GOVERNMENT OF PUDUCHERRY
CHIEF SECRETARIAT (HOUSING)
(G.O. Ms. No. 12/2025-Hg., Puducherry, dated 15th July 2025)
ORDER
The Union territory of Puducherry has been witnessing rapid urbanization and population growth which has led to the drastic changes in the land use pattern and development of new settlements across the Union territory of Puducherry. Since, the Comprehensive Development Plan as well as the Building Bye-Laws have not been revised in a regular interval in accordance with the changing societal needs, technological advancements and demands of the public, many constructions happened in deviations to the Building Bye-Law. Therefore, the Government of
[ 907 ] 908 LA GAZETTE DE L'ETAT [PART–II
Puducherry, prepared this Scheme to give an amnesty to the public as
an one-time measure hereby notifies the following Scheme to regularise
the unauthorised constructions and buildings constructed in deviation
to the sanctioned plan, as a one-time measure.
NOTIFICATION
In exercise of the powers conferred by section 46A read with
section 2(37) of the Puducherry Town and Country Planning Act, 1969
(No. 13 of 1970), the Lieutenant-Governor, Puducherry, in consultation
with the Town and Country Planning Department Board, hereby notifies
the following Scheme namely:-
1. Short title, applicability and commencement.— (1) This Scheme
may be called "The Puducherry One-Time Regularization Scheme for the
unpermitted constructions and deviations 2025".
(2) They shall be applicable to all the existing buildings and
buildings where structural works are completed and all roof slabs are
laid, in the jurisdiction of all the Planning Authorities in the Union
territory of Puducherry, constructed from 01-05-1987 to the date of
Notification of the Scheme.
(3) They shall come into force from the date of its Notification
in the Official Gazette.
2. Definitions.— In these Scheme, unless the context otherwise
requires,-
(i) "Act" means, the Puducherry Town and Country Planning
Act, 1969;
(ii) "Board" means, the Puducherry Town and Country Planning
Board constituted under the Act;
(iii) "Building Bye-Laws" means, the Puducherry Building
Bye-Laws and Zoning Regulations, 2012;
(iv) "Construction" means, any construction, addition or
reconstruction which was carried out or completed during the period
from 01-05-1987 to the date of Notification of the Scheme, without
obtaining a building permission from the Planning Authority;
909
PART–II] LA GAZETTE DE L'ETAT
(v) "Guideline Value" means, the prevailing guideline value of land in terms of rupees per square meter as fixed by the Registration Department of the Union Territory, as on the date of filing of Application for regularization;
(vi) "Notification" means, a Notification published in the Official Gazette of Puducherry and the word "Notified" shall be construed, accordingly;
(vii) "Planning Authority" means, any Local Planning Authority
constituted under the Act;
(viii) "Registered Technical Personnel" means a Town Planner / Architect / Engineer / Structural Engineer / Quality Auditor / Construction Engineer / Developer / Licensed Supervisor registered or deemed to have been registered by the Planning Authority;
(ix) "Rule" means, the Puducherry Town and Country Planning
Rules, 1974;
(x) "Total Built up area" means, the entire built up area covered
in the building including common areas and balconies on all floors;
(xi) "Unauthorized Deviated Construction" means, any construction, addition or reconstruction which was carried out or completed during the period from 01-05-1987 to the date of Notification of the Scheme, in deviation to the sanctioned building plan issued by the Planning Authority;
(xii) Words and expressions used and not defined in this Scheme, but defined in the Act, the Rules and the Puducherry Building Bye-Laws and Zoning Regulations, 2012 made thereunder, shall have the same meaning assigned to them in the said Act, the Rules and the Building Bye-Laws.
3. Regularization Notice to the Building owners.— The concerned Planning Authority may serve a notice to all the owners or occupiers of unauthorized buildings or deviated buildings within a period of six months from the date of notification of the Scheme.
4. Compulsory Online Application for Regularization.— (1) As per clause 1(2) as stated above, an Application for regularization of buildings constructed without prior plan approval / buildings constructed in deviation to the approved plan as given in Annexure-I 910 LA GAZETTE DE L'ETAT [PART–II
shall be made by the Owner / General Power of Attorney / Registered Association to the Planning Authority in the prescribed pro forma along with the documents listed below only through online mode. It shall be filed within a period of one year from the date of Notification of this Scheme along with the required fees as mentioned in clause 6. If any Owner / General Power of Attorney / Registered Association does not apply within the stipulated time, he shall be liable for enforcement action under the law, as per clause 13 and his building shall not be taken up for regularization under this Scheme.
(2) The Application shall be accompanied by the following
documents, namely:-
(a) Proof for payment of Application fee, if any, paid to the
Planning Authority under this Scheme.
(b) Floor plans, elevations and sections of the buildings constructed, the site plan, building plan and wherever applicable the service plans, parking plans drawn as provided in the Puducherry Building Bye-Laws and Zoning Regulations and specification thereunder. The plans so submitted shall be:
(i) Certified by the owner to the effect that "These are the drawings having reference to the details furnished in the Application and documents enclosed along with it".
(ii) Certified by the Registered Technical Personnel to the effect that "These are the drawings having reference to the details furnished in online Application and documents enclosed along with it and that the details and measurements therein conform to the actual constructions made at the site. Further, certify that the unauthorized building(s) is/are structurally stable".
(iii) Certified by a Registered Structural Engineer to the effect that "The unauthorized Special Buildings / Multi-storied Buildings / Group developments as per the drawings and Application(s) enclosed herewith is / are structurally stable".
(c) Self-attested copy of ownership documents of the land / site /
Apartment.
911
PART–II] LA GAZETTE DE L'ETAT
(d) Time stamped digital photographs of the unauthorised buildings applied for regularisation under this Scheme (minimum of 4 numbers from all the four sides showing all external details of development) which is to be signed by the owner and the Registered Technical Personnel.
(e) Proof for the period of completion of the construction / structural works completed / roof laid (copy of property tax / electricity / water supply bills).
(f) Proof of valid registration of the Registered Technical
Personnel.
(g) Copies of the documents regarding Court cases, if any (Courts, Tribunal, Ombudsman, etc.) pertaining to or of reference to the plot or constructions therein.
(h) Any Government orders, circulars, any form of communication(s) pending to the plot / land or any construction works therein.
(i) Copy of approved plans and / or permit issued, if any, by
the Planning Authority.
(j) Details of action, if any taken by the Planning Authority
against the unauthorized construction.
(k) Copy of previous orders, if any, regularizing
constructions within the Plot.
(l) Copy of the resolution made by all owners of their
Association (for residential Apartments).
(m) Checklist and acknowledgment.
(n) Any other details pertaining to or of relevance to the plot
and buildings therein, if any.
(3) If, the online Application received is not in order and /or incomplete for further scrutiny, the Planning Authority shall return the same, within ninety working days of the receipt of the online Application, to the Applicant (Annexure-III).
(4) The site of construction of unauthorized buildings constructed in unapproved / unauthorized layouts falling outside the Comprehensive Development Plan area in Puducherry and Karaikal 912 LA GAZETTE DE L'ETAT [PART–II
regions shall be regularized by collecting charges as per the G.O. Ms. No. 20/2017-Hg., dated 20-10-2017, as subsequently amended, in the first instance and thereafter the buildings constructed in the said site shall be considered for regularisation.
5. Clearance from other Authorities / Departments in certain cases.— In the following cases, clearance (NOC) shall be obtained by the Applicants from the concerned Authorities before considering the Application under the Scheme by the Planning Authority:
(a) In respect of cases of residential and non-residential buildings exceeding 17 mts. in height, and buildings of public congregation like Schools, Cinema Theatres, Function halls and other assembly buildings on plot area of 500 sq.m. and above:-
From the Fire Service Department, Puducherry or from the empanelled Third Party Fire Safety Certifying Agencies notified by the Government of Puducherry.
(b) From the Airport Authority of India / Archaeological Survey of India / Railways or any State / Central Government Organizations, wherever applicable.
6. Payment of Fee and Regularization Charges.— (1)Application Fee.— A non-refundable Application fee of 5000 (Rupees five thousand only) for residential buildings and 10,000 (Rupees ten thousand only) for other buildings shall be paid in the name of the Member-Secretary of the concerned Planning Authority at the time of filing online Application for regularization by way of e-transfer.
(2) Scrutiny Fee.— A non-refundable scrutiny fee at the rate of 20 per sq.m. for residential buildings and 50 per sq.m. for Applications other than residential buildings shall be paid in the name of the Member-Secretary of the concerned Planning Authority along with the Application by way of e-transfer.
(3) Regularization Charges.— (a) The Owner / Applicant shall
pay the regularization charges at the rates as given in Annexure-II.
(b) In case of deficit parking area in the ongoing constructions, online Application for regularization shall be considered, only, if parking area is provided as per the requirements specified in the Puducherry Building Bye-Laws and Zoning Regulations. However, in case of deficit parking area 913
PART–II] LA GAZETTE DE L'ETAT
in the buildings completed and occupied before this Notification, regularization charge equivalent to the Weighted Guideline Value of the land rated in the concerned locality applicable at the time of submission of online Application shall be paid for the deficit parking area.
(c) The charges are levied for the total violated built up area on all floors. The charges does not include the fee / charges such as permit / development charges etc., to be paid to other Departments / Local Bodies / Government agencies.
(d) The Planning Authority after verification of the self computation table of regularization charge filed by the Applicant shall intimate in Annexure-IV about the regularization charges to be paid by the Applicant.
(e) The Applicant shall remit the regularization charges by way of e-transfer to the Member-Secretary of the concerned Planning Authority within 30 days from the receipt of notice as in Annexure -IV.
7. Regularization Scheme will not be applicable to the following cases.— Regularization of unauthorized constructions shall not be considered in the following cases and in cases where public interest and public safety are likely to be adversely affected, viz.
(a) Encroachment on Government land or property belonging to Public undertakings, Puducherry Housing Board, Puducherry Industrial Promotion and Development Investment Corporation, Puducherry Urban Development Agency, Local Bodies, Endowments, Hindu Religious Institutions and Wakf Board, etc.
(b) Land for which the Applicant has no Title Deed.
(c) Surplus land declared under the Puducherry Land Reforms Act / Agriculture Land / Ceiling / lands resumed under the Land Acquisition Act, etc.
(d) Buildings affected under alignment of any proposed road under Master Plan / Comprehensive Development Plan / Road Development Plan or any other public road / Rail corridors.
(e) Tank bed and lake, canal bunds, river course / drain / canals
and any other water body.
914 LA GAZETTE DE L'ETAT [PART–II
(f) Prohibited buildings under the Coastal Regulation Zone and such other environmentally restricted zones as prescribed in the respective regulations.
(g) Layout / Master Plan Open Spaces / Areas earmarked for Recreational Use in the Master Plan / Comprehensive Development Plan.
(h) Buildings that are not in conformity with the land use as
notified in the Master Plan / Comprehensive Development Plan.
(i) Site under legal litigation / disputes regarding ownership of
the site / building.
(j) Building constructions that compromises on structural safety
of the building.
(k) Under any circumstances the buildings / floors constructed after the cut-off date as stipulated in clause 1(2) are not eligible for regularization. If any Registered Technical Personnel (RTP) / Applicant submit application for regularization of such buildings suppressing the facts, he / she will be black listed without any notice. No Application of blacklisted RTP is acceptable, until unblocked by the Planning Authority with the consent of the Town and Country Planning Board.
8. Exemption. — (i) Buildings constructed prior to 01-05-1987.
(ii) Huts, semi-permanent and RCC residential buildings up to two storeys (G+1) in sites up to 60 sq. m. of built up area are exempted from operation of this Scheme.
(iii) Residential building falling in slums, identified / notified by the Puducherry Slum Clearance Board / other identified slums / free house sites given by the Government and residential buildings constructed by the beneficiaries of various Government Housing Subsidy Schemes (for Below Poverty Line (BPL) category only).
9. Violation after submission of online Application.— During verification, if it is found that the Applicant has misrepresented / undertaken further additions or extensions to the existing building after submitting the online Application, then such Application shall be summarily rejected and necessary action shall be taken against such unauthorized buildings including sealing / demolition of premises as per law and also legal actions shall be initiated against the Registered Technical Personnel and the Applicant.
915
PART–II] LA GAZETTE DE L'ETAT
10. Scrutiny, Rejection and Approval by the Planning Authority.— After receipt of the online Application for regularization in the prescribed pro forma (Annexure-I) along with required documents and plans as per this Scheme, the Planning Authority (or) and the Town and Country Planning Department shall carryout inspection, confirm the status of the building and scrutinize the Application. The Applications for regularization of ordinary residential and ordinary commercial buildings shall be disposed of by the Member-Secretary of the Planning Authority. The online Applications for regularization of buildings other than ordinary residential and ordinary commercial buildings shall be placed before the Planning Authority Committee, for its approval. The Planning Authority / Committee will examine whether the minimum safety and security provisions in the building are provided such as, clearance from overhead electric lines, availability of minimum width of road, availability of parking facilities, facilities for persons with disabilities, fire escape staircases, lift, provisions for waste disposal, rainwater storage arrangements, solar assisted water heating and lighting systems and any other provisions in the building Bye-Laws having serious safety and security concerns. The buildings having outright violations that exceed the limits of regularization tolerance as above shall not be considered by the Planning Authority / Committee and its decision shall be communicated to the Applicant. The Applicant shall comply with the directions of the Planning Authority Committee within 30 days from the date of communication of the decision. The Planning Authority shall communicate its approval or rejection to the Applicant, as early as possible, but not beyond six months from the date of receipt of online Applications (Annexures-V and VI). Mere submission of online Application or any delay in communication of final orders in the matter by the Planning Authority will not be construed as Approval.
11. Regularization of individual flats.— (1) Individual flats in a building shall be regularized following two stage process. Wherein, the registered Association or Society of the building has to submit drawings for the entire building along with detailed infrastructure drawings. Individual flat owner shall submit detailed drawings for the unit owned by him in the building. Scrutiny, subject to clause (10) shall be made as follows:
(i) An in-principle clearance shall be given for the entire building in which the said residential / commercial flat is situated.
916 LA GAZETTE DE L'ETAT [PART–II
(ii) If, the entire building is found approvable, then regularization of the individual flat / floor under reference shall be done.
(2) The Planning Authority Committee shall decide the regularization charges that is to be paid in common by the registered Association or Society and that is to be paid by the individual for their individual flat / floor of the building.
12. Issue of proceedings showing Regularisation of the Buildings and Occupancy Certificate (Annexure-V).— In case of approval, the Planning Authority shall issue proceedings to the effect that the building is regularized under this Scheme and the proceedings issued by the Planning Authority itself shall be treated as Occupancy Certificate. In case of incomplete buildings, Occupancy Certificate shall be issued only after the verification of the completion of buildings, in all aspects.
13. Consequences of non-regularization.— Where no regulations is ordered under this Scheme for an unauthorised / deviated building; then-
(a) No electricity, water supply, drainage and sewerage connections shall be extended to such unauthorised/deviated building;
(b) Such unauthorised / deviated building shall not be
registered by the Registration Department.
(c) Such unauthorized constructions would be treated as continuing offence and penalty as per the Act / Rules would be levied.
(d) Other enforcement action including sealing/demolition shall be initiated by the Planning Authority as per the Building Bye-Law provisions.
(e) Unless the existing buildings in a site are regularised, no fresh building Applications shall be considered by the Planning Authority.
14. Infrastructure Development Fund.— (i) All the fees arising under this Scheme shall be kept in a separate corpus fund by the respective Planning Authority. Such funds shall be utilized by the Planning Authority for the purpose of augmentations, improvements or creation of an infrastructure facility in order to ease the pressure on the infrastructure occurred due to the deviation.
917
PART–II] LA GAZETTE DE L'ETAT
(ii) The following Committee on Infrastructure shall be
constituted for each region as follows:
I. Puducherry Planning Area
(a) Chief Secretary
. . Chairman
(b) Secretary (Public Works Department) . . Member
(c) Secretary (Town and Country Planning) . . Member
(d) Secretary (Local Administration) . . Member
(e) Chief Engineer, Public Works Department . . Member
(f) Member-Secretary,
. . Convenor
Puducherry Planning Authority.
II. Karaikal Planning Area
(a) District Collector, Karaikal District . . Chairman
(b) Municipal Commissioner,
. . Member
Karaikal Municipality.
(c) Deputy Director,
. . Member
Local Administration Department.
(d) Superintending Engineer,
. . Member
Public Works Department, Karaikal.
(e) Member-Secretary,
. . Convenor
Karaikal Planning Authority.
III. Yanam Planning Area
(a) Regional Administrator, Yanam . . Chairman
(b) Municipal Commissioner, Yanam Municipality . . Member
(c) Executive Engineer,
. . Member
Public Works Department, Yanam region
(d) Member-Secretary, Yanam Planning Authority . . Convenor 918 LA GAZETTE DE L'ETAT [PART–II
IV. Mahe Planning Area
(a) Regional Administrator, Mahe . . Chairman
(b) Municipal Commissioner, Mahe Municipality . . Member
(c) Executive Engineer,
Public Works Department, Mahe region . . Member
(d) Member-Secretary, Mahe Planning Authority . . Convenor
(iii) This Committee shall examine the requirement of the
infrastructure projects for the respective planning areas and recommend
the executing agency for that works.
(iv) Based on the Committee recommendation, the Planning
Authority shall deposit the work to the executing agency and the works
to be completed following the due procedure by the executing authority.
15. Appeals.— (i) Any person aggrieved by any Order passed
under the Scheme by the Planning Authority may prefer an Appeal to
the Committee viz., Town and Country Planning Board, within 30 days
from the date of receipt of the Order.
(ii) The Town and Country Planning Board shall dispose of the
Appeals, as per the provisions contained in the Act / Rules.
(By order of the Lieutenant-Governor)
S. MURUGESAN,
Under Secretary to Government (Housing).
————
919
PART–II] LA GAZETTE DE L'ETAT
ANNEXURE-I 920 LA GAZETTE DE L'ETAT [PART–II 921
PART–II] LA GAZETTE DE L'ETAT
922 LA GAZETTE DE L'ETAT [PART–II 923
PART–II] LA GAZETTE DE L'ETAT 924 LA GAZETTE DE L'ETAT [PART–II 925
PART–II] LA GAZETTE DE L'ETAT
16. INDEMNITY BOND AND UNDERTAKING
(Notarized undertaking to be executed on
100 Non-Judicial e-stamp paper)
1. This Undertaking / Indemnity bond is executed on this ................................................................................... day of 20 ................. at .................................................... by the Owner / Applicant, (hereinafter called the first party) which terms shall include their legal heirs, successors, agents, assignees etc.
A Name and Address of the Owner/Applicant (First Party)
(1) Name
:
(2) Age
:
(3) S / D / W / o.
:
(4) Door / Plot / Flat No. :
(5) Road / Street
:
(6) Locality :
(7) Village / Town / City : PIN :
(8) District
:
(9) e-Mail
:
(10) Phone / Mobile No. :
B Location of the Building
(1) Plot / Door No.
:
(2) R.S. No. / T.S. No. :
(3) Ward No. / Block No. :
(4) Street / Road Name :
(5) Layout / Nagar Name :
(6) Village Name :
(7) Municipality / Commune Name :
2. Executed in favour of the Member-Secretary, .................... Planning Authority, (hereinafter called the second party) which term shall include their officers, successors in office and staff.
926 LA GAZETTE DE L'ETAT [PART–II
3. Declaration-cum-Undertaking and Indemnity Bond by the Owner /
Applicant:
(a) Whereas, the FIRST PARTY has applied for the regularisation of the unauthorized constructed / deviated building constructed to a total built up area ................ sq.m. Whereas, the SECOND PARTY has agreed to consider regularisation of the unauthorized construction/deviation in the said site / plot in terms of the Puducherry one-time regularization Scheme for the unpermitted constructions and deviations 2025 and made it a condition that there shall not be any defect / litigations / land acquisition over the said site / land and the same shall be free from all claims of Government/Banks / and attachment of Courts, and the FIRST PARTY has to indemnify the SECOND PARTY to this effect.
And whereas, the FIRST PARTY having agreed to the aforesaid condition hereby indemnifies the SECOND PARTY with the above assurance and hereby solemnly declare that the abovesaid site / land is the property of the FIRST PARTY which is possessed by him / her since, the date of purchase and the same is free from all defects, litigations, claims and attachments from any Courts, etc., and in case of any disputes / litigations arises at any time, in future, the FIRST PARTY will be responsible for the settlement of the same and the SECOND PARTY will not be a party to any such disputes/litigations.
(b) I / We affirm that I / We shall not encroach any Government land / canal / road portion adjoining or passing the plot / land, in any manner. If any such encroachment is found at the later stage, the regularisation of the building shall be deemed to be revoked and shall be liable to be dealt as per law and the Planning Authority shall not be held responsible. (c) I / We affirm that I / We shall pay necessary fees/ charges to the Planning Authority.
4. I/We, the above named deponent, do hereby solemnly affirm and certify that we have executed this undertaking with free will and signed this ........................... day of ......................... 20 .......................... .
Name of the Owner / Applicant :
Address
:
Signature
:
Sworn and signed before me.
Notary 927
PART–II] LA GAZETTE DE L'ETAT
17. LIST OF DOCUMENTS TO BE ENCLOSED ALONGWITH THE APPLICATION
Details of documents
1. Sanctioned Plan copy.
2. Copy of Ownership Document/Title Deed for land / site / flat
self-attested.
3. Plans prepared by Registered Technical Personnel and signed by
Applicant and RTP.
4. Self Computation Table for Regularisation charge.
5. e-transfer receipt in favour of the Member-Secretary, Planning Authority separately towards (i) Application and Scrutiny fee and (ii) the Regularisation Charge.
6. Encumbrance certificate of land / site / apartment for the past 15 years issued not prior to 30 days from the date of submitting the online Application.
7. 4 Nos. of time stamped photographs from four sides of the unauthorised construction showing all external details of development, which is signed by the owner and the Registered Technical Personnel.
8. Indemnity Bond and Undertaking.
9. NOC from the Fire Service Department / Airport Authority of India / Archaeological Survey of India / Railways or any State / Central Government Organisations (wherever applicable).
10. Proof for the period of completion of the construction/structural works completed/ roof laid (copy of property tax/electricity/water supply bills).
11. Weighted Guideline Rate value of the plot as on date of Application.
928 LA GAZETTE DE L'ETAT [PART–II 929
PART–II] LA GAZETTE DE L'ETAT 930 LA GAZETTE DE L'ETAT [PART–II
ANNEXURE – II
(See clause 6)
REGULARISATION CHARGES FOR UNAUTHORISED
CONSTRUCTION / DEVIATION
1. Regularisation charges for unauthorised deviated construction
If, a building or part thereof has been constructed deviating from the
approved plan of the Planning Authority, the same shall be regularised
at the rates provided in the Table below.
Table
Type of building constructed Rate per sq. m. (in )
deviated from the approved plan
(a) Residential buildings. 500
(b) Mixed use buildings and 750
Special buildings.
(c) Multi-storeyed buildings. 1,000
(d) Government buildings. Exempted from the payment of
Regularisation Charges. However,
t h e b u i l d i n g s h o u l d b e g o t
regul arise d from t he Planning
Authority.
(e) Government aided schools 50% of (b) or (c) as applicable
above.
2. Regula risat ion charg es for una ut horise d c onstr uc tion
If, a building or part thereof has been constructed unauthorisedly, i.e.,
without obtaining the requisite building permission from the Planning
Authority, as required under the Building Bye-Laws, the same shall be
regularised at the rates as stipulated in the above Table with a multiplication
factor of 1.2.
931
PART–II] LA GAZETTE DE L'ETAT
ANNEXURE – III
(See clause 4)
......................................... PLANNING AUTHORITY
No. ........................... Date :
INTIMATION REGARDING ADDITIONAL PARTICULARS TO BE FURNISHED FOR REGULARISATION OF UNAUTHORISED CONSTRUCTIONS/DEVIATIONS
To :
Tmt./Thiru ...........................................
..................................... ... ... ... ............. ..
..................................... ... ... ... ............. ..
Sir/Madam,
Your online Application No. ........................., date ........................., fo r t he r egul a ri sa ti o n of u na ut hor is ed c o ns t r uc ti on / de vi a t i o n at .......................................................... (precisely state the location of the building) has been examined by the .............................................. Planning Authority.
The Planning Authority Committee has approved the above- mentioned unauthorised construction for regularisation in accordance with the provisions in "The Puducherry one-time regularization Scheme for the unpermitted constructions and deviations 2025", under the following conditions.
(1)
(2)
(3)
In accordance to the above, you are directed to comply with all the above conditions and submit a letter of intimation to the Member-Secretary to the effect that the above conditions are compiled alongwith the following documents within ................. days.
Member-Secretary
................................ Planning Authority 932 LA GAZETTE DE L'ETAT [PART–II
ANNEXURE – IV
(See clause 6)
......................................... PLANNING AUTHORITY
No. ........................... Date :
INTIMATION REGARDING REMITTANCE OF
REGULARISATION CHARGES FOR REGULARISATION
OF UNAUTHORISED CONSTRUCTIONS / DEVIATIONS
To :
Tmt./Thiru ...........................................
..................................... ... ... ... ............. ..
..................................... ... ... ... ............. ..
Sir/Madam,
It is hereby acknowledged that the receipt of the NOC's and other
documents for the regularisation of the building constructed by you
at .....................................................................................................................
You are directed to remit the regularisation charges of ......................,
by e-transfer in the name of the Member-Secretary, ............................
Planning Authority within 30 days from the receipt of this notice, failing
which your application will be refused and further action will be taken
on the unauthorised construction/deviations as per the Puducherry
Town and Country Planning Act and the Puducherry Building Bye-Laws
and Zoning Regulations.
Member-Secretary
................................ Planning Authority 933
PART–II] LA GAZETTE DE L'ETAT
ANNEXURE – V
(See clauses 10 and 12)
......................................... PLANNING AUTHORITY
No. ........................... Date :
FINAL ORDERS REGARDING REGULARISATION OF
UNAUTHORISED CONSTRUCTION / DEVIATION
To :
Tmt./Thiru ...........................................
..................................... ... ... ... ............. ..
..................................... ... ... ... ............. ..
Sir/Madam,
Your online application No. .........................., date ..........................
for the regularisation of unauthorised construction at ..........................
.............................................. (precisely state the location of the building)
has been considered by the .......................... Planning Authority.
The Planning Authority Committee has approved the above-
mentioned unauthorised construction for regularisation in accordance
with the provisions in "The Puducherry one-time regularization Scheme
for the unpermitted constructions and deviations 2025" vide Order
No. .........................., date ...................... under the following conditions:
(1)
(2)
The conditions stipulated in the order were complied with and the
following NOCs were submitted:
(1)
(2) 934 LA GAZETTE DE L'ETAT [PART–II
The regularisation charges of ................................... as stipulated in the order have been remitted vide e-transfer No. ..............................., date .......................................... Hence, in accordance to the orders of the Committee, it is certified that the unauthorised construction of ...................................... building at ................................... (precisely mention the location of the building) is hereby regularised under the provisions of "The Puducherry one-time regularization Scheme for the unpermitted constructions and deviations 2025".
Member-Secretary
................................ Planning Authority
————
ANNEXURE – VI
(G.O. Ms. No. 12/2025-Hg, dated 15-07-2025)
(See clause 10)
......................................... PLANNING AUTHORITY
No. ........................... Date :
ORDER REJECTING THE REGULARISATION APPLICATION
To :
Tmt./Thiru ...........................................
..................................... ... ... ... ............. ..
..................................... ... ... ... ............. ..
Sir/Madam,
Whereas, your online Application for the regularisation of the unauthorised construction at ................................................... (precisely mention the location of the site) has been examined as per the provisions of "The Puducherry one-time regularization Scheme for the unpermitted constructions and deviations 2025" has been rejected due to the following reasons:
(1)
(2) 935
PART–II] LA GAZETTE DE L'ETAT
Now, therefore, in pursuance of the provisions in "The Puducherry one-time regularization Scheme for the unpermitted constructions and deviations 2025", it is hereby informed that your Application for regularisation is hereby refused and your unauthorized construction cannot be regularised.
Member-Secretary
................................ Planning Authority
Date :
Place :
————
online publication at "https://styandptg.py.gov.in" Published by the Director, Government Press, Puducherry.