09.2008. Not to mention contiguity, compactness and integrated nature of the land adds to the already existing industrial infrastructure created for the IT Park Industrial Area. In view of the same the contiguity, compactness and existing infrastructure form the furtherance of the essential object of both the enactments, the KT & CP Act and the KIAD Act, i.e.. planned development.
2) A combined layout map of Bangalore Hardware - IT /BT - Areospace and SEZ Parks at Devanahalli, Bangalore adjacent to the Bangalore International Airport (yet another acquisition under the KIADB, i.e.. industrial land) are part of villages that are adjacent to the present lands forming a contiguous, compact block of industrial lands. Not to mention the project proponent has procured the consent of the land owners whose lands are situated adjacent and adjoining to the existing land situated at ITBT Industrial Area. The proposed acquisition will enable the formation of a better, larger and well equipped industrial land/area rather than having a small piece/patch of lands earmarked for agriculture amongst, rather in the midst, of large contiguous industrial lands.
3) The lands proposed to be acquired for the project proponent herein are situated at Gollahalli-Kotnathevaru-Kondanahalli villages. All villages adjoining the area proposed for the project herein, i.e., Bandikodigehalli Gollahalli, Singalli, Arebinnmangala. Huvinaykanahalli, Mahadevakodigenahalli, B. K. Palya, kothnathevaru, Kondanahalli for industrial areas acquired for Hardware - IT /BT - Areospace and SEZ Parks. These lands are already existing industrial lands. The lands proposed for acquisition form a contiguous block with the lands mentioned hereinabove. In view of the contiguity, compactness and integrated nature the lands are ideally suited for industrial usage.
4) The said lands are for a Single Unit Complex and incidentally the project proponent has procured consent as regards most of the lands proposed for acquisition. The requirement of a track to an extent as required by the petitioner coupled with other factors as mentioned hereinabove make the proposal of the project feasible in 'the very lands and the said lands are the only lands ideally suited for the project.
Incidentally, the opinion of the learned Advocate General read in consonance with the facts on hand in the present case would reveal that the lands are ideally suited for the proposed project and the same is to be encouraged. The case at hand herein is one wherein change in land use as contemplated under the KT & CP Act, is not required as the case squarely fits into the parameters as assigned by the learned Advocate General for harmonious reading of both enactments, i.e., the KT & CP Act and the KIAD Act. In turn, making the proposal at hand, a fit case for issuance of notification under section 3(1) of KIAD Act, 1966.· In view of the same the committee decided to encourage the project. The committee ratified the issuance of GO dated 15.3.2013 and granted 2 years extension of time to implement the project.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting held on 19.11 .2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 158 SPI 2012, BANGALORE, DATED: 03.01.2014
Action taken by Commerce and Industries Department as per Government Order No. CI 158 SPI 2012, dated: 15.03.2013 is ratified. Further the Government is pleased to grant two years extension of time from the date of issue of this order to M/s Manyata Developers Pvt. Ltd., to implement the project approved vide Government Order No. CI 190 SPI 2010, dated: 02.06.2010 and Government Order No. CI 158 SPI 2012, dated: 15.03.2013.
AII other terms and conditions indicated in the Government Order dated: 02.06.2010 read at (2) above, remain unaltered.
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
PR 323
Commerce and Industries Department.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ಭಾಗ ೧ ೬೫೮ನಗರಾಭಿವೃದ್ಧಿ ಸಚಿವಾಲಯ
ಅಧಿಕೃತ ಜ್ಞಾಪನ
ಸಂಖ್ಯೆ: ನಅಇ 39 ಸಮನ್ವಯ 2014 ಬೆಂಗಳೂರು, ದಿನಾಂಕ: 01-03-2014
ವಿಷಯ : ನಗರಾಭಿವೃದ್ಧಿ ಇಲಾಖೆಯ ಟೆಂಡರ್ ಬುಲೆಟಿನ್ನಲ್ಲಿ ಪ್ರಕಟಿಸಲು ಅಪರ ಕಾರ್ಯದರ್ಶಿ ನಗರಾಭಿವೃದ್ಧಿ ಇಲಾಖೆ ಇವರನ್ನು ಟೆಂಡರ್ ಬುಲೆಟಿನ್ ಅಧಿಕಾರಿಯನ್ನಾಗಿ ನೇಮಿಸುವ ಬಗ್ಗೆ.
ಉಲ್ಲೇಖ : ಸಮಸಂಖ್ಯೆಯ ಅಧಿಕೃತ ಜ್ಞಾಪನ, ದಿನಾಂಕ: 27-01-2014.
ಉಲ್ಲೇಖಿತ ಅಧಿಕೃತ ಜ್ಞಾಪನದಲ್ಲಿ ನಗರಾಭಿವೃದ್ಧಿ ಇಲಾಖೆಯ ಟೆಂಡರ್ ನೋಟಿಫಿಕೇಷನ್ ಪ್ರಸ್ತಾವನೆಗಳನ್ನು ಟೆಂಡರ್ ಬುಲೆಟಿನ್ನಲ್ಲಿ ಪ್ರಕಟಿಸಲು ಸರ್ಕಾರದ ಅಪರ ಕಾರ್ಯದರ್ಶಿ, ನಗರಾಭಿವೃದ್ಧಿ ಇಲಾಖೆ ಇವರನ್ನು ಟೆಂಡರ್ ಬುಲೆಟಿನ್ ಅಧಿಕಾರಿಯನ್ನಾಗಿ ನೇಮಿಸಲಾಗಿದ್ದು ಇದನ್ನು ಮಾರ್ಪಡಿಸಿ ಇವರ ಬದಲಾಗಿ ಸರ್ಕಾರದ ಉಪ-ಕಾರ್ಯದರ್ಶಿ-2, ನಗರಾಭಿವೃದ್ಧಿ ಇಲಾಖೆ ಇವರನ್ನು ಟೆಂಡರ್ ಬುಲೆಟಿನ್ ಅಧಿಕಾರಿಯನ್ನಾಗಿ ಕೂಡಲೇ ಜಾರಿಗೆ ಬರುವಂತೆ ನೇಮಿಸಲಾಗಿದೆ.
ಎನ್. ಗೋಪಾಲಯ್ಯ
PR. 325
ಸರ್ಕಾರದ ಅಧೀನ ಕಾರ್ಯದರ್ಶಿ,
ನಗರಾಭಿವೃದ್ಧಿ ಇಲಾಖೆ (ಸಮನ್ವಯ).
ನಗರಾಭಿವೃದ್ಧಿ ಸಚಿವಾಲಯ
ಅಧಿಕೃತ ಜ್ಞಾಪನ
ಸಂಖ್ಯೆ: ನಅಇ 39 ಸಮನ್ವಯ 2014 ಬೆಂಗಳೂರು, ದಿನಾಂಕ: 27-01-2014
ವಿಷಯ : ನಗರಾಭಿವೃದ್ಧಿ ಇಲಾಖೆಯ ಟೆಂಡರ್ ಬುಲೆಟಿನ್ನಲ್ಲಿ ಪ್ರಕಟಿಸಲು ಅಪರ ಕಾರ್ಯದರ್ಶಿ ನಗರಾಭಿವೃದ್ಧಿ ಇಲಾಖೆ ಇವರನ್ನು ಟೆಂಡರ್ ಬುಲೆಟಿನ್ ಅಧಿಕಾರಿಯನ್ನಾಗಿ ನೇಮಿಸುವ ಬಗ್ಗೆ.
ಉಲ್ಲೇಖ : ಸರ್ಕಾರದ ಉಪ-ಕಾರ್ಯದರ್ಶಿ-1, ನಗರಾಭಿವೃದ್ಧಿ ಇಲಾಖೆ ಇವರ ಟಿಪ್ಪಣಿ ದಿನಾಂಕ: 18-01-2014.
ನಗರಾಭಿವೃದ್ಧಿ ಇಲಾಖೆಯ ಟೆಂಡರ್ ನೋಟಿಫಿಕೇಷನ್ ಪ್ರಸ್ತಾವನೆಗಳನ್ನು ಟೆಂಡರ್ ಬುಲೆಟಿನ್ನಲ್ಲಿ ಪ್ರಕಟಿಸಲು ಟೆಂಡರ್ ಬುಲೆಟಿನ್ ಅಧಿಕಾರಿಯಾಗಿದ್ದ ಸರ್ಕಾರದ ಉಪ-ಕಾರ್ಯದರ್ಶಿ-1, ನಗರಾಭಿವೃದ್ಧಿ ಇಲಾಖೆ ಇವರ ಬದಲಾಗಿ ಸರ್ಕಾರದ ಅಪರ ಕಾರ್ಯದರ್ಶಿ, ನಗರಾಭಿವೃದ್ಧಿ ಇಲಾಖೆ ಇವರನ್ನು ಟೆಂಡರ್ ಬುಲೆಟಿನ್ ಅಧಿಕಾರಿಯನ್ನಾಗಿ ಕೂಡಲೇ ಜಾರಿಗೆ ಬರುವಂತೆ ನೇಮಿಸಲಾಗಿದೆ.
ಎನ್. ಗೋಪಾಲಯ್ಯ
ಸರ್ಕಾರದ ಅಧೀನ ಕಾರ್ಯದರ್ಶಿ,
ನಗರಾಭಿವೃದ್ಧಿ ಇಲಾಖೆ (ಸಮನ್ವಯ).
PR. 326
ಯೋಜನೆ, ಕಾರ್ಯಕ್ರಮ ಸಂಯೋಜನೆ ಮತ್ತು ಸಾಂಖ್ಯಿಕ ಸಚಿವಾಲಯ
ವಿಷಯ : ಕರ್ನಾಟಕ ಶಾಸಕರ ಸ್ಥಳೀಯ ಪ್ರದೇಶಾಭಿವೃದ್ಧಿ ಯೋಜನೆ ಅಡಿ 2013-14ನೇ ಸಾಲಿನ ಅನುದಾನ ಬಿಡುಗಡೆ ಮಾಡುವ ಬಗ್ಗೆ.
ಓದಲಾಗಿದೆ : 1. ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಯೋಇ 47 ಯೋವಿವಿ 2013, ದಿನಾಂಕ: 11-07-2013.
2. ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಯೋಇ 36 ಯೋವಿವಿ 2013, ದಿನಾಂಕ: 02-08-2013.
3. ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಯೋಇ 36 ಯೋವಿವಿ 2013, ದಿನಾಂಕ: 19-09-2013.
4. ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಯೋಇ 36 ಯೋವಿವಿ 2013, ದಿನಾಂಕ: 28-10-2013.
5. ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಯೋಇ 36 ಯೋವಿವಿ 2013, ದಿನಾಂಕ: 09-01-2014.
ಪ್ರಸ್ತಾವನೆ :
2013-14ನೇ ಸಾಲಿನಲ್ಲಿ ಕರ್ನಾಟಕ ಶಾಸಕರ ಸ್ಥಳೀಯ ಪ್ರದೇಶಾಭಿವೃದ್ಧಿ ಯೋಜನೆ ಅಡಿ ಒಟ್ಟು ರೂ.60150.00 ಲಕ್ಷಗಳನ್ನು ಒದಗಿಸಲಾಗಿದ್ದು, ಈ ಪೈಕಿ ಮೇಲೆ ಓದಲಾದ (1)ರ ಸರ್ಕಾರಿ ಆದೇಶದಲ್ಲಿ 2012-13ನೇ ಸಾಲಿನಲ್ಲಿ 8 ಜಿಲ್ಲೆಗಳಿಗೆ ಬಿಡುಗಡೆಯಾಗದ ರೂ.1547.52 ಲಕ್ಷಗಳನ್ನು 2013-14ನೇ ಸಾಲಿನ ಅನುದಾನದಲ್ಲಿ ಬಿಡುಗಡೆ ಮಾಡಲಾಗಿದೆ ಹಾಗೂ ಓದಲಾದ (2), (3), (4) ಮತ್ತು (5)ರ ಸರ್ಕಾರಿ ಆದೇಶಗಳಲ್ಲಿ ಕರ್ನಾಟಕ ಶಾಸಕರ ಸ್ಥಳೀಯ ಪ್ರದೇಶಾಭಿವೃದ್ಧಿ ಯೋಜನೆಯಡಿ 2013-14ನೇ ಸಾಲಿಗೆ ಈವರೆಗೆ ತಲಾ ರೂ.146.40 ಲಕ್ಷಗಳಂತೆ ಒಟ್ಟು ರೂ.43430.56 ಲಕ್ಷಗಳನ್ನು ಸೇರಿಸಿ ಈವರೆಗೆ ಒಟ್ಟು ರೂ.44978.08 ಲಕ್ಷಗಳನ್ನು ಬಿಡುಗಡೆ ಮಾಡಲಾಗಿದೆ.
2013-14ನೇ ಸಾಲಿನ ಅಂತಿಮ ಕಂತಿನ ಅನುದಾನವಾಗಿ ತಲಾ ರೂ.50.00 ಲಕ್ಷಗಳಂತೆ ರೂ.14850.00 ಲಕ್ಷಗಳನ್ನು ಬಿಡುಗಡೆಗೊಳಿಸಲು ಸರ್ಕಾರವು ಉದ್ದೇಶಿಸಿದೆ. ಅದರಂತೆ ಈ ಕೆಳಕಂಡ ಆದೇಶ.
ಭಾಗ ೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ೬೫೯ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಯೋಇ 36 ಯೋವಿವಿ 2013, ಬೆಂಗಳೂರು, ದಿನಾಂಕ: 04-03-2014.
ಕರ್ನಾಟಕ ಶಾಸಕರ ಸ್ಥಳೀಯ ಪ್ರದೇಶಾಭಿವೃದ್ಧಿ ಯೋಜನೆಯಡಿ 2013-14ನೇ ಸಾಲಿನ ಅಂತಿಮ ಕಂತಿನ ಅನುದಾನವಾಗಿ ಅನುಬಂಧ-1ರಲ್ಲಿ ಸೂಚಿಸಿರುವ ವಿಧಾನಸಭಾ ಕ್ಷೇತ್ರಗಳಿಗೆ ಮತ್ತು ಅನುಬಂಧ-2ರಲ್ಲಿ ಸೂಚಿಸಿರುವ ವಿಧಾನ ಪರಿಷತ್ ಸದಸ್ಯರುಗಳ ಕ್ಷೇತ್ರಗಳಿಗೆ ತಲಾ ರೂ.50.00 ಲಕ್ಷ (ಐವತ್ತು ಲಕ್ಷ ರೂಪಾಯಿಗಳು ಮಾತ್ರ)ಗಳಂತೆ ಒಟ್ಟು ರೂ.14850.00 ಲಕ್ಷ (ಒಂದು ನೂರ ನಲವತ್ತೆಂಟು ಕೋಟಿ ಐವತ್ತು ಲಕ್ಷ ರೂಪಾಯಿಗಳು ಮಾತ್ರ) ಗಳನ್ನು ಸಂಬಂಧಪಟ್ಟ ಜಿಲ್ಲಾಧಿಕಾರಿಗಳಿಗೆ ಈ ಕೆಳಕಂಡ ಲೆಕ್ಕಶೀರ್ಷಿಕೆಗಳಡಿ ಬಿಡುಗಡೆ ಮಾಡಿದೆ.
| ;ಋಋ | \]^ _'/` | ಉ ಖಒಒ" ಂ/ / | - ; ಖಒಒ= ಂ/ / | ಔ#ಕ ಖಒಒ" ಂ/ / |
| 6 | ;ಒಇಒ=5<=;5ಒ=<=<;=<ಒಆ 91 ?ಣ: | ,66+5ಆ | :: | ,66+5ಆ |
| 1 | >ಒಇಒ=5<=ಜಿ<<=<=<,=,6; 9) ಖ ?ಣ: | ;ಒಆ<;+ಆ> | ಖಈಚಚಋಇ0 | 6>>ಜಿ<+6< |
| ಇ | >ಒಇಒ=5<=ಜಿ<<=<=<,=>;; 90 -'ಜ ಓ : | ,6ಜಿಒಜಿ+,ಜಿ | 7ಈಖಖಋ0ಈ | ,ಜಿ>>5+ಜಿ6 |
| 7 | >ಒಇಒ=5<=ಜಿ<<=<=<,=>;6 9ಕಿಓ ಓ : | ಒ<ಜಿ6+;ಇ | 60ಖಇಋಘಿಘಿ | 5ಇ5ಇ+;5 |
| ಔ#ಕ | 77ಘಿಚಖಋ5ಖ | 67ಖಈ5ಋ55 | ಈಘಿಖ1ಖಋ5ಖ |
ಬಿಡುಗಡೆಯಾದ ಈ ಅನುದಾನವನ್ನು ಜಿಲ್ಲಾಧಿಕಾರಿಗಳ ವೈಯಕ್ತಿಕ ಠೇವಣಿ ಖಾತೆಯಲ್ಲಿಟ್ಟುಕೊಂಡು ಅಗತ್ಯತೆಗೆ ಅನುಗುಣವಾಗಿ ಖರ್ಚು ಮಾಡತಕ್ಕದ್ದು.
ಜಿಲ್ಲಾಧಿಕಾರಿಗಳು ಆಯಾ ಶಾಸಕರಿಂದ ಕ್ರಿಯಾ ಯೋಜನೆಯನ್ನು ಪಡೆದು ಅಧಿಕೃತ ಜ್ಞಾಪನ ಸಂಖ್ಯೆ:ಯೋಇ 39 ಯೋವಿವಿ 2012 (ಭಾ), ದಿನಾಂಕ: 10-07-2012ರನ್ವಯ ಮತ್ತು ತದನಂತರ ಹೊರಡಿಸಿದ ಮಾರ್ಗಸೂಚಿಗಳನ್ವಯ ಅನುಷ್ಟಾನಗೊಳಿಸತಕ್ಕದ್ದು.
ಕಾಮಗಾರಿಗಳನ್ನು ಅನುಷ್ಟಾನಗೊಳಿಸುವ ಮುನ್ನ ಪರಿಷ್ಕøತ ಮಾರ್ಗಸೂಚಿಯ ಕಂಡಿಕೆ 3.15 ರನ್ವಯ ಅಗತ್ಯ ಕ್ರಮ ಕೈಗೊಳ್ಳತಕ್ಕದ್ದು.
ನಿಯಮಾನುಸಾರ ಹಣ ಬಳಕೆ ಪ್ರಮಾಣ ಪತ್ರವನ್ನು ಆಯಾ ಜಿಲ್ಲಾಧಿಕಾರಿಗಳ ಮೇಲು ಸಹಿಯೊಂದಿಗೆ ಸರ್ಕಾರಕ್ಕೆ ಸಲ್ಲಿಸುವುದು. ಬಿಡುಗಡೆ ಮಾಡಿದ ಅನುದಾನವನ್ನು ನಿಗದಿತ ಅವಧಿಯಲ್ಲಿ ಬಳಕೆ ಮಾಡಿಕೊಳ್ಳತಕ್ಕದ್ದು.
ಈ ಆದೇಶವನ್ನು ಆರ್ಥಿಕ ಇಲಾಖೆಯ ಹಿಂಬರಹ ಸಂಖ್ಯೆ: ಆಇ 344/ವೆಚ್ಚ-06/2013, ದಿನಾಂಕ: 03-03-2014ರಲ್ಲಿ ನೀಡಿರುವ ಸಹಮತಿಯ ಮೇರೆಗೆ ಹೊರಡಿಸಲಾಗಿದೆ.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪಾಲರ ಆಜ್ಞಾನುಸಾರ ಮತ್ತು ಅವರ ಹೆಸರಿನಲ್ಲಿ,
ಎಸ್.ಉಮಾವತಿ,
ಸರ್ಕಾರದ ಅಧೀನ ಕಾರ್ಯದರ್ಶಿ-1 & 2,
ಯೋಜನೆ, ಕಾರ್ಯಕ್ರಮ ಸಂಯೋಜನೆ ಮತ್ತು ಸಾಂಖ್ಯಿಕ ಇಲಾಖೆ.
ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಯೋಇ 36 ಯೋವಿವಿ 2013, ಬೆಂಗಳೂರು, ದಿನಾಂಕ: 04-03-2014ರ ಅನುಬಂಧ-1
| ; | ( ಚಿ/9ಚಿ?; | \]^ 7ಈಚಈ:05:ಖ55:5:56 | ಔ#ಕ | ||
| 6ಇ1 | 711 | 71ಇ | |||
| 6` | ಖ ಕಿಎ( ಚಿ/9ಚಿ?; | ||||
| 6 | ಠ.![ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಠ.1ಎ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | &h. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | )ಈ[ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | h ^ ಊ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | ದ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ 1` | ಛ>ಎ( ಚಿ/9ಚಿ?; | 6ಚಇಋ1ಖ | ಘಿ1ಋಚ5 | ಇ7ಋ51 | ಇ55ಋ55 |
| 6 | 7k | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ) ಛಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ) ಛಿ9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ಓ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ಖ9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | ಖಕಿ9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಚ | ಂ9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಖ | ಖ9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಘಿ | h ಘಕಛಿ9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 1ಈಘಿಋಘಿ1 | 6ಇಘಿಋ5ಈ | ಈ6ಋ5ಇ | 7ಈ5ಋ55 | |
| ಇ` | %; ಎ( ಚಿ/9ಚಿ?; | ||||
| 6 | 12 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಘ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ? ಛಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ಏ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ಈ ^ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| ಔ#ಕ | 6ಚಇಋ1ಖ | ಘಿ1ಋಚ5 | ಇ7ಋ51 | ಇ55ಋ55 | |
| 7` | $ಎ ( ಚಿ/9ಚಿ?; | ||||
| 6 | ಕಛಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| ಇ | [ ![ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | [ 1ಎ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | ಓ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಚ | ? &ಕಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಖ | &ಕ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 1ಇ6ಋ57 | 61ಇಋ05 | 7ಈಋಇ0 | 755ಋ55 | |
| ಈ` | &ಛಿ ಎ ( ಚಿ/9ಚಿ?; | ||||
| 6 | ? ಕ9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | 8![ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| 7 | 81ಎ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | 82[9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | #ಊಓಈ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಚ | ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಖ | ಘಿ ಕಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಘಿ | 1ಎ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 1ಈಘಿಋಘಿ1 | 6ಇಘಿಋ5ಈ | ಈ6ಋ5ಇ | 7ಈ5ಋ55 | |
| 0` | '' ,ಕಿಎ( ಚಿ/9ಚಿ?; | ||||
| 6 | ಕಿ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | 0 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | 9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ಜ^ಈ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 66ಈಋಈ1 | 06ಋಖ5 | 11ಋ0ಖ | 155ಋ55 | |
| ಚ` | 'ಜಎ( ಚಿ/9ಚಿ?; | ||||
| 6 | 9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ? | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ?2[9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | /ಔ9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | 9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | 7 ಊ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಚ | 7^9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 151ಋ60 | 65ಖಋ6ಈ | ಇಘಿಋ0ಘಿ | ಇಈ5ಋ55 | |
| ಖ` | -ಜಎ( ಚಿ/9ಚಿ?; | ||||
| 6 | -]ಕಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ) | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ಕಿ9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ಋ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | k | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 675ಋ55 | ಚಚಋ1ಈ | 1ಖಋಇಈ | 1ಈ5ಋ55 | |
| ಘಿ` | ಎ( ಚಿ/9ಚಿ?; | ||||
| 6 | ಖಿ2/ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | hಕಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | +ಙ+ಗಊ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ಈ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ) ಚ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| ಔ#ಕ 65` | %\ಛ-ಎ( ಚಿ/9ಚಿ?; | 6ಚಇಋ1ಖ | ಘಿ1ಋಚ5 | ಇ7ಋ51 | ಇ55ಋ55 |
| 6 | ^) ಛಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | 1[\ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ಖಿಖ'ಜ] | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | h | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | {ಠ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 677ಋ75 | ಚಚಋ1ಈ | 1ಖಋಇಈ | 1ಈ5ಋ55 | |
| 66` | ಎ( ಚಿ/9ಚಿ? ; | ||||
| 6 | ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಖಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | 12 1 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ಊಕಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ಜ 9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | 1 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಚ | [\ಈ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಖ | ಠ8 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಘಿ | 1 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 65 | ಋಜ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 66 | ^ ಕಛಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಇ6ಚಋ0ಖ | 60ಘಿಋಘಿಈ | 01ಋಇಚ | ಈಈ5ಋ55 | |
| 61` | /ಎ ( ಚಿ/9ಚಿ?; | ||||
| 6 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| 1 | ಅ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| 7 | ? &ಜ][ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 66ಈಋಈ1 | 06ಋಖ5 | 11ಋ0ಖ | 155ಋ55 | |
| 6ಇ` | 9 / ಎ ( ಚಿ/9ಚಿ ?; | ||||
| 6 | ಈ 0ಔ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಘಿಙ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | $% | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ^ ಚ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ಕಛಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | ?ಓ ಚ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಚ | )ಅ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಖ | ಓ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಘಿ | !ಗಿಘಈ ದಚ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 65 | h8 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 66 | ಖಿ9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 61 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| 6ಇ | ಓ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 67 | ಘhಊ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 6ಈ | # ಈ.9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 60 | h ![ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 6ಚ | +.+ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 6ಖ | h ಘಕಛಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 6ಘಿ | hಜ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 15 | 0 1 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 16 | ಓಘಿ 0ಔ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 11 | ಠ+ಃ+ಗ +ಈ ದಚ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1ಇ | 9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 17 | ಓರ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1ಈ | 0 ಋ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 10 | 7++.9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1ಚ | ಖಿಙ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1ಖ | ಓ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಖ5ಖಋ07 | 7ಇ1ಋ05 | 6ಈಖಋಚ0 | 6755ಋ55 | |
| 67` | 9 ;' ಎ ( ಚಿ/9ಚಿ?; | ||||
| 6 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| 1 | ಖ|) ಛಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ಕಛಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ಚ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 66ಈಋಈ1 | 06ಋಖ5 | 11ಋ0ಖ | 155ಋ55 | |
| 6ಈ` | ಆಎ( ಚಿ/9ಚಿ? ; | ||||
| 6 | ಃ+79: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಛ-ಓ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ?ಓ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | 7 ಓ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ? ಖ 0ಔ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | ಓಖ9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಚ | ?.+ಅ+ ಚ 9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಖ | [ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಘಿ | [ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 65 | ಛ-}ಓ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 66 | ಂ ಜ][ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಇ6ಚಋ0ಖ | 60ಘಿಋಘಿಈ | 01ಋಇಚ | ಈಈ5ಋ55 | |
| 60` | ಒಎ'( ಚಿ/9ಚಿ?; | ||||
| 6 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| 1 | ಐ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ಚ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ಕಛಿ9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | +.+ ಚ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಚ | ಖಿ2 ಜ][ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 151ಋ60 | 65ಖಋ6ಈ | ಇಘಿಋ0ಘಿ | ಇಈ5ಋ55 | |
| 6ಚ` | ಜ/ ಎ' ( ಚಿ/9ಚಿ ?; | ||||
| 6 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| 1 | ಛಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ?ಓ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ಖ ಚ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 66ಈಋಈ1 | 06ಋಖ5 | 11ಋ0ಖ | 155ಋ55 | |
| 6ಖ` | ಒಎ'( ಚಿ/9ಚಿ?; | ||||
| 6 | ಓ ಚ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಅ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಈಚಋಚ0 | ಇ5ಋಘಿ5 | 66ಋಇ7 | 655ಋ55 | |
| 6ಘಿ` | ಜಿ?$ /ಃಒ ಎ' ( ಚಿ/9ಚಿ ?; | ||||
| 6 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| 1 | 1ಎ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | h ಎ ಅ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ) ಚಔ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| 0 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| ಚ | ![ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಖ | ಖಠ$2 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 1ಇ6ಋ57 | 61ಇಋ05 | 7ಈಋಇ0 | 755ಋ55 | |
| 15` | <ಒ2ಎ'( ಚಿ/9ಚಿ?; | ||||
| 6 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| 1 | ಖಂ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| 7 | h | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| ಔ#ಕ | 677ಋ75 | ಚಚಋ1ಈ | 1ಖಋಇಈ | 1ಈ5ಋ55 | |
| 16` | ]ರಎ'( ಚಿ/9ಚಿ?; | ||||
| 6 | ಖಿ *2 1 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | h ಊ 2ಋ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ಖಿ * | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ಋ_ಕಛಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| 0 | ) | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಚ | ಖಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 151ಋ60 | 65ಖಋ6ಈ | ಇಘಿಋ0ಘಿ | ಇಈ5ಋ55 | |
| 11` | ಒಎ'( ಚಿ/9ಚಿ?; ಚಿ | ||||
| 6 | ಊಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | )8ಕಛಿ=ಊಖ9ಖಿಣ: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | )8ಕಛಿ=ಊಖ9:9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | )8ಕಛಿ=ಊಖ 2 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | 'ಜಕಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| ಚ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| ಔ#ಕ | 151ಋ60 | 65ಖಋ6ಈ | ಇಘಿಋ0ಘಿ | ಇಈ5ಋ55 | |
| 1ಇ` | >ಎ( ಚಿ/9ಚಿ?; | ||||
| 6 | ಖಿ* . | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಈ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ಏ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | [\h & | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| 0 | hಖಕಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 6ಚಇಋ1ಖ | ಘಿ1ಋಚ5 | ಇ7ಋ51 | ಇ55ಋ55 | |
| 17` | ಖಗಿ-ಎ'( ಚಿ/9ಚಿ?; | ||||
| 6 | ಐಠ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಏkಕಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | )h ಅ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ತ[9: | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ಠಘಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | ))ಈ 0ಔ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಚ | ಅ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಖ | 7 ಕಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 1ಇ6ಋ57 | 61ಇಋ05 | 7ಈಋಇ0 | 755ಋ55 | |
| 1ಈ` | 9&h ಎ' ( ಚಿ/9ಚಿ ?; | ||||
| 6 | ಓತಿ ಅ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಠ ಕಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ಊ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | h ಚ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | h | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | 1 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಚ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| ಔ#ಕ | 151ಋ60 | 65ಖಋ6ಈ | ಇಘಿಋ0ಘಿ | ಇಈ5ಋ55 | |
| 10` | %\ ಎ' ( ಚಿ/9ಚಿ ?; | ||||
| 6 | ^ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ಅ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | 0ಛ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | 1 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 677ಋ75 | ಚಚಋ1ಈ | 1ಖಋಇಈ | 1ಈ5ಋ55 | |
| 1ಚ` | < /ಃಒ ಎ' ( ಚಿ/9ಚಿ ?; | ||||
| 6 | ಖಿ7 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | h ಜ^ . ಊ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ಚ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ಈ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ಕ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| ಔ#ಕ | 6ಚಇಋ1ಖ | ಘಿ1ಋಚ5 | ಇ7ಋ51 | ಇ55ಋ55 | |
| 1ಖ` | ಎ'( ಚಿ/9ಚಿ?; | ||||
| 6 | ಖಿಃ] | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| ಇ | [ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| ಔ#ಕ | 66ಈಋಈ1 | 06ಋಖ5 | 11ಋ0ಖ | 155ಋ55 | |
| 1ಘಿ` | 9ಎ'( ಚಿ/9ಚಿ?; | ||||
| 6 | h 1ಎ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | h ![ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | h 2 1 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ಅ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | ^ಅ= | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಚ | hಊ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಖ | ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಘಿ | #_[\ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 65 | . | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 66 | #h | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 61 | ^ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 6ಇ | 1ಎ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 67 | /k[\ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 6ಈ | 3 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 60 | h | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 6ಚ | ಋಎಗಘ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 6ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| ಔ#ಕ | ಈ6ಘಿಋಖ7 | 1ಚಖಋ65 | 651ಋ50 | ಘಿ55ಋ55 | |
| ಇ5` | /ಎ'( ಚಿ/9ಚಿ?; | ||||
| 6 | h | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | #7 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | 02[h | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | 7 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | #ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| ಚ | ಈ 0 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 151ಋ60 | 65ಖಋ6ಈ | ಇಘಿಋ0ಘಿ | ಇಈ5ಋ55 | |
| ಔ#ಕ | 070ಘಿಋ61 | ಇ705ಋಖ5 | 61ಚ5ಋ5ಖ | 66155ಋ55 |
ಎಸ್.ಉಮಾವತಿ,
ಸರ್ಕಾರದ ಅಧೀನ ಕಾರ್ಯದರ್ಶಿ-1 & 2,
ಯೋಜನೆ, ಕಾರ್ಯಕ್ರಮ ಸಂಯೋಜನೆ ಮತ್ತು ಸಾಂಖ್ಯಿಕ ಇಲಾಖೆ.
ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಯೋಇ 36 ಯೋವಿವಿ 2013, ಬೆಂಗಳೂರು, ದಿನಾಂಕ: 04-03-2014ರ ಅನುಬಂಧ-2
| ; | ( ಚಿ/->)ಕಿ _];ಏ];=` | \]^ 7ಈಚಈ:05:ಖ55:5:56 | ಔ#ಕ | ||
| 6ಇ1 | 711 | 71ಇ | |||
| 6` ಖ ಕಿಎ | |||||
| 6 | )ಘಿ. ?.ಃಈ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | '_. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಈಚಋಚ0 | ಇ5ಋಘಿ5 | 66ಋಇ7 | 655ಋ55 | |
| 1` ಛ>ಎ | |||||
| 6 | ಛ1 ಓ ಙ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 1ಖಋಖಖ | 6ಈಋ7ಈ | ಈಋ0ಚ | ಈ5ಋ55 | |
| ಇ` % ಎ | |||||
| 6 | ಙ+'?. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 1ಖಋಖಖ | 6ಈಋ7ಈ | ಈಋ0ಚ | ಈ5ಋ55 | |
| 7` $ಎ | |||||
| 6 | ಖಖಖಗ+ ?.+ಖಿ ಕಿಔ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 1ಖಋಖಖ | 6ಈಋ7ಈ | ಈಋ0ಚ | ಈ5ಋ55 | |
| ಈ` &ಛಿ ಎ | |||||
| 6 | #2hಊಃಈ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | +ಠ+0[k | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | #_ಃಈ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ 0` -ಜಎ | ಖ0ಋ07 | 70ಋಇಈ | 6ಚಋ56 | 6ಈ5ಋ55 | |
| 6 | ?.k)k | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 1ಖಋಖಖ | 6ಈಋ7ಈ | ಈಋ0ಚ | ಈ5ಋ55 | |
| ಚ` ಎ | |||||
| 6 | 7.#. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | +ಗ+ [ಔ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಈಚಋಚ0 | ಇ5ಋಘಿ5 | 66ಋಇ7 | 655ಋ55 | |
| ಖ` ಎ | |||||
| 6 | ಓ *0. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಗ +ಅ+!ಗಿಘ [ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ಗ +.+ ^. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಖ0ಋ07 | 70ಋಇಈ | 6ಚಋ56 | 6ಈ5ಋ55 | |
| ಘಿ` /ಎ | |||||
| 6 | ಗ ++ಓ0 ತಿ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | .$%. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಈಚಋಚ0 | ಇ5ಋಘಿ5 | 66ಋಇ7 | 655ಋ55 | |
| 65` 9/ಎ | |||||
| 6 | ಖಖಖ ಖ | {ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಠ+ಘಿ +ಜ]ಔ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ಗ +.+71 . | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ಅ+ಗ.+ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | ಠ+ಗ.+ 0. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | ಖಖಖಗ.+.+ಈ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಚ | .++ ಚ 0. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಖ | ಈ{ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಘಿ | 2@ಗ +.+ ಔ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 65 | 2@ಖಖಖ ಎಘಿ.3. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 66 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< | |
| 61 | 1#ಊ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 6ಇ | + ಘಿ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 67 | + [} | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 6ಈ | .7 .7 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ _66`9;'ಎ | 7ಇಇಋ15 | 1ಇ6ಋಚಈ | ಖಈಋ5ಈ | ಚಈ5ಋ55 | |
| 6 | ಜ][} | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ? 2{ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | +ಛ-}k | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಖ0ಋ07 | 70ಋಇಈ | 6ಚಋ56 | 6ಈ5ಋ55 | |
| _61`ಆಎ | |||||
| 6 | 7ಐಓ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಗ.+ಓ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ++ [ಔ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | .+ಊ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | 7+ ?.+ಓ 0 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 0 | +ಊ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 6ಚಇಋ1ಖ | ಘಿ1ಋಚ5 | ಇ7ಋ51 | ಇ55ಋ55 | |
| _6ಇ`ಒಎ | |||||
| 6 | ಋh 8{ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಠ+ಛ-} | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | #0ಔ1. [ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಖ0ಋ07 | 70ಋಇಈ | 6ಚಋ56 | 6ಈ5ಋ55 | |
| _67`ಒಎ | |||||
| 6 | ಗ +7+[ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಃ+ಘಿ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಈಚಋಚ0 | ಇ5ಋಘಿ5 | 66ಋಇ7 | 655ಋ55 | |
| _6ಈ` ಜಿ?$/ಃಒಎ | |||||
| 6 | ಅ++ {ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | + khಊ ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | " 0.[\. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಖ0ಋ07 | 70ಋಇಈ | 6ಚಋ56 | 6ಈ5ಋ55 | |
| _60`<ಒ2ಎ | |||||
| 6 | +21? 20 ಃ] | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಜಖಿ2/ಘಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ _6ಚ`]ರಎ | ಈಚಋಚ0 | ಇ5ಋಘಿ5 | 66ಋಇ7 | 655ಋ55 | |
| 6 | ಅ+ ?.+0 ಋ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | h ಋ0 ಃ] ಊ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | .+ +7i[} | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | 2@ಂ++ಛ-}hಊಚ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಈ | h 20. ಊ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 677ಋ75 | ಚಚಋ1ಈ | 1ಖಋಇಈ | 1ಈ5ಋ55 | |
| _6ಖ` ಚಿಒಎ | |||||
| 6 | ಋಎಃ][} | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | )ಓ ಃ] | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ~ಠ8ಘಿ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 7 | ಖಿ2/ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 66ಈಋಈ1 | 06ಋಖ5 | 11ಋ0ಖ | 155ಋ55 | |
| _6ಘಿ`> | |||||
| 6 | [}ಔ h | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 1ಖಋಖಖ | 6ಈಋ7ಈ | ಈಋ0ಚ | ಈ5ಋ55 | |
| _15`ಖಗಿ-ಎ | |||||
| 6 | #[0 | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 1ಖಋಖಖ | 6ಈಋ7ಈ | ಈಋ0ಚ | ಈ5ಋ55 | |
| _16`9&hಎ | |||||
| 6 | ಗ.+.+ಃಈ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಙ+ಗ.+{ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | [+h ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಖ0ಋ07 | 70ಋಇಈ | 6ಚಋ56 | 6ಈ5ಋ55 | |
| _11`%\ಎ | |||||
| 6 | ಜಘ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಗ++ಜಋ20 1 {ಖ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | ಗ +ಖಿ2/. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಖ0ಋ07 | 70ಋಇಈ | 6ಚಋ56 | 6ಈ5ಋ55 | |
| _1ಇ` | |||||
| 6 | ' ಃ&.ಖಿ2 1!ಗಿಘ[ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | 1ಖಋಖಖ | 6ಈಋ7ಈ | ಈಋ0ಚ | ಈ5ಋ55 | |
| _17`9ಎ | |||||
| 6 | .#k ಃಈ. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಜಕಿತ 1 0. | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಇ | 1 0.ಖಿ {ಓಕಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಖ0ಋ07 | 70ಋಇಈ | 6ಚಋ56 | 6ಈ5ಋ55 |
R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2014-16
Licensed to post without prepayment WPP No. 297
ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಏಪ್ರಿಲ್ ೧೭, ೨೦೧೪ ಭಾಗ ೧ ೬೭೨| ; | ( ಚಿ/->)ಕಿ _];ಏ];=` | \]^ 7ಈಚಈ:05:ಖ55:5:56 | ಔ#ಕ | ||
| 6ಇ1 | 711 | 71ಇ | |||
| _1ಈ`/ಎ | |||||
| 6 | ಚ ಈ.ಖಿ | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| 1 | ಠ+ಠ+ಖಿk | ;ಜಿ+ಜಿಜಿ | ,ಒ+>ಒ | ಒ+5ಇ | ಒ<+<< |
| ಔ#ಕ | ಈಚಋಚ0 | ಇ5ಋಘಿ5 | 66ಋಇ7 | 655ಋ55 | |
| ಔ#ಕ | 165ಖಋ17 | 661ಚಋಖಈ | 76ಇಋಘಿ6 | ಇ0ಈ5ಋ55 |
ಎಸ್.ಉಮಾವತಿ,
ಸರ್ಕಾರದ ಅಧೀನ ಕಾರ್ಯದರ್ಶಿ-1 & 2, PR. 327
ಯೋಜನೆ, ಕಾರ್ಯಕ್ರಮ ಸಂಯೋಜನೆ ಮತ್ತು ಸಾಂಖ್ಯಿಕ ಇಲಾಖೆ.
ಶಿಕ್ಷಣ ಸಚಿವಾಲಯ
ವಿಷಯ : ಸರ್ಕಾರಿ ಪ್ರಾಥಮಿಕ ಶಾಲೆಗಳಲ್ಲಿ ಸೇವೆ ಸಲ್ಲಿಸುತ್ತಿರುವ ಆಯಾಗಳ ಮಾಸಿಕ ಗೌರವ ಧನವನ್ನು
–
ರೂ.3000/- ದಿಂದ ರೂ.5000/- ಕ್ಕೆ ಹೆಚ್ಚಿಸುವ ಬಗ್ಗೆ ಹಾಗೂ ರಾಷ್ಟ್ರೀಯ ಪಿಂಚಣಿ ವ್ಯವಸ್ಥೆ ಎಲ್ಐಟಿ (N.P.S.-lite scheme) ಸೌಲಭ್ಯವನ್ನು ಒದಗಿಸುವ ಬಗ್ಗೆ.
ಓದಲಾಗಿದೆ : 1. ಸರ್ಕಾರಿ ಆದೇಶ ಸಂಖ್ಯೆ: ಇಡಿ 100 ಪಿಬಿಎಸ್ 2009, ದಿನಾಂಕ: 09-09-2009.
2. ಆಯುಕ್ತರು ಸಾರ್ವಜನಿಕ ಶಿಕ್ಷಣ ಇಲಾಖೆ, ಬೆಂಗಳೂರು ರವರ ಪತ್ರ ಸಂಖ್ಯೆ:
-
ಎ.ಡಿ.ಎಂ.2(2)/ಆಯಾ./145/2006-07, ದಿನಾಂಕ: 08-07
2013.
ಪ್ರಸ್ತಾವನೆ :
ಮೇಲೆ ಓದಲಾಗಿರುವ (1)ರ ಸರ್ಕಾರಿ ಆದೇಶದಲ್ಲಿ ರಾಜ್ಯ ಸರ್ಕಾರಿ ಪ್ರಾಥಮಿಕ ಶಾಲೆಗಳಲ್ಲಿ ಕಾರ್ಯನಿರ್ವಹಿಸುತ್ತಿರುವ ಆಯಾಗಳ ಮಾಸಿಕ ವೇತನವನ್ನು ರೂ.1500/- ರಿಂದ 3000/- ಕ್ಕೆ ಹೆಚ್ಚಿಸಲಾಗಿತ್ತು. ಮೇಲೆ ಓದಲಾಗಿರುವ (2) ರ ಪತ್ರದಲ್ಲಿ ಆಯುಕ್ತರು, ಸಾರ್ವಜನಿಕ ಶಿಕ್ಷಣ ಇಲಾಖೆ, ಬೆಂಗಳೂರು ಇವರು ಆಯಾಗಳ ಮಾಸಿಕ ವೇತನವನ್ನು ಹೆಚ್ಚಿಸುವ ಬಗ್ಗೆ ಹಾಗೂ ಆಯಾಗಳು ನಿವೃತ್ತಿ ಹೊಂದಿದ ನಂತರ ನಿವೃತ್ತಿ ವೇತನ ನೀಡುವ ಬಗ್ಗೆ ಸರ್ಕಾರಕ್ಕೆ ಪ್ರಸ್ತಾವನೆ ಸಲ್ಲಿಸಿರುತ್ತಾರೆ. ಸದರಿ ಪ್ರಸ್ತಾವನೆಯನ್ನು ಸರ್ಕಾರ ಕೂಲಂಕಷವಾಗಿ ಪರಿಶೀಲಿಸಿ ಸರ್ಕಾರಿ ಪ್ರಾಥಮಿಕ ಶಾಲೆಗಳಲ್ಲಿ ಸೇವೆ ಸಲ್ಲಿಸುತ್ತಿರುವ ಆಯಾಗಳ ಮಾಸಿಕ ವೇತನವನ್ನು ಹೆಚ್ಚಿಸುವ ಬಗ್ಗೆ ಹಾಗೂ ನಿವೃತ್ತಿ ನಂತರ ನಿವೃತ್ತಿ ವೇತನ ಸೌಲಭ್ಯ ನೀಡುವ ಬಗ್ಗೆ ಈ ಕೆಳಕಂಡಂತೆ ಆದೇಶಿಸಿದೆ.
ಸರ್ಕಾರದ ಆದೇಶ ಸಂಖ್ಯೆ: ಇಡಿ 136 ಪಿಬಿಎಸ್ 2012, ಬೆಂಗಳೂರು ದಿನಾಂಕ: 26-12-2013.
2. ರಾಜ್ಯ ಸರ್ಕಾರಿ ಹಿರಿಯ ಪ್ರಾಥಮಿಕ ಶಾಲೆಗಳಲ್ಲಿ ಸೇವೆ ಸಲ್ಲಿಸುತ್ತಿರುವ ಆಯಾಗಳ ಮಾಸಿಕ ಗೌರವಧನವನ್ನು (Honararium) ರೂ.3000/- ದಿಂದ ರೂ.5000/- (ಐದು ಸಾವಿರ ರೂಪಾಯಿಗಳು ಮಾತ್ರ) ಗಳಿಗೆ ಹೆಚ್ಚಿಸಿ ಸರ್ಕಾರದ ಮಂಜೂರಾತಿ ನೀಡಲಾಗಿದೆ. ಈ ಗೌರವಧನವು ಲಮ್ಸಮ್ (Lumpsum) ಗೌರವಧನವಾಗಿರುತ್ತದೆ. ಡಿ.ಎ. ಅಥವಾ ಕನಿಷ್ಠ ವೇತನಕ್ಕೆ ಸಂಬಂಧಪಟ್ಟಿರುವುದಿಲ್ಲ. ಈ ಹೆಚ್ಚುವರಿ ವೆಚ್ಚವನ್ನು ಇಲಾಖೆಯು ಜಿಲ್ಲಾ ವಲಯದಡಿಯ ಆಯವ್ಯಯ ಅವಕಾಶದಿಂದಲೇ ಲೆಕ್ಕ ಶೀರ್ಷಿಕೆ 2202-01-101-0-71 (ಯೋಜನೇತರ) ಅಡಿ ನಿಗದಿಯಾಗಿರುವ ಜಿಲ್ಲಾ ಆಯವ್ಯಯದ ಮಿತಿಯೊಳಗೇ ಭರಿಸತಕ್ಕದ್ದು. ಈ ಸಂಬಂಧ ಹೆಚ್ಚುವರಿ ಅನುದಾನ ನೀಡಲಾಗುವುದಿಲ್ಲ ಹಾಗೂ ಕಂದಾಯ ಇಲಾಖೆಯ ಗ್ರಾಮಸಹಾಯಕರಿಗೆ ಅನ್ವಯಿಸುವಂತೆ ರಾಷ್ಟ್ರೀಯ ಪಿಂಚಣಿ ವ್ಯವಸ್ಥೆ-ಎಲ್ಐಟಿ (N.P.S.-lite scheme) ಸೌಲಭ್ಯವನ್ನು ಜಾರಿಗೊಳಿಸಲು ಸಹ ಮಂಜೂರಾತಿ ನೀಡಿದೆ. ಅಲ್ಲದೇ ಮಾಸಿಕ ಸಂಭಾವನೆಯನ್ನು ಸೂಕ್ತವಾಗಿ ಹೆಚ್ಚಿಸಲು ಸಹ ಸಹಮತಿ ನೀಡಿದೆ.
3. ಈ ಆದೇಶವನ್ನು ಆರ್ಥಿಕ ಇಲಾಖೆಯ ಟಿಪ್ಪಣಿ ಸಂಖ್ಯೆ: ಆಇ 616 ವೆಚ್ಚ-8/2013, ದಿನಾಂಕ:11-10-2013ರಲ್ಲಿ ನೀಡಿರುವ ಸಹಮತಿಯೊಂದಿಗೆ ಹೊರಡಿಸಲಾಗಿದೆ.
ಕರ್ನಾಟಕ ರಾಜ್ಯಪಾಲರ ಆದೇಶಾನುಸಾರ ಮತ್ತು ಅವರ ಹೆಸರಿನಲ್ಲಿ PR. 328
ಎಸ್.ಬಿ.ಪಟಗಾರ,
ಸರ್ಕಾರದ ಅಧೀನ ಕಾರ್ಯದರ್ಶಿ,
SC-150
ಶಿಕ್ಷಣ ಇಲಾಖೆ (ಪ್ರಾಥಮಿಕ).
ಮುದ್ರಕರು ಹಾಗೂ ಪ್ರಕಾಶಕರು:- ಸಂಕಲನಾಧಿಕಾರಿಗಳು, ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಸರ್ಕಾರಿ ಕೇಂದ್ರ ಮುದ್ರಣಾಲಯ, ಬೆಂಗಳೂರು-59