In regard to policy notified by the Government on Construction of Water Storage Ponds for Water Cons

Published 26 February 2024

Department
Directorate of Water Supply
Type
Extra Ordinary
Notification no.
WR-IRWR014/3/2024-IW2/790947/2024
Gazetteid
CHD/0092/2024-26
Identifier
in.gazette.punjabdsa.2024-02-26.62881
Languages
English, Punjabi

click here for IIIF manifest

2190
PUNJAB GOVT. GAZ. (EXTRA), FEBRUARY 26, 2024 (PHGN 7, 1945 SAKA)

EXTRAORDINARY

Published by Authority

CHANDIGARH, MONDAY, FEBRUARY 26, 2024 (PHALGUNA 7, 1945 SAKA)

GOVERNMENT OF PUNJAB

WATER RESOURCES DEPARTMENT

(Works Branch)

NOTIFICATION

The 26th February, 2024

No. WR-IRWR014/3/2024-IW2/790947/2024.–In regard to policy notified by the Government on Construction of Water Storage Ponds for Water Conservation, 2024 issued vide no. WR-IRWR014/3/2024- IW2/445 Dated, Chandigarh:30.01.2024, the proposed SOP is detailed as below:-

Sr. Procedure

Timeline No.

(in days) 1. The applicant/bidder will submit its application to Executive Engineer/Canals T0+1=T1 (Head office) along with filled Application/Registration form (Annexure-A) including

below documents.

i. Copy of purchase agreement or ownership deed,

ii. site plan,

iii. design of pond (including proposed depth)

iv. lithology report of area by Pilot bore upto 15 m depth from lab accredited by NABL,

v. the design of connectivity of pond with the existing source of canal water,

vi. consent of all the owners falling along the way of water course or pipeline.

The Executive Engineer/Canals will accept the application, in case all the documents

are Annexed or otherwise the application will be rejected. The accepted case will then be

directly sent to concerned Executive Engineer/Canals in field.

2. The concerned Executive Engineer/Canals (field) will check the documents submitted T1+5=T2 by the applicant along with the feasibility of the proposal submitted by taking report from its

Sub Divisional officer/Ground Water (deputed in the field Canal Divisions) regarding:-

i. the area assessment report

ii. verification of consent of all the owners falling along the way of water course or

( 2190 )PUNJAB GOVT. GAZ. (EXTRA), FEBRUARY 26, 2024 (PHGN 7, 1945 SAKA) 2191 pipeline annexed with application,

iii. Field level report

iv. Connectivity of pond from canal (RD and type of regulator structure (outlet)

3. The case will then be sent by the concerned Executive Engineer/Canals (field) T2+1=T3 to Design Water System for vetting the pond design.

4. After getting report from Design Water System, the case will be sent by CE/ T4+4=T5 DWS to Executive Engineer/Canals (Head office).

6. Executive Engineer/Canals will put up the case to the committee of Chief Engineers T5+2=T6 (CE/Canals & GW, CE/Drainage, CE/Vigilance & Quality assurance) who is the

competent authority for final decision of approval.

Total process time = 13 days

*Note- The applicant will be required to sign an agreement with the concerned Executive Engineer (Field) after submission of Bank Guarantee and the work will be started only after obtaining all the necessary approvals and compliances from the Competent Authorities such as NOCs from other department/ individual, Mining permit, Environment clearances etc.

The application proforma required to be filled by applicant is attached as Annexure-A.

Chandigarh

Principal Secretary, Govt. of Punjab, The 21st February, 2024 Department of Water Resource, Chandigarh.

2192 PUNJAB GOVT. GAZ. (EXTRA), FEBRUARY 26, 2024 (PHGN 7, 1945 SAKA)

Annexure-A

Performa for Application for registration for Water Storage Ponds under Water Conservation Policy

2024 (to be filled by an Agency/Bidder/Individual/L&C Society)

1. Name of the Agency/Bidder/individual/L&C Societies:

2. Name of Owner(s):

3. Contact details of Owner(s):

a. Contact no.:

b. E-mail id:

c. Address:

4. Address of Agency/individual/L&C Societies:

a. Plot/Khasra/Village:

b. Landmark:

c. City/Town:

d. Block:

e. District:

5. Registration/PAN/GST of Agency/individual/L&C Societies:

6. Area of land applied for storage pond (min. one acre):

7. Details of area alongwith copy of Fard:

a. Plot/Khasra/Village:

b. City/Town:

c. Block/District:

8. Whether copy of purchase agreement or ownership deed annexed (yes/no):

9. Whether site plan annexed (yes/no):

10. Whether design of pond annexed (yes/no):

11. Whether lithology report of bore of 15 m annexed by NABL accredited lab (yes/no):

12. Whether design of connection of canal water with pond is annexed (yes/no):

13. Whether consent of all the owners falling along the way of water course or pipeline to bring canal water to the pond is annexed (yes/no):

Declaration:

It is certified that, I apply for registration for Water Storage Pond under Water Conservation Policy 2024 and to abide by its conditions.

1. The land for Water Storage Pond shall be purchased by me and will be transferred to the Water Resources Department, Punjab, before starting the actual execution on the site, if the work is allotted.

2. The area shall be so selected that canal water can be made easily available to fill the pond.

3. Mining Permit and all other mandatory clearances including Environmental Clearance, if required, shall be obtained by me at my own level and cost before the start of the work from Department of Mines and Geology.

4. The expenditure for purchasing and mutation of land in name of Water Resources Department, PilotPUNJAB GOVT. GAZ. (EXTRA), FEBRUARY 26, 2024 (PHGN 7, 1945 SAKA) 2193 bore of area or any other site testing (required), excavation of Pond, fencing of pond, connectivity of pond with the existing source of canal water (as per approved by CE/Design Water System) shall be borne by me.

5. Only the excavated earth shall be used for creation of dowel or banks around the pond. Further, the surplus excavated earth available shall be disposed off by me at my own expense and necessary royalty as applicable will be paid by me.

6. The Bank Guarantee amounting to Rs. 10 lacs shall be deposited by me in the name of Chief Engineer/ Headquarter, Water Resources, Punjab via demand draft (till the time online portal is made operational) which shall be released after the water is released in the pond and pipe network is made operational. If any disposal of the earth takes place then the requisite charges of mining as admissible from time to time shall be deposited by me.

7. The pond site will be handed over to the Department of Water Resources only after completion of excavation work, construction of bundh, construction of infrastructure for connecting pond with canal source and requisite regulation structure.

8. Consent of all the owners falling along the way of water course or pipeline to bring canal water to the pond shall be obtained at my own level and cost and submitted along with the proposal/bid.

9. Before execution on site, an information board showing details/drawing of the pond will be installed at pond site at my own level and cost.

10. The agency shall leave the site clean to the full satisfaction of the Department of Water Resources and relinquish all the rights and liabilities.

11. The Water Resources Department, Punjab will not be a party for any dispute or loss incurred of the applicant with any department or individual.

Date _______________

Owner's (Applicant's) Signature