Servants of Knowledge
Puducherry Gazette · Government of Puducherry

The Electricity Department has stated vide I.D. Note No. 1165/ED/ SE/HoD/EHV/PLCC & Lines/F.RoW/2017-2018, dated 04-04-2018 of the Superintending Engineer-cum-Head of Department, Electricity Department, Puducherry, under the powers conferred in Electricity Act, 2003 and Indian Telegraph Act, 1885, compensation is being paid only for the crop damages while erection of towers and stringing of transmission lines.

Published 05 September 2023

Department
INDUSTRIAL DEVELOPMENT (POWER) DEPARTMENT
Type
Extraordinary
Gazette no.
69
Part
II
Category
ORDER
Identifier
in.gazette.puducherry.2023-09-05.extraordinary-ii-issue-69
Languages
English, Tamil, French
Published at
Original source ↗

Registered No.

PY/44/2021-23

Registered with the Registrar of Newspapers for India under No. 10410 Amflºƒˆ \VWÈ ∂´E>µ

La Gazette de L' État de Poudouchéry

The Gazette of Puducherry

PART - II

E≈©A ÿkπX| EXTRAORDINAIRE EXTRAORDINARY

∂]ÔV´D ÿ✓u≈ Publiée par Published by

ÿkπX| Autorité Authority

®ı Amflºƒˆ ÿƒÀkVF¬˛wÁ\ 2023 } ÿƒ©¶D✓Ï |5 { No. 69 Poudouchéry Mardi 5 Septembre 2023

No. Puducherry Tuesday 5th September 2023

(14 Bhadra 1945)

GOVERNMENT OF PUDUCHERRY

INDUSTRIAL DEVELOPMENT (POWER) DEPARTMENT

(G.O. Ms. No. 33, Puducherry, dated 1st September 2023)

ORDER

The Electricity Department has stated vide I.D. Note No. 1165/ED/ SE/HoD/EHV/PLCC & Lines/F.RoW/2017-2018, dated 04-04-2018 of the Superintending Engineer-cum-Head of Department, Electricity Department, Puducherry, under the powers conferred in Electricity Act, 2003 and Indian Telegraph Act, 1885, compensation is being paid only for the crop damages while erection of towers and stringing of transmission lines

based on the rates assessed by the concerned Revenue Authorities for

[ 1519 ] 1520 LA GAZETTE DE L'ETAT [PART–II

the various type of crops damaged and various type of trees removed which are essentially required to have adequate clearance as per the Indian Electricity Rules, 1956 as detailed below:

Voltage Class Ground Sectional Clearance Clearance (vertical) (horizontal)

(1) (2) (3) (4)

Not exceeding 66 KV 4.00 m 3.00 m

Not exceeding 132 KV 4.60 m 3.50 m

Not exceeding 220 KV 5.50 m 4.30 m

Not exceeding 400 KV 8.00 m 6.50 m

2. The Electricity Department has also stated that in the recent past, the Department has been receiving demand for payment of compensation for affected land due to laying of EHV lines. As there is no provision for payment of compensation for the affected land, the land owners are objecting to erect towers and to string transmission lines in their land, due to which the execution of works relating to the

transmission line is getting delayed.

3. The Electricity Department has further stated that the Ministry of Power, Government of India, had formulated Guidelines regarding the payment of compensation for land towards damages in regard to Right of Way for Transmission lines as stipulated in sections 67 and 68 of the Electricity Act, 2003, read with sections 10 and 16 of Indian Telegraph

Act, 1885, which will be in addition to the compensation towards normal crop and tree damages. The said amount will be payable only of transmission lines supported by a tower base of 66 KV and above and not for sub-transmission lines and distribution lines below 66 KV as follows:

(i) Compensation @ 85% of land value as determined by District

Magistrate or any other Authority based on Circle Rate/Guideline Value/ Stamp Act rates for tower base area (between four legs) impacted severely due to installation of Tower/Pylon structure.

1521

PART–II] LA GAZETTE DE L'ETAT

(ii) Compensation towards diminution of land value in the width

of Right of Way Corridor due to laying of transmission lines and

imposing certain restriction would be decided by the States as per

categorization/type of land in different places of States, subject to a

maximum of 15% of land value as determined based on Circle rate/

Guideline value/Stamp Act rates.

(iii) In areas where land owner/owners have been offered/

accepted alternate mode of compensation by concerned Corporation/

Municipality under Transfer Development Rights (TDR) Policy of State,

the Licensee/Utility shall deposit compensation amount as per (i) and (ii)

above with the concerned Corporation/Municipality/Local Body or the

State Government.

(iv) For this purpose, the width of Right of Way Corridor shall

not be more than that prescribed in the Table below and shall not be

less than the width directly below the conductors.

Right of Way Width for different voltage line as per the Ministry

of Environment and Forests Guidelines, dated 05-05-2014, is as follows:

Transmission Voltage Width of Right of Way

(in metres)

66 KV

18

110 KV

22

132 KV

27

220 KV

35400 KV SC 46 400 KV DC 46 +/- 500 KV HVDC 52 765 KV SC (with delta configuration) 64765 KV DC 67 +/- 800 KV HVDC 69 1200 KV 89 1522 LA GAZETTE DE L'ETAT [PART–II

4. The Electricity Department has requested for adoption of the Government of India Guidelines as this would not only facilitate an early resolution for right of way issues, but, also for completion of the vital transmission lines.

5. The Government of Puducherry, after examination of the proposal has decided to adopt the Guidelines issued by the Ministry of Power, Government of India for payment of compensation towards damages in regard to Right of Way for transmission line communicated vide Letter No. 3/7/2015-Trans., dated 15-10-2015 from the Ministry of Power, Government of India Guidelines for payment of compensation towards

damages in regard to Right of Way for transmission lines.

6. Accordingly, approval of the Lieutenant-Governor, Puducherry, is hereby conveyed for adoption of Government of India, Ministry of Power Guidelines for payment of compensation towards damages in regard to Right of Way for transmission lines covering 110 KV, 132 KV and 230 KV lines and above as below, subject to the condition that it

will be applicable to ongoing and new works.

(i) Compensation @ 85% of land value as determined by District Magistrate or any other Authority based on Circle rate/Guideline value/ Stamp Act rates for tower base area (between four legs).

(ii) Compensation towards diminution of land value in the width of Right of Way (RoW) Corridor due to laying of transmission lines,

subject to a maximum of 15% of land value as determined based on Circle rate/Guideline value/Stamp Act rates.

7. This issues with the concurrence of the Finance Department

vide their I.D. Note No. 475/FD/F3/FC/2021-22, dated 24-09-2021.

(By order of the Lieutenant-Governor)

S. MURUGESAN,

Under Secretary to Government (Power).

————

online publication at "https://styandptg.py.gov.in" Published by The Director, Government Press, Puducherry.

Cite this issue. Puducherry Gazette, Government of Puducherry, 05 September 2023. Indian Gazettes, https://egazette.servantsofknowledge.in/details/in.gazette.puducherry.2023-09-05.extraordinary-ii-issue-69/. Archive identifier in.gazette.puducherry.2023-09-05.extraordinary-ii-issue-69.