GOVERNMENT OF PUDUCHERRY
CHIEF SECRETARIAT (HOUSING)
(G.O. Ms. No. 15/2024-Hg., Puducherry, dated 13th September 2024)
NOTIFICATION
I n e x e r c i s e o f t h e p o w e r s c o n f e r r e d b y s e c t i o n 4 7 o f the Puducherry Town and Country Planning Act, 1969 (No. 13 of 1970), the Lieutenant-Governor, Puducherry, in consultation with the Town and Country Planning Department, based on the Notification of "Puducherry Energy Conservation Building Rules, 2022 and the Puducherry Energy Conservation Building Code, 2022" notified by the Government of Puducherry vide G.O. Ms. No. 7/2022-Envt., Puducherry, dated 02-09-2022 of the Chief Secretariat (Environment), Government of Puducherry,
[ 441 ] 442 LA GAZETTE DE L'ETAT [PART–II
hereby makes the following Amendments to the Puducherry Building Bye-Laws and Zoning Regulations, 2012 issued vide G.O.Ms. No.5/ 2012-Hg., dated 05-03-2012 of the Chief Secretariat (Housing), Government of Puducherry, namely:-
(1) These Bye-Laws and Regulations may be called the Puducherry Building Bye-Laws and Zoning Regulations (Amendment), 2024.
(2) The provisions of these Bye-Laws and Zoning Regulations
shall apply to the planning area declared vide:-
(i) G.O. Ms. No. 79/84/F6, dated 17th August, 1984, notified
in the Gazette No. 35, dated 28th August, 1984;
(ii) G.O. Ms. No. 93/85/F6, dated 08th July, 1985, notified in
the Gazette No. 31, dated 30th July, 1985; and
(iii) G.O. Ms. No. 68/89/F6, dated 26th July, 1989, notified in the Gazette No. 83, dated 31st July, 1989 of the Housing Secretariat, Government of Puducherry and such other areas in the Union territory of Puducherry, notified from time to time.
(3) They shall come into force on and from the date of their
publication in the Official Gazette.
2. Amendment of clause 38 (7). Energy Conservation Building.— In the Puducherry Building Bye-Laws and Zoning Regulations, 2012, (hereinafter referred to as the said Regulations) in Chapter-III - Health and Sanitation-General Building Requirements, for the existing clause 38(7), the following shall be substituted, namely.-
"(7) (i) Energy Conservation Building.— Any commercial building with a connected load of 100 KW or above or a contract demand of 120 KVA or above whichever is found appropriate/applicable, shall comply with the provisions of 'Puducherry Energy Conservation Building Rules, 2022' and 'the Puducherry Energy Conservation Building Code, 2022' as amended from time to time.
Provided that this clause shall not extend to,—
(a) Buildings that do not use either electricity or fossil fuel; or
(b) Equipment and portions of building systems that use
energy primarily for manufacturing processes.
443
PART–II] LA GAZETTE DE L'ETAT
(ii) Overriding effect of Safety, Health and Environmental
Codes.— Where these directives are contrary to any of the provisions
of laws relating to safety, health or environment, the provisions of safety,
health or environmental laws shall apply."
3. Amendment of clause 68.— In the said Regulations, for the
existing clauses 68, 68.1, 68.2 and 68.3, the following shall be substituted,
namely.—
"68. Rooftop Solar Energy Installation: Rooftop Photovoltaic
Power Station, or Rooftop PV system, is a photovoltaic system that has
its electricity-generating solar panels mounted on the rooftop of
residential/commercial buildings. The various components of such
a system include photovoltaic modules, mounting systems, cables, solar
inverters and other electrical accessories. Rooftop PV systems are faster
than other types of renewable power plants. They are clean, quiet and
visually unobtrusive. The minimum power generation requirement norms
for Rooftop Solar PV Installation for various categories of the buildings
are given in the Table below:
TABLE
S.No. Category Plot size Generation requirements
(sq.m.)
(1) (2) (3)
(4)
Residential :
(ii) Group Housing All sizes Minimum 5 percent of the
connected load.
All other buildings :
load above 30 KW.
444 LA GAZETTE DE L'ETAT [PART–II
(1) (2) (3)
(4)
(iv) Mercantile, hotels, 500 and For buildings with connected
motels, assembly above. load of : buildings, industrial and institutional. 50 – 1,000 10 KWp or 5 percent KW. of connected load, whichever is higher.
Above 10 KWp or 10 percent 1,000 KW. of connected load, whichever is higher.
Note : (1) Plots with size lesser than 500 sq.m. shall be encouraged
for installation of SPV panels; and
(2) At least, 1 percent of connected load shall be generated from a renewable energy source such as photovoltaic cells or wind mills or hybrid.
(By order of the Lieutenant-Governor)
P. EJOUMALE, Under Secretary to Government (Housing).
————