Servants of Knowledge
Karnataka Gazette · Government of Karnataka

Karnataka Gazette, Part Part-1, 09 March 2017

Published 09 March 2017

Part
Part-1
Identifier
in.gazette.karnataka_new.2017-03-09.Part-1
Languages
English, Kannada
Published at
Original source ↗

click here for IIIF manifest

ಸಂಪುಟ ೧೫೨

Volume 152

ಬೆಂಗಳೂರು, ಗುರುವಾರ, ಮಾರ್ಚ್ ೯, ೨೦೧೭ (ಫಾಲ್ಗುಣ ೧೮, ಶಕ ವರ್ಷ ೧೯೩೮)

Bengaluru, Thursday, March 9, 2017 (Phalguna 18, Shaka Varsha 1938)

ಸಂಚಿಕೆ ೧೦

Issue 10

ಭಾಗ ೧

ರಾಜ್ಯ ಸರ್ಕಾರದ ಮುಖ್ಯ ಆದೇಶಗಳು ಹಾಗೂ ಸುತ್ತೋಲೆ ಮುಂತಾದ

ಎಲ್ಲಾ ಇಲಾಖೆಗಳಿಗೂ ಸಂಬಂಧಿಸಿದ ಆದೇಶಗಳು

COMMERCE AND INDUSTRIES SECRETARIAT

Sub: Extension of time and change of location to implement the project of M/s Kingswood Decor Pvt. Ltd., at Immavu Village, Thandya Industrial Area, Nanjangud Taluk, Mysuru District.

Ref: 1) Proceedings of the 36th State High Level Clearance Committee (SHLCC) meeting held on 15.10.2014.

2) Proceedings of the 37th State High Level Clearance Committee (SHLCC) meeting held on 27.03.2015.

3) Government Order No.CI 250 SPI 2014, dt.20.05.2015.

4) Proceedings of the 45th State High Level Clearance Committee (SHLCC) meeting held on 28.09.2016.

Preamble:

The proposal of M/s Kingswood Decor Pvt. Ltd. to establish a unit for manufacture of "Particle boards, Pre-laminated particle boards, Medium Density Fiber Boards (MDF), High pressure laminates, Ply boards and Veneers was approved in the 36th SHLCC meeting held on 15.10.2014 with a direction to Land Audit Committee to assess the land requirement for the project. Accordingly, the subject was discussed in the 15th Land Audit Committee meeting held on 23.12.2014 and decided the extent of land required for the project as 60 acres and resolved to recommend to SHLCC to consider the same. The Government Order was issued vide No. CI 250 SPI 2014, dated: 20.05.2015 read at (2) above.

The company, vide their letter dated: 09.03.2015, had requested to consider change of location of the project to Masthenahalli KIADB Industrial Area, Chintamani Taluk, Chikkaballapura District instead of land at Mysuru District. The proposal was re-examined in the 37th SHLCC held on 27.03.2015 and approved the location of the project as KIADB Industrial Area, Masthenahalli Village, Chintamani Taluk, Chikkaballapura District.

The company, vide their letter dated: 06.08.2016, had again requested for change of project location to 60 acres of land at Sy. Nos. from 390 to 525 of Immavu Village, Nanjangud Taluk, Mysuru District.

In the 32nd Land Audit Committee Meeting held on 07.09.2016, resolved to recommend to SHLCC for change of location from Masthenahalli Village, Chintamani Taluk, Chikkaballapura District to 60 acres of undeveloped KIADB land at Immavu Village, Nanjangud Taluk, Mysuru District as per the norms of KIADB and also recommended for considering extension of time by 2 years to implement the project.

(೧೦೯)೧೧೦ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಮಾರ್ಚ್ ೯, ೨೦೧೭ ಭಾಗ ೧ The proposal was examined in the 45th State High Level Clearance Committee (SHLCC) Meeting held on 28.09.2016.

Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.

Hence, the following order.

GOVERNMENT ORDER NO. CI 250 SPI 2014, BENGALURU, DATED: 24.10.2016

Government is pleased to approve change of location of the project from Masthenahalli Village, Chintamani Taluk, Chikkaballapura District to 60 acres of undeveloped KIADB land at Immavu Village, Nanjangud Taluk, Mysuru District as per the norms of KIADB and also to grant extension of time by two years to implement the project.

All other terms and conditions indicated in the Government Order No. CI 250 SPI 2014, dated 20.05.2015 read at (2) above, remain unaltered.

P.R. 41

By Order and in the name of the Governor of Karnataka,

NAGARATHNAMMA G.

SC-25

Desk Officer (Technical Cell) (I/c),

Commerce & Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub: Extension of time to implement the project of M/s Gulbarga Cement Ltd., at Ferozabad, Kirani, Somanathahalli Villages in Kalaburagi Taluk and District.

Ref: 1) 14th State High Level Clearance Committee (SHLCC) meeting held on 17.03.2008.

2) Government Order No. CI 79 SPI 2008, dt:03.05.2008.

3) Government Order No. CI 79 SPI 2008, dt: 21.07.2010.

4) 28th Meeting of SHLCC held on 23.05.2012.

5) Government Order No. CI 79 SPI 2008, dt: 18.06.2012.

6) 35th State High Level Clearance Committee (SHLCC) meeting held on 14.05.2014.

7) Government Order No.CI 154 SPI 2012, dt: 16.07.2014.

8) 45th State High Level Clearance Committee (SHLCC) meeting held on 28.09.2016.

Preamble:

The Project proposal of M/s Gulbarga Cement Ltd., to establish a "3.5 Million TPA Cement Plant with 100 MW Thermal Power Plant", with an investment of ` 1,100 crore, at Ferozabad, Kirani, Somanathahalli Villages in Kalaburagi Taluk and District was approved in the 14th SHLCC meeting held on 17.03.2008. The Government Order was issued vide No. CI 79 SPI 2008, dated:

03.05.2008 read at (2) above.

In the 23rd Meeting of SHLCC held on 19.06.2010, approval was accorded for extension of time by 2 years to implement the project. Accordingly, Government Order vide No. CI 79 SPI 2008, dated: 21.07.2010 read at (3) above.

In the 28th Meeting of SHLCC held on 23.05.2012, approval was accorded for extension of time by further 2 years to implement the project with an additional investment of ` 800 crores. Accordingly, Government Order vide No. CI 154 SPI 2012, dated:

18.06.2012 was issued read at (5) above.

In the 35th Meeting of SHLCC held on 14.05.2014, approval has been accorded for extension of time to implement the project for a further period of two years. Accordingly, Government Order vide No. CI 154 SPI 2012, dated: 16.07.2014 was issued read at (7) above.

Now the company, vide their letter dated: 17.05.2016, has informed that they have commenced mining operations since September, 2014 and are in the process of purchase of land for railway line from Martur Station. KIADB has handed over possession of lands on 3rd September, 2014. It is also informed that there is a stay order from Hon'ble High Court of Karnataka on 74 acres of land which is essential for setting up the project. In view of this, the company was not in a position to commence any project activities and hence the delay in implementation of the project. Further, it is also informed that the design, engineering and construction of the plant will take a minimum of 42 months for completion. In view of the above, the company has requested for grant of extension of time for a period of five years from 16.07.2016 for implementing the project.

ಭಾಗ ೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಮಾರ್ಚ್ ೯, ೨೦೧೭ ೧೧೧

In the 31st Land Audit Committee Meeting held on 05.07.2016, the Committee resolved to recommend to SHLCC for granting extension of time of 2 years for implementation of the project.

The proposal was examined and approved in the 45th State High Level Clearance Committee (SHLCC) Meeting held on 28.09.2016. Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.

Hence, the following order.

GOVERNMENT ORDER NO. CI 154 SPI 2012, BENGALURU, DATED: 24.10.2016

The Government is pleased to grant extension of time to M/s Gulbarga Cement Ltd., to implement the project approved vide Government Order No. CI 79 SPI 2008, dated: 03.05.2008 for further period of two years from the date of issue of this order.

All other terms and conditions indicated in the Government Order dated: 03.05.2008 read at (2) above, remain unaltered.

P.R. 42

By Order and in the name of the Governor of Karnataka,

NAGARATHNAMMA G.

SC-25

Desk Officer (Technical Cell) (I/c),

Commerce & Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub: Project Proposal of M/s Uttam Galva Ferous Ltd., to establish "6.00 MTPA Integrated Steel Plant and Captive Power Generation" at Special Industrial Zone, Vijayanagara Area Development Authority (VADA), Hosapete and Sandur Taluk, Ballari District - Change of source of water Reg.

Read: 1) Proceedings of the 21st State High Level Clearance Committee (SHLCC) meeting held on 29.03.2010.

2) Government Order No. CI 122 SPI 2010, dated: 26.04.2010.

3) Proceedings of the 22nd State High Level Clearance Committee (SHLCC) meeting held on 24.05.2010.

4) Government Order No. CI 122 SPI 2010, dated: 10.06.2010.

5) Government Order No. CI 122 SPI 2010, dated: 27.08.2011.

6) Government Order No. CI 122 SPI 2010, dated: 09.06.2016.

7) Proceedings of the 45th State High Level Clearance Committee (SHLCC) meeting held on 28.09.2016.

Preamble:

The project proposal of M/s Brahmani Industries Ltd., to establish "6.00 MTPA Integrated Steel Plant & Captive Power Generation" with an investment of ` 36,000 crores, generating employment to about 25,000 persons in 4,000 acres of land at Special Industrial Zone, Vijayanagara Area Development Authority (VADA), Ballari, Hosapete and Sandur Taluks was approved by 21st SHLCC meeting held on 29.03.2010. Accordingly, Government Order was issued vide Government Order No. CI 122 SPI 2010, dated:

26.04.2010 read at (2) above.

On the request of the company, SHLCC in its 22nd meeting held on 24.05.2010 approved to consider change in name from M/s Brahmani Industries Ltd., to M/s Brahmani Industries (Karnataka) Ltd. Accordingly, Government Order was issued vide Government Order No. CI 122 SPI 2010, dated: 10.06.2010 read at (4) above.

The State High Level Clearance Committee in its 25th Meeting held on 14.07.2011 further approved the change of name from M/s Brahmani Industries (Karnataka) Ltd., to M/s Uttam Galva Ferous Ltd. Accordingly, Government Order was issued vide Government Order No. CI 122 SPI 2010, dated: 27.08.2011 read at (5) above.

The water requirement for the company in the 1st Phase – 2 TMC and 2nd Phase – 2 TMC, total 4 TMC (68.40 MGD) of water from downstream of Alamatti Dam – Krishna River was approved by the SHLCC and accordingly incorporated in the Government Order No. CI 122 SPI 2010, dated: 26.04.2010.

In the Government Order read at (6) above, extension of time up to 08.06.2019 was given for implementation of the project approved vide Government Order No. CI 122 SPI 2010, dated: 26.04.2010.

Now, the company vide their letter dated: 04.07.2016 has informed that The Chief Engineer, Water Resources Development Institute, in their report dated: 06.07.2014, addressed to Secretary to Government, Water Resources Department, has recommended for೧೧೨ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಮಾರ್ಚ್ ೯, ೨೦೧೭ ಭಾಗ ೧ supply of water for the project from Thungabhadra River basin instead of Alamatti Dam - Krishna River. Hence, the company has requested SHLCC for change of Source of Water for their project from Alamatti Dam - Krishna River to Thungabhadra River.

The proposal was examined and approved in the 45th State High Level Clearance Committee (SHLCC) Meeting held on 28.09.2016. Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.

Hence, the following order.

GOVERNMENT ORDER NO. CI 122 SPI 2010, BENGALURU, DATED: 20.10.2016

The Government is pleased to approve the change of source of water from Alamatti Dam - Krishna River to Tungabhadra River basin as per the conditions stipulated by Water Resources Department on drawal of water from river basin and storage of water in the project location premises by making suitable storage facility.

All other terms and conditions indicated in the Government Order dated: 26.04.2010 read at (2) above, remain unaltered.

P.R. 43

By Order and in the name of the Governor of Karnataka,

NAGARATHNAMMA G.

SC-25

Desk Officer (Technical Cell) (I/c),

Commerce & Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub: Project Proposal of M/s Orient Cement Ltd., to establish "Cement Plant for Manufacture of 4 MTPA Cement and 3 MTPA Clinker with 50 MW Captive Power Plant" at Itagi, Mogla, Digaon Villages, Chittapur Taluk, Kalaburagi District.

Read: 1) 17th State High Level Clearance Committee (SHLCC) meeting held on 28.01.2009.

2) Government Order No. CI 60 SPI 2009, dated: 11.08.2009.

3) 33th State High Level Clearance Committee (SHLCC) meeting held on 19.11.2013.

4) Government Order No. CI 60 SPI 2009, dated: 09.01.2014.

5) 36th State High Level Clearance Committee (SHLCC) meeting held on 15.10.2014.

6) Government Order No. CI 60 SPI 2009, dated: 05.12.2014.

7) 45th State High Level Clearance Committee (SHLCC) meeting held on 28.09.2016.

Preamble:

The proposal of M/s Orient Cement Ltd., to establish "Cement Plant for Manufacture of 4 MTPA Cement & 3 MTPA Clinker with 50 MW Captive Power Plant" with an investment of ` 1,294 crore in 1750 acres of land to be purchased with permission U/s 109 of KLR Act at various Sy. Nos. of Itagi, Mogla, Digaon villages, Chittapur Taluk, Kalaburagi District, was approved in 17th SHLCC meeting held on 28.01.2009. Accordingly, Govt. order was issued vide No. CI 60 SPI 2009, dated: 11.08.2009 read at (2) above.

In the 33rd meeting of SHLCC held on 19.11.2013, approval accorded for acquisition of 275 acres of land out of the 1750 acres already acquired for the project and grant extension of time to M/s Orient Cement Ltd., to implement the project approved vide Government Order No. CI 60 SPI 2009, dated: 11.08.2009.

In the 36th meeting of SHLCC held on 15.10.2014, approval was accorded for purchase of 291 acres of additional land for railway siding and cement terminal, water storage and rain water harvesting, electrical receiving sub-station, provision for KPTCL and township with residential and social amenities. Accordingly, Government order was issued vide No. CI 60 SPI 2009, dated: 05.12.2014 read at (4) above.

Now, the company in its request had listed various effective steps taken for implementation of the project and has informed that the delay was due to Court case & Family disputes of land owners in the process of purchasing the land and has sought extension of time by a further period of 2 years for implementation of the project.

In the 31st Land Audit Committee held on 05.07.2016, the Committee resolved to recommend to SHLCC for granting extension of time of 2 years for implementation of the project.

The proposal was examined and approved in the 45th State High Level Clearance Committee (SHLCC) Meeting held on 28.09.2016. Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.

ಭಾಗ ೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಮಾರ್ಚ್ ೯, ೨೦೧೭ ೧೧೩

Hence the following order.

GOVERNMENT ORDER NO. CI 60 SPI 2009, BENGALURU, DATED: 24.10.2016

The Government is pleased to grant extension of time to M/s Orient Cement Ltd., to implement the project for further period of two years from the date of issue of this order.

All other terms and conditions indicated in the Government Order dated: 11.08.2009 read at (2) above, remain unaltered.

P.R. 44

By Order and in the name of the Governor of Karnataka,

NAGARATHNAMMA G.

SC-25

Desk Officer (Technical Cell) (I/c),

Commerce & Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub: Amendment to the earlier approved project proposal of M/s Minera Steel & Power Pvt. Ltd., to establish "0.5 MTPA Integrated Steel Plant" at Sandur Taluk, Ballari District.

Read: 1) Proceedings of the 42nd State High Level Clearance Committee (SHLCC) meeting held on 04.01.2016.

2) Government Order No. CI 15 SPI 2016, dated 21.01.2016.

3) Proceedings of the 45th State High Level Clearance Committee (SHLCC) meeting held on 28.09.2016.

Preamble:

The project proposal of M/s Minera Steel & Power Pvt. Ltd., to establish "0.5 MTPA Integrated Steel Plant", with an investment of ` 2180.40 crore, generating employment to about 525 persons in 77 acres and 12 guntas of land to be acquired by KIADB as SUC at Yerabanahalli Village, Sandur Taluk, Ballari District was approved by 42nd SHLCC meeting held on 04.01.2016. Accordingly, Government Order was issued vide No. CI 15 SPI 2016, dated: 21.01.2016 read at (2) above.

Now, the company vide letter dated 01.08.2016 had requested to modify the Government Order No. CI 15 SPI 2016, dated:

21.01.2016 as follows:

➢ To be acquired by KIADB as SUC - 16 Acres 29 Guntas

➢ To be purchased u/s 109 of KLR Act - 60 Acres 23 Guntas

Total - 77 Acres 12 Guntas

The list of Survey Nos. for the land to be acquired by KIADB as SUC are 105, 107, 79, 90, 73A/2, 73/A/2, 73/A1, 78/AA, 73/B, 78/E, 69, 70, 71, 68 of Yerabanahalli Village, Sandur Taluk, Ballari District and the list of Survey Nos. for the land to be purchased u/s 109 of KLR Act are 100/2B, 100/2C/1, 100/2D, 100/2E, 100/2F, 100/21, 100/2A, 100/2C/2, 100/4, 100/5, 100/6 of Yerabanahalli Village, Sandur Taluk, Ballari District.

In the 32nd Land Audit Committee meeting held on 07.09.2016, the Committee resolved to recommend to SHLCC for changing the mode of acquisition of land for the project from U/s 109 of KLR Act to partly by KIADB & partly U/s 109 of KLR Act as per the request of the company

The proposal was examined in the 45th State High Level Clearance Committee (SHLCC) Meeting held on 28.09.2016.

Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.

Hence, the following order.

GOVERNMENT ORDER NO. CI 15 SPI 2016, BENGALURU, DATED: 24.10.2016

Government is pleased to accord approval to M/s Minera Steel & Power Pvt. Ltd., to change in mode of acquisition of land from U/s 109 of KLR Act to partly i.e. 16 acres 29 guntas by KIADB & partly i.e. 60 acres 23 guntas U/s 109 of KLR Act. All other terms and conditions indicated in the Government Order No. CI 15 SPI 2016, dated 21.01.2016 read at (1) above, remain unaltered.

P.R. 45

By Order and in the name of the Governor of Karnataka,

NAGARATHNAMMA G.

SC-25

Desk Officer (Technical Cell) (I/c),

Commerce & Industries Department.

೧೧೪ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಮಾರ್ಚ್ ೯, ೨೦೧೭ ಭಾಗ ೧

COMMERCE AND INDUSTRIES SECRETARIAT

Sub: Amendment to earlier approved project proposal of M/s Aaress Iron & Steel Ltd. to establish "1.5 Million TPA Integrated Steel Plant" at Basapura, Kididalu, Halavarthi, Koppala Villages of Koppala District - Reg. Read: 1) 4th SHLCC meeting held on 06.06.2005.

2) Government Order No. CI 511 SPI 2005, dated: 22.12.2005 and 22.03.2006.

3) 13th SHLCC meeting held on 13.03.2008.

4) Government Order vide No. CI 96 SPI 2008, dated: 09.05.2008.

5) 29th SHLCC meeting held on 06.09.2012.

6) Government Order No. CI 96 SPI 2008, dated: 02.11.2012.

7) Proceedings of the 45th State High Level Clearance Committee (SHLCC) meeting held on

28.09.2016.

Preamble:

The project proposal of M/s Aaress Iron & Steel Ltd. to establish "1 Million TPA Integrated Steel Plant" with an investment of ` 2292.26 crores, in 370.12 hectares of land (1034 acres) at Basapura, Koppala and Halavarthi Villages of Koppala District was approved vide Government Order No.CI 511 SPI 2005, dated: 22.12.2005 and land to be acquired by KIADB referred at (2) above.

The Government order No. CI 511 SPI 2005, dated: 22.03.2006 issued by Commerce & Industries Department has permitted the bifurcation of the project into two – implementation of Iron Ore Pelletisation Plant by M/s MSPL Ltd & Integrated Steel Plant by M/s Aaress Iron & Steel Ltd., which belongs to the same promoters, with all other conditions laid down in original Government Order at Government Order No. CI 511 SPI 2005, dated: 22.12.2005 issued by Commerce & Industries Department, applicable to both the companies.

The proposal of the company to increase the capacity of the Steel Plant from 1.0 MTPA to 2.5 MTPA with an investment of ` 4612.60 crores, with additional land of 995.50 acres to be purchased U/s 109 of KLR Act at Basapura and Halavarthi Villages of Koppala District was approved in the 8th SHLCC meeting held on 23.02.2007.

Subsequently the company vide its letter dated: 26.02.2008 had requested for acquiring 995.50 acres of land through KIADB instead of purchasing the land with permission U/s. 109 of KLR Act and for extension of 2 years of time for implementation of the project. The same was approved in the 13th SHLCC held on 13.03.2008 and Government Order vide No. CI 96 SPI 2008, dated:

09.05.2008 was issued.

KSSIDC vide letter dated: 29.03.2012 & 03.03.2012 had requested for acquisition of 104 acres of land at Basapura Village, Koppala Taluk to establish Industrial Estate. This land was part of the land identified for M/s Aaress Iron & Steel Limited for their 2nd Phase of the project.

The subject was discussed in the 27th SHLCC meeting held on 13.4.2012 and the Committee decided to seek more information from M/s Aaress Iron & Steel Ltd., about the present status of implementation of the project and deferred the subject.

As per decision of 29th SHLCC meeting held on 06.09.2012, Government accorded approval to the following;

 Extension of time up to 2 years.

 KIADB to earmark 104 acres of land to KSSIDC for formation of Industrial Estate, out of the land approved to M/s Aaress Iron & Steel Ltd. in 8th SHLCC approved.

Accordingly Government Order was issued vide No. CI 96 SPI 2008, dated: 02.11.2012 read at (6) above.

The company vide letter dated: 18.07.2012 had informed that due to the following reasons they were not able to take up the implementation of the 1st phase of the project:

• Court cases were pending on part of the land allotted for 1st phase of the project.

• Awaiting EC from MOEF.

• The sketch and reports for drawal of water submitted to WRD were yet to be approved.

The company, vide their letter dated: 29.6.2016, had requested approval for the following, without linking the subject with land approved to KSSIDC.

ಭಾಗ ೧ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಮಾರ್ಚ್ ೯, ೨೦೧೭ ೧೧೫

➢ Extension of time for additional 3 years.

➢ Enhancing the capacity of integrated steel plant form existing 2.5 MTPA to 3.5 MTPA.

➢ Permit the company to buy the lands by way of permission U/s 109 of KLR Act and through KIADB at its convenience.

➢ Add sy. No's part of 337 of Koppala part of 54,55,88,89,90 & 128 of Basapur, part 130 (new numbers as 142 to 147 and 151) of Halavarthi; part of 264,269 to 273,275 to 280 of Ginigera Village, proposed area totals to 933.01 acres in all.

These Sy. No are needed for the ancillary services viz. Stores/truck yard, quarters, railway corridor etc. There is no change in other survey numbers furnished earlier.

The proposal of the company has been placed before the 32nd LAC meeting held on 07.09.2016. The decision of the LAC is as follows:

The Committee noted the request of the company and opinion of KSSIDC and informed the company to exclude 104 acres 11 guntas of land allotted to KSSIDC for formation of industrial estate for small scale industries, out of the land identified for their project.

After detailed discussions, the Committee resolved to recommend to SHLCC for approval of the following subject to exclusion of 104 acres as detailed below:

 Extension of time by 3 years to implement the project.

 Enhancing of capacity of the proposed Steel Plant from 2.5 to 3.5 MTPA.

 Purchase of land for the project either U/s 109 of KLR Act or through KIADB acquisition.

 Include additional Sy.Nos.337 (Part) of Koppala, part of 54,55,88,89,90 & 128 of Basapur, part 130 (new numbers at 142 to 147 and 151) of Halavarthi; part of 264, 269 to 273, 275 to 280 of Ginigera Village, limiting the total extent of land recommended for the project to 933.01 acres.

The proposal was examined in the 45th State High Level Clearance Committee (SHLCC) Meeting held on 28.09.2016.

Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.

Government has examined the recommendations made by the State Level Single Window Clearance Committee in all aspects.

Hence, the following order.

GOVERNMENT ORDER NO. CI 274 SPI 2016, BENGALURU, DATED: 20.10.2016

Government is pleased to accord approval for the following proposals of M/s Aaress Iron & Steel Ltd.

• Extension of time by 3 years to implement the project.

• Enhancement of capacity of the proposed Steel Plant from 2.5 to 3.5 MTPA.

• Purchase of land for the project either U/s 109 of KLR Act or through KIADB acquisition.

• To include additional Sy. Nos.337 (Part) of Koppala, part of 54,55,88,89,90 & 128 of Basapur, part 130 (new numbers at 142 to 147 and 151) of Halavarthi; part of 264,269 to 273, 275 to 280 of Ginigera Village, limiting the total extent of land recommended for the project to 933.01 acres and subject to exclusion of 104 acres 11 guntas of land allotted to KSSIDC for formation of Industrial Estate.

All other terms and conditions indicated in the Government Order No. CI 511 SPI 2005, dated: 22.12.2005 read at (2) above, remain unaltered.

P.R. 46

By Order and in the name of the Governor of Karnataka,

NAGARATHNAMMA G.

SC-25

Desk Officer (Technical Cell) (I/c),

Commerce & Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub: Proposal of M/s Starragheckert Machine Tools Pvt. Ltd., for change in name of the company in respect of land in Plot No.66 of (Aerospace Sector) Hitech, Defence & Aerospace Park, Devanahalli, Bengaluru District - reg.

R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2017-19

Licensed to post without prepayment WPP No. 297

೧೧೬ ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಗುರುವಾರ, ಮಾರ್ಚ್ ೯, ೨೦೧೭ ಭಾಗ ೧

Ref: 1) Proceedings of the 21st State High Level Clearance Committee (SHLCC) meeting held on 29.03.2010.

2) Government Order No. CI 151 SPI 2010, dated: 29.04.2010.

3) Letter No. KIADB-HO/BAP-ALLOT/19582/7012/2016-17, dated: 30.07.2016 from Chief Executive Officer & Executive Member, KIADB, Bengaluru.

4) Request from M/s Starragheckert Machine Tools Pvt. Ltd., dated: 11.02.2016.

Preamble:

The proposal of M/s Starragheckert Machine Tools Pvt. Ltd., establish a "General Engineering Industry for Aerospace and Automobile applications" with Horizontal Milling Machines 4 & 5 Axis, Turnkey Automation Solutions for Prototyping and Pilot Production at KIADB Aerospace Park Industrial Area, Devanahalli Taluk, Bengaluru Rural District, with an investment of ` 127 crore, was approved in 21st SHLCC meeting held on 29.03.2010. The Government Order was issued vide Government Order No. CI 151 SPI 2010, dated: 29.04.2010 read at (2) above.

Now, the company in its letter read at (4) above has requested for change in name from M/s Starragheckert Machine Tools Pvt. Ltd., to M/s Starrag India Pvt. Ltd.

Chief Executive Officer & Executive Member, KIADB has informed that there is no change in shareholding of the company and as per clause 12(ii) of the lease cum sale agreement dated: 26.08.2011, we may consider the request of the company subject to condition that, the original promoter directors / shareholders should continue to hold minimum 51% interest / shares in the newly formed company.

The SHLCC in its meeting held on 14.05.2014, has authorized the Additional Chief Secretary to Govt., Commerce & Industries Dept. to amend the Government Orders / Approval letters and to place such issues before the next SHLCC / SLSWCC for ratification.

In view of the above, Chief Executive Officer & Executive Member, KIADB, has requested for change in name of the company from M/s Starragheckert Machine Tools Pvt. Ltd., to M/s Starrag India Pvt. Ltd., subject to ratification by the SLSWCC / SHLCC meeting.

Government has examined the proposal in all aspects. Hence, the following order.

GOVERNMENT ORDER NO. CI 151 SPI 2010,BENGALURU, DATED: 27.10.2016

Government is pleased to approve the change of name from M/s Starragheckert Machine Tools Pvt. Ltd., to "M/s Starrag India Pvt. Ltd."

All other terms and conditions indicated in the Government Order dated: 29.04.2010 read at (2) above, remain unaltered.

By Order and in the name of the Governor of Karnataka, P.R. 47

NAGARATHNAMMA G.

Desk Officer (Technical Cell) (I/c), SC-25

Commerce & Industries Department. ಮುದ್ರಕರು ಹಾಗೂ ಪ್ರಕಾಶಕರು:- ಸಂಕಲನಾಧಿಕಾರಿಗಳು, ಕರ್ನಾಟಕ ರಾಜ್ಯಪತ್ರ, ಸರ್ಕಾರಿ ಕೇಂದ್ರ ಮುದ್ರಣಾಲಯ, ಬೆಂಗಳೂರು-59.