THE LAKSHADWEEP GAZETTE EXTRAORDINARY 1

VOL. LX. No. 22 MONDAY, 29th JULY, 2024/ 07th SRAVANA, 1946 (SAKA)

GOVERNMENT OF INDIA LAKSHADWEEP ADMINISTRATION (COLLECTORATE) KAVARATTI-682 555 Phone: 04896 - 262384, 262279,263974 E-mail ID: [email protected] or collectorate2@gmail. com

FORM II [See rule 5(1)] PRELIMINARY NOTIFICATION [Under Section II (1) of the RFCTLARR Act,2013]

F.No. 34/14/2018-LR Dated: 26.07.2024 Whereas it appears to the appropriate Government that a total of 0.7683 hectares (7683 Sqm) land is required in the Kavaratti Village (Dweep) Panchayath of Kavaratti Taluk. Lakshadweep District for public purposes, namely. Construction of Lakshadweep House,Annex (Raj Nivas) and Connecting Road at Kavaratti. Social Impact Assessment Study was carried out by SIACS and a report submitted. Appraisal of the SIA Report was done by an independent multidisciplinary expert group constituted by the appropriate Government of Union Territory of Lakshadweep u/s 7 of the Act/ Preliminary investigation was conducted by a committee of officers constituted by Collector (LA) as laid down under rule 4. The summary of the Social Impact Assessment Report/preliminary investigation is as follows (Coy of SIA report is attached as Annexure-I)

2. Therefore, it is notified that for the above said project in the Kavaratti Village of Kavaratti Taluk. Lakshadweep District a piece of land measuring. 0.7683 hectares (7683 Sqm) of standard measurement, whose detail description is as following, is under acquisition:

S. No. Survey No. Type of title Type of land Area under acqusition (in Sqm) Name and address of person interested Boundaries
N E S W
1 7/2 Owner Private 120 Aboobacker Peedika Vadakke Puthiyapura Sy. No. 10 7/3 7/5A3 7/1
2 7/3 Owner Private 150 Kidave Aliyamakkada Sy. No. 10 7/4 7/5A3 7/2
3 7/4 Owner Private 130 Kadeesha Pathanakuly Sy.No.10 7/5A1,5A2 7/5A3a 7/3
4 7/5A3A Owner Private 80 Poo Chekkilam 7/1,2,3,4 7/5A2 7/7,7/8A 7/5A3b
5 7/5A1 Owner Private 260 Poo Chekkilam Sy.No.10 7/6 7/5B 7/4
6 7/8A Owner Private 760 Mohammed, Kunjikunji Valiyaaliyammakaada Kuppipura, Kidave Aliyammakada kuppipura, Ibrahim Kutty Cherya Aliyammakada 7/5A3A 7/7/9,Sy.No.11 7/8B 7/7, 7/8B
7 10/1 Owner Private 50 Mohammed Malmi Vadakke Puthiyapua 10/10 10/2 Sy.No.7 Sy.No.9
8 10/2 Owner Private 130 Aboobacker Peedika Vadakke Puthiyapura Arabian sea 10/3 Sy.No.7 10/10,1
9 10/3 Owner Private 140 Kidave Aliyammakkada Arabian sea 10/4 Sy.No.7 10/2
10 10/4 Owner Private 140 Kadeesha Pathanakuly Arabian sea 10/11,5 Sy.No.7 10/3
11 10/5 Owner Private 220 Poo Chekkilam 10/11 10/6 Sy.No.7 10/4
12 10/6 Owner Private 100 Kidave, Alavi, Koya Kunnam 10/12 10/7 Sy.No.7 10/6
13 10/7 Owner Private 380 Mohammed Kunhi Kunhi, Kidave Aliyammakada kuppipura, Ibrahim Kutty Cherya Aliyammakada Kuppipura Asi Manadam 10/13 10/14 Sy.No.11 10/6
14 10/9 Owner Private 90 Mohammed Kunhi Kunhi, Kidave Valiya Aliyammakada kuppipura, Ibrahim Kutty Cherya Aliyammakada Kuppipura Asi Manadam 10/14 y.No.11 S 10/14
15 17/1 Owner Private 590 Attakoya Thangal Aranakade (Tharavade) Sy.No.18 17/4,5A 17/5A2,5A Sy.No.11
16 17/6B1 Owner Private 110 Cheriyabi Puthiyan Nallala 17/6A 11/7 11/6B2 Sy.No.11
17 17/5A2 Owner Private 220 Assan, Koyamma, Khalid, Hamsath, Pathumma, Amina Kadapurathava 17/1 17/5A 17/6B1,6 A Sy.No.11
18 11/5A1 Owner Private 960 Mohammed Malmi Aliyammakkada 11/7A1 11/7A1 11/5A2 11/3C1,5B
19 11/7A1 Owner Private 1580 Mohammed Kunhi Kunhi, Kidave Valiya Aliyammakada kuppipura, Ibrahim Kutty Cherya Aliyammakada Kuppipura Asi Manadam Sy.No.10 11/6,Sy.No.17 11/5A1 11/2
20 11/7A2 Owner Private 40 Mohammed Kunhi Kunhi, Kidave Valiya Aliyammakada kuppipura, Ibrahim Kutty Cherya Aliyammakada Kuppipura Asi Manadam 11/7A1 11/7A3 11/7A3 11/5A2
21 11/3C1 Owner Private 20 Mohamme Malmi Aliyammakkada 11/5A1 11/5A1 11/3C2 11/3B
22 18/1 Owner Private 160 Attakoya Thangal Aranakad (Tharavad) 18/5 18/4 18/2 18/2
23 18/3 Owner Private 90 Attakoya Thangal Aranakade (Tharavade) 18/2 18/2 Sy.No.17 Sy.No.11
24 6/1B Owner Private 40 Basha Sahib Kunnam Sy.No.7 Sy.No.7 6/1A Sy.No.8
25 11/1 Owner Private 740 Mohammed Kunhi Kunhi, Kidave Aliyammakada kuppipura, Ibrahim Kutty Cherya Aliyammakada Kuppipura Asi Manadam Sy.No.10 11/2 11/2 Sy.No.7
26 11/3A1 Owner Private 325 Mohammed Kunhi Kunhi, Kidave Aliyammakada kuppipura, Ibrahim Kutty Cherya Aliyammakada Kuppipura Asi Manadam 11/5C 11/3B 11/3A2 11/2
27 11/5C Owner Private 20 Mohamme Malmi Aliyammakkada 11/7C 11/5B 11/5C 11/5C
28 11/7C Owner Private 10 Mohammed Kunhi Kunhi, Kidave Valiya Aliyammakada kuppipura, Ibrahim Kutty Cherya Aliyammakada Kuppipura Asi Manadam 11/2 11/7A1 11/5C 11/7C
Trees Structure
Variety Number Type Plinth Area
1-Coconut Tree (Thengu) 2-Pine (Shabook) 3-Baniyan Tree (Almaram) 4-Thespesia (Cheerani) 5-Fig Tree (Athimaram) 6-Neem (Vepu) 86 Nos. 3 Nos. 4 Nos 6 Nos 1 No 1 No Nil Nil
THE LAKSHADWEEP GAZETTE EXTRAORDINARY 2 THE LAKSHADWEEP GAZETTE EXTRAORDINARY 3 THE LAKSHADWEEP GAZETTE EXTRAORDINARY 4

3. This notification is made under the provisions of section 11(1) of the Right to Fair Compensation and Transparency in Land acquisition, Rehabilitation and Resettlement Act, 2013 (30 of 2013), to all whom it may concern.

THE LAKSHADWEEP GAZETTE EXTRAORDINARY 5

4. A plan of the land may be inspected in the office of the Collector (LA) and Deputy Collector cum CEO Central on any working day during the working hours.

5. The Government is pleased to authorize Collector (LA), Kavaratti and his Revenue / Survey staff to enter upon and survey land, take levels of any land, dig or bore into the sub- soil and do all other acts required for the proper execution of their work as provided and specified in section 12 of the said Act.

6. Under section 11(4) of the Act, no person shall make any transaction or cause any transaction of land i.e. sale/purchase, etc., or create any encumbrances on such land from the date of publication of such notification without prior approval of the Collector (LA).

7. Objections to the acquisition, if any, may be filed by the person interested within 60 (sixty days) from the date of publication of this notification as provided under section 15 of the Act before Collector (LA).

8. This issue with the approval of the appropriate government vide diary no.1947 dated 26 .07.2024

Encl: As above Sd/-

(Dr. Giri Sankar, IAS.,) Land Acquisition Collector

To

1. The Director, Printing & Stationer, Kavaratti with request to publish the above notification in the official Gazette of Lakshadweep as an extra ordinary.

2. The Chairperson, Village (Dweep) Panchayath, Kavaratti. 3. The Deputy Collector cum CEO Central/ Block Development Officer, Kavaratti Island with request to display at prominent place for wide publicity.

4. The Superintend Engineer (LPWD) Kavaratti with request to publish the notification in two local daily news papers one in Malayalam and one in English and furnish tear sheets to Collectorate.

5. Copy to web coordinator, Collectorate, Kavaratti with direction to upload into the official website of UTLA.

6. Copy to Additional District Magistrate, Kavaratti.

Copy:

1. PA to Hon'ble Administrator, UT of Lakshadweep, Kavaratti 2. Advisor to the Administrator, UTLA, Kavaratti 3. Secretary Revenue, UTLA, Kavaratti 4. District Collector, UTLA, KavarattiTHE LAKSHADWEEP GAZETTE EXTRAORDINARY 6

UNION TERRITORY OF LAKSHADWEEP ADMINISTRATION

DEPARTMENT OF REVENUE

COLLECTORATE

KAVARATTI -682555

F. No.34/47/2021-LR/726 Dated 29 -07-2024

NOTIFICATION

Sub: Retraction of Land Acquisition Proceedings for the Land

acquisition for the Development of High-End Eco Tourism project

and other allied infrastructure in Suheli Valiyakara Island - Reg.

Ref:Notification of Social Impact Assessment F. No.34/47/2021-LR,

dated: 08.06.2022.

Land acquisition proceedingswere initiated as per the request of the Director of Tourism Development UTLA vide letter FNo.25/02/2022-TD/240 dated. 27.05.2022, for the proposed development project viz: Land acquisition for the development of High-End Eco Tourism project and other allied infrastructure in Suheli Valiyakara Island and Notification of Social Impact Assessment under subsection 1 of Section 4 of the RFCTLARR, Act, 2013 was issued by the LAC vide F No 34/47/2021 –LR dated 08.06.2021.

2. Whereas, it has been ascertained that the land earmarked for the said project falls under the classification of „Pandaram" land. Section 2 (s) of the Laccadive, Minicoy and Amindivi Islands Land Revenue and Tenancy Regulation, 1965 defines Pandaram land as "land in which the Government has a proprietary right immediately before the commencement of this regulation and includes any land in which may acquire such rights under the regulation or under any other law". These Pandaram land were allotted to the Cowledars for through Cowl Agreements for a specific period of time, for carrying out improvements.

THE LAKSHADWEEP GAZETTE EXTRAORDINARY 7

3. Whereas, Section 2(e) of the Laccadive, Minicoy and Amindivi Islands Land Revenue and Tenancy Regulation, 1965defines "Cowledar" as a person who has been or is granted a lease of Pandaram land on rent for a specified period, one of the conditions of such lease being that he makes improvements thereto. Thus, the Cowledars are mere lease holders of Pandaram land, until and unless Occupant Rights have been conferred upon them u/s 83 of Laccadive, Minicoy and Amindivi Islands Land Revenue and Tenancy Regulation, 1965.

4. Whereas, it is also submitted that no occupancy rights have been conferred upon the Cowledars who have been allotted the Pandaram lands involved in the extant case.

5. Whereas, in light of this, the Administration has issued an order to take over the said Pandaram lands for the development of High-End eco Tourism project and other allied infrastructure in Suheli Valiyakara Island vide F No.34/78/2023-LR dated 05.03.2024.

6. Accordingly, the land acquisition proceedings initiated in the extant case, with the issuance of Social Impact Assessment vide F No 34/47/2021 –LR dated 08.06.2022 is hereby cancelled.

7. This is issued with the approval of the competent authority vide diary no. 1940 dated 28.07.2024.

Sd/-

(DR. R. GIRI SANKAR, IAS)

COLLECTOR (LA)

To:

1. The Director, Printing & Stationery, Kavaratti with request to publish the above notification in the official Gazette of Lakshadweep as an extra ordinary.

2. The Deputy Collector /Block Development Officer, Kavaratti Island with request to display at prominent place for wide publicity.

3. The Director of Tourism Development UTLA, UTLA Kavaratti

4. The Executive Officer, Village (Dweep) Panchayath, Kavaratti.

THE LAKSHADWEEP GAZETTE EXTRAORDINARY 8

UNION TERRITORY OF LAKSHADWEEP ADMINISTRATION

DEPARTMENT OF REVENUE

COLLECTORATE

KAVARATTI -682555

F. No.34/48/2021-LR Dated 29 -07-2024

NOTIFICATION

Sub: Retraction of Land Acquisition Proceedings for the Land

acquisition for the Development of High-End Eco Tourism project

and other allied infrastructure in Parali –II - Reg.

Ref:Notification of Social Impact Assessment F. No.34/48/2021-LR,

dated: 08.06.2022.

Land acquisition proceedingswere initiated as per the request of the Director of Tourism Development UTLA vide letter FNo.25/02/2022-TDdated. 27.05.2022, for the proposed development project viz: Land acquisition for the development of High-End Eco Tourism project and other allied infrastructure in Parali-IIand Notification of Social Impact Assessment under subsection 1 of Section 4 of the RFCTLARR, Act, 2013 was issued by the LAC vide F No 34/48/2021 –LR dated 08.06.2021.

2. Whereas, it has been ascertained that the land earmarked for the said project falls under the classification of „Pandaram" land. Section 2 (s) of the Laccadive, Minicoy and Amindivi Islands Land Revenue and Tenancy Regulation, 1965 defines Pandaram land as "land in which the Government has a proprietary right immediately before the commencement of this regulation and includes any land in which may acquire such rights under the regulation or under any other law". TheseTHE LAKSHADWEEP GAZETTE EXTRAORDINARY 9 Pandaram land were allotted to the Cowledars for through Cowl Agreements for a specific period of time, for carrying out improvements.

3. Whereas, Section 2(e) of the Laccadive, Minicoy and Amindivi Islands Land Revenue and Tenancy Regulation, 1965defines "Cowledar" as a person who has been or is granted a lease of Pandaram land on rent for a specified period, one of the conditions of such lease being that he makes improvements thereto. Thus, the Cowledars are mere lease holders of Pandaram land, until and unless Occupant Rights have been conferred upon them u/s 83 of Laccadive, Minicoy and Amindivi Islands Land Revenue and Tenancy Regulation, 1965.

4. Whereas, it is also submitted that no occupancy rights have been conferred upon the Cowledars who have been allotted the Pandaram lands involved in the extant case.

5. Whereas, in light of this, the Administration has issued an order to take over the said Pandaram lands for the development of High-End Eco Tourism project and other allied infrastructure in Parali-II vide F No.34/94/2023-LR dated 22.12.2023.

6. Hencethe land acquisition proceedings initiated with respect to the island of Parali-II (Pandaram lands)with issuance of Social Impact Assessment vide F No 34/47/2021 –LR dated 08.06.2022, is hereby retracted.

7. This is issued with the approval of the competent authority vide diary no. 1941 dated 28.07.2024.

Sd/-

(DR. R. GIRI SANKAR, IAS)

COLLECTOR (LA)

To:

1. The Director, Printing & Stationery, Kavaratti with request to publish the above notification in the official Gazette of Lakshadweep as an extra ordinary.

2. The Deputy Collector /Block Development Officer, Agatti Island with request to display at prominent place for wide publicity.

THE LAKSHADWEEP GAZETTE EXTRAORDINARY 10

UNION TERRITORY OF LAKSHADWEEP ADMINISTRATION

DEPARTMENT OF REVENUE

COLLECTORATE

KAVARATTI -682555

F. No.34/46/2021-LR/728 Dated. 29 -07-2024

NOTIFICATION

Sub: Retraction of Land Acquisition Proceedings for the Land

acquisition for the Development of High-End eco Tourism project

and other allied infrastructure in Suheli Cheriyakara Island - Reg.

Ref:Notification of Social Impact Assessment F. No.34/46/2021-LR,

dated: 06.12.2021.

Land acquisition proceedingswere initiated as per the request of the Director of Tourism Development UTLA vide letter FNo.25/02/2022-TD dated. 27.05.2022, for the proposed development project viz: Land acquisition for the development of High-End eco Tourism project and other allied infrastructure in Suheli Cheriyakara Island and Notification of Social Impact Assessment under subsection 1 of Section 4 of the RFCTLARR, Act, 2013 was issued by the LAC vide F No 34/46/2021 –LR dated 06.12.2021.

2. Whereas, it has been ascertained that the land earmarked for the said project falls under the classification of „Pandaram" land. Section 2 (s) of the Laccadive, Minicoy and Amindivi Islands Land Revenue and Tenancy Regulation, 1965 defines Pandaram land as "land in which the Government has a proprietary right immediately before the commencement of this regulation and includes any land in which may acquire such rights under the regulation or under any other law".

These Pandaram land were allotted to the Cowledars for through Cowl Agreements for a specific period of time, for carrying out improvements.

THE LAKSHADWEEP GAZETTE EXTRAORDINARY 11

3. Whereas, Section 2(e) of the Laccadive, Minicoy and Amindivi Islands Land Revenue and Tenancy Regulation, 1965defines "Cowledar" as a person who has been or is granted a lease of Pandaram land on rent for a specified period, one of the conditions of such lease being that he makes improvements thereto. Thus, the Cowledars are mere lease holders of Pandaram land, until and unless Occupant Rights have been conferred upon them u/s 83 of Laccadive, Minicoy and Amindivi Islands Land Revenue and Tenancy Regulation, 1965.

4. Whereas, it is also submitted that no occupancy rights have been conferred upon the Cowledars who have been allotted the Pandaram lands involved in the extant case.

5. Whereas, in light of this, the Administration has issued an order to take over the said Pandaram lands for the development of High-End eco Tourism project and other allied infrastructure in Suheli Cheriyakara Island vide F No.34/77/2023-LR dated 18.12.2023.

6. Hencethe land acquisition proceedings initiated with respect to the Island of Suheli Cheriyakarawith the issuance of Social Impact Assessment Notification F No 34/46/2021 –LR dated 08.06.2022, is hereby retracted.

7. This is issued with the approval of the competent authority vide diary no. 1942 dated 28 .07.2024.

Sd/-

(DR. R. GIRI SANKAR, IAS)

COLLECTOR (LA)

( DR. R. GIRI SANKAR, IAS) COLLECTOR (LA) To:

1. The Director, Printing & Stationery, Kavaratti with request to publish the above notification in the official Gazette of Lakshadweep as an extra ordinary.

2. The Deputy Collector cum CEO Central/Block Development Officer, Kavaratti Island with request to display at prominent place for wide publicity.

3. The Director of Tourism Development UTLA, UTLA Kavaratti

4. The Chairperson, Village (Dweep) Panchayath, Kavaratti.

THE LAKSHADWEEP GAZETTE EXTRAORDINARY 12

UNION TERRITORY OF LAKSHADWEEP ADMINISTRATION

DEPARTMENT OF REVENUE

COLLECTORATE

KAVARATTI -682555

F. No.34/46/2021-LR/730 Dated. 29 -07-2024

NOTIFICATION

Sub:Retraction of Land Acquisition Proceedings for the Land

acquisition in Uninhabited Island - Reg.

Land acquisition proceedings for the lands in various uninhabited Islands, were initiated as per the requisition received from the Departments of the UTL Administration. The elaborate details of the requisition received are as given below:

S. No Land Acquisition project (Island) Requisitioning Department Requisition letter reference details
1 Development of High –End Eco Tourism Project and other allied infrastructure in at Paralli-III of Agatti Island Director, Tourism Department UTLA, Kavaratti F.No.25/07/2022TD/2 46- dated.27.05.2022
2 Installation of DVOR and other infrastructure at Kalpitti Island Director Port Shipping & Aviation, UTLA, Kavaratti F.No.LD- 12002/9/2018-PORT- UT-LKS dated.01.06.2022
3 Development of High –End Eco Tourism Project and other allied infrastructure at Cheriyam Island Director, Tourism Department UTLA, Kavaratti F.No.25/09/2022- TD/234- dated.27.05.2022
4 Development of High –End Eco Tourism Project and other allied infrastructure in at Kodithala Island Director, Tourism Department UTLA, Kavaratti F.No.25/02/2022- TD/239 dated.27.05.2022
5 Development of High –End Eco Tourism Project and other allied infrastructure in at Pitti-II of Kalpeni Island Director, Tourism Department UTLA, Kavaratti F.No.25/11/2022- TD/236 dated.27.05.2022
6 Development of High –End Eco Tourism Project and other allied infrastructure at Thilakkam-II of Kalpeni Island Director, Tourism Department UTLA, Kavaratti F.No.25/12/2022- TD/244 dated.27.05.2022
7 Development of High –End Eco Tourism Project and other allied infrastructure in at Thilakkam -III of Kalpeni Island Director, Tourism Department UTLA, Kavaratti F.No.25/03/2022-TD dated.27.05.2022
THE LAKSHADWEEP GAZETTE EXTRAORDINARY 13

2. Accordingly, for the above mentioned projects, SIA Notification was issued under Section 4 of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. The details of the SIA Notifications are as follows:

S. No Land Acquisition project (Island) SIA Notification Number SIA Issuance date
1 Development of High –End Eco Tourism Project and other allied infrastructure in at Paralli-III of Agatti Island F.No.34/49/2021- LR 08.06.2022
2 Installation of DVOR and other infrastructure at Kalpitti Island F.No.34/54/2021- LR 06.12.2021
3 Development of High –End Eco Tourism Project and other allied infrastructure at Cheriyam Island F.No.34/52/2021- LR 08.06.2022
4 Development of High –End Eco Tourism Project and other allied infrastructure in at Kodithala Island F.No.34/52/2022- LR 08.06.2022
5 Development of High –End Eco Tourism Project and other allied infrastructure in at Pitti-II of Kalpeni Island F.No.34/49/2022- LR 08.06.2022
6 Development of High –End Eco Tourism Project and other allied infrastructure at Thilakkam-II of Kalpeni Island F.No.34/50/2022- LR 08.06.2022
7 Development of High –End Eco Tourism Project and other allied infrastructure in at Thilakkam -III of Kalpeni Island F.No.34/51/2022- LR 08.06.2022
THE LAKSHADWEEP GAZETTE EXTRAORDINARY 14

3. Whereas, it has been ascertained that the land earmarked for the said project falls under the classification of „Pandaram" land. Section 2 (s) of the Laccadive, Minicoy and Amindivi Islands Land Revenue and Tenancy Regulation, 1965 defines Pandaram land as "land in which the Government has a proprietary right immediately before the commencement of this regulation and includes any land in which may acquire such rights under the regulation or under any other law". These Pandaram land were allotted to the Cowledars for through Cowl Agreements for a specific period of time, for carrying out improvements.

4. Whereas, Section 2(e) of the Laccadive, Minicoy and Amindivi Islands Land Revenue and Tenancy Regulation, 1965defines "Cowledar" as a person who has been or is granted a lease of Pandaram land on rent for a specified period, one of the conditions of such lease being that he makes improvements thereto. Thus, the Cowledars are mere lease holders of Pandaram land, until and unless Occupant Rights have been conferred upon them u/s 83 of Laccadive, Minicoy and Amindivi Islands Land Revenue and Tenancy Regulation, 1965.

5. Whereas, it is also submitted that no occupancy rights have been

conferred upon the Cowledars who have been allotted the Pandaram lands

involved in the extant cases.

6. Whereas, in light of this, the Administration has issued an order to take over the said Pandaram lands in the aforementioned Islands. The details of the orders issued for taking back Pandaram lands in uninhabited Islands, is as follows:

THE LAKSHADWEEP GAZETTE EXTRAORDINARY 15
S. No Land Acquisition project (Island) Pandaram land taking over order number Pandaram land taking over order date
1 Development of High –End Eco Tourism Project and other allied infrastructure at Paralli-III F.No.34/93/2023- LR/1264 22.12.2023
2 Installation of DVOR and other infrastructure at Kalpitti Island F.No.34/27/2024- LR/596 27.06.2024
3 Development of High –End Eco Tourism Project and other allied infrastructure at Cheriyam Island F.No.34/80/2024- LR/1247 20.12.2023
4 Development of High –End Eco Tourism Project and other allied infrastructure at Kodithala Island F.No.34/83/2023- LR/1250 20.12.2023
5 Development of High –End Eco Tourism Project and other allied infrastructure at Pitti- II of Kalpeni Island. F.No.34/90/2023- LR/1246 20.12.2023
6 Development of High –End Eco Tourism Project and other allied infrastructure in at Thilakkam-II of Kalpeni Island F.No.34/88/2023- LR/1248 20.12.2023
7 Development of High –End Eco Tourism Project and other allied infrastructure at Thilakkam-III of Kalpeni Island F.No.34/89/2023- LR/1249 20.12.2023

7. Hencethe land acquisition proceedings initiated with respect to the Uninhabited Islands vide SIA Notifications, as mentioned Para 2 of this notification is hereby cancelled.

THE LAKSHADWEEP GAZETTE EXTRAORDINARY 16

8. This is issued with the approval of the competent authority vide diary no. 1958 dated 29.07.2024.

Sd/-

COLLECTOR (LA)

(DR. R. GIRI SANKAR, IAS) ( DR. R. GIRI SANKAR, IAS) COLLECTOR (LA) To:

1. The Director, Printing & Stationery, Kavaratti with request to publish the above notification in the official Gazette of Lakshadweep as an extra ordinary.

2. The Deputy Collector /Block Development Officer, Kavaratti, Agatti and Kalpeni Island with request to display at prominent place for wide publicity.

3. The Director of Tourism Development UTLA, UTLA Kavaratti

4. The Executive Officer, Village (Dweep) Panchayath, Kavaratti, Agatti and Kalpeni.

5. The web coordinator, Collectorate, Kavaratti with direction to upload into the official website of UTLA.

Copy to:

1. PA to the Secretary (Revenue).

2. PA to the District Collector/Appropriate Government, UTLA, Kavaratti for information.

THE LAKSHADWEEP GAZETTE EXTRAORDINARY 17

UNION TERRITORY OF LAKSHADWEEP ADMINISTRATION

DEPARTMENT OF REVENUE

COLLECTORATE

KAVARATTI – 682 555

FORM II

[See rule 5(1)]

PRELIMINARY NOTIFICATION

[Under Section 11 (1) of the RFCTLARR Act, 2013]

F.No.34/23/2021-LR/731 Dated. 29 .07. 2024

Whereas it appears to the Appropriate Government that a total area of 0.3458 hectares (3458 Sqm) land is required in the Agatti Village (Dweep) Panchayat of Agatti Taluk, Lakshadweep District for public purposes, namely, Expansion of Rajiv Gandhi Specialty Hospital at Agatti Island, Lakshadweep. Social Impact Assessment Study was carried out by SIACS and a report submitted. Appraisal of the SIA Report was done by an Independent Multidisciplinary Expert Group constituted by the Appropriate Government of UT of Lakshadweep u/s 7 of the Act. Preliminary investigation was conducted by a committee of officers constituted by Collector (LA) as laid down under rule 4. The summary of the Social Impact Assessment Report/ preliminary investigation is as follows (Copy of SIA report is attached as Annexure- I).

2. Therefore, it is notified that for the above said project in the Agatti Village of Agatti Taluk, Lakshadweep District a piece of land measuring, 0.3458 hectares (3458 Sqm) of standard measurement, whose details description is as following, is under acquisition:

Sl. No . Survey No. Type of title Type of land Area under acquisi tion (in Sqm) Name and address of person interested Boundaries
N E S W
1 988/5B Owner Private 41 Keepattacharabiyoda Mapadaillam Kunhibi Kunhibi 988/5A,4 988/5A 988/9B 988/9B
2 988/9A Owner Private 380 Kuttiyappada Attakoya, Aboobackerkoya, Kasmikoya, Makkikulam Muhammed, Kunhibi, Kunhikkappada Sheemabi,Sirajkoya, Koya, Beefathummabi, Vellainoda Kulus, Beeyathabiyoda Attakoya,Thalakada Muhammedkoya Moulavi 988/4 988/9B 988/10A 988A
3 988/10A Owner Private 270 Kalkandiyoda Mayammakada Cheriyakoya, Kamabi 988/9A 988/10B 988/11 988A
4 988/12A Owner Private 120 Vallainoda Mariyomma, Kulus, Sarammapada Aboobacker 988/11 988/12B 989/1A1 988A
5 989/1A1 Owner Private 340 Sarammapada Cheriyapura Yousef, Aboobacker, Biyakuttiyoda Kasmi, Sarammapada Aboobacker, Avvammapada Ahamed, Khalid, Koyammu, Bambathi, Kadeeshomma, Shareefa, Hamza, Beelathi, Amina 988/12A 989/1A2 989/2A 889A
6 989/2A Owner Private 340 Attam Kasmi, Kadeesha, Fathumma, Kadeeshomma,Tholiyod a Usman Haji, Cheriyapura Aboobacker, Koyassan, Fathima, Kuttiyam Mukriyoda Ahamed, Beethara,Fathima, Yousef, Aboobacker, Mariyam, Hajaromma, Kadeesha. 989/1A1 989/2B 989/3,17A 989A
7 989/3 Owner Private 30 Vallainoda Mariyam Umma 989/2A 989/2A 989/17 A 989/2A
8 989/17A Owner Private 130 Kalmathithiyoda Kasmi, Fathumma, Amberpalli Kadeeshomma, Hamza, Kalamthithiyoda Mohammed, Kotta Hajara. 989/2A,3 989/17B 999/10B 989A
9 989/17C Owner Private 120 Kalmathithiyoda Kasmi, Fathumma, Amberpalli Kadeeshomma, Hamza, Kalamthithiyoda Mohammed, Kotta Hajara. 989/18,9,11,12 999/10A 999/10A 989/17B
10 990/16 Owner Private 60 Adanaillam Amina Umma, Cheriyapura Sarammappada Mohammed , Kalanoda Aboobacker, Rukiyath 990/20B2 990/17 990/14 990/15
11 990/17 Owner Private 70 Tholiyoda Usman Haji, Pandarappura Abdulla, Sainaba, Kadeeshomma, Manichi, Haleemath, Sailani, Adanaillam Muhammed, Cheriyammad Kakkada Mohammed, Haleema Umma 990/20B2 990/20B2 990/20B2C 990/18
12 990/20B2A Owner Private 16 Kalkandiyoda Mayammakkada Cheriyakoya, Kamabi 990/6B CC Road 990/15,14, 17 990/20B,1
13 990/20B2C Owner Private 105 Kalkandiyoda Mayammakkada Cheriyakoya, Kamabi 990/20BB2 CC Road 999/5 990/17,18,
14 999/2 Owner Private 20 Moothammada Kasmi, Abdulkader, Abdul Rahiman, Fathumma 999/4 999/4 999/3 999/1
15 999/3 Owner Private 50 Chadippura Haleema, Maviya, Muthalif, Attabi, Ummul Vaseel, Rukiyath 999/2,4 999/6 999/7,8 999//10
16 999/4 Owner Private 90 Kattampalli Beefathummabi, Nafeesabi, Abdul Rahiman 990/19 999/5 999/6,3 999/2,
17 999/5 Owner Private 110 Keepattacharabiyoda Meppadaillam Kunhibi 990/19 ROAD 999/6,4 999/4
18 999/6 Owner Private 120 Bander Cheriyabi, Keelaillam Beebi, Fathummabi, Abdullakoya, Muthukoya, Attakoya, Cheriyabi 999/4,5 ROAD 999/9 999/3,7
19 999/7 Owner Private 30 Kumbinoda Ahamed 999/3 999/6 999/9 999/8
20 999/8 Owner Private 30 Kumbinoda Ahamed 999/3 999/7 999/9 999/10A
21 999/10B Owner Private 986 Amber Palli Muthavalli Keepattacharabiyoda Mepadaillam Kasmikoya (Wakf) 989/17A 999/10A 979/11 999A
Trees Structure
Variety Number Type Plinth Area
1- Coconut Tree 2- Thespesia 3- Neem Tree 4- Pine 135 Nos 2 Nos 1 No 1 No Concrete Toilet 1 No
THE LAKSHADWEEP GAZETTE EXTRAORDINARY 18 THE LAKSHADWEEP GAZETTE EXTRAORDINARY 19 THE LAKSHADWEEP GAZETTE EXTRAORDINARY 20

3. This notification is made under the provisions of section 11(1) of the Right to Fair Compensation and Transparency in Land acquisition, Rehabilitation and Resettlement Act, 2013 (30 of 2013), to all whom it may concern.

4. A plan of the land may be inspected in the office of the Collector (LA) and Deputy Collector cum CEO (Central)/ Block Development office, Agatti on any working day during the working hours.

5. The Government is pleased to authorize Collector (LA), Kavaratti and his Revenue/ Survey staff to enter upon and survey land, take levels of any land, dig or bore into the sub-soil and do all other acts required for the proper execution of their work as provided and specified in section 12 of the said Act.

6. Under section 11(4) of the Act, no person shall make any transaction or cause any transaction of land i.e. sale/purchase, etc., or create any encumbrances on such land from the date of publication of such notification without prior approval of the Collector (LA).

THE LAKSHADWEEP GAZETTE EXTRAORDINARY 21

7. Objections to the acquisition, if any, may be filed by the person interested within 60 (sixty days) from the date of publication of this notification as provided under section 15 of the Act before Collector (LA).

8. This Notification is issued, as the Preliminary Notification issued vide F.No.34/23/2021-LR dated 22.10.2022, has lapsed as per Section 19 (7) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013.

9. This issue with the approval of the Appropriate Government vide diary no. 1956 dated. 28 .07.2024.

Encl: As above Sd/-

(Dr. R. Giri Sankar, IAS)

Collector (LA)

To

1. The Director, Printing & Stationery, Kavaratti with request to publish the above notification in the official Gazette of Lakshadweep as an extra ordinary.

2. The Executive Officer, Village (Dweep) Panchayat, Agatti. 3. The Deputy Collector / Block Development Officer, Agatti Island with request to display at prominent place for wide publicity.

4. The Director, Medical & Health Services, Kavaratti with request to publish the notification in two local daily news papers one in Malayalam and one in English and furnish tear sheets to Collectorate.

5. Copy to Additional District Magistrate, Kavaratti. 6. Copy to web coordinator, Collectorate, Kavaratti with direction to upload into the official website of UTL

Copy:-

1. Secretary Revenue, UTLA, Kavaratti. 2. Secretary Health, UTLA, Kavaratti. 3. District Collector, UTLA, Kavaratti. 4. Guard file / Office Copy.

THE LAKSHADWEEP GAZETTE EXTRAORDINARY 22

भारत सरकार/GOVERNMENT OF INDIA

लक्षद्वीप प्रशासन /LAKSHADWEEP ADMINISTRATION

समाहताा कायाालय (COLLECTORATE)

कवरत्ती/KAVARATTI- 682 555

फ़ोन/ Phone: 04896- 262384, 262279, 263974 ईमेल/ E-mail ID: [email protected]

FORM II

[See rule 5(1)]

PRELIMINARY NOTIFICATION

[Under Section 11 (1) of the RFCTLARR Act, 2013]

F.No.34/23/2022-LR/732 Dated. 29.07.2024

Whereas it appears to the Appropriate Government that a total of 0.2880 hectares (2880 Sqm) land is required in the Agatti Village (Dweep) Panchayat of Agatti Taluk, Lakshadweep District for public purposes, namely, Construction of LPG Godown at Agatti Island. Social Impact Assessment Study was carried out by SIACS and a report submitted. Appraisal of the SIA Report was done by an independent multidisciplinary expert group constituted by the appropriate Government of UT of Lakshadweep u/s 7 of the Act/ Preliminary investigation was conducted by a committee of officers constituted by Collector (LA) as laid down under rule 4. The summary of the Social Impact Assessment Report/ preliminary investigation is as follows (Copy of SIA report is attached as Annexure-I).

2. Therefore, it is notified that for the above said project in the Agatti Village of Agatti Taluk, Lakshadweep District a piece of land measuring, 0.2880 hectares (2880 Sqm) of standard measurement, whose detail description is as following, is under acquisition:

Sl. No . Survey No. Type of title Type of land Area under acquisiti on (in Sqm) Name and address of person interested Boundaries
N E S W
1 1285/2D Owner Private 1950 Beekuttiyoda Kallillam Kunhibi 1285/2C Lagoon 1285/2E Road
2 1285/2E Owner Private 930 Kallillam Sayed Abdullakoya 1285/2D Lagoon 1285/2F Road
Trees Structure
Variety Number Type Plinth Area

/

/

1285/2E

Kallillam Sayed Abdullakoya

5 8 2 15 8 2 1 THE LAKSHADWEEP GAZETTE EXTRAORDINARY 23

Trees

Structure

Variety Number Type Plinth Area 1-Coconut Tree (Thengu) 40 Nos. Nil Nil 3. This notification is made under the provisions of section 11(1) of the Right to Fair Compensation and Transparency in Land acquisition, Rehabilitation and Resettlement Act, 2013 (30 of 2013), to all whom it may concern.

4. A plan of the land may be inspected in the office of the Collector (LA) and Deputy Collector cum CEO Central/ BDO, Agatti on any working day during the working hours.

5. The Government is pleased to authorize Collector (LA), Kavaratti and his Revenue/ Survey staff to enter upon and survey land, take levels of any land, dig or bore into the sub- soil and do all other acts required for the proper execution of their work as provided and specified in section 12 of the said Act.

6. Under section 11(4) of the Act, no person shall make any transaction or cause any transaction of land i.e. sale/purchase, etc., or create any encumbrances on such land from the date of publication of such notification without prior approval of the Collector (LA).

7. Objections to the acquisition, if any, may be filed by the person interested within 60 (sixty days) from the date of publication of this notification as provided under section 15 of the Act before Collector (LA).

8. This Notification is issued, as the Preliminary Notification issued vide F.No.34/23/2022-LR/1509 dated 27.12.2022, has lapsed as per Section 19 (7) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013.

9. This issue with the approval of the appropriate government vide diary no. 1959 dated 29.07.2024.

Encl: As above

Sd/-

Encl: As above

(Dr. R. Giri Sankar, IAS.,) Collector (LA) To ( DR. R. GIRI SANKAR, IAS) COLLECTOR (LA) LGP. Kvt. L-819/07-2024/10

1. The Director, Printing & Stationary, Kavaratti with request to publish the above notification in the official Gazette of Lakshadweep as an extra ordinary.

2. The Chairperson, Village (Dweep) Panchayat, Agatti Island. 3. The Deputy Collector cum CEO Central/ Block Development Officer, Agatti Island

Cite this issue. Lakshadweep Gazette, Lakshadweep Administration, 07 August 2024. Indian Gazettes, https://egazette.servantsofknowledge.in/details/in.gazette.lakshadweep.2024-08-07.2024080768/. Archive identifier in.gazette.lakshadweep.2024-08-07.2024080768.