M/s Farmergrow Organic Foods, having its manufacturing unit located at Khatoni No. 270 to 284, Murab

Published 23 January 2026

Department
Power
Type
Ordinary
Notification no.
No.ENRG/10/201/2025-ENERGY/3111
Category
Part - I
Gazetteid
CHD/0092/2024-2026
Notification Date
23-12-2025
Notification For
Other notification
Identifier
in.gazette.punjabdsa.2026-01-23.90251
Languages
English, Punjabi

click here for IIIF manifest

PART I] PUNJAB GOVT. GAZ., JANUARY 23, 2026 (MAGHA 3, 1947 SAKA) 197

Published by Authority

No. 4] CHANDIGARH, FRIDAY, JANUARY 23, 2026 (MAGHA 3, 1947 SAKA)

PART I

Punjab Government Notifications and Orders

GOVERNMENT OF PUNJAB

DEPARTMENT OF POWER

(ENERGY BRANCH)

NOTIFICATION

The 23rd December, 2025

No.ENRG/10/201/2025-ENERGY/3111.-ln exercise of the powers conferred by section 12 of the Punish Electricity (Duty) Act, 2005 (Punjab Act No. 9 of 2005), and all other powers enabling him in this behalf, the Governor of Punjab is pleased to grant hundred percent (100%) exemption to M/s Farmergrow Organic Foods, having its manufacturing unit located at Khatoni No. 270 to 284, Murabba No. 108 Khewat No. 137, NH62, Satyam College, Abohar, District Fazilka, from the payment of electricity duty (except Social Security Fund and Infrastructure Development Fund etc.) for a period of ten years, under the Industrial and Business Development Policy, 2022 in public interest, subject to the following conditions, namely:

CONDITIONS

(i) the exemption shall be granted to the said Firm for manufacturing of Wheat Flour, Refined Wheat Flour, Granulated Wheat, Chokar, as per the conditions contained in the Eligibility Certificate issued by the Convenor-cum-General Manager, District Level Committee, District Industries Centre, Fazilka, vide Endorsement No. 2196, dated the 03rd October, 2025;

(ii) the exemption shall be granted from 15th March, 2024 to 14th March, 2034 or the date of exhaustion/ utilization of quantum of eligible incentive i.e. rupees 5,05,96,233/- (rupees five crore five lakh ninety six thousand two hundred thirty three only), whichever is earlier, as per the Eligibility Certificate dated the 03rd October, 2025. However, this exemption shall be available on the power consumption corresponding to the Electric Load (KW) required for the installed capacity as recorded in the approved DPR, (Proposed Electricity Load 750 KW), whichever is lower. However, the date of commercial production of the Unit is certified as 27th April, 2024;

(iii) in the event of any revision of rate of electricity duty at any subsequent point of time, the exemption to theextent of revised levied rate of electricity duty (except contributions out of electricity duty e. g. Social ( 197 ) 198 PUNJAB GOVT. GAZ., JANUARY 23, 2026 (MAGHA 3, 1947 SAKA) PART I] Security Fund etc.) shall be applicable to the Unit; (iv) the usage of the power by the Firm during the aforesaid period shall be regulated through a transparent metering arrangement installed or approved by the Punjab State Power Corporation Limited and the Chief Electrical Inspector to record the consumption of the Unit under exemption;

(v) the exemption shall not be applicable for the residential area of the said premises and to that effect, an undertaking shall be submitted by the Unit that no residential area exists in the premises. If there is a residential area in the premises, in that event, a separate meter has to be installed or a separate electricity connection shall be obtained in order to record the electricity consumption of that residential area, which shall be excluded from the total electricity consumption of the Unit;

(vi) It shall be ensured that the Firm does not connect the load of any other Unit with this Unit for the purpose of availing exemption from electricity duty;

(vii) the exemption shall be strictly in accordance with the Eligibility Certificate issued by the Conenor-cum- General Manager, District Level Committee, District Industries Centre, Fazilka, vide Endorsement No. 2196, dated the 03rd October, 2025; and

(viii) In case any exemption claimed in excess is detected at any point of time, it shall be liable for recovery and penal action under the provisions of the said Act.

To ensure the compliance of the above conditions and proper utilization of incentive. the Auditor of the office of the Chief Electrical Inspector may inspect the Unit at any time. In case, any violation of any of the provisions of the said Act and the rules made thereunder and the above conditions is detected, the owner of the Unit shall be liable for action under section 8 of the said Act and the rules made thereunder and the exemption shall automatically cease for which the owner of the Unit shall be responsible.

Sd/-

BASANT GARG,

Chandigarh

Administrative Secretary to Govt. of Punjab,

The 11th December, 2025

Department of Power.

3616/1-2026/Pb.Govt.Press, S.A.S. Nagar

Cite this issue. Punjab Gazette, Government of Punjab, 23 January 2026. Indian Gazettes, https://egazette.servantsofknowledge.in/details/in.gazette.punjabdsa.2026-01-23.90251/. Archive identifier in.gazette.punjabdsa.2026-01-23.90251.